GROUND FLOOR PLAN
SCALE:1/8"=1'-0"
A401
A - 101
DRAWING TYPES LEGEND
1 - PLANS (HORIZONTAL VIEWS)
2 - ELEVATIONS (VERTICAL VIEWS)
3 - SECTIONS (SECTIONAL VIEWS)
4 - ENLARGED VIEWS (PLANS, ELEVATIONS OR
SECTIONS THAT ARE NOT DETAIL VIEWS)
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
DISCIPLINE TYPE (ARCHITECTURE SHOWN)
DRAWING TYPE (PLAN, ELEVATION, ETC.,
SERIES NUMBER
DETAIL CALLOUT
ENLARGED PLAN OR DETAIL
ON SHEET INDICATED
A201
INTERIOR ELEVATION CALLOUT
ARROWS INDICATE INTERIOR
ELEVATION ON SHEET
INDICATED
STRUCTURAL GRIDS
AS INDICATED ON DRAWINGS
A
BUILDING SECTION CALLOUT
ARROWS INDICATE BUILDING
SECTION ON SHEET INDICATED
A301
WALL SECTION CALLOUT
ARROW INDICATE WALL SECTION ON
SHEET INDICATED
A302
ROOM NAME
ROOM NAME & NUMBER SYMBOL
REFER TO ROOM FINISH SCHEDULE ON
SHEET A-603
DOOR NUMBER SYMBOL
REFER TO DOOR SCHEDULE
SHEET A-601
PARTITION TYPE SYMBOL
REFER TO PARTITION TYPES
ON SHEET A-001
GLAZING TYPE SYMBOL
REFER TO GLAZING TYPES
ON SHEET A-602
A
AL1
REVISION SYMBOL
REFER TO SHEET BORDER FOR
REVISION HISTORY
ELEVATION DATUM SYMBOL
INDICATES DATUM ELEVATION
AS INDICATED
1 Bottom Text Top Text
DISCIPLINE MODIFIER (ELEMENTS SHOWN)
ARCHITECTURAL SYMBOLS LEGEND
D3
0 4' 8' 16'
PLAN DRAWING TITLE
BUILDING SECTION
SCALE:1/8"=1'-0" 0 4' 8' 16'
ALL OTHER DRAWING TITLES
SOLID BLACK NORTH
ARROW INDICATES PLAN
NORTH FOR EACH
SPECIFIC PLAN.
A301
EXTERIOR ELEVATION CALLOUT
ARROW INDICATE ELEVATION ON
SHEET INDICATED
A201
D3
N
101A
A. ALL INTERIOR PATCH AND INFILL PARTITIONS SHALL
BE TYPE "A1" - UNLESS NOTED OTHERWISE
B. ALL GYPSUM WALL BOARD SHALL BE 5/8" TYPE "X",
FIRE RESISTANT.
C. PROVIDE CONTINUOUS 20 GAGE DEFLECTION TRACK
(2 1/2" DEEP LEG TRACK) AND 20 GAGE UPPER
HORIZONTAL SPACER BARS AT ALL INTERIOR
PARTITIONS EXTENDED TO DECK.
D. SUBSTITUTE 5/8" TYPE "X", FIRE RESISTANT TILE
BACKER BOARD AT ALL LOCATIONS SCHEDULED TO
RECEIVE WALL TILE.
E. ALL SOUND ATTENUATION, UNFACED ACOUSTICAL
BATTS WHERE INDICATED OR NOTED SHALL FILL THE
STUD CAVITY AND SHALL BE UNFACED, 2.5 PCF -
INSTALLED CONTINUOUS VERTICALLY, CUT TIGHT TO
FIT.
F. AT ALL WALLS, SEAL ALL PENETRATIONS WITH
MINERAL WOOL OR ACOUSTICAL SEALANT.
TYPICAL PARTITION NOTES
FINISH FLOOR
DECK
3-5/8" STUDS
AT 16"
OC(BOTH
SIDES)
5/8" GYP BD
(BOTH SIDES)
SLOTTED DEFL
TRACK (BOTH SIDES)
SCHEDULED CLG
STEEL RUNNER
CHANNEL
(BOTH SIDES)
FINISH
FLOOR
NON-RATED PARTITION WITH
12" CMU IN LIEU OF 8" CMU
DECK
SCHEDULED
CLG8" CMU
1 HR. RATED PARTITION WITH 8" CMU
IBC TABLE 720.1, MATERIAL 3
1 HR. RATED PARTITION WITH 12" CMU
IBC TABLE 720.1, MATERIAL 3
2 HR. RATED PARTITION WITH 8" CMU
IBC TABLE 720.1, MATERIAL 3
2 HR. RATED PARTITION WITH 12" CMU
IBC TABLE 720.1, MATERIAL 3
1 HR. RATED SHAFT WALL
PARTITION AS SHOWN
H1
1" TYPE "X"
SHAFT LINER
PANEL
FINISHED
FLOOR
DECK
2 1/2" C-H
STUDS
AT 24" OC
5/8" TYPE "X"
GYP BD
STEEL RUNNER
CHANNEL
SCHEDULED CLG
NON-RATED PARTITION
NON-RATED PARTITION AS
SHOWN ABOVE WITH UNFACED
ACOUSTICAL BATTS
A2
A1
A3
5/8" TYPE "X" GYP
BD (BOTH SIDES)
1 HR. RATED PARTITION
UL # U419
1 HR. RATED PARTITION AS
SHOWN WITH UNFACED
ACOUSTICAL BATTS
NON-RATED PARTITION AS SHOWN ABOVE
WITH UNFACED ACOUSTICAL BATTS AND
EXTENDING GYPSUM BOARD TO DECK
B2
B1
B3
1 HR. RATED PARTITION WITH
6" STUDS AND UNFACED
ACOUSTICAL BATTS
FINISH FLOOR
5/8" GYP BD
SCHEDULED
CLG
STEEL RUNNER
CHANNEL
1-5/8" STUDS
AT 16" OC
NON-RATED FURRING
PARTITION
D1
D2
D3
D4
NON-RATED FURRING
PARTITION WITH 2-1/2" STUDS
IN LIEU OF 1-5/8" STUDS
NON-RATED FURRING
PARTITION WITH 3-5/8" STUDS
IN LIEU OF 1-5/8" STUDS
NON-RATED FURRING
PARTITION WITH 3-5/8" STUDS
AND UNFACED ACOUSTICAL
BATTS IN LIEU OF 1-5/8" STUDS
NON-RATED FURRING
PARTITION
C1
FINISH FLOOR
5/8" GYP BD
SCHEDULED
CLG
6" M
IN
7/8" FURRING
CHANNEL AT
16" OC
EXISTING
CONSTRUCTION
FINISH FLOOR
DECK
SLOTTED
DEFL TRACK
SCHEDULED
CLG
STEEL RUNNER
CHANNEL
3-5/8" STUDS
AT 16" OC
PROVIDE UL ASSEMBLY
HW-D-0042 TO DECK
5/8" GYP BD
(BOTH SIDES)
FINISH
FLOOR
DECK
SLOTTED
DEFL TRACK
SCHEDULED CLG
STEEL RUNNER
CHANNEL
1 HR. RATED PARTITION
AS SHOWN
J1
6" M
IN
BASE AS
SCHEDULED
BASE AS
SCHEDULED
BASE AS
SCHEDULEDBASE AS
SCHEDULED
BASE AS
SCHEDULED
BASE AS
SCHEDULED
3-5/8" STUDS
AT 16" OC
SLOTTED
DEFL TRACK
NON-RATED PARTITION AS SHOWNF1
F2
G1
G2
G3
G4
NON-RATED FURRING PARTITION
WITH 1-1/2" FURRING CHANNEL IN
LIEU OF 7/8" CHANNEL
C2
STEEL RUNNER
CHANNEL
A4
NON-RATED PARTITION AS SHOWN
ABOVE WITH 6" STUDS IN LIEU OF
3-5/8" STUDS
PROVIDE UL ASSEMBLY
HW-D-0042 TO DECK
FINISH
FLOOR
DECK
SCHEDULED CLG
8" CMU
PROVIDE UL ASSEMBLY
HW-D-0042 TO DECK
BASE AS
SCHEDULED
BASE AS
SCHEDULED
FIRE STOPPING
FIRE STOPPING
6" M
IN
A5 NON-RATED PARTITION AS SHOWN ABOVE
AND EXTENDING GYPSUM BOARD TO DECK
2 HR. RATED PARTITION AS
SHOWN WITH UNFACED
ACOUSTICAL BATTS
DECK
2 LAYERS 5/8"
GYP BD (BOTH
SIDES) SCHEDULED
CLG
STEEL RUNNER
CHANNEL
3-5/8" STUDS
AT 16" OC
2 HR. RATED PARTITION WITH
6" STUDS IN LIEU OF 3-5/8"
STUDS
2 HR. RATED PARTITION WITH 6"
STUDS UNFACED ACOUSTICAL
BATTS IN LIEU OF 3-5/8" STUDS
PROVIDE UL ASSEMBLY
HW-D-0042 TO DECK
2 HR. RATED PARTITION
UL # 419K1
K2
K3
K4
BASE AS
SCHEDULEDFINISH FLOOR
5/8" GYP BD
(BOTH SIDES)
FINISH FLOOR
DECK
SLOTTED
DEFL TRACK
SCHEDULED
CLG
STEEL RUNNER
CHANNEL
3-5/8" STUDS
AT 16" OC
PROVIDE UL ASSEMBLY
HW-D-0042 TO DECK
BASE AS
SCHEDULED
SMOKE PARTITIONL1
FIRE STOPPING CONT SEALANT
10"
2 HR. RATED SHAFT WALL
PARTITION - UL #420
M1
1" TYPE "X"
SHAFT LINER
PANEL
FINISHED
FLOOR
DECK
6" C-H
STUDS
AT 24" OC
2 LAYERS 5/8"
TYPE "X" GYP BD
STEEL RUNNER
CHANNEL
SCHEDULED CLG
BASE AS
SCHEDULED
SLOTTED
DEFL TRACK
PROVIDE UL ASSEMBLY
HW-D-0042 TO DECK
FIRE STOPPING
A6
NON-RATED PARTITION AS SHOWN ABOVE
WITH 8" STUDS AND EXTENDING GYPSUM
BOARD TO DECK
B4
1 HR. RATED PARTITION WITH
6" STUDS
NON-RATED FURRING
PARTITION WITH 7/8" FURRING
CHANNEL, 5/8" TILE BACKER
BOARD IN LIEU OF 5/8" GYP BD.
C3
1 HR. RATED SHAFT WALL
PARTITION AS SHOWN ABOVE
WITH 6" C-H STUDS IN LIEU
OF 2 1/2"
H2
PROVIDE UL ASSEMBLY
HW-D-0042 TO DECK
FIRE STOPPING
D5
NON-RATED FURRING PARTITION
WITH 6" STUDS UP TO STRUCTURE
IN LIEU OF 1-5/8" STUDS
UNRATED DEMOUNTABLE PARTITIONDM1
SCHEDULED
CEILING
MOUNTING SILL
TRACK
CEILING CHANNEL
PANEL W/ SCHEDULED
FINISH
3' -0
"H
EI
G H
T
NOTE: DEMOUNTABLE PARTITIONS
ARE NOT INCLUDED IN SCOPE OF
WORK, U.N.O.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:2
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
PARTITION TYPES & SYMBOLS LEGEND
CEM
GAK
GMD 97
A-001
A-001
SCALE: 1 1/2" = 1'-0"
1 PARTITION TYPES
6" 1'-6"1'0
1 1/2" = 1'-0"
DN
UP
T T
T
T
T
DN
A A
B B
C C
D D
E E
F F
G G
H H
J J
K K
L L
M M
N N
P P
M
AT
C H
LI
N
E S
EE
1/
A D
-1
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-104
MATCH LINE
SEE 1/AD-103
M
AT
C H
LI
N
E S
EE
1/
A D
-1
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-102
MATCH LINE
SEE 1/AD-101
P.1 P.1
16.1
16.1
0.9
0.9
GENERAL NOTES
A. ALL EXISTING SYSTEMS MUST BE MAINTAINED
THROUGHOUT CONSTRUCTION. COORDINATE WITH
THE OWNER ANY PRE-APPROVED DISRUPTION AND
VERIFICATION OF SERVICE WITHIN THE EXISTING
BUILDING SO AS TO MINIMIZE THE DISRUPTION
OF SERVICE.
B. COORDINATE ALL DEMOLITION PHASING EFFORTS
WITH THE OWNER/ARCHITECT. EVERY EFFORT SHALL
BE MADE TO MINIMIZE THE DISRUPTION OF
OPERATIONS, AND PROVIDE SAFETY FOR THE
OCCUPANTS. EXCESSIVE NOISE OR VIBRATION
SHALL BE PRE-APPROVED AND COORDINATED
WITH THE OWNER.
C. VERIFY ALL EXISTING CONDITIONS AND NOTIFY
THE ARCHITECT/OWNER OF ANY DISCREPANCIES
D. REMOVE ALL DEMOLITION MATERIALS FROM
THE SITE UNLESS NOTED OTHERWISE. THE OWNER
SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS. COORDINATE WITH OWNER.
E. PROVIDE PROTECTION FOR ALL EXISTING
BUILDING MATERIALS AND EQUIPMENT FROM
DAMAGE DUE TO ANY DEMOLITION OR
CONSTRUCTION RELATED ACTIVITY PERFORMED
UNDER THIS CONTRACT.
F. REPAIR OR REPLACE ANY WALLS, FLOORS,
OR EQUIPMENT DAMAGED AS A RESULT OF
DEMOLITION OR CONSTRUCTION TO MATCH
EXISTING FINISH AND CONDITION.
G. THE CONTRACTOR SHALL COORDINATE WITH
THE OWNER/A/E ANY MATERIALS TO BE REUSED AND
WILL BE RESPONSIBLE FOR VERIFYING AND MAINTAINING
THE FUNCTIONAL AND AESTHETIC INTEGRITY OF
THE MATERIALS.
H. VERIFY AND MAINTAIN THE LOCATION OF EXISTING
POWER, COMMUNICATION AND DATA CABLES SO AS
TO NOT INADVERTENTLY INTERRUPT THE CONTINUITY
OF SERVICE.
I. PATCH ALL FLOOR, WALL AND CEILING PENETRATIONS
RESULTING FROM REMOVAL OR RE-ROUTING OF NEW
OR EXISTING PIPING, DUCTWORK, CONDUIT, ETC. AS
REQUIRED TO MAINTAIN FIRE SEPARATIONS. FINISH AS
REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.
J. CAP ALL DISCONNECTED MECHANICAL PIPING LINES
WITHIN THE WALL OR FLOOR. PATCH AND FINISH TO
MATCH NEW OR EXISTING ADJACENT SURFACES.
K. ALL CEILING AND WALL MOUNTED ITEMS INCLUDING
BUT NOT LIMITED TO LIGHTS, SPEAKERS, SMOKE OR
THERMAL DETECTORS SHALL BE REINSTALLED IN THEIR
ORIGINAL LOCATION AND CONDITION UNLESS
OTHERWISE NOTED.
L. CONSTRUCT TEMPORARY PARTITIONS WITHIN THE
EXISTING BUILDING WHICH OFFER A 1HR ENCLOSURE
TO ISOLATE ANY DEMOLITION CONSTRUCTION WORK
FROM THE GENERAL PUBLIC AND AS DEEMED
NECESSARY BY THE OWNER OR FIRE MARSHALL.
COORDINATE LOCATIONS WITH THE OWNER AND
MAINTAIN MEANS OF EGRESS THROUGHOUT WORK.
M. MAINTAIN SECURE, WEATHER-TIGHT ENCLOSURE AT
THE EXTERIOR OF THE EXISTING BUILDING
THROUGHOUT THE DEMOLITION/ CONSTRUCTION
PORTION OF THE WORK IN THAT AREA. BUILDING
SECURITY SHALL BE THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR AND COORDINATED WITH
THE OWNER.
N. REMOVE IN THEIR ENTIRETY ALL EXISTING WALLS,
DOORS, MILLWORK, PLUMBING FIXTURES, ETC
AS REQUIRED TO EXECUTE THE DEMOLITION/
CONSTRUCTION WORK DESCRIBED BY THE A/E.
O. SEE MECHANICAL AND ELECTRICAL DRAWINGS
AND NOTES FOR FURTHER SEQUENCING AND
SCOPE OF WORK.
P. AVOID ANY DISTURBANCE OF SOILS WITHIN THE
ZONE OF THE INFLUENCE AROUND EXISTING
FOOTINGS AND FLOOR SLABS AS DIRECTED BY
SOILS ENGINEER.
Q. AT ALL LOCATIONS WHERE ITEMS ARE CALLED
OUT TO BE REMOVED, THE CONTRACTOR IS TO PATCH
AND REPAIR WALL/FLOOR/CEILINGS AS REQUIRED
TO MATCH ADJACENT SURFACES EVEN IF NOT
SPECIFICALLY CALLED OUT IN DEMO LEGEND.
R. CONTRACTOR MUST REVIEW ALL SHEETS IN
ALL DISCIPLINES TO LOCATE ALL DEMO ITEMS.
NOT ALL DEMOLITION ITEMS ARE ON THE DEMO
SHEETS. FOR CLARITY SOME DEMO ITEMS ARE
IN DETAILS, SECTIONS, PLANS, ELEVATIONS, ETC.
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
NOT IN SCOPE
EXTENTS OF CONCRETE SLAB DEMOLITION
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:2
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
COMPOSITE BASEMENT DEMOLITION PLAN
CEM
GAK
GMD 98
AD-100
AD-100SCALE: 1/16" = 1'-0"
1 OVERALL BASEMENT DEMOLITION PLAN
0 8' 16' 32'
1/16" = 1'-0"
N
KEYPLAN
9 10 11 12 13 14 15 16
H
J
K
L
M
N
P
MATCH LINE
SEE 1/AD-102
4 6
4 6
COORDINATE PHASE 2
EXISTING CONCRETE
WALL CUT WITH DOOR
INSTALLATION AS
SHOWN ON 2/A-106
RR WOMEN
M
AT
C H
LI
N
E S
EE
1/
A D
-1
REFER TO 1/G-200
AND 1/G-201 FOR
SEQUENCING PLANS
2 2
2 2
2 2
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
NOT IN SCOPE
EXTENTS OF CONCRETE SLAB DEMOLITION
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:2
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
BASEMENT DEMOLITION - AREA 1
CEM
GAK
GMD 99
AD-101
AD-101
KEYPLAN
SCALE: 1/8" = 1'-0"
1 BASEMENT DEMOLITION - AREA 1
N
0 4' 8' 16'
1/8" = 1'-0"
UPUP
DN
A
9 10 11 12 13 14 15 16
B
C
D
E
F
G
MATCH LINE
SEE 1/AD-101
M
AT
C H
LI
N
E S
EE
1/
A D
-1
4 6
4 6
16.1
STORAGE
EXISTING
LOADING
DOCK
ELEV. EQUIP
CORRIDOR
CORR.
JAN.
CORRIDOR
EXISTING
STAIR
SERVICE
ELEV
18 18
DEMOLISH AS PART
OF PHASE 2B
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
NOT IN SCOPE
EXTENTS OF CONCRETE SLAB DEMOLITION
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:3
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
BASEMENT DEMOLITION - AREA 2
CEM
GAK
GMD 100
AD-102
AD-102
SCALE: 1/8" = 1'-0"
1 BASEMENT DEMOLITION - AREA 2
KEYPLAN
N
DN
J
J
J
J J
A
2 3 4 5 6 7 8
B
C
D
E
F
G
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-104
4 6
4 6
0.9
RR WOMEN
EXISTING
SPRAY ROOM
EXISTING
ELEC
EXISTING
ELEC
EXISTING
BATTERY
BACK UP
EXISTING
TEL/COM
RR WOMEN
CORR.
EXISTING
BOILER
AREA-WAY
ELEC VAULT
RR MEN
2 2
1'-1 3/4" 6'-4"
13 13
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
NOT IN SCOPE
EXTENTS OF CONCRETE SLAB DEMOLITION
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:3
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
BASEMENT DEMOLITION - AREA 3
CEM
GAK
GMD 101
AD-103
AD-103
KEYPLAN
SCALE: 1/8" = 1'-0"
1 BASEMENT DEMOLITION - AREA 3
N
T T
T
T
T
1 2 3 4 5 6 7 8
H
J
K
L
M
N
P
MATCH LINE
SEE 1/AD-103
M
AT
C H
LI
N
E S
EE
1/
A D
-1
4 6
4 6
0.9
EXISTING
WORK AREA
RR MEN
EXISTING
OFFICE
EXISTING
OFFICE
EXISTING
OFFICE
0421 EXISTING
CONFERENCE
ROOM
EXISTING
OFFICE
EXISTING
OFFICE
EXISTING
CORRIDOR
EXISTING
OFFICE
EXISTING
OPEN OFFICE
EXISTING
OFFICE
EXISTING
STORAGE
EXISTING.
TEL/COM
RR MEN
EXISTING
STUDIO
EXISTING
CIRCULATION
EXISTING
STUDIO
EXISTING
OPEN OFFICE
EXISTING
OFFICE
EXISTING
OFFICE
COORDINATE
PHASE 2
EXISTING
CONCRETE
WALL CUT
WITH DOOR
INSTALLATION
AS SHOWN
ON 1/A-106
WORK TO BE
INCLUDED IN
PHASE 2
19 12
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
NOT IN SCOPE
EXTENTS OF CONCRETE SLAB DEMOLITION
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:3
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
BASEMENT DEMOLITION - AREA 4
CEM
GAK
GMD 102
AD-104
AD-104
KEYPLAN
SCALE: 1/8" = 1'-0"
1 BASEMENT DEMOLITION - AREA 4
N
A A
B B
C C
D D
E E
F F
G G
H H
J J
K K
L L
M M
N N
P P
P.1 P.1
16.1
16.1
0.9
0.9
MATCH LINE
SEE 1/AD-112
MATCH LINE
SEE 1/AD-113
M
AT
C H
LI
N
E S
EE
1/
A D
-1
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-111
M
AT
C H
LI
N
E S
EE
1/
AD
-1
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-114
GENERAL NOTES
A. ALL EXISTING SYSTEMS MUST BE MAINTAINED
THROUGHOUT CONSTRUCTION. COORDINATE WITH
THE OWNER ANY PRE-APPROVED DISRUPTION AND
VERIFICATION OF SERVICE WITHIN THE EXISTING
BUILDING SO AS TO MINIMIZE THE DISRUPTION
OF SERVICE.
B. COORDINATE ALL DEMOLITION PHASING EFFORTS
WITH THE OWNER/ARCHITECT. EVERY EFFORT SHALL
BE MADE TO MINIMIZE THE DISRUPTION OF
OPERATIONS, AND PROVIDE SAFETY FOR THE
OCCUPANTS. EXCESSIVE NOISE OR VIBRATION
SHALL BE PRE-APPROVED AND COORDINATED
WITH THE OWNER.
C. VERIFY ALL EXISTING CONDITIONS AND NOTIFY
THE ARCHITECT/OWNER OF ANY DISCREPANCIES
D. REMOVE ALL DEMOLITION MATERIALS FROM
THE SITE UNLESS NOTED OTHERWISE. THE OWNER
SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS. COORDINATE WITH OWNER.
E. PROVIDE PROTECTION FOR ALL EXISTING
BUILDING MATERIALS AND EQUIPMENT FROM
DAMAGE DUE TO ANY DEMOLITION OR
CONSTRUCTION RELATED ACTIVITY PERFORMED
UNDER THIS CONTRACT.
F. REPAIR OR REPLACE ANY WALLS, FLOORS,
OR EQUIPMENT DAMAGED AS A RESULT OF
DEMOLITION OR CONSTRUCTION TO MATCH
EXISTING FINISH AND CONDITION.
G. THE CONTRACTOR SHALL COORDINATE WITH
THE OWNER/A/E ANY MATERIALS TO BE REUSED AND
WILL BE RESPONSIBLE FOR VERIFYING AND MAINTAINING
THE FUNCTIONAL AND AESTHETIC INTEGRITY OF
THE MATERIALS.
H. VERIFY AND MAINTAIN THE LOCATION OF EXISTING
POWER, COMMUNICATION AND DATA CABLES SO AS
TO NOT INADVERTENTLY INTERRUPT THE CONTINUITY
OF SERVICE.
I. PATCH ALL FLOOR, WALL AND CEILING PENETRATIONS
RESULTING FROM REMOVAL OR RE-ROUTING OF NEW
OR EXISTING PIPING, DUCTWORK, CONDUIT, ETC. AS
REQUIRED TO MAINTAIN FIRE SEPARATIONS. FINISH AS
REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.
J. CAP ALL DISCONNECTED MECHANICAL PIPING LINES
WITHIN THE WALL OR FLOOR. PATCH AND FINISH TO
MATCH NEW OR EXISTING ADJACENT SURFACES.
K. ALL CEILING AND WALL MOUNTED ITEMS INCLUDING
BUT NOT LIMITED TO LIGHTS, SPEAKERS, SMOKE OR
THERMAL DETECTORS SHALL BE REINSTALLED IN THEIR
ORIGINAL LOCATION AND CONDITION UNLESS
OTHERWISE NOTED.
L. CONSTRUCT TEMPORARY PARTITIONS WITHIN THE
EXISTING BUILDING WHICH OFFER A 1HR ENCLOSURE
TO ISOLATE ANY DEMOLITION CONSTRUCTION WORK
FROM THE GENERAL PUBLIC AND AS DEEMED
NECESSARY BY THE OWNER OR FIRE MARSHALL.
COORDINATE LOCATIONS WITH THE OWNER AND
MAINTAIN MEANS OF EGRESS THROUGHOUT WORK.
M. MAINTAIN SECURE, WEATHER-TIGHT ENCLOSURE AT
THE EXTERIOR OF THE EXISTING BUILDING
THROUGHOUT THE DEMOLITION/ CONSTRUCTION
PORTION OF THE WORK IN THAT AREA. BUILDING
SECURITY SHALL BE THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR AND COORDINATED WITH
THE OWNER.
N. REMOVE IN THEIR ENTIRETY ALL EXISTING WALLS,
DOORS, MILLWORK, PLUMBING FIXTURES, ETC
AS REQUIRED TO EXECUTE THE DEMOLITION/
CONSTRUCTION WORK DESCRIBED BY THE A/E.
O. SEE MECHANICAL AND ELECTRICAL DRAWINGS
AND NOTES FOR FURTHER SEQUENCING AND
SCOPE OF WORK.
P. AVOID ANY DISTURBANCE OF SOILS WITHIN THE
ZONE OF THE INFLUENCE AROUND EXISTING
FOOTINGS AND FLOOR SLABS AS DIRECTED BY
SOILS ENGINEER.
Q. AT ALL LOCATIONS WHERE ITEMS ARE CALLED
OUT TO BE REMOVED, THE CONTRACTOR IS TO PATCH
AND REPAIR WALL/FLOOR/CEILINGS AS REQUIRED
TO MATCH ADJACENT SURFACES EVEN IF NOT
SPECIFICALLY CALLED OUT IN DEMO LEGEND.
R. CONTRACTOR MUST REVIEW ALL SHEETS IN
ALL DISCIPLINES TO LOCATE ALL DEMO ITEMS.
NOT ALL DEMOLITION ITEMS ARE ON THE DEMO
SHEETS. FOR CLARITY SOME DEMO ITEMS ARE
IN DETAILS, SECTIONS, PLANS, ELEVATIONS, ETC.
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:4
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
COMPOSITE FIRST FLOOR DEMOLITION
PLAN
CEM
GAK
GMD 103
AD-110
AD-110
KEYPLAN
SCALE: 1/16" = 1'-0"
1 COMPOSITE FIRST FLOOR DEMOLITION FLOOR PLAN
0 8' 16' 32'
1/16" = 1'-0"
N
8 9 10 11 12 13 14 15 16
J
K
L
M
N
P
MATCH LINE
SEE 1/AD-112
12 1ABOVE
ABOVE
9 9 9 9
4 6
4 6
4 6
4 6
EXISTING
MECH
2 2 2 2 2 2
2 2
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:4
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
FIRST FLOOR DEMOLITION - AREA 1
CEM
GAK
GMD 104
AD-111
AD-111
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR DEMOLITION - AREA 1 1
KEYPLAN
N
A
9 10 11 12 13 14 15 16
B
C
D
E
F
G
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-111
9 9 9
10 5
4 6 15
4 6
4 6
4 6
16.1
12 12 12
EXISTING ATO
ROOM
EXISTING
STAIR
EXISTING SMF
DATA ROOM
EXISTING
MECH
SERVICE
ELEV
STOR.
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:4
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
FIRST FLOOR DEMOLITION - AREA 2
CEM
GAK
GMD 105
AD-112
AD-112
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR DEMOLITION - AREA 2
KEYPLAN
N
A
2 3 4 5 6 7 8
B
C
D
E
F
G
MATCH LINE
SEE 1/AD-114
M
AT
C H
LI
N
E S
EE
1/
A D
-1
ABOVE
9 9 9 9
4 6
4 6
4 6
4 6
4 6
4 6
4 6
4 6 4 6
0.9
B
AS
E
BI
D
EXISTING SMF
DATA ROOM
EXISTING
MECH
21 21
2 2
2 2
22 2
12 12
12 1121 121 121
19 19
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:5
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
FIRST FLOOR DEMOLITION - AREA 3
CEM
GAK
GMD 106
AD-113
AD-113
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR DEMOLITION - AREA 3
KEYPLAN
N
1 2 3 4 5 6 7 8
J
K
L
M
N
P
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-113
ABOVE
9 9
4 64 6
4 6
4 6
EXISTING
MECH
22 2 2
2 2
12 12 12
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:5
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
FIRST FLOOR DEMOLITION - AREA 4
CEM
GAK
GMD 107
AD-114
AD-114
KEYPLAN
SCALE: 1/8" = 1'-0"
1 FIRST FLOOR DEMOLITION - AREA 4
N
A A
B B
C C
D D
E E
F F
G G
H H
J J
K K
L L
M M
N N
P P
P.1 P.1
16.1
16.1
0.9
0.9
MATCH LINE
SEE 1/AD-122
MATCH LINE
SEE 1/A-121
M
AT
C H
LI
N
E S
EE
1/
A -1
M
AT
C H
LI
N
E S
EE
1/
A -1
M
AT
C H
LI
N
E S
EE
1/
A D
-1
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-123
MATCH LINE
SEE 1/AD-124
AD-125
GENERAL NOTES
A. ALL EXISTING SYSTEMS MUST BE MAINTAINED
THROUGHOUT CONSTRUCTION. COORDINATE WITH
THE OWNER ANY PRE-APPROVED DISRUPTION AND
VERIFICATION OF SERVICE WITHIN THE EXISTING
BUILDING SO AS TO MINIMIZE THE DISRUPTION
OF SERVICE.
B. COORDINATE ALL DEMOLITION PHASING EFFORTS
WITH THE OWNER/ARCHITECT. EVERY EFFORT SHALL
BE MADE TO MINIMIZE THE DISRUPTION OF
OPERATIONS, AND PROVIDE SAFETY FOR THE
OCCUPANTS. EXCESSIVE NOISE OR VIBRATION
SHALL BE PRE-APPROVED AND COORDINATED
WITH THE OWNER.
C. VERIFY ALL EXISTING CONDITIONS AND NOTIFY
THE ARCHITECT/OWNER OF ANY DISCREPANCIES
D. REMOVE ALL DEMOLITION MATERIALS FROM
THE SITE UNLESS NOTED OTHERWISE. THE OWNER
SHALL RESERVE THE RIGHT TO SALVAGE ANY
MATERIALS. COORDINATE WITH OWNER.
E. PROVIDE PROTECTION FOR ALL EXISTING
BUILDING MATERIALS AND EQUIPMENT FROM
DAMAGE DUE TO ANY DEMOLITION OR
CONSTRUCTION RELATED ACTIVITY PERFORMED
UNDER THIS CONTRACT.
F. REPAIR OR REPLACE ANY WALLS, FLOORS,
OR EQUIPMENT DAMAGED AS A RESULT OF
DEMOLITION OR CONSTRUCTION TO MATCH
EXISTING FINISH AND CONDITION.
G. THE CONTRACTOR SHALL COORDINATE WITH
THE OWNER/A/E ANY MATERIALS TO BE REUSED AND
WILL BE RESPONSIBLE FOR VERIFYING AND MAINTAINING
THE FUNCTIONAL AND AESTHETIC INTEGRITY OF
THE MATERIALS.
H. VERIFY AND MAINTAIN THE LOCATION OF EXISTING
POWER, COMMUNICATION AND DATA CABLES SO AS
TO NOT INADVERTENTLY INTERRUPT THE CONTINUITY
OF SERVICE.
I. PATCH ALL FLOOR, WALL AND CEILING PENETRATIONS
RESULTING FROM REMOVAL OR RE-ROUTING OF NEW
OR EXISTING PIPING, DUCTWORK, CONDUIT, ETC. AS
REQUIRED TO MAINTAIN FIRE SEPARATIONS. FINISH AS
REQUIRED FOR NEW OR EXISTING ADJACENT SURFACES.
J. CAP ALL DISCONNECTED MECHANICAL PIPING LINES
WITHIN THE WALL OR FLOOR. PATCH AND FINISH TO
MATCH NEW OR EXISTING ADJACENT SURFACES.
K. ALL CEILING AND WALL MOUNTED ITEMS INCLUDING
BUT NOT LIMITED TO LIGHTS, SPEAKERS, SMOKE OR
THERMAL DETECTORS SHALL BE REINSTALLED IN THEIR
ORIGINAL LOCATION AND CONDITION UNLESS
OTHERWISE NOTED.
L. CONSTRUCT TEMPORARY PARTITIONS WITHIN THE
EXISTING BUILDING WHICH OFFER A 1HR ENCLOSURE
TO ISOLATE ANY DEMOLITION CONSTRUCTION WORK
FROM THE GENERAL PUBLIC AND AS DEEMED
NECESSARY BY THE OWNER OR FIRE MARSHALL.
COORDINATE LOCATIONS WITH THE OWNER AND
MAINTAIN MEANS OF EGRESS THROUGHOUT WORK.
M. MAINTAIN SECURE, WEATHER-TIGHT ENCLOSURE AT
THE EXTERIOR OF THE EXISTING BUILDING
THROUGHOUT THE DEMOLITION/ CONSTRUCTION
PORTION OF THE WORK IN THAT AREA. BUILDING
SECURITY SHALL BE THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR AND COORDINATED WITH
THE OWNER.
N. REMOVE IN THEIR ENTIRETY ALL EXISTING WALLS,
DOORS, MILLWORK, PLUMBING FIXTURES, ETC
AS REQUIRED TO EXECUTE THE DEMOLITION/
CONSTRUCTION WORK DESCRIBED BY THE A/E.
O. SEE MECHANICAL AND ELECTRICAL DRAWINGS
AND NOTES FOR FURTHER SEQUENCING AND
SCOPE OF WORK.
P. AVOID ANY DISTURBANCE OF SOILS WITHIN THE
ZONE OF THE INFLUENCE AROUND EXISTING
FOOTINGS AND FLOOR SLABS AS DIRECTED BY
SOILS ENGINEER.
Q. AT ALL LOCATIONS WHERE ITEMS ARE CALLED
OUT TO BE REMOVED, THE CONTRACTOR IS TO PATCH
AND REPAIR WALL/FLOOR/CEILINGS AS REQUIRED
TO MATCH ADJACENT SURFACES EVEN IF NOT
SPECIFICALLY CALLED OUT IN DEMO LEGEND.
R. CONTRACTOR MUST REVIEW ALL SHEETS IN
ALL DISCIPLINES TO LOCATE ALL DEMO ITEMS.
NOT ALL DEMOLITION ITEMS ARE ON THE DEMO
SHEETS. FOR CLARITY SOME DEMO ITEMS ARE
IN DETAILS, SECTIONS, PLANS, ELEVATIONS, ETC.
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN PLACE TO THE GREATEST
EXTENT POSSIBLE. REPLACE DAMAGED FINISHES AS
NEEDED TO MATCH EXISTING.
7. REMOVE LOW WALL AND WINDOW SILL.
8. REMOVE PRECAST CONCRETE PANEL.
9. SAW CUT AND REMOVE CONCRETE TOPPING AS
NEEDED TO INSTALL SEISMIC BRACING. REFER TO
STRUCTURAL FOR ADDITIONAL INFORMATION.
10.REMOVE WALL TO EXTENTS SHOWN. SHORE UP
CONCRETE STAIR AS NEEDED TO PERFORM WORK.
REFER TO STRUCTURAL FOR ADDITIONAL
INFORMATION.
11.SAW CUT AND REMOVE THE DECORATIVE
CONCRETE FIN FROM EXISTING COLUMN. ALIGN
WITH BASE OF COLUMN AT GRADE/ 2ND FLOOR
COURTYARD.
12.REMOVE WALL TO EXTENTS SHOWN.
13.REMOVE MECHANICAL EQUIPMENT. REF:
MECHANICAL.
14.SAW CUT AND REMOVE CONCRETE TOPPING.
(APPROX 3") STRUCTURAL SLAB BELOW TO REMAIN
IN PLACE - RE: CIVIL, SHEET CD101.
15.REMOVE ACCESS FLOORING AS NEEDED TO
PERFORM WORK. PROTECT , MODIFY AND
REINSTALL AS NEEDED.
16.REMOVE HANDRAIL AND RELATED COMPONENTS.
PATCH ADJACENT SURFACES.
17.REMOVE WALL MOUNTED HEATERS. SALVAGE AND
REINSTALL AS DIRECTED. RE: MECHANICAL.
18.SAW CUT AND REMOVE CONCRETE SLAB AS
REQUIRED FOR INSTALLATION OF NEW FOUNDATION.
COORDINATE WITH STRUCTURAL SHEETS SB101
THRU SB104 FOR SPECIFIC LOCATION DIMENSIONS.
19.REMOVE EXISTING PLUMBING FIXTURE AND TOILET
PARTITION.
20.REMOVE & DISCARD EXISTING DEMOUNTABLE OR
OPERABLE PARTITION.
21.REMOVE EXISTING CASEWORK OR VANITY.
22.REMOVE EXISTING PARAPET CAP.
23.LOCATION OF EXISTING SUMP PITS TO BE REMOVED.
COORDINATE WITH PLUMBING.
24.CUT AND REMOVED EXISTING SLAB FOR
INSTALLATION OF NEW SUMP PITS. COORDINATE
WITH PLUMBING FOR LOCATION.
25.REMOVE BRICK VENEER AS REQ'D FOR
INSTALLATION OF NEW CONCRETE SLAB EXTENSION.
26.REMOVE ENTIRE ELEVATOR ASSEMBLY.
27.REMOVE STAIR UNIT IN ITS ENTIRETY.
DEMOLITION KEYNOTES
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
2:
:5
PM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
COMPOSITE SECOND FLOOR DEMOLITION
PLAN
CEM
GAK
GMD 108
AD-120
AD-120SCALE: 1/16" = 1'-0"
1 COMPOSITE SECOND FLOOR DEMOLITION PLAN
KEYPLAN
0 8' 16' 32'
J
K
L
M
N
P
M
AT
C H
LI
N
E S
EE
1/
A D
-1
MATCH LINE
SEE 1/AD-122
4 64 6 4 6
1 1 1 1 1 1
8 8 8 8 8
4 6 4 6
4 6
4 6
4 6
4 6
4 6
12 12 12
4 6 4 64 64 64 6
2 2
2 2
12 12
2 2
22 2222
12 12 12 12 12
2 2
2 2
12 12
27 12
1212 12
DEMOLITION LEGEND
ITEM TO BE DEMOLISHED
ITEM TO REMAIN
1. DEMO EXISTING WINDOW/ STOREFRONT.
2. REMOVE DOOR AND FRAME.
3. CUT AND REMOVE CONCRETE WALL TO EXTENTS
SHOWN.
4. REMOVE EXISTING CEILING SYSTEM TO EXTENTS OF
NEW WORK SHOWN ON RCP.
5. REMOVE/REINSTALL EXISTING HANDRAIL AS NEEDED
TO PERFORM WORK.
6. PROTECT FINISHES IN…