ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION.pdf
PDF 16 MB Posted
- Solicitation number
- 6973GH-18-R-00009
About this file
ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION (pdf)
View the file
Other files
Show 40 more
Latest 50 of 251 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORLD
AIRPORT
WILL ROGERS
WORLD
AIRPORT
WILL ROGERS
U S
CHICKASHA
SH 39
SH 59
PURCELL
SH 39
I-
U S
U S
S H
S H
I-
OKLA. CITY
SH 152
H.
E.
BA
ILE
Y
U S
TUTTLE
BLANCHARD
SH 37
MUSTANG
EL RENO
I-40 US 66
I-40
YUKON
EDMOND
AIRPARK
MAX WESTHEIMER
SH 9NORMAN
I-240
SHAWNEE
I-40
TURNER
US 62
US 66
KINGFISHER
SH 33
GUTHRIE
S H
SH 105
U S
CHICKASHA
SH 39
SH 59
PURCELL
SH 39
I-
U S
U S
S H
S H
I-
OKLA. CITY
PAGE
SH 152
H.
E.
BA
ILE
Y
U S
AIRPORT
TUTTLE
BLANCHARD
SH 37
MUSTANG
EL RENO
CLARENCE E.
I-40
AIRPORT
US 66
I-40
YUKON
WILEY POST
EDMOND
AIRPARK
MAX WESTHEIMER
SH 9NORMAN
I-240
SHAWNEE
I-40
TURNER
US 62
US 66 CHANDLER
KINGFISHER
SH 33
GUTHRIE
SH 105
DRAINPIPE DRAINPIPE
O
VER
H
AN
G
C
AN
O P Y
C
AN
O P Y
C
AN
O P Y
W H
IP
W H
IP
TR
AN
SFO
R M
ER
C O N C R
ETE
C O N C R
ETE
C O N C R
ETE
A
SP
H
ALT
A
SP
H
ALT
A
SP
H
ALT
A
SP
H
ALT
C O N C R
ETE
S
TAIR
S
S
TAIR
S
2"
R
AM
P
Q U E S A D A D R
S D U K E
AV
E
S D U K E
AV
E
Q U E S A D A D R
E D D
IE
AV
E
S.W. 66TH ST.
D E N N
IN
G A
VE
M A C
A R
TH
U R B
LV
D
S.W. 63RD ST.
S.W. 64TH ST.
S.W. 66TH ST.
C H R
IS
TI
AN
AV
E
S.W. 63RD ST.
S.W. 64TH ST.
S.W. 68TH ST.
S.W.69THST.
D E N N
IN
G
A V E
E D D
IE
AV
E
MIKE MONRONEY BLVD.
F O S
TE
R
D R
IV
E
S.W.61STST.
S.W. 62ND ST.
S.W. 61ST ST.
S.W. 61ST ST. 3.33503437
MULTI-PURPOSE BUILDING
BID OPTION NOTES:
A. REFER TO SPECIFICATIONS FOR FULL BID OPTION
SCOPE OF WORK.
B. OPTION NO. 1 - INSULATED METAL PANELS AT
EXTERIOR WALL OF INTERIOR COURTYARD.
C. OPTION NO. 2 - INSULATED METAL PANEL WALL
MANUFACTURERS INTEGRATED WINDOW SYSTEM
AT THE EXTERIOR WALLS.
D. OPTION NO. 3 - MECHANICAL SCREENS AT ROOF
E. OPTION NO. 4A - ELECTRONIC WINDOW SHADE
CONTROL SYSTEM.
F. OPTION NO. 4B - DYNAMIC GLAZING AT STAIRWELL
CURTAINWALL.
G. OPTION NO. 5A - INSTALL A NEW CONCRETE
TOPPING SLAB OVER A NEW WATERPROOF
MEMBRANE AT THE FIRST FLOOR PERIMETER
WALKWAY.
H. OPTION NO. 5B - INSTALL NEW PAVERS OVER A NEW
WATERPROOF MEMBRANE AT THE FIRST FLOOR
PERIMETER WALKWAY.
I. OPTION NO. 6 - LOADING DOCK ACCESS RAMP
WATERPROOF COATING INSTALLATION ON THE
VERTICAL RAMP WALLS.
TIENG
AI LING
21544
O K L A H O M A
RE
G
IS
T E
RE
D PROFESSIONA L ENG
INEER
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RUSSELL
FRANK
KETNER
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
INEER
15891
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PROFESS IONA L
ENG
INEER
GARY W.
JAMES
16166
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IONA L
ENG
INEER
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
FAA
MIKE MONRONEY AERONAUTICAL CENTER
OKLAHOMA CITY, OKLAHOMA
Frankfurt Short Bruza Architects Engineers Planners
5801 Broadway Ext., Suite 500 Oklahoma City, Oklahoma 73118
Telephone 405 840 2931 Facsimile 405 842 7750
Type B 100% - December 20, 2017
OKLAHOMA CERTIFICATE OF
AUTHORIZATION
ARCHITECTURE: # 00199
EXP. 06/30/19 DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
RENOVATION
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
OKLAHOMA CERTIFICATE OF
AUTHORIZATION
P.E: # 1072
EXP. 06/30/18
VOLUME TWO
G-000.2
G-000.2
CEM
GAK
GMD 214
SCALE: NTS
1 VICINITY PLAN
SCALE: NTS
2 PROJECT LOCATION MAP
N
N
(INTERIORS, FIRE PROTECTION, PLUMBING, MECHANICAL)
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
7:
:4
AM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
SHEET INDEX - VOLUME 2
Author
Checker
Designer 215
G-001.2
G-001.2
SHEET INDEX VOLUME 2
SHEET
NUMBER TITLE
MD111 FIRST FLOOR DEMOLITION PLAN - AREA 1
MD112 FIRST FLOOR DEMOLITION PLAN - AREA 2
MD113 FIRST FLOOR DEMOLITION PLAN - AREA 3
MD114 FIRST FLOOR DEMOLITION PLAN - AREA 4
MD121 SECOND FLOOR DEMOLITION PLAN - AREA 1
MD122 SECOND FLOOR EMOLITION PLAN - AREA 2
MD123 SECOND FLOOR DEMOLITION PLAN - AREA 3
MD124 SECOND FLOOR DEMOLITION PLAN - AREA 4
MD131 THIRD FLOOR DEMOLITION PLAN - AREA 1
MD132 THIRD FLOOR DEMOLITION PLAN - AREA 2
MD133 THIRD FLOOR DEMOLITION PLAN - AREA 3
MD134 THIRD FLOOR DEMOLITION PLAN - AREA 4
MD135 BASEMENT DEMOLITION HVAC PLAN - AREA 1
MD136 BASEMENT DEMOLITION HVAC PLAN - AREA 2
MD137 BASEMENT DEMOLITION HVAC PLAN - AREA 3
MD138 BASEMENT DEMOLITION HVAC PLAN - AREA 4
MP101 BASEMENT PIPING PLAN - AREA 1
MP102 BASEMENT PIPING PLAN - AREA 2
MP103 BASEMENT PIPING PLAN - AREA 3
MP104 BASEMENT PIPING PLAN - AREA 4
MP111 FIRST FLOOR PIPING PLAN - AREA 1
MP112 FIRST FLOOR PIPING PLAN - AREA 2
MP113 FIRST FLOOR PIPING PLAN - AREA 3
MP114 FIRST FLOOR PIPING PLAN - AREA 4
MP121 SECOND FLOOR PIPING PLAN - AREA 1
MP122 SECOND FLOOR PIPING PLAN - AREA 2
MP123 SECOND FLOOR PIPING PLAN - AREA 3
MP124 SECOND FLOOR PIPING PLAN - AREA 4
MP131 THIRD FLOOR PIPING PLAN - AREA 1
MP132 THIRD FLOOR PIPING PLAN - AREA 2
MP133 THIRD FLOOR PIPING PLAN - AREA 3
MP134 THIRD FLOOR PIPING PLAN - AREA 4
M-301 SECTIONS
M-401 ENLARGED PLANS
M-403 ENLARGED PLANS
M-501 DETAILS
M-502 DETAILS
M-503 DETAILS
M-504 DETAILS
M-601 FLOW DIAGRAMS
M-602 FLOW DIAGRAMS
M-603 FLOW DIAGRAMS
M-604 FLOW DIAGRAM
M-605 FLOW DIAGRAM
M-701 SCHEDULES
M-702 SCHEDULES
M-703 SCHEDULES
M-704 SCHEDULES
M-705 SCHEDULES
M-706 SCHEDULES
M-801 CONTROL DIAGRAMS
M-802 CONTROL DIAGRAMS
M-803 CONTROL DIAGRAMS
M-804 CONTROL DIAGRAM
M-805 CONTROL DIAGRAMS
M-806 CONTROL DIAGRAM
M-807 CONTROL DIAGRAM
M-808 CONTROL DIAGRAM
M-809 CONTROL DIAGRAM
M-810 CONTROL DIAGRAM
SHEET INDEX VOLUME 2
SHEET
NUMBER TITLE
F-401 FIRE PROTECTION STANDPIPE RISER SECTIONS
F-501 FIRE ALARM INPUT/OUTPUT MATRIX
F-601 FIRE SUPPRESSION PIPING SCHEMATIC
F-602 FIRE ALARM RISER DIAGRAM
PLUMBING
P-001 LEGEND & ABBREVIATIONS
PD101 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 1
PD102 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 2
PD103 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 3
PD104 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 4
PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 1
PD112 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 2
PD113 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 3
PD114 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 4
PD121 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 1
PD122 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 2
PD123 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 3
PD124 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 4
PD131 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 1
PD132 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 2
PD133 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 3
PD134 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 4
P-101 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 1
P-102 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 2
P-103 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 3
P-104 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 4
P-105 BASEMENT FLOOR PLUMBING PLAN - AREA 1
P-106 BASEMENT FLOOR PLUMBING PLAN - AREA 2
P-107 BASEMENT FLOOR PLUMBING PLAN - AREA 3
P-108 BASEMENT FLOOR PLUMBING PLAN - AREA 4
P-111 FIRST FLOOR PLUMBING PLAN - AREA 1
P-112 FIRST FLOOR PLUMBING PLAN - AREA 2
P-113 FIRST FLOOR PLUMBING PLAN - AREA 3
P-114 FIRST FLOOR PLUMBING PLAN - AREA 4
P-121 SECOND FLOOR PLUMBING PLAN - AREA 1
P-122 SECOND FLOOR PLUMBING PLAN - AREA 2
P-123 SECOND FLOOR PLUMBING PLAN - AREA 3
P-124 SECOND FLOOR PLUMBING PLAN - AREA 4
P-131 THIRD FLOOR PLUMBING PLAN - AREA 1
P-132 THIRD FLOOR PLUMBING PLAN - AREA 2
P-133 THIRD FLOOR PLUMBING PLAN - AREA 3
P-134 THIRD FLOOR PLUMBING PLAN - AREA 4
P-141 ROOF PLAN - AREA 1
P-142 ROOF PLAN - AREA 2
P-143 ROOF PLAN - AREA 3
P-144 ROOF PLAN - AREA 4
P-401 ENLARGED PLUMBING PLAN
P-402 ENLARGED PLUMBING PLAN
P-403 ENLARGED PLUMBING PLAN
P-404 ENLARGED PLUMBING PLAN
P-405 ENLARGED PLUMBING PLAN
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING RISER DIAGRAMS
P-602 PLUMBING RISER DIAGRAMS
P-603 PLUMBING RISER DIAGRAMS
P-604 PLUMBING RISER DIAGRAMS
P-701 PLUMBING SCHEDULES
P-702 PLUMBING SCHEDULES
MECHANICAL
M-001 LEGEND & ABBREVIATIONS
M-101 BASEMENT MECHANICAL PLAN - AREA 1
M-102 BASEMENT MECHANICAL PLAN - AREA 2
M-103 BASEMENT MECHANICAL PLAN - AREA 3
M-104 BASEMENT MECHANICAL PLAN - AREA 4
M-111 FIRST FLOOR MECHANICAL PLAN - AREA 1
M-112 FIRST FLOOR MECHANICAL PLAN - AREA 2
M-113 FIRST FLOOR MECHANICAL PLAN - AREA 3
M-114 FIRST FLOOR MECHANICAL PLAN - AREA 4
M-121 SECOND FLOOR MECHANICAL PLAN - AREA 1
M-122 SECOND FLOOR MECHANICAL PLAN - AREA 2
M-123 SECOND FLOOR MECHANICAL PLAN - AREA 3
M-124 SECOND FLOOR MECHANICAL PLAN - AREA 4
M-131 THIRD FLOOR MECHANICAL PLAN - AREA 1
M-132 THIRD FLOOR MECHANICAL PLAN - AREA 2
M-133 THIRD FLOOR MECHANICAL PLAN - AREA 3
M-134 THIRD FLOOR MECHANICAL PLAN - AREA 4
MH135 HVAC ROOF PLAN
MD101 BASEMENT DEMOLITION PIPING PLAN - AREA 1
MD102 BASEMENT DEMOLITION PIPING PLAN - AREA 2
MD103 BASEMENT DEMOLITION PIPING PLAN - AREA 3
MD104 BASEMENT DEMOLITION PIPING PLAN - AREA 4
SHEET INDEX VOLUME 2
SHEET
NUMBER TITLE
GENERAL
G-000.2 COVER SHEET - VOLUME 2
G-001.2 SHEET INDEX - VOLUME 2
INTERIORS
IN101 BASEMENT FLOOR PATTERN PLAN - AREA 1
IN102 BASEMENT FLOOR PATTERN PLAN - AREA 2
IN103 BASEMENT FLOOR PATTERN PLAN - AREA 3
IN104 BASEMENT FLOOR PATTERN PLAN - AREA 4
IN111 FIRST FLOOR PATTERN PLAN - AREA 1
IN112 FIRST FLOOR PATTERN PLAN - AREA 2
IN113 FIRST FLOOR PATTERN PLAN - AREA 3
IN114 FIRST FLOOR PATTERN PLAN - AREA 4
IN121 SECOND FLOOR PATTERN PLAN - AREA 1
IN122 SECOND FLOOR PATTERN PLAN - AREA 2
IN123 SECOND FLOOR PATTERN PLAN - AREA 3
IN124 SECOND FLOOR PATTERN PLAN - AREA 4
IN131 THIRD FLOOR PATTERN PLAN - AREA 1
IN132 THIRD FLOOR PATTERN PLAN - AREA 2
IN133 THIRD FLOOR PATTERN PLAN - AREA 3
IN134 THIRD FLOOR PATTERN PLAN - AREA 4
IF100 OVERALL BASEMENT FURNITURE PLAN
IF101 BASEMENT FURNITURE PLAN - AREA 1
IF102 BASEMENT FURNITURE PLAN - AREA 2
IF103 BASEMENT FURNITURE PLAN - AREA 3
IF104 BASEMENT FURNITURE PLAN - AREA 4
IF110 OVERALL FIRST FLOOR FURNITURE PLAN
IF111 FIRST FLOOR FURNITURE PLAN - AREA 1
IF112 FIRST FLOOR FURNITURE PLAN - AREA 2
IF113 FIRST FLOOR FURNITURE PLAN - AREA 3
IF114 FIRST FLOOR FURNITURE PLAN - AREA 4
IF120 OVERALL SECOND FLOOR FURNITURE PLAN
IF121 SECOND FLOOR FURNITURE PLAN - AREA 1
IF122 SECOND FLOOR FURNITURE PLAN - AREA 2
IF123 SECOND FLOOR FURNITURE PLAN - AREA 3
IF124 SECOND FLOOR FURNITURE PLAN - AREA 4
IF130 OVERALL THIRD FLOOR FURNITURE PLAN
IF131 THIRD FLOOR FURNITURE PLAN - AREA 1
IF132 THIRD FLOOR FURNITURE PLAN - AREA 2
IF133 THIRD FLOOR FURNITURE PLAN - AREA 3
IF134 THIRD FLOOR FURNITURE PLAN - AREA 4
IG101 BASEMENT SIGNAGE PLAN - AREA 1
IG102 BASEMENT SIGNAGE PLAN - AREA 2
IG103 BASEMENT SIGNAGE PLAN - AREA 3
IG104 BASEMENT SIGNAGE PLAN - AREA 4
IG111 FIRST FLOOR SIGNAGE PLAN - AREA 1
IG112 FIRST FLOOR SIGNAGE PLAN - AREA 2
IG113 FIRST FLOOR SIGNAGE PLAN - AREA 3
IG114 FIRST FLOOR SIGNAGE PLAN - AREA 4
IG121 SECOND FLOOR SIGNAGE PLAN - AREA 1
IG122 SECOND FLOOR SIGNAGE PLAN - AREA 2
IG123 SECOND FLOOR SIGNAGE PLAN - AREA 3
IG124 SECOND FLOOR SIGNAGE PLAN - AREA 4
IG131 THIRD FLOOR SIGNAGE PLAN - AREA 1
IG132 THIRD FLOOR SIGNAGE PLAN - AREA 2
IG133 THIRD FLOOR SIGNAGE PLAN - AREA 3
IG134 THIRD FLOOR SIGNAGE PLAN - AREA 4
IG401 SIGNAGE DETAILS
IG601 SIGNAGE SCHEDULES
FIRE PROTECTION
F-001 LEGEND & ABBREVIATIONS
FD 101 BASEMENT FIRE PROTECTION DEMOLITION PLAN
FD 102 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN
FD 103 SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
FD 104 THIRD FLOOR FIRE PROTECTION DEMOLITION PLAN
F-101 BASEMENT FIRE PROTECTION PLAN - AREA 1
F-102 BASEMENT FIRE PROTECTION PLAN - AREA 2
F-103 BASEMENT FIRE PROTECTION PLAN - AREA 3
F-104 BASEMENT FIRE PROTECTION PLAN - AREA 4
F-105 BASEMENT FIRE PROTECTION PLAN - PHASE 2
F-106 FIRST FLOOR FIRE PROTECTION PLAN - AREA 1
F-107 FIRST FLOOR FIRE PROTECTION PLAN - AREA 2
F-108 FIRST FLOOR FIRE PROTECTION PLAN - AREA 3
F-109 FIRST FLOOR FIRE PROTECTION PLAN - AREA 4
F-110 SECOND FLOOR FIRE PROTECTION PLAN - AREA 1
F-111 SECOND FLOOR FIRE PROTECTION PLAN - AREA 2
F-112 SECOND FLOOR FIRE PROTECTION PLAN - AREA 3
F-113 SECOND FLOOR FIRE PROTECTION PLAN - AREA 4
F-114 THIRD FLOOR FIRE PROTECTION PLAN - AREA 1
F-115 THIRD FLOOR FIRE PROTECTION PLAN - AREA 2
F-116 THIRD FLOOR FIRE PROTECTION PLAN - AREA 3
F-117 THIRD FLOOR FIRE PROTECTION PLAN - AREA 4
F-118 ROOF FIRE PROTECTION PLAN
DN
DN
DN
DN
DN
UP
MATCHLINE
SEE 1 / IN102
M
AT
C H
LI
N
E S
EE
/I N
RR WOMEN
BREAK
ROOM
CONFERENCE
ROOM
CORRIDOR
OPEN OFFICE
OPEN OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
COMM.
ELEC.
COMPUTER
WORK ROOM
PRIVATE
OFFICE
0108A
PHONE
ROOM
0108B
PHONE
ROOM
0108C
PHONE
ROOM
0108D
CONFERENCE
ROOM
0108E
EQ
'-6
FU
LL
TI
LE
S
EQ 6'-6" EQ
20'-2 1/2" (VIF)
EQ
6'
-6
EQ
'-7
VI
F)
'-8
1/ 2"
1' -0
4 FULL TILES 1'-3"
7'-9"
EQ 52'-0" EQ
EQ 6'-6" EQ
EQ
6'
-6
EQ
EQ 6'-6" EQ
'-1
1'
-0
EQ 16'-3" EQ
EQ 16'-3" EQ
'-4
3/ 4"
(V
IF
20'-0 3/4" (VIF)
EQ 6'-6" EQ
EQ 6'-6" EQ
6' -6
'-1
0" 1'
-0
25'-6" 1'-7 1/2"
1' -0
'-9 1/
4"
25'-6" 1'-7 1/2"
OPEN OFFICE
4 FULL TILES
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
ELEV LOBBY
STAIR 1
ELEV 1
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:1
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
BASEMENT FLOOR PATTERN PLAN - AREA
JBY
SAR
JBY 216
IN101
IN101
N
KEYPLAN
SCALE: 1/8" = 1'-0"
BASEMENT FLOOR PATTERN PLAN - AREA 11
0 4' 8' 16'
1/8" = 1'-0"
UP
DN
DN
M
AT
C H
LI
N
E S
EE
/I N
MATCHLINE
SEE 1 / IN101
OPEN OFFICE
CORR.
JAN.
STORAGE
EXISTING
STAIR
CORRIDOR
ELEV. EQUIP
SERVICE
ELEV
EXISTING
LOADING
DOCK
CORRIDOR
CORR.
CORRIDOR
PHONE
ROOM
0203A
PHONE
ROOM
0203B
PRIVATE
OFFICE
0203C
PRIVATE
OFFICE
0203D
CONFERENCE
ROOM
0203E
EXISTING LAB
EXISTING
STORAGE
COMPUTER
WORKROOM
STORAGE
0215RECORD
STORAGE
FU
LL
TI
LE
S
7' -2
EQ
6'
-6
EQ
EQ 6'-6" EQ
'-6
1/ 2"
25'-3 1/4"
CORRIDOR
7'-9"
4 FULL TILES
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:2
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
BASEMENT FLOOR PATTERN PLAN - AREA
JBY
SAR
JBY 217
IN102
IN102
N
KEYPLAN
SCALE: 1/8" = 1'-0"
BASEMENT FLOOR PATTERN PLAN - AREA 21
MATCHLINE
SEE 1 / IN104
M
AT
C H
LI
N
E S
EE
/I N
RR WOMEN
EXISTING
ELEC
SECURE
SHREDDER
SECURE
STORAGE
BREAK ROOM
0310EXISTING
SPRAY ROOM
EXISTING
BOILER
EXISTING
ELEC
EXISTING
BATTERY
BACK UP
CORR.
EXISTING
TEL/COM
RR MEN
RR WOMEN
AREA-WAY
0313 ELEC VAULT
CORRIDOR
RECORD
STORAGE
CORRIDOR
0320 SYSTEMS
0322A
STORAGE
PRINT SHOP
ETR
ETR
ETR
ETR
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:2
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
BASEMENT FLOOR PATTERN PLAN - AREA
JBY
SAR
JBY 218
IN103
IN103N
KEYPLAN
SCALE: 1/8" = 1'-0"
BASEMENT FLOOR PATTERN PLAN - AREA 31
SEE 1 / IN103
M
AT
C H
LI
N
E S
EE
/I N
EXISTING
WORK AREA
EXISTING
OPEN OFFICE
EXISTING
OFFICE
0425 EXISTING
STORAGE
RR MEN
EXISTING
CONFERENCE
ROOM
EXISTING
CIRCULATION
EXISTING
OFFICE
EXISTING
OFFICE
EXISTING
OPEN OFFICE
EXISTING
OFFICE
EXISTING
STUDIO
EXISTING
OFFICE
EXISTING
CORRIDOR
EXISTING
OFFICE
PRINT SHOP
EXISTING
CORRIDOR
0409 EXISTING
OFFICE
EXISTING
OFFICE
EXISTING
STUDIO
EXISTING
OFFICE
WORK ROOM
CORRIDOR
RR MEN
OPEN OFFICE
CORRIDOR
EXISTING.
TEL/COM
EQ
'-6
"3
FU
LL
TI
LE
S
FOLDER/
INSERTER
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
STAIR 3
ELEV LOBBY
ELEV 3
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:3
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
BASEMENT FLOOR PATTERN PLAN - AREA
JBY
SAR
JBY 219
IN104
IN104N
KEYPLAN
SCALE: 1/8" = 1'-0"
BASEMENT FLOOR PATTERN PLAN - AREA 41
DN
DN
DN
DN
MATCHLINE
SEE 1 / IN112
M
AT
C H
LI
N
E S
EE
/I N
OPEN OFFICE
CIRCULATION
LOUNGE
STAIR 1
ENTRYWAY
ELEV 1
STORAGE
BREAK ROOM
WOMENS
MENS
SYSTEMS
EXISTING
MECH
A/V
CORRIDOR
CONFERENCE
SMF
STORAGE
VEST.
ELEC.
JAN.
COMM
1119E
PHONE
ROOM
1119D
PHONE
ROOM
1119C
PHONE
ROOM
1119B
PHONE
ROOM
1119A
135° 45°
9' -9
9 8
9' -9
78'-0" 1'-1"
9' -1
1/
2"
'-7
1/ 4"
VESTIBULE
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:4
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
FIRST FLOOR PATTERN PLAN - AREA 1
JBY
SAR
JBY 220
IN111
IN111N
KEYPLAN
SCALE: 1/8" = 1'-0"
FIRST FLOOR PATTERN PLAN - AREA 11
DN
DN
DN
DN
M
AT
C H
LI
N
E S
EE
/I N
MATCHLINE
SEE 1 / IN111SMF
STORAGE
EXISTING
TELECOM
VEST.
EXISTING
MECH
EXISTING ATO
ROOM
SERVICE
ELEV
WOMENS
MENS
VENDING
ELEC.
COMM.
OPEN OFFICE
EXISTING
STAIR
ENTRY
EXISTING SMF
DATA ROOM
EXISTING
ELEC CL.
STOR.
OPEN OFFICE
CIRCULATION
52'-0" 1'-5" 9'-9" 1'-6" 43'-10 1/2" 9 3/4" 8'-1 1/2"1'-1 3/4"
'-1
1/ 2" 3
FU
LL
TI
LE
S
82'-10 1/2" 9 3/4"
'-1
1/ 2" 3
FU
LL
TI
LE
S
2 3
4 3
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:5
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
FIRST FLOOR PATTERN PLAN - AREA 2
JBY
SAR
JBY 221
IN112
IN112N
KEYPLAN
SCALE: 1/8" = 1'-0"
FIRST FLOOR PATTERN PLAN - AREA 21
DN DN
SEE 1 / IN114
M
AT
C H
LI
N
E S
EE
/I N
OPEN OFFICE
OPEN OFFICE
CIRCULATION
VEST.
CORRIDOR
COMM.
WOMENS
MENS
JAN.
ELEC.
EXISTING
MECH
BREAK ROOM
CORRIDOR
EXISTING SMF
DATA ROOM
EXISTING
DATA ROOM
CAGE
1'-2 1/4" 74'-9" 1'-4 3/4"
5°
45°
9'-9"
'-1
1/ 2" 3
FU
LL
TI
LE
S
7"
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:5
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
FIRST FLOOR PATTERN PLAN - AREA 3
JBY
SAR
JBY 222
IN113
IN113N
KEYPLAN
SCALE: 1/8" = 1'-0"
FIRST FLOOR PATTERN PLAN - AREA 31
DN
MATCHLINE
SEE 1 / IN113
M
AT
C H
LI
N
E S
EE
/I N
ENTRYWAY
ELEV 3
STORAGE
STAIR 3
LOUNGE
CORRIDOR
EXISTING
MECH
CONFERENCE
COMM.
ELEC.
NURSING
MENS
WOMENS
CIRCULATION
OPEN OFFICE
CORRIDOR
A/V
PRIVATE
OFFICE
1417B
CONFERENCE
ROOM
1417C
PRIVATE
OFFICE
1417D
135°
9'-9"
9' -9
9'-9"
9' -9
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:0
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
FIRST FLOOR PATTERN PLAN - AREA 4
JBY
SAR
JBY 223
IN114
IN114N
KEYPLAN
SCALE: 1/8" = 1'-0"
FIRST FLOOR PATTERN PLAN - AREA 41
DN
DN
DN
MATCHLINE
SEE 1 / IN122
M
AT
C H
LI
N
E S
EE
/I N
OUTDOOR
AREA
CONFERENCE
ROOM
STAIR 1
2103 ENTRYWAY
ELEV 1
LOUNGE
CORRIDOR
WOMENS
MENS
COMM.
ELEC.
SYSTEMS
OPEN OFFICE
STORAGE
STORAGE
OPEN OFFICE
PHONE
ROOM
2113A
PHONE
ROOM
2113B
PHONE
ROOM
2113C
PHONE
ROOM
2113D
PRIVATE
OFFICE
2113F
PRIVATE
OFFICE
2113G
CONFERENCE
ROOM
2113H
FU
LL
TI
LE
S
EQ
EQ
6 FULL TILES
5 FULL TILES
C L C L
CL
EQ EQ
FU
LL
TI
LE
S
'-0
FU
LL
TI
LE
S
'-0
FU
LL
TI
LE
S
'-0
16 FULL TILES
26'-0"
FU
LL
TI
LE
S
5 FULL TILES
16 FULL TILES
26'-0"
C L
OPEN OFFICE
OPEN OFFICE
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:1
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
SECOND FLOOR PATTERN PLAN - AREA 1
JBY
SAR
JBY 224
IN121
IN121N
KEYPLAN
SCALE: 1/8" = 1'-0"
SECOND FLOOR PATTERN PLAN - AREA 11
DN
DN
DN
M
AT
C H
LI
N
E S
EE
/I N
MATCHLINE
SEE 1 / IN121
OPEN OFFICE
JAN.
ELEC.
COMM.
MENS
WOMENS
STORAGE
SERVICE
ELEV
EXISTING
STAIR
OPEN OFFICE
CONFERENCE
ROOM
2113H
OPEN OFFICE
PHONE
ROOM
2304F
PHONE
ROOM
2304G
PRIVATE
OFFICE
2304E
PRIVATE
OFFICE
2304D
CL
C LC L
6 FULL TILES
EQ EQ
4 416 FULL TILES
26'-0"
16 FULL TILES
26'-0"
5 FULL TILES
FU
LL
TI
LE
S
FU
LL
TI
LE
S
'-7
1/ 2"
FU
LL
TI
LE
S
FU
LL
TI
LE
S
'-4
1/ 2"
FU
LL
TI
LE
S
'-7
1/ 2"
C L
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:2
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
SECOND FLOOR PATTERN PLAN - AREA 2
JBY
SAR
JBY 225
IN122
IN122N
KEYPLAN
SCALE: 1/8" = 1'-0"
SECOND FLOOR PATTERN PLAN - AREA 21
MATCHLINE
SEE 1 / IN124
M
AT
C H
LI
N
E S
EE
/I N
OPEN OFFICE
OPEN OFFICE
LOBBY
MENS
2303 WOMENS
COMM.
ELEC.
SYSTEMS
STORAGE
NURSING
CONFERENCE
ROOM
2304C
PRIVATE
OFFICE
2304A
PRIVATE
OFFICE
2304B
FU
LL
TI
LE
S
C L
FU
LL
TI
LE
S
'-4
1/ 2"
FU
LL
TI
LE
S
'-7
1/ 2"
FU
LL
TI
LE
S
5 FULL TILES
16 FULL TILES
26'-0"
6 FULL TILES
16 FULL TILES
26'-0"
4 4
CL
16 FULL TILES
26'-0" 6 FULL TILES
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:3
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
SECOND FLOOR PATTERN PLAN - AREA 3
JBY
SAR
JBY 226
IN123
IN123N
KEYPLAN
SCALE: 1/8" = 1'-0"
SECOND FLOOR PATTERN PLAN - AREA 31
DN
DN
DN
MATCHLINE
SEE 1 / IN123
M
AT
C H
LI
N
E S
EE
/I N
ELEV 3
ENTRYWAY
2402 LOUNGE
STAIR 3
CONFERENCE ROOM
BREAK ROOM
ELEC.
JAN.
COMM.
MENS
WOMENS
STORAGE
OPEN OFFICE
PHONE ROOM
2414A
PHONE ROOM
2414B
PHONE ROOM
2414C
OPEN OFFICE
PHONE ROOM
2308A PHONE ROOM
2308B
PHONE ROOM
2308C
16 FULL TILES
26'-0"
CL
4 4
16 FULL TILES
26'-0" 6 FULL TILES
EQ EQ
CL
C L
FU
LL
TI
LE
S
FU
LL
TI
LE
S
'-0
FU
LL
TI
LE
S
'-0
FU
LL
TI
LE
S
EQ
EQ
5 FULL TILES
16 FULL TILES
26'-0"
OPEN OFFICE
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:4
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
SECOND FLOOR PATTERN PLAN - AREA 4
JBY
SAR
JBY 227
IN124
IN124N
KEYPLAN
SCALE: 1/8" = 1'-0"
SECOND FLOOR PATTERN PLAN - AREA 41
DN
DN
MATCHLINE
SEE 1 / IN132
M
AT
C H
LI
N
E S
EE
/I N
OPEN OFFICE
CONFERENCE
ROOM
STAIR 1
ENTRYWAY
ELEV 1
LOUNGE
BREAK ROOM
WOMENS
MENS
COMM.
ELEC.
SYSTEMS
OPEN OFFICE
PHONE
ROOM
3113A
PHONE
ROOM
3113B
PHONE
ROOM
3113C
PHONE
ROOM
3113D
PRIVATE
OFFICE
3113F
PRIVATE
OFFICE
3113E
CONFERENCE
ROOM
3113G
ELEVATOR
CONTROL
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:5
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
THIRD FLOOR PATTERN PLAN - AREA 1
JBY
SAR
JBY 228
IN131
IN131N
KEYPLAN
SCALE: 1/8" = 1'-0"
THIRD FLOOR PATTERN PLAN - AREA 11
DN UP
DN
DN
DN
DN
M
AT
C H
LI
N
E S
EE
/I N
MATCHLINE
SEE 1 / IN131
SERVICE
ELEV
STORAGE
WOMENS
MENS
ELEC.
COMM.
JAN.
OPEN OFFICE
EXISTING
STAIR
CONFERENCE
ROOM
3113G
OPEN OFFICE
OPEN OFFICE
PHONE
ROOM
3304F
PHONE
ROOM
3304G
PRIVATE
OFFICE
3304D
PRIVATE
OFFICE
3304E
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
9:
:5
AM
C :\U se rs
\J
BG
\D oc um en ts \M y Re vi t\6
_I nt r_
JB
G .rv t
THIRD FLOOR PATTERN PLAN - AREA 2
JBY
SAR
JBY 229
IN132
IN132N
KEYPLAN
SCALE: 1/8" = 1'-0"
THIRD FLOOR PATTERN PLAN - AREA 21
MATCHLINE
SEE 1 / IN134
M
AT
C H
LI
N
E S
EE
/I N
OPEN OFFICE
OPEN OFFICE
COMM.
ELEC.
SYSTEMS
MENS
WOMENS
LOBBY
NURSING
STORAGE
PRIVATE
OFFICE
3304B
PRIVATE
OFFICE
3304C
CONFERENCE
ROOM
3304A
GENERAL NOTES
A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,
A-612 AND A-613 FOR FINISH INFORMATION NOT
ILLUSTRATED ON INTERIOR FINISH PLANS.
B. DO NOT INSTALL SLIVERS LESS THAN 3".
CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO
ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.
C. FLOORING STOPS AT MILLWORK, U.N.O.
D. "+" INDICATES START POINT FOR FLOOR TILE
INSTALLATIONS.
E. USE THE GRIDS PROVIDED FOR LOCATION OF
ACCENT FLOOR TILES.
F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL
FLOORS, U.N.O.
FLOOR PATTERN LEGEND
CPT1,2: CARPET TILE (AS SCHEDULED)
CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)
CPT3: CARPET TILE (IRON)
CPT4: CARPET TILE (BLUE)
CPT5: CARPET TILE (FLAG BLUE)
CPT6: CARPET TILE
LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)
PFT1: 12"X24" PORCELAIN TILE (WHITE)
PFT2: 6"X24" PORCELAIN TILE (WHITE)
PFT3: 12"X24" PORCELAIN TILE (GRAY)
SHEET KEYNOTES
1. NOT USED
2. ACCESS FLOORING RAMP
3. ALIGN TILE EDGES
4. ALIGN FULL TILE HERE
5. REFER TO SHEET IN102 FOR START POINT OF
CORRIDOR 0201/CORRIDOR 0202 CARPET TILE
INSTALLATION
6. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0203 CARPET TILE INSTALLATION
7. REFER TO SHEET IN101 FOR START POINT OF
OPEN OFFICE 0106 CARPET TILE INSTALLATION
8. INSTALL CARPET TILE IN NORTH - SOUTH
DIRECTION
9. REFTER TO SHEET IN114 FOR START POINT OF
OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET
TILE INSTALLATION
10.REFER TO SHEET IN113 FOR START POINT OF
OPEN OFFICE 1214 CARPET TILE INSTALLATION.
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24…
This is the start of the file's text. The full file is on GovTribe.