ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION.pdf

PDF 16 MB Posted

Attached to
CONSTRUCTION: Multi-Purpose Building Renovation, FAA, MMAC, Oklahoma City, OK
Solicitation number
6973GH-18-R-00009
Issued by

About this file

ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 10- .html file.htm HTM file
ATTACHMENT 5-SF25.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
ATTACHMENT 10R-BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 7-CONTRACTOR'S RELEASE.pdf PDF
ATTACHMENT 4-WAGE DETERMINATION OK49.pdf PDF
ATTACHMENT 15-ADDENDUM 2.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 MECHANICAL.pdf PDF
ATTACHMENT 3-CHAPTER 33 CONSTRUCTION SAFETY.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL.pdf PDF
ATTACHMENT 8-OPERATIONAL CONTROL DOCUMENTS.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0003.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 12-CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION.pdf PDF
24-ATTEND Sign In Second Site Visit.pdf PDF
ATTACHMENT 6R-SF25A PAYMENT BOND 8/2016.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
AMENDMENT 0002.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 9- .html file.htm HTM file
ATTACHMENT 9R-ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 11-PAST PERFORMANCE SURVEY.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 1.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 ELECTRICAL.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
AMENDMENT 0003.pdf PDF
Show 40 more

Latest 50 of 251 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORLD

AIRPORT

WILL ROGERS

WORLD

AIRPORT

WILL ROGERS

U S

CHICKASHA

SH 39

SH 59

PURCELL

SH 39

I-

U S

U S

S H

S H

I-

OKLA. CITY

SH 152

H.

E.

BA

ILE

Y

U S

TUTTLE

BLANCHARD

SH 37

MUSTANG

EL RENO

I-40 US 66

I-40

YUKON

EDMOND

AIRPARK

MAX WESTHEIMER

SH 9NORMAN

I-240

SHAWNEE

I-40

TURNER

US 62

US 66

KINGFISHER

SH 33

GUTHRIE

S H

SH 105

U S

CHICKASHA

SH 39

SH 59

PURCELL

SH 39

I-

U S

U S

S H

S H

I-

OKLA. CITY

PAGE

SH 152

H.

E.

BA

ILE

Y

U S

AIRPORT

TUTTLE

BLANCHARD

SH 37

MUSTANG

EL RENO

CLARENCE E.

I-40

AIRPORT

US 66

I-40

YUKON

WILEY POST

EDMOND

AIRPARK

MAX WESTHEIMER

SH 9NORMAN

I-240

SHAWNEE

I-40

TURNER

US 62

US 66 CHANDLER

KINGFISHER

SH 33

GUTHRIE

SH 105

DRAINPIPE DRAINPIPE

O

VER

H

AN

G

C

AN

O P Y

C

AN

O P Y

C

AN

O P Y

W H

IP

W H

IP

TR

AN

SFO

R M

ER

C O N C R

ETE

C O N C R

ETE

C O N C R

ETE

A

SP

H

ALT

A

SP

H

ALT

A

SP

H

ALT

A

SP

H

ALT

C O N C R

ETE

S

TAIR

S

S

TAIR

S

2"

R

AM

P

Q U E S A D A D R

S D U K E

AV

E

S D U K E

AV

E

Q U E S A D A D R

E D D

IE

AV

E

S.W. 66TH ST.

D E N N

IN

G A

VE

M A C

A R

TH

U R B

LV

D

S.W. 63RD ST.

S.W. 64TH ST.

S.W. 66TH ST.

C H R

IS

TI

AN

AV

E

S.W. 63RD ST.

S.W. 64TH ST.

S.W. 68TH ST.

S.W.69THST.

D E N N

IN

G

A V E

E D D

IE

AV

E

MIKE MONRONEY BLVD.

F O S

TE

R

D R

IV

E

S.W.61STST.

S.W. 62ND ST.

S.W. 61ST ST.

S.W. 61ST ST. 3.33503437

MULTI-PURPOSE BUILDING

BID OPTION NOTES:

A. REFER TO SPECIFICATIONS FOR FULL BID OPTION

SCOPE OF WORK.

B. OPTION NO. 1 - INSULATED METAL PANELS AT

EXTERIOR WALL OF INTERIOR COURTYARD.

C. OPTION NO. 2 - INSULATED METAL PANEL WALL

MANUFACTURERS INTEGRATED WINDOW SYSTEM

AT THE EXTERIOR WALLS.

D. OPTION NO. 3 - MECHANICAL SCREENS AT ROOF

E. OPTION NO. 4A - ELECTRONIC WINDOW SHADE

CONTROL SYSTEM.

F. OPTION NO. 4B - DYNAMIC GLAZING AT STAIRWELL

CURTAINWALL.

G. OPTION NO. 5A - INSTALL A NEW CONCRETE

TOPPING SLAB OVER A NEW WATERPROOF

MEMBRANE AT THE FIRST FLOOR PERIMETER

WALKWAY.

H. OPTION NO. 5B - INSTALL NEW PAVERS OVER A NEW

WATERPROOF MEMBRANE AT THE FIRST FLOOR

PERIMETER WALKWAY.

I. OPTION NO. 6 - LOADING DOCK ACCESS RAMP

WATERPROOF COATING INSTALLATION ON THE

VERTICAL RAMP WALLS.

TIENG

AI LING

21544

O K L A H O M A

RE

G

IS

T E

RE

D PROFESSIONA L ENG

INEER

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RUSSELL

FRANK

KETNER

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

INEER

15891

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PROFESS IONA L

ENG

INEER

GARY W.

JAMES

16166

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IONA L

ENG

INEER

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

FAA

MIKE MONRONEY AERONAUTICAL CENTER

OKLAHOMA CITY, OKLAHOMA

Frankfurt Short Bruza Architects Engineers Planners

5801 Broadway Ext., Suite 500 Oklahoma City, Oklahoma 73118

Telephone 405 840 2931 Facsimile 405 842 7750

Type B 100% - December 20, 2017

OKLAHOMA CERTIFICATE OF

AUTHORIZATION

ARCHITECTURE: # 00199

EXP. 06/30/19 DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

RENOVATION

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

OKLAHOMA CERTIFICATE OF

AUTHORIZATION

P.E: # 1072

EXP. 06/30/18

VOLUME TWO

G-000.2

G-000.2

CEM

GAK

GMD 214

SCALE: NTS

1 VICINITY PLAN

SCALE: NTS

2 PROJECT LOCATION MAP

N

N

(INTERIORS, FIRE PROTECTION, PLUMBING, MECHANICAL)

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

/2

0/

7:

:4

AM

C :\U se rs

\c em

\D oc um en ts \M y Re vi t\6

_A rc h_

CE

M .rv t

SHEET INDEX - VOLUME 2

Author

Checker

Designer 215

G-001.2

G-001.2

SHEET INDEX VOLUME 2

SHEET

NUMBER TITLE

MD111 FIRST FLOOR DEMOLITION PLAN - AREA 1

MD112 FIRST FLOOR DEMOLITION PLAN - AREA 2

MD113 FIRST FLOOR DEMOLITION PLAN - AREA 3

MD114 FIRST FLOOR DEMOLITION PLAN - AREA 4

MD121 SECOND FLOOR DEMOLITION PLAN - AREA 1

MD122 SECOND FLOOR EMOLITION PLAN - AREA 2

MD123 SECOND FLOOR DEMOLITION PLAN - AREA 3

MD124 SECOND FLOOR DEMOLITION PLAN - AREA 4

MD131 THIRD FLOOR DEMOLITION PLAN - AREA 1

MD132 THIRD FLOOR DEMOLITION PLAN - AREA 2

MD133 THIRD FLOOR DEMOLITION PLAN - AREA 3

MD134 THIRD FLOOR DEMOLITION PLAN - AREA 4

MD135 BASEMENT DEMOLITION HVAC PLAN - AREA 1

MD136 BASEMENT DEMOLITION HVAC PLAN - AREA 2

MD137 BASEMENT DEMOLITION HVAC PLAN - AREA 3

MD138 BASEMENT DEMOLITION HVAC PLAN - AREA 4

MP101 BASEMENT PIPING PLAN - AREA 1

MP102 BASEMENT PIPING PLAN - AREA 2

MP103 BASEMENT PIPING PLAN - AREA 3

MP104 BASEMENT PIPING PLAN - AREA 4

MP111 FIRST FLOOR PIPING PLAN - AREA 1

MP112 FIRST FLOOR PIPING PLAN - AREA 2

MP113 FIRST FLOOR PIPING PLAN - AREA 3

MP114 FIRST FLOOR PIPING PLAN - AREA 4

MP121 SECOND FLOOR PIPING PLAN - AREA 1

MP122 SECOND FLOOR PIPING PLAN - AREA 2

MP123 SECOND FLOOR PIPING PLAN - AREA 3

MP124 SECOND FLOOR PIPING PLAN - AREA 4

MP131 THIRD FLOOR PIPING PLAN - AREA 1

MP132 THIRD FLOOR PIPING PLAN - AREA 2

MP133 THIRD FLOOR PIPING PLAN - AREA 3

MP134 THIRD FLOOR PIPING PLAN - AREA 4

M-301 SECTIONS

M-401 ENLARGED PLANS

M-403 ENLARGED PLANS

M-501 DETAILS

M-502 DETAILS

M-503 DETAILS

M-504 DETAILS

M-601 FLOW DIAGRAMS

M-602 FLOW DIAGRAMS

M-603 FLOW DIAGRAMS

M-604 FLOW DIAGRAM

M-605 FLOW DIAGRAM

M-701 SCHEDULES

M-702 SCHEDULES

M-703 SCHEDULES

M-704 SCHEDULES

M-705 SCHEDULES

M-706 SCHEDULES

M-801 CONTROL DIAGRAMS

M-802 CONTROL DIAGRAMS

M-803 CONTROL DIAGRAMS

M-804 CONTROL DIAGRAM

M-805 CONTROL DIAGRAMS

M-806 CONTROL DIAGRAM

M-807 CONTROL DIAGRAM

M-808 CONTROL DIAGRAM

M-809 CONTROL DIAGRAM

M-810 CONTROL DIAGRAM

SHEET INDEX VOLUME 2

SHEET

NUMBER TITLE

F-401 FIRE PROTECTION STANDPIPE RISER SECTIONS

F-501 FIRE ALARM INPUT/OUTPUT MATRIX

F-601 FIRE SUPPRESSION PIPING SCHEMATIC

F-602 FIRE ALARM RISER DIAGRAM

PLUMBING

P-001 LEGEND & ABBREVIATIONS

PD101 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 1

PD102 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 2

PD103 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 3

PD104 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - AREA 4

PD111 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 1

PD112 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 2

PD113 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 3

PD114 FIRST FLOOR PLUMBING DEMOLITION PLAN - AREA 4

PD121 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 1

PD122 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 2

PD123 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 3

PD124 SECOND FLOOR PLUMBING DEMOLITION PLAN - AREA 4

PD131 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 1

PD132 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 2

PD133 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 3

PD134 THIRD FLOOR PLUMBING DEMOLITION PLAN - AREA 4

P-101 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 1

P-102 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 2

P-103 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 3

P-104 BASEMENT UNDERFLOOR PLUMBING PLAN - AREA 4

P-105 BASEMENT FLOOR PLUMBING PLAN - AREA 1

P-106 BASEMENT FLOOR PLUMBING PLAN - AREA 2

P-107 BASEMENT FLOOR PLUMBING PLAN - AREA 3

P-108 BASEMENT FLOOR PLUMBING PLAN - AREA 4

P-111 FIRST FLOOR PLUMBING PLAN - AREA 1

P-112 FIRST FLOOR PLUMBING PLAN - AREA 2

P-113 FIRST FLOOR PLUMBING PLAN - AREA 3

P-114 FIRST FLOOR PLUMBING PLAN - AREA 4

P-121 SECOND FLOOR PLUMBING PLAN - AREA 1

P-122 SECOND FLOOR PLUMBING PLAN - AREA 2

P-123 SECOND FLOOR PLUMBING PLAN - AREA 3

P-124 SECOND FLOOR PLUMBING PLAN - AREA 4

P-131 THIRD FLOOR PLUMBING PLAN - AREA 1

P-132 THIRD FLOOR PLUMBING PLAN - AREA 2

P-133 THIRD FLOOR PLUMBING PLAN - AREA 3

P-134 THIRD FLOOR PLUMBING PLAN - AREA 4

P-141 ROOF PLAN - AREA 1

P-142 ROOF PLAN - AREA 2

P-143 ROOF PLAN - AREA 3

P-144 ROOF PLAN - AREA 4

P-401 ENLARGED PLUMBING PLAN

P-402 ENLARGED PLUMBING PLAN

P-403 ENLARGED PLUMBING PLAN

P-404 ENLARGED PLUMBING PLAN

P-405 ENLARGED PLUMBING PLAN

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-601 PLUMBING RISER DIAGRAMS

P-602 PLUMBING RISER DIAGRAMS

P-603 PLUMBING RISER DIAGRAMS

P-604 PLUMBING RISER DIAGRAMS

P-701 PLUMBING SCHEDULES

P-702 PLUMBING SCHEDULES

MECHANICAL

M-001 LEGEND & ABBREVIATIONS

M-101 BASEMENT MECHANICAL PLAN - AREA 1

M-102 BASEMENT MECHANICAL PLAN - AREA 2

M-103 BASEMENT MECHANICAL PLAN - AREA 3

M-104 BASEMENT MECHANICAL PLAN - AREA 4

M-111 FIRST FLOOR MECHANICAL PLAN - AREA 1

M-112 FIRST FLOOR MECHANICAL PLAN - AREA 2

M-113 FIRST FLOOR MECHANICAL PLAN - AREA 3

M-114 FIRST FLOOR MECHANICAL PLAN - AREA 4

M-121 SECOND FLOOR MECHANICAL PLAN - AREA 1

M-122 SECOND FLOOR MECHANICAL PLAN - AREA 2

M-123 SECOND FLOOR MECHANICAL PLAN - AREA 3

M-124 SECOND FLOOR MECHANICAL PLAN - AREA 4

M-131 THIRD FLOOR MECHANICAL PLAN - AREA 1

M-132 THIRD FLOOR MECHANICAL PLAN - AREA 2

M-133 THIRD FLOOR MECHANICAL PLAN - AREA 3

M-134 THIRD FLOOR MECHANICAL PLAN - AREA 4

MH135 HVAC ROOF PLAN

MD101 BASEMENT DEMOLITION PIPING PLAN - AREA 1

MD102 BASEMENT DEMOLITION PIPING PLAN - AREA 2

MD103 BASEMENT DEMOLITION PIPING PLAN - AREA 3

MD104 BASEMENT DEMOLITION PIPING PLAN - AREA 4

SHEET INDEX VOLUME 2

SHEET

NUMBER TITLE

GENERAL

G-000.2 COVER SHEET - VOLUME 2

G-001.2 SHEET INDEX - VOLUME 2

INTERIORS

IN101 BASEMENT FLOOR PATTERN PLAN - AREA 1

IN102 BASEMENT FLOOR PATTERN PLAN - AREA 2

IN103 BASEMENT FLOOR PATTERN PLAN - AREA 3

IN104 BASEMENT FLOOR PATTERN PLAN - AREA 4

IN111 FIRST FLOOR PATTERN PLAN - AREA 1

IN112 FIRST FLOOR PATTERN PLAN - AREA 2

IN113 FIRST FLOOR PATTERN PLAN - AREA 3

IN114 FIRST FLOOR PATTERN PLAN - AREA 4

IN121 SECOND FLOOR PATTERN PLAN - AREA 1

IN122 SECOND FLOOR PATTERN PLAN - AREA 2

IN123 SECOND FLOOR PATTERN PLAN - AREA 3

IN124 SECOND FLOOR PATTERN PLAN - AREA 4

IN131 THIRD FLOOR PATTERN PLAN - AREA 1

IN132 THIRD FLOOR PATTERN PLAN - AREA 2

IN133 THIRD FLOOR PATTERN PLAN - AREA 3

IN134 THIRD FLOOR PATTERN PLAN - AREA 4

IF100 OVERALL BASEMENT FURNITURE PLAN

IF101 BASEMENT FURNITURE PLAN - AREA 1

IF102 BASEMENT FURNITURE PLAN - AREA 2

IF103 BASEMENT FURNITURE PLAN - AREA 3

IF104 BASEMENT FURNITURE PLAN - AREA 4

IF110 OVERALL FIRST FLOOR FURNITURE PLAN

IF111 FIRST FLOOR FURNITURE PLAN - AREA 1

IF112 FIRST FLOOR FURNITURE PLAN - AREA 2

IF113 FIRST FLOOR FURNITURE PLAN - AREA 3

IF114 FIRST FLOOR FURNITURE PLAN - AREA 4

IF120 OVERALL SECOND FLOOR FURNITURE PLAN

IF121 SECOND FLOOR FURNITURE PLAN - AREA 1

IF122 SECOND FLOOR FURNITURE PLAN - AREA 2

IF123 SECOND FLOOR FURNITURE PLAN - AREA 3

IF124 SECOND FLOOR FURNITURE PLAN - AREA 4

IF130 OVERALL THIRD FLOOR FURNITURE PLAN

IF131 THIRD FLOOR FURNITURE PLAN - AREA 1

IF132 THIRD FLOOR FURNITURE PLAN - AREA 2

IF133 THIRD FLOOR FURNITURE PLAN - AREA 3

IF134 THIRD FLOOR FURNITURE PLAN - AREA 4

IG101 BASEMENT SIGNAGE PLAN - AREA 1

IG102 BASEMENT SIGNAGE PLAN - AREA 2

IG103 BASEMENT SIGNAGE PLAN - AREA 3

IG104 BASEMENT SIGNAGE PLAN - AREA 4

IG111 FIRST FLOOR SIGNAGE PLAN - AREA 1

IG112 FIRST FLOOR SIGNAGE PLAN - AREA 2

IG113 FIRST FLOOR SIGNAGE PLAN - AREA 3

IG114 FIRST FLOOR SIGNAGE PLAN - AREA 4

IG121 SECOND FLOOR SIGNAGE PLAN - AREA 1

IG122 SECOND FLOOR SIGNAGE PLAN - AREA 2

IG123 SECOND FLOOR SIGNAGE PLAN - AREA 3

IG124 SECOND FLOOR SIGNAGE PLAN - AREA 4

IG131 THIRD FLOOR SIGNAGE PLAN - AREA 1

IG132 THIRD FLOOR SIGNAGE PLAN - AREA 2

IG133 THIRD FLOOR SIGNAGE PLAN - AREA 3

IG134 THIRD FLOOR SIGNAGE PLAN - AREA 4

IG401 SIGNAGE DETAILS

IG601 SIGNAGE SCHEDULES

FIRE PROTECTION

F-001 LEGEND & ABBREVIATIONS

FD 101 BASEMENT FIRE PROTECTION DEMOLITION PLAN

FD 102 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN

FD 103 SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN

FD 104 THIRD FLOOR FIRE PROTECTION DEMOLITION PLAN

F-101 BASEMENT FIRE PROTECTION PLAN - AREA 1

F-102 BASEMENT FIRE PROTECTION PLAN - AREA 2

F-103 BASEMENT FIRE PROTECTION PLAN - AREA 3

F-104 BASEMENT FIRE PROTECTION PLAN - AREA 4

F-105 BASEMENT FIRE PROTECTION PLAN - PHASE 2

F-106 FIRST FLOOR FIRE PROTECTION PLAN - AREA 1

F-107 FIRST FLOOR FIRE PROTECTION PLAN - AREA 2

F-108 FIRST FLOOR FIRE PROTECTION PLAN - AREA 3

F-109 FIRST FLOOR FIRE PROTECTION PLAN - AREA 4

F-110 SECOND FLOOR FIRE PROTECTION PLAN - AREA 1

F-111 SECOND FLOOR FIRE PROTECTION PLAN - AREA 2

F-112 SECOND FLOOR FIRE PROTECTION PLAN - AREA 3

F-113 SECOND FLOOR FIRE PROTECTION PLAN - AREA 4

F-114 THIRD FLOOR FIRE PROTECTION PLAN - AREA 1

F-115 THIRD FLOOR FIRE PROTECTION PLAN - AREA 2

F-116 THIRD FLOOR FIRE PROTECTION PLAN - AREA 3

F-117 THIRD FLOOR FIRE PROTECTION PLAN - AREA 4

F-118 ROOF FIRE PROTECTION PLAN

DN

DN

DN

DN

DN

UP

MATCHLINE

SEE 1 / IN102

M

AT

C H

LI

N

E S

EE

/I N

RR WOMEN

BREAK

ROOM

CONFERENCE

ROOM

CORRIDOR

OPEN OFFICE

OPEN OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

COMM.

ELEC.

COMPUTER

WORK ROOM

PRIVATE

OFFICE

0108A

PHONE

ROOM

0108B

PHONE

ROOM

0108C

PHONE

ROOM

0108D

CONFERENCE

ROOM

0108E

EQ

'-6

FU

LL

TI

LE

S

EQ 6'-6" EQ

20'-2 1/2" (VIF)

EQ

6'

-6

EQ

'-7

VI

F)

'-8

1/ 2"

1' -0

4 FULL TILES 1'-3"

7'-9"

EQ 52'-0" EQ

EQ 6'-6" EQ

EQ

6'

-6

EQ

EQ 6'-6" EQ

'-1

1'

-0

EQ 16'-3" EQ

EQ 16'-3" EQ

'-4

3/ 4"

(V

IF

20'-0 3/4" (VIF)

EQ 6'-6" EQ

EQ 6'-6" EQ

6' -6

'-1

0" 1'

-0

25'-6" 1'-7 1/2"

1' -0

'-9 1/

4"

25'-6" 1'-7 1/2"

OPEN OFFICE

4 FULL TILES

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

ELEV LOBBY

STAIR 1

ELEV 1

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:1

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

BASEMENT FLOOR PATTERN PLAN - AREA

JBY

SAR

JBY 216

IN101

IN101

N

KEYPLAN

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PATTERN PLAN - AREA 11

0 4' 8' 16'

1/8" = 1'-0"

UP

DN

DN

M

AT

C H

LI

N

E S

EE

/I N

MATCHLINE

SEE 1 / IN101

OPEN OFFICE

CORR.

JAN.

STORAGE

EXISTING

STAIR

CORRIDOR

ELEV. EQUIP

SERVICE

ELEV

EXISTING

LOADING

DOCK

CORRIDOR

CORR.

CORRIDOR

PHONE

ROOM

0203A

PHONE

ROOM

0203B

PRIVATE

OFFICE

0203C

PRIVATE

OFFICE

0203D

CONFERENCE

ROOM

0203E

EXISTING LAB

EXISTING

STORAGE

COMPUTER

WORKROOM

STORAGE

0215RECORD

STORAGE

FU

LL

TI

LE

S

7' -2

EQ

6'

-6

EQ

EQ 6'-6" EQ

'-6

1/ 2"

25'-3 1/4"

CORRIDOR

7'-9"

4 FULL TILES

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:2

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

BASEMENT FLOOR PATTERN PLAN - AREA

JBY

SAR

JBY 217

IN102

IN102

N

KEYPLAN

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PATTERN PLAN - AREA 21

MATCHLINE

SEE 1 / IN104

M

AT

C H

LI

N

E S

EE

/I N

RR WOMEN

EXISTING

ELEC

SECURE

SHREDDER

SECURE

STORAGE

BREAK ROOM

0310EXISTING

SPRAY ROOM

EXISTING

BOILER

EXISTING

ELEC

EXISTING

BATTERY

BACK UP

CORR.

EXISTING

TEL/COM

RR MEN

RR WOMEN

AREA-WAY

0313 ELEC VAULT

CORRIDOR

RECORD

STORAGE

CORRIDOR

0320 SYSTEMS

0322A

STORAGE

PRINT SHOP

ETR

ETR

ETR

ETR

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:2

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

BASEMENT FLOOR PATTERN PLAN - AREA

JBY

SAR

JBY 218

IN103

IN103N

KEYPLAN

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PATTERN PLAN - AREA 31

SEE 1 / IN103

M

AT

C H

LI

N

E S

EE

/I N

EXISTING

WORK AREA

EXISTING

OPEN OFFICE

EXISTING

OFFICE

0425 EXISTING

STORAGE

RR MEN

EXISTING

CONFERENCE

ROOM

EXISTING

CIRCULATION

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

OPEN OFFICE

EXISTING

OFFICE

EXISTING

STUDIO

EXISTING

OFFICE

EXISTING

CORRIDOR

EXISTING

OFFICE

PRINT SHOP

EXISTING

CORRIDOR

0409 EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

STUDIO

EXISTING

OFFICE

WORK ROOM

CORRIDOR

RR MEN

OPEN OFFICE

CORRIDOR

EXISTING.

TEL/COM

EQ

'-6

"3

FU

LL

TI

LE

S

FOLDER/

INSERTER

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

STAIR 3

ELEV LOBBY

ELEV 3

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:3

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

BASEMENT FLOOR PATTERN PLAN - AREA

JBY

SAR

JBY 219

IN104

IN104N

KEYPLAN

SCALE: 1/8" = 1'-0"

BASEMENT FLOOR PATTERN PLAN - AREA 41

DN

DN

DN

DN

MATCHLINE

SEE 1 / IN112

M

AT

C H

LI

N

E S

EE

/I N

OPEN OFFICE

CIRCULATION

LOUNGE

STAIR 1

ENTRYWAY

ELEV 1

STORAGE

BREAK ROOM

WOMENS

MENS

SYSTEMS

EXISTING

MECH

A/V

CORRIDOR

CONFERENCE

SMF

STORAGE

VEST.

ELEC.

JAN.

COMM

1119E

PHONE

ROOM

1119D

PHONE

ROOM

1119C

PHONE

ROOM

1119B

PHONE

ROOM

1119A

135° 45°

9' -9

9 8

9' -9

78'-0" 1'-1"

9' -1

1/

2"

'-7

1/ 4"

VESTIBULE

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:4

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

FIRST FLOOR PATTERN PLAN - AREA 1

JBY

SAR

JBY 220

IN111

IN111N

KEYPLAN

SCALE: 1/8" = 1'-0"

FIRST FLOOR PATTERN PLAN - AREA 11

DN

DN

DN

DN

M

AT

C H

LI

N

E S

EE

/I N

MATCHLINE

SEE 1 / IN111SMF

STORAGE

EXISTING

TELECOM

VEST.

EXISTING

MECH

EXISTING ATO

ROOM

SERVICE

ELEV

WOMENS

MENS

VENDING

ELEC.

COMM.

OPEN OFFICE

EXISTING

STAIR

ENTRY

EXISTING SMF

DATA ROOM

EXISTING

ELEC CL.

STOR.

OPEN OFFICE

CIRCULATION

52'-0" 1'-5" 9'-9" 1'-6" 43'-10 1/2" 9 3/4" 8'-1 1/2"1'-1 3/4"

'-1

1/ 2" 3

FU

LL

TI

LE

S

82'-10 1/2" 9 3/4"

'-1

1/ 2" 3

FU

LL

TI

LE

S

2 3

4 3

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:5

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

FIRST FLOOR PATTERN PLAN - AREA 2

JBY

SAR

JBY 221

IN112

IN112N

KEYPLAN

SCALE: 1/8" = 1'-0"

FIRST FLOOR PATTERN PLAN - AREA 21

DN DN

SEE 1 / IN114

M

AT

C H

LI

N

E S

EE

/I N

OPEN OFFICE

OPEN OFFICE

CIRCULATION

VEST.

CORRIDOR

COMM.

WOMENS

MENS

JAN.

ELEC.

EXISTING

MECH

BREAK ROOM

CORRIDOR

EXISTING SMF

DATA ROOM

EXISTING

DATA ROOM

CAGE

1'-2 1/4" 74'-9" 1'-4 3/4"

5°

45°

9'-9"

'-1

1/ 2" 3

FU

LL

TI

LE

S

7"

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:5

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

FIRST FLOOR PATTERN PLAN - AREA 3

JBY

SAR

JBY 222

IN113

IN113N

KEYPLAN

SCALE: 1/8" = 1'-0"

FIRST FLOOR PATTERN PLAN - AREA 31

DN

MATCHLINE

SEE 1 / IN113

M

AT

C H

LI

N

E S

EE

/I N

ENTRYWAY

ELEV 3

STORAGE

STAIR 3

LOUNGE

CORRIDOR

EXISTING

MECH

CONFERENCE

COMM.

ELEC.

NURSING

MENS

WOMENS

CIRCULATION

OPEN OFFICE

CORRIDOR

A/V

PRIVATE

OFFICE

1417B

CONFERENCE

ROOM

1417C

PRIVATE

OFFICE

1417D

135°

9'-9"

9' -9

9'-9"

9' -9

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:0

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

FIRST FLOOR PATTERN PLAN - AREA 4

JBY

SAR

JBY 223

IN114

IN114N

KEYPLAN

SCALE: 1/8" = 1'-0"

FIRST FLOOR PATTERN PLAN - AREA 41

DN

DN

DN

MATCHLINE

SEE 1 / IN122

M

AT

C H

LI

N

E S

EE

/I N

OUTDOOR

AREA

CONFERENCE

ROOM

STAIR 1

2103 ENTRYWAY

ELEV 1

LOUNGE

CORRIDOR

WOMENS

MENS

COMM.

ELEC.

SYSTEMS

OPEN OFFICE

STORAGE

STORAGE

OPEN OFFICE

PHONE

ROOM

2113A

PHONE

ROOM

2113B

PHONE

ROOM

2113C

PHONE

ROOM

2113D

PRIVATE

OFFICE

2113F

PRIVATE

OFFICE

2113G

CONFERENCE

ROOM

2113H

FU

LL

TI

LE

S

EQ

EQ

6 FULL TILES

5 FULL TILES

C L C L

CL

EQ EQ

FU

LL

TI

LE

S

'-0

FU

LL

TI

LE

S

'-0

FU

LL

TI

LE

S

'-0

16 FULL TILES

26'-0"

FU

LL

TI

LE

S

5 FULL TILES

16 FULL TILES

26'-0"

C L

OPEN OFFICE

OPEN OFFICE

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:1

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

SECOND FLOOR PATTERN PLAN - AREA 1

JBY

SAR

JBY 224

IN121

IN121N

KEYPLAN

SCALE: 1/8" = 1'-0"

SECOND FLOOR PATTERN PLAN - AREA 11

DN

DN

DN

M

AT

C H

LI

N

E S

EE

/I N

MATCHLINE

SEE 1 / IN121

OPEN OFFICE

JAN.

ELEC.

COMM.

MENS

WOMENS

STORAGE

SERVICE

ELEV

EXISTING

STAIR

OPEN OFFICE

CONFERENCE

ROOM

2113H

OPEN OFFICE

PHONE

ROOM

2304F

PHONE

ROOM

2304G

PRIVATE

OFFICE

2304E

PRIVATE

OFFICE

2304D

CL

C LC L

6 FULL TILES

EQ EQ

4 416 FULL TILES

26'-0"

16 FULL TILES

26'-0"

5 FULL TILES

FU

LL

TI

LE

S

FU

LL

TI

LE

S

'-7

1/ 2"

FU

LL

TI

LE

S

FU

LL

TI

LE

S

'-4

1/ 2"

FU

LL

TI

LE

S

'-7

1/ 2"

C L

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:2

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

SECOND FLOOR PATTERN PLAN - AREA 2

JBY

SAR

JBY 225

IN122

IN122N

KEYPLAN

SCALE: 1/8" = 1'-0"

SECOND FLOOR PATTERN PLAN - AREA 21

MATCHLINE

SEE 1 / IN124

M

AT

C H

LI

N

E S

EE

/I N

OPEN OFFICE

OPEN OFFICE

LOBBY

MENS

2303 WOMENS

COMM.

ELEC.

SYSTEMS

STORAGE

NURSING

CONFERENCE

ROOM

2304C

PRIVATE

OFFICE

2304A

PRIVATE

OFFICE

2304B

FU

LL

TI

LE

S

C L

FU

LL

TI

LE

S

'-4

1/ 2"

FU

LL

TI

LE

S

'-7

1/ 2"

FU

LL

TI

LE

S

5 FULL TILES

16 FULL TILES

26'-0"

6 FULL TILES

16 FULL TILES

26'-0"

4 4

CL

16 FULL TILES

26'-0" 6 FULL TILES

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:3

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

SECOND FLOOR PATTERN PLAN - AREA 3

JBY

SAR

JBY 226

IN123

IN123N

KEYPLAN

SCALE: 1/8" = 1'-0"

SECOND FLOOR PATTERN PLAN - AREA 31

DN

DN

DN

MATCHLINE

SEE 1 / IN123

M

AT

C H

LI

N

E S

EE

/I N

ELEV 3

ENTRYWAY

2402 LOUNGE

STAIR 3

CONFERENCE ROOM

BREAK ROOM

ELEC.

JAN.

COMM.

MENS

WOMENS

STORAGE

OPEN OFFICE

PHONE ROOM

2414A

PHONE ROOM

2414B

PHONE ROOM

2414C

OPEN OFFICE

PHONE ROOM

2308A PHONE ROOM

2308B

PHONE ROOM

2308C

16 FULL TILES

26'-0"

CL

4 4

16 FULL TILES

26'-0" 6 FULL TILES

EQ EQ

CL

C L

FU

LL

TI

LE

S

FU

LL

TI

LE

S

'-0

FU

LL

TI

LE

S

'-0

FU

LL

TI

LE

S

EQ

EQ

5 FULL TILES

16 FULL TILES

26'-0"

OPEN OFFICE

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:4

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

SECOND FLOOR PATTERN PLAN - AREA 4

JBY

SAR

JBY 227

IN124

IN124N

KEYPLAN

SCALE: 1/8" = 1'-0"

SECOND FLOOR PATTERN PLAN - AREA 41

DN

DN

MATCHLINE

SEE 1 / IN132

M

AT

C H

LI

N

E S

EE

/I N

OPEN OFFICE

CONFERENCE

ROOM

STAIR 1

ENTRYWAY

ELEV 1

LOUNGE

BREAK ROOM

WOMENS

MENS

COMM.

ELEC.

SYSTEMS

OPEN OFFICE

PHONE

ROOM

3113A

PHONE

ROOM

3113B

PHONE

ROOM

3113C

PHONE

ROOM

3113D

PRIVATE

OFFICE

3113F

PRIVATE

OFFICE

3113E

CONFERENCE

ROOM

3113G

ELEVATOR

CONTROL

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:5

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

THIRD FLOOR PATTERN PLAN - AREA 1

JBY

SAR

JBY 228

IN131

IN131N

KEYPLAN

SCALE: 1/8" = 1'-0"

THIRD FLOOR PATTERN PLAN - AREA 11

DN UP

DN

DN

DN

DN

M

AT

C H

LI

N

E S

EE

/I N

MATCHLINE

SEE 1 / IN131

SERVICE

ELEV

STORAGE

WOMENS

MENS

ELEC.

COMM.

JAN.

OPEN OFFICE

EXISTING

STAIR

CONFERENCE

ROOM

3113G

OPEN OFFICE

OPEN OFFICE

PHONE

ROOM

3304F

PHONE

ROOM

3304G

PRIVATE

OFFICE

3304D

PRIVATE

OFFICE

3304E

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

9:

:5

AM

C :\U se rs

\J

BG

\D oc um en ts \M y Re vi t\6

_I nt r_

JB

G .rv t

THIRD FLOOR PATTERN PLAN - AREA 2

JBY

SAR

JBY 229

IN132

IN132N

KEYPLAN

SCALE: 1/8" = 1'-0"

THIRD FLOOR PATTERN PLAN - AREA 21

MATCHLINE

SEE 1 / IN134

M

AT

C H

LI

N

E S

EE

/I N

OPEN OFFICE

OPEN OFFICE

COMM.

ELEC.

SYSTEMS

MENS

WOMENS

LOBBY

NURSING

STORAGE

PRIVATE

OFFICE

3304B

PRIVATE

OFFICE

3304C

CONFERENCE

ROOM

3304A

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE SHEETS A-611,

A-612 AND A-613 FOR FINISH INFORMATION NOT

ILLUSTRATED ON INTERIOR FINISH PLANS.

B. DO NOT INSTALL SLIVERS LESS THAN 3".

CONTRACTOR TO PROVIDE SEAMING DIAGRAM TO

ARCHITECT FOR APPROVAL IF CONFLICT OCCURS.

C. FLOORING STOPS AT MILLWORK, U.N.O.

D. "+" INDICATES START POINT FOR FLOOR TILE

INSTALLATIONS.

E. USE THE GRIDS PROVIDED FOR LOCATION OF

ACCENT FLOOR TILES.

F. KEYNOTES AND DIMENSIONS ARE TYPICAL FOR ALL

FLOORS, U.N.O.

FLOOR PATTERN LEGEND

CPT1,2: CARPET TILE (AS SCHEDULED)

CPT1,2: 50/50 MIX (SMOKE/BLUE ACCENT)

CPT3: CARPET TILE (IRON)

CPT4: CARPET TILE (BLUE)

CPT5: CARPET TILE (FLAG BLUE)

CPT6: CARPET TILE

LVT1,2: LUXURY VINYL TILE (AS SCHEDULED)

PFT1: 12"X24" PORCELAIN TILE (WHITE)

PFT2: 6"X24" PORCELAIN TILE (WHITE)

PFT3: 12"X24" PORCELAIN TILE (GRAY)

SHEET KEYNOTES

1. NOT USED

2. ACCESS FLOORING RAMP

3. ALIGN TILE EDGES

4. ALIGN FULL TILE HERE

5. REFER TO SHEET IN102 FOR START POINT OF

CORRIDOR 0201/CORRIDOR 0202 CARPET TILE

INSTALLATION

6. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0203 CARPET TILE INSTALLATION

7. REFER TO SHEET IN101 FOR START POINT OF

OPEN OFFICE 0106 CARPET TILE INSTALLATION

8. INSTALL CARPET TILE IN NORTH - SOUTH

DIRECTION

9. REFTER TO SHEET IN114 FOR START POINT OF

OPEN OFFICE 1119/OPEN OFFICE 1312 CARPET

TILE INSTALLATION

10.REFER TO SHEET IN113 FOR START POINT OF

OPEN OFFICE 1214 CARPET TILE INSTALLATION.

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.