ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL.pdf

PDF 19 MB Posted

Attached to
CONSTRUCTION: Multi-Purpose Building Renovation, FAA, MMAC, Oklahoma City, OK
Solicitation number
6973GH-18-R-00009
Issued by

About this file

ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 10- .html file.htm HTM file
ATTACHMENT 5-SF25.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
ATTACHMENT 10R-BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 7-CONTRACTOR'S RELEASE.pdf PDF
ATTACHMENT 4-WAGE DETERMINATION OK49.pdf PDF
ATTACHMENT 15-ADDENDUM 2.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 MECHANICAL.pdf PDF
ATTACHMENT 3-CHAPTER 33 CONSTRUCTION SAFETY.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL.pdf PDF
ATTACHMENT 8-OPERATIONAL CONTROL DOCUMENTS.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0003.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 12-CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION.pdf PDF
24-ATTEND Sign In Second Site Visit.pdf PDF
ATTACHMENT 6R-SF25A PAYMENT BOND 8/2016.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
AMENDMENT 0002.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 9- .html file.htm HTM file
ATTACHMENT 9R-ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 11-PAST PERFORMANCE SURVEY.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 1.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 ELECTRICAL.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
AMENDMENT 0003.pdf PDF
Show 40 more

Latest 50 of 251 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORLD

AIRPORT

WILL ROGERS

WORLD

AIRPORT

WILL ROGERS

U S

CHICKASHA

SH 39

SH 59

PURCELL

SH 39

I-

U S

U S

S H

S H

I-

OKLA. CITY

SH 152

H.

E.

BA

ILE

Y

U S

TUTTLE

BLANCHARD

SH 37

MUSTANG

EL RENO

I-40 US 66

I-40

YUKON

EDMOND

AIRPARK

MAX WESTHEIMER

SH 9NORMAN

I-240

SHAWNEE

I-40

TURNER

US 62

US 66

KINGFISHER

SH 33

GUTHRIE

S H

SH 105

U S

CHICKASHA

SH 39

SH 59

PURCELL

SH 39

I-

U S

U S

S H

S H

I-

OKLA. CITY

PAGE

SH 152

H.

E.

BA

ILE

Y

U S

AIRPORT

TUTTLE

BLANCHARD

SH 37

MUSTANG

EL RENO

CLARENCE E.

I-40

AIRPORT

US 66

I-40

YUKON

WILEY POST

EDMOND

AIRPARK

MAX WESTHEIMER

SH 9NORMAN

I-240

SHAWNEE

I-40

TURNER

US 62

US 66 CHANDLER

KINGFISHER

SH 33

GUTHRIE

SH 105

DRAINPIPE DRAINPIPE

O

VER

H

AN

G

C

AN

O P Y

C

AN

O P Y

C

AN

O P Y

W H

IP

W H

IP

TR

AN

SFO

R M

ER

C O N C R

ETE

C O N C R

ETE

C O N C R

ETE

A

SP

H

ALT

A

SP

H

ALT

A

SP

H

ALT

A

SP

H

ALT

C O N C R

ETE

S

TAIR

S

S

TAIR

S

2"

R

AM

P

Q U E S A D A D R

S D U K E

AV

E

S D U K E

AV

E

Q U E S A D A D R

E D D

IE

AV

E

S.W. 66TH ST.

D E N N

IN

G A

VE

M A C

A R

TH

U R B

LV

D

S.W. 63RD ST.

S.W. 64TH ST.

S.W. 66TH ST.

C H R

IS

TI

AN

AV

E

S.W. 63RD ST.

S.W. 64TH ST.

S.W. 68TH ST.

S.W.69THST.

D E N N

IN

G

A V E

E D D

IE

AV

E

MIKE MONRONEY BLVD.

F O S

TE

R

D R

IV

E

S.W.61STST.

S.W. 62ND ST.

S.W. 61ST ST.

S.W. 61ST ST. 3.33503437

MULTI-PURPOSE BUILDING

BID OPTION NOTES:

A. REFER TO SPECIFICATIONS FOR FULL BID OPTION

SCOPE OF WORK.

B. OPTION NO. 1 - INSULATED METAL PANELS AT

EXTERIOR WALL OF INTERIOR COURTYARD.

C. OPTION NO. 2 - INSULATED METAL PANEL WALL

MANUFACTURERS INTEGRATED WINDOW SYSTEM

AT THE EXTERIOR WALLS.

D. OPTION NO. 3 - MECHANICAL SCREENS AT ROOF

E. OPTION NO. 4A - ELECTRONIC WINDOW SHADE

CONTROL SYSTEM.

F. OPTION NO. 4B - DYNAMIC GLAZING AT STAIRWELL

CURTAINWALL.

G. OPTION NO. 5A - INSTALL A NEW CONCRETE

TOPPING SLAB OVER A NEW WATERPROOF

MEMBRANE AT THE FIRST FLOOR PERIMETER

WALKWAY.

H. OPTION NO. 5B - INSTALL NEW PAVERS OVER A NEW

WATERPROOF MEMBRANE AT THE FIRST FLOOR

PERIMETER WALKWAY.

I. OPTION NO. 6 - LOADING DOCK ACCESS RAMP

WATERPROOF COATING INSTALLATION ON THE

VERTICAL RAMP WALLS.

TIENG

AI LING

21544

O K L A H O M A

RE

G

IS

T E

RE

D PROFESSIONA L ENG

INEER

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RUSSELL

FRANK

KETNER

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IO NA L

ENG

INEER

15891

JASON K.

BLUBAUGH

25269

O K L A H O M A

LI

C

EN

S E

D

PROFESS IONA L

ENG

INEER

GARY W.

JAMES

16166

O K L A H O M A

LI

C

EN

S E

D

PRO FES S IONA L

ENG

INEER

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

FAA

MIKE MONRONEY AERONAUTICAL CENTER

OKLAHOMA CITY, OKLAHOMA

Frankfurt Short Bruza Architects Engineers Planners

5801 Broadway Ext., Suite 500 Oklahoma City, Oklahoma 73118

Telephone 405 840 2931 Facsimile 405 842 7750

Type B 100% - December 20, 2017

OKLAHOMA CERTIFICATE OF

AUTHORIZATION

ARCHITECTURE: # 00199

EXP. 06/30/19 DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

RENOVATION

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

OKLAHOMA CERTIFICATE OF

AUTHORIZATION

P.E: # 1072

EXP. 06/30/18

VOLUME ONE

G-000.1

G-000.1

CEM

GAK

GMD 1

SCALE: NTS

1 VICINITY PLAN

SCALE: NTS

2 PROJECT LOCATION MAP

N

N

(GENERAL, CIVIL, LANDSCAPE, STRUCTURAL, ARCHITECURAL)

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

/2

0/

7:

:4

AM

C :\U se rs

\c em

\D oc um en ts \M y Re vi t\6

_A rc h_

CE

M .rv t

SHEET INDEX - VOLUME 1

CEM

GAK

GMD 2

G-001.1

G-001.1

SHEET INDEX VOLUME 1

SHEET

NUMBER TITLE

A-202 BUILDING ELEVATIONS

A-203 BUILDING ELEVATIONS

A-204 BUILDING ELEVATIONS

A-205 BUILDING ELEVATIONS

A-301 BUILDING SECTION

A-302 BUILDING SECTION

A-303 WALL SECTIONS

A-304 WALL SECTIONS

A-305 WALL SECTIONS

A-306 WALL SECTIONS

A-307 WALL SECTIONS

A-308 WALL SECTIONS

A-401 ENLARGED CIRCULATION PLANS

A-402 ENLARGED CIRCULATION PLANS

A-403 ENLARGED CIRCULATION PLANS

A-404 ENLARGED CIRCULATION PLANS

A-410 ENLARGED RESTROOM PLANS

A-411 ENLARGED RESTROOM PLANS

A-412 ENLARGED RESTROOM PLANS

A-413 ENLARGED RESTROOM PLANS

A-414 ENLARGED RESTROOM PLANS

A-415 ENLARGED RESTROOM ELEVATIONS

A-416 ENLARGED RESTROOM ELEVATIONS

A-417 ENLARGED RESTROOM ELEVATIONS

A-418 ENLARGED RESTROOM ELEVATIONS

A-420 ENLARGED INTERIOR ELEVATIONS

A-421 ENLARGED INTERIOR ELEVATIONS

A-422 ENLARGED INTERIOR ELEVATIONS

A-423 ENLARGED INTERIOR ELEVATIONS

A-424 ENLARGED INTERIOR ELEVATIONS

A-425 ENLARGED INTERIOR ELEVATIONS

A-426 ENLARGED INTERIOR ELEVATIONS

A-427 ENLARGED INTERIOR ELEVATIONS

A-428 MILLWORK SECTIONS

A-501 DETAILS

A-502 DETAILS

A-503 DETAILS

A-504 DETAILS

A-505 DETAILS

A-506 DETAILS

A-510 DOOR AND GLAZING DETAILS

A-511 DOOR TYPES ,FRAME TYPES AND GLAZING DETAILS

A-601 DOOR SCHEDULE

A-602 GLAZING ELEVATIONS

A-603 GLAZING ELEVATIONS

A-604 GLAZING ELEVATIONS

A-605 GLAZING ELEVATIONS

A-606 GLAZING ELEVATIONS

A-607 GLAZING ELEVATIONS

A-608 INTERIOR GLAZING ELEVATIONS

A-609 INTERIOR GLAZING ELEVATIONS

A-610 INTERIOR GLAZING ELEVATIONS

A-611 ROOM FINISH SCHEDULE - PHASE ONE

A-612 ROOM FINISH SCHEDULE - PHASE TWO

A-613 ROOM FINISH SCHEDULE - PHASE TWO

SHEET INDEX VOLUME 1

SHEET

NUMBER TITLE

SF403 ENLARGED THIRD FLOOR FRAMING PLANS

SF404 ENLARGED ROOF FRAMING PLANS

SF405 ENLARGED HIGH ROOF FRAMING PLANS

SF406 ENLARGED AHU 3-1 AND 3-2 PLATFORM FRAMING PLAN AND ELEVATIONS

SF407 ENLARGED AHU 3-3 AND 3-4 PLATFORM FRAMING PLAN AND ELEVATIONS

SF408 ENLARGED ELECTRICAL VAULT FRAMING PLAN

SF501 FRAMING SECTIONS AND DETAILS

SF502 FRAMING SECTIONS AND DETAILS

SF503 FRAMING SECTIONS AND DETAILS

SF504 FRAMING SECTIONS AND DETAILS

SF505 FRAMING SECTIONS AND DETAILS

SF506 FRAMING SECTIONS AND DETAILS

SF507 FRAMING SECTIONS AND DETAILS

SF508 FRAMING SECTIONS AND DETAILS

SF509 FRAMING SECTIONS AND DETAILS

SF510 FRAMING SECTIONS AND DETAILS

SF511 FRAMING SECTIONS AND DETAILS

SF901 3D ISOMETRIC VIEWS

SF902 3D ISOMETRIC VIEWS

ARCHITECTURAL

A-001 PARTITION TYPES & SYMBOLS LEGEND

AD-100 COMPOSITE BASEMENT DEMOLITION PLAN

AD-101 BASEMENT DEMOLITION - AREA 1

AD-102 BASEMENT DEMOLITION - AREA 2

AD-103 BASEMENT DEMOLITION - AREA 3

AD-104 BASEMENT DEMOLITION - AREA 4

AD-110 COMPOSITE FIRST FLOOR DEMOLITION PLAN

AD-111 FIRST FLOOR DEMOLITION - AREA 1

AD-112 FIRST FLOOR DEMOLITION - AREA 2

AD-113 FIRST FLOOR DEMOLITION - AREA 3

AD-114 FIRST FLOOR DEMOLITION - AREA 4

AD-120 COMPOSITE SECOND FLOOR DEMOLITION PLAN

AD-121 SECOND FLOOR DEMOLITION - AREA 1

AD-122 SECOND FLOOR DEMOLITION - AREA 2

AD-123 SECOND FLOOR DEMOLITION - AREA 3

AD-124 SECOND FLOOR DEMOLITION - AREA 4

AD-125 SECOND FLOOR DEMOLITION - COURTYARD

AD-130 COMPOSITE THIRD FLOOR DEMOLITION PLAN

AD-131 THIRD FLOOR DEMOLITION - AREA 1

AD-132 THIRD FLOOR DEMOLITION - AREA 2

AD-133 THIRD FLOOR DEMOLITION - AREA 3

AD-134 THIRD FLOOR DEMOLITION - AREA 4

AD-201 DEMOLITION ELEVATIONS

AD-202 DEMOLITION ELEVATIONS

AD-203 DEMOLITION ELEVATIONS

AD-204 DEMOLITION ELEVATIONS

AD-205 DEMOLITION ELEVATIONS

A-100 COMPOSITE BASEMENT FLOOR PLAN - PHASE 1

A-101 BASEMENT FLOOR PLAN - AREA 1 - PHASE 1

A-102 BASEMENT FLOOR PLAN - AREA 2 - PHASE 1

A-103 BASEMENT FLOOR PLAN - AREA 3 - PHASE 1

A-104 BASEMENT FLOOR PLAN - AREA 4 - PHASE 1

A-105 OVERALL BASEMENT FLOOR PLAN - PHASE 2

A-106 ENLARGED BASEMENT FLOOR PLANS

A-107 LOADING DOCK

A-108 LOADING DOCK

A-110 COMPOSITE FIRST FLOOR PLAN

A-111 FIRST FLOOR PLAN - AREA 1

A-112 FIRST FLOOR PLAN - AREA 2

A-113 FIRST FLOOR PLAN - AREA 3

A-114 FIRST FLOOR PLAN - AREA 4

A-120 COMPOSITE SECOND FLOOR PLAN

A-121 SECOND FLOOR PLAN - AREA 1

A-122 SECOND FLOOR PLAN - AREA 2

A-123 SECOND FLOOR PLAN - AREA 3

A-124 SECOND FLOOR PLAN - AREA 4

A-125 SECOND FLOOR PLAN - OUTDOOR AREA

A-130 COMPOSITE THIRD FLOOR PLAN

A-131 THIRD FLOOR PLAN - AREA 1

A-132 THIRD FLOOR PLAN - AREA 2

A-133 THIRD FLOOR PLAN - AREA 3

A-134 THIRD FLOOR PLAN - AREA 4

A-140 ROOF PLAN

A-141 CANOPY PLAN SECTIONS AND DETAILS

A-150 BASEMENT REFLECTED CEILING PLAN - PHASE 1

A-151 FIRST FLOOR REFLECTED CEILING PLAN

A-152 SECOND FLOOR REFLECTED CEILING PLAN

A-153 THIRD FLOOR REFLECTED CEILING PLAN

A-154 ENLARGED REFLECTED CEILING PLAN

A-155 ENLARGED REFLECTED CEILING PLAN

A-156 ENLARGED REFLECTED CEILING PLAN

A-201 BUILDING ELEVATIONS

SHEET INDEX VOLUME 1

SHEET

NUMBER TITLE

GENERAL

G-000.1 COVER SHEET - VOLUME 1

G-001.1 SHEET INDEX - VOLUME 1

G-002 CODE ANALYSIS

G-100 BASEMENT CODE PLAN

G-101 FIRST FLOOR CODE PLAN

G-102 SECOND FLOOR CODE PLAN

G-103 THIRD FLOOR CODE PLAN

G-200 BASEMENT PHASING PLAN - SEQUENCE A

G-201 BASEMENT PHASING PLAN - SEQUENCE B

G-202 FIRST FLOOR PHASING PLAN - SEQUENCE A

G-203 FIRST FLOOR PHASING PLAN - SEQUENCE B

SURVEY/MAPPING

V-101 TOPOGRAPHIC SURVEY

CIVIL

C-001 GENERAL NOTES

C-002 LEGEND & ABBREVIATIONS

CD101 SITE DEMOLITION PLAN

CS101 SITE LAYOUT PLAN

CP101 SITE JOINTING PLAN

CG101 SITE GRADING PLAN

CG102 ENLARGED SITE GRADING PLAN

CG401 EROSION CONTROL PLAN

CG501 EROSION CONTROL NOTES & DETAILS

CU101 SITE UTILITY PLAN

C-501 PAVING & JOINT DETAILS

C-502 JOINT DETAILS

C-503 STORM DRAIN DETAILS

C-504 AREA INLET DETAILS

LANDSCAPE

LS101 LANDSCAPE SITE PLAN

LS401 DETAIL AREAS A1 AND A2 PAVING LAYOUT PLANS

LS402 DETAIL AREAS A1 AND AS MISCELLANEOUS LAYOUT PLANS

LS403 DETAIL AREAS B1 AND B2 LAYOUT PLANS

LS404 SECOND FLOOR OUTDOOR AREA PAVING PLAN

LS501 HARDSCAPE DETAILS

LS502 HARDSCAPE DETAILS

LS503 FACILITY SIGN DETAILS

LG401 DETAIL AREAS A1, A2 AND B2 PLANTING BED GRADING PLANS

LP101 SITE LANDSCAPE PLAN

STRUCTURAL

S-001 GENERAL NOTES

S-002 GENERAL NOTES

S-003 TYPICAL DETAILS

S-004 TYPICAL DETAILS

S-005 WIND DIAGRAM AND TYPICAL DETAILS

S-006 TYPICAL DETAILS

SB101 BASEMENT FOUNDATION SLAB PLAN - AREA 1

SB102 BASEMENT FOUNDATION SLAB PLAN - AREA 2

SB103 BASEMENT FOUNDATION SLAB PLAN - AREA 3

SB104 BASEMENT FOUNDATION SLAB PLAN - AREA 4

SB401 ENLARGED BASEMENT FOUNDATION PLANS

SB402 AREAWAY ENLARGED PLANS AND DETAILS

SB501 FOUNDATION DETAILS

SB502 FOUNDATION DETAILS

SB503 FOUNDATION DETAILS

SB504 FOUNDATION DETAILS

SB505 FOUNDATION DETAILS

SF101 FIRST FLOOR FRAMING PLAN - AREA 1

SF102 FIRST FLOOR FRAMING PLAN - AREA 2

SF103 FIRST FLOOR FRAMING PLAN - AREA 3

SF104 FIRST FLOOR FRAMING PLAN - AREA 4

SF105 SECOND FLOOR FRAMING PLAN - AREA 1

SF106 SECOND FLOOR FRAMING PLAN - AREA 2

SF107 SECOND FLOOR FRAMING PLAN - AREA 3

SF108 SECOND FLOOR FRAMING PLAN - AREA 4

SF109 THIRD FLOOR FRAMING PLAN - AREA 1

SF110 THIRD FLOOR FRAMING PLAN - AREA 2

SF111 THIRD FLOOR FRAMING PLAN - AREA 3

SF112 THIRD FLOOR FRAMING PLAN - AREA 4

SF113 ROOF FRAMING PLAN - AREA 1

SF114 ROOF FRAMING PLAN - AREA 2

SF115 ROOF FRAMING PLAN - AREA 3

SF116 ROOF FRAMING PLAN - AREA 4

SF201 FRAMING ELEVATIONS

SF202 FRAMING ELEVATIONS

SF203 FRAMING ELEVATIONS

SF204 FRAMING ELEVATIONS

SF205 FRAMING ELEVATIONS AND DETAILS

SF206 FRAMING ELEVATIONS AND DETAILS

SF401 ENLARGED FIRST FLOOR FRAMING PLANS

SF402 ENLARGED SECOND FLOOR AND CANOPY ROOF FRAMING PLANS

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

1:

:1

PM

C :\U se rs

\d ap

\D oc um en ts \6

_A rc h_ da p.

rv t

CODE ANALYSIS

CEM

GAK

GMD 3

G-002

G-002

UP

DN

DN

DN

DN

DN

DN

DN

DN

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R

E1HR E1HRE1HR

E1HR

E

1H R

E 1H

R E

1H R

E 1H

R E

1H R

E1HR

E 1H

R

1HR

1HR

1H R

E1HR E1HRE1HR E1HR

E

1H R

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R

E1HR

E 1H

R E

1H R

E 1H

R

E1HR E1HRE1HR E1HR E1HR E1HR1HR 1HR1HR

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R

E1HR E1HRE1HR E1HR

1HR 1HR1HR

1H R

1H R

1HR

1HR

1H R

E 1H

R

E 1H

R

E1HR E1HR

E1HR E1HR

TR

A

VE

L

D

IS

TA

N

C E

3'

-8

TRAVEL DISTANCE 215'-0"

TRAVEL DISTANCE 156'

TR

A

VE

L

D

IS

TA

N

C E

8'

-0

ETR

ETR

0419 0421

0416 0417

04180413

0425 0427

0428 0101

0313 0312

03190310

TR

A

VE

L

D

IS

TA

N

C E

4'

-0

TR

AV

EL

D

IS

TA

N C

E

6'

0214 0216

0203A 0203B

0203C 0203C

0203E

0108E

0108D0108C 0108B

0108A

LIFE SAFETY LEGEND

OCCUPANT LOAD NUMBER AT EXIT

COMPONENT

EXIT COMPONENT MAXIMUM OCCUPANT

CAPACITY NUMBER

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

WALL BRACKET

MOUNTED AT 48" AFF

DRY CHEMICAL TYPE FIRE EXTINGUISHER IN

SURFACE MOUNTED CABINET

MOUNTED AT 48" AFF

TWO HOUR CONSTRUCTION2 HR

ONE HOUR CONSTRUCTION1 HR

SMOKE ENCLOSURE CONSTRUCTIONS

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

SEMI-RECESSED

MOUNTED AT 48" AFF

TRAVEL DISTANCE

OCCUPANCY LEGEND

B - BUSINESS

46, 549SF/ 100 SF

466 OCCUPANTS

S-1 STORAGE (AND MECHANICAL)

13, 557 SF/ 300 SF

46 OCCUPANTS

TOTAL OCC. LOAD: 512

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

1:

:3

PM

C :\U se rs

\d ap

\D oc um en ts \6

_A rc h_ da p.

rv t

BASEMENT CODE PLAN

CEM

GAK

GMD 4

G-100

G-100

SCALE: 1/16" = 1'-0"

1 BASEMENT CODE PLAN

N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

NOTE: FURNITURE SHOWN FOR

REFERENCE ONLY

BASEMENT FLOOR

ROOM NUMBER ROOM NAME

0101 RR WOMEN

0103 BREAK ROOM

0104 CONFERENCE ROOM

0105 CORRIDOR

0106 OPEN OFFICE

0107 CORRIDOR

0108 OPEN OFFICE

0108A PRIVATE OFFICE

0108B PHONE ROOM

0108C PHONE ROOM

0108D PHONE ROOM

0108E CONFERENCE ROOM

0112 ELEC.

0113 COMM.

0115 COMPUTER WORK ROOM

0201 CORRIDOR

0202 CORRIDOR

0203 OPEN OFFICE

0203A PHONE ROOM

0203B PHONE ROOM

0203C PRIVATE OFFICE

0203D PRIVATE OFFICE

0203E CONFERENCE ROOM

0204 ELEV. EQUIP

0205 SERVICE ELEV

0206 CORRIDOR

0207 CORRIDOR

0208 EXISTING LOADING DOCK

0209 EXISTING STAIR

0210 EXISTING LAB

0211 STORAGE

0212 RECORD STORAGE

0213 CORR.

0214 STORAGE

0215 STORAGE

0216 EXISTING STORAGE

0301 RR WOMEN

0303 RR MEN

0304 JAN.

0305 EXISTING TEL/COM

0306 CORR.

0308 EXISTING BATTERY BACK UP

0309 EXISTING ELEC

0310 BREAK ROOM

0311 EXISTING BOILER

0312 ELEC VAULT

0313 AREA-WAY

0314 EXISTING SPRAY ROOM

0315 EXISTING ELEC

0316 RR WOMEN

0318 SECURE STORAGE

0319 SECURE SHREDDER

0320 CORRIDOR

0321 FOLDER/ INSERTER

0322 STORAGE

0322A SYSTEMS

0322B JAN.

0401 RR MEN

0402 CORRIDOR

0403 WORK ROOM

0404 EXISTING OFFICE

0405 EXISTING STUDIO

0406 EXISTING OFFICE

0407 PRINT SHOP

0408 EXISTING OFFICE

0409 EXISTING CORRIDOR

0411 EXISTING STUDIO

0412 EXISTING OPEN OFFICE

0413 EXISTING OFFICE

0414 EXISTING WORK AREA

0415 EXISTING OPEN OFFICE

0416 EXISTING OFFICE

0417 EXISTING OFFICE

0418 EXISTING CORRIDOR

0419 EXISTING OFFICE

0421 EXISTING OFFICE

0422 EXISTING CONFERENCE ROOM

0423 EXISTING CIRCULATION

0425 EXISTING OFFICE

0426 EXISTING. TEL/COM

0427 EXISTING STORAGE

0428 RR MEN

DN

UP

UP

DN

DN

DN DN

DN

DN

DN

DN

DNDN DN

DN

AB

C

1HR 1HR1HR

1H R

1H R

1H R

1H R

1HR

1H R

1H R

1HR 1HR

1HR

1H R

1H R

1H R

1HR

1H R

E 1H

R E

1H R

E 1H

R

E1HR E

1H

R E

1H R

E 1H

R

E1HR

E 1H

R E

1H

RE1HR E1HRE1HR

1H R

1H R

1H R

E 1H

R

E 1H

R

E1HR E1HR

E1HR E1HR

E1HR E1HR E

1H

R E1HR

E1HR E1HRE1HR E1HR

E 1H

R E

1H R

E1HR E1HRE1HR E1HR E

1H

R E

1H R

E 1H

R E

1H

RE1HR E

1H

RE1HR E1HRE1HR

E 1H

R E

1H R

E 1H

R

E1HR E1HRE1HR

E1HR E1HRE1HR E1HR

E 1H

R E

1H R

E1HR

E1HRE1HR

E1HRE

1H

R E

1H R

E1HR E1HR E1HR E1HRE1HR E1HR E1HR E1HR E1HR

E 1H

R E

1H

R1HR 1HR1HR

1HR 1HR1HR 1HR

1HR

1H R

1H R

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R E

1H R

E 1H

R E

1H R

E1HR E1HRE1HR E1HR E1HR E1HR E1HR E1HR E1HR E1HRE1HR E1HR 1H

R

1H R

1H R

1HR 1HR

TBD

12151216

1108 1109

14081409

13031304

TRAVEL DISTANCE 228'-0" TRAVEL DISTANCE 272'-0"

TR

A

VE

L

D

IS

TA

N

C E

2'

-0

TRAVEL DISTANCE 152'-2"

TRAVEL DISTANCE 174'-0"TRAVEL DISTANCE 174'-0"

1119E

1417C

1417B

1417D

1119C

1119D

1119B

1119A

LIFE SAFETY LEGEND

OCCUPANT LOAD NUMBER AT EXIT

COMPONENT

EXIT COMPONENT MAXIMUM OCCUPANT

CAPACITY NUMBER

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

WALL BRACKET

MOUNTED AT 48" AFF

DRY CHEMICAL TYPE FIRE EXTINGUISHER IN

SURFACE MOUNTED CABINET

MOUNTED AT 48" AFF

TWO HOUR CONSTRUCTION2 HR

ONE HOUR CONSTRUCTION1 HR

SMOKE ENCLOSURE CONSTRUCTIONS

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

SEMI-RECESSED

MOUNTED AT 48" AFF

TRAVEL DISTANCE

OCCUPANCY LEGEND

B - BUSINESS

49, 803 SF/ 100 SF

498 OCCUPANTS

S-1 STORAGE (AND MECHANICAL)

5, 070 SF/ 300 SF

17 OCCUPANTS

TOTAL OCC. LOAD: 515

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

1:

:5

PM

C :\U se rs

\d ap

\D oc um en ts \6

_A rc h_ da p.

rv t

FIRST FLOOR CODE PLAN

CEM

GAK

GMD 5

G-101

G-101

SCALE: 1/16" = 1'-0"

1 FIRST FLOOR CODE PLAN

FIRST FLOOR

ROOM

NUMBER ROOM NAME

0109 STAIR 1

0110 ELEV LOBBY

0111 ELEV 1

0204 ELEV EQUIPMENT

0205 SERVICE ELEVATOR

0429 STAIR 3

0430 ELEV LOBBY

0431 ELEV 3

1101 VESTIBULE

1102 STAIR 1

1103 ELEV 1

1104 STORAGE

1105 ENTRYWAY

1106 LOUNGE

1107 CORRIDOR

1108 WOMENS

1109 MENS

1110 CORRIDOR

1111 SYSTEMS

1112 ELEC.

1113 JAN.

1114 A/V

1115 EXISTING MECH

1116 CONFERENCE

1118 BREAK ROOM

1119 OPEN OFFICE

1119A PHONE ROOM

1119B PHONE ROOM

1119C PHONE ROOM

1119D PHONE ROOM

1119E COMM

1120 CIRCULATION

1201 VEST.

1207 CORRIDOR

1209 STOR.

1211 EXISTING MECH

1212 VENDING

1213 ELEC.

1214 COMM.

1215 MENS

1216 WOMENS

1217 CIRCULATION

1218 OPEN OFFICE

1219 EXISTING STAIR

1221 SERVICE ELEV

1222 EXISTING ATO ROOM

1223 EXISTING SMF DATA ROOM

1224 ENTRY

1225 SMF STORAGE

1226 EXISTING TELECOM

1227 EXISTING DATA ROOM

1228 ELEC CL.

1301 VEST.

1302 CORRIDOR

1303 WOMENS

1304 MENS

1305 COMM.

1306 EXISTING MECH

1307 ELEC.

1308 JAN.

1309 BREAK ROOM

1311 CORRIDOR

1312 OPEN OFFICE

1313 CIRCULATION

1314 OPEN OFFICE

1315 EXISTING DATA ROOM CAGE

1401 VESTIBULE

1402 STAIR 3

1403 ELEV 3

1404 STORAGE

1405 ENTRYWAY

1406 LOUNGE

1407 CORRIDOR

1408 WOMENS

1409 MENS

1411 NURSING

1412 ELEC.

1413 COMM.

1414 EXISTING MECH

1415 CONFERENCE

1416 A/V

1417 OPEN OFFICE

1417B PRIVATE OFFICE

1417C CONFERENCE ROOM

1417D PRIVATE OFFICE

1418 CIRCULATION

N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

NOTE: FURNITURE SHOWN FOR

REFERENCE ONLY

UPDN

UP

DN

DN

DN DN

DN

DN

DN

DN

DN

DN

DN

DN

AB

C

1HR 1HR1HR

1H R 1H

R

1HR

2H R

2H R

2H R

2H R

2H R

2H R

2H R

1H R

1H R

1H R

1H R

1H R

1H R

1HR

1HR

E 1H

R E

1H R

E 1H

R

E1HR

E 1H

R E

1H R

E 1H

R

E1HR

E 1H

R

E 1H

R

E1HR

1H R

1HR 1HR

1H R

1HR 1HR

1HR 1HR1HR

1H R

1HR1HR 1HR

1H R

1H R

1H R

1HR 1H

R

1H R

1H R

1H R

1H R

1H R

1HR

1H R

1H R

1H R

TRAVEL DISTANCE 179'-0"

TR

A

VE

L

D

IS

TA

N

C E

3'

-0

TR

A

VE

L

D

IS

TA

N

C E

2'

-0

2103 2102

24082409

2107 2108

23022303

2212 2211

21142115

TRAVEL DISTANCE 134'-0"

2113G2113F

2304B

2304C

2304A

2414A 2414B 2414C

2113D

2113C

2113B2113A

2113H

2304E2304D

23042304

2308A 2308C 2309D

2308B

2304F

2304G

LIFE SAFETY LEGEND

OCCUPANT LOAD NUMBER AT EXIT

COMPONENT

EXIT COMPONENT MAXIMUM OCCUPANT

CAPACITY NUMBER

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

WALL BRACKET

MOUNTED AT 48" AFF

DRY CHEMICAL TYPE FIRE EXTINGUISHER IN

SURFACE MOUNTED CABINET

MOUNTED AT 48" AFF

TWO HOUR CONSTRUCTION2 HR

ONE HOUR CONSTRUCTION1 HR

SMOKE ENCLOSURE CONSTRUCTIONS

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

SEMI-RECESSED

MOUNTED AT 48" AFF

TRAVEL DISTANCE

OCCUPANCY LEGEND

OUTDOOR AREA IBC 1004.5

15, 167 SF

B - BUSINESS

45, 920 SF/ 100 SF

460 OCCUPANTS

S-1 STORAGE (AND MECHANICAL)

1, 986 SF/ 300 SF

7 OCCUPANTS

TOTAL OCC. LOAD: 467

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

1:

:1

PM

C :\U se rs

\d ap

\D oc um en ts \6

_A rc h_ da p.

rv t

SECOND FLOOR CODE PLAN

CEM

GAK

GMD 6

G-102

G-102

SCALE: 1/16" = 1'-0"

1 SECOND FLOOR CODE PLAN

N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

SECOND FLOOR

ROOM

NUMBER ROOM NAME

2101 ELEV 1

2102 ENTRYWAY

2103 STAIR 1

2104 LOUNGE

2105 OPEN OFFICE

2106 CORRIDOR

2107 WOMENS

2108 MENS

2109 COMM.

2111 ELEC.

2112 SYSTEMS

2113 OPEN OFFICE

2113A PHONE ROOM

2113B PHONE ROOM

2113C PHONE ROOM

2113D PHONE ROOM

2113F PRIVATE OFFICE

2113G PRIVATE OFFICE

2113H CONFERENCE ROOM

2114 STORAGE

2115 STORAGE

2116 BREAK ROOM

2117 CONFERENCE ROOM

2207 JAN.

2208 ELEC.

2209 COMM.

2211 MENS

2212 WOMENS

2213 STORAGE

2214 SERVICE ELEV

2215 OPEN OFFICE

2216 EXISTING STAIR

2301 LOBBY

2302 WOMENS

2303 MENS

2304 OPEN OFFICE

2304A PRIVATE OFFICE

2304B PRIVATE OFFICE

2304C CONFERENCE ROOM

2304D PRIVATE OFFICE

2304E PRIVATE OFFICE

2304F PHONE ROOM

2304G PHONE ROOM

2305 COMM.

2306 ELEC.

2307 SYSTEMS

2308 OPEN OFFICE

2308A PHONE ROOM

2308B PHONE ROOM

2308C PHONE ROOM

2309 NURSING

2309D PHONE ROOM

2311 STORAGE

2401 ELEV 3

2402 ENTRYWAY

2403 STAIR 3

2404 LOUNGE

2405 CONFERENCE ROOM

2407 BREAK ROOM

2408 WOMENS

2409 MENS

2411 JAN.

2412 ELEC.

2413 COMM.

2414 OPEN OFFICE

2414A PHONE ROOM

2414B PHONE ROOM

2414C PHONE ROOM

2415 STORAGE

2500 OUTDOOR AREA

DN UP

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

AB

C

DN

DN

1HR 1HR1HR

1H R

1HR

1H R

1H R

2H R

2H R

2H R

2H R

2H R

2H R

2H R

1H R

1H R

E1HR

E 1H

R

E1HR

E 1H

R

E 1H

R E

1H R

E 1H

R

E 1H

R E

1H R

E 1H

R

E1HR

1H R

1H R

1H R

1H R

1HR

1HR

1H R

1HR 1HR

1HR 1HR

1H R

1H R

1H R

1HR 1H

R

1H R

1H R

1HR 1HR1HR 1H

R

1H

R1HR1HR 1HR1H

R 1H

R 1H

R

1HR

1H R

1H R

1H R

TRAVEL DISTANCE 196'-0"

3'

-0 "T

R

AV

EL

D

IS

TA

N C

E

TRAVEL DISTANCE 133'-0"

TR

A

VE

L

D

IS

TA

N

C E

3'

-0

34083409

3107 3108

33023303

3212 3211

3103 3102

3304A

3304C3304B

3113G

3113E 3113F

3113D

3113C

3113B

3113A

3308C

3308B 3308A

3308D

3304E3304D

3414A 3414B 3414C

3304G

3304F

LIFE SAFETY LEGEND

OCCUPANT LOAD NUMBER AT EXIT

COMPONENT

EXIT COMPONENT MAXIMUM OCCUPANT

CAPACITY NUMBER

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

WALL BRACKET

MOUNTED AT 48" AFF

DRY CHEMICAL TYPE FIRE EXTINGUISHER IN

SURFACE MOUNTED CABINET

MOUNTED AT 48" AFF

TWO HOUR CONSTRUCTION2 HR

ONE HOUR CONSTRUCTION1 HR

SMOKE ENCLOSURE CONSTRUCTIONS

DRY CHEMICAL TYPE FIRE EXTINGUISHER -

SEMI-RECESSED

MOUNTED AT 48" AFF

TRAVEL DISTANCE

OCCUPANCY LEGEND

B - BUSINESS

44, 811 SF/ 100 SF

449 OCCUPANTS

S-1 STORAGE (AND MECHANICAL)

2, 637 SF/ 300 SF

9 OCCUPANTS

TOTAL OCC. LOAD: 458

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T

A

T E O F O K LA HO

M A

/2

0/

1:

:3

PM

C :\U se rs

\d ap

\D oc um en ts \6

_A rc h_ da p.

rv t

THIRD FLOOR CODE PLAN

CEM

GAK

GMD 7

G-103

G-103

SCALE: 1/16" = 1'-0"

1 THIRD FLOOR CODE PLAN

N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

THIRD FLOOR

ROOM

NUMBER ROOM NAME

3101 ELEV 1

3102 ENTRYWAY

3103 STAIR 1

3104 LOUNGE

3105 OPEN OFFICE

3106 ELEVATOR CONTROL

3107 WOMENS

3108 MENS

3109 COMM.

3111 ELEC.

3112 SYSTEMS

3113 OPEN OFFICE

3113A PHONE ROOM

3113B PHONE ROOM

3113C PHONE ROOM

3113D PHONE ROOM

3113E PRIVATE OFFICE

3113F PRIVATE OFFICE

3113G CONFERENCE ROOM

3116 BREAK ROOM

3117 CONFERENCE ROOM

3207 JAN.

3208 ELEC.

3209 COMM.

3211 MENS

3212 WOMENS

3213 STORAGE

3214 SERVICE ELEV

3215 OPEN OFFICE

3216 EXISTING STAIR

3301 LOBBY

3302 WOMENS

3303 MENS

3304 OPEN OFFICE

3304A CONFERENCE ROOM

3304B PRIVATE OFFICE

3304C PRIVATE OFFICE

3304D PRIVATE OFFICE

3304E PRIVATE OFFICE

3304F PHONE ROOM

3304G PHONE ROOM

3305 COMM.

3306 ELEC.

3307 SYSTEMS

3308 OPEN OFFICE

3308A PHONE ROOM

3308B PHONE ROOM

3308C PHONE ROOM

3308D PHONE ROOM

3309 NURSING

3311 STORAGE

3401 ELEV 3

3402 ENTRYWAY

3403 STAIR 3

3404 LOUNGE

3405 CONFERENCE ROOM

3407 BREAK ROOM

3408 WOMENS

3409 MENS

3410 ELEVATOR CONTROL

3411 JAN.

3412 ELEC.

3413 COMM.

3414 OPEN OFFICE

3414A PHONE ROOM

3414B PHONE ROOM

3414C PHONE ROOM

3415 STORAGE

UP

UP

UP

DN

A. SEQUENCING NOTED ON THESE PLANS ARE A

SUGGESTED APPROACH TO THE SCOPE OF WORK.

CONTRACTOR SHALL COORDINATE ALL PHASING

WITH GOVERNMENT PRIOR TO STARTING WORK.

B. AT LEAST TWO MEANS OF EGRESS SHALL BE

MAINTAINED AT ALL TIMES WHILE BUILDING IS

OCCUPIED.

C. ALL TEMPORARY CONSTRUCTION SHALL BE

PROVIDED AND CONSTRUCTED PER IBC 3306.

D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF

DATA CENTER IS TO BE CAREFULLY PROTECTED

DURING CONSTRUCTION.

EQ-031

EQ-021

EQ-020

EQ-031 EQ-019

EQ-031

EQ-017

EQ

-0

EQ

-0

EQ

-0

EQ-031

EQ-018

EQ-031 EQ-018

EQ-021 EQ-020EQ-031

EQ-022 EQ-022 EQ-022 EQ-022

EQ

-0

EQ

-0

EQ

-0

EQ-022 EQ-022

EQ-022 EQ-022

TABLEHEAT TUNNEL

PAPER DRILL

PRESS

EQ-031

EQ-017

EQ-026

EQ-019

EQ-031

SECURE

STORAGE

SECURE

SHREDDER

EQ-036

EQ-036EQ-036

EQ-036

EQ-031 EQ-031

EQ-007 EQ-006

EQ-005

EQ

-0

EQ

-0

31 EQ-004

EQ-003

EQ-002

EQ-001

EQ

-0

EQ

-0

31 EQ

-0

EQ-031

EQ

-0

EQ-031R

EQ-015

EQ

-0

EQ

-0

EQ

-0

R

EQ-031

EQ-031

EQ

-0

R

EQ

-0

R

EQ-031R

EQ

-0

EQ-031

EQ-014

EQ

-0

EQ

-0

EQ

-0

EQ

-0

EQ

-0

EQ-031

EQ-031 EQ-031R

EQ-033

EQ-030

EQ-035EQ-034

EQ-030

EQ-034EQ-034

PRINT SHOP

EQ-033

A1

A1

A4

A4

ALIGN

'-2

1/ 4"

24'-2"

RR MEN

RR WOMEN

0316 CORRIDOR

BREAK ROOM

RR WOMEN

STORAGE

CORR.

RR MEN

JAN.

AREA-WAY

ELEC VAULT

0312 A-410

A-411

C1C1

C1

C1C1

F1

4 4

LIMITS OF CONSTRUCTION -

PHASE 1 SEQUENCE A

NOT IN SCOPE

AREA TO BE OCCUPIED DURING

NORMAL BUSINESS HOURS

AREA TO BE OCCUPIED 24 HOURS A

DAY, 7 DAYS A WEEK

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

/2

0/

7:

:2

AM

C :\U se rs

\c em

\D oc um en ts \M y Re vi t\6

_A rc h_

CE

M .rv t

BASEMENT PHASING PLAN - SEQUENCE A

MRO

JRM

GMD 8

G-200

G-200N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

SCALE: 1/16" = 1'-0"

1 PROPOSED BASEMENT SEQUENCING PLAN - PHASE 1A

GENERAL NOTES

PRINT SHOP EQUIP. SCHEDULE

MARK DESCRIPTION MANUF. MODEL UTILITIES NOTES

EQ-001 STITCHER ISP STITCHING AND

BINDERY PRODUCTS

S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1

EQ-002 WIRE STITCHER BOSTICH 7AW 115V, 1PH, 6.8A, 1/3HP 1

EQ-003 STITCHER ISP STITCHING AND

BINDERY PRODUCTS

S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1

EQ-004 WIRE STITCHER STANLEY BOSTITCH 7AW 115V, 1PH, 5.8A, 1/3HP 1

EQ-005 HYDRAULIC PAPER CUTTER PRO-CUT 320 MPS 208V, 1PH,30A, 1/2HP 5

EQ-006 HYDRAULIC PAPER CUTTER CHALLENGE TITAN 200 208V, 1PH, 12A 5

EQ-007 PAPER CUTTER CHALLENGE 193 HBE 230A, 3PH, 9.4A, 15A MAX

BREAKER

EQ-008 PAPER SHREDDER FELLOWES 520HS 115V, 1PH, 11A 1

EQ-009 PRINTER 3 KODAK DIGIMASTER EX150 VIF 1

EQ-010 PRINTER/COPIER/SCANNER KONICA MINOLTA HD506 VIF 4

EQ-011 PRINTER/COPIER/SCANNER RICOH PRO C900S 208V, 1PH, 24A 4

EQ-012 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET

Z6100PS

120V, 1PH, 4A 1

EQ-013 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET

Z6100PS

120V, 1PH, 4A 1

EQ-014 LAMINATOR GBC EAGLE 105 208V, 1PH, 10A 1

EQ-015 PRINTER 4 CANON IMAGERUNNER 110 VIF 4

EQ-016 PRINTER 2 KODAK DIGIMASTER EX150 VIF 1

EQ-017 BINDING MACHINE POWIS PARKER FASTBACK 15XS 115V, 1PH, 7A 2

EQ-018 BINDING MACHINE POWIS PARKER FASTBACK 20 120V, 1PH, 10A 2

EQ-019 FOLDING MACHINE BAUM ULTRAFOLD 714 XE 115V, 1PH, 11A 2

EQ-020 AUTOMATIC PUNCH JAMES BURNER

INTERNATIONAL

ALPHA DOC L33 110V, 1PH, 10A 2

EQ-021 JOGGER SYNTRON I-2C JOGGER 115V, 1PH, 4A 2

EQ-022 ELECTRIC BINDING STATION GBC PB2600 120V, 1PH, .03A 2

EQ-023 STATION FOLDER WITH PILE

FEED

BAUM 2015 208-230V, 3PH, 60HZ, 17A 2

EQ-024 COLLATOR/FINISHER BOURG BST 10/BST 20 (2) 120V, 12A, (1) 120V, 5A 2

EQ-025 COLLATOR/STITCHER BOURG BST 10/AGR-T (2) 120V, 12A 2

EQ-026 PRINTER 1 CANON IMAGERUNNER 7110VP VIF 1

EQ-028 HEAT TUNNEL PREFERRED

PACKAGING

PP180828 220V, 1PH, 40A 4

EQ-029 PAPER DRILL PRESS CHALLENGE RKH 759 115V, 1PH, 19.6A 4

EQ-030 MULTI-HEAD PAPER DRILL CHALLENGE MS-10A 230V, 3PH, 14A 4

EQ-031 TABLE - - -

EQ-031R TABLE -

EQ-032 TRIMMER - - - 1

EQ-033 HIGH SPEED SHREDDER IDEAL.MBM DESTROYIT 4107 220V, 3 PH., 40A MAX

BREAKER

EQ-034 CABINET - - - 4

EQ-035 WASTE RECEPTACLE - - - 4

EQ-036 SECURE TRASH BIN EQ-035 2

SEQUENCE 1A NOTES

1. ALL ROOMS INDICATED ON 1/G-200 ARE TO BE

CONTRUCTED AND READY TO BE OCCUPIED PRIOR TO

BEGINNING PHASE 1 SEQUENCE B.

2. RUN NEW CONDUITS OVERHEAD FROM PRINT SHOP

EQUIPMENT BRANCH PANEL TO NEW OUTLETS AT ALL

EXISTING OR RELOCATED PRINT SHOP EQUIPMENT

LOCATIONS INDICATED ON 1/G-200. THE PRINT SHOP

WILL BE OPERATIONAL DURING NORMAL BUSINESS

HOURS AT ALL TIMES DURING CONSTRUCTION.

3. TEMPORARY UTILITIES ARE TO BE PROVIDED FOR HVAC

AND POWER PRIOR TO REMOVING ANY MECHANICAL OR

ELECTRICAL EQUIPMENT.

NOTES: 1. EXISTING EQUIPMENT TO REMAIN IN PLACE. PROVIDE NEW POWER FROM OVERHEAD FROM ELECTRICAL ROOM 0112

PRIOR TO REMOVING PANELS IN PRINT SHOP FOR NEW SHEAR WALL FOUNDATIONS.

2. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-200 IN PHASE 1, SEQUENCE A.

3. EXISTING EQUIPMENT TO BE PROTECTED IN PLACE FOR PHASE 1, SEQUENCE A AND TEMPORARILY RELOCATED IN

PHASE 1, SEQUENCE B. RELOCATE TO EXISTING LOCATION AFTER COMPLETION OF PHASE 1.

4. EXISTING EQUIMENT TO BE TEMPORARILY RELOCATED IN PHASE 1, SEQUENCE B. PROVIDE TEMPORARY POWER AND DATA AS REQUIRED UNTIL THE COMPLETION OF PHASE 1, THEN RELOCATE TO EXISTING LOCATION

5. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-201 IN PHASE 1, SEQUENCE B.

SHEET KEYNOTES

1. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE OF

3-5/8" STEEL STUDS @16" O.C.

2. TEMPORARY DOOR.

3. UNDERFLOOR PIPING. SAW CUT SLAB AS REQUIRED

AND PATCH.

4. EXISTING AIR HANDLING UNIT TO BE REMOVED.

TEMPORARY AHU(S) TO BE PROVIDED PRIOR TO

REMOVAL.

5. LEAVE OPENING IN CONCRETE SLAB FOR FUTURE

UNDERFLOOR PIPING TO BE INSTALLED IN PHASE 2.

6. NEW CONCRETE FOOTING - EXISTING MECHANICAL

EQUIPMENT TO REMAIN OPERATIONAL, SHORE

DURING CONSTRUCTION OF FOOTING.

7. EXISTING TRANSFORMERS TO BE REMOVED -

TEMPORARY ELECTRICAL SERVICE IS TO BE

PROVIDED PRIOR TO REMOVAL.

SEQUENCING LEGEND

DN

DN

DN

DN

DN

DN

DN

DN

EXISTING

WORK AREA

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

OFFICE

0421 EXISTING

CONFERENCE

ROOM

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

CORRIDOR

EXISTING

OFFICE

EXISTING

OPEN OFFICE

EXISTING

OFFICE

EXISTING

STORAGE

EXISTING.

TEL/COM

EXISTING

SPRAY ROOM

EXISTING

ELEC

EXISTING

ELEC

EXISTING

BATTERY

BACK UP

EXISTING

TEL/COM

EXISTING

LOADING

DOCK

ELEV. EQUIP

EXISTING

CIRCULATION

CORRIDOR

CORR.

EXISTING

BOILER

CORRIDOR

EXISTING

STAIR

EXISTING

OFFICE

EXISTING

OPEN OFFICE

PRINT SHOP

CORRIDOR

OPEN OFFICE

CORRIDOR

CORRIDOR

WORK ROOM

EXISTING

CORRIDOR

EXISTING

STUDIO

BREAK

ROOM

0103 CONFERENCE

ROOM

OPEN OFFICE

CORRIDOR

CORRIDOR

OPEN OFFICE

EXISTING LAB

BREAK ROOM

COMM.

ELEC.

RECORD

STORAGE

STORAGE

STORAGE

0215 EXISTING

STORAGE

STORAGE

COMPUTER

WORK ROOM

CONFERENCE

ROOM

0108E

PHONE

ROOM

0108D

PHONE

ROOM

0108C

PHONE

ROOM

0108B

PRIVATE

OFFICE

0108A

PHONE

ROOM

0203A

PHONE

ROOM

0203B

PRIVATE

OFFICE

0203C

PRIVATE

OFFICE

0203D

CONFERENCE

ROOM

0203E

SYSTEMS

0322A

EQ-031R

EQ-031R

TR

IM

M

ER

EQ

-0

R

EQ

-0

R

EQ-031R

EQ-031

EQ-007 EQ-006

EQ-005

EQ-031

EQ-030 EQ-030 EQ-029EQ-028 EQ-031EQ-034EQ-034 EQ-034 EQ-035

EQ

-0

EQ-031R

EQ-011

EQ-015

EQ-015

EQ

-0

EQ-010

EQ-031R

EQ-031R

EQ-031R

EQ

-0

R

EQ

-0

R

EQ-031R

EQ-031R

EQ-034EQ-034EQ-034

EQ-030 EQ-030 EQ-029EQ-028

EQ-031

EQ-035

6 6

EXISTING MAIN FIRE

ALARM PANEL

NEW FIRE ALARM

PANEL LOCATION

A. SEQUENCING NOTED ON THESE PLANS ARE A

SUGGESTED APPROACH TO THE SCOPE OF WORK.

CONTRACTOR SHALL COORDINATE ALL PHASING

WITH GOVERNMENT PRIOR TO STARTING WORK.

B. AT LEAST TWO MEANS OF EGRESS SHALL BE

MAINTAINED AT ALL TIMES WHILE BUILDING IS

OCCUPIED.

C. ALL TEMPORARY CONSTRUCTION SHALL BE

PROVIDED AND CONSTRUCTED PER IBC 3306.

D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF

DATA CENTER IS TO BE CAREFULLY PROTECTED

DURING CONSTRUCTION.

NOT IN SCOPE

AREA TO BE OCCUPIED DURING

NORMAL BUSINESS HOURS

AREA TO BE OCCUPIED 24 HOURS A

DAY, 7 DAYS A WEEK

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

/2

0/

7:

:3

AM

C :\U se rs

\c em

\D oc um en ts \M y Re vi t\6

_A rc h_

CE

M .rv t

BASEMENT PHASING PLAN - SEQUENCE B

MRO

JRM

GMD 9

G-201

G-201N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

GENERAL NOTES

PRINT SHOP EQUIP. SCHEDULE

MARK DESCRIPTION MANUF. MODEL UTILITIES NOTES

EQ-001 STITCHER ISP STITCHING AND

BINDERY PRODUCTS

S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1

EQ-002 WIRE STITCHER BOSTICH 7AW 115V, 1PH, 6.8A, 1/3HP 1

EQ-003 STITCHER ISP STITCHING AND

BINDERY PRODUCTS

S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1

EQ-004 WIRE STITCHER STANLEY BOSTITCH 7AW 115V, 1PH, 5.8A, 1/3HP 1

EQ-005 HYDRAULIC PAPER CUTTER PRO-CUT 320 MPS 208V, 1PH,30A, 1/2HP 5

EQ-006 HYDRAULIC PAPER CUTTER CHALLENGE TITAN 200 208V, 1PH, 12A 5

EQ-007 PAPER CUTTER CHALLENGE 193 HBE 230A, 3PH, 9.4A, 15A MAX

BREAKER

EQ-008 PAPER SHREDDER FELLOWES 520HS 115V, 1PH, 11A 1

EQ-009 PRINTER 3 KODAK DIGIMASTER EX150 VIF 1

EQ-010 PRINTER/COPIER/SCANNER KONICA MINOLTA HD506 VIF 4

EQ-011 PRINTER/COPIER/SCANNER RICOH PRO C900S 208V, 1PH, 24A 4

EQ-012 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET

Z6100PS

120V, 1PH, 4A 1

EQ-013 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET

Z6100PS

120V, 1PH, 4A 1

EQ-014 LAMINATOR GBC EAGLE 105 208V, 1PH, 10A 1

EQ-015 PRINTER 4 CANON IMAGERUNNER 110 VIF 4

EQ-016 PRINTER 2 KODAK DIGIMASTER EX150 VIF 1

EQ-017 BINDING MACHINE POWIS PARKER FASTBACK 15XS 115V, 1PH, 7A 2

EQ-018 BINDING MACHINE POWIS PARKER FASTBACK 20 120V, 1PH, 10A 2

EQ-019 FOLDING MACHINE BAUM ULTRAFOLD 714 XE 115V, 1PH, 11A 2

EQ-020 AUTOMATIC PUNCH JAMES BURNER

INTERNATIONAL

ALPHA DOC L33 110V, 1PH, 10A 2

EQ-021 JOGGER SYNTRON I-2C JOGGER 115V, 1PH, 4A 2

EQ-022 ELECTRIC BINDING STATION GBC PB2600 120V, 1PH, .03A 2

EQ-023 STATION FOLDER WITH PILE

FEED

BAUM 2015 208-230V, 3PH, 60HZ, 17A 2

EQ-024 COLLATOR/FINISHER BOURG BST 10/BST 20 (2) 120V, 12A, (1) 120V, 5A 2

EQ-025 COLLATOR/STITCHER BOURG BST 10/AGR-T (2) 120V, 12A 2

EQ-026 PRINTER 1 CANON IMAGERUNNER 7110VP VIF 1

EQ-028 HEAT TUNNEL PREFERRED

PACKAGING

PP180828 220V, 1PH, 40A 4

EQ-029 PAPER DRILL PRESS CHALLENGE RKH 759 115V, 1PH, 19.6A 4

EQ-030 MULTI-HEAD PAPER DRILL CHALLENGE MS-10A 230V, 3PH, 14A 4

EQ-031 TABLE - - -

EQ-031R TABLE -

EQ-032 TRIMMER - - - 1

EQ-033 HIGH SPEED SHREDDER IDEAL.MBM DESTROYIT 4107 220V, 3 PH., 40A MAX

BREAKER

EQ-034 CABINET - - - 4

EQ-035 WASTE RECEPTACLE - - - 4

EQ-036 SECURE TRASH BIN EQ-035 2

SEQUENCE 1B NOTES

1. COORDINATE RELOCATION OF PRINT SHOP EQUIPMENT

TO MINIMIZE PRINT SHOP DOWN TIME.

2. WEST STAIR ACCESS TO FIRST FLOOR EXIT TO BE

MAINTAINED THROUGH-OUT PHASE 1B.

3. COORDINATE LOADING DOCK ACCESS WITH BASEMENT

AND FIRST FLOOR SMF DATA CENTER OCCUPANTS.

4. CONSTRUCTION OF SERVICE ELEVATOR SHAFT, ETC.

SUBJECT TO CONTRACTOR SEQUENCE OF

CONSTRUCTION.

NOTES: 1. EXISTING EQUIPMENT TO REMAIN IN PLACE. PROVIDE NEW POWER FROM OVERHEAD FROM ELECTRICAL ROOM 0112

PRIOR TO REMOVING PANELS IN PRINT SHOP FOR NEW SHEAR WALL FOUNDATIONS.

2. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-200 IN PHASE 1, SEQUENCE A.

3. EXISTING EQUIPMENT TO BE PROTECTED IN PLACE FOR PHASE 1, SEQUENCE A AND TEMPORARILY RELOCATED IN

PHASE 1, SEQUENCE B. RELOCATE TO EXISTING LOCATION AFTER COMPLETION OF PHASE 1.

4. EXISTING EQUIMENT TO BE TEMPORARILY RELOCATED IN PHASE 1, SEQUENCE B. PROVIDE TEMPORARY POWER AND DATA AS REQUIRED UNTIL THE COMPLETION OF PHASE 1, THEN RELOCATE TO EXISTING LOCATION

5. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-201 IN PHASE 1, SEQUENCE B.

SCALE: 1/16" = 1'-0"

1 PROPOSED BASEMENT SEQUENCING PLAN - PHASE 1B

SHEET KEYNOTES

1. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE

OF 3-5/8" STEEL STUDS @16" O.C.

2. TEMPORARY DOOR.

3. UNDERFLOOR PIPING. SAW CUT SLAB AS

REQUIRED AND PATCH.

4. NEW AIR HANDLING UNIT - SEQUENCE INSTALLATION

TO MINIMIZE OPERATION OF TEMPORARY AIR

HANDLERS.

5. LEAVE OPENING IN CONCRETE SLAB FOR FUTURE

UNDERFLOOR PIPING TO BE INSTALLED IN PHASE 2.

6. NEW CONCRETE FOOTING.

7. PROVIDE CONSTRUCTION LOCK AND SIGNAGE ON

EXISTING DOOR FOR CONSTRUCTION AREA.

8. PHASE DEMOLITION OF EXISTING FIRE ALARM

PANEL SUCH THAT NEW FIRE ALARM PANEL IS

FULLY FUNCTIONAL BY AREA. ALL FIRE ALARM

DEVICES, TERMINATIONS ,WIRING AND DEMOLITION

SHALL BE BY FIRE ALARM TECHNICIANS. PROVIDE

FIRE WATCH IN ANY OCCUPIED AREAS WITHOUT

FUNCTIONING FIRE ALARM SERVICE.

UP

UP

SMF

STORAGE

ENTRY

ENTRY

A5

B1 B1

B1

B1

B1

A. SEQUENCING NOTED ON THESE PLANS ARE A

SUGGESTED APPROACH TO THE SCOPE OF WORK.

CONTRACTOR SHALL COORDINATE ALL PHASING

WITH GOVERNMENT PRIOR TO STARTING WORK.

B. AT LEAST TWO MEANS OF EGRESS SHALL BE

MAINTAINED AT ALL TIMES WHILE BUILDING IS

OCCUPIED.

C. ALL TEMPORARY CONSTRUCTION SHALL BE

PROVIDED AND CONSTRUCTED PER IBC 3306.

D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF

DATA CENTER IS TO BE CAREFULLY PROTECTED

DURING CONSTRUCTION.

NOT IN SCOPE

AREA TO BE OCCUPIED DURING

NORMAL BUSINESS HOURS

AREA TO BE OCCUPIED 24 HOURS A

DAY, 7 DAYS A WEEK

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

/2

0/

7:

:4

AM

C :\U se rs

\c em

\D oc um en ts \M y Re vi t\6

_A rc h_

CE

M .rv t

FIRST FLOOR PHASING PLAN - SEQUENCE

A

MRO

JRM

GMD 10

G-202

G-202N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

SCALE: 1/16" = 1'-0"

1 FIRST FLOOR PHASING PLAN -PHASE 2A

GENERAL NOTES

SEQUENCE 2A NOTES

1. NEW SMF ENTRY (1224) AND STORAGE ROOM (1225)

TO BE COMPLETE AND FUNCTIONING PRIOR TO

DEMOLITION OF EXISTING SMF ENTRY.

2. EGRESS TUNNELS ARE TO BE OF 1-HOUR FIRE

RATED CONSTRUCTION AND MAINTAINED UNTIL

ALTERNATE MEANS OF EGRESS ARE AVAILABLE

FROM THE SMF DATA ROOM AND THE BASEMENT.

3. BASEMENT EGRESS WILL BE LIMITED TO SOUTH

STAIR AND UNDERGROUND PEDESTRIAN TUNNELS

FOR THE DURATION OF PHASE 2 CONSTRUCTION.

PROVIDE SIGNAGE DIRECTING BASEMENT

OCCUPANTS TO ALTERNATE ROUTES.

4. TEMPORARY FIRE ALARM SERVICE TO BE PROVIDED

BEFORE REMOVING ANY FIRE ALARM DEVICES,

WIRING OR CONDUIT. FIRE ALARM DEMO SHALL BE

PERFORMED BY A FIRE ALARM TECHNICIAN.

SHEET KEYNOTES

1. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE OF

3-5/8" STEEL STUDS @16" O.C.

2. TEMPORARY DOOR

3. INSTALL STEEL BRACING DURING THIS SEQUENCE.

4. EXISTING FIRE SUPRESSION RELEASING PANEL TO

BE REMOVED BY FIRE ALARM TECHNICIAN.

5. INSTALL NEW FIRE ALARM CONTROL PANEL AND

PATCH OVER TO EXISTING LOCATION PRIOR TO

REMOVAL OF EXISTING, BY FIRE ALARM TECHNICIAN.

DN

UP

UP

DN

A. SEQUENCING NOTED ON THESE PLANS ARE A

SUGGESTED APPROACH TO THE SCOPE OF WORK.

CONTRACTOR SHALL COORDINATE ALL PHASING

WITH GOVERNMENT PRIOR TO STARTING WORK.

B. AT LEAST TWO MEANS OF EGRESS SHALL BE

MAINTAINED AT ALL TIMES WHILE BUILDING IS

OCCUPIED.

C. ALL TEMPORARY CONSTRUCTION SHALL BE

PROVIDED AND CONSTRUCTED PER IBC 3306.

D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF

DATA CENTER IS TO BE CAREFULLY PROTECTED

DURING CONSTRUCTION.

EXISTING ATO

ROOM

EXISTING

MECH

EXISTING

MECH

EXISTING

STAIR

EXISTING SMF

DATA ROOM

EXISTING

MECH

SERVICE

ELEV

STOR.

ELEV 1

STORAGE

ENTRYWAY

STAIR 1

ELEV 3

EXISTING

MECH

VENDING

ELEC.

COMM.

C O

RR

ID

O R

OPEN OFFICE

LOUNGE

CORRIDOR

WOMENS

MENS

SYSTEMS

JAN.

A/V

CONFERENCE

C O

RR

ID

O R

BREAK ROOM

OPEN OFFICE

CIRCULATION

STAIR 3

STORAGE

ENTRYWAY

LOUNGE

C O

RR

ID

O R

WOMENS

MENS

COMM.

ELEC.

NURSING

CONFERENCE

A/V

1416 OPEN OFFICE

CIRCULATION

VEST.

C O

RR

ID

O R

WOMENS

MENS

JAN.

ELEC.

COMM.

BREAK ROOM

CORRIDOR

OPEN OFFICE

CIRCULATION

OPEN OFFICE

16'-6 1/4" 263'-1 3/4"

EXISTING

TELECOM

EXISTING

DATA ROOM

CAGE

ELEC.

VEST.

ELEC CL.

PRIVATE

OFFICE

1417B

CONFERENCE

ROOM

1417C

PRIVATE

OFFICE

1417D

PHONE

ROOM

1119D

PHONE

ROOM

1119C

PHONE

ROOM

1119B

PHONE

ROOM

1119A

COMM

1119E

VESTIBULE

1 2 3

1 2 3

20' MIN.

NOT IN SCOPE

AREA TO BE OCCUPIED DURING

NORMAL BUSINESS HOURS

AREA TO BE OCCUPIED 24 HOURS A

DAY, 7 DAYS A WEEK

DESIGNED BY:

DRAWN BY:

WORK ORDER NO.

OFFICE OF

ISSUED BY

DRAWING NO.

DATE

PREPARED BYREVIEWED BY

REV DATE

APPROVED BY

DESCRIPTION

OF

SHEET NO.

APP'DCHECK

FACILITY MANAGEMENT

AMP-400

MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA

FEDERAL AVIATION ADMINISTRATION

DECEMBER 20, 2017

405/840-2931 www.fsb-ae.com

13-007860 AMP-400-E-

FRANKFURT SHORT BRUZA

DEPARTMENT OF TRANSPORTATION

5801 BROADWAY EXT., SUITE 500

OKLAHOMA CITY, OKLAHOMA

Work Request Construction No: 13-007860

MPB-24 (MULTI-PURPOSE BUILDING)

RENOVATION

M.OWENSBY

RICHARD S.

JOHNSON

2300L IC E N S E D A R C H IT

E C T

S T A

T E O F O K LA HO

M

A

/2

0/

7:

:2

AM

C :\U se rs

\c em

\D oc um en ts \M y Re vi t\6

_A rc h_

CE

M .rv t

FIRST FLOOR PHASING PLAN - SEQUENCE

B

MRO

JRM

GMD 11

G-203

G-203N

0 8' 16' 32'

1/16" = 1'-0"

KEYPLAN

GENERAL NOTES

SCALE: 1/16" = 1'-0"

1 FIRST FLOOR PHASING PLAN - PHASE 2B

SEQUENCE 2B NOTES

1. NEW SMF ENTRY (1224) AND STORAGE ROOM (1225)

TO BE COMPLETE AND FUNCTIONING PRIOR TO

DEMOLITION OF EXISTING SMF ENTRY.

2. EGRESS TUNNELS ARE TO BE OF 1-HOUR FIRE

RATED CONSTRUCTION AND MAINTAINED UNTIL

ALTERNATE MEANS OF EGRESS ARE AVAILABLE

FROM THE SMF DATA ROOM AND THE BASEMENT.

3. BASEMENT EGRESS WILL BE LIMITED TO SOUTH

STAIR AND UNDERGROUND PEDESTRIAN TUNNELS

FOR THE DURATION OF PHASE 2 CONSTRUCTION.

PROVIDE SIGNAGE DIRECTING BASEMENT

OCCUPANTS TO ALTERNATE ROUTES.

4. ALL REMAINING CONSTRUCTION IS TO OCCUR

DURING THIS SEQUENCE.

5. CONSTRUCTION OF SERVICE ELEVATOR SHAFT, ETC.

SUBJECT TO CONTRACTOR SEQUENCE OF

CONSTRUCTION.

SHEET KEYNOTES

1. TEMPORARY EGRESS TUNNEL - 1-HOUR FIRE RATED

CEILING, WALLS AND FLOOR.

2. TEMPORARY DOOR - COORDINATE ACCESS CONTROL

REQUIREMENTS WITH GOVERNMENT.

3. PROVIDE TEMPORARY CONCRETE SIDEWALK -

EXTEND TO SIDEWALK AT MACARTHUR.

4. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE OF

3-5/8" STEEL STUDS @16" O.C.

NOTE:

THE SURVEY WAS PERFORMED BY JIVIDEN AND COMPANY, PLLC. IT IS SHOWN

HERE AT A REDUCED SCALE TO FIT WITHIN THE LIMITS OF THE SHEET. THE

SCALE IT IS SHOWN AT IS 1" = 50' (SEE NEW BAR SCALE, BELOW).

GENERAL NOTES

1. INTENT

THE CONSTRUCTION DRAWINGS AND THE SPECIFICATIONS

ACCOMPANYING THEM DESCRIBE THE WORK TO BE DONE AND THE

MATERIALS TO BE FURNISHED FOR CONSTRUCTION.

THE PURPOSE OF THE SPECIFICATIONS IS TO INTERPRET THE INTENT OF

THE DRAWINGS AND TO DESIGNATE THE METHOD OF THE PROCEDURE,

TYPE AND QUALITY OF MATERIALS REQUIRED TO COMPLETE THE WORK.

ALL WORK NOT EXPRESSLY COVERED IN THE SPECIFICATIONS,

INCLUDING, BUT NOT LIMITED TO, PAVING, GRADING, DEMOLITION,

DRAINAGE STRUCTURES, ETC., SHALL BE PERFORMED ACCORDING TO

THE APPROPRIATE SECTIONS OF THE CITY OF OKLAHOMA CITY

STANDARD SPECIFICATIONS AND DETAILS, CURRENT VERSION.

2. CONFLICTS

THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL

MEASUREMENTS AT THE SITE BEFORE ORDERING ANY MATERIALS OR

DOING ANY WORK. ANY SUCH DISCREPANCY IN DIMENSION WHICH MAY

BE FOUND SHALL BE SUBMITTED TO THE A/E FOR CONSIDERATION

BEFORE THE CONTRACTOR PROCEEDS WITH THE WORK IN THE

AFFECTED AREAS.

THE CONTRACTOR WILL NOT BE ALLOWED ANY EXTRA COMPENSATION BY

REASON OF ANY MATTER OR THING CONCERNING WHICH HE MIGHT HAVE

INFORMED HIMSELF.

NO PLEAS OF IGNORANCE OF CONDITIONS THAT EXIST, OR OF

DIFFICULTIES OR CONDITIONS THAT EXIST, OR OF DIFFICULTIES OR

CONDITIONS THAT MAY BE ENCOUNTERED OR OF ANY OTHER RELEVANT

MATTER CONCERNING THE WORK TO BE PERFORMED OR IN THE

EXECUTION OF THE WORK WILL BE ACCEPTED AS AN EXCUSE FOR ANY

FAILURE OR OMISSION ON THE PART OF THE CONTRACTOR TO FULFILL

EVERY DETAIL OF ALL THE REQUIREMENTS OF THE CONTRACT

DOCUMENTS GOVERNING THE WORK.

3. FIELD QUALITY CONTROL

COMPACTION SHALL BE IN ACCORDANCE WITH ASTM D-698 FOR ALL SITE

WORK UNLESS OTHERWISE SHOWN. AREAS OF SETTLEMENT WILL BE

EXCAVATED AND REFILLED AT CONTRACTOR'S EXPENSE.

TECHNICAL PROVISIONS

1. CONSTRUCTION STAKING

THE CONTRACTOR SHALL ESTABLISH HORIZONTAL AND VERTICAL

CONTROLS FOR THE EXECUTION OF CONSTRUCTION. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR FURNISHING ALL CONSTRUCTION STAKES.

THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING COORDINATES AND

ELEVATIONS PRIOR TO BEGINNING DEMOLITION.

2. ADJUSTMENT OF EXISTING STRUCTURES

THIS WORK SHALL CONSIST OF THE NECESSARY ADJUSTMENTS.

ALTERATIONS, RELOCATING OR RESETTING, TO THE REQUIRED GRADE

AND ALIGNMENT OF EXISTING STRUCTURES, EQUIPMENT OR

APPURTENANCES WHICH ARE NOT TO BE REMOVED OR ABANDONED AND

WHICH ARE NOT THE PROPERTY OF A PRIVATE COMPANY, FIRM OR

CORPORATION REQUIRED TO MOVE THEIR OWN PROPERTY, IN

ACCORDANCE WITH THESE SPECIFICATIONS AND REASONABLY CLOSE

CONFORMITY WITH THE LINES, GRADES, ELEVATIONS AND DIMENSIONS

SHOWN ON THE PLANS.

3. PROTECTION OF EXISTING STRUCTURES

THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SHEETING, SHORING,

AND OTHER BRACING AND SUPPORTS TO PROTECT IMPROVEMENTS

ADJACENT TO THE CONSTRUCTION. DAMAGE TO AREAS OUTSIDE OF THE

WORK AREA SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.

4. INCIDENTAL WORK

ANY ITEM NOT COVERED IN THE SPECIFICATIONS OR DRAWING SHALL BE

CONSIDERED AS INCIDENTAL CONSTRUCTION FOR WHICH THE

CONTRACTOR IS RESPONSIBLE.THIS INCLUDES, BUT IS NOT LIMITED TO,

CONSTRUCTION FENCE, DETECTABLE WARNING PLATES, ETC.

5. FINAL CLEANUP

UPON COMPLETION OF THE WORK, AND BEFORE ACCEPTANCE AND FINAL

PAYMENT WILL BE MADE, THE CONTRACTOR SHALL CLEAN AND REMOVE,

FROM THE SITE OF WORK, SURPLUS AND DISCARD MATERIAL,

TEMPORARY STRUCTURES, STUMPS, OR PORTIONS OF TREES AND

DEBRIS OF ANY KIND. THE CONTRACTOR SHALL LEAVE THE SITE OF

WORK IN A NEAT AND ORDERLY CONDITION. WASTE MATERIALS REMOVED

FROM THE SITE OF THE WORK SHALL BE DISPOSED OF OFF-SITE.

6. PUBLIC CONVENIENCES AND SAFETY

MATERIALS STORED ABOUT THE WORK SITE SHALL BE SO PLACED AND

THE WORK SHALL AT ALL TIMES BE SO CONDUCTED AS TO CAUSE NO

GREATER OBSTRUCTION TO THE TRAVELING PUBLIC THAN IS

CONSIDERED NECESSARY BY THE OWNER. THE SIDEWALKS AND

DRIVEWAYS SHALL BE KEPT OPEN TO ALLOW FOR THE FREE PASSAGE OF

VEHICLES AND PEDESTRIANS, PROVIDED THAT, WHERE THE BRIDGING IS

IMPRACTICAL OR UNNECESSARY, THE CONTRACTOR MAY MAKE

ARRANGEMENTS SATISFACTORY TO THE OWNER AND/OR THE CITY OF

OKLAHOMA CITY AND THE OKLAHOMA CITY AIRPORT TRUST FOR THE

DIVERSION OF TRAFFIC AND SHALL, AT HIS OWN EXPENSE, PROVIDE ALL

MATERIALS AND PERFORM WORK NECESSARY FOR THE CONSTRUCTION

AND MAINTENANCE OF ROADWAYS AND BRIDGES FOR THE DIVERSION OF

TRAFFIC. THE CONTRACTOR SHALL NOTIFY THE CITY OF OKLAHOMA CITY,

THE FEDERAL AVIATION ADMINISTRATION, AND THE OKLAHOMA CITY

AIRPORT TRUST WHEN ANY STREET IS CLOSED OR OBSTRUCTED AND

SHALL KEEP ANY STREET IN CONDITION FOR UNOBSTRUCTED USE OF

FIRE APPARATUS.

THE CONTRACTOR MUST PROVIDE NOTICE TO THE FEDERAL AVIATION

ADMINISTRATION OF ANY STREET CLOSURE OR PARKING STALL CLOSURE

THREE WEEKS IN ADVANCE OF SAID CLOSURE.

7. PROTECTION AND RESTORATION OF PROPERTY

THE CONTRACTOR SHALL NOT ENTER UPON PRIVATE PROPERTY FOR

ANY PURPOSE WITHOUT FIRST OBTAINING PERMISSION AND HE SHALL BE

RESPONSIBLE FOR THE PRESERVATION OF AND SHALL USE EVERY

PRECAUTION NECESSARY TO PREVENT DAMAGE TO ALL TREES, FENCES,

CULVERTS, BRIDGES, PAVEMENTS, DRIVEWAYS, SIDEWALKS, ETC. AND TO

ALL WATER, SEWER, GAS, OR ELECTRICAL LINES OR APPURTENANCES

THEREOF AND TO ALL OTHER PUBLIC OR PRIVATE PROPERTY ALONG OR

ADJACENT TO WORK. THE CONTRACTOR SHALL NOTIFY THE PROPER

REPRESENTATIVES OF ANY PUBLIC SERVICE CORPORATION, AND

COMPANY, OR ANY INDIVIDUAL NOT LESS THAN TWENTY-FOUR (24)

HOURS IN ADVANCE OF ANY WORK WHICH MIGHT DAMAGE OR INTERFERE

WITH THE PREPARATION OF THEIR OR HIS PROPERTY, ALONG OR

ADJACENT TO THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR ALL DAMAGE OR INJURY TO PROPERTY OR ANY CHARACTER

RESULTING FROM AN ACT, OMISSION, NEGLECT, OR MISCONDUCT IN THE

MANNER OR METHOD OF EXECUTING THE WORK OR DUE TO HIS

NON-EXECUTION OF THE WORK OR AT ANY TIME DUE TO DEFECTIVE

WORK OR MATERIALS, AND SAID RESPONSIBILITY SHALL NOT BE

RELEASED UNTIL THE WORK SHALL HAVE BEEN COMPLETED AND

ACCEPTED, WHEN AND WHERE ANY DIRECT OR MISCONDUCT IN THE

EXECUTION OF THE WORK OR IN CONSEQUENCE OF THE NON-EXECUTION

THEREOF, ON THE PART OF THE CONTRACTOR, HE SHALL RESTORE AT

HIS EXPENSE, SUCH PROPERTY TO A CONDITION SIMILAR OR EQUAL TO

THE EXISTING BEFORE SUCH DAMAGE OR INJURY WAS DONE, BY

REPAIRING, REBUILDING, OR OTHERWISE RESTORING AS MAY BE

DIRECTED OR HE SHALL MAKE GOOD FOR SUCH DAMAGE OR INJURY IN

AN ACCEPTABLE MANNER.

8. CLEARING AND GRUBBING

THE CONTRACTOR SHALL USE EVERY PRECAUTION NECESSARY TO

PREVENT DAMAGE TO ALL TREES, SHRUBS, FENCES, DRIVEWAYS, ETC.,

ADJACENT TO THE LINE OF CONSTRUCTION.

EXCEPT IN AREAS TO BE CLEARED, DO NOT REMOVE, CUT, DEFACE,

INJURE, OR DESTROY TREES OR SHRUBS WITHOUT THE OWNER'S

PERMISSION. DO NOT FASTEN OR ATTACH ROPES, CABLES, OR GUYS TO

EXISTING NEARBY TREES FOR ANCHORAGES UNLESS AUTHORIZED BY

THE OWNER. WHERE SUCH USE OF ATTACHED ROPES, CABLES, OR GUYS

IS AUTHORIZED, THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY

RESULTANT DAMAGE.

9. EXCAVATION

EXCAVATION AND TRENCHING WORK SHALL INCLUDE REMOVAL AND

SUBSEQUENT HANDLING OF ALL MATERIALS EXCAVATED OR OTHERWISE

REMOVED IN PERFORMANCE OF THE CONTRACT WORK, REGARDLESS OF

THE TYPE, CHARACTER, COMPOSITION OR CONDITION THEREOF.

EXCAVATION WORK SHALL BE PERFORMED IN A SAFE AND PROPER

MANNER WITH SUITABLE PRECAUTIONS BEING TAKEN AGAINST ALL

HAZARDS. EXCAVATIONS SHALL PROVIDE ADEQUATE WORKING SPACE

AND CLEARANCES FOR THE WORK TO BE PERFORMED THEREIN.

EXCAVATED MATERIAL REQUIRED TO BE USED FOR BACKFILL MAY BE

DEPOSITED BY THE CONTRACTOR IN STORAGE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.