ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL.pdf
PDF 19 MB Posted
- Solicitation number
- 6973GH-18-R-00009
About this file
ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL (pdf)
View the file
Other files
Show 40 more
Latest 50 of 251 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WORLD
AIRPORT
WILL ROGERS
WORLD
AIRPORT
WILL ROGERS
U S
CHICKASHA
SH 39
SH 59
PURCELL
SH 39
I-
U S
U S
S H
S H
I-
OKLA. CITY
SH 152
H.
E.
BA
ILE
Y
U S
TUTTLE
BLANCHARD
SH 37
MUSTANG
EL RENO
I-40 US 66
I-40
YUKON
EDMOND
AIRPARK
MAX WESTHEIMER
SH 9NORMAN
I-240
SHAWNEE
I-40
TURNER
US 62
US 66
KINGFISHER
SH 33
GUTHRIE
S H
SH 105
U S
CHICKASHA
SH 39
SH 59
PURCELL
SH 39
I-
U S
U S
S H
S H
I-
OKLA. CITY
PAGE
SH 152
H.
E.
BA
ILE
Y
U S
AIRPORT
TUTTLE
BLANCHARD
SH 37
MUSTANG
EL RENO
CLARENCE E.
I-40
AIRPORT
US 66
I-40
YUKON
WILEY POST
EDMOND
AIRPARK
MAX WESTHEIMER
SH 9NORMAN
I-240
SHAWNEE
I-40
TURNER
US 62
US 66 CHANDLER
KINGFISHER
SH 33
GUTHRIE
SH 105
DRAINPIPE DRAINPIPE
O
VER
H
AN
G
C
AN
O P Y
C
AN
O P Y
C
AN
O P Y
W H
IP
W H
IP
TR
AN
SFO
R M
ER
C O N C R
ETE
C O N C R
ETE
C O N C R
ETE
A
SP
H
ALT
A
SP
H
ALT
A
SP
H
ALT
A
SP
H
ALT
C O N C R
ETE
S
TAIR
S
S
TAIR
S
2"
R
AM
P
Q U E S A D A D R
S D U K E
AV
E
S D U K E
AV
E
Q U E S A D A D R
E D D
IE
AV
E
S.W. 66TH ST.
D E N N
IN
G A
VE
M A C
A R
TH
U R B
LV
D
S.W. 63RD ST.
S.W. 64TH ST.
S.W. 66TH ST.
C H R
IS
TI
AN
AV
E
S.W. 63RD ST.
S.W. 64TH ST.
S.W. 68TH ST.
S.W.69THST.
D E N N
IN
G
A V E
E D D
IE
AV
E
MIKE MONRONEY BLVD.
F O S
TE
R
D R
IV
E
S.W.61STST.
S.W. 62ND ST.
S.W. 61ST ST.
S.W. 61ST ST. 3.33503437
MULTI-PURPOSE BUILDING
BID OPTION NOTES:
A. REFER TO SPECIFICATIONS FOR FULL BID OPTION
SCOPE OF WORK.
B. OPTION NO. 1 - INSULATED METAL PANELS AT
EXTERIOR WALL OF INTERIOR COURTYARD.
C. OPTION NO. 2 - INSULATED METAL PANEL WALL
MANUFACTURERS INTEGRATED WINDOW SYSTEM
AT THE EXTERIOR WALLS.
D. OPTION NO. 3 - MECHANICAL SCREENS AT ROOF
E. OPTION NO. 4A - ELECTRONIC WINDOW SHADE
CONTROL SYSTEM.
F. OPTION NO. 4B - DYNAMIC GLAZING AT STAIRWELL
CURTAINWALL.
G. OPTION NO. 5A - INSTALL A NEW CONCRETE
TOPPING SLAB OVER A NEW WATERPROOF
MEMBRANE AT THE FIRST FLOOR PERIMETER
WALKWAY.
H. OPTION NO. 5B - INSTALL NEW PAVERS OVER A NEW
WATERPROOF MEMBRANE AT THE FIRST FLOOR
PERIMETER WALKWAY.
I. OPTION NO. 6 - LOADING DOCK ACCESS RAMP
WATERPROOF COATING INSTALLATION ON THE
VERTICAL RAMP WALLS.
TIENG
AI LING
21544
O K L A H O M A
RE
G
IS
T E
RE
D PROFESSIONA L ENG
INEER
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RUSSELL
FRANK
KETNER
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IO NA L
ENG
INEER
15891
JASON K.
BLUBAUGH
25269
O K L A H O M A
LI
C
EN
S E
D
PROFESS IONA L
ENG
INEER
GARY W.
JAMES
16166
O K L A H O M A
LI
C
EN
S E
D
PRO FES S IONA L
ENG
INEER
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
FAA
MIKE MONRONEY AERONAUTICAL CENTER
OKLAHOMA CITY, OKLAHOMA
Frankfurt Short Bruza Architects Engineers Planners
5801 Broadway Ext., Suite 500 Oklahoma City, Oklahoma 73118
Telephone 405 840 2931 Facsimile 405 842 7750
Type B 100% - December 20, 2017
OKLAHOMA CERTIFICATE OF
AUTHORIZATION
ARCHITECTURE: # 00199
EXP. 06/30/19 DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
RENOVATION
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
OKLAHOMA CERTIFICATE OF
AUTHORIZATION
P.E: # 1072
EXP. 06/30/18
VOLUME ONE
G-000.1
G-000.1
CEM
GAK
GMD 1
SCALE: NTS
1 VICINITY PLAN
SCALE: NTS
2 PROJECT LOCATION MAP
N
N
(GENERAL, CIVIL, LANDSCAPE, STRUCTURAL, ARCHITECURAL)
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
7:
:4
AM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
SHEET INDEX - VOLUME 1
CEM
GAK
GMD 2
G-001.1
G-001.1
SHEET INDEX VOLUME 1
SHEET
NUMBER TITLE
A-202 BUILDING ELEVATIONS
A-203 BUILDING ELEVATIONS
A-204 BUILDING ELEVATIONS
A-205 BUILDING ELEVATIONS
A-301 BUILDING SECTION
A-302 BUILDING SECTION
A-303 WALL SECTIONS
A-304 WALL SECTIONS
A-305 WALL SECTIONS
A-306 WALL SECTIONS
A-307 WALL SECTIONS
A-308 WALL SECTIONS
A-401 ENLARGED CIRCULATION PLANS
A-402 ENLARGED CIRCULATION PLANS
A-403 ENLARGED CIRCULATION PLANS
A-404 ENLARGED CIRCULATION PLANS
A-410 ENLARGED RESTROOM PLANS
A-411 ENLARGED RESTROOM PLANS
A-412 ENLARGED RESTROOM PLANS
A-413 ENLARGED RESTROOM PLANS
A-414 ENLARGED RESTROOM PLANS
A-415 ENLARGED RESTROOM ELEVATIONS
A-416 ENLARGED RESTROOM ELEVATIONS
A-417 ENLARGED RESTROOM ELEVATIONS
A-418 ENLARGED RESTROOM ELEVATIONS
A-420 ENLARGED INTERIOR ELEVATIONS
A-421 ENLARGED INTERIOR ELEVATIONS
A-422 ENLARGED INTERIOR ELEVATIONS
A-423 ENLARGED INTERIOR ELEVATIONS
A-424 ENLARGED INTERIOR ELEVATIONS
A-425 ENLARGED INTERIOR ELEVATIONS
A-426 ENLARGED INTERIOR ELEVATIONS
A-427 ENLARGED INTERIOR ELEVATIONS
A-428 MILLWORK SECTIONS
A-501 DETAILS
A-502 DETAILS
A-503 DETAILS
A-504 DETAILS
A-505 DETAILS
A-506 DETAILS
A-510 DOOR AND GLAZING DETAILS
A-511 DOOR TYPES ,FRAME TYPES AND GLAZING DETAILS
A-601 DOOR SCHEDULE
A-602 GLAZING ELEVATIONS
A-603 GLAZING ELEVATIONS
A-604 GLAZING ELEVATIONS
A-605 GLAZING ELEVATIONS
A-606 GLAZING ELEVATIONS
A-607 GLAZING ELEVATIONS
A-608 INTERIOR GLAZING ELEVATIONS
A-609 INTERIOR GLAZING ELEVATIONS
A-610 INTERIOR GLAZING ELEVATIONS
A-611 ROOM FINISH SCHEDULE - PHASE ONE
A-612 ROOM FINISH SCHEDULE - PHASE TWO
A-613 ROOM FINISH SCHEDULE - PHASE TWO
SHEET INDEX VOLUME 1
SHEET
NUMBER TITLE
SF403 ENLARGED THIRD FLOOR FRAMING PLANS
SF404 ENLARGED ROOF FRAMING PLANS
SF405 ENLARGED HIGH ROOF FRAMING PLANS
SF406 ENLARGED AHU 3-1 AND 3-2 PLATFORM FRAMING PLAN AND ELEVATIONS
SF407 ENLARGED AHU 3-3 AND 3-4 PLATFORM FRAMING PLAN AND ELEVATIONS
SF408 ENLARGED ELECTRICAL VAULT FRAMING PLAN
SF501 FRAMING SECTIONS AND DETAILS
SF502 FRAMING SECTIONS AND DETAILS
SF503 FRAMING SECTIONS AND DETAILS
SF504 FRAMING SECTIONS AND DETAILS
SF505 FRAMING SECTIONS AND DETAILS
SF506 FRAMING SECTIONS AND DETAILS
SF507 FRAMING SECTIONS AND DETAILS
SF508 FRAMING SECTIONS AND DETAILS
SF509 FRAMING SECTIONS AND DETAILS
SF510 FRAMING SECTIONS AND DETAILS
SF511 FRAMING SECTIONS AND DETAILS
SF901 3D ISOMETRIC VIEWS
SF902 3D ISOMETRIC VIEWS
ARCHITECTURAL
A-001 PARTITION TYPES & SYMBOLS LEGEND
AD-100 COMPOSITE BASEMENT DEMOLITION PLAN
AD-101 BASEMENT DEMOLITION - AREA 1
AD-102 BASEMENT DEMOLITION - AREA 2
AD-103 BASEMENT DEMOLITION - AREA 3
AD-104 BASEMENT DEMOLITION - AREA 4
AD-110 COMPOSITE FIRST FLOOR DEMOLITION PLAN
AD-111 FIRST FLOOR DEMOLITION - AREA 1
AD-112 FIRST FLOOR DEMOLITION - AREA 2
AD-113 FIRST FLOOR DEMOLITION - AREA 3
AD-114 FIRST FLOOR DEMOLITION - AREA 4
AD-120 COMPOSITE SECOND FLOOR DEMOLITION PLAN
AD-121 SECOND FLOOR DEMOLITION - AREA 1
AD-122 SECOND FLOOR DEMOLITION - AREA 2
AD-123 SECOND FLOOR DEMOLITION - AREA 3
AD-124 SECOND FLOOR DEMOLITION - AREA 4
AD-125 SECOND FLOOR DEMOLITION - COURTYARD
AD-130 COMPOSITE THIRD FLOOR DEMOLITION PLAN
AD-131 THIRD FLOOR DEMOLITION - AREA 1
AD-132 THIRD FLOOR DEMOLITION - AREA 2
AD-133 THIRD FLOOR DEMOLITION - AREA 3
AD-134 THIRD FLOOR DEMOLITION - AREA 4
AD-201 DEMOLITION ELEVATIONS
AD-202 DEMOLITION ELEVATIONS
AD-203 DEMOLITION ELEVATIONS
AD-204 DEMOLITION ELEVATIONS
AD-205 DEMOLITION ELEVATIONS
A-100 COMPOSITE BASEMENT FLOOR PLAN - PHASE 1
A-101 BASEMENT FLOOR PLAN - AREA 1 - PHASE 1
A-102 BASEMENT FLOOR PLAN - AREA 2 - PHASE 1
A-103 BASEMENT FLOOR PLAN - AREA 3 - PHASE 1
A-104 BASEMENT FLOOR PLAN - AREA 4 - PHASE 1
A-105 OVERALL BASEMENT FLOOR PLAN - PHASE 2
A-106 ENLARGED BASEMENT FLOOR PLANS
A-107 LOADING DOCK
A-108 LOADING DOCK
A-110 COMPOSITE FIRST FLOOR PLAN
A-111 FIRST FLOOR PLAN - AREA 1
A-112 FIRST FLOOR PLAN - AREA 2
A-113 FIRST FLOOR PLAN - AREA 3
A-114 FIRST FLOOR PLAN - AREA 4
A-120 COMPOSITE SECOND FLOOR PLAN
A-121 SECOND FLOOR PLAN - AREA 1
A-122 SECOND FLOOR PLAN - AREA 2
A-123 SECOND FLOOR PLAN - AREA 3
A-124 SECOND FLOOR PLAN - AREA 4
A-125 SECOND FLOOR PLAN - OUTDOOR AREA
A-130 COMPOSITE THIRD FLOOR PLAN
A-131 THIRD FLOOR PLAN - AREA 1
A-132 THIRD FLOOR PLAN - AREA 2
A-133 THIRD FLOOR PLAN - AREA 3
A-134 THIRD FLOOR PLAN - AREA 4
A-140 ROOF PLAN
A-141 CANOPY PLAN SECTIONS AND DETAILS
A-150 BASEMENT REFLECTED CEILING PLAN - PHASE 1
A-151 FIRST FLOOR REFLECTED CEILING PLAN
A-152 SECOND FLOOR REFLECTED CEILING PLAN
A-153 THIRD FLOOR REFLECTED CEILING PLAN
A-154 ENLARGED REFLECTED CEILING PLAN
A-155 ENLARGED REFLECTED CEILING PLAN
A-156 ENLARGED REFLECTED CEILING PLAN
A-201 BUILDING ELEVATIONS
SHEET INDEX VOLUME 1
SHEET
NUMBER TITLE
GENERAL
G-000.1 COVER SHEET - VOLUME 1
G-001.1 SHEET INDEX - VOLUME 1
G-002 CODE ANALYSIS
G-100 BASEMENT CODE PLAN
G-101 FIRST FLOOR CODE PLAN
G-102 SECOND FLOOR CODE PLAN
G-103 THIRD FLOOR CODE PLAN
G-200 BASEMENT PHASING PLAN - SEQUENCE A
G-201 BASEMENT PHASING PLAN - SEQUENCE B
G-202 FIRST FLOOR PHASING PLAN - SEQUENCE A
G-203 FIRST FLOOR PHASING PLAN - SEQUENCE B
SURVEY/MAPPING
V-101 TOPOGRAPHIC SURVEY
CIVIL
C-001 GENERAL NOTES
C-002 LEGEND & ABBREVIATIONS
CD101 SITE DEMOLITION PLAN
CS101 SITE LAYOUT PLAN
CP101 SITE JOINTING PLAN
CG101 SITE GRADING PLAN
CG102 ENLARGED SITE GRADING PLAN
CG401 EROSION CONTROL PLAN
CG501 EROSION CONTROL NOTES & DETAILS
CU101 SITE UTILITY PLAN
C-501 PAVING & JOINT DETAILS
C-502 JOINT DETAILS
C-503 STORM DRAIN DETAILS
C-504 AREA INLET DETAILS
LANDSCAPE
LS101 LANDSCAPE SITE PLAN
LS401 DETAIL AREAS A1 AND A2 PAVING LAYOUT PLANS
LS402 DETAIL AREAS A1 AND AS MISCELLANEOUS LAYOUT PLANS
LS403 DETAIL AREAS B1 AND B2 LAYOUT PLANS
LS404 SECOND FLOOR OUTDOOR AREA PAVING PLAN
LS501 HARDSCAPE DETAILS
LS502 HARDSCAPE DETAILS
LS503 FACILITY SIGN DETAILS
LG401 DETAIL AREAS A1, A2 AND B2 PLANTING BED GRADING PLANS
LP101 SITE LANDSCAPE PLAN
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-003 TYPICAL DETAILS
S-004 TYPICAL DETAILS
S-005 WIND DIAGRAM AND TYPICAL DETAILS
S-006 TYPICAL DETAILS
SB101 BASEMENT FOUNDATION SLAB PLAN - AREA 1
SB102 BASEMENT FOUNDATION SLAB PLAN - AREA 2
SB103 BASEMENT FOUNDATION SLAB PLAN - AREA 3
SB104 BASEMENT FOUNDATION SLAB PLAN - AREA 4
SB401 ENLARGED BASEMENT FOUNDATION PLANS
SB402 AREAWAY ENLARGED PLANS AND DETAILS
SB501 FOUNDATION DETAILS
SB502 FOUNDATION DETAILS
SB503 FOUNDATION DETAILS
SB504 FOUNDATION DETAILS
SB505 FOUNDATION DETAILS
SF101 FIRST FLOOR FRAMING PLAN - AREA 1
SF102 FIRST FLOOR FRAMING PLAN - AREA 2
SF103 FIRST FLOOR FRAMING PLAN - AREA 3
SF104 FIRST FLOOR FRAMING PLAN - AREA 4
SF105 SECOND FLOOR FRAMING PLAN - AREA 1
SF106 SECOND FLOOR FRAMING PLAN - AREA 2
SF107 SECOND FLOOR FRAMING PLAN - AREA 3
SF108 SECOND FLOOR FRAMING PLAN - AREA 4
SF109 THIRD FLOOR FRAMING PLAN - AREA 1
SF110 THIRD FLOOR FRAMING PLAN - AREA 2
SF111 THIRD FLOOR FRAMING PLAN - AREA 3
SF112 THIRD FLOOR FRAMING PLAN - AREA 4
SF113 ROOF FRAMING PLAN - AREA 1
SF114 ROOF FRAMING PLAN - AREA 2
SF115 ROOF FRAMING PLAN - AREA 3
SF116 ROOF FRAMING PLAN - AREA 4
SF201 FRAMING ELEVATIONS
SF202 FRAMING ELEVATIONS
SF203 FRAMING ELEVATIONS
SF204 FRAMING ELEVATIONS
SF205 FRAMING ELEVATIONS AND DETAILS
SF206 FRAMING ELEVATIONS AND DETAILS
SF401 ENLARGED FIRST FLOOR FRAMING PLANS
SF402 ENLARGED SECOND FLOOR AND CANOPY ROOF FRAMING PLANS
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
1:
:1
PM
C :\U se rs
\d ap
\D oc um en ts \6
_A rc h_ da p.
rv t
CODE ANALYSIS
CEM
GAK
GMD 3
G-002
G-002
UP
DN
DN
DN
DN
DN
DN
DN
DN
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R
E1HR E1HRE1HR
E1HR
E
1H R
E 1H
R E
1H R
E 1H
R E
1H R
E1HR
E 1H
R
1HR
1HR
1H R
E1HR E1HRE1HR E1HR
E
1H R
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R
E1HR
E 1H
R E
1H R
E 1H
R
E1HR E1HRE1HR E1HR E1HR E1HR1HR 1HR1HR
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R
E1HR E1HRE1HR E1HR
1HR 1HR1HR
1H R
1H R
1HR
1HR
1H R
E 1H
R
E 1H
R
E1HR E1HR
E1HR E1HR
TR
A
VE
L
D
IS
TA
N
C E
3'
-8
TRAVEL DISTANCE 215'-0"
TRAVEL DISTANCE 156'
TR
A
VE
L
D
IS
TA
N
C E
8'
-0
ETR
ETR
0419 0421
0416 0417
04180413
0425 0427
0428 0101
0313 0312
03190310
TR
A
VE
L
D
IS
TA
N
C E
4'
-0
TR
AV
EL
D
IS
TA
N C
E
6'
0214 0216
0203A 0203B
0203C 0203C
0203E
0108E
0108D0108C 0108B
0108A
LIFE SAFETY LEGEND
OCCUPANT LOAD NUMBER AT EXIT
COMPONENT
EXIT COMPONENT MAXIMUM OCCUPANT
CAPACITY NUMBER
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
WALL BRACKET
MOUNTED AT 48" AFF
DRY CHEMICAL TYPE FIRE EXTINGUISHER IN
SURFACE MOUNTED CABINET
MOUNTED AT 48" AFF
TWO HOUR CONSTRUCTION2 HR
ONE HOUR CONSTRUCTION1 HR
SMOKE ENCLOSURE CONSTRUCTIONS
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
SEMI-RECESSED
MOUNTED AT 48" AFF
TRAVEL DISTANCE
OCCUPANCY LEGEND
B - BUSINESS
46, 549SF/ 100 SF
466 OCCUPANTS
S-1 STORAGE (AND MECHANICAL)
13, 557 SF/ 300 SF
46 OCCUPANTS
TOTAL OCC. LOAD: 512
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
1:
:3
PM
C :\U se rs
\d ap
\D oc um en ts \6
_A rc h_ da p.
rv t
BASEMENT CODE PLAN
CEM
GAK
GMD 4
G-100
G-100
SCALE: 1/16" = 1'-0"
1 BASEMENT CODE PLAN
N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
NOTE: FURNITURE SHOWN FOR
REFERENCE ONLY
BASEMENT FLOOR
ROOM NUMBER ROOM NAME
0101 RR WOMEN
0103 BREAK ROOM
0104 CONFERENCE ROOM
0105 CORRIDOR
0106 OPEN OFFICE
0107 CORRIDOR
0108 OPEN OFFICE
0108A PRIVATE OFFICE
0108B PHONE ROOM
0108C PHONE ROOM
0108D PHONE ROOM
0108E CONFERENCE ROOM
0112 ELEC.
0113 COMM.
0115 COMPUTER WORK ROOM
0201 CORRIDOR
0202 CORRIDOR
0203 OPEN OFFICE
0203A PHONE ROOM
0203B PHONE ROOM
0203C PRIVATE OFFICE
0203D PRIVATE OFFICE
0203E CONFERENCE ROOM
0204 ELEV. EQUIP
0205 SERVICE ELEV
0206 CORRIDOR
0207 CORRIDOR
0208 EXISTING LOADING DOCK
0209 EXISTING STAIR
0210 EXISTING LAB
0211 STORAGE
0212 RECORD STORAGE
0213 CORR.
0214 STORAGE
0215 STORAGE
0216 EXISTING STORAGE
0301 RR WOMEN
0303 RR MEN
0304 JAN.
0305 EXISTING TEL/COM
0306 CORR.
0308 EXISTING BATTERY BACK UP
0309 EXISTING ELEC
0310 BREAK ROOM
0311 EXISTING BOILER
0312 ELEC VAULT
0313 AREA-WAY
0314 EXISTING SPRAY ROOM
0315 EXISTING ELEC
0316 RR WOMEN
0318 SECURE STORAGE
0319 SECURE SHREDDER
0320 CORRIDOR
0321 FOLDER/ INSERTER
0322 STORAGE
0322A SYSTEMS
0322B JAN.
0401 RR MEN
0402 CORRIDOR
0403 WORK ROOM
0404 EXISTING OFFICE
0405 EXISTING STUDIO
0406 EXISTING OFFICE
0407 PRINT SHOP
0408 EXISTING OFFICE
0409 EXISTING CORRIDOR
0411 EXISTING STUDIO
0412 EXISTING OPEN OFFICE
0413 EXISTING OFFICE
0414 EXISTING WORK AREA
0415 EXISTING OPEN OFFICE
0416 EXISTING OFFICE
0417 EXISTING OFFICE
0418 EXISTING CORRIDOR
0419 EXISTING OFFICE
0421 EXISTING OFFICE
0422 EXISTING CONFERENCE ROOM
0423 EXISTING CIRCULATION
0425 EXISTING OFFICE
0426 EXISTING. TEL/COM
0427 EXISTING STORAGE
0428 RR MEN
DN
UP
UP
DN
DN
DN DN
DN
DN
DN
DN
DNDN DN
DN
AB
C
1HR 1HR1HR
1H R
1H R
1H R
1H R
1HR
1H R
1H R
1HR 1HR
1HR
1H R
1H R
1H R
1HR
1H R
E 1H
R E
1H R
E 1H
R
E1HR E
1H
R E
1H R
E 1H
R
E1HR
E 1H
R E
1H
RE1HR E1HRE1HR
1H R
1H R
1H R
E 1H
R
E 1H
R
E1HR E1HR
E1HR E1HR
E1HR E1HR E
1H
R E1HR
E1HR E1HRE1HR E1HR
E 1H
R E
1H R
E1HR E1HRE1HR E1HR E
1H
R E
1H R
E 1H
R E
1H
RE1HR E
1H
RE1HR E1HRE1HR
E 1H
R E
1H R
E 1H
R
E1HR E1HRE1HR
E1HR E1HRE1HR E1HR
E 1H
R E
1H R
E1HR
E1HRE1HR
E1HRE
1H
R E
1H R
E1HR E1HR E1HR E1HRE1HR E1HR E1HR E1HR E1HR
E 1H
R E
1H
R1HR 1HR1HR
1HR 1HR1HR 1HR
1HR
1H R
1H R
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R E
1H R
E 1H
R E
1H R
E1HR E1HRE1HR E1HR E1HR E1HR E1HR E1HR E1HR E1HRE1HR E1HR 1H
R
1H R
1H R
1HR 1HR
TBD
12151216
1108 1109
14081409
13031304
TRAVEL DISTANCE 228'-0" TRAVEL DISTANCE 272'-0"
TR
A
VE
L
D
IS
TA
N
C E
2'
-0
TRAVEL DISTANCE 152'-2"
TRAVEL DISTANCE 174'-0"TRAVEL DISTANCE 174'-0"
1119E
1417C
1417B
1417D
1119C
1119D
1119B
1119A
LIFE SAFETY LEGEND
OCCUPANT LOAD NUMBER AT EXIT
COMPONENT
EXIT COMPONENT MAXIMUM OCCUPANT
CAPACITY NUMBER
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
WALL BRACKET
MOUNTED AT 48" AFF
DRY CHEMICAL TYPE FIRE EXTINGUISHER IN
SURFACE MOUNTED CABINET
MOUNTED AT 48" AFF
TWO HOUR CONSTRUCTION2 HR
ONE HOUR CONSTRUCTION1 HR
SMOKE ENCLOSURE CONSTRUCTIONS
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
SEMI-RECESSED
MOUNTED AT 48" AFF
TRAVEL DISTANCE
OCCUPANCY LEGEND
B - BUSINESS
49, 803 SF/ 100 SF
498 OCCUPANTS
S-1 STORAGE (AND MECHANICAL)
5, 070 SF/ 300 SF
17 OCCUPANTS
TOTAL OCC. LOAD: 515
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
1:
:5
PM
C :\U se rs
\d ap
\D oc um en ts \6
_A rc h_ da p.
rv t
FIRST FLOOR CODE PLAN
CEM
GAK
GMD 5
G-101
G-101
SCALE: 1/16" = 1'-0"
1 FIRST FLOOR CODE PLAN
FIRST FLOOR
ROOM
NUMBER ROOM NAME
0109 STAIR 1
0110 ELEV LOBBY
0111 ELEV 1
0204 ELEV EQUIPMENT
0205 SERVICE ELEVATOR
0429 STAIR 3
0430 ELEV LOBBY
0431 ELEV 3
1101 VESTIBULE
1102 STAIR 1
1103 ELEV 1
1104 STORAGE
1105 ENTRYWAY
1106 LOUNGE
1107 CORRIDOR
1108 WOMENS
1109 MENS
1110 CORRIDOR
1111 SYSTEMS
1112 ELEC.
1113 JAN.
1114 A/V
1115 EXISTING MECH
1116 CONFERENCE
1118 BREAK ROOM
1119 OPEN OFFICE
1119A PHONE ROOM
1119B PHONE ROOM
1119C PHONE ROOM
1119D PHONE ROOM
1119E COMM
1120 CIRCULATION
1201 VEST.
1207 CORRIDOR
1209 STOR.
1211 EXISTING MECH
1212 VENDING
1213 ELEC.
1214 COMM.
1215 MENS
1216 WOMENS
1217 CIRCULATION
1218 OPEN OFFICE
1219 EXISTING STAIR
1221 SERVICE ELEV
1222 EXISTING ATO ROOM
1223 EXISTING SMF DATA ROOM
1224 ENTRY
1225 SMF STORAGE
1226 EXISTING TELECOM
1227 EXISTING DATA ROOM
1228 ELEC CL.
1301 VEST.
1302 CORRIDOR
1303 WOMENS
1304 MENS
1305 COMM.
1306 EXISTING MECH
1307 ELEC.
1308 JAN.
1309 BREAK ROOM
1311 CORRIDOR
1312 OPEN OFFICE
1313 CIRCULATION
1314 OPEN OFFICE
1315 EXISTING DATA ROOM CAGE
1401 VESTIBULE
1402 STAIR 3
1403 ELEV 3
1404 STORAGE
1405 ENTRYWAY
1406 LOUNGE
1407 CORRIDOR
1408 WOMENS
1409 MENS
1411 NURSING
1412 ELEC.
1413 COMM.
1414 EXISTING MECH
1415 CONFERENCE
1416 A/V
1417 OPEN OFFICE
1417B PRIVATE OFFICE
1417C CONFERENCE ROOM
1417D PRIVATE OFFICE
1418 CIRCULATION
N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
NOTE: FURNITURE SHOWN FOR
REFERENCE ONLY
UPDN
UP
DN
DN
DN DN
DN
DN
DN
DN
DN
DN
DN
DN
AB
C
1HR 1HR1HR
1H R 1H
R
1HR
2H R
2H R
2H R
2H R
2H R
2H R
2H R
1H R
1H R
1H R
1H R
1H R
1H R
1HR
1HR
E 1H
R E
1H R
E 1H
R
E1HR
E 1H
R E
1H R
E 1H
R
E1HR
E 1H
R
E 1H
R
E1HR
1H R
1HR 1HR
1H R
1HR 1HR
1HR 1HR1HR
1H R
1HR1HR 1HR
1H R
1H R
1H R
1HR 1H
R
1H R
1H R
1H R
1H R
1H R
1HR
1H R
1H R
1H R
TRAVEL DISTANCE 179'-0"
TR
A
VE
L
D
IS
TA
N
C E
3'
-0
TR
A
VE
L
D
IS
TA
N
C E
2'
-0
2103 2102
24082409
2107 2108
23022303
2212 2211
21142115
TRAVEL DISTANCE 134'-0"
2113G2113F
2304B
2304C
2304A
2414A 2414B 2414C
2113D
2113C
2113B2113A
2113H
2304E2304D
23042304
2308A 2308C 2309D
2308B
2304F
2304G
LIFE SAFETY LEGEND
OCCUPANT LOAD NUMBER AT EXIT
COMPONENT
EXIT COMPONENT MAXIMUM OCCUPANT
CAPACITY NUMBER
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
WALL BRACKET
MOUNTED AT 48" AFF
DRY CHEMICAL TYPE FIRE EXTINGUISHER IN
SURFACE MOUNTED CABINET
MOUNTED AT 48" AFF
TWO HOUR CONSTRUCTION2 HR
ONE HOUR CONSTRUCTION1 HR
SMOKE ENCLOSURE CONSTRUCTIONS
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
SEMI-RECESSED
MOUNTED AT 48" AFF
TRAVEL DISTANCE
OCCUPANCY LEGEND
OUTDOOR AREA IBC 1004.5
15, 167 SF
B - BUSINESS
45, 920 SF/ 100 SF
460 OCCUPANTS
S-1 STORAGE (AND MECHANICAL)
1, 986 SF/ 300 SF
7 OCCUPANTS
TOTAL OCC. LOAD: 467
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
1:
:1
PM
C :\U se rs
\d ap
\D oc um en ts \6
_A rc h_ da p.
rv t
SECOND FLOOR CODE PLAN
CEM
GAK
GMD 6
G-102
G-102
SCALE: 1/16" = 1'-0"
1 SECOND FLOOR CODE PLAN
N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
SECOND FLOOR
ROOM
NUMBER ROOM NAME
2101 ELEV 1
2102 ENTRYWAY
2103 STAIR 1
2104 LOUNGE
2105 OPEN OFFICE
2106 CORRIDOR
2107 WOMENS
2108 MENS
2109 COMM.
2111 ELEC.
2112 SYSTEMS
2113 OPEN OFFICE
2113A PHONE ROOM
2113B PHONE ROOM
2113C PHONE ROOM
2113D PHONE ROOM
2113F PRIVATE OFFICE
2113G PRIVATE OFFICE
2113H CONFERENCE ROOM
2114 STORAGE
2115 STORAGE
2116 BREAK ROOM
2117 CONFERENCE ROOM
2207 JAN.
2208 ELEC.
2209 COMM.
2211 MENS
2212 WOMENS
2213 STORAGE
2214 SERVICE ELEV
2215 OPEN OFFICE
2216 EXISTING STAIR
2301 LOBBY
2302 WOMENS
2303 MENS
2304 OPEN OFFICE
2304A PRIVATE OFFICE
2304B PRIVATE OFFICE
2304C CONFERENCE ROOM
2304D PRIVATE OFFICE
2304E PRIVATE OFFICE
2304F PHONE ROOM
2304G PHONE ROOM
2305 COMM.
2306 ELEC.
2307 SYSTEMS
2308 OPEN OFFICE
2308A PHONE ROOM
2308B PHONE ROOM
2308C PHONE ROOM
2309 NURSING
2309D PHONE ROOM
2311 STORAGE
2401 ELEV 3
2402 ENTRYWAY
2403 STAIR 3
2404 LOUNGE
2405 CONFERENCE ROOM
2407 BREAK ROOM
2408 WOMENS
2409 MENS
2411 JAN.
2412 ELEC.
2413 COMM.
2414 OPEN OFFICE
2414A PHONE ROOM
2414B PHONE ROOM
2414C PHONE ROOM
2415 STORAGE
2500 OUTDOOR AREA
DN UP
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
AB
C
DN
DN
1HR 1HR1HR
1H R
1HR
1H R
1H R
2H R
2H R
2H R
2H R
2H R
2H R
2H R
1H R
1H R
E1HR
E 1H
R
E1HR
E 1H
R
E 1H
R E
1H R
E 1H
R
E 1H
R E
1H R
E 1H
R
E1HR
1H R
1H R
1H R
1H R
1HR
1HR
1H R
1HR 1HR
1HR 1HR
1H R
1H R
1H R
1HR 1H
R
1H R
1H R
1HR 1HR1HR 1H
R
1H
R1HR1HR 1HR1H
R 1H
R 1H
R
1HR
1H R
1H R
1H R
TRAVEL DISTANCE 196'-0"
3'
-0 "T
R
AV
EL
D
IS
TA
N C
E
TRAVEL DISTANCE 133'-0"
TR
A
VE
L
D
IS
TA
N
C E
3'
-0
34083409
3107 3108
33023303
3212 3211
3103 3102
3304A
3304C3304B
3113G
3113E 3113F
3113D
3113C
3113B
3113A
3308C
3308B 3308A
3308D
3304E3304D
3414A 3414B 3414C
3304G
3304F
LIFE SAFETY LEGEND
OCCUPANT LOAD NUMBER AT EXIT
COMPONENT
EXIT COMPONENT MAXIMUM OCCUPANT
CAPACITY NUMBER
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
WALL BRACKET
MOUNTED AT 48" AFF
DRY CHEMICAL TYPE FIRE EXTINGUISHER IN
SURFACE MOUNTED CABINET
MOUNTED AT 48" AFF
TWO HOUR CONSTRUCTION2 HR
ONE HOUR CONSTRUCTION1 HR
SMOKE ENCLOSURE CONSTRUCTIONS
DRY CHEMICAL TYPE FIRE EXTINGUISHER -
SEMI-RECESSED
MOUNTED AT 48" AFF
TRAVEL DISTANCE
OCCUPANCY LEGEND
B - BUSINESS
44, 811 SF/ 100 SF
449 OCCUPANTS
S-1 STORAGE (AND MECHANICAL)
2, 637 SF/ 300 SF
9 OCCUPANTS
TOTAL OCC. LOAD: 458
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T
A
T E O F O K LA HO
M A
/2
0/
1:
:3
PM
C :\U se rs
\d ap
\D oc um en ts \6
_A rc h_ da p.
rv t
THIRD FLOOR CODE PLAN
CEM
GAK
GMD 7
G-103
G-103
SCALE: 1/16" = 1'-0"
1 THIRD FLOOR CODE PLAN
N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
THIRD FLOOR
ROOM
NUMBER ROOM NAME
3101 ELEV 1
3102 ENTRYWAY
3103 STAIR 1
3104 LOUNGE
3105 OPEN OFFICE
3106 ELEVATOR CONTROL
3107 WOMENS
3108 MENS
3109 COMM.
3111 ELEC.
3112 SYSTEMS
3113 OPEN OFFICE
3113A PHONE ROOM
3113B PHONE ROOM
3113C PHONE ROOM
3113D PHONE ROOM
3113E PRIVATE OFFICE
3113F PRIVATE OFFICE
3113G CONFERENCE ROOM
3116 BREAK ROOM
3117 CONFERENCE ROOM
3207 JAN.
3208 ELEC.
3209 COMM.
3211 MENS
3212 WOMENS
3213 STORAGE
3214 SERVICE ELEV
3215 OPEN OFFICE
3216 EXISTING STAIR
3301 LOBBY
3302 WOMENS
3303 MENS
3304 OPEN OFFICE
3304A CONFERENCE ROOM
3304B PRIVATE OFFICE
3304C PRIVATE OFFICE
3304D PRIVATE OFFICE
3304E PRIVATE OFFICE
3304F PHONE ROOM
3304G PHONE ROOM
3305 COMM.
3306 ELEC.
3307 SYSTEMS
3308 OPEN OFFICE
3308A PHONE ROOM
3308B PHONE ROOM
3308C PHONE ROOM
3308D PHONE ROOM
3309 NURSING
3311 STORAGE
3401 ELEV 3
3402 ENTRYWAY
3403 STAIR 3
3404 LOUNGE
3405 CONFERENCE ROOM
3407 BREAK ROOM
3408 WOMENS
3409 MENS
3410 ELEVATOR CONTROL
3411 JAN.
3412 ELEC.
3413 COMM.
3414 OPEN OFFICE
3414A PHONE ROOM
3414B PHONE ROOM
3414C PHONE ROOM
3415 STORAGE
UP
UP
UP
DN
A. SEQUENCING NOTED ON THESE PLANS ARE A
SUGGESTED APPROACH TO THE SCOPE OF WORK.
CONTRACTOR SHALL COORDINATE ALL PHASING
WITH GOVERNMENT PRIOR TO STARTING WORK.
B. AT LEAST TWO MEANS OF EGRESS SHALL BE
MAINTAINED AT ALL TIMES WHILE BUILDING IS
OCCUPIED.
C. ALL TEMPORARY CONSTRUCTION SHALL BE
PROVIDED AND CONSTRUCTED PER IBC 3306.
D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF
DATA CENTER IS TO BE CAREFULLY PROTECTED
DURING CONSTRUCTION.
EQ-031
EQ-021
EQ-020
EQ-031 EQ-019
EQ-031
EQ-017
EQ
-0
EQ
-0
EQ
-0
EQ-031
EQ-018
EQ-031 EQ-018
EQ-021 EQ-020EQ-031
EQ-022 EQ-022 EQ-022 EQ-022
EQ
-0
EQ
-0
EQ
-0
EQ-022 EQ-022
EQ-022 EQ-022
TABLEHEAT TUNNEL
PAPER DRILL
PRESS
EQ-031
EQ-017
EQ-026
EQ-019
EQ-031
SECURE
STORAGE
SECURE
SHREDDER
EQ-036
EQ-036EQ-036
EQ-036
EQ-031 EQ-031
EQ-007 EQ-006
EQ-005
EQ
-0
EQ
-0
31 EQ-004
EQ-003
EQ-002
EQ-001
EQ
-0
EQ
-0
31 EQ
-0
EQ-031
EQ
-0
EQ-031R
EQ-015
EQ
-0
EQ
-0
EQ
-0
R
EQ-031
EQ-031
EQ
-0
R
EQ
-0
R
EQ-031R
EQ
-0
EQ-031
EQ-014
EQ
-0
EQ
-0
EQ
-0
EQ
-0
EQ
-0
EQ-031
EQ-031 EQ-031R
EQ-033
EQ-030
EQ-035EQ-034
EQ-030
EQ-034EQ-034
PRINT SHOP
EQ-033
A1
A1
A4
A4
ALIGN
'-2
1/ 4"
24'-2"
RR MEN
RR WOMEN
0316 CORRIDOR
BREAK ROOM
RR WOMEN
STORAGE
CORR.
RR MEN
JAN.
AREA-WAY
ELEC VAULT
0312 A-410
A-411
C1C1
C1
C1C1
F1
4 4
LIMITS OF CONSTRUCTION -
PHASE 1 SEQUENCE A
NOT IN SCOPE
AREA TO BE OCCUPIED DURING
NORMAL BUSINESS HOURS
AREA TO BE OCCUPIED 24 HOURS A
DAY, 7 DAYS A WEEK
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
7:
:2
AM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
BASEMENT PHASING PLAN - SEQUENCE A
MRO
JRM
GMD 8
G-200
G-200N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
SCALE: 1/16" = 1'-0"
1 PROPOSED BASEMENT SEQUENCING PLAN - PHASE 1A
GENERAL NOTES
PRINT SHOP EQUIP. SCHEDULE
MARK DESCRIPTION MANUF. MODEL UTILITIES NOTES
EQ-001 STITCHER ISP STITCHING AND
BINDERY PRODUCTS
S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1
EQ-002 WIRE STITCHER BOSTICH 7AW 115V, 1PH, 6.8A, 1/3HP 1
EQ-003 STITCHER ISP STITCHING AND
BINDERY PRODUCTS
S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1
EQ-004 WIRE STITCHER STANLEY BOSTITCH 7AW 115V, 1PH, 5.8A, 1/3HP 1
EQ-005 HYDRAULIC PAPER CUTTER PRO-CUT 320 MPS 208V, 1PH,30A, 1/2HP 5
EQ-006 HYDRAULIC PAPER CUTTER CHALLENGE TITAN 200 208V, 1PH, 12A 5
EQ-007 PAPER CUTTER CHALLENGE 193 HBE 230A, 3PH, 9.4A, 15A MAX
BREAKER
EQ-008 PAPER SHREDDER FELLOWES 520HS 115V, 1PH, 11A 1
EQ-009 PRINTER 3 KODAK DIGIMASTER EX150 VIF 1
EQ-010 PRINTER/COPIER/SCANNER KONICA MINOLTA HD506 VIF 4
EQ-011 PRINTER/COPIER/SCANNER RICOH PRO C900S 208V, 1PH, 24A 4
EQ-012 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET
Z6100PS
120V, 1PH, 4A 1
EQ-013 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET
Z6100PS
120V, 1PH, 4A 1
EQ-014 LAMINATOR GBC EAGLE 105 208V, 1PH, 10A 1
EQ-015 PRINTER 4 CANON IMAGERUNNER 110 VIF 4
EQ-016 PRINTER 2 KODAK DIGIMASTER EX150 VIF 1
EQ-017 BINDING MACHINE POWIS PARKER FASTBACK 15XS 115V, 1PH, 7A 2
EQ-018 BINDING MACHINE POWIS PARKER FASTBACK 20 120V, 1PH, 10A 2
EQ-019 FOLDING MACHINE BAUM ULTRAFOLD 714 XE 115V, 1PH, 11A 2
EQ-020 AUTOMATIC PUNCH JAMES BURNER
INTERNATIONAL
ALPHA DOC L33 110V, 1PH, 10A 2
EQ-021 JOGGER SYNTRON I-2C JOGGER 115V, 1PH, 4A 2
EQ-022 ELECTRIC BINDING STATION GBC PB2600 120V, 1PH, .03A 2
EQ-023 STATION FOLDER WITH PILE
FEED
BAUM 2015 208-230V, 3PH, 60HZ, 17A 2
EQ-024 COLLATOR/FINISHER BOURG BST 10/BST 20 (2) 120V, 12A, (1) 120V, 5A 2
EQ-025 COLLATOR/STITCHER BOURG BST 10/AGR-T (2) 120V, 12A 2
EQ-026 PRINTER 1 CANON IMAGERUNNER 7110VP VIF 1
EQ-028 HEAT TUNNEL PREFERRED
PACKAGING
PP180828 220V, 1PH, 40A 4
EQ-029 PAPER DRILL PRESS CHALLENGE RKH 759 115V, 1PH, 19.6A 4
EQ-030 MULTI-HEAD PAPER DRILL CHALLENGE MS-10A 230V, 3PH, 14A 4
EQ-031 TABLE - - -
EQ-031R TABLE -
EQ-032 TRIMMER - - - 1
EQ-033 HIGH SPEED SHREDDER IDEAL.MBM DESTROYIT 4107 220V, 3 PH., 40A MAX
BREAKER
EQ-034 CABINET - - - 4
EQ-035 WASTE RECEPTACLE - - - 4
EQ-036 SECURE TRASH BIN EQ-035 2
SEQUENCE 1A NOTES
1. ALL ROOMS INDICATED ON 1/G-200 ARE TO BE
CONTRUCTED AND READY TO BE OCCUPIED PRIOR TO
BEGINNING PHASE 1 SEQUENCE B.
2. RUN NEW CONDUITS OVERHEAD FROM PRINT SHOP
EQUIPMENT BRANCH PANEL TO NEW OUTLETS AT ALL
EXISTING OR RELOCATED PRINT SHOP EQUIPMENT
LOCATIONS INDICATED ON 1/G-200. THE PRINT SHOP
WILL BE OPERATIONAL DURING NORMAL BUSINESS
HOURS AT ALL TIMES DURING CONSTRUCTION.
3. TEMPORARY UTILITIES ARE TO BE PROVIDED FOR HVAC
AND POWER PRIOR TO REMOVING ANY MECHANICAL OR
ELECTRICAL EQUIPMENT.
NOTES: 1. EXISTING EQUIPMENT TO REMAIN IN PLACE. PROVIDE NEW POWER FROM OVERHEAD FROM ELECTRICAL ROOM 0112
PRIOR TO REMOVING PANELS IN PRINT SHOP FOR NEW SHEAR WALL FOUNDATIONS.
2. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-200 IN PHASE 1, SEQUENCE A.
3. EXISTING EQUIPMENT TO BE PROTECTED IN PLACE FOR PHASE 1, SEQUENCE A AND TEMPORARILY RELOCATED IN
PHASE 1, SEQUENCE B. RELOCATE TO EXISTING LOCATION AFTER COMPLETION OF PHASE 1.
4. EXISTING EQUIMENT TO BE TEMPORARILY RELOCATED IN PHASE 1, SEQUENCE B. PROVIDE TEMPORARY POWER AND DATA AS REQUIRED UNTIL THE COMPLETION OF PHASE 1, THEN RELOCATE TO EXISTING LOCATION
5. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-201 IN PHASE 1, SEQUENCE B.
SHEET KEYNOTES
1. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE OF
3-5/8" STEEL STUDS @16" O.C.
2. TEMPORARY DOOR.
3. UNDERFLOOR PIPING. SAW CUT SLAB AS REQUIRED
AND PATCH.
4. EXISTING AIR HANDLING UNIT TO BE REMOVED.
TEMPORARY AHU(S) TO BE PROVIDED PRIOR TO
REMOVAL.
5. LEAVE OPENING IN CONCRETE SLAB FOR FUTURE
UNDERFLOOR PIPING TO BE INSTALLED IN PHASE 2.
6. NEW CONCRETE FOOTING - EXISTING MECHANICAL
EQUIPMENT TO REMAIN OPERATIONAL, SHORE
DURING CONSTRUCTION OF FOOTING.
7. EXISTING TRANSFORMERS TO BE REMOVED -
TEMPORARY ELECTRICAL SERVICE IS TO BE
PROVIDED PRIOR TO REMOVAL.
SEQUENCING LEGEND
DN
DN
DN
DN
DN
DN
DN
DN
EXISTING
WORK AREA
EXISTING
OFFICE
EXISTING
OFFICE
EXISTING
OFFICE
EXISTING
OFFICE
0421 EXISTING
CONFERENCE
ROOM
EXISTING
OFFICE
EXISTING
OFFICE
EXISTING
CORRIDOR
EXISTING
OFFICE
EXISTING
OPEN OFFICE
EXISTING
OFFICE
EXISTING
STORAGE
EXISTING.
TEL/COM
EXISTING
SPRAY ROOM
EXISTING
ELEC
EXISTING
ELEC
EXISTING
BATTERY
BACK UP
EXISTING
TEL/COM
EXISTING
LOADING
DOCK
ELEV. EQUIP
EXISTING
CIRCULATION
CORRIDOR
CORR.
EXISTING
BOILER
CORRIDOR
EXISTING
STAIR
EXISTING
OFFICE
EXISTING
OPEN OFFICE
PRINT SHOP
CORRIDOR
OPEN OFFICE
CORRIDOR
CORRIDOR
WORK ROOM
EXISTING
CORRIDOR
EXISTING
STUDIO
BREAK
ROOM
0103 CONFERENCE
ROOM
OPEN OFFICE
CORRIDOR
CORRIDOR
OPEN OFFICE
EXISTING LAB
BREAK ROOM
COMM.
ELEC.
RECORD
STORAGE
STORAGE
STORAGE
0215 EXISTING
STORAGE
STORAGE
COMPUTER
WORK ROOM
CONFERENCE
ROOM
0108E
PHONE
ROOM
0108D
PHONE
ROOM
0108C
PHONE
ROOM
0108B
PRIVATE
OFFICE
0108A
PHONE
ROOM
0203A
PHONE
ROOM
0203B
PRIVATE
OFFICE
0203C
PRIVATE
OFFICE
0203D
CONFERENCE
ROOM
0203E
SYSTEMS
0322A
EQ-031R
EQ-031R
TR
IM
M
ER
EQ
-0
R
EQ
-0
R
EQ-031R
EQ-031
EQ-007 EQ-006
EQ-005
EQ-031
EQ-030 EQ-030 EQ-029EQ-028 EQ-031EQ-034EQ-034 EQ-034 EQ-035
EQ
-0
EQ-031R
EQ-011
EQ-015
EQ-015
EQ
-0
EQ-010
EQ-031R
EQ-031R
EQ-031R
EQ
-0
R
EQ
-0
R
EQ-031R
EQ-031R
EQ-034EQ-034EQ-034
EQ-030 EQ-030 EQ-029EQ-028
EQ-031
EQ-035
6 6
EXISTING MAIN FIRE
ALARM PANEL
NEW FIRE ALARM
PANEL LOCATION
A. SEQUENCING NOTED ON THESE PLANS ARE A
SUGGESTED APPROACH TO THE SCOPE OF WORK.
CONTRACTOR SHALL COORDINATE ALL PHASING
WITH GOVERNMENT PRIOR TO STARTING WORK.
B. AT LEAST TWO MEANS OF EGRESS SHALL BE
MAINTAINED AT ALL TIMES WHILE BUILDING IS
OCCUPIED.
C. ALL TEMPORARY CONSTRUCTION SHALL BE
PROVIDED AND CONSTRUCTED PER IBC 3306.
D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF
DATA CENTER IS TO BE CAREFULLY PROTECTED
DURING CONSTRUCTION.
NOT IN SCOPE
AREA TO BE OCCUPIED DURING
NORMAL BUSINESS HOURS
AREA TO BE OCCUPIED 24 HOURS A
DAY, 7 DAYS A WEEK
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
7:
:3
AM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
BASEMENT PHASING PLAN - SEQUENCE B
MRO
JRM
GMD 9
G-201
G-201N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
GENERAL NOTES
PRINT SHOP EQUIP. SCHEDULE
MARK DESCRIPTION MANUF. MODEL UTILITIES NOTES
EQ-001 STITCHER ISP STITCHING AND
BINDERY PRODUCTS
S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1
EQ-002 WIRE STITCHER BOSTICH 7AW 115V, 1PH, 6.8A, 1/3HP 1
EQ-003 STITCHER ISP STITCHING AND
BINDERY PRODUCTS
S3A 1 1/8 115V, 1PH, 6.8A, 1/3HP 1
EQ-004 WIRE STITCHER STANLEY BOSTITCH 7AW 115V, 1PH, 5.8A, 1/3HP 1
EQ-005 HYDRAULIC PAPER CUTTER PRO-CUT 320 MPS 208V, 1PH,30A, 1/2HP 5
EQ-006 HYDRAULIC PAPER CUTTER CHALLENGE TITAN 200 208V, 1PH, 12A 5
EQ-007 PAPER CUTTER CHALLENGE 193 HBE 230A, 3PH, 9.4A, 15A MAX
BREAKER
EQ-008 PAPER SHREDDER FELLOWES 520HS 115V, 1PH, 11A 1
EQ-009 PRINTER 3 KODAK DIGIMASTER EX150 VIF 1
EQ-010 PRINTER/COPIER/SCANNER KONICA MINOLTA HD506 VIF 4
EQ-011 PRINTER/COPIER/SCANNER RICOH PRO C900S 208V, 1PH, 24A 4
EQ-012 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET
Z6100PS
120V, 1PH, 4A 1
EQ-013 LARGE FORMATE PLOTTER HP DREAMCOLOR DESIGNJET
Z6100PS
120V, 1PH, 4A 1
EQ-014 LAMINATOR GBC EAGLE 105 208V, 1PH, 10A 1
EQ-015 PRINTER 4 CANON IMAGERUNNER 110 VIF 4
EQ-016 PRINTER 2 KODAK DIGIMASTER EX150 VIF 1
EQ-017 BINDING MACHINE POWIS PARKER FASTBACK 15XS 115V, 1PH, 7A 2
EQ-018 BINDING MACHINE POWIS PARKER FASTBACK 20 120V, 1PH, 10A 2
EQ-019 FOLDING MACHINE BAUM ULTRAFOLD 714 XE 115V, 1PH, 11A 2
EQ-020 AUTOMATIC PUNCH JAMES BURNER
INTERNATIONAL
ALPHA DOC L33 110V, 1PH, 10A 2
EQ-021 JOGGER SYNTRON I-2C JOGGER 115V, 1PH, 4A 2
EQ-022 ELECTRIC BINDING STATION GBC PB2600 120V, 1PH, .03A 2
EQ-023 STATION FOLDER WITH PILE
FEED
BAUM 2015 208-230V, 3PH, 60HZ, 17A 2
EQ-024 COLLATOR/FINISHER BOURG BST 10/BST 20 (2) 120V, 12A, (1) 120V, 5A 2
EQ-025 COLLATOR/STITCHER BOURG BST 10/AGR-T (2) 120V, 12A 2
EQ-026 PRINTER 1 CANON IMAGERUNNER 7110VP VIF 1
EQ-028 HEAT TUNNEL PREFERRED
PACKAGING
PP180828 220V, 1PH, 40A 4
EQ-029 PAPER DRILL PRESS CHALLENGE RKH 759 115V, 1PH, 19.6A 4
EQ-030 MULTI-HEAD PAPER DRILL CHALLENGE MS-10A 230V, 3PH, 14A 4
EQ-031 TABLE - - -
EQ-031R TABLE -
EQ-032 TRIMMER - - - 1
EQ-033 HIGH SPEED SHREDDER IDEAL.MBM DESTROYIT 4107 220V, 3 PH., 40A MAX
BREAKER
EQ-034 CABINET - - - 4
EQ-035 WASTE RECEPTACLE - - - 4
EQ-036 SECURE TRASH BIN EQ-035 2
SEQUENCE 1B NOTES
1. COORDINATE RELOCATION OF PRINT SHOP EQUIPMENT
TO MINIMIZE PRINT SHOP DOWN TIME.
2. WEST STAIR ACCESS TO FIRST FLOOR EXIT TO BE
MAINTAINED THROUGH-OUT PHASE 1B.
3. COORDINATE LOADING DOCK ACCESS WITH BASEMENT
AND FIRST FLOOR SMF DATA CENTER OCCUPANTS.
4. CONSTRUCTION OF SERVICE ELEVATOR SHAFT, ETC.
SUBJECT TO CONTRACTOR SEQUENCE OF
CONSTRUCTION.
NOTES: 1. EXISTING EQUIPMENT TO REMAIN IN PLACE. PROVIDE NEW POWER FROM OVERHEAD FROM ELECTRICAL ROOM 0112
PRIOR TO REMOVING PANELS IN PRINT SHOP FOR NEW SHEAR WALL FOUNDATIONS.
2. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-200 IN PHASE 1, SEQUENCE A.
3. EXISTING EQUIPMENT TO BE PROTECTED IN PLACE FOR PHASE 1, SEQUENCE A AND TEMPORARILY RELOCATED IN
PHASE 1, SEQUENCE B. RELOCATE TO EXISTING LOCATION AFTER COMPLETION OF PHASE 1.
4. EXISTING EQUIMENT TO BE TEMPORARILY RELOCATED IN PHASE 1, SEQUENCE B. PROVIDE TEMPORARY POWER AND DATA AS REQUIRED UNTIL THE COMPLETION OF PHASE 1, THEN RELOCATE TO EXISTING LOCATION
5. EXISTING EQUIPMENT TO BE RELOCATED TO NEW PERMANENT LOCATION INDICATED ON 1/G-201 IN PHASE 1, SEQUENCE B.
SCALE: 1/16" = 1'-0"
1 PROPOSED BASEMENT SEQUENCING PLAN - PHASE 1B
SHEET KEYNOTES
1. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE
OF 3-5/8" STEEL STUDS @16" O.C.
2. TEMPORARY DOOR.
3. UNDERFLOOR PIPING. SAW CUT SLAB AS
REQUIRED AND PATCH.
4. NEW AIR HANDLING UNIT - SEQUENCE INSTALLATION
TO MINIMIZE OPERATION OF TEMPORARY AIR
HANDLERS.
5. LEAVE OPENING IN CONCRETE SLAB FOR FUTURE
UNDERFLOOR PIPING TO BE INSTALLED IN PHASE 2.
6. NEW CONCRETE FOOTING.
7. PROVIDE CONSTRUCTION LOCK AND SIGNAGE ON
EXISTING DOOR FOR CONSTRUCTION AREA.
8. PHASE DEMOLITION OF EXISTING FIRE ALARM
PANEL SUCH THAT NEW FIRE ALARM PANEL IS
FULLY FUNCTIONAL BY AREA. ALL FIRE ALARM
DEVICES, TERMINATIONS ,WIRING AND DEMOLITION
SHALL BE BY FIRE ALARM TECHNICIANS. PROVIDE
FIRE WATCH IN ANY OCCUPIED AREAS WITHOUT
FUNCTIONING FIRE ALARM SERVICE.
UP
UP
SMF
STORAGE
ENTRY
ENTRY
A5
B1 B1
B1
B1
B1
A. SEQUENCING NOTED ON THESE PLANS ARE A
SUGGESTED APPROACH TO THE SCOPE OF WORK.
CONTRACTOR SHALL COORDINATE ALL PHASING
WITH GOVERNMENT PRIOR TO STARTING WORK.
B. AT LEAST TWO MEANS OF EGRESS SHALL BE
MAINTAINED AT ALL TIMES WHILE BUILDING IS
OCCUPIED.
C. ALL TEMPORARY CONSTRUCTION SHALL BE
PROVIDED AND CONSTRUCTED PER IBC 3306.
D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF
DATA CENTER IS TO BE CAREFULLY PROTECTED
DURING CONSTRUCTION.
NOT IN SCOPE
AREA TO BE OCCUPIED DURING
NORMAL BUSINESS HOURS
AREA TO BE OCCUPIED 24 HOURS A
DAY, 7 DAYS A WEEK
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
7:
:4
AM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
FIRST FLOOR PHASING PLAN - SEQUENCE
A
MRO
JRM
GMD 10
G-202
G-202N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
SCALE: 1/16" = 1'-0"
1 FIRST FLOOR PHASING PLAN -PHASE 2A
GENERAL NOTES
SEQUENCE 2A NOTES
1. NEW SMF ENTRY (1224) AND STORAGE ROOM (1225)
TO BE COMPLETE AND FUNCTIONING PRIOR TO
DEMOLITION OF EXISTING SMF ENTRY.
2. EGRESS TUNNELS ARE TO BE OF 1-HOUR FIRE
RATED CONSTRUCTION AND MAINTAINED UNTIL
ALTERNATE MEANS OF EGRESS ARE AVAILABLE
FROM THE SMF DATA ROOM AND THE BASEMENT.
3. BASEMENT EGRESS WILL BE LIMITED TO SOUTH
STAIR AND UNDERGROUND PEDESTRIAN TUNNELS
FOR THE DURATION OF PHASE 2 CONSTRUCTION.
PROVIDE SIGNAGE DIRECTING BASEMENT
OCCUPANTS TO ALTERNATE ROUTES.
4. TEMPORARY FIRE ALARM SERVICE TO BE PROVIDED
BEFORE REMOVING ANY FIRE ALARM DEVICES,
WIRING OR CONDUIT. FIRE ALARM DEMO SHALL BE
PERFORMED BY A FIRE ALARM TECHNICIAN.
SHEET KEYNOTES
1. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE OF
3-5/8" STEEL STUDS @16" O.C.
2. TEMPORARY DOOR
3. INSTALL STEEL BRACING DURING THIS SEQUENCE.
4. EXISTING FIRE SUPRESSION RELEASING PANEL TO
BE REMOVED BY FIRE ALARM TECHNICIAN.
5. INSTALL NEW FIRE ALARM CONTROL PANEL AND
PATCH OVER TO EXISTING LOCATION PRIOR TO
REMOVAL OF EXISTING, BY FIRE ALARM TECHNICIAN.
DN
UP
UP
DN
A. SEQUENCING NOTED ON THESE PLANS ARE A
SUGGESTED APPROACH TO THE SCOPE OF WORK.
CONTRACTOR SHALL COORDINATE ALL PHASING
WITH GOVERNMENT PRIOR TO STARTING WORK.
B. AT LEAST TWO MEANS OF EGRESS SHALL BE
MAINTAINED AT ALL TIMES WHILE BUILDING IS
OCCUPIED.
C. ALL TEMPORARY CONSTRUCTION SHALL BE
PROVIDED AND CONSTRUCTED PER IBC 3306.
D. ALL EQUIPMENT OR UTILITIES SERVING THE SMF
DATA CENTER IS TO BE CAREFULLY PROTECTED
DURING CONSTRUCTION.
EXISTING ATO
ROOM
EXISTING
MECH
EXISTING
MECH
EXISTING
STAIR
EXISTING SMF
DATA ROOM
EXISTING
MECH
SERVICE
ELEV
STOR.
ELEV 1
STORAGE
ENTRYWAY
STAIR 1
ELEV 3
EXISTING
MECH
VENDING
ELEC.
COMM.
C O
RR
ID
O R
OPEN OFFICE
LOUNGE
CORRIDOR
WOMENS
MENS
SYSTEMS
JAN.
A/V
CONFERENCE
C O
RR
ID
O R
BREAK ROOM
OPEN OFFICE
CIRCULATION
STAIR 3
STORAGE
ENTRYWAY
LOUNGE
C O
RR
ID
O R
WOMENS
MENS
COMM.
ELEC.
NURSING
CONFERENCE
A/V
1416 OPEN OFFICE
CIRCULATION
VEST.
C O
RR
ID
O R
WOMENS
MENS
JAN.
ELEC.
COMM.
BREAK ROOM
CORRIDOR
OPEN OFFICE
CIRCULATION
OPEN OFFICE
16'-6 1/4" 263'-1 3/4"
EXISTING
TELECOM
EXISTING
DATA ROOM
CAGE
ELEC.
VEST.
ELEC CL.
PRIVATE
OFFICE
1417B
CONFERENCE
ROOM
1417C
PRIVATE
OFFICE
1417D
PHONE
ROOM
1119D
PHONE
ROOM
1119C
PHONE
ROOM
1119B
PHONE
ROOM
1119A
COMM
1119E
VESTIBULE
1 2 3
1 2 3
20' MIN.
NOT IN SCOPE
AREA TO BE OCCUPIED DURING
NORMAL BUSINESS HOURS
AREA TO BE OCCUPIED 24 HOURS A
DAY, 7 DAYS A WEEK
DESIGNED BY:
DRAWN BY:
WORK ORDER NO.
OFFICE OF
ISSUED BY
DRAWING NO.
DATE
PREPARED BYREVIEWED BY
REV DATE
APPROVED BY
DESCRIPTION
OF
SHEET NO.
APP'DCHECK
FACILITY MANAGEMENT
AMP-400
MIKE MONRONEY AERONAUTICAL CENTER - OKLAHOMA CITY, OKLAHOMA
FEDERAL AVIATION ADMINISTRATION
DECEMBER 20, 2017
405/840-2931 www.fsb-ae.com
13-007860 AMP-400-E-
FRANKFURT SHORT BRUZA
DEPARTMENT OF TRANSPORTATION
5801 BROADWAY EXT., SUITE 500
OKLAHOMA CITY, OKLAHOMA
Work Request Construction No: 13-007860
MPB-24 (MULTI-PURPOSE BUILDING)
RENOVATION
M.OWENSBY
RICHARD S.
JOHNSON
2300L IC E N S E D A R C H IT
E C T
S T A
T E O F O K LA HO
M
A
/2
0/
7:
:2
AM
C :\U se rs
\c em
\D oc um en ts \M y Re vi t\6
_A rc h_
CE
M .rv t
FIRST FLOOR PHASING PLAN - SEQUENCE
B
MRO
JRM
GMD 11
G-203
G-203N
0 8' 16' 32'
1/16" = 1'-0"
KEYPLAN
GENERAL NOTES
SCALE: 1/16" = 1'-0"
1 FIRST FLOOR PHASING PLAN - PHASE 2B
SEQUENCE 2B NOTES
1. NEW SMF ENTRY (1224) AND STORAGE ROOM (1225)
TO BE COMPLETE AND FUNCTIONING PRIOR TO
DEMOLITION OF EXISTING SMF ENTRY.
2. EGRESS TUNNELS ARE TO BE OF 1-HOUR FIRE
RATED CONSTRUCTION AND MAINTAINED UNTIL
ALTERNATE MEANS OF EGRESS ARE AVAILABLE
FROM THE SMF DATA ROOM AND THE BASEMENT.
3. BASEMENT EGRESS WILL BE LIMITED TO SOUTH
STAIR AND UNDERGROUND PEDESTRIAN TUNNELS
FOR THE DURATION OF PHASE 2 CONSTRUCTION.
PROVIDE SIGNAGE DIRECTING BASEMENT
OCCUPANTS TO ALTERNATE ROUTES.
4. ALL REMAINING CONSTRUCTION IS TO OCCUR
DURING THIS SEQUENCE.
5. CONSTRUCTION OF SERVICE ELEVATOR SHAFT, ETC.
SUBJECT TO CONTRACTOR SEQUENCE OF
CONSTRUCTION.
SHEET KEYNOTES
1. TEMPORARY EGRESS TUNNEL - 1-HOUR FIRE RATED
CEILING, WALLS AND FLOOR.
2. TEMPORARY DOOR - COORDINATE ACCESS CONTROL
REQUIREMENTS WITH GOVERNMENT.
3. PROVIDE TEMPORARY CONCRETE SIDEWALK -
EXTEND TO SIDEWALK AT MACARTHUR.
4. TEMPORARY PARTITION - 5/8" GYP. BD. ONE SIDE OF
3-5/8" STEEL STUDS @16" O.C.
NOTE:
THE SURVEY WAS PERFORMED BY JIVIDEN AND COMPANY, PLLC. IT IS SHOWN
HERE AT A REDUCED SCALE TO FIT WITHIN THE LIMITS OF THE SHEET. THE
SCALE IT IS SHOWN AT IS 1" = 50' (SEE NEW BAR SCALE, BELOW).
GENERAL NOTES
1. INTENT
THE CONSTRUCTION DRAWINGS AND THE SPECIFICATIONS
ACCOMPANYING THEM DESCRIBE THE WORK TO BE DONE AND THE
MATERIALS TO BE FURNISHED FOR CONSTRUCTION.
THE PURPOSE OF THE SPECIFICATIONS IS TO INTERPRET THE INTENT OF
THE DRAWINGS AND TO DESIGNATE THE METHOD OF THE PROCEDURE,
TYPE AND QUALITY OF MATERIALS REQUIRED TO COMPLETE THE WORK.
ALL WORK NOT EXPRESSLY COVERED IN THE SPECIFICATIONS,
INCLUDING, BUT NOT LIMITED TO, PAVING, GRADING, DEMOLITION,
DRAINAGE STRUCTURES, ETC., SHALL BE PERFORMED ACCORDING TO
THE APPROPRIATE SECTIONS OF THE CITY OF OKLAHOMA CITY
STANDARD SPECIFICATIONS AND DETAILS, CURRENT VERSION.
2. CONFLICTS
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL
MEASUREMENTS AT THE SITE BEFORE ORDERING ANY MATERIALS OR
DOING ANY WORK. ANY SUCH DISCREPANCY IN DIMENSION WHICH MAY
BE FOUND SHALL BE SUBMITTED TO THE A/E FOR CONSIDERATION
BEFORE THE CONTRACTOR PROCEEDS WITH THE WORK IN THE
AFFECTED AREAS.
THE CONTRACTOR WILL NOT BE ALLOWED ANY EXTRA COMPENSATION BY
REASON OF ANY MATTER OR THING CONCERNING WHICH HE MIGHT HAVE
INFORMED HIMSELF.
NO PLEAS OF IGNORANCE OF CONDITIONS THAT EXIST, OR OF
DIFFICULTIES OR CONDITIONS THAT EXIST, OR OF DIFFICULTIES OR
CONDITIONS THAT MAY BE ENCOUNTERED OR OF ANY OTHER RELEVANT
MATTER CONCERNING THE WORK TO BE PERFORMED OR IN THE
EXECUTION OF THE WORK WILL BE ACCEPTED AS AN EXCUSE FOR ANY
FAILURE OR OMISSION ON THE PART OF THE CONTRACTOR TO FULFILL
EVERY DETAIL OF ALL THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS GOVERNING THE WORK.
3. FIELD QUALITY CONTROL
COMPACTION SHALL BE IN ACCORDANCE WITH ASTM D-698 FOR ALL SITE
WORK UNLESS OTHERWISE SHOWN. AREAS OF SETTLEMENT WILL BE
EXCAVATED AND REFILLED AT CONTRACTOR'S EXPENSE.
TECHNICAL PROVISIONS
1. CONSTRUCTION STAKING
THE CONTRACTOR SHALL ESTABLISH HORIZONTAL AND VERTICAL
CONTROLS FOR THE EXECUTION OF CONSTRUCTION. THE CONTRACTOR
SHALL BE RESPONSIBLE FOR FURNISHING ALL CONSTRUCTION STAKES.
THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING COORDINATES AND
ELEVATIONS PRIOR TO BEGINNING DEMOLITION.
2. ADJUSTMENT OF EXISTING STRUCTURES
THIS WORK SHALL CONSIST OF THE NECESSARY ADJUSTMENTS.
ALTERATIONS, RELOCATING OR RESETTING, TO THE REQUIRED GRADE
AND ALIGNMENT OF EXISTING STRUCTURES, EQUIPMENT OR
APPURTENANCES WHICH ARE NOT TO BE REMOVED OR ABANDONED AND
WHICH ARE NOT THE PROPERTY OF A PRIVATE COMPANY, FIRM OR
CORPORATION REQUIRED TO MOVE THEIR OWN PROPERTY, IN
ACCORDANCE WITH THESE SPECIFICATIONS AND REASONABLY CLOSE
CONFORMITY WITH THE LINES, GRADES, ELEVATIONS AND DIMENSIONS
SHOWN ON THE PLANS.
3. PROTECTION OF EXISTING STRUCTURES
THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SHEETING, SHORING,
AND OTHER BRACING AND SUPPORTS TO PROTECT IMPROVEMENTS
ADJACENT TO THE CONSTRUCTION. DAMAGE TO AREAS OUTSIDE OF THE
WORK AREA SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
4. INCIDENTAL WORK
ANY ITEM NOT COVERED IN THE SPECIFICATIONS OR DRAWING SHALL BE
CONSIDERED AS INCIDENTAL CONSTRUCTION FOR WHICH THE
CONTRACTOR IS RESPONSIBLE.THIS INCLUDES, BUT IS NOT LIMITED TO,
CONSTRUCTION FENCE, DETECTABLE WARNING PLATES, ETC.
5. FINAL CLEANUP
UPON COMPLETION OF THE WORK, AND BEFORE ACCEPTANCE AND FINAL
PAYMENT WILL BE MADE, THE CONTRACTOR SHALL CLEAN AND REMOVE,
FROM THE SITE OF WORK, SURPLUS AND DISCARD MATERIAL,
TEMPORARY STRUCTURES, STUMPS, OR PORTIONS OF TREES AND
DEBRIS OF ANY KIND. THE CONTRACTOR SHALL LEAVE THE SITE OF
WORK IN A NEAT AND ORDERLY CONDITION. WASTE MATERIALS REMOVED
FROM THE SITE OF THE WORK SHALL BE DISPOSED OF OFF-SITE.
6. PUBLIC CONVENIENCES AND SAFETY
MATERIALS STORED ABOUT THE WORK SITE SHALL BE SO PLACED AND
THE WORK SHALL AT ALL TIMES BE SO CONDUCTED AS TO CAUSE NO
GREATER OBSTRUCTION TO THE TRAVELING PUBLIC THAN IS
CONSIDERED NECESSARY BY THE OWNER. THE SIDEWALKS AND
DRIVEWAYS SHALL BE KEPT OPEN TO ALLOW FOR THE FREE PASSAGE OF
VEHICLES AND PEDESTRIANS, PROVIDED THAT, WHERE THE BRIDGING IS
IMPRACTICAL OR UNNECESSARY, THE CONTRACTOR MAY MAKE
ARRANGEMENTS SATISFACTORY TO THE OWNER AND/OR THE CITY OF
OKLAHOMA CITY AND THE OKLAHOMA CITY AIRPORT TRUST FOR THE
DIVERSION OF TRAFFIC AND SHALL, AT HIS OWN EXPENSE, PROVIDE ALL
MATERIALS AND PERFORM WORK NECESSARY FOR THE CONSTRUCTION
AND MAINTENANCE OF ROADWAYS AND BRIDGES FOR THE DIVERSION OF
TRAFFIC. THE CONTRACTOR SHALL NOTIFY THE CITY OF OKLAHOMA CITY,
THE FEDERAL AVIATION ADMINISTRATION, AND THE OKLAHOMA CITY
AIRPORT TRUST WHEN ANY STREET IS CLOSED OR OBSTRUCTED AND
SHALL KEEP ANY STREET IN CONDITION FOR UNOBSTRUCTED USE OF
FIRE APPARATUS.
THE CONTRACTOR MUST PROVIDE NOTICE TO THE FEDERAL AVIATION
ADMINISTRATION OF ANY STREET CLOSURE OR PARKING STALL CLOSURE
THREE WEEKS IN ADVANCE OF SAID CLOSURE.
7. PROTECTION AND RESTORATION OF PROPERTY
THE CONTRACTOR SHALL NOT ENTER UPON PRIVATE PROPERTY FOR
ANY PURPOSE WITHOUT FIRST OBTAINING PERMISSION AND HE SHALL BE
RESPONSIBLE FOR THE PRESERVATION OF AND SHALL USE EVERY
PRECAUTION NECESSARY TO PREVENT DAMAGE TO ALL TREES, FENCES,
CULVERTS, BRIDGES, PAVEMENTS, DRIVEWAYS, SIDEWALKS, ETC. AND TO
ALL WATER, SEWER, GAS, OR ELECTRICAL LINES OR APPURTENANCES
THEREOF AND TO ALL OTHER PUBLIC OR PRIVATE PROPERTY ALONG OR
ADJACENT TO WORK. THE CONTRACTOR SHALL NOTIFY THE PROPER
REPRESENTATIVES OF ANY PUBLIC SERVICE CORPORATION, AND
COMPANY, OR ANY INDIVIDUAL NOT LESS THAN TWENTY-FOUR (24)
HOURS IN ADVANCE OF ANY WORK WHICH MIGHT DAMAGE OR INTERFERE
WITH THE PREPARATION OF THEIR OR HIS PROPERTY, ALONG OR
ADJACENT TO THE WORK. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ALL DAMAGE OR INJURY TO PROPERTY OR ANY CHARACTER
RESULTING FROM AN ACT, OMISSION, NEGLECT, OR MISCONDUCT IN THE
MANNER OR METHOD OF EXECUTING THE WORK OR DUE TO HIS
NON-EXECUTION OF THE WORK OR AT ANY TIME DUE TO DEFECTIVE
WORK OR MATERIALS, AND SAID RESPONSIBILITY SHALL NOT BE
RELEASED UNTIL THE WORK SHALL HAVE BEEN COMPLETED AND
ACCEPTED, WHEN AND WHERE ANY DIRECT OR MISCONDUCT IN THE
EXECUTION OF THE WORK OR IN CONSEQUENCE OF THE NON-EXECUTION
THEREOF, ON THE PART OF THE CONTRACTOR, HE SHALL RESTORE AT
HIS EXPENSE, SUCH PROPERTY TO A CONDITION SIMILAR OR EQUAL TO
THE EXISTING BEFORE SUCH DAMAGE OR INJURY WAS DONE, BY
REPAIRING, REBUILDING, OR OTHERWISE RESTORING AS MAY BE
DIRECTED OR HE SHALL MAKE GOOD FOR SUCH DAMAGE OR INJURY IN
AN ACCEPTABLE MANNER.
8. CLEARING AND GRUBBING
THE CONTRACTOR SHALL USE EVERY PRECAUTION NECESSARY TO
PREVENT DAMAGE TO ALL TREES, SHRUBS, FENCES, DRIVEWAYS, ETC.,
ADJACENT TO THE LINE OF CONSTRUCTION.
EXCEPT IN AREAS TO BE CLEARED, DO NOT REMOVE, CUT, DEFACE,
INJURE, OR DESTROY TREES OR SHRUBS WITHOUT THE OWNER'S
PERMISSION. DO NOT FASTEN OR ATTACH ROPES, CABLES, OR GUYS TO
EXISTING NEARBY TREES FOR ANCHORAGES UNLESS AUTHORIZED BY
THE OWNER. WHERE SUCH USE OF ATTACHED ROPES, CABLES, OR GUYS
IS AUTHORIZED, THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY
RESULTANT DAMAGE.
9. EXCAVATION
EXCAVATION AND TRENCHING WORK SHALL INCLUDE REMOVAL AND
SUBSEQUENT HANDLING OF ALL MATERIALS EXCAVATED OR OTHERWISE
REMOVED IN PERFORMANCE OF THE CONTRACT WORK, REGARDLESS OF
THE TYPE, CHARACTER, COMPOSITION OR CONDITION THEREOF.
EXCAVATION WORK SHALL BE PERFORMED IN A SAFE AND PROPER
MANNER WITH SUITABLE PRECAUTIONS BEING TAKEN AGAINST ALL
HAZARDS. EXCAVATIONS SHALL PROVIDE ADEQUATE WORKING SPACE
AND CLEARANCES FOR THE WORK TO BE PERFORMED THEREIN.
EXCAVATED MATERIAL REQUIRED TO BE USED FOR BACKFILL MAY BE
DEPOSITED BY THE CONTRACTOR IN STORAGE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.