ATTACHMENT 15-ADDENDUM 2.pdf

PDF 7 MB Posted

Attached to
CONSTRUCTION: Multi-Purpose Building Renovation, FAA, MMAC, Oklahoma City, OK
Solicitation number
6973GH-18-R-00009
Issued by

About this file

ATTACHMENT 15-ADDENDUM 2 (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 10- .html file.htm HTM file
ATTACHMENT 5-SF25.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
ATTACHMENT 10R-BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 7-CONTRACTOR'S RELEASE.pdf PDF
ATTACHMENT 4-WAGE DETERMINATION OK49.pdf PDF
ATTACHMENT 15-ADDENDUM 2.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 MECHANICAL.pdf PDF
ATTACHMENT 3-CHAPTER 33 CONSTRUCTION SAFETY.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL.pdf PDF
ATTACHMENT 8-OPERATIONAL CONTROL DOCUMENTS.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0003.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 12-CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION.pdf PDF
24-ATTEND Sign In Second Site Visit.pdf PDF
ATTACHMENT 6R-SF25A PAYMENT BOND 8/2016.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
AMENDMENT 0002.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 9- .html file.htm HTM file
ATTACHMENT 9R-ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 11-PAST PERFORMANCE SURVEY.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 1.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 ELECTRICAL.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
AMENDMENT 0003.pdf PDF
Show 40 more

Latest 50 of 251 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MPB Renovation

MMAC, Oklahoma City

Bidder Inquiries

2/2/2018 id status Discipline RFI Response Response By

1 Ready G Clarification: For Option PHASE 2 work, the Owner will have occupancy of the

Basement and the Data Center on the First Floor (Critical Occupancy). All other areas will be vacated

No response required FAA

2 Ready T Drawing T001, general note #1 states that “All comm data copper fiber demo & installation will be performed by the FAA IT Group”. Please confirm that this will be true.

Clarification: All comm/data copper/fiber demo will be performed by the contractor and coordinated with the FAA IT Group. The FAA IT Group will identify conduits and cabling to remain. The contractor will remove remaining horizontal copper cabling from in-floor ducts and all horizontal cabling above ceiling from telecommunication closets and all associated conduits. All existing telecommunication copper and fiber riser cables to remain.

FAA

3 Open G, E The Print shop has some equipment that is to be relocated and/or stored and then reinstalled per the Ledgers On sheet G200 and G201. Please confirm that we are

NOT to include the cost for this in our proposal.

Print shop equipment indicated on G200 and G201 is to be relocated by the Government. However, temporary power and comm is to be provided by the Contractor for connection of the equipment in the locations shown.

Note: The plans on G200 and G201 are proposed sequencing plans. It will be the responsibility of the Contractor to develop a plan for construction sequencing that allows for continued occupancy of the areas identified.

Clarification: The G Series sheets are simply a suggested sequence of construction. Refer to General Note A on G sheets.

MRO

4 Open A Sheet AD-100 Does not match Sheet G200 in Areas out of scope. Can you confirm

Elect Room 0309 and Battery Backup 0308 are not in the scope of this project?

Rooms 0308 and 0309 are not in scope. MRO

5 Ready FAA Will CLIN 0002 - Phase 2 be awarded at the time of the initial award? If not when will option 2 be awarded later during the project?

As stated in clause H.6, exercise of the option CLINs must be made in writing within 30 days of completion of Phase 1. Further, per provision

M.3(d), "An offeror's proposal price will be determined by totaling the proposed prices for all priced CLINS (0001-0005) to arrive at a total estimated contract value."

FAA

6 Open A The Options on the Cover sheets do not match the Options in the Specs. Can you clarify which Options are to Be Priced?

Refer to addendum 001 - the specs and CLIN schedule take precedence over the drawings. Anything indicated as an option in the drawings is to be provided as the Base Bid option.

MRO

7 Ready FAA In the solicitation for offers Section M paragraph M.2 Technical Evaluation, the evaluation factors for Offerors (general contractors) has multi-story office or multi-story hospital renovations listed as projects to be submitted. It was stated at the prep-proposal meeting that this would be broadened in scope to allow other complex renovation projects to be submitted. It was also stated that revisions to the project documents can only be revised by amendment. Therefore, please revise the solicitation accordingly.

M.2 has been revised. FAA

8 Open A Please provide elevations for the back side of the high roof wall panels as shown in elevation 1/A-206. What materials are to be used on this?

Insulated metal wall panels will be on the reverse side, Re: A-305 CEM

9 Open A Please provide elevations for the back side of the high roof wall panels as shown in elevation 1/A-206. What materials are to be used on this?

Insulated metal wall panels will be on the reverse side, Re: A-305 CEM

10 Open S Can more information be provided on the structural drawings in regards to what is base bid (CLIN 0001) vs bid options? It is unclear whether any work on the plans is to be base bid (CLIN 0001) that is not on the basement floor.

All basement structural work with the exception of the stair towers is part of CLIN 0001.

MRO

Bidder Inquiries

2/2/2018

11 Open S Is there any structural work required for the base bid (CLIN 0001) that is not located on the basement floor? It is unclear if any openings or supports will need to be created for MEP trades in other areas of the building for the base bid.

Any structural work outside of the basement is not part of CLIN 0001. Any provisions for Phase 2 (CLIN 002) work to be provided in Phase 1 are indicated in the Drawings.

MRO

12 Open A Will any roofing work be required in the base bid? Will any new pipes or HVAC equipment need a penetration and flashing on the roof in the base bid?

No roofing is base bid. Piping and HVAC provisions for phase 2 (CLIN 0002) are identified on the Drawings.

MRO

13 Open A Is the existing concrete supposed to be demolished to the dashed line around the expansion joints with Keynote 2 on drawing AD-125? Drawing A-125 with Keynote

1 directs to detail 11/A-503, and that detail can only be applicable if the concrete is removed?

Refer to detail 11/A-503 and note existing concrete slab. CEM

14 Open A Please clarify where in the metal panel elevations the integrated window system applies per spec 074213.19 section 2.2 part A? The section cuts through the windows show a typical window condition and not the detail for the Centria

Formavue FV-200 system. Also, the headline description for the integrated

Window System (spec 074213.19 section 2.2 part A) calls for it to be Bid Option 2.

Aren't all of the metal panels in that spec Bid Option 2? Is there a separate option for the integrated window system?

The base bid option is to be provided. No integrated window system is part of the project.

MRO

15 Open A Please indicate where Traffic Coatings per spec 071800 are to be applied on the plans?

Traffic coatings are to be used in the base bid exterior "breeze way" at the ground level as indicated in the Spec Section 010300.

MRO

16 Open L Landscape drawing LS-404 indicates waterproofing under the elevated paver system in the second floor courtyard. Please clarify if waterproofing is required under the entire elevated paving system and which waterproofing system is to be utilzied?

Yes, waterproofing is required over the entire second floor outdoor area.

For type of waterproofing, refer to sheet A-505.

DS

17 Open A Please indicate where EIFS is located on the project as indicated per spec section

072419?

There is no EIFS in the project. Specification Section 072419 is removed as part of this Addendum.

MRO

18 Open L Please indicate what the paving around the exterior of the building as shown on drawings LS101, LS401, LS402 & LS403 is to be comprised of? It appears that it is stamped & colored concrete and not the paving system that is shown on drawing

LS404? Please provide concrete thickness & rock base thickness if it is stamped concrete pavement?

Pavement is natural colored concrete with colored accent areas and tooled joints. Refer to notes on drawings. For breezeway pavement refer to LS drawings and drawing A-505.

DS

19 Open C Is all work on the civil plans to be in Phase 1 (CLIN 0001) or Bid Option 2 (CLIN

0002)? Will any work shown on the civil drawings be required in the Base Bid (CLIN

0001)?

All civil work is part of CLIN 0002. MRO

20 Open M Please indicate what work on the mechanical drawings is to be base bid (CLIN

0001) vs Bid Option 2 (CLIN 0002). Will any work be required outside of the basement floor that is in the base bid (CLIN 0001)? Can the drawings be revised to reflected to show what work is required for each CLIN item?

All basement mechanical work except for the stair towers is base bid. Any provisions for Phase 2 (CLIN 0002) work is indicated on the Drawings

(reference mechanical piping plans).

MRO

21 Open P Please indicate what work on the plumbing drawings is to be base bid (CLIN 0001) vs Bid Option 2 (CLIN 0002). Will any work be required outside of the basement floor that is in the base bid (CLIN 0001)? Can the drawings be reflected to show what work is required for each CLIN item?

All plumbing work in the basement is to be base bid (Phase 1, CLIN 0001). MRO

22 Open E Please indicate what work on the electrical drawings is to be base bid (CLIN 0001) vs Bid Option 2 (CLIN 0002). Will any work be required out of the basement floor that is in the base bid (CLIN 0001)? Can the drawings be reflected to show what work is required for each CLIN item?

All electrical work in the basement is to be base bid (Phase 1, CLIN 0001). MRO

Bidder Inquiries

2/2/2018

23 Open A What are the exact location(s) for the metal panels type MT-1 and MT-2 as specified in spec 074213?

They are located in the following rooms: 1105 Entryway, 1106 Lounge, 1107 Corridor, 1405 Entryway, 1406 Lounge and 1407 Corridor. Refer to the following details: 1,2,3,4 & 5/A-402, 1/A-403 for exact locations and design.

BY

24 Open G When reading the drawings it has been impossible to distinguish what work is to be CLIN 0001 vs CLIN 0002. There is much support work for each trade that may not exist in the basement of the building, however will be required elsewhere in the building. Can the drawings be revised to show what work will be required to each bid form CLIN cost breakdown so contractors can accurately bid the project?

Any provisions for Phase 2 to be provided in Phase 1 are indicated in the drawings. It is the responsibility of the Contractor to ensure that all required utilities to areas to remain occupied are kept in service.

MRO

25 Open A The cover sheet of the drawings indicates bid options that do not match the bid form per the solicitation document. Other alternates shown on the drawings, such as glazing alternate 4A on sheet (A-606), are also not located on the bid form.

Can the bid form and other constuctuion documents be edited so it is clear how to accurately bid the alternates?

The bid form is to be used for bid options. Any bid options not included in the bid form indicated in the Drawings or Specifications are to be bid as the base bid option only.

MRO

26 Open A Many of the interior elevations (sheets A-420 through A-427) state "elevation is for future design package (NIC)". Just to clarify, none of the finishes shown in these elevations are to be included in this proposal (ie. Casework, booths, wood paneling, wall tile, aluminum lettering, solid surface tops/ ledges, artform panels, etc)? Will blocking for future items be required in the base bid inside those walls?

WIll the walls require paint per the base bid?

Correct. Materials and finishes shown in the elevations marked as (NIC) are not to be included. Blocking for future items is required, as well as painting the walls per the base bid.

BY

27 Open A The glazing elevations call for alternates 4A & 4B. There is not a spot on the bid form for those alternates. Please provide a spot on the bid form and provide a description of those alternates if applicable to the project.

The bid form is to be used for bid options. Any bid options not included in the bid form indicated in the Drawings or Specifications are to be bid as the base bid option only.

MRO

28 Open FAA Is this project considered "air side"? If so, what insurance requirements are applicable?

This project is not considered "airside". FAA

29 Open A Please provide a spec or product information for the vehicle barrier arm gates and post mounted key card readers per keynote 1 on sheet CU101?

See Addendum #2

30 Open A Demountable partitons are labeled NIC per detail 1/A-001, however are listed in spec 102219. Please indicate if these to be included in the bid and if so, what locations are to be included.

Spec 102219 will be removed. CEM

31 Open A Keynote 6 on the architectural plans says to protect finishes in place. Please clarify what finishes are to remain in place and be protected?

Refer to the room finish schedule on sheets A-611, 612 & 613 for room finishes designated ETR. The room finish schedule takes precedence.

BY

32 Open A Floor plans (A-111 through A-134) indicate a legend that shows access flooring with diagonal lines. The basement floor plans have checkered lines to indicate access flooring. Are the checkered lines on the floor plans (A-111 through A-134) supposed to indicate access flooring like the basement plans?

That is correct CEM

33 Open I On sheet A611 the Room finish schedule references WD-1 for wood ceiling, which keynote 15 says it is NIC. Please clarify if the intent is to install ACT1 at the areas to receive WD1 or to leave the areas to receive WD1 as exposed?

The intent is to install ACT1 in these areas. NOTE: The WD-1 ceiling/wall system located at the main entrances (rooms: 1105 Entryway, 1106

Lounge, 1107 Corridor, 1405 Entryway, 1406 Lounge and 1407 Corridor) are in the base bid.

BY

34 Open A Plans call for ceiling and wall mounted TVs such as in elevation 3/A-424. Is rough-in of power, cabling and blocking required for those TVs to be included in our bid?

Yes. BY

Bidder Inquiries

2/2/2018

35 Open A The specification allows for a "comparable product". Tate Access Floors manufacturers a 3"FFH access floor, consisting of pedestal assemblies and 24"x24" panels. At 3"FFH, there is approx. 1-3/8" of open/clear space below the panels for cabling. This access floor system can be leveled to account for inconsistencies in the sub-floor. The panels are mechanically secured to the pedestal assemblies.

Will this type of low finished floor height access floor system be accepted as a comparable product?

A 3" height is not acceptable for the raised floor. MRO

36 Open A Specifications 101100 and 102600 indicate products that are listed as "Not In

Contract" on the drawings. Are the spec sections provided for reference only or is the general contractor supposed to provide those products? Is blocking for those products required in the bid?

Correct, the specifications are for reference. Blocking is to be provided. MRO

37 Open A Keynote 5 on drawing A-606 indicates a bid option for electric roller shades. There is not a line item on the bid form for that option. Please advise?

The bid form is to be used for bid options. Any bid options not included in the bid form indicated in the Drawings or Specifications are to be bid as the base bid option only.

MRO

38 Open A Section 010300 Options. Paragraph 1.4.A States that BASEMENT RENOVATION is

Option No. 0001. Shouldn’t this read Line item 0001 Base Bid?

Refer to Addendum 001. MRO

39 Open A Section 012700 Unit Prices Paragraph 3.1.B Requires that hourly rates be provided for various trades for After Hours and Weekend Work. If we are to provide these unit rates, does this mean that we are not to include costs for after hour and week end work in the Base Bid and Options?

The Unit Prices described in SECTION 012700 – UNIT PRICES will be used to help verify costs for future, potential Changes in the Work. If the Bidder determines that After Hours and Weekend Work is required to accomplish the Work defined in the Bidding Documents, those costs should be included in the Bid.

JBC

40 Open A Section 015900 Field Offices and Sheds paragraph 8.2 States Parking is to be coordinated with FAA. Will parking be available in the vicinity of the project in exiting lots or will a temporary lot need to be construction? What are the intentions of the FAA?

Construction Parking will be located soemwhere on the FAA Campus. A temporary lot will NOT have to be Constructed for this Project

JBC

41 Open FAA Section 019113 General Commissioning Requirements Paragraph H1.b states to include the cost of commissioning in the total price. Does this mean that we are to include the cost of the Commissioning Agent or does this mean that we are to include the cost required for the participation in the commissioning process as outlined in the specifications? Please clarify.

A commissioning agent has already been hired by the Owner and will be paid by the Owner. The contractor is required to include the costs for participating in the commissioning process.

FAA

42 Ready FAA Can you confirm that the FAA project is Not under the Governments EM 385

Guidelines for Safety?

EM385 Guidelines apply to DoD construction projects, not Department of

Transportation/FAA projects.

FAA

43 Ready FAA Does The FAA have their Own Set Of Safety Rules are do they Follow OSHA

Standards? Please provide safety standards that are applicable to this project.

SIR clause AC0090 Environmental Safety and Health addresses this question.

FAA

44 Open S Detail Six on Sheet SB504 Breezeway slab edge details would indicate that the complete 1st floor Breezeway is to be removed and replaced with either option 1 a new slab are Option 2 concrete pavers. Please confirm what we are to bid.

On detail six on sheet SB504, bid option 1 shall be deleted. Bid option 2 shall refer addendum #1, specification section 010300, part 1.4 C.

TAL

45 Open A Can you confirm if any work is to be included on the existing roof structures? For example south elevation 1 existing penthouse.

Existing roof structures such as the penthouse and vestige of old concrete cooling tower will not need work.

CEM

46 Open A Are we to include removal of the existing ceilings in the spaces to be renovated?

The demolition drawing keynote 4 states remove existing ceiling system to extents of new work shown on RCP. Are the existing ceilings to be removed by the abatement contractor?

Any ACM will be remediated and removed by the FAA. Any non-ACM will be removed the contractor.

CEM

Bidder Inquiries

2/2/2018

47 Open A Are we to include removal of the existing flooring in the spaces to be renovated?

The demolition drawings do not indicate removal of existing flooring however the architectural drawings show new flooring going in these areas. Is existing flooring to be removed by the abatement contractor?

Any ACM will be remediated and removed by the FAA. Any non-ACM will be removed the contractor.

CEM

48 Open A On sheet A-112, keynote 4 notes to install security turnstile. Please clarify if this is to be furnished and installed, if so please provide specs and details.

Use Turnlock 100 (3 wing) by Boon Edam or equal. CEM

49 Open A On the Architectural floor plans, partitions are labeled at existing walls that are to remain in place. For example, on sheet A-102 at gridline 9 between grids G & F, they label an existing partition with A4. Please clarify if any work is to be done to these existing partitions that are labeled?

Clarification: walls at room #318 and #319 are new. CEM

50 Ready FP In the specification section 283111 DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM, there are two sections I needed some clarification on. “1.7 Quality Assurance, B.

Fire Alarm demolition and installation shall be performed by a fire alarm technician” and “1.9 Sequencing and Scheduling C. …Fire alarm system demolition shall be performed by a fire alarm technician.” I am assuming this means device termination/removal and that any conduit or disconnect fire alarm cabling could be removed by the Electrical Contractor. This is important for us because we do not install/demo conduit especially on projects of this size, usually the Electrical

Contractor will remove/install any conduit and many times they install/remove the cabling as well and we come back to make the final terminations of devices & equipment.

Removal/installation of fire alarm conduit system and boxes shall be performed by electrical contractor. Removal/installation of fire alarm cabling, devices, and termination and testing shall be performed by fire alarm technician.

FAA

51 Open E The FAA electrical specifications tell us to use Galvanized Ridgid Conduit in electrical and mechanical rooms. During the walk through I noticed the majority of conduit installed in the electrical room is EMT. Will EMT in the electrical room be acceptable for this project?

Where subject to physical damage (up to 10' AFF), use GRC. EMT shall be permitted above this height.

52 Open G It is my understanding that Phase 2 will not be released until the end of the 300 day Phase 1. And then we start the Phase 2 1,090 schedule.

Correct MRO

53 Open S Has the concrete slab where the new utility transformers are to be mounted been engineered and approved to support the new transformers? There are currently openings in the concrete slab and with the new penetrations needed for the secondary conduits I am concerned about the strength of the slab.

Yes. The concrete slab with additional steel support are designed to support the new transformers.

TAL

54 Open G Although the specification say “all demo to be done during the hours of 6:00PM-

6:00AM” will we be allowed to work on demolition during normal business hours if we are not making excessive noise?

Only demolition work that creates excessive noise is to be conducted outside of normal business hours. If any work results in occupant complaints it is to be stopped immediately and resumed after business hours.

MRO

Bidder Inquiries

2/2/2018

55 Ready FAA With respect to Instructions to Offeror (ITO) L.3(e)(4)(A), ITO provides the following address for submitting Proposal Guarantee:

"... In accordance with Section I, Clause 3.4.1-1 Proposal Guarantee, an original, signed Proposal Guarantee shall be submitted by the due date and time for receipt of proposals to the following address:

FAA Customer Service Desk (AAQ-700)

Room 313, Multi-Purpose Building

6500 S. Macarthur Blvd (Zip 73169)

PO Box 25082

Oklahoma City, OK 73125-4933 "

Please clarify the address offerors will submit Proposal Guarantee as this appears to be two merged addresses.

Answer: Both addresses are correct, depending on how guarantee is sent.

Street: 6500 S. MacArthur Blvd. PO Box: PO Box 25082

Oklahoma City, OK 73169 Oklahoma City, OK 73125

FAA

56 Ready FAA With respect to Section C -- Description/Specifications, AC4563 Emergency

Situations and Exercises During Contract Performance at the Mike Monroney

Aeronautical Center; can the government provide a description of the duration and frequency of exercises at this location?

Answer: No, that information is not available. FAA

57 Open FAA With respect to Section E -- Inspection and Acceptance, clause 3.10.1-1 Contractor

Inspection Requirements; upon contract award, what is the estimated timeframe for the Contractor to receive approval and authority to perform site visit and conduct all necessary inspections? Are there any expected delays/time constraints

Contractor should take into account prior to attempting to perform the inspection?

The contractor can schedule site visits and inspections with the FAA immediately after receiving award. There will be occupants in the building so inspecting some areas may need to occur after business hours.

FAA

58 Ready FAA With respect to Section F.4 -- Contractor's Construction Schedule, the Contractor must submit the construction work schedule to the CO for approval within 15 days of the date established for "Commencement of Work" in accordance with Clause

3.2.2.3-56. Per Clause 3.2.2.3-56, " ... within five days after the work on the contract starts or after another period determined by the CO, prepare and submit to the CO for approval three copies of a practicable schedule ..." Please confirm it is the Government's intent for the Contractor to submit one copy of the construction work schedule both 15 days prior to the commencement of work, and three more copies of the work schedule five days after contract start date.

Answer: The “15 days of the date established for Commencement of

Work” specified in clause F.4 is “another period determined by the CO” as stated in clause 3.2.2.3-56.

FAA

59 Ready FAA As per I.1 Subcontractors and Outside Associates and Consultants, what subcontractors must be submitted with the proposal?

Answer: At a minimum, electrical and mechanical subcontractors will be submitted with the proposal.

FAA

60 Open G Is there a plan for temporary work such as, HVAC, electrical and waterproofing, in place for the required continued building operations during demolition and construction or are these temporary work plans up to the contractor?

Proposed sequencing plans are provided on Sheets G200 and G201.

However, it is the responsibility of the Contractor to develop their own sequencing plans as required to maintain operation of occupied areas.

MRO

61 Open A Are the options for this project as listed in Section B, Items 0002-0005 or as listed in the Drawings Volume 1-Civil, sheet number G- 000.1 in the Bid Options box?

Refer to addendum 001 - the specs and CLIN schedule take precedence over the drawings. Anything indicated as an option in the drawings is to be provided as the Base Bid option.

MRO

62 Open G What is the required availability of the dock during the phases of the project? Access to the dock will be required for the SMF data center. Temporary shut down may be possible if coordinated with the Users.

MRO

63 Open A What are the limits of the basement renovation, item 0001, as a standalone project?

The basement renovation is not a stand alone project. MRO

Bidder Inquiries

2/2/2018

64 Open FAA Please clarify if funding is currently available for this solicitation. If available, please state what Options are funded and the timing limitation for such funding i.e. is the funding available on a calendar year or fiscal year basis?

Funding is available for the Base Bid, Phase 1 now. The remaining funding is on a fiscal year basis, but we expect to receive access to the all remaining funds by 2nd quarter of 2019 (Jan – March).

FAA

65 Open FAA In reference to the evaluation factors given in M.2 Technical Evaluation, is the value of the projects given in the subcontractor evaluations total contract value or subcontract value?

Subcontract value. FAA

66 Ready FAA Is the Hazardous Materials Safety Sheet (p. 40; sec. 3.6.3-3) due with the Feb. 9 proposal? If so, how shall it be included in the proposal?

Answer: Hazardous Material Identification is due with the proposal. It can be included as an attachment in Section I.

FAA

67 Ready FAA Is the Buy American Material Price Comparison (p. 46; sec. 3.6.4-3) due with the

Feb. 9 proposal? If so, how shall it be included in the proposal?

Answer: Buy American Act information is due with the proposal. It can be included as an attachment in Section I.

FAA

68 Ready FAA How shall the Small Business Subcontractors Plans be included in the proposal? Answer: The Small Business Subcontracting Plan should be included in

Section I.

FAA

69 Ready FAA Are the items listed in the meeting Agenda for Tuesday, January 16, 2018, 2:30pm, Screening Information Request/Request for Offer (SIR/RFQ), 6973GH-18-R-00009, Multi-Purpose Building (MPB) Renovation Project officially incorporated in the solicitation? If so, will copies be provided on FBO?

Answer: Everything addressed in the pre-proposal conference site visit is included in the original solicitation.

FAA

70 Open G Does the basement have any history of water issues, such leakage or drainage problems?

The basement has had issues with water leaking underneath the

"breezeway" paving.

MRO

71 Open FAA Is there any lay space available and if so what is its location and the usage rules for that space?

Lay space is available. The contractor can utilize the green lawn area on the east side of the building as long as it is repaired to its condition before the project began. There is also a remote area on campus where trailers/containers can be stored. Any area on campus requires compliance with City of Oklahoma, Public Works Department Best

Management Practices manual.

FAA

72 Open A In FINAL Type B Specs Volume 1, Section 010100, Part 1, 1.3, C 5 paint is not mentioned, is painting required?

Yes, that paragraph is intended to be a supplemental, brief description of the Work and is not intended to supercede any of the published Bidding

Documents.

JBC

73 Ready FAA Please verify what security and site access requirements the contractor is responsible for providing.

Answer: Security and site access requirements are clearly defined in SIR clauses 3.14-1, 3.14-2 and 3.14-4.

FAA

74 Open A In reference to the Electrochromic Glass option, Option #003, specification 088800-

Dynamic Glazing, indicates no substitutions will be considered. Flintco believes there are other products available that would bring completion and possible cost savings to the project. Will alternate options be considered?

Pre-bid substition requests will not be considered. MRO

75 Open G Spec Section 019113 states that Optimum Energy Solutions - Curtis Anthony has been selected as the Commissioning Authority, please verify that this is not a service that does not need to be a part of our bid.

Correct. MRO

76 Open E Drawing T - 001 under "Telecommunications Symbols" it states a data/voice drop and says "Three (3) cat.6 data/voice cables. Is this 3 data & 3 voice each or just 3 total data/voice together?

Three drops total. Each drop may be used for voice or data.

77 Open E Per the note below listed on the Drawings Volume 3 Telecom and Security - AMP –

400 – E – TY001. JCI is the only company able to do the Access control and Security install or are they going to be the company monitoring it and anyone can place a bid?

(General Notes)

Access control and security shall be by JCI. However, items such as the PA system shall be open to bidders.

Bidder Inquiries

2/2/2018

78 Open A RFI regarding the access floor. The specification allows for a "comparable product". Tate Access Floors manufacturers a 3"FFH access floor, consisting of pedestal assemblies and 24"x24" panels. At 3"FFH, there is approx. 1-3/8" of open/clear space below the panels for cabling. This access floor system can be leveled to account for inconsistencies in the sub-floor. The panels are mechanically secured to the pedestal assemblies. Will this type of low finished floor height access floor system be accepted as a comparable product?

Pre-bid substition requests will not be considered. A 3" height is not acceptable.

MRO

79 Open G Please supply or direct us to plans and specifications that outline the location of temporary egress throughout the phases and electrical, plumbing and mechanical systems switch overs throughout the project to keep the facility operational.

Proposed sequencing plans are provided on Sheets G200 and G201.

However, it is the responsibility of the Contractor to develop their own sequencing plans as required to maintain operation of occupied areas.

MRO

80 Open A Reference A100 and A105: A100 Composite Basement Floor Plan -Phase One shows the work to be accomplished during Option One. There is no means of egress shown out of the basement until the stair towers in Phase Two are completed. How do you intend to occupy the basement when there are no stairways to the first floor?

Proposed sequencing plans are provided on Sheets G200 and G201.

However, it is the responsibility of the Contractor to develop their own sequencing plans as required to maintain operation of occupied areas.

MRO

81 Open FAA Reference 014000 Quality Control: Who is to pay for materials testing on this job? The contractor shall pay for all material testing and special test and inspections required by the Authority Having Jurisdiction.

FAA

82 Open P PD102 & PD102, keynote 2 – add that sump pump vent piping will remain. PD102 and PD102 keynote 2 will be modified to state that existing sump pump vent piping will remain

RR

83 Open E Is there an existing schedule, or one-line, for panels BZE, BZE-1, BZW, BC1L, BC2R, EBC, & EBZ, or their approximate location, that feed the print shop?

Not at this time. Additional informatin may be provided to the successful bidder. The majority of the equipment is fed from panels in the northwest quadrant of the print shop.

84 Open E Note #7, on electrical drawing ED100, states to remove and replace the MCC. But there isn’t an MCC listed on the one-line on sheet EP602. Are we to completely replace, or Retrofill? Is this MCC fed from the SMF Data Center Gear? And if we are to replace this MCC is there any information for this MCC? Such as switch count, AIC rating, and amp rating of each switch, etc?

Remove the MCC. FSB

85 Ready E Is it the intent on this project for the electrical contractor to perform any work on the fire alarm system?

The electrical contractor is only to provide the rough-in for the fire alarm system.

FAA

86 Ready FAA Will the FAA IT group provide their own faceplates and data jacks for their cables? Yes FAA

87 Ready E In the general note “A” on the Data/Telecom prints, sheet AMP-400-E-TT101, it states that all offices will get three cables for each work outlet. Does this include the floor boxes, in the modular flooring?

Yes. FAA

88 Open E Will the electrical contractor be required to install wall sleeves for conduit when penetrating gypsum fire rated/non-fire rated walls? Or will the use of fire proof caulking around conduits be sufficient?

Any UL listed assembly is acceptable.

89 Open E Will there be any additional grounding required for the low profile flooring, other than manufacturers recommendations?

Grounding shall be in accordance with manufacturer's recommendations and any applicable codes and standards.

91 Open E Will we need to maintain the redundant feed to the MSB switchgear, for the temporary service, during construction of phase 1?

Maintain redundant feed to MSB switchgear

92 Open E Are the electrical rooms considered mechanical areas? For the purposes of conduit selection, yes. See response to question 51.

Bidder Inquiries

2/2/2018

93 Open E On the lighting detail sheet AMP-400-E-EL501, shows the detail for the typical power pack occupancy sensor set up. But, in the general notes, “B” states that emergency lights that function as night lights are to be on 24/7. Lights that are not identified “NL” shall be switched with the room lights. Since the emergency lights and the normal power lighting cannot be in the same raceway, they would need their own switch and power pack. They do make power packs that have two sets of contacts in them, but they are more expensive, and would still need the additional separate switch to operate according to the diagram. What is the intent on switching two different circuits that cannot share raceways, from the same switch?

Design intent is for one low voltage switch to control multiple contactors for an area. The emergency lighting circuit shall be switched via power pack with a fail safe (ON/closed) configuration.

94 Open E Who will be inspecting the elecrical work? Verify with the FAA.

95 Ready E Spec section 260523, part 3.1, paragraph A, #1, states that outlet boxes shall be no smaller than 4” wide, 4” high, and 2-½” deep. 2-½” isn’t a standard box size for boxes. Should it say 2-1/8”?

2 1/8 is correct FAA

96 Open E Is it the intention to utilize the warning planks called for in specification 260543 paragraph K?

Omit 3.4 (K) from 260543.

97 Open E Is it the intention to label all conduits, exposed or concealed, as indicated in

260553-2, part 22, paragraph B? And if so, what is the distance between markings?

And which means will be enforced?

Markings shall occur at the beginning and end of each conduit run, as well as on entry/exit of penetrations and junction boxes.

98 Open E Can the Retrofill of the existing GE gear, be done by other manufacturers, if the

Retrofilled gear performs within intended use, and the proper arc flash study, coordination study, and short circuit

Alternatives to GE shall be permitted, provided they do not require more outage time, have the same warranty, are UL listed, and are otherwise equivalent.

FAA - W.O. #2013007860 FEBRUARY 2, 2018

CONCRETE UNIT MASONRY 042200 - 1

FSB / FAA MPB Renovation (Type B)

SECTION 042200 - CONCRETE UNIT MASONRY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 DEFINITIONS

A. CMU(s): Concrete masonry unit(s).

B. Reinforced Masonry: Masonry containing reinforcing steel in grouted cells.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For the following:

Reinforcing Steel: Detail bending, lap lengths, and placement of unit masonry reinforcing bars. Comply with ACI 315.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For testing agency.

B. Material Certificates: For each type and size of the following:

1. Masonry units.

a. Include material test reports substantiating compliance with requirements.

b. For masonry units used in structural masonry, include data and calculations establishing average net-area compressive strength of units.

c. Cementitious materials. Include name of manufacturer, brand name, and type.

d. Mortar admixtures.

e. Preblended, dry mortar mixes. Include description of type and proportions of ingredients.

f. Grout mixes. Include description of type and proportions of ingredients.

g. Reinforcing bars.

h. Joint reinforcement.

i. Anchors, ties, and metal accessories.

C. Mix Designs: For each type of mortar and grout. Include description of type and proportions of ingredients.

CONCRETE UNIT MASONRY 042200 - 2

1. Include test reports for mortar mixes required to comply with property specification. Test according to ASTM C 109/C 109M for compressive strength, ASTM C 1506 for water retention, and ASTM C 91/C 91M for air content.

2. Include test reports, according to ASTM C 1019, for grout mixes required to comply with compressive strength requirement.

1.5 QUALITY ASSURANCE

A. Testing Agency Qualifications: Qualified according to ASTM C 1093 for testing indicated.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Store masonry units on elevated platforms in a dry location. If units are not stored in an enclosed location, cover tops and sides of stacks with waterproof sheeting, securely tied. If units become wet, do not install until they are dry.

B. Store cementitious materials on elevated platforms, under cover, and in a dry location. Do not use cementitious materials that have become damp.

C. Store aggregates where grading and other required characteristics can be maintained and contamination avoided.

D. Deliver preblended, dry mortar mix in moisture-resistant containers. Store preblended, dry mortar mix in delivery containers on elevated platforms in a dry location or in covered weatherproof dispensing silos.

E. Store masonry accessories, including metal items, to prevent corrosion and accumulation of dirt and oil.

1.7 FIELD CONDITIONS

A. Protection of Masonry: During construction, cover tops of walls, projections, and sills with waterproof sheeting at end of each day's work. Cover partially completed masonry when construction is not in progress.

1. Extend cover a minimum of 24 inches down both sides of walls, and hold cover securely in place.

B. Do not apply uniform floor or roof loads for at least 12 hours and concentrated loads for at least three days after building masonry walls or columns.

C. Stain Prevention: Prevent grout, mortar, and soil from staining the face of masonry to be left exposed or painted. Immediately remove grout, mortar, and soil that come in contact with such masonry.

1. Protect base of walls from rain-splashed mud and from mortar splatter by spreading coverings on ground and over wall surface.

2. Protect sills, ledges, and projections from mortar droppings.

CONCRETE UNIT MASONRY 042200 - 3

3. Protect surfaces of window and door frames, as well as similar products with painted and integral finishes, from mortar droppings.

4. Turn scaffold boards near the wall on edge at the end of each day to prevent rain from splashing mortar and dirt onto completed masonry.

D. Hot-Weather Requirements: Comply with hot-weather construction requirements contained in

TMS 602/ACI 530.1/ASCE 6.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Source Limitations for Masonry Units: Obtain exposed masonry units of a uniform texture and color, or a uniform blend within the ranges accepted for these characteristics, from single source from single manufacturer for each product required.

B. Source Limitations for Mortar Materials: Obtain mortar ingredients of a uniform quality, including color for exposed masonry, from single manufacturer for each cementitious component and from single source or producer for each aggregate.

2.2 PERFORMANCE REQUIREMENTS

A. Provide structural unit masonry that develops indicated net-area compressive strengths at 28 days.

1. Determine net-area compressive strength of masonry from average net-area compressive strengths of masonry units and mortar types (unit-strength method) according to TMS

602/ACI 530.1/ASCE 6.

2.3 UNIT MASONRY, GENERAL

A. Masonry Standard: Comply with TMS 602/ACI 530.1/ASCE 6 except as modified by requirements in the Contract Documents.

B. Defective Units: Referenced masonry unit standards may allow a certain percentage of units to contain chips, cracks, or other defects exceeding limits stated. Do not use units where such defects are exposed in the completed Work and will be within 20 feet vertically and horizontally of a walking surface.

C. Fire-Resistance Ratings: Comply with requirements for fire-resistance-rated assembly designs indicated.

1. Where fire-resistance-rated construction is indicated, units shall be listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction.

CONCRETE UNIT MASONRY 042200 - 4

2.4 CONCRETE MASONRY UNITS

A. Shapes: Provide shapes indicated and as follows, with exposed surfaces matching exposed faces of adjacent units unless otherwise indicated.

1. Provide special shapes for lintels, corners, jambs, sashes, movement joints, headers, bonding, and other special conditions.

2. Provide square-edged units for outside corners unless otherwise indicated.

B. CMUs:

1. Unit Compressive Strength: Provide units with minimum average net-area compressive strength of 2800 psi.

2. Density Classification: Lightweight.

3. Size (Width): Manufactured to dimensions 3/8 inch less-than-nominal dimensions.

4. Concrete Lintels: ASTM C 1623, matching CMUs in color, texture, and density classification; and with reinforcing bars indicated. Provide lintels with net-area compressive strength not less than that of CMUs.

2.5 MORTAR AND GROUT MATERIALS

A. Portland Cement: ASTM C 150/C 150M, Type I or II, except Type III may be used for cold-weather construction. Provide natural color or white cement as required to produce mortar color indicated.

B. Hydrated Lime: ASTM C 207, Type S.

C. Portland Cement-Lime Mix: Packaged blend of portland cement and hydrated lime containing no other ingredients.

D. Aggregate for Mortar: ASTM C 144.

1. For mortar that is exposed to view, use washed aggregate consisting of natural sand or crushed stone.

2. For joints less than 1/4 inch thick, use aggregate graded with 100 percent passing the No.

16 sieve.

E. Aggregate for Grout: ASTM C 404.

F. Water: Potable.

2.6 REINFORCEMENT

A. Uncoated Steel Reinforcing Bars: ASTM A 615/A 615M or ASTM A 996/A 996M, Grade 60.

B. Reinforcing Bar Positioners: Wire units designed to fit into mortar bed joints spanning masonry unit cells and to hold reinforcing bars in center of cells. Units are formed from 0.148-inch steel wire, hot-dip galvanized after fabrication. Provide units designed for number of bars indicated.

CONCRETE UNIT MASONRY 042200 - 5

1. Products: Subject to compliance with requirements, available products that may be incorporated into the Work include, but are not limited to, the following:

a. Heckmann Building Products Inc.; No. 376 Rebar Positioner.

b. Hohmann & Barnard, Inc.; #RB or #RB-Twin Rebar Positioner.

c. Wire-Bond; O-Ring or Double O-Ring Rebar Positioner.

C. Masonry-Joint Reinforcement, General: Ladder type complying with ASTM A 951/A 951M.

1. Interior Walls: Mill- galvanized carbon steel.

2. Wire Size for Side Rods: 0.187-inch diameter.

3. Wire Size for Cross Rods: 0.187-inch diameter.

4. Spacing of Cross Rods: Not more than 16 inches o.c.

5. Provide in lengths of not less than 10 feet, with prefabricated corner and tee units.

2.7 TIES AND ANCHORS

A. General: Ties and anchors shall extend at least 1-1/2 inches into masonry but with at least a 5/8-inch cover on outside face.

B. Materials: Provide ties and anchors specified in this article that are made from materials that comply with the following unless otherwise indicated:

1. Hot-Dip Galvanized, Carbon-Steel Wire: ASTM A 82/A 82M, with ASTM A 153/A

153M, Class B-2 coating.

2. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M.

2.8 MORTAR AND GROUT MIXES

A. General: Do not use admixtures, including pigments, air-entraining agents, accelerators, retarders, water-repellent agents, antifreeze compounds, or other admixtures unless otherwise indicated.

1. Do not use calcium chloride in mortar or grout.

2. Use portland cement-lime mortar unless otherwise indicated.

B. Preblended, Dry Mortar Mix: Furnish dry mortar ingredients in form of a preblended mix.

Measure quantities by weight to ensure accurate proportions, and thoroughly blend ingredients before delivering to Project site.

C. Mortar for Unit Masonry: Comply with ASTM C 270, Proportion Specification. Provide the following types of mortar for applications stated unless another type is indicated or needed to provide required compressive strength of masonry.

1. For masonry below grade or in contact with earth, use Type S.

2. For reinforced masonry, use Type S.

http://www.specagent.com/LookUp/?ulid=1339&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456993066&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456993067&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456993068&mf=04&src=wd

CONCRETE UNIT MASONRY 042200 - 6

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

1. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

2. Verify that foundations are within tolerances specified.

3. Verify that substrates are free of substances that would impair mortar bond.

B. Before installation, examine rough-in and built-in construction for piping systems to verify actual locations of piping.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION, GENERAL

A. Build chases and recesses to accommodate items specified in this and other Sections.

B. Leave openings for equipment to be installed before completing masonry. After installing equipment, complete masonry to match construction immediately adjacent to opening.

C. Use full-size units without cutting if possible. If cutting is required to provide a continuous pattern or to fit adjoining construction, cut units with motor-driven saws; provide clean, sharp, unchipped edges. Allow units to dry before laying unless wetting of units is specified. Install cut units with cut surfaces and, where possible, cut edges concealed.

3.3 TOLERANCES

A. Dimensions and Locations of Elements:

1. For dimensions in cross section or elevation, do not vary by more than plus 1/2 inch or minus 1/4 inch.

2. For location of elements in plan, do not vary from that indicated by more than plus or minus 1/2 inch.

3. For location of elements in elevation, do not vary from that indicated by more than plus or minus 1/4 inch in a story height or 1/2 inch total.

B. Lines and Levels:

1. For bed joints and top surfaces of bearing walls, do not vary from level by more than 1/4 inch in 10 feet, or 1/2-inch maximum.

2. For conspicuous horizontal lines, such as lintels, sills, parapets, and reveals, do not vary from level by more than 1/8 inch in 10 feet, 1/4 inch in 20 feet, or 1/2-inch maximum.

3. For vertical lines and surfaces do not vary from plumb by more than 1/4 inch in 10 feet, 3/8 inch in 20 feet, or 1/2-inch maximum.

CONCRETE UNIT MASONRY 042200 - 7

4. For conspicuous vertical lines, such as external corners, door jambs, reveals, and expansion and control joints, do not vary from plumb by more than 1/8 inch in 10 feet, 1/4 inch in 20 feet, or 1/2-inch maximum.

5. For lines and surfaces, do not vary from straight by more than 1/4 inch in 10 feet, 3/8 inch in 20 feet, or 1/2-inch maximum.

6. For vertical alignment of exposed head joints, do not vary from plumb by more than 1/4 inch in 10 feet, or 1/2-inch maximum.

7. For faces of adjacent exposed masonry units, do not vary from flush alignment by more than 1/16 inch.

C. Joints:

1. For bed joints, do not vary from thickness indicated by more than plus or minus 1/8 inch, with a maximum thickness limited to 1/2 inch.

2. For exposed bed joints, do not vary from bed-joint thickness of adjacent courses by more than 1/8 inch.

3. For head and collar joints, do not vary from thickness indicated by more than plus 3/8 inch or minus 1/4 inch.

4. For exposed head joints, do not vary from thickness indicated by more than plus or minus

1/8 inch.

3.4 LAYING MASONRY WALLS

A. Lay out walls in advance for accurate spacing of surface bond patterns with uniform joint thicknesses and for accurate location of openings, movement-type joints, returns, and offsets.

Avoid using less-than-half-size units, particularly at corners, jambs, and, where possible, at other locations.

B. Bond Pattern for Exposed Masonry: Unless otherwise indicated, lay exposed masonry in running bond; do not use units with less-than-nominal 4-inch horizontal face dimensions at corners or jambs.

C. Lay concealed masonry with all units in a wythe in running bond or bonded by lapping not less than 4 inches. Bond and interlock each course of each wythe at corners. Do not use units with less-than-nominal 4-inch horizontal face dimensions at corners or jambs.

D. Stopping and Resuming Work: Stop work by stepping back units in each course from those in course below; do not tooth. When resuming work, clean masonry surfaces that are to receive mortar, remove loose masonry units and mortar, and wet brick if required before laying fresh masonry.

E. Built-in Work: As construction progresses, build in items specified in this and other Sections.

Fill in solidly with masonry around built-in items.

F. Fill space between steel frames and masonry solidly with mortar unless otherwise indicated.

G. Fill cores in hollow CMUs with grout 24 inches under bearing plates, beams, lintels, posts, and similar items unless otherwise indicated.

CONCRETE UNIT MASONRY 042200 - 8

H. Build nonload-bearing interior partitions full height of story to underside of solid floor…