AMENDMENT 0002.pdf

PDF 202 KB Posted

Attached to
CONSTRUCTION: Multi-Purpose Building Renovation, FAA, MMAC, Oklahoma City, OK
Solicitation number
6973GH-18-R-00009
Issued by

About this file

AMENDMENT 0002 (pdf)

View the file

Other files

File Type Posted
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 10- .html file.htm HTM file
ATTACHMENT 5-SF25.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
ATTACHMENT 10R-BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 7-CONTRACTOR'S RELEASE.pdf PDF
ATTACHMENT 4-WAGE DETERMINATION OK49.pdf PDF
ATTACHMENT 15-ADDENDUM 2.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 MECHANICAL.pdf PDF
ATTACHMENT 3-CHAPTER 33 CONSTRUCTION SAFETY.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 CIVIL.pdf PDF
ATTACHMENT 8-OPERATIONAL CONTROL DOCUMENTS.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
AMENDMENT 0003.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 12-CLIENT AUTHORIZATION LETTER.docx DOCX document
ATTACHMENT 2-DRAWINGS VOLUME 2 INTERIORS AND FIRE PROTECTION.pdf PDF
24-ATTEND Sign In Second Site Visit.pdf PDF
ATTACHMENT 6R-SF25A PAYMENT BOND 8/2016.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
AMENDMENT 0002.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 9- .html file.htm HTM file
ATTACHMENT 9R-ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 11-PAST PERFORMANCE SURVEY.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 1.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 ELECTRICAL.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 13-ASBESTOS REPORTS.pdf PDF
ATTACHMENT 6-SF25A.pdf PDF
ATTACHMENT 9-OCAT 00310 ANTI/NON-COLLUSION AFFIDAVIT.pdf PDF
SIR 6973GH-18-R-00009.pdf PDF
ATTACHMENT 14-ADDENDUM 1.pdf PDF
ATTACHMENT 1-SPECIFICATIONS VOLUME 2.pdf PDF
ATTACHMENT 10-OCAT 00320 BUSINESS RELATIONSHIP AFFIDAVIT.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 3 TELECOM AND SECURITY.pdf PDF
AMENDMENT 0001.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 ARCHITECTURAL.pdf PDF
20180116 SITE VISIT ATTENDEES SIGN IN SHEET.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 2 PLUMBING.pdf PDF
ATTACHMENT 5R-SF25 PERFORMANCE BOND 8/2016.pdf PDF
ATTACHMENT 2-DRAWINGS VOLUME 1 STRUCTURAL.pdf PDF
AMENDMENT 0003.pdf PDF
Show 40 more

Latest 50 of 251 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 4

0002 01/09/2018 13-007860

AAQ-811 FAC. & AVIATION SAFETY ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

MPB ROOM 380

AAQ0811-AFN

OKLAHOMA CITY OK 73125

AAQ-811 FAC. & AVIATION SAFETY ACQ

FAA AERONAUTICAL CENTER

PO BOX 25082

MPB ROOM 380

AAQ811-AFN

OKLAHOMA CITY OK 73125

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

6973GH-18-R-00009

copies to the issuing office.

01/09/2018

(x)

Due date for receipt of proposals has not been changed. Proposals are due by 2:00 p.m. CT on February 9, 2018.

Amendment continues on page 2:

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Connie M. Houpt

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-18-R-00009/0002

LIST OF CHANGES:

1. CLINs 0006-0008 added to Section B.

2. Section G: Clause, AC1227, is incorporated as follows:

AC1227 Release Form (JAN 1997)

AC1227 Release Form (JAN 1997)

The contractor will be required to execute

Contractor's Release Form DOT F 4220.4 (2-71) prior to final payment under the contract.

(Note: A copy of Form DOT F 4220.4 (2-71) is attached hereto for information purposes.)

3. Section J: Addendum 1 incorporated as

Attachment 14.

4. Section M: Clause, M.2, is incorporated as follows:

M.2 TECHNICAL EVALUATION

(a) Each evaluator will use the following criteria to measure and score each proposal.

Scoring will reflect the extent to which the

Offeror, as well as proposed Mechanical and

Electrical subcontractors, has met the overall requirements. Upon completion of the evaluation by member of the evaluation team, the lead technical evaluator will summarize the proposals and submit the Final Technical

Evaluation Report to the Source Selection

Official.

(b) Evaluation factors will be scored as outlined below to which the Offeror has met the overall factor requirements.

(1) Offerors (general contractors) will be evaluated as follows:

(A) High Confidence: Occupied multi-story office renovations over $40 million, with Exceptional Quality and Schedule and both the Mechanical and Electrical subcontractors have

High Confidence ratings (see below).

(B) Satisfactory Confidence:

Un-occupied multi-story office renovations over

$30 million, with at least Very Good Quality and

Schedule and both the Mechanical and Electrical subcontractors have at least Satisfactory

Continued ...

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-18-R-00009/0002

Confidence ratings.

(C) Little Confidence: Other renovation types under $30 million, with at least

Satisfactory Quality and Schedule and both the

Mechanical or Electrical subcontractors have at least Little Confidence ratings.

(D) If a survey is not received for each of the offeror (general), mechanical and electrical contractors, the offeror will be rated with Unknown Confidence.

(E) Any offeror will be rated with

NO CONFIDENCE if ANY of the factors in the Past

Performance Surveys, CPARS or other sources are rated with Marginal or Unsatisfactory.

(2) Mechanical subcontractors will be evaluated as follows:

(A) High Confidence: HVAC, Plumbing and Fire Suppression systems in multi-story office or multi-story hospital renovations over $10 million, with Exceptional

Quality and Schedule.

(B) Satisfactory Confidence: HVAC, Plumbing and Fire Suppression systems in multi-story office or multi-story hospital renovations over $5 million, with at least Very

Good Quality and Schedule.

(C) Little Confidence: HVAC, Plumbing and Fire Suppression systems in other renovation types under $5 million, with at least

Satisfactory Quality and Schedule.

(D) If a survey is not received from the mechanical contractor, that contractor will be rated with Unknown Confidence.

(E) The offeror will be rated with

NO CONFIDENCE if ANY of the factors in the Past

Performance Surveys, CPARS or other sources are rated with ‘Unsatisfactory’.

(3) Electrical subcontractors will be evaluated as follows:

(A) High Confidence: Electrical and Security systems in multi-story office or multi-story hospital renovations over $5 million, with Exceptional Quality and Schedule.

(B) Satisfactory Confidence:

Electrical and Security systems in Multi-story office or multi-story hospital renovations over

$2.5 million, with at least Very Good Quality and

Schedule.

(C) Little Confidence: Electrical and Security systems in other renovation types

Continued ...

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6973GH-18-R-00009/0002

under $2.5 million, with at least Satisfactory

Quality and Schedule.

(D) If a survey is not received from the electrical contractor, that contractor will be rated with Unknown Confidence.

(E) The offeror will be rated with

NO CONFIDENCE if ANY of the factors in the Past

Performance Surveys, CPARS or other sources are rated with Marginal or Unsatisfactory.

All other terms and conditions remain the same.

Add Item 0006 as follows:

0006 MAINTENANCE/DEFECT SECURITY (IAW Clause H.7)

Electronic & IT: 03

Add Item 0007 as follows:

0007 UNIT PRICES: SF

Install floor leveling material over existing structural slab to receive new waterproofing membrane.

Electronic & IT: 03

Add Item 0008 as follows:

0008 UNIT PRICES: HR

After hours and weekend project construction activities

Electronic & IT: 03

Page 6R(a)

Section B - Supplies or Services/Prices

Section B - Schedule

PART I - SECTION B

SUPPLIES/SERVICES & PRICE/COST

The contractor shall furnish all labor, tools, materials, equipment, and supplies, necessary to accomplish the construction project; Renovation of MPB-24 (Multi-Purpose Building) at the Mike Monroney Aeronautical Center, Oklahoma City, OK, set forth below in accordance with (IAW) the attached project manual, drawings, and the other terms, conditions, and provisions as set forth herein.

The contractor shall complete the entire Work ready for occupancy and use not later than 300 calendar days after receiving notice to proceed.

ITEM NO. DESCRIPTION Unit TOTAL AMOUNT

0001 FIRM FIXED PRICE LS $

Phase 1, Basement Renovation Contractor shall provide all labor, materials, and equipment necessary to renovate the basement of MPB IAW the Technical Specification, Renovation of MPB-24 (Multi-Purpose Building) (Section J, Attachment 1) and Technical Drawings & Configuration, MPB-24 (Multi-Purpose Building) Renovation (Section J, Attachment 2)

OPTIONAL LINE ITEMS (Per Specifications Section 010300)

0002 FIRM FIXED PRICE LS $

Phase 2, 1st, 2nd & 3rd Floor Renovation Contractor shall provide all labor, materials, and equipment necessary to renovate the 1st, 2nd & 3rd floors of MPB IAW the Technical Specification, Renovation of MPB-24 (Multi-Purpose Building) (Section J, Attachment 1) and Technical Drawings & Configuration, MPB-24 (Multi-Purpose Building) Renovation (Section J, Attachment 2) *This is an optional line item to be exercised at the discretion of the Government

0003 *OPTION ITEM – FIRM FIXED PRICE LS $

Electroglazing at Stair Curtain Wall Contractor shall provide all labor, materials, and equipment necessary to construct Electroglazing at Stair Curtain Wall IAW the Technical Specification, Renovation of MPB-24 (Multi-Purpose Building) (Section J, Attachment 1) and Technical Drawings & Configuration, Page 7R(a)

MPB-24 (Multi-Purpose Building) Renovation (Section J, Attachment 2) *This is an optional line item to be exercised at the discretion of the Government

0004 *OPTION ITEM – FIRM FIXED PRICE LS $

Install New Pavers over W.P. Membrane at the Exterior Perimeter Contractor shall provide all labor, materials, and equipment necessary to construct Install New Pavers over W.P. Membrane at Exterior Perimeter IAW the Technical Specification, Renovation of MPB-24 (Multi-Purpose Building) (Section J, Attachment 1) and Technical Drawings & Configuration, MPB-24 (Multi-Purpose Building) Renovation (Section J, Attachment 2) *This is an optional line item to be exercised at the discretion of the Government

0005 *OPTION ITEM – FIRM FIXED PRICE LS $

Loading Dock Area Vertical Wall Acrylic Coating

System Contractor shall provide all labor, materials, and equipment necessary to construct Loading Dock Area Vertical Wall Acrylic Coating System IAW the Technical Specification, Renovation of MPB-24 (Multi-Purpose Building) (Section J, Attachment 1) and Technical Drawings & Configuration, MPB-24 (Multi-Purpose Building) Renovation (Section J, Attachment 2) *This is an optional line item to be exercised at the discretion of the Government

0006 MAINTENANCE/DEFECT SECURITY $_________ EA

Contractor shall provide cost of providing the Maintenance/Defect Security as required in Clause H.7.

UNIT PRICES (Per Specifications Section 012700)

0007 INSTALL FLOOR LEVELING MATERIAL OVER $__________ / SQ FT

EXISTING STRUCTURAL SLAB TO RECEIVE

NEW WATERPROOFING MEMBRANE

FOLLOWING TOPPING SLAB REMOVAL AT

THE FIRST FLOOR PERIMETER.

0008 AFTER HOURS AND WEEKEND PROJECT $__________ / HR

CONSTRUCTION ACTIVITIES

CLIN Worksheet The contractor shall furnish a price for all labor, tools, materials, equipment, and supplies, necessary to accomplish the following breakout items. The pricing of these items will not affect the project award. These prices should be included in prices above and are only for FAA internal use.

0001 Basement Renovation, Phase 1

Page 8R

Basement Mechanical Replacement (including LS $ installation of mechanical shaft walls from basement to 1st floor, AHU-B-1 replacement, AHU-B2 replacement, associated housekeeping pads and duct modifications in basement):

Basement Grinder Pump and Sewerage Ejector: LS $

Switchgear Retrofill, Phase 1 portion: LS $

Transformer Relocation (including moving LS $ transformers from basement to exterior and demolition of interior equipment vault):

Mechanical Replacement, Phase 1 portion: LS $

Plumbing System Replacement, Phase 1 portion: LS $

0002 1st, 2nd & 3rd Floor Renovation, Phase 2

Roof Top AHU Support Steel (including support steel LS $ frame, walk grating, perimeter safety rail and screen wall support steel):

Building Structural Deficiencies Correction LS $ (Including slab demolition, installation of new shear walls, expansion joint, drilled piers, seismic bracing – portal framing, increased steel at courtyard and window openings ):

Site Utility Lines: LS $

Exterior Wall Panels and Glazing (including LS $ demolition of existing windows and storefront, demolition of precast wall panels, installation of wall panels, column covers and glazing):

Roof Repairs: LS $

Exterior Concrete Paving and Walks: LS $

Switchgear Retrofill, Phase 2 portion: LS $

Courtyard Leak Repair (including demolition of brick LS $ veneer, demolition of concrete topping slab, replacement of concrete topping slab, repair of waterproofing and replacement of veneer):

Mechanical Replacement, Phase 2 portion (including LS $ shaft walls from floors 1 to roof and roof hood):

Page 9R

Plumbing System Replacement, Phase 2 portion: LS $

Elevators: LS $

Clause List

The remainder of this page has been intentionally left blank.

6973GH-18-R-00009-0002
6973GH-18-R-00009 page 6

File details come from the government source that posted it.