Bosch Solicitation 693JK425R500011 Amendment No. 3 containing further Questions and Answers.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- DOT's Purchase of Bosch Equipment for Use in a Closed Circuit Television (CCTV) System Modernization
- Solicitation number
- 693JK425R500011
About this file
This document is an Amendment No. 3 containing Questions and Answers for Solicitation No. 693JK425R500011, a Department of Transportation (DOT) project for Closed Circle Television (CCTV) System Modernization utilizing Bosch equipment. The solicitation involves installing 285 interior cameras in areas like parking garages, stairwells, suite entrances, and common areas, with four exterior cameras, and requires upgrading the existing Bosch Video Management System (BVMS) from version 12.0.1 to version 13.X. Key technical requirements include integrating NetApp storage units with existing Virtual Video Recording Management (VRM) servers, using specific Bosch camera models (NDV-5702-A-GOV and NDE-5702-A-GOV), and ensuring compatibility with six existing ADAM-6050-D modules for device input integration.
The Q&A document reveals specific implementation details, including infrastructure considerations such as wall types (concrete, drywall, modular), power stability, and cabling requirements. Notably, the government will handle anticipated cabling and electrical requirements, provide limited on-site equipment storage, and parking for the project team. Contractor qualifications include having both expert and master-level Bosch-certified field service engineers. The project does not require FISMA or FedRAMP compliance, and the security integrator is not responsible for addressing cyber risks. Most detailed technical specifications will be provided post-award, with the DOT Office of Security serving as the primary point of contact for camera field of view settings.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Questions & Responses
| Question | DOT Response |
| How stable is the power? | Very stable |
| Is there a dropped ceiling in all areas of installation? | Not in all areas. There are some dropped ceiling, some drywall and some concrete block installation areas |
| What type of walls are in the perimeter areas? | Concrete and drywall |
| What type of walls is inside the offices? | Drywall and modular |
| Do we need to drill between the walls, to mount cameras and run our cable infrastructure? | No |
| Do we need to use conduit for some of the cameras? | No |
| According to the SOW, it is our understanding that all communication cable infrastructure will be run by other, is that correct? | Yes |
| Can you provide a copy of the as builds from the existing installed cameras? | Drawings will be provided to the awardee |
| Can you provide a floor plan for the new cameras on the different building? | No |
| What is the name of the security company that installed your existing cameras? | We cannot disclose this information |
| Are you planning to use the existing Command Control (SOC) for the new CCTV System? | Yes |
| Is there a plan new for a new command control system? | Not Applicable for this solicitation |
| If yes, how far apart will the new Command Control be from the old command control system? | Not Applicable for this solicitation |
| Is there a special room with HVAC allocated for the new Servers? | Not Applicable for this solicitation |
| How many cameras are to be installed on interior areas, and what types of areas are they? | Two Hundred Eighty Five (285) Parking Garages, Stariwells, Suite Entrances, Common Areas |
| How many cameras are to be installed on a roof, do you have a drawing for it? | Zero |
| How many cameras are to be installed on poles to view parking lots? | Zero |
| How many cameras will be installed outside the building? | Four |
| Do you need 360-degree view in some areas? If so can you specify what areas? | No |
| Do you need Pan/Tilt/Zoom for some areas? | Yes |
| Is there a parking area to be viewed by any camera? If yes, please specify what type of camera? | Yes. PTZ, Fixed and Multi-Imager Cameras |
| Is there a requirement to install some cameras on poles? | No |
| If yes, is there an existing connection to existing conduit to the poles? | Not Applicable for this solicitation |
| Are they going to be standalone cameras, as in not connected to the facility’s network? | Cameras installed will be connected to the network |
| How often does the contractor shall participate in Continuous Monitoring Strategy and methods or shall provide a Continuous Monitoring capability that the DOT determines acceptable. | Not Applicable for this solicitation |
| Will the hardening (applying STIGs. FISMA recommended images for the OS, etc.) of the servers will be done by the contractors? Or will it be handled by DOT IT staff? | Not Applicable for this solicitation |
| Will the contractor have to provide an IT Security Plan for the proposed IT systems? | No |
| Does the entire system need to be compliant to FISMA or FEDRAMP? | No |
| Is it the responsibility of the security integrator to address the cyber risk of these systems? | No |
| Does the proposed system need to demonstrate a cyber security vulnerabilities test? | No |
| We need the fingerprint of your Bosch BVMS software to view your license key and see how many licenses, cameras, decoders, and other devices are on the system and confirm version. Can we the fingerprint off of your system? If you need assistance in finding it, we can help. | DOT cannot provide this information until post award to the awardee. |
| In SOW Section 11, you refer to "fully qualified" field service engineers (FSE) multiple times. Bosch offers two levels of certification: Expert and Master. Given the complexity of your system, we recommend Master-level certification. Could you please clarify which certification level is required? | Interested firms must have an employee with an expert level certification and an employee with a master level certification. |
| In your material list, you have listed the NDV-5702-A-GOV and NDE-5702-A-GOV with a description of a 5MP camera. However, these model numbers correspond to 2MP cameras. Could you confirm which camera model you intend to use? | NDV-5702-A-GOV and NDE-5702-A-GOV |
| Would the Government like to upgrade the NDV-5702-A-GOV and NDE-5702-A-GOV camera model to an NDE-8703-R, which is the same product line as other cameras and they are 6MP? That way all dome cameras are the same series. | No |
| There is no mention of installing the NDV-5702-A-GOV or the NDE-5702-A-GOV. Can you confirm if these models will be installed? | Please refer to Task 8, page 4 of 12 on SOW document in solicitation |
| Provide model number, serial number, and current version of any NetApp appliances you currently have? | DSA-N2E8XC-12AT, DOT cannot provide serial numbers until post award to the awardee. |
| Who will be primary POC for setting field of views on cameras? | DOT Office of Security |
| Based on the system design, a Bosch Pro system requires one (1) Bosch BVMS Application Server (part # MHW-S380RB-SC) to run BVMS 13. All other devices will serve solely as storage arrays and will not require BVMS 13. In your Statement of Work (SOW) Section 5, you mention that “Software upgrade required on 3 servers and 10 client workstations.” We would like to clarify this, as an upgrade will not be needed on the three (3) servers. Could you please clarify this statement? | DOT has BVMS 12.0.1 currently running on 3 servers. 1 central server and 2 VRM Servers. Required server software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| If BVMS 13 is to be installed on a virtual server, we will need the specifications for the virtual server. Can you provide the virtual server specifications, if applicable? | DOT cannot provide this information until post award to the awardee. DOT can confirm that their BVMS server environment is sufficient for software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| In SOW Section 5, you mention “Integrate NetApp Storage units with existing Virtual VRMs.” However, a Pro system can only support one (1) instance of VRM. Could you please clarify this statement? | DOT intends to add additional storage units to existing VRM storage systems. |
| If an application server (MHW-S380RB-SC) is required, will the Government be providing it? | Not Applicable for this solicitation |
| In SOW Section 6, you mention “Ensure replacement camera functionality with Adams module programming.” What type of Adam programming is required? | DOT utilizes six (6) Adam modules model #ADAM-6050-D for device input integration with BVMS. These are used to send auto point commands to locations throughout DOT's campus. Existing configuration concerning these modules, the CCTV cameras associated with them and how they integrate with the existing BVMS 12.0.1 system are fully required to be captured and transferred to BVMS 13.3.X (X=latest current version by the time this project is in progress) |
| Does the government have the admin credentials for the remote portal account that activated the current version of BVMS? This will be needed to upgrade to BVMS 13.0. | Yes |
| Will you require storage calculations of the new cameras to confirm the three (3) existing servers and four (4) NetApp appliances can handle the bandwidth and storage? If storage calculations are required, we will need to know what to set parameters at. Example, H.264, high quality, 100% recording, 30+ days. | No |
| Please provide the model number, storage capacity, and operating system (OS) for each server that will be reused, so we can confirm they will support the upgrade to BVMS 13. If the current servers' hardware or OS cannot be upgraded, will the Government be providing new servers? | DOT cannot provide this information until post award to the awardee. DOT can confirm that their BVMS server environment is sufficient for software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| Please provide the model number and operating system (OS) for each server that will be reused, so we can confirm they will support the upgrade to BVMS 13. If the current workstations hardware or OS cannot be upgraded, will the Government be providing new workstation? | DOT cannot provide this information until post award to the awardee. DOT can confirm that their BVMS workstations are sufficient for software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| The documentation does not indicate whether POE switches will be supplied. Will the Government be providing the POE switches? | Anticipated Cabling and Electrical requirements are the responsibility of the Government. |
| Will the Government be responsible for connecting all new cables to the POE switch? If not, is the Government supplying patch cables? | Anticipated Cabling and Electrical requirements are the responsibility of the Government. |
| Would the Government be open to considering an equivalent monitor? There are several higher-quality options (Samsung) available that meet or exceed the specifications of the proposed monitors, often at a lower cost. Furthermore, the monitors are not essential to the operation of the Bosch system but are merely for viewing. | No |
| Will there be an area for contractor to stage equipment on-site? | DOT does not have the space to store all of the equipment required for this project however some storage space will provided. DOT anticipates this project will occur in phases through the POP. Equipment for each phase can be stored on site. |
| If the contract is awarded, will there be parking available on the premises for one work vehicle? | Parking can be provided to awardee during this project. |
Questions rcvd on 2025-08-28
| Question | DOT Response |
| How stable is the power? | Very stable |
| Is there a dropped ceiling in all areas of installation? | Not in all areas. There are some dropped ceiling, some drywall and some concrete block installation areas |
| What type of walls are in the perimeter areas? | Concrete and drywall |
| What type of walls is inside the offices? | Drywall and modular |
| Do we need to drill between the walls, to mount cameras and run our cable infrastructure? | No |
| Do we need to use conduit for some of the cameras? | No |
| According to the SOW, it is our understanding that all communication cable infrastructure will be run by other, is that correct? | Yes |
| Can you provide a copy of the as builds from the existing installed cameras? | Drawings will be provided to the awardee |
| Can you provide a floor plan for the new cameras on the different building? | No |
| What is the name of the security company that installed your existing cameras? | We cannot disclose this information |
| Are you planning to use the existing Command Control (SOC) for the new CCTV System? | Yes |
| Is there a plan new for a new command control system? | Not Applicable for this solicitation |
| If yes, how far apart will the new Command Control be from the old command control system? | Not Applicable for this solicitation |
| Is there a special room with HVAC allocated for the new Servers? | Not Applicable for this solicitation |
| How many cameras are to be installed on interior areas, and what types of areas are they? | Two Hundred Eighty Five (285) Parking Garages, Stariwells, Suite Entrances, Common Areas |
| How many cameras are to be installed on a roof, do you have a drawing for it? | Zero |
| How many cameras are to be installed on poles to view parking lots? | Zero |
| How many cameras will be installed outside the building? | Four |
| Do you need 360-degree view in some areas? If so can you specify what areas? | No |
| Do you need Pan/Tilt/Zoom for some areas? | Yes |
| Is there a parking area to be viewed by any camera? If yes, please specify what type of camera? | Yes. PTZ, Fixed and Multi-Imager Cameras |
| Is there a requirement to install some cameras on poles? | No |
| If yes, is there an existing connection to existing conduit to the poles? | Not Applicable for this solicitation |
| Are they going to be standalone cameras, as in not connected to the facility’s network? | Cameras installed will be connected to the network |
| How often does the contractor shall participate in Continuous Monitoring Strategy and methods or shall provide a Continuous Monitoring capability that the DOT determines acceptable. | Not Applicable for this solicitation |
| Will the hardening (applying STIGs. FISMA recommended images for the OS, etc.) of the servers will be done by the contractors? Or will it be handled by DOT IT staff? | Not Applicable for this solicitation |
| Will the contractor have to provide an IT Security Plan for the proposed IT systems? | No |
| Does the entire system need to be compliant to FISMA or FEDRAMP? | No |
| Is it the responsibility of the security integrator to address the cyber risk of these systems? | No |
| Does the proposed system need to demonstrate a cyber security vulnerabilities test? | No |
Questions rcvd on 2025-09-02
| Question | DOT Response |
| We need the fingerprint of your Bosch BVMS software to view your license key and see how many licenses, cameras, decoders, and other devices are on the system and confirm version. Can we the fingerprint off of your system? If you need assistance in finding it, we can help. | DOT cannot provide this information until post award to the awardee. |
| In SOW Section 11, you refer to "fully qualified" field service engineers (FSE) multiple times. Bosch offers two levels of certification: Expert and Master. Given the complexity of your system, we recommend Master-level certification. Could you please clarify which certification level is required? | Interested firms must have an employee with an expert level certification and an employee with a master level certification. |
| In your material list, you have listed the NDV-5702-A-GOV and NDE-5702-A-GOV with a description of a 5MP camera. However, these model numbers correspond to 2MP cameras. Could you confirm which camera model you intend to use? | NDV-5702-A-GOV and NDE-5702-A-GOV |
| Would the Government like to upgrade the NDV-5702-A-GOV and NDE-5702-A-GOV camera model to an NDE-8703-R, which is the same product line as other cameras and they are 6MP? That way all dome cameras are the same series. | No |
| There is no mention of installing the NDV-5702-A-GOV or the NDE-5702-A-GOV. Can you confirm if these models will be installed? | Please refer to Task 8, page 4 of 12 on SOW document in solicitation |
| Provide model number, serial number, and current version of any NetApp appliances you currently have? | DSA-N2E8XC-12AT, DOT cannot provide serial numbers until post award to the awardee. |
| Who will be primary POC for setting field of views on cameras? | DOT Office of Security |
| Based on the system design, a Bosch Pro system requires one (1) Bosch BVMS Application Server (part # MHW-S380RB-SC) to run BVMS 13. All other devices will serve solely as storage arrays and will not require BVMS 13. In your Statement of Work (SOW) Section 5, you mention that “Software upgrade required on 3 servers and 10 client workstations.” We would like to clarify this, as an upgrade will not be needed on the three (3) servers. Could you please clarify this statement? | DOT has BVMS 12.0.1 currently running on 3 servers. 1 central server and 2 VRM Servers. Required server software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| If BVMS 13 is to be installed on a virtual server, we will need the specifications for the virtual server. Can you provide the virtual server specifications, if applicable? | DOT cannot provide this information until post award to the awardee. DOT can confirm that their BVMS server environment is sufficient for software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| In SOW Section 5, you mention “Integrate NetApp Storage units with existing Virtual VRMs.” However, a Pro system can only support one (1) instance of VRM. Could you please clarify this statement? | DOT intends to add additional storage units to existing VRM storage systems. |
| If an application server (MHW-S380RB-SC) is required, will the Government be providing it? | Not Applicable for this solicitation |
| In SOW Section 6, you mention “Ensure replacement camera functionality with Adams module programming.” What type of Adam programming is required? | DOT utilizes six (6) Adam modules model #ADAM-6050-D for device input integration with BVMS. These are used to send auto point commands to locations throughout DOT's campus. Existing configuration concerning these modules, the CCTV cameras associated with them and how they integrate with the existing BVMS 12.0.1 system are fully required to be captured and transferred to BVMS 13.3.X (X=latest current version by the time this project is in progress) |
| Does the government have the admin credentials for the remote portal account that activated the current version of BVMS? This will be needed to upgrade to BVMS 13.0. | Yes |
| Will you require storage calculations of the new cameras to confirm the three (3) existing servers and four (4) NetApp appliances can handle the bandwidth and storage? If storage calculations are required, we will need to know what to set parameters at. Example, H.264, high quality, 100% recording, 30+ days. | No |
| Please provide the model number, storage capacity, and operating system (OS) for each server that will be reused, so we can confirm they will support the upgrade to BVMS 13. If the current servers' hardware or OS cannot be upgraded, will the Government be providing new servers? | DOT cannot provide this information until post award to the awardee. DOT can confirm that their BVMS server environment is sufficient for software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| Please provide the model number and operating system (OS) for each server that will be reused, so we can confirm they will support the upgrade to BVMS 13. If the current workstations hardware or OS cannot be upgraded, will the Government be providing new workstation? | DOT cannot provide this information until post award to the awardee. DOT can confirm that their BVMS workstations are sufficient for software upgrade from 12.0.1 to 13.X (X=latest current version by the time this project is in progress) |
| The documentation does not indicate whether POE switches will be supplied. Will the Government be providing the POE switches? | Anticipated Cabling and Electrical requirements are the responsibility of the Government. |
| Will the Government be responsible for connecting all new cables to the POE switch? If not, is the Government supplying patch cables? | Anticipated Cabling and Electrical requirements are the responsibility of the Government. |
| Would the Government be open to considering an equivalent monitor? There are several higher-quality options (Samsung) available that meet or exceed the specifications of the proposed monitors, often at a lower cost. Furthermore, the monitors are not essential to the operation of the Bosch system but are merely for viewing. | No |
| Will there be an area for contractor to stage equipment on-site? | DOT does not have the space to store all of the equipment required for this project however some storage space will provided. DOT anticipates this project will occur in phases through the POP. Equipment for each phase can be stored on site. |
| If the contract is awarded, will there be parking available on the premises for one work vehicle? | Parking can be provided to awardee during this project. |