Bosch Solicitation 693JK425R500011 Amendment 2 containing 30 Questions and Answers.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- DOT's Purchase of Bosch Equipment for Use in a Closed Circuit Television (CCTV) System Modernization
- Solicitation number
- 693JK425R500011
About this file
This file is an Amendment 2 containing Questions and Answers for Solicitation 693JK425R500011, issued by the Department of Transportation for a Closed Circuit Television (CCTV) System Modernization project. The solicitation involves purchasing Bosch equipment and installing a new camera system with 285 interior cameras located in parking garages, stairwells, suite entrances, and common areas, along with four exterior cameras. Key technical details include the installation will involve concrete and drywall walls, existing command control will be utilized, and cameras will be network-connected with some Pan/Tilt/Zoom capabilities for parking areas.
The Q&A document reveals specific implementation details, confirming that communication cable infrastructure will be run by another party, no drilling between walls is required, and no conduit is needed for camera installation. Notably, the project does not require FISMA or FedRAMP compliance, and the contractor will not need to provide an IT Security Plan or demonstrate cybersecurity vulnerability testing. The existing security infrastructure will be leveraged, with drawings of existing camera installations to be provided to the awarded contractor after selection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Questions & Responses
| Question | DOT Response |
| How stable is the power? | Very stable |
| Is there a dropped ceiling in all areas of installation? | Not in all areas. There are some dropped ceiling, some drywall and some concrete block installation areas |
| What type of walls are in the perimeter areas? | Concrete and drywall |
| What type of walls is inside the offices? | Drywall and modular |
| Do we need to drill between the walls, to mount cameras and run our cable infrastructure? | No |
| Do we need to use conduit for some of the cameras? | No |
| According to the SOW, it is our understanding that all communication cable infrastructure will be run by other, is that correct? | Yes |
| Can you provide a copy of the as builds from the existing installed cameras? | Drawings will be provided to the awardee |
| Can you provide a floor plan for the new cameras on the different building? | No |
| What is the name of the security company that installed your existing cameras? | We cannot disclose this information |
| Are you planning to use the existing Command Control (SOC) for the new CCTV System? | Yes |
| Is there a plan new for a new command control system? | Not Applicable for this solicitation |
| If yes, how far apart will the new Command Control be from the old command control system? | Not Applicable for this solicitation |
| Is there a special room with HVAC allocated for the new Servers? | Not Applicable for this solicitation |
| How many cameras are to be installed on interior areas, and what types of areas are they? | Two Hundred Eighty Five (285) Parking Garages, Stariwells, Suite Entrances, Common Areas |
| How many cameras are to be installed on a roof, do you have a drawing for it? | Zero |
| How many cameras are to be installed on poles to view parking lots? | Zero |
| How many cameras will be installed outside the building? | Four |
| Do you need 360-degree view in some areas? If so can you specify what areas? | No |
| Do you need Pan/Tilt/Zoom for some areas? | Yes |
| Is there a parking area to be viewed by any camera? If yes, please specify what type of camera? | Yes. PTZ, Fixed and Multi-Imager Cameras |
| Is there a requirement to install some cameras on poles? | No |
| If yes, is there an existing connection to existing conduit to the poles? | Not Applicable for this solicitation |
| Are they going to be standalone cameras, as in not connected to the facility’s network? | Cameras installed will be connected to the network |
| How often does the contractor shall participate in Continuous Monitoring Strategy and methods or shall provide a Continuous Monitoring capability that the DOT determines acceptable. | Not Applicable for this solicitation |
| Will the hardening (applying STIGs. FISMA recommended images for the OS, etc.) of the servers will be done by the contractors? Or will it be handled by DOT IT staff? | Not Applicable for this solicitation |
| Will the contractor have to provide an IT Security Plan for the proposed IT systems? | No |
| Does the entire system need to be compliant to FISMA or FEDRAMP? | No |
| Is it the responsibility of the security integrator to address the cyber risk of these systems? | No |
| Does the proposed system need to demonstrate a cyber security vulnerabilities test? | No |
Questions rcvd on 2025-08-28
| Question | DOT Response |
| How stable is the power? | Very stable |
| Is there a dropped ceiling in all areas of installation? | Not in all areas. There are some dropped ceiling, some drywall and some concrete block installation areas |
| What type of walls are in the perimeter areas? | Concrete and drywall |
| What type of walls is inside the offices? | Drywall and modular |
| Do we need to drill between the walls, to mount cameras and run our cable infrastructure? | No |
| Do we need to use conduit for some of the cameras? | No |
| According to the SOW, it is our understanding that all communication cable infrastructure will be run by other, is that correct? | Yes |
| Can you provide a copy of the as builds from the existing installed cameras? | Drawings will be provided to the awardee |
| Can you provide a floor plan for the new cameras on the different building? | No |
| What is the name of the security company that installed your existing cameras? | We cannot disclose this information |
| Are you planning to use the existing Command Control (SOC) for the new CCTV System? | Yes |
| Is there a plan new for a new command control system? | Not Applicable for this solicitation |
| If yes, how far apart will the new Command Control be from the old command control system? | Not Applicable for this solicitation |
| Is there a special room with HVAC allocated for the new Servers? | Not Applicable for this solicitation |
| How many cameras are to be installed on interior areas, and what types of areas are they? | Two Hundred Eighty Five (285) Parking Garages, Stariwells, Suite Entrances, Common Areas |
| How many cameras are to be installed on a roof, do you have a drawing for it? | Zero |
| How many cameras are to be installed on poles to view parking lots? | Zero |
| How many cameras will be installed outside the building? | Four |
| Do you need 360-degree view in some areas? If so can you specify what areas? | No |
| Do you need Pan/Tilt/Zoom for some areas? | Yes |
| Is there a parking area to be viewed by any camera? If yes, please specify what type of camera? | Yes. PTZ, Fixed and Multi-Imager Cameras |
| Is there a requirement to install some cameras on poles? | No |
| If yes, is there an existing connection to existing conduit to the poles? | Not Applicable for this solicitation |
| Are they going to be standalone cameras, as in not connected to the facility’s network? | Cameras installed will be connected to the network |
| How often does the contractor shall participate in Continuous Monitoring Strategy and methods or shall provide a Continuous Monitoring capability that the DOT determines acceptable. | Not Applicable for this solicitation |
| Will the hardening (applying STIGs. FISMA recommended images for the OS, etc.) of the servers will be done by the contractors? Or will it be handled by DOT IT staff? | Not Applicable for this solicitation |
| Will the contractor have to provide an IT Security Plan for the proposed IT systems? | No |
| Does the entire system need to be compliant to FISMA or FEDRAMP? | No |
| Is it the responsibility of the security integrator to address the cyber risk of these systems? | No |
| Does the proposed system need to demonstrate a cyber security vulnerabilities test? | No |
Questions rcvd on 2025-08-XX
Questions rcvd on 2025-08-XXX