Bridge_Inspection_Rpt_STR_5140-158P.pdf
PDF 2 MB Posted
- Attached to
- Blue Ridge Parkway Pavement Preservation Federal contract opportunity
- Solicitation number
- 693C73-18-R-000004
About this file
Bridge Inspection Report_STR_5140-158P
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUNNEL INSPECTION REPORT
SHERILL COVE TUNNEL
BLUE RIDGE PARKWAY THROUGH SHERILL COVE MOUNTAIN
BLUE RIDGE PARKWAY
NP
STRUCTURE NO. 5140-158P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/15/15
Report prepared by: SP
MILE POINT: 466.24
Federal Highway Administration KILOMETER POINT: 750.32 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-158P
SHERILL COVE TUNNEL INSPECTION DATE: 6/15/15
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 14.2 FT (4.3 M)
SPRINGLINE LENGTH: ........ 29.5 FT (9.0 M) STRUCT. TOTAL LENGTH: ... 590.0 FT (179.8 M)
CURB TO CURB WIDTH: ..... 29.5 FT (9.0 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 2Z8,2Z5 / 00000 YEAR RECONSTRUCTED: ....N/A
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1958-LININGS EXTENDED, PORTALS CONSTRUCTED; INNER CONCRETE LINER OVER OLD
TIMBER LINING. 2008-REFLECTORS REPLACED.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 466.24 (KM PT 750.32)
STATE: .................................. NORTH CAROLINA LOCATION: 2.8 MILES TO U.S. ROUTE 441
FACILITY CARRIED: ............. BLUE RIDGE PARKWAY
FEATURE INTERSECTED: ... SHERILL COVE MOUNTAIN
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in good condition overall. The main problem is the exposed drain chase on the west lining approximately 340' from the north portal. At the time of this inspection, leakage at several drain chases was minor. Other problems include areas of exposed rebar throughout the lining, incorrect vertical clearance signs at the approaches, and minor gravel accumulation along the west curbline.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: C. CASTRO, R. SILVESTRY
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-158P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
59.1 CLEAN AND SEAL AREAS OF EXPOSED REBAR IN LINING WITH APPROVED
PROTECTIVE COATING.
1 LS $3,000 $3,000
222.7 INSTALL CORRECT VERTICAL CLEARANCE SIGNS AT APPROACHES. 2 EA $250 $1,000
59.4 REMOVE GRAVEL ACCUMULATION FROM WEST CURBLINE. 1 LS $1,000 $1,000
PRELIM. MAINTENANCE TOTAL : $5,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0 $0 $5,000
$5,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$5,000
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-158P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 6
1. LINING F
PORTALS 2. G
CURBS AND SIDEWALKS 3. N
DRAINS AND DRAINAGE 4. F
WEARING SURFACE5. G
RIDEABILITY 6. G
LIGHTING 7. N
OTHER 8. (REFLECTORS/STRIPING) G
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 6
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
F7. SIGNS
G8. ALIGNMENT
G9. OTHER (STRIPING)
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
ITEM REFERENCE AND REMARKS
59.1,4 SPALLING WITH EXPOSED REBAR ON CROWN OF LINING
APPROXIMATELY 55' FROM NORTH PORTAL; ON WEST LINING DUE
TO POP OUTS APPROXIMATELY 64' FROM NORTH PORTAL AND AT
120'; AND ON EAST LINING APPROXIMATELY 120', 420', AND 490'
FROM NORTH PORTAL.
MINOR TO MODERATE CRACKING WITH EFFLORESCENCE AND
STAINING ON SEVERAL LOCATIONS.
MODERATE CRACKING WITH EFFLORESCENCE AND SPALLING ON
EAST LINING APPROXIMATELY 340' FROM NORTH PORTAL HAS
EXPOSED DRAIN CHASE. SEVERAL OTHER DRAIN CHASES HAVE
MINOR LEAKAGE. MINOR GRAVEL ACCUMULATION ALONG WEST
CURBLINE.
59.2 MINOR DETERIORATION OF MASONRY MORTAR JOINTS WITH
EFFLORESCENCE AND VEGETATION GROWTH. MINOR CRACKING
AT MASONRY/CONCRETE JOINT ON BOTH PORTALS.
222.7 14'-3" CLEARANCE SIGN AT SOUTH APPROACH; 14'-10" AT NORTH
APPROACH; ACTUAL VERTICAL CLEARANCE IS 14'-2".
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-158P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... SHERILL COVE TUNNEL (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............3 - TUNNEL (3) COUNTY CODE: ........................ 099 - JACKSON
(204) STRUCTURE NUMBER: ..... 5140-158P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... SHERILL COVE MOUNTAIN
(207) ROAD SECTION NO: .......... 158P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140158P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 2.8 MILES TO U.S. ROUTE 4
(210) OPERATING UNIT: ............. BALSAM (10) INV. RTE. - MIN. VERT. CLR: .. 14.00 FT (4.27 M)
(211) PROJECT NO(S): ................ 2Z8,2Z5 (11) MILE POINT: ............................. 466.24 (KM PT 750.32)
(212) DRAWING NUMBERS: ....... 00000 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
29.5 FT (9.0 M)
590.0 FT (179.8 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-158P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 29.5 FT (9.0 M) (16) LATITUDE: ............................. 35°30'44.60"
(17) LONGITUDE: ......................... 83°16'15.00"
(19) DETOUR LENGTH: ............... 20 MI (32 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 3.9 FT (1.2 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
0.0 FT (0.0 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
0 °
NO
29.5 FT (9.0 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - N/A
0 - N/A
0 - N/A
0.00 FT (0.00 M)
14.17 FT (4.32 M)
14.17 FT (4.32 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
1 - MAINTENANCE
D - MINOR
$5,000
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1958-LININGS EXTENDED, PORTALS CONSTRUCTED; INNER CONCRETE LINER OVER OLD TIMBER LINING. 2008-REFLECTORS
REPLACED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-158P
PHOTOGRAPHS STRUCTURE NO. 5140-158P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL VIEW OF ROADWAY LOOKING NORTH
PHOTO #5 - GENERAL ROADWAY VIEW
LOOKING SOUTH
PHOTO #6 - EFFLORESCENCE ALONG RING
STONES IN NORTH PORTAL
PHOTO #7 - ACTIVE WATER LEAKAGE
THROUGH DRAIN CHASE APPROXIMATELY 10'
FROM NORTH PORTAL
PHOTO #8 - CRACKING WITH
EFFLORESCENCE AND STAINING ON EAST
LINING APPROXIMATELY 28' FROM NORTH
PORTAL
PHOTO #9 - CRACKING WITH
EFFLORESCENCE AND RUST STAINING ON
EAST SIDE NEAR CROWN APPROXIMATELY 45'
FROM NORTH PORTAL
PHOTO #10 - CRACKING WITH
EFFLORESCENCE AND SPALLING WITH
EXPOSED REBAR AT CROWN APPROXIMATELY
55' FROM NORTH PORTAL
PHOTO #11 - LEAKAGE AND EFFLORESCENCE ON WEST LINING
APPROXIMATELY 64' FROM NORTH PORTAL; NOTE RUST STAINING ON
POPOUTS FROM EXPOSED REBAR
PHOTO #12 - CLOSE-UP OF PREVIOUS PHOTO
PHOTO #13 - CRACKING WITH
EFFLORESCENCE ON EAST LINING
APPROXIMATELY 64' FROM NORTH PORTAL
PHOTO #14 - CRACKING WITH
EFFLORESCENCE, STAINING, AND ACTIVE
WATER LEAKAGE ALONG DRAIN CHASE ON
WEST LINING APPROXIMATELY 88' FROM
NORTH PORTAL
PHOTO #15 - SPALLING AT DRAIN CHASE ON
GROUND 88' FROM NORTH PORTAL
PHOTO #16 - CRACKING WITH
EFFLORESCENCE ON WEST WALL
APPROXIMATELY 90' FROM NORTH PORTAL
PHOTO #17 - CRACKING WITH
EFFLORESCENCE AND RUST STAINING
EXTENDING DOWN FROM CROWN ON WEST
SIDE APPROXIMATELY 95' FROM NORTH
PORTAL
PHOTO #18 - EXPOSED REBAR, CRACKING,
WATER STAINING AND EFFLORESCENCE OF
EAST TUNNEL LINING APPROXIMATELY 120'
FROM NORTH PORTAL; SIMILAR CONDITIONS
ON WEST SIDE
PHOTO #19 - CRACKING WITH
EFFLORESCENCE ON WEST TUNNEL LINING
APPROXIMATELY 200' FROM NORTH PORTAL
PHOTO #20 - SPALLING WITH ACTIVE WATER
LEAKAGE AT EAST LINING APPROXIMATELY
218' FROM NORTH PORTAL
PHOTO #21 - CRACKING WITH
EFFLORESCENCE ON WEST WALL
APPROXIMATELY 220' FROM NORTH PORTAL;
NOTE SIMILAR CONDITION ON EAST WALL
PHOTO #22 - CRACKING WITH
EFFLORESCENCE ON EAST WALL
APPROXIMATELY 260' FROM NORTH PORTAL
PHOTO #23 - CRACKING ON WEST WALL
APPROXIMATELY 270' FROM NORTH PORTAL
PHOTO #24 - CRACKING WITH
EFFLORESCENCE AND SPALLING WITH
EXPOSED DRAIN CHASE ON EAST LINING
APPROXIMATELY 340' FROM NORTH PORTAL
PHOTO #25 - CRACKING WITH
EFFLORESCENCE ON EAST TUNNEL LINING
APPROXIMATELY 385' FROM NORTH PORTAL
PHOTO #26 - VERTICAL CRACKING WITH
EFFLORESCENCE ON EAST WALL
APPROXIMATELY 390' FROM NORTH PORTAL
PHOTO #27 - CRACKING AND MINOR SPALLING
WITH EXPOSED REBAR ON EAST WALL
APPROXIMATELY 490' FROM SOUTH PORTAL
PHOTO #28 - CRACKING AND STAINING ON
EAST WALL APPROXIMATELY 500' FROM
NORTH PORTAL; NOTE POPOUTS TYPICAL OF
WEST WALL
PHOTO #29 - SPALLING AND PATCHING ON
WEST WALL APPROXIMATELY 515' FROM
NORTH PORTAL
PHOTO #30 - VERTICAL CRACKING OF WEST
WALL APPROXIMATELY 530' FROM NORTH
PORTAL
PHOTO #31 - CRACKING WITH EFFLORESCENCE ON WEST WALL
APPROXIMATELY 550' FROM NORTH END
PHOTO #32 - EFFLORESCENCE ON EAST WALL OF SOUTH PORTAL;
NOTE DEBRIS ACCUMULATION ALONG WALL
PHOTO #33 - DEBRIS ACCUMULATION AND
MOSS GROWTH ALONG WEST CURB LANE
File details come from the government source that posted it.