Bridge_Inspection_Rpt_STR_5140-153P.pdf
PDF 2 MB Posted
- Attached to
- Blue Ridge Parkway Pavement Preservation Federal contract opportunity
- Solicitation number
- 693C73-18-R-000004
About this file
Bridge Inspection Report_STR_5140-153P
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUNNEL INSPECTION REPORT
PINNACLE RIDGE TUNNEL
BLUE RIDGE PARKWAY THROUGH PINNACLE RIDGE
BLUE RIDGE PARKWAY
NP
STRUCTURE NO. 5140-153P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/16/15
Report prepared by: SP
MILE POINT: 439.70
Federal Highway Administration KILOMETER POINT: 707.61 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-153P
PINNACLE RIDGE TUNNEL INSPECTION DATE: 6/16/15
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 12.3 FT (3.8 M)
SPRINGLINE LENGTH: ........ 30.0 FT (9.1 M) STRUCT. TOTAL LENGTH: ... 859.0 FT (261.8 M)
CURB TO CURB WIDTH: ..... 30.0 FT (9.1 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 2W5,2W2,2V13 / 00000 YEAR RECONSTRUCTED:
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1962-LINING EXTENSION, PORTAL WALLS. 1996-LINING REHABILITATION.
2008-REFLECTORS REPLACED.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 439.70 (KM PT 707.61)
STATE: .................................. NORTH CAROLINA LOCATION: 16.5 MILES TO NC ROUTE 215
FACILITY CARRIED: ............. BLUE RIDGE PARKWAY
FEATURE INTERSECTED: ... PINNACLE RIDGE
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in fair condition overall. The main problem is leakage from the crown of the lining onto the roadway surface below, approximately 825' from the north portal, which could cause hazardous driving conditions to motorists during freezing weather. The tunnel lining has numerous areas of cracking with efflorescence and leakage, along with several areas of exposed rebar throughout. Other problems include a missing drainage tile along the base of the west wall approximately 740' from the north portal, a missing clearance sign at the south approach, an incorrect clearance sign at the north approach, missing edge of roadway striping along both curblines at spots, and moderate gravel accumulation along the west curbline near the south portal.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: C. CASTRO, R. SILVESTRY
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-153P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
59.8 REPAINT EAST EDGE OF ROADWAY STRIPING APPROXIMATELY 35' FROM NORTH
PORTAL AND AT VARIOUS LOCATIONS.
1 LS $2,000 $2,000
222.7 POST CORRECT VERTICAL CLEARANCE SIGN AT NORTH APPROACH. 1 EA $300 $1,000
59.4 REMOVE GRAVEL ACCUMULATION FROM WEST CURBLINE NEAR SOUTH PORTAL
AND DEBRIS ALONG EAST CURBLINE.
1 LS $1,000 $1,000
PRELIM. MAINTENANCE TOTAL : $4,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.4 REPLACE DRAIN CHASES AS NECESSARY. 1 LS $70,000 $70,000 $0
59.1 CLEAN AND SEAL EXPOSED REBAR ON LINING WITH APPROVED
PROTECTING COATING.
1 LS $3,000 $3,000 $0
59.4 REPAIR LEAKING HOLE AT 825' FROM NORTH PORTAL. REPAIR
DRAIN TILE ALONG WEST BASE OF TUNNEL APPROXIMATELY 740'
FROM NORTH PORTAL.
1 LS $32,000 $32,000 $0
59 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS $75,000 $75,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $180,000 $0
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0 $180,000 $4,000
$184,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$184,000
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-153P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 6
1. LINING F
PORTALS 2. G
CURBS AND SIDEWALKS 3. N
DRAINS AND DRAINAGE 4. F
WEARING SURFACE5. G
RIDEABILITY 6. G
LIGHTING 7. N
OTHER 8. (REFLECTORS/STRIPING) F
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 7
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
P7. SIGNS
G8. ALIGNMENT
N9. OTHER
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
ITEM REFERENCE AND REMARKS
59.1,4 MINOR SPALLING WITH EXPOSED REBAR ALONG LINING AT
FOLLOWING LOCATIONS FROM NORTH PORTAL: 220', 380'(CR),
464'(CR), 489'(CR), 560'(CR), 615', 669', 733', AND 752'. CR=CROWN.
MINOR CRACKING WITH HEAVY EFFLORESCENCE THROUGHOUT
TUNNEL. NUMEROUS AREAS OF PATCHING WITH MINOR CRACKING
OF SOME PATCHES. SPALL ON EAST SIDE AT 814' FROM NORTH
PORTAL. LEAKING CRACKS ON LINING AT 105', 155', AND 825' FROM
NORTH PORTAL.
LEAKING HOLE WITH EXPOSED REBAR NEAR CROWN IN DRAIN
CHASE AT 40' FROM NORTH PORTAL. LEAKING HOLE NEAR CROWN
AT 825' FROM NORTH PORTAL.
LEAKING DRAIN CHASES AT 40', 85', 700', 740', 764', 782', AND 834'
FROM NORTH PORTAL.
MISSING DRAINAGE TILE AT BASE OF WEST TUNNEL LINING
APPROXIMATELY 740' FROM NORTH PORTAL (NO VERIFIED DURING
THIS INSPECTION).
59.2 MINOR EFFLORESCENCE FROM MORTAR JOINTS AND MOSS
GROWTH AT BOTH PORTALS.
59.4,5 WATER LEAKAGE ON TUNNEL WEARING SURFACE APPROXIMATELY
50' FROM SOUTH PORTAL. DEBRIS AND GRAVEL ACCUMULATION,
AND VEGETATION GROWING IN EAST AND WEST CURBLINES ALONG
TUNNEL.
59.8 EDGE OF ROADWAY STRIPING IS MISSING ALONG EAST AND WEST
CURBLINE AT SEVERAL LOCATIONS.
222.7 VERTICAL CLEARANCE SIGN AT SOUTH APPROACH MISSING. 13'-11"
VERTICAL CLEARANCE SIGN AT NORTH APPROACH; SIGN IS
INCORRECT. ACTUAL CLEARANCE IS 12'-4".
N - Not applicable or a safety feature is not required.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-153P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... PINNACLE RIDGE TUNNEL (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............3 - TUNNEL (3) COUNTY CODE: ........................ 087 - HAYWOOD
(204) STRUCTURE NUMBER: ..... 5140-153P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... PINNACLE RIDGE
(207) ROAD SECTION NO: .......... 153P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140153P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 16.5 MILES TO NC ROUTE 21
(210) OPERATING UNIT: ............. BALSAM (10) INV. RTE. - MIN. VERT. CLR: .. 13.67 FT (4.17 M)
(211) PROJECT NO(S): ................ 2W5,2W2,2V13 (11) MILE POINT: ............................. 439.70 (KM PT 707.61)
(212) DRAWING NUMBERS: ....... 00000 (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
30.0 FT (9.1 M)
859.0 FT (261.8 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-153P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 30.0 FT (9.1 M) (16) LATITUDE: ............................. 35°26'01.50"
(17) LONGITUDE: ......................... 83°01'59.10"
(19) DETOUR LENGTH: ............... 35 MI (56 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 3.0 FT (0.9 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
0.0 FT (0.0 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
15 °
NO
30.0 FT (9.1 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - N/A
0 - N/A
0 - N/A
0.00 FT (0.00 M)
12.33 FT (3.76 M)
12.33 FT (3.76 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
C - MODERATE
$4,000
$180,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1962-LINING EXTENSION, PORTAL WALLS. 1996-LINING REHABILITATION. 2008-REFLECTORS REPLACED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-153P
PHOTOGRAPHS STRUCTURE NO. 5140-153P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL ROADWAY VIEW LOOKING SOUTH
PHOTO #4 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #5 - WATER DRIPPING AT ROCK BANK
ON EAST SIDE OF NORTH PORTAL
PHOTO #6 - TYPICAL EFFLORESCENCE ON
RINGSTONES AT NORTH PORTAL
PHOTO #7 - CRACKING WITH EFFLORESCENCE ON EAST LINING NEAR
NORTH PORTAL
PHOTO #8 - SPALLING ON WEST LINING APPROXIMATELY 20' FROM
NORTH PORTAL
PHOTO #9 - SPALLING, EXPOSED REBAR, AND
LEAKAGE ON DRAIN CHASE AT CROWN
APPROXIMATELY 40' FROM NORTH PORTAL
PHOTO #10 - CRACKING WITH
EFFLORESCENCE ON EAST LINING
APPROXIMATELY 75' FROM NORTH PORTAL
PHOTO #11 - CRACKING WITH
EFFLORESCENCE WITH ACTIVE WATER
LEAKAGE ALONG DRAIN CHASE ON EAST
LINING APPROXIMATELY 85' FROM NORTH
PORTAL
PHOTO #12 - CRACKING WITH
EFFLORESCENCE ON EAST LINING
APPROXIMATELY 90' FROM NORTH PORTAL
PHOTO #13 - CRACKING WITH
EFFLORESCENCE WITH ACTIVE WATER
LEAKAGE ALONG ON EAST LINING
APPROXIMATELY 105' FROM NORTH PORTAL
PHOTO #14 - CRACKING AND
EFFLORESCENCE ON WEST LINING
APPROXIMATELY 115' FROM NORTH PORTAL
PHOTO #15 - CRACKING WITH
EFFLORESCENCE ON EAST LINING
APPROXIMATELY 120' FROM NORTH PORTAL
PHOTO #16 - SPALLING WITH LEAKAGE,
CRACKING AND EFFLORESCENCE ON WEST
TUNNEL LINING APPROXIMATELY 155' FROM
PHOTO #17 - CRACKING WITH
EFFLORESCENCE ALONG TUNNEL CROWN
APPROXIMATELY 155' FROM NORTH PORTAL
PHOTO #18 - CRACKING ON EAST LINING
APPROXIMATELY 155' FROM NORTH PORTAL
PHOTO #19 - CRACKING WITH
EFFLORESCENCE ON WEST LINING
APPROXIMATELY 210' FROM NORTH PORTAL
PHOTO #20 - SPALLING WITH EXPOSED
REBAR ON WEST LINING APPROXIMATELY 220'
FROM NORTH PORTAL
PHOTO #21 - CRACKING WITH
EFFLORESCENCE ON EAST LINING
APPROXIMATELY 314' FROM NORTH PORTAL
PHOTO #22 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 464'
PHOTO #23 - VERTICAL CRACKING IN WEST
LINING APPROXIMATELY 484' FROM NORTH
PORTAL
PHOTO #24 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 489'
PHOTO #25 - SPALL WITH EXPOSED REBAR
APPROXIMATELY 509' FROM NORTH PORTAL
PHOTO #26 - FADED PAVEMENT STRIPE ON
EAST SIDE STARTING APPROXIMATELY 539'
FROM NORTH PORTAL GOING SOUTH
PHOTO #27 - EXPOSED REBAR IN CROWN OF TUNNEL LINING
APPROXIMATELY 560' FROM NORTH PORTAL
PHOTO #28 - FADED PAVEMENT STRIPE ON WEST SIDE AT 649' FROM
PHOTO #29 - SPALL ON EAST LINING APPROXIMATELY 615' FROM
NORTH PORTAL
PHOTO #30 - SPALL WITH EXPOSED REBAR APPROXIMATELY 669'
PHOTO #31 - CRACKING WITH
EFFLORESCENCE ON WEST LINING
APPROXIMATELY 709' FROM NORTH PORTAL
PHOTO #32 - CRACKING WITH
EFFLORESCENCE AND ACTIVE WATER
LEAKAGE ALONG DRAIN CHASE
APPROXIMATELY 700' FROM NORTH PORTAL
PHOTO #33 - SPALL WITH EXPOSED REBAR ON
CROWN APPROXIMATELY 733' FROM NORTH
PORTAL
PHOTO #34 - CRACKING WITH
EFFLORESCENCE AND SPALLING ON EAST
LINING APPROXIMATELY 739' FROM NORTH
PORTAL
PHOTO #35 - CRACKING WITH
EFFLORESCENCE ON WEST LINING
APPROXIMATELY 739' FROM NORTH PORTAL
PHOTO #36 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 752'
PHOTO #37 - CRACKING WITH
EFFLORESCENCE AND ACTIVE WATER
LEAKAGE APPROXIMATELY 740' FROM NORTH
PORTAL
PHOTO #38 - CRACKING WITH
EFFLORESCENCE AND ACTIVE WATER
LEAKAGE ALONG DRAIN CHASE
APPROXIMATELY 752' FROM NORTH PORTAL
PHOTO #39 - CRACKING WITH
EFFLORESCENCE ON EAST LINING
APPROXIMATELY 759' FROM NORTH PORTAL
PHOTO #40 - CRACKING WITH
EFFLORESCENCE AND ACTIVE WATER
LEAKAGE ALONG DRAIN CHASE ON WEST
LINING APPROXIMATELY 764' FROM NORTH
PHOTO #41 - CRACKING WITH
EFFLORESCENCE ALONG DRAIN CHASE ON
WEST LINING 782' FROM NORTH PORTAL
PHOTO #42 - CRACKING WITH
EFFLORESCENCE NEAR CROWN ON WEST
LINING APPROXIMATELY 814' FROM NORTH
PHOTO #43 - SPALLING ALONG BOTTOM OF EAST LINING
APPROXIMATELY 814' FROM NORTH PORTAL
PHOTO #44 - HORIZONTAL AND DIAGONAL CRACKING WITH
EFFLORESCENCE ON EAST LINING APPROXIMATELY 825' FROM NORTH
PHOTO #45 - CRACKING WITH
EFFLORESCENCE AND ACTIVE WATER
LEAKAGE ON WEST LINING APPROXIMATELY
825' FROM NORTH PORTAL
PHOTO #46 - CRACKING WITH
EFFLORESCENCE AND SPALLING IN DRAIN
CHASE APPROXIMATELY 834' FROM NORTH
PHOTO #47 - CRACKING WITH EFFLORESCENCE AND HONEYCOMBING
ON EAST LINING APPROXIMATELY 836' FROM NORTH PORTAL