Bridge_Inspection_Rpt_STR_5140-131P.pdf
PDF 4 MB Posted
- Attached to
- Blue Ridge Parkway Pavement Preservation Federal contract opportunity
- Solicitation number
- 693C73-18-R-000004
About this file
Bridge Inspection Report_STR_5140-131P
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
OCONALUFTEE RIVER BRIDGE
BLUE RIDGE PARKWAY OVER OCONALUFTEE RIVER & BIG COVE ROAD
BLUE RIDGE PARKWAY
LN
STRUCTURE NO. 5140-131P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/15/15
Report prepared by: WS
MILE POINT: 469.01
Federal Highway Administration KILOMETER POINT: 754.75 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-131P
OCONALUFTEE RIVER BRIDGE INSPECTION DATE: 6/15/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER
# OF BEAMS, MAIN SPAN: .. 5
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE
WEARING SURFACE: .......... BITUMINOUS
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L
ABUTMENT / PIER MAT'L: ... MASONRY
PROJ./PLAN REF. NO: ......... 2Z4 /
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1985-JOINT REPAIR.
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: ..
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: ..
SKEW ANGLE:
FRACTURE CRITICAL:
311.3 FT (94.9 M)
62.3 FT (19.0 M)
33.0 FT (10.1 M)
26.2 FT (8.0 M)
N/A 0 °
NO
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 469.01 (KM PT 754.75)
STATE: ................................. NORTH CAROLINA LOCATION: 0.1 MILES TO END OF PARKWAY
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. OCONALUFTEE RIVER & BIG COVE ROA
STRUCTURE EVALUATION SUMMARY
This prestressed multi-beam bridge is in fair condition overall. Current problems include severe corrosion of the steel bearing devices, moderate deterioration of the mortar joints at the piers, and moderate cracking of the wearing surface including section loss along the longitudinal cracks. Other problems are two displaced stones due to collision damage in the southeast approach parapet, debris accumulation at Pier #4, a lack of Type 3 reflective object markers for the underpass roadway, small trees growing from pier cap edges, and debris accumulation and vegetation growth along curblines.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: C. CASTRO, R. SILVESTRY
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-131P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
61.4 REMOVE FLOOD DEBRIS FROM PIER #4. 1 LS $1,000 $1,000
222.7 INSTALL TYPE 3 REFLECTIVE OBJECT MARKERS FOR UNDERPASS ROADWAY AT
NORTH ABUTMENT CORNERS.
2 EA $250 $1,000
60.13 REMOVE SMALL TREES FROM PIERS AS NECESSARY. 1 LS $1,000 $1,000
58.7 REMOVE DEBRIS AND VEGETATION ACCUMULATION FROM ALONG CURBLINES. 1 LS $1,000 $1,000
222.5 FILL ERODED AREAS AROUND FOOTINGS OF GATE POSTS AT SOUTH APPROACH. 1 LS $1,000 $1,000
PRELIM. MAINTENANCE TOTAL : $5,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.1 CLEAN AND PAINT BEARING DEVICES. 50 EA $600 $30,000 $0
60.1,6, 222.3
REPOINT STONE MASONRY MORTAR JOINTS. RESET DISPLACED
CAPSTONES IN SOUTHWEST APPROACH PARAPET.
60 LF $150 $10,000 $0
59 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS $25,000 $25,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $65,000 $0
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0 $65,000 $5,000
$70,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$70,000
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-131P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7
1. DECK SLAB G
2. EXPANSION JOINTS F
3. WEARING SURFACE F
4. RIDEABILITY G
5. CURBS, SIDEWALKS, AND MEDIAN G
6. PARAPETS AND/OR RAILINGS G
7. DRAINS AND DRAINAGE F
8. UTILITIES G
9. DEFLECTION AND/OR VIBRATION G
10. OTHER N
59. SUPERSTRUCTURE 6
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10. ALIGNMENT
11. OTHER
60. SUBSTRUCTURE
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
P F N N N G N N G G N
G N G G N G F N G G N N
F N G N F G N
58.1
58.2
58.3
58.5,6
58.7
58.8
59.1
59.2
59.6
ITEM REFERENCE AND REMARKS
MINOR CRACKING OF DECK UNDERSIDE WITH EFFLORESCENCE.
PATCHED AREAS IN BAYS #1 AND #4, IN SPAN #5. HONEYCOMBING
WITH EXPOSED REBAR ON DECK UNDERSIDE IN SPAN #1, BAY #4.
MODERATE DETERIORATION/LACK OF JOINT FILLER IS ALLOWING
LEAKAGE AT PIERS AND ABUTMENTS.
MODERATE TO SEVERE SECTION LOSS AND TRANSVERSE
CRACKING WITH VEGETATION GROWTH OF WEARING SURFACE AT
DECK JOINTS OVER PIERS AND ABUTMENTS. MODERATE
LONGITUDINAL AND MAP CRACKING IN WEARING SURFACE.
MODERATE RUTTING IN WHEEL LINES. SECTION LOSS ALONG
LONGITUDINAL CRACKING.
MINOR CRACKING OF CURBS AND PARAPETS. MOSS GROWTH AT
ANCHOR BOLTS AND NUTS AT BASE OF RAILING POSTS.
WATER STAINS ON EXTERIOR GIRDERS FROM DRAIN LEAKAGE.
STAINING AT GIRDER ENDS FROM JOINT LEAKAGE. MINOR TO
MODERATE DEBRIS AND VEGETATION ACCUMULATION ALONG
CURBLINES AND IN DECK DRAINS.
UTILITY LINES RUNNING THROUGH EAST HANDRAIL AND ALONG
EAST WINGWALLS. SOME EXPOSED WIRING AT SOUTH ABUTMENT.
UTILITY BOX NEXT TO SOUTHEAST WINGWALL.
MODERATE TO SEVERE RUSTING OF BEARING DEVICES WITH
MINOR PITTING. BEARING DEVICES ON SOUTH END OF GIRDERS AT
PIERS #1, #2, #4, AND SOUTH ABUTMENT HAVE SHIFTED NORTH UP
TO 1".
COLLISION DAMAGE ON UNDERSIDE OF BEAM #2, AND #5 IN SPAN
#1. MINOR SPALL WITH EXPOSED REBAR DUE TO INSUFFICIENT
CONCRETE COVER ON UNDERSIDE OF BEAM #5 IN SPAN #2. MINOR
CRACKING WITH EFFLORESCENCE ON SEVERAL GIRDERS
THROUGHOUT STRUCTURE. MODERATE RUST STAINING ON
EXTERIOR GIRDERS IN SEVERAL LOCATIONS.
PATCHES ON SEVERAL DIAPHRAGMS.
INSPECTION DATE: 6/15/15
STRUCTURE NO. 5140-131P FIELD INSPECTION REPORT
OCONALUFTEE RIVER BRIDGE
ITEM REFERENCE AND REMARKS
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
1. ALIGNMENT
61. CHANNEL 6
G G N F N
HIGH
SUFF
25 FT.
9. STREAM BED COMPOSITION :
SILT, GRAVEL
222. APPROACHES 7
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS
(UNDERPASS ROADWAY)
N N N G F G F G F
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.1 MINOR DETERIORATION OF BREASTWALL MASONRY MORTAR
JOINTS WITH SOME EFFLORESCENCE. VEGETATION GROWTH
BETWEEN NORTH ABUTMENT AND NORTHEAST WINGWALL. MINOR
TO MODERATE MOSS GROWTH ON SOUTH ABUTMENT
BREASTWALL.
60.3 MINOR DEBRIS AND MODERATE VEGETATION ACCUMULATION ON
BEARING SEATS.
60.4 MINOR CRACKING WITH EFFLORESCENCE ON BACKWALLS.
60.6,7 MINOR DETERIORATION OF WINGWALL MASONRY MORTAR JOINTS;
MINOR EFFLORESCENCE FROM JOINTS. HEAVY VEGETATION ON
NORTH WINGWALLS, MINOR ON SOUTH WINGWALLS. MINOR
DEBRIS IN WEEP HOLES. MINOR TO MODERATE EROSION AT
NORTH WINGWALLS.
60.13 MINOR EFFLORESCENCE FROM PIER MASONRY MORTAR JOINTS.
MINOR TO MODERATE VEGETATION ON PIERS. SMALL TREES
GROWING FROM MASONRY MORTAR JOINTS ON SOUTH FACE OF
PIERS #2 AND #3 AND ON NORTH FACE PIERS #3 AND #4 NEAR
WEST END.
60.17 MINOR TO MODERATE SCOUR AT PIERS; APPROXIMATELY 2' DEEP
SCOUR HOLE AT PIER #3; NO UNDERMINING NOTED. MINOR SCOUR
ALONG NORTH FACE OF PIER #2 AND PIER #4. MINOR VOID AT BASE
OF PIER #4.
61.4 HEAVY FLOOD DEBRIS ACCUMULATION AT WEST SIDE OF PIERS #4.
222.3 TWO CAPSTONES DISPLACED DUE TO COLLISION DAMAGE AT
SOUTHEAST APPROACH PARAPET AND SEVERAL STONES LOOSE
DUE TO DETERIORATED MORTAR.
222.4,6,9 TRANSVERSE CRACKING ON PAVEMENT AT APPROACHES.
POTHOLES IN UNDERPASS ROADWAY. UNDERPASS ROADWAY
EXHIBITS MODERATE MAP CRACKING BENEATH BRIDGE.
CENTERLINE STRIPE HAS FADED. PONDED WATER BETWEEN
UNDERPASS ROADWAY AND NORTH ABUTMENT REPORTED
PREVIOUSLY, NOT NOTED DURING THIS INSPECTION.
222.5 MODERATE EROSION AT SOUTH APPROACH SHOULDERS HAS
EXPOSED FOOTINGS FOR GATE POSTS.
222.7 14'-0" VERTICAL CLEARANCE SIGNS AT BOTH UNDERPASS
APPROACHES. "WEIGHT LIMIT 20 TONS" AND "OCONALUFTEE
RIVER" SIGNS AT BOTH APPROACHES. "WARNING AVOID PARKWAY
DURING FOG, SNOW AND ICE" SIGN POSTED AT SOUTH APPROACH.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-131P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 20 19
HS 19 17 26 23
TYPE 3 18 16 24 22
TYPE 3S2 24 22 33 30
TYPE 3-3 30 27 40 36
DESIGN LOADING: H15 (M13.5)
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
OPERATING RATING LOWERED DUE TO SEVERED PRESTRESSING STRANDS IN GIRDER #5.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-131P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... OCONALUFTEE RIVER BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 173 - SWAIN
(204) STRUCTURE NUMBER: ..... 5140-131P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... OCONALUFTEE RIVER & BIG
(207) ROAD SECTION NO: .......... 131P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140131P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.1 MILES TO END OF PARKW
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2Z4 (11) MILE POINT: ............................. 469.01 (KM PT 754.75)
(212) DRAWING NUMBERS: ....... (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
5 - PRESTRESSED CONCRETE
02 - STRINGER/MULTI-BEAM or GIRDER
62.3 FT (19.0 M)
311.3 FT (94.9 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... P - POSTED FOR LOAD
(66) INVENTORY RATING: ...... 18.8 TONS (17.0 METRIC TONS) (70) BRIDGE POSTING: .............. 3 - POSTING REQUIRED
(64) OPERATING RATING: ...... 25.5 TONS (23.1 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-131P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 26.2 FT (8.0 M) (16) LATITUDE: ............................. 35°30'22.00"
(17) LONGITUDE: ......................... 83°18'02.00"
(19) DETOUR LENGTH: ............... 20 MI (32 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 6 - HIGHWAY-WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 7.5 FT (2.3 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
33.0 FT (10.1 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
0 °
NO
26.2 FT (8.0 M)
2.4 FT (0.7 M)
2.4 FT (0.7 M)
2 - MOUNTED ON PARAPET
3 - CONCRETE/STEEL
1 - CONTINUOUS RAIL
2.67 FT (0.81 M)
99.99 FT (99.99 M)
14.25 FT (4.34 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
8 - Stable; scour above top of fo
2 - REHAB/RECONSTRUCTION
D - MINOR
$5,000
$65,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-JOINT REPAIR.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-131P
PHOTOGRAPHS STRUCTURE NO. 5140-131P
PHOTO #1 - LOOKING SOUTH
FLOW
PHOTO #2 - GENERAL VIEW OF EAST SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - EROSION AT NORTHWEST CORNER
PHOTO #5 - TRANSVERSE CRACKING ON
NORTH APPROACH PAVEMENT
PHOTO #6 - CRACKING OF WEARING
SURFACE, NORTH SPAN SHOWN; NOTE
POTHOLES, AND FADED PAVEMENT STRIPE
PHOTO #7 - TRANSVERSE CRACKING ON
WEARING SURFACE OVER OPEN JOINT AT
PIER #1
PHOTO #8 - DEBRIS AND SOIL ACCUMULATION
IN OPEN JOINT AT EAST END OF JOINT OVER
PIER #1
PHOTO #9 - TRANSVERSE CRACKING ON
WEARING SURFACE OVER OPEN JOINT AT
PIER #2
PHOTO #10 - DEBRIS ACCUMULATION ALONG
WEST CURBLINE
PHOTO #11 - TYPICAL MOSS GROWTH AT ANCHOR BOLTS ON RAILING
POSTS; EAST RAILING OVER SPAN #3 SHOWN
PHOTO #12 - TYPICAL DETERIORATION OF JOINT SEALANT IN RAILING
JOINTS, WEST JOINT OVER PIER #3 SHOWN
PHOTO #13 - RUTTING ALONG WEEL LINE AND CRACKING OF
WEARING SURFACE AT SOUTH END OF SOUTH SPAN, SOUTHBOUND
LANE SHOWN
PHOTO #14 - TYPICAL CONDITION OF DECK DRAINS, WEST SIDE OF
SPAN #4 NEAR PIER #4 SHOWN
PHOTO #15 - CRACKING ON SOUTH
APPROACH PAVEMENT
PHOTO #16 - EXPOSED UTILITY WIRES AT
SOUTHEAST CORNER OF RAILING
PHOTO #17 - UNDERMINING AT BASE OF GATEPOST LOCATED AT
SOUTHWEST CORNER; NOTE ALSO EROSION ON SHOULDER
PHOTO #18 - CRACKING WITH EFFLORESCENCE AND HONEYCOMBING
ON DECK UNDERSIDE AT BAY #3 IN SPAN #1
PHOTO #19 - HONEYCOMBING ON DECK UNDERSIDE AT BAY #4 IN
SPAN #1
PHOTO #20 - TRANSVERSE CRACKING WITH EFFLORESCENCE ON
DECK UNDERSIDE IN BAYS #3 AND #4 AT SPAN #2 NEAR PIER #1
PHOTO #21 - SPALLING WITH EXPOSED REBAR ON DECK UNDERSIDE
AT BAY #1 ON SPAN #5; NOTE ALSO PATCHING WITH STAINING ON
BEAM #1
PHOTO #22 - VEHICULAR SCRAPES AT GIRDER #1 IN SPAN #1; THIS
GIRDER HAS BEEN PREVIOUSLY REPAIRED DUE TO COLLISION
DAMAGE
PHOTO #23 - SPALLING AND PATCHING ON UNDERSIDE OF GIRDER #2
IN SPAN #1
PHOTO #24 - COLLISION DAMAGE ON GIRDER #2 IN SPAN #1
PHOTO #25 - SPALL ON UNDERSIDE OF GIRDER #5 IN SPAN #1
PHOTO #26 - EXPOSED REBAR ON GIRDER #5 IN SPAN #2 NEAR PIER
#1
PHOTO #27 - EFFLORESCENCE ON
UNDERSIDE OF GIRDERS #1 AND #2 IN SPAN
#4 NEAR PIER #4; NOTE ALSO
EFFLORESCENCE ON DECK UNDERSIDE IN
BAY #2
PHOTO #28 - WATER STAINED AREA DUE TO
DECK DRAINAGE AT MIDSPAN OF SPAN #4 ON
WEST SIDE OF PIER #1
PHOTO #29 - BEARING #3 ON NORTH ABUTMENT
PHOTO #30 - BEARING #4 SHIFTING TOWARDS NORTH ON SOUTH
ABUTMENT; NOTE ALSO CORROSION
PHOTO #31 - BEARING #3 ON PIER #1 SHIFTED TOWARDS NORTH;
CONDITION IS SIMILAR FOR BEARINGS #2 AND #5
PHOTO #32 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #33 - VERTICAL CRACKING ON
ABUTMENT BREASTWALL BETWEEN GIRDERS
#3 AND #4 AT NORTH ABUTMENT
PHOTO #34 - GENERAL VIEW OF SOUTH
ABUTMENT
PHOTO #35 - GENERAL VIEW OF PIER #2
PHOTO #36 - DETERIORATION AND VOIDS AT BASE OF PIERS DUE TO
CRACKING AND LOST OF MORTAR JOINT, WEST END OF PIER #2
SHOWN; NOTE ALSO SCOUR
PHOTO #37 - VEGETATION AND MOSS
GROWTH AT MORTAR JOINTS ON SOUTH
FACE OF PIER #2
PHOTO #38 - TREE GROWING EAST END OF
PIER #2, SOUTH FACE
PHOTO #39 - GENERAL VIEW OF PIER #3; NOTE MINOR
EFFLORESCENCE, VEGETATION AND VINE GROWTH
PHOTO #40 - DETERIORATION OF MORTAR JOINTS ALONG WATERLINE
AT UPSTREAM END OF PIER #3
PHOTO #41 - GENERAL VIEW OF PIER #4, SOUTH FACE SHOWN; NOTE
VEGETATION AND MOSS GROWTH
PHOTO #42 - CLOSE UP OF BEARING SEAT AT EAST END OF PIER #4
PHOTO #43 - VOIDS DUE TO DETERIORATION OF MORTAR JOINT AT
NORTH FACE OF PIER #4, PIER SECTION NEAR WEST END SHOWN;
NOTE VEGETATION GROWTH IN JOINTS; NOTE ALSO SCOUR AT PIER
PHOTO #44 - DEBRIS ACCUMULATION ON UPSTREAM END OF PIER #4
PHOTO #45 - EFFLORESCENCE, VEGETATION, AND MOSS GROWTH ON
WINGWALLS; SOUTHEAST WINGWALL SHOWN
PHOTO #46 - EROSION AT END OF NORTH APPROACH PARAPETS, EAST
PARAPET SHOWN
PHOTO #47 - UTILITY CONDUITS GOING INSIDE OF EAST RAILING
SOUTH END SHOWN; NOTE ALSO CABLE ATTACHED OUTSIDE OF
RAILING, AND UTILITY BOX AT END OF PARAPET
PHOTO #48 - LOOKING UPSTREAM
PHOTO #49 - GENERAL VIEW LOOKING DOWNSTREAM
PHOTO #50 - POSTING SIGN AT SOUTH END
File details come from the government source that posted it.