Bridge_Inspection_Rpt_STR_5140-125P.pdf
PDF 3 MB Posted
- Attached to
- Blue Ridge Parkway Pavement Preservation Federal contract opportunity
- Solicitation number
- 693C73-18-R-000004
About this file
Bridge Inspection Report_STR_5140-125P
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
FRENCH BROAD RIVER BRIDGE
BLUE RIDGE PARKWAY OVER FRENCH BROAD RIVER & NC ROUTE 191
BLUE RIDGE PARKWAY
LS
STRUCTURE NO. 5140-125P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/12/15
Report prepared by: EU
MILE POINT: 393.44
Federal Highway Administration KILOMETER POINT: 632.99 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-125P
FRENCH BROAD RIVER BRIDGE INSPECTION DATE: 6/12/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... BOX GIRDER - SINGLE or SPREAD NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 924.4 FT (281.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 98.5 FT (30.0 M) WEARING SURFACE: .......... NONE DECK WIDTH: ...................... 35.8 FT (10.9 M) ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 28.0 FT (8.5 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2R11 / NONE SKEW ANGLE: ..................... 29 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO STRUCTURE HISTORY: ...... 2009- SPALL ON DECK IN SPAN #5 REPAIRED; DECK AND DECK JOINTS SEALED
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 393.44 (KM PT 632.99)
STATE: ................................. NORTH CAROLINA LOCATION: 1.7 MILES TO I-26
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. FRENCH BROAD RIVER & NC ROUTE 191
STRUCTURE EVALUATION SUMMARY
This concrete box girder bridge is in fair condition overall. Problems include transversal and map cracking on wearing surface plus three spalls, one with exposed rebar; impact damage to the west railing near the north end and at the south end, and a detached section near Pier #7; and spalling with exposed rebar at the west parapet, at the north abutment breastwall, at the underside of the box girder in Span #10, at the west overhang near the south abutment, and on the southwest wingwall. Other problems include several minor spalls with exposed rebar on the box underside throughout the structure, and debris accumulation at the upstream end of Piers #5, and #6.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: C. CASTRO, R. SILVESTRY
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-125P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.6 REPLACE BROKEN RAIL SECTIONS AT SOUTH END OF WEST RAIL AND NORTH
END OF WEST RAIL. REPAIR DISLOCATED SECTION OF WEST RAIL OVER PIER #7.
REPLACE RANDOM MISSING NUTS IN WEST RAIL.
20 LF $250 $5,000
58.1, 59.2, 60.1
CLEAN AND SEAL EXPOSED REBAR THROUGHOUT STRUCTURE WITH APPROVED
PROTECTIVE COATING.
1 LS $2,000 $2,000
60.13, 61.4 REMOVE DEBRIS ACCUMULATION AT END OF PIERS. 1 LS $1,000 $1,000
PRELIM. MAINTENANCE TOTAL : $8,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0 $0 $8,000
$8,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$8,000
REMARKS: Hinges for hatch at Span #3 are missing; all other hatches are grouted shut.
Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-125P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 6
1. DECK SLAB F
2. EXPANSION JOINTS F
3. WEARING SURFACE N
4. RIDEABILITY G
5. CURBS, SIDEWALKS, AND MEDIAN G
6. PARAPETS AND/OR RAILINGS F
7. DRAINS AND DRAINAGE F
8. UTILITIES N
9. DEFLECTION AND/OR VIBRATION G
10. OTHER N
59. SUPERSTRUCTURE 6
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10. ALIGNMENT
11. OTHER
60. SUBSTRUCTURE
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS (CONCRETE FTG)
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
G F N N N N N N G G N
G N G N N G F N F G N N
G N N G G G N
58.1,5
58.2
58.6
58.7
59.2
59.9
ITEM REFERENCE AND REMARKS
WIDESPREAD MINOR HONEYCOMBING, SPALLING, AND POPOUTS
WITH EXPOSED REBAR THROUGHOUT DECK UNDERSIDE.
DIAGONAL AND TRANSVERSE CRACKING THROUGHOUT DECK
SURFACE. SPALL (8" DIA.) IN SPAN #5, SOUTHBOUND LANE AND (3"
DIA.) IN SPAN #3, NORTHBOUND LANE. SPALL WITH EXPOSED
REBAR ON DECK OVERHANG UNDERSIDE ON WEST SIDE AT SOUTH
ABUTMENT WITH MODERATE CRACK DEVELOPING INTO SPALL.
MINOR CRACKING WITH EFFLORESCENCE ON OVERHANGS IN
SEVERAL LOCATIONS. MINOR SCALING ON DECK, CURBS, AND
SIDEWALKS.
DROP-IN SPANS HAVE SOIL ACCUMULATION IN SLIDING PLATE
JOINT. MINOR DETERIORATION OF JOINT FILLER MATERIAL AT
NORTH ABUTMENT JOINT. UNDERSIDE OF JOINTS IN NORTH
DROP-IN SPAN WET THROUGHOUT.
ONE SECTION OF METAL RAILING HAS DETACHED FROM RAIL POST
IN SPAN #8 NEAR PIER #7, WEST SIDE. MINOR CRACKING AND
SPALLING OF CONCRETE PARAPETS WITH EFFLORESCENCE AND
EXPOSED REBAR. MODERATE COLLISION DAMAGE TO SOUTHWEST
RAIL END; POST HAS SHEARED AT BASE. MISSING NUT ON WEST
RAIL 16' SOUTH OF PIER #7. IMPACT DAMAGE (LIKELY FROM FALLEN
TREE) TO 8' SECTION OF WEST RAIL, 20' FROM NORTH TRANSITION.
MOSS GROWTH AT BASE OF RAILNG POSTS.
MINOR TO MODERATE DEBRIS ACCUMULATION ALONG CURBLINES.
MINOR SPALLING WITH EXPOSED REBAR THROUGHOUT BOX
GIRDER. MINOR CRACKING OF SPAN #6, EAST SIDE. WIDESPREAD
MINOR AND HAIRLINE CRACKING THROUGHOUT STRUCTURE. AREA
OF HONEYCOMBING WITH EXPOSED REBAR NEAR EAST EDGE OF
SOUTH DROP-IN SPAN. 3'X5' AREA OF HONEYCOMBING ON
UNDERSIDE OF SPAN #8 NEAR PIER #7. MINOR DIAGONAL CRACK
AT ALL BEARING AREAS OF DROP-IN SPANS. MINOR LEAKAGE
THROUGH HINGE JOINTS OF DROP-IN SPANS. MINOR DIAGONAL
CRACK WITH SPALL DEVELOPING AT EAST AND WEST SIDES AT
NORTH ABUTMENT.
MINOR SAGGING OF SPANS #5 AND #6 (UNABLE TO VERIFY DURING
THIS INSPECTION).
FIELD INSPECTION REPORT STRUCTURE NO. 5140-125P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 7
G G N G N
HIGH
SUFF
60 FT.
SAND, STONES
222. APPROACHES 6
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N N G G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.1 MINOR CRACKING OF BREASTWALLS; MINOR SPALLING WITH
EXPOSED REBAR ON BOTH SIDES OF NORTH ABUTMENT
BREASTWALL DUE TO INSUFFICIENT CONCRETE COVER. MINOR
LEAKAGE THROUGH DECK EXPANSION JOINTS AT BOTH
ABUTMENTS.
60.6 MINOR CRACKING WITH EFFLORESCENCE ON WINGWALLS.
MODERATE TO HEAVY VEGETATION GROWTH ALONG WINGWALLS.
SOUTHWEST WINGWALL HAS 6" DIAMETER SPALL WITH EXPOSED
REBAR NEAR SOUTH ABUTMENT.
60.7 WEEP HOLES AT NORTH ABUTMENT PARTIALLY FILLED WITH
DEBRIS.
60.9 MODERATE EROSION ON BOTH SIDES OF NORTH ABUTMENT
SLOPE. MODERATE EROSION AT SOUTH ABUTMENT SLOPE.
60.13 MINOR SPALLING WITH EXPOSED REBAR AT PIERS #1 THROUGH #3
AND PIERS #5 THROUGH #9. MINOR SCALING IN NORMAL WATER
ZONE AT PIERS #4, #5, AND #6. MINOR COLLISION DAMAGE TO
SOUTHWEST FACE OF PIER #8.
MINOR VEGETATION GROWTH ON PIERS #3 AND #7. DEBRIS
ACCUMULATION AT UPSTREAM END OF PIER #6. (SEE 61.4)
60.16 EXPOSED TOP OF FOOTING AT DOWNSTREAM END OF PIER #4.
61.4 MODERATE ACCUMULATION OF DRIFT AT PIER #6; MINOR AT PIER
#5.
222.4,6 TRANSVERSE CRACKING AT NORTH APPROACH PAVEMENT.
MODERATE SETTLEMENT OF NORTH APPROACH PAVEMENT ALONG
JOINT.
222.7 "FRENCH BOARD RIVER" AT NORTHWEST CORNER.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-125P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 22 20 37 33
TYPE 3 21 19 35 32
TYPE 3S2 25 23 42 38
TYPE 3-3 28 25 47 42
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-125P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... FRENCH BROAD RIVER BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 021 - BUNCOMBE
(204) STRUCTURE NUMBER: ..... 5140-125P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... FRENCH BROAD RIVER & NC
(207) ROAD SECTION NO: .......... 125P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140125P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.7 MILES TO I-26
(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2R11 (11) MILE POINT: ............................. 393.44 (KM PT 632.99)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
06 - BOX GIRDER - SINGLE or SPREAD
98.5 FT (30.0 M)
924.4 FT (281.8 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 0 - NONE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 22.1 TONS (20.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 36.8 TONS (33.4 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 1 - DECK SURVEY (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-125P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 28.0 FT (8.5 M) (16) LATITUDE: ............................. 35°30'02.00"
(17) LONGITUDE: ......................... 82°35'26.00"
(19) DETOUR LENGTH: ............... 20 MI (32 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 6 - HIGHWAY-WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 5.0 FT (1.5 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
35.8 FT (10.9 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
29 °
NO
28.0 FT (8.5 M)
2.7 FT (0.8 M)
2.7 FT (0.8 M)
2 - MOUNTED ON PARAPET
3 - CONCRETE/STEEL
1 - CONTINUOUS RAIL
2.83 FT (0.86 M)
99.99 FT (99.99 M)
45.00 FT (13.70 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
8 - Stable; scour above top of fo
1 - MAINTENANCE
D - MINOR
$8,000
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2009- SPALL ON DECK IN SPAN #5 REPAIRED; DECK AND DECK JOINTS SEALED
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-125P
PHOTOGRAPHS STRUCTURE NO. 5140-125P
FLOW
PHOTO #1 - LOOKING NORTH
PHOTO #2 - WEST (DOWNSTREAM) SIDE (PHOTO FROM 6/26/13
INSPECTION)
PHOTO #3 - TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - DETERIORATION OF JOINT FILLER
MATERIAL, DEBRIS ACCUMULATION, AND
CONCRETE SPALLING AT NORTH EXPANSION
JOINT, SIMILAR AT SOUTH EXPANSION JOINT
PHOTO #5 - TYPICAL MAP CRACKING OF WEARING SURFACE, SOUTH
END OF DECK SHOWN
PHOTO #6 - SPALLING ON WEARING SURFACE IN NORTHBOUND LANE
AT SPAN #3, SIMILAR CONDITION IN SOUTHBOUND LANE AT SPAN #5
AND IN NORTHBOUND LANE AT SPAN #8
PHOTO #7 - FULL TRANSVERSE CRACKING OF
WEARING SURFACE IN SPAN #9, SIMILAR
CONDITION AT AT MIDSPAN OF SPAN #6
ALONG CONSTRUCTION JOINT
PHOTO #8 - IMPACT DAMAGE TO WEST
BRIDGE RAIL APPROXIMATELY 20' FROM
NORTH ABUTMENT; NOTE DEBRIS
ACCUMULATION ALONG CURB AND ON
SIDEWALK
PHOTO #9 - TYPICAL VERTICAL CRACKING AT PARAPETS, WEST
PARAPET AT SOUTH END OF SPAN #6 SHOWN; NOTE ALSO TYPICAL
SCALING ALONG SIDEWALKS
PHOTO #10 - EXPOSED REBAR ON FACE OF WEST PARAPET AT
MIDSECTION OF SPAN #6
PHOTO #11 - EXPOSED REBAR ON FACE OF WEST PARAPET, SPAN #7
NEAR MIDSPAN SHOWN
PHOTO #12 - DETACHED SECTION OF WEST RAIL NEAR PIER #7
PHOTO #13 - MISSING ANCHOR BOLT NUT AT RAIL CONNECTION TO
WEST PARAPET IN SPAN #8 NEAR PIER #7
PHOTO #14 - WEST RAILING BROKEN CONNECTION AT SOUTH END
PHOTO #15 - SETTLEMENT OF NORTH
APPROACH PAVEMENT
PHOTO #16 - TRANSVERSE CRACKING AT
SOUTH END OF SOUTH APPROACH PAVEMENT
PHOTO #17 - GENERAL UNDERSIDE VIEW
LOOKING NORTH, SOUTH PIER IN
FOREGROUND
PHOTO #18 - TYPICAL UNDERSIDE VIEW,
SOUTH SPAN SHOWN
PHOTO #19 - SPALLING WITH EXPOSED REBAR AT WEST OVERHANG
AT SOUTH ABUTMENT
PHOTO #20 - SPALLING WITH EXPOSED REBAR ON BOX GIRDER
UNDERSIDE AT EAST SIDE, SOUTH END; NOTE WATER LEAKAGE AT
ABUTMENT
PHOTO #21 - EXPOSED REBAR ON BOX UNDERSIDE AT SPAN #1,
SIMILAR CONDITION IN SPANS 8 AND 9
PHOTO #22 - ACTIVE WATER LEAKAGE ON BOX UNDERSIDE AT SLIDE
JOINT IN SPAN #3 NEAR PIER #2, SIMILAR CONDITION IN SPAN #7 NEAR
PIER #6, AND IN SPAN #7 NEAR PIER #7
PHOTO #23 - EFFLORESCENCE ON UNDERSIDE OF EAST OVERHANG
AT SPAN #4 NEAR PIER #4
PHOTO #24 - SPALLING WITH EXPOSED REBAR ON BOX UNDERSIDE IN
SPAN #10
PHOTO #25 - CRACKING WITH EFFLORESCENCE ON BOX GIRDER
UNDERSIDE AT NORTH SPAN, EAST CORNER
PHOTO #26 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #27 - DIAGONAL CRACKING AND
SPALLING WITH EXPOSED REBAR AT WEST
SIDE OF NORTH ABUTMENT; NOTE WATER
LEAKAGE THROUGH VERTICAL JOINT
PHOTO #28 - SPALLING WITH EXPOSED
REBAR AT EAST SIDE OF NORTH ABUTMENT;
NOTE ALSO CRACKING FROM BEARING SEAT
PHOTO #29 - GENERAL VIEW OF SOUTH
ABUTMENT
PHOTO #30 - VERTICAL CRACKING AT EAST
SIDE OF SOUTH ABUTMENT BREASTWALL;
NOTE WATER LEAKAGE
PHOTO #31 - ACTIVE WATER LEAKAGE ON
EAST SIDE OF SOUTH ABUTMENT
PHOTO #32 - VERTICAL CRACKING AT SOUTH
ABUTMENT BREASTWALL NEAR WEST END
PHOTO #33 - MAP CRACKING OF FINISH COAT
AT SOUTHEAST WINGWALL
PHOTO #34 - EXPOSED REBAR AT NORTH
FACE OF PIER #1
PHOTO #35 - VEGETATION GROWTH ON PIER #3, NORTH FACE SHOWN
PHOTO #36 - EXPOSED REBAR AT NORTH SIDE OF PIER #5
PHOTO #37 - DEBRIS ACCUMULATION AT
UPSTREAM SIDE OF PIER #6
PHOTO #38 - VINE GROWTH ON PIER #7
PHOTO #39 - POPOUTS WITH EXPOSED REBAR AND RUST STAINING
ON SOUTH SIDE OF PIER #7
PHOTO #40 - COLLISION DAMAGE TO WEST SIDE OF PIER #8
PHOTO #41 - LOOKING UPSTREAM FROM DECK
PHOTO #42 - LOOKING DOWNSTREAM FROM DECK
File details come from the government source that posted it.