Bridge Inspection Report_STR_5140-124P
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
I-26 BRIDGE
BLUE RIDGE PARKWAY OVER I-26
BLUE RIDGE PARKWAY
LS
STRUCTURE NO. 5140-124P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 8/11/15
Report prepared by: WS
MILE POINT: 391.79
Federal Highway Administration KILOMETER POINT: 630.33 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-124P
I-26 BRIDGE INSPECTION DATE: 8/11/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 512.3 FT (156.1 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 94.7 FT (28.9 M) WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 35.2 FT (10.7 M) ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.0 FT (8.5 M)
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES / SPREAD YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2G19, 2G20-LG / SKEW ANGLE: ..................... 22 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO STRUCTURE HISTORY: ...... 1985-JOINT REPAIR. 2003-BEARING REPAIRS. 2004-JOINT REPAIRS. 2011-BEAMS PAINTED
AT PIERS #1, #2, AND #6.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 391.79 (KM PT 630.33)
STATE: ................................. NORTH CAROLINA LOCATION: 1.8 MILES TO NC ROUTE 191
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. I-26
STRUCTURE EVALUATION SUMMARY
This steel multi-beam bridge is in fair condition overall. Problems include delamination and spalling with exposed rebar on the top surface of the deck in several locations and spalling with exposed rebar on Piers #1, #3, and #6, as well as at both abutments. In addition, there is deterioration of the west sidewalk joint sealant over Pier #1 and at the south bridge end. There is also a debris accumulation with vegetation growth along the west curbline and east curbline at the joints. Active leakage through the joints and onto the steel superstructure and pier caps was noted at pier #1 and #6.
Since the previous inspection, the drop grate inlet located at the southwest shoulder of the south approach has been repaired.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future. It should be noted this inspection was conducted without the aid of a snooper truck.
INSPECTION TEAM: M. REGER, G. GOODLIN, N. JANSEN
CONDITION ASSESSMENT:
MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-124P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.1, 60.13 CLEAN AND SEAL EXPOSED REBAR WITH APPROVED PROTECTIVE COATING AS
NECESSARY.
8 SF $200 $2,000
60.6,11,12 REMOVE VEGETATION AS NECESSARY. 1 LS $2,000 $2,000
58.2,7 REMOVE DEBRIS FROM CURBLINES AT JOINTS. REMOVE DEBRIS FROM
EXPANSION JOINTS.
1 LS $1,000 $1,000
58.5 CLEAN AND SEAL HOLES IN WEST SIDEWALK JOINTS OVER PIER #1 AND AT
SOUTH BRIDGE END.
1 LS $1,000 $1,000
PRELIM. MAINTENANCE TOTAL : $6,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.1,2,6,7 PAINT SUPERSTRUCTURE AND BEARINGS. 1 LS $700,000 $700,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $700,000 $0
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0 $700,000 $6,000
$706,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$706,000
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
Consideration should be given to installing an approach guardrail system meeting current safety standards to improve motorist safety.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-124P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.
8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present
7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 6 ITEM REFERENCE AND REMARKS
F1. DECK SLAB
F2. EXPANSION JOINTS
N3. WEARING SURFACE
G4. RIDEABILITY
G5. CURBS, SIDEWALKS, AND MEDIAN
G6. PARAPETS AND/OR RAILINGS
G7. DRAINS AND DRAINAGE
N8. UTILITIES
G9. DEFLECTION AND/OR VIBRATION
N10. OTHER
59. SUPERSTRUCTURE 6
F
2. GIRDERS OR BEAMS
1. BEARING DEVICES
G
N3. ARCH(ES) OR SLAB(S)
G4. FLOOR BEAMS AND STRINGERS
N5. TRUSSES
G6. DIAPHRAGMS AND BRACING
F7. PAINT
N8. FASCIA(E)
G9. DEFLECTION AND/OR VIBRATION
G10. ALIGNMENT
F11. OTHER (VEGETATION)
60. SUBSTRUCTURE 7
58.1 TOP SIDE: MINOR TO MODERATE TRANSVERSE CRACKING
THROUGHOUT. MINOR ABRASION OF DECK. MINOR SPALLING WITH
EXPOSED REBAR DUE INSUFFICIENT CONCRETE COVER ALONG
CENTERLINE IN SOUTHBOUND LANE OF SPAN #1. AREAS OF
DELAMINATION, 6' WIDE, IN PATCHED AREA IN SPAN #2 ALONG EAST
SIDE OF CENTERLINE, BEGINNING 38' FROM JOINT AT PIER #1,
EXTENDING 10' SOUTH.
UNDERSIDE: MINOR TRANSVERSE CRACKING WITH
EFFLORESCENCE ON UNDERSIDE OF DECK AND OVERHANGS.
DECK IS DAMP IN SEVERAL LOCATIONS. MINOR SPALL DEVELOPING
ON WEST OVERHANG OVER PIER #1. MINOR SPALLING IN SPAN #4.
58.2 MINOR TO MODERATE DEBRIS ACCUMULATION WITH VEGETATION
GROWTH IN EXPANSION JOINTS, MAINLY AT ENDS. MODERATE
LEAKAGE THROUGH JOINT AT EAST SIDE OVER PIER #1 AND WEST
SIDE OVER PIER #6; SEE ALSO 58.7.
58.5,6 MINOR CRACKING OF CONCRETE SIDEWALK AND PARAPETS.
MINOR RUSTING OF RAILING. MINOR DETERIORATION OF JOINT
SEALANT IN WEST SIDEWALK OVER PIER #1 AND AT SOUTH BRIDGE
END. WELD CRACK IN END CAP TO PIPE CONNECTION, WEST RAIL
OVER PIER #6.
58.7 MINOR TO MODERATE DEBRIS ACCUMULATION WITH VEGETATION
GROWTH ALONG EAST CURBLINE IN SPAN #1 AND WEST CURBLINE
IN SPAN #1, 2, 3; SEE ALSO 58.2.
59.1 UNABLE TO VERIFY DURING THIS INSPECTION DUE TO LACK OF
SNOOPER: MINOR TO MODERATE RUSTING OF ALL BEARINGS; UP
TO 20% SECTION LOSS FROM ANCHOR BOLTS AT PIER #2 FOR SPAN
#2. ANCHOR BOLTS ARE BENT AT PIER #2 BEARINGS #3, #4, AND #5
FOR SPAN #3, AT PIER #5, BEARING #5 FOR SPAN #6.
LARGE BIRD NESTS ON BEARING #4 AT PIER #3 AND BEARING #2 AT
PIER #5. ANCHOR BOLTS FOR BEARING REPAIR AT BEARING #3,
PIER #5 NOT FULLY SEATED.
ABUTMENTS
BREASTWALLS OR COLUMNS1. G
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. G
BACKWALLS AND/OR BULKHEADS 4. G
FOUNDATIONS 5. N
WINGWALLS 6. G
WEEP HOLES7. N
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR9. G
SETTLEMENT OR DEFLECTION10. G
SLOPE PROTECTION11. G
OTHER (VEGETATION) 12. F
PIER(S)
WALLS AND/OR COLUMNS 13. G
PILE BENTS 14. N
CAPS AND/OR BEARING SEATS 15. G
FOUNDATIONS 16. N
EROSION AND/OR SCOUR17. G
SETTLEMENT OR DEFLECTION18. G
OTHER 19. N
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL N
222. APPROACHES 5
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N G F G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.2,6 BOTTOM FLANGE OF BEAMS #1, #2, #4, AND #5 IN SPAN #1 ARE
DEFORMED AT ABOUT MIDSPAN. SPLICE PLATE BOLTS ARE
INSTALLED UPSIDE DOWN. ONE MISSING BOLT FROM SOUTH
DIAPHRAGM CONNECTION ON BEAM #5 OF SPAN #2. MINOR
SPALLING OF DIAPHRAGM IN BAY #2 OF SPAN #7 NEAR PIER #6.
59.2,6,7 BEAM ENDS AND BEARINGS HAVE BEEN REPAINTED OVER PIERS
#1, #2, #5, AND #6. WIDESPREAD MINOR PEELING OF PAINT AND
SPOT RUSTING ON BEAMS AND DIAPHRAGMS. MINOR SPOT
RUSTING AND PITTING AT BEAM ENDS. ACTIVE LEAKAGE ONTO
BEAM #5 IN SPAN #2 NEAR PIER #1; SEE ALSO 58.2,7. PAINT
FAILURE WITH MODERATE RUSTING AND MINOR PITTING ON
EXTERIOR SIDE OF BEAM #1 AT SPLICE PLATE IN SPAN #3.
59.11, 60.12 MINOR TO MODERATE VEGETATION UNDER STRUCTURE IN SOME
AREAS; VINE GROWTH EXTENDS UP PIERS #1, #2, #5, AND #6.
60.3,4 MINOR WATER STAINS ON BACKWALLS AND BEARING SEATS.
MINOR CRACKING WITH EFFLORESCENCE ON WEST SIDE AND
NORTH FACE OF SOUTH ABUTMENT. MINOR SPALLING WITH
EXPOSED REBAR DUE TO INSUFFICIENT CONCRETE COVER ON
EAST SIDE OF NORTH ABUTMENT CHEEKWALL. MINOR SPALLING
AND POPOUT WITH EXPOSED REBAR ON SOUTH ABUTMENT
BACKWALL IN BAY #2.
60.6 MINOR CRACKING WITH EFFLORESCENCE ON NORTH ABUTMENT
WINGWALLS. MODERATE VEGETATION AT WINGWALLS.
60.9,11 MODERATE VEGETATION GROWTH ON SLOPE PAVING AT BOTH
ABUTMENTS.
60.13 MINOR SPALLING WITH EXPOSED REBAR ON WEST SIDE OF PIERS
#1 AND #6, AND EAST SIDE OF PIER #3. MINOR SPALLING WITH
EXPOSED REBAR ON UNDERSIDE OF PIER #2 CAP WITH MINOR
POPOUTS ON NORTH FACE.
60.15 MINOR SCALING, STAINING, AND DELAMINATION OF PIER CAPS;
LEAKAGE ON WEST SIDE OF PIER #6 CAP, SEE ALSO 58.2,7. MINOR
POPOUTS WITH EXPOSED REBAR ON EAST SIDE OF PIER #6 CAP.
222.3, 36.C APPROACH GUARDRAIL AT EAST SIDE OF SOUTH APPROACH ONLY.
GUARDRAILS NOT PROVIDED AT NORTHEAST, NORTHWEST, AND
SOUTHWEST CORNERS.
222.4 MINOR TO MODERATE CRACKING OF NORTH APPROACH PAVEMENT
WITH VEGETATION GROWTH.
222.5 EROSION AND UNDERMINING OF SOUTHWEST DROP GRATE INLET
HAS BEEN REPAIRED SINCE LAST INSPECTION.
ADDITIONAL ITEM REFERENCE AND REMARKS
36.B BRIDGE RAIL NOT CONNECTED TO APPROACH GUARDRAIL AT SOUTHEAST CORNER.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-124P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 22 20 36 33
TYPE 3 21 19 35 31
TYPE 3S2 25 23 42 38
TYPE 3-3 28 25 46 42
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-124P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... I-26 BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 021 - BUNCOMBE
(204) STRUCTURE NUMBER: ..... 5140-124P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... I-26
(207) ROAD SECTION NO: .......... 124P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140124P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.8 MILES TO NC ROUTE 191
(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2G19, 2G20-LG (11) MILE POINT: ............................. 391.79 (KM PT 630.33)
(212) DRAWING NUMBERS: ....... (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
02 - STRINGER/MULTI-BEAM or GIRDER
94.7 FT (28.9 M)
512.3 FT (156.1 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 21.6 TONS (19.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 36.1 TONS (32.7 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 8/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-124P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 28.0 FT (8.5 M) (16) LATITUDE: ............................. 35°29'45.90"
(17) LONGITUDE: ......................... 82°33'57.40"
(19) DETOUR LENGTH: ............... 8 MI (13 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 04
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 9.0 FT (2.7 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
35.2 FT (10.7 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
22 °
NO
28.0 FT (8.5 M)
2.5 FT (0.8 M)
2.5 FT (0.8 M)
2 - MOUNTED ON PARAPET
3 - CONCRETE/STEEL
1 - CONTINUOUS RAIL
2.80 FT (0.85 M)
99.99 FT (99.99 M)
75.00 FT (22.90 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1000
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
C - MODERATE
$6,000
$700,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-JOINT REPAIR. 2003-BEARING REPAIRS. 2004-JOINT REPAIRS. 2011-BEAMS PAINTED AT PIERS #1, #2, AND #6.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-124P
PHOTOGRAPHS STRUCTURE NO. 5140-124P
PHOTO #1 - LOOKING NORTH TOWARD ASHEVILLE
PHOTO #2 - EAST SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING SOUTH
PHOTO #4 - TRANSVERSE CRACKING OF
NORTH APPROACH PAVEMENT
PHOTO #5 - TRANSVERSE CRACKING OF NORTH APPROACH
PAVEMENT; NOTE ALSO VEGETATION GROWTH ALONG NORTHWEST
CURBLINE
PHOTO #6 - VEGETATION GROWTH ALONG NORTHEAST APPROACH
CURB
PHOTO #7 - DELAMINATED AREA WITHIN PATCHED AREA IN SPAN #2,
EAST OF CENTERLINE
PHOTO #8 - SPALLING WITH EXPOSED REBAR AND POPOUTS ON TOP
OF DECK, MIDSPAN OF SPAN #1
PHOTO #9 - HOLE ON WEST SIDEWALK
EXPANSION JOINT MATERIAL OVER PIER #1
PHOTO #10 - SEPARATION ALONG EDGE OF
COMPRESSION JOINT AT PIER #2
PHOTO #11 - DEBRIS ACCUMULATION ALONG
WEST CURBLINE, SPAN #2 SHOWN; NOTE
ALSO EVIDENCE OF WATER PONDING
PHOTO #12 - TYPICAL TRANSVERSE
CRACKING OF DECK, MIDSPAN OF SPAN #3
SHOWN
PHOTO #13 - TYPICAL DEBRIS ACCUMULATION
IN JOINTS OVER PIERS, PIER #3 SHOWN
PHOTO #14 - GENERAL VIEW OF PARAPET
JOINT FILLER ON EAST SIDE OF PIER #4; NOTE
MISSING JOINT FILLER MATERIAL
PHOTO #15 - GENERAL VIEW OF PATCHED
AREA IN SPAN #5; NOTE ALSO UNIFORM
TRANSVERSE CRACKING
PHOTO #16 - GENERAL VIEW OF SOUTH END
OF EAST CURBLINE; NOTE VEGETATION
GROWTH
PHOTO #17 - COLLISION SCRAPS ON WEST PARAPET PIER #6; NOTE
VEGETATION GROWTH IN JOINT
PHOTO #18 - WELD CRACK ON END CAP OF WEST RAILING, AT PIER #6
PHOTO #19 - GENERAL VIEW OF PAVEMENT REPAIR AREA AT WEST
SIDE OF SOUTH APPROACH
PHOTO #20 - GENERAL VIEW OF REPAIR TO CURB DRAIN INLET AT
SOUTHWEST CORNER APPROACH
PHOTO #21 - GENERAL VIEW OF SOUTH APPROACH PAVEMENT
PHOTO #22 - GENERAL UNDERSIDE VIEW OF SPAN #7 LOOKING
NORTH; NOTE REHABILITATION TO BEARING SEATS ON SOUTH FACE
OF PIER #6
PHOTO #23 - TYPICAL CONDITION OF DIAPHRAGM, CENTER BAY IN
SPAN #7 SHOWN
PHOTO #24 - TRANSVERSE CRACKING WITH EFFLORESCENCE ON
DECK UNDERSIDE AT BAY #2 IN SPAN #7
PHOTO #25 - GENERAL UNDERSIDE VIEW OF
WEST BAY IN SPAN #6; NOTE WATER LEAKAGE
ON TRANSVERSE CRACKING FROM DECK
PHOTO #26 - TYPICAL RUST FRECKLING, EAST
EXTERIOR BEAM IN SPAN #7 SHOWN
PHOTO #27 - PAINT PEELING AND RUST ON BOTTOM FLANGE OF WEST
EXTERIOR GIRDER IN SPAN #7
PHOTO #28 - TYPICAL CONDITION OF BEARING, BEARING FOR EAST
EXTERIOR GIRDER ON SOUTH ABUTMENT SHOWN
PHOTO #29 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #30 - DIAGONAL CRACK WITH LIGHT EFFLORESCENCE ON
WEST END OF SOUTH ABUTMENT
PHOTO #31 - WATER STAINS UNDERNEATH
WEST MOST BEARING ON NORTH FACE OF
PIER #1
PHOTO #32 - GENERAL VIEW OF PIER #5,
SOUTH FACE
PHOTO #33 - VEGETATION GROWTH ON PIER
#5, WEST SIDE
PHOTO #34 - GENERAL VIEW OF PIER #6
PHOTO #35 - GENERAL VIEW OF PIER CAP OF
PIER #6, SOUTH SIDE; NOTE BEARING
REPAIRS PERFORMED
PHOTO #36 - VINE GROWTH ON COLUMN OF
PIER #6
PHOTO #37 - VEGETATION GROWTH ON EAST
SIDE OF NORTH ABUTMENT