Bridge_Inspection_Rpt_STR_5140-124P.pdf

PDF 2 MB Posted

Attached to
Blue Ridge Parkway Pavement Preservation Federal contract opportunity
Solicitation number
693C73-18-R-000004
Issued by
Department of Transportation Federal Highway Administration

About this file

Bridge Inspection Report_STR_5140-124P

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway Pavement Preservation, newest first.
File Type Posted
69C37018R000004_Amendment_000001.pdf PDF
Bridge_Inspection_Rpt_STR_5140-157P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-146P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-156P.pdf PDF
NEPA_document_CE.pdf PDF
Bridge_Inspection_Rpt_STR_5140-186P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-117P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-116P.pdf PDF
Plans_Adv.pdf PDF
VETS-4212.pdf PDF
Bridge_Inspection_Rpt_STR_5140-129P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-119P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-144P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-173P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-123P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-126P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-150P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-158P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-148P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-193P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-140P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-194P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-149P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-118P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-143P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-139P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-120P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-185P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-147P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-155P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-141P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-122P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-142P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-151P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-127P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-153P.pdf PDF
RFP_Solicitation_NP-BLRI_PVT_PRES_FY17.pdf PDF
Bridge_Inspection_Rpt_STR_5140-145P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-125P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-121P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-131P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-203P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-197P.pdf PDF
Synopsis_-_BLRI_PVT_PRES_FY17.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

I-26 BRIDGE

BLUE RIDGE PARKWAY OVER I-26

BLUE RIDGE PARKWAY

LS

STRUCTURE NO. 5140-124P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 8/11/15

Report prepared by: WS

MILE POINT: 391.79

Federal Highway Administration KILOMETER POINT: 630.33 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 5140-124P

I-26 BRIDGE INSPECTION DATE: 8/11/15

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 512.3 FT (156.1 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 94.7 FT (28.9 M) WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 35.2 FT (10.7 M) ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.0 FT (8.5 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES / SPREAD YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 2G19, 2G20-LG / SKEW ANGLE: ..................... 22 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO STRUCTURE HISTORY: ...... 1985-JOINT REPAIR. 2003-BEARING REPAIRS. 2004-JOINT REPAIRS. 2011-BEAMS PAINTED

AT PIERS #1, #2, AND #6.

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 391.79 (KM PT 630.33)

STATE: ................................. NORTH CAROLINA LOCATION: 1.8 MILES TO NC ROUTE 191

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. I-26

STRUCTURE EVALUATION SUMMARY

This steel multi-beam bridge is in fair condition overall. Problems include delamination and spalling with exposed rebar on the top surface of the deck in several locations and spalling with exposed rebar on Piers #1, #3, and #6, as well as at both abutments. In addition, there is deterioration of the west sidewalk joint sealant over Pier #1 and at the south bridge end. There is also a debris accumulation with vegetation growth along the west curbline and east curbline at the joints. Active leakage through the joints and onto the steel superstructure and pier caps was noted at pier #1 and #6.

Since the previous inspection, the drop grate inlet located at the southwest shoulder of the south approach has been repaired.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future. It should be noted this inspection was conducted without the aid of a snooper truck.

INSPECTION TEAM: M. REGER, G. GOODLIN, N. JANSEN

CONDITION ASSESSMENT:

MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424

REPORT REVIEW:

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/31/15

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-124P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

58.1, 60.13 CLEAN AND SEAL EXPOSED REBAR WITH APPROVED PROTECTIVE COATING AS

NECESSARY.

8 SF $200 $2,000

60.6,11,12 REMOVE VEGETATION AS NECESSARY. 1 LS $2,000 $2,000

58.2,7 REMOVE DEBRIS FROM CURBLINES AT JOINTS. REMOVE DEBRIS FROM

EXPANSION JOINTS.

1 LS $1,000 $1,000

58.5 CLEAN AND SEAL HOLES IN WEST SIDEWALK JOINTS OVER PIER #1 AND AT

SOUTH BRIDGE END.

1 LS $1,000 $1,000

PRELIM. MAINTENANCE TOTAL : $6,000

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

59.1,2,6,7 PAINT SUPERSTRUCTURE AND BEARINGS. 1 LS $700,000 $700,000 $0

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $700,000 $0

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ...

TOTAL ITEMIZED COSTS:

$0 $700,000 $6,000

$706,000

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

$706,000

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

Consideration should be given to installing an approach guardrail system meeting current safety standards to improve motorist safety.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-124P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.

8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present

7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.

4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 6 ITEM REFERENCE AND REMARKS

F1. DECK SLAB

F2. EXPANSION JOINTS

N3. WEARING SURFACE

G4. RIDEABILITY

G5. CURBS, SIDEWALKS, AND MEDIAN

G6. PARAPETS AND/OR RAILINGS

G7. DRAINS AND DRAINAGE

N8. UTILITIES

G9. DEFLECTION AND/OR VIBRATION

N10. OTHER

59. SUPERSTRUCTURE 6

F

2. GIRDERS OR BEAMS

1. BEARING DEVICES

G

N3. ARCH(ES) OR SLAB(S)

G4. FLOOR BEAMS AND STRINGERS

N5. TRUSSES

G6. DIAPHRAGMS AND BRACING

F7. PAINT

N8. FASCIA(E)

G9. DEFLECTION AND/OR VIBRATION

G10. ALIGNMENT

F11. OTHER (VEGETATION)

60. SUBSTRUCTURE 7

58.1 TOP SIDE: MINOR TO MODERATE TRANSVERSE CRACKING

THROUGHOUT. MINOR ABRASION OF DECK. MINOR SPALLING WITH

EXPOSED REBAR DUE INSUFFICIENT CONCRETE COVER ALONG

CENTERLINE IN SOUTHBOUND LANE OF SPAN #1. AREAS OF

DELAMINATION, 6' WIDE, IN PATCHED AREA IN SPAN #2 ALONG EAST

SIDE OF CENTERLINE, BEGINNING 38' FROM JOINT AT PIER #1,

EXTENDING 10' SOUTH.

UNDERSIDE: MINOR TRANSVERSE CRACKING WITH

EFFLORESCENCE ON UNDERSIDE OF DECK AND OVERHANGS.

DECK IS DAMP IN SEVERAL LOCATIONS. MINOR SPALL DEVELOPING

ON WEST OVERHANG OVER PIER #1. MINOR SPALLING IN SPAN #4.

58.2 MINOR TO MODERATE DEBRIS ACCUMULATION WITH VEGETATION

GROWTH IN EXPANSION JOINTS, MAINLY AT ENDS. MODERATE

LEAKAGE THROUGH JOINT AT EAST SIDE OVER PIER #1 AND WEST

SIDE OVER PIER #6; SEE ALSO 58.7.

58.5,6 MINOR CRACKING OF CONCRETE SIDEWALK AND PARAPETS.

MINOR RUSTING OF RAILING. MINOR DETERIORATION OF JOINT

SEALANT IN WEST SIDEWALK OVER PIER #1 AND AT SOUTH BRIDGE

END. WELD CRACK IN END CAP TO PIPE CONNECTION, WEST RAIL

OVER PIER #6.

58.7 MINOR TO MODERATE DEBRIS ACCUMULATION WITH VEGETATION

GROWTH ALONG EAST CURBLINE IN SPAN #1 AND WEST CURBLINE

IN SPAN #1, 2, 3; SEE ALSO 58.2.

59.1 UNABLE TO VERIFY DURING THIS INSPECTION DUE TO LACK OF

SNOOPER: MINOR TO MODERATE RUSTING OF ALL BEARINGS; UP

TO 20% SECTION LOSS FROM ANCHOR BOLTS AT PIER #2 FOR SPAN

#2. ANCHOR BOLTS ARE BENT AT PIER #2 BEARINGS #3, #4, AND #5

FOR SPAN #3, AT PIER #5, BEARING #5 FOR SPAN #6.

LARGE BIRD NESTS ON BEARING #4 AT PIER #3 AND BEARING #2 AT

PIER #5. ANCHOR BOLTS FOR BEARING REPAIR AT BEARING #3,

PIER #5 NOT FULLY SEATED.

ABUTMENTS

BREASTWALLS OR COLUMNS1. G

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. G

BACKWALLS AND/OR BULKHEADS 4. G

FOUNDATIONS 5. N

WINGWALLS 6. G

WEEP HOLES7. N

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR9. G

SETTLEMENT OR DEFLECTION10. G

SLOPE PROTECTION11. G

OTHER (VEGETATION) 12. F

PIER(S)

WALLS AND/OR COLUMNS 13. G

PILE BENTS 14. N

CAPS AND/OR BEARING SEATS 15. G

FOUNDATIONS 16. N

EROSION AND/OR SCOUR17. G

SETTLEMENT OR DEFLECTION18. G

OTHER 19. N

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL N

222. APPROACHES 5

OTHER 9.

ALIGNMENT8.

SIGNS 7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS2.

1. APPROACH SLABS N

N G F G G N G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 1

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59.2,6 BOTTOM FLANGE OF BEAMS #1, #2, #4, AND #5 IN SPAN #1 ARE

DEFORMED AT ABOUT MIDSPAN. SPLICE PLATE BOLTS ARE

INSTALLED UPSIDE DOWN. ONE MISSING BOLT FROM SOUTH

DIAPHRAGM CONNECTION ON BEAM #5 OF SPAN #2. MINOR

SPALLING OF DIAPHRAGM IN BAY #2 OF SPAN #7 NEAR PIER #6.

59.2,6,7 BEAM ENDS AND BEARINGS HAVE BEEN REPAINTED OVER PIERS

#1, #2, #5, AND #6. WIDESPREAD MINOR PEELING OF PAINT AND

SPOT RUSTING ON BEAMS AND DIAPHRAGMS. MINOR SPOT

RUSTING AND PITTING AT BEAM ENDS. ACTIVE LEAKAGE ONTO

BEAM #5 IN SPAN #2 NEAR PIER #1; SEE ALSO 58.2,7. PAINT

FAILURE WITH MODERATE RUSTING AND MINOR PITTING ON

EXTERIOR SIDE OF BEAM #1 AT SPLICE PLATE IN SPAN #3.

59.11, 60.12 MINOR TO MODERATE VEGETATION UNDER STRUCTURE IN SOME

AREAS; VINE GROWTH EXTENDS UP PIERS #1, #2, #5, AND #6.

60.3,4 MINOR WATER STAINS ON BACKWALLS AND BEARING SEATS.

MINOR CRACKING WITH EFFLORESCENCE ON WEST SIDE AND

NORTH FACE OF SOUTH ABUTMENT. MINOR SPALLING WITH

EXPOSED REBAR DUE TO INSUFFICIENT CONCRETE COVER ON

EAST SIDE OF NORTH ABUTMENT CHEEKWALL. MINOR SPALLING

AND POPOUT WITH EXPOSED REBAR ON SOUTH ABUTMENT

BACKWALL IN BAY #2.

60.6 MINOR CRACKING WITH EFFLORESCENCE ON NORTH ABUTMENT

WINGWALLS. MODERATE VEGETATION AT WINGWALLS.

60.9,11 MODERATE VEGETATION GROWTH ON SLOPE PAVING AT BOTH

ABUTMENTS.

60.13 MINOR SPALLING WITH EXPOSED REBAR ON WEST SIDE OF PIERS

#1 AND #6, AND EAST SIDE OF PIER #3. MINOR SPALLING WITH

EXPOSED REBAR ON UNDERSIDE OF PIER #2 CAP WITH MINOR

POPOUTS ON NORTH FACE.

60.15 MINOR SCALING, STAINING, AND DELAMINATION OF PIER CAPS;

LEAKAGE ON WEST SIDE OF PIER #6 CAP, SEE ALSO 58.2,7. MINOR

POPOUTS WITH EXPOSED REBAR ON EAST SIDE OF PIER #6 CAP.

222.3, 36.C APPROACH GUARDRAIL AT EAST SIDE OF SOUTH APPROACH ONLY.

GUARDRAILS NOT PROVIDED AT NORTHEAST, NORTHWEST, AND

SOUTHWEST CORNERS.

222.4 MINOR TO MODERATE CRACKING OF NORTH APPROACH PAVEMENT

WITH VEGETATION GROWTH.

222.5 EROSION AND UNDERMINING OF SOUTHWEST DROP GRATE INLET

HAS BEEN REPAIRED SINCE LAST INSPECTION.

ADDITIONAL ITEM REFERENCE AND REMARKS

36.B BRIDGE RAIL NOT CONNECTED TO APPROACH GUARDRAIL AT SOUTHEAST CORNER.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-124P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 22 20 36 33

TYPE 3 21 19 35 31

TYPE 3S2 25 23 42 38

TYPE 3-3 28 25 46 42

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-124P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... I-26 BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 021 - BUNCOMBE

(204) STRUCTURE NUMBER: ..... 5140-124P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... I-26

(207) ROAD SECTION NO: .......... 124P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140124P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.8 MILES TO NC ROUTE 191

(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 2G19, 2G20-LG (11) MILE POINT: ............................. 391.79 (KM PT 630.33)

(212) DRAWING NUMBERS: ....... (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

94.7 FT (28.9 M)

512.3 FT (156.1 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 21.6 TONS (19.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 36.1 TONS (32.7 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 8/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-124P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(51) CURB TO CURB WIDTH: ........... 28.0 FT (8.5 M) (16) LATITUDE: ............................. 35°29'45.90"

(17) LONGITUDE: ......................... 82°33'57.40"

(19) DETOUR LENGTH: ............... 8 MI (13 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 04

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 1 - HIGHWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... N

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 9.0 FT (2.7 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

35.2 FT (10.7 M)

38.0 FT (11.6 M)

22.0 FT (6.7 M)

8.0 FT (2.4 M)

8.0 FT (2.4 M)

0 - NO MEDIAN

22 °

NO

28.0 FT (8.5 M)

2.5 FT (0.8 M)

2.5 FT (0.8 M)

2 - MOUNTED ON PARAPET

3 - CONCRETE/STEEL

1 - CONTINUOUS RAIL

2.80 FT (0.85 M)

99.99 FT (99.99 M)

75.00 FT (22.90 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: .......................... N

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1000

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N - Not over waterway.

2 - REHAB/RECONSTRUCTION

C - MODERATE

$6,000

$700,000

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1985-JOINT REPAIR. 2003-BEARING REPAIRS. 2004-JOINT REPAIRS. 2011-BEAMS PAINTED AT PIERS #1, #2, AND #6.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 5140-124P

PHOTOGRAPHS STRUCTURE NO. 5140-124P

PHOTO #1 - LOOKING NORTH TOWARD ASHEVILLE

PHOTO #2 - EAST SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING SOUTH

PHOTO #4 - TRANSVERSE CRACKING OF

NORTH APPROACH PAVEMENT

PHOTO #5 - TRANSVERSE CRACKING OF NORTH APPROACH

PAVEMENT; NOTE ALSO VEGETATION GROWTH ALONG NORTHWEST

CURBLINE

PHOTO #6 - VEGETATION GROWTH ALONG NORTHEAST APPROACH

CURB

PHOTO #7 - DELAMINATED AREA WITHIN PATCHED AREA IN SPAN #2,

EAST OF CENTERLINE

PHOTO #8 - SPALLING WITH EXPOSED REBAR AND POPOUTS ON TOP

OF DECK, MIDSPAN OF SPAN #1

PHOTO #9 - HOLE ON WEST SIDEWALK

EXPANSION JOINT MATERIAL OVER PIER #1

PHOTO #10 - SEPARATION ALONG EDGE OF

COMPRESSION JOINT AT PIER #2

PHOTO #11 - DEBRIS ACCUMULATION ALONG

WEST CURBLINE, SPAN #2 SHOWN; NOTE

ALSO EVIDENCE OF WATER PONDING

PHOTO #12 - TYPICAL TRANSVERSE

CRACKING OF DECK, MIDSPAN OF SPAN #3

SHOWN

PHOTO #13 - TYPICAL DEBRIS ACCUMULATION

IN JOINTS OVER PIERS, PIER #3 SHOWN

PHOTO #14 - GENERAL VIEW OF PARAPET

JOINT FILLER ON EAST SIDE OF PIER #4; NOTE

MISSING JOINT FILLER MATERIAL

PHOTO #15 - GENERAL VIEW OF PATCHED

AREA IN SPAN #5; NOTE ALSO UNIFORM

TRANSVERSE CRACKING

PHOTO #16 - GENERAL VIEW OF SOUTH END

OF EAST CURBLINE; NOTE VEGETATION

GROWTH

PHOTO #17 - COLLISION SCRAPS ON WEST PARAPET PIER #6; NOTE

VEGETATION GROWTH IN JOINT

PHOTO #18 - WELD CRACK ON END CAP OF WEST RAILING, AT PIER #6

PHOTO #19 - GENERAL VIEW OF PAVEMENT REPAIR AREA AT WEST

SIDE OF SOUTH APPROACH

PHOTO #20 - GENERAL VIEW OF REPAIR TO CURB DRAIN INLET AT

SOUTHWEST CORNER APPROACH

PHOTO #21 - GENERAL VIEW OF SOUTH APPROACH PAVEMENT

PHOTO #22 - GENERAL UNDERSIDE VIEW OF SPAN #7 LOOKING

NORTH; NOTE REHABILITATION TO BEARING SEATS ON SOUTH FACE

OF PIER #6

PHOTO #23 - TYPICAL CONDITION OF DIAPHRAGM, CENTER BAY IN

SPAN #7 SHOWN

PHOTO #24 - TRANSVERSE CRACKING WITH EFFLORESCENCE ON

DECK UNDERSIDE AT BAY #2 IN SPAN #7

PHOTO #25 - GENERAL UNDERSIDE VIEW OF

WEST BAY IN SPAN #6; NOTE WATER LEAKAGE

ON TRANSVERSE CRACKING FROM DECK

PHOTO #26 - TYPICAL RUST FRECKLING, EAST

EXTERIOR BEAM IN SPAN #7 SHOWN

PHOTO #27 - PAINT PEELING AND RUST ON BOTTOM FLANGE OF WEST

EXTERIOR GIRDER IN SPAN #7

PHOTO #28 - TYPICAL CONDITION OF BEARING, BEARING FOR EAST

EXTERIOR GIRDER ON SOUTH ABUTMENT SHOWN

PHOTO #29 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #30 - DIAGONAL CRACK WITH LIGHT EFFLORESCENCE ON

WEST END OF SOUTH ABUTMENT

PHOTO #31 - WATER STAINS UNDERNEATH

WEST MOST BEARING ON NORTH FACE OF

PIER #1

PHOTO #32 - GENERAL VIEW OF PIER #5,

SOUTH FACE

PHOTO #33 - VEGETATION GROWTH ON PIER

#5, WEST SIDE

PHOTO #34 - GENERAL VIEW OF PIER #6

PHOTO #35 - GENERAL VIEW OF PIER CAP OF

PIER #6, SOUTH SIDE; NOTE BEARING

REPAIRS PERFORMED

PHOTO #36 - VINE GROWTH ON COLUMN OF

PIER #6

PHOTO #37 - VEGETATION GROWTH ON EAST

SIDE OF NORTH ABUTMENT