Text version
TUNNEL INSPECTION REPORT
PINE MOUNTAIN TUNNEL
BLUE RIDGE PARKWAY THROUGH PINE MOUNTAIN
BLUE RIDGE PARKWAY
NP
STRUCTURE NO. 5140-143P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/11/15
Report prepared by: SP
MILE POINT: 399.10
Federal Highway Administration KILOMETER POINT: 642.27 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-143P
PINE MOUNTAIN TUNNEL INSPECTION DATE: 6/11/15
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 14.3 FT (4.4 M)
SPRINGLINE LENGTH: ........ 29.3 FT (8.9 M) STRUCT. TOTAL LENGTH: ... 1,462.0 FT (445.6 M)
CURB TO CURB WIDTH: ..... 29.3 FT (8.9 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 2S2,2S9,2S14 / YEAR RECONSTRUCTED:
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1985-LINING REHABILITATION.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 399.10 (KM PT 642.27)
STATE: .................................. NORTH CAROLINA LOCATION: 5.7 MILES TO NC ROUTE 191
FACILITY CARRIED: ............. BLUE RIDGE PARKWAY
FEATURE INTERSECTED: ... PINE MOUNTAIN
STRUCTURE EVALUATION SUMMARY
This concrete tunnel is in fair condition overall. The main problem is the moderate deterioration with leakage along the drain chases approximately 10' and 1168' from the north portal. Other problems include minor spalling with exposed rebar on the tunnel lining at several spots, missing and broken reflectors along both sides of the tunnel, and moderate vine growth on both portals, which overhangs the roadway at the south portal.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: C. CASTRO, R. SILVESTRY
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-143P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
59.1 CLEAN EXPOSED REBAR IN LINING AND SEAL WITH APPROVED PROTECTIVE
COATING.
10 SF $300 $3,000
59.8 REPLACE MISSING AND DAMAGED TUNNEL REFLECTORS AS NECESSARY. 1 LS $4,000 $4,000
59.2 REMOVE VINE GROWTH FROM BOTH PORTALS. 1 LS $1,000 $1,000
PRELIM. MAINTENANCE TOTAL : $8,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.4 REPLACE DRAIN CHASES APPROXIMATELY 10' AND 1168' FROM
NORTH PORTAL.
90 LF $750 $68,000 $0
59 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS $50,000 $50,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $118,000 $0
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0 $118,000 $8,000
$126,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$126,000
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-143P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 6
F
2. PORTALS
1. LINING
G
N3. CURBS AND SIDEWALKS
F4. DRAINS AND DRAINAGE
G5. WEARING SURFACE
G6. RIDEABILITY
N7. LIGHTING
F8. OTHER (REFLECTORS)
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 8
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
G7. SIGNS
G8. ALIGNMENT
N9. OTHER
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
ITEM REFERENCE AND REMARKS
59.1,4 MINOR SPALLING WITH EXPOSED REBAR ON TUNNEL LINING AT
SEVERAL SPOTS INCLUDING: AT EAST LINING APPROXIMATELY 416',
WITH MODERATE CRACKING AND DELAMINATION, AND 1432' FROM
NORTH PORTAL; ON WEST LINING APPROXIMATELY 300' AND 347'
FROM NORTH PORTAL; ON CROWN APPROXIMATELY 430', 444', 719',
838', 902', AND 1060' FROM NORTH PORTAL AND NEAR SOUTH
PORTAL.
MINOR CRACKING WITH EFFLORESCENCE AND LEAKAGE
THROUGHOUT TUNNEL; MODERATE AT EAST LINING NEAR NORTH
PORTAL AND ON WEST LINING APPROXIMATELY 1168' FROM NORTH
PORTAL. SEVERAL CRACKS HAVE BEEN INJECTED AND SEALED.
MODERATE CRACKING WITH EFFLORESCENCE AND LEAKAGE OF
DRAIN CHASES APPROXIMATELY 10' AND 1168' FROM NORTH
PORTAL.
59.2 MINOR CRACKING WITH EFFLORESCENCE ON RING STONE
MASONRY JOINTS. MODERATE VINE GROWTH ON BOTH PORTALS;
OVERHANGS ROADWAY AT SOUTH PORTAL.
59.2,4 MODERATE LEAKAGE ALONG WEST SIDE OF NORTH PORTAL.
59.8 MISSING OR DAMAGED SEVERAL REFLECTORS ALONG BOTH SIDES
OF TUNNEL.
222.7 13'-11" VERTICAL CLEARANCE SIGN POSTED AT SOUTH APPROACH.
14'-0" VERTICAL CLEARANCE SIGN POSTED AT NORTH APPROACH.
"TURN LIGHTS ON" AND "PINE MOUNTAIN TUNNEL" SIGNS AT BOTH
APPROACHES.
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-143P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... PINE MOUNTAIN TUNNEL (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............3 - TUNNEL (3) COUNTY CODE: ........................ 021 - BUNCOMBE
(204) STRUCTURE NUMBER: ..... 5140-143P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... PINE MOUNTAIN
(207) ROAD SECTION NO: .......... 143P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140143P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 5.7 MILES TO NC ROUTE 191
(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 14.00 FT (4.27 M)
(211) PROJECT NO(S): ................ 2S2,2S9,2S14 (11) MILE POINT: ............................. 399.10 (KM PT 642.27)
(212) DRAWING NUMBERS: ....... (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
29.3 FT (8.9 M)
1,462.0 FT (445.6 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-143P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 29.3 FT (8.9 M) (16) LATITUDE: ............................. 35°27'01.20"
(17) LONGITUDE: ......................... 82°38'31.50"
(19) DETOUR LENGTH: ............... 40 MI (64 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
0.0 FT (0.0 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
0 °
NO
21.8 FT (6.6 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - N/A
0 - N/A
0 - N/A
0.00 FT (0.00 M)
14.33 FT (4.37 M)
14.33 FT (4.37 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
$8,000
$118,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-LINING REHABILITATION.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-143P
PHOTOGRAPHS STRUCTURE NO. 5140-143P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL VIEW OF ROADWAY LOOKING SOUTH
PHOTO #5 - TYPICAL EFFLORESCENCE AT
PORTAL RING STONES, WEST RING STONES
AT NORTH PORTAL SHOWN; NOTE ALSO
LEAKAGE AND VEGETATION GROWTH AT THIS
LOCATION
PHOTO #6 - CRACKING WITH
EFFLORESCENCE ON EAST LINING NEAR
NORTH PORTAL
PHOTO #7 - CRACKING WITH
EFFLORESCENCE AND LEAKAGE ALONG EAST
SIDE OF DRAIN CHASE APPROXIMATELY 10'
FROM NORTH PORTAL; NOTE ALSO CRACKING
WITH EFFLORESCENCE ON LINING; SIMILAR
AT WEST SIDE SAME LOCATION
PHOTO #8 - CRACKING WITH
EFFLORESCENCE ON WEST LINING
APPROXIMATELY 39' FROM NORTH PORTAL
PHOTO #9 - CRACKING WITH
EFFLORESCENCE ON CROWN
APPROXIMATELY 81' FROM NORTH PORTAL;
NOTE INJECTED AND SEALED CRACKS ON
WEST LINING
PHOTO #10 - CRACKING WITH
EFFLORESCENCE ON WEST LINING
APPROXIMATELY 120' FROM NORTH PORTAL;
NOTE EFFLORESCENCE AND LEAKAGE ALONG
DRAIN CHASE
PHOTO #11 - MISSING REFLECTOR ON EAST
LINING APPROXIMATELY 110' FROM NORTH
PORTAL
PHOTO #12 - CRACKING WITH
EFFLORESCENCE AND LEAKAGE ALONG
DRAIN CHASE ON WEST LINING
APPROXIMATELY 300' FROM NORTH PORTAL;
NOTE SPALLING WITH EXPOSED REBAR ON
RIGHT SIDE OF DRAIN CHASE
PHOTO #13 - CRACKING AND SPALLING WITH
EXPOSED REBAR ON EAST LINING
APPROXIMATELY 416' FROM NORTH PORTAL;
CRACKING WITH EFFLORESCENCE ACROSS
ON WEST LINING
PHOTO #14 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 430'
FROM NORTH PORTAL, SIMILAR AT 444' FROM
NORTH PORTAL
PHOTO #15 - VERTICAL CRACKING AND
SPALLING WITH EXPOSED REBAR ON EAST
LINING APPROXIMATELY 596' FROM NORTH
PORTAL
PHOTO #16 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 719'
FROM NORTH PORTAL
PHOTO #17 - SPALLING WITH EXPOSED REBAR ON CROWN
APPROXIMATELY 838' FROM NORTH PORTAL
PHOTO #18 - SPALLING WITH EXPOSED REBAR ON CROWN
APPROXIMATELY 900'-915' FROM NORTH PORTAL
PHOTO #19 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 900'-915'
FROM NORTH PORTAL
PHOTO #20 - CRACKING WITH
EFFLORESCENCE ON WEST WALL
APPROXIMATELY 1050' FROM NORTH PORTAL
PHOTO #21 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 1060'
FROM NORTH PORTAL
PHOTO #22 - CRACKING WITH
EFFLORESCENCE ON WEST WALL
APPROXIMATELY 1163' FROM NORTH PORTAL
PHOTO #23 - SPALLING ALONG
CONSTRUCTION JOINT ON EAST SIDE
APPROXIMATELY 1170' FROM NORTH PORTAL
PHOTO #24 - CRACKING WITH
EFFLORESCENCE AT WEST WALL
APPROXIMATELY 1206' FROM NORTH PORTAL
PHOTO #25 - SPALLING WITH EXPOSED
REBAR AT EAST WALL APPROXIMATELY 1265'
FROM NORTH PORTAL
PHOTO #26 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 1305'
PHOTO #27 - DELAMINATION AND SPALLING
WITH EXPOSED REBAR AT CROWN
APPROXIMATELY 1380'-1410' FROM NORTH
PORTAL
PHOTO #28 - SPALLING WITH EXPOSED
REBAR ON EAST LINING APPROXIMATELY 1432'
PHOTO #29 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 1440'
FROM NORTH PORTAL
PHOTO #30 - DELAMINATION AND CRACKING
WITH EFFLORESCENCE ON WEST SIDE
APPROXIMATELY 1450' FROM NORTH PORTAL
PHOTO #31 - CRACKING WITH
EFFLORESCENCE ON WEST LINING NEAR
SOUTH PORTAL; NOTE ALSO MISSING
REFLECTOR
PHOTO #32 - SPALLING AND CRACKING WITH
EFFLORESCENCE ON EAST WALL AT SOUTH
PORTAL
PHOTO #33 - VEGETATION GROWTH OVERHANGING SOUTH PORTAL