Bridge Inspection Report_STR_5140-146P
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TUNNEL INSPECTION REPORT
FERRIN KNOB TUNNEL #3
BLUE RIDGE PARKWAY THROUGH FERRIN KNOB
BLUE RIDGE PARKWAY
NP
STRUCTURE NO. 5140-146P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/12/15
Report prepared by: SP
MILE POINT: 401.33
Federal Highway Administration KILOMETER POINT: 645.86 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-146P
FERRIN KNOB TUNNEL #3 INSPECTION DATE: 6/12/15
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 14.5 FT (4.4 M)
SPRINGLINE LENGTH: ........ 28.8 FT (8.8 M) STRUCT. TOTAL LENGTH: ... 402.0 FT (122.5 M)
CURB TO CURB WIDTH: ..... 28.8 FT (8.8 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 2S2,2S9,2S14 / YEAR RECONSTRUCTED:
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 1985-LINING REHABILITATION.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 401.33 (KM PT 645.86)
STATE: .................................. NORTH CAROLINA LOCATION: 7.9 MILES TO NC ROUTE 191
FACILITY CARRIED: ............. BLUE RIDGE PARKWAY
FEATURE INTERSECTED: ... FERRIN KNOB
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in good condition overall, and has only minor problems at this time. These include several areas of minor spalling with exposed rebar on the lining and crown, missing reflectors from the lining and along the centerline striping, and vegetation growing from the masonry at both portals. In addition, the drainage inlet on the west side of the south portal is clogged with debris. Finally, there are several areas of cracking with efflorescence and leakage on the lining.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: C. CASTRO, R. SILVESTRY
CONDITION ASSESSMENT:
CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-146P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
59.8 REPLACE MISSING AND DAMAGED REFLECTORS ALONG LINING. REPLACE
MISSING REFLECTORS ALONG CENTERLINE STRIPING.
1 LS $3,000 $3,000
59.2 REMOVE VEGETATION FROM MASONRY AT BOTH PORTALS. 1 LS $2,000 $2,000
59.4 REMOVE DEBRIS FROM INLET ON WEST SIDE OF SOUTH APPROACH. 1 LS $1,000 $1,000
PRELIM. MAINTENANCE TOTAL : $6,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.1 CLEAN AND SEAL LEAKY JOINTS. CLEAN EXPOSED REBAR ON
LINING AND CROWN AND SEAL WITH APPROVED PROTECTIVE
COATING.
1 LS $22,000 $24,000 $0
59 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS $16,000 $16,000 $0
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $40,000 $0
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
$0 $40,000 $6,000
$46,000
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
$46,000
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-146P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 7
G
2. PORTALS
1. LINING
G
N3. CURBS AND SIDEWALKS
F4. DRAINS AND DRAINAGE
G5. WEARING SURFACE
G6. RIDEABILITY
N7. LIGHTING
F8. OTHER (REFLECTORS)
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 8
N1. APPROACH SLABS
N2. RELIEF JOINTS
N3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
G7. SIGNS
G8. ALIGNMENT
F9. OTHER (STRIPING)
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
ITEM REFERENCE AND REMARKS
59.1,4 MINOR SPALLING WITH EXPOSED REBAR ON EAST LINING
APPROXIMATELY 79', 146', 210', 240' AND 316' FROM NORTH PORTAL;
ON WEST LINING APPROXIMATELY 282' FROM NORTH PORTAL; AND
ON CROWN APPROXIMATELY 98', 189', 202', 237', AND 246' FROM
NORTH PORTAL.
MINOR CRACKING WITH EFFLORESCENCE AND LEAKAGE, MAINLY
AT DRAIN CHASE AREAS, NEAR PORTALS AND PREVIOUSLY
REPAIRED AREAS.
MODERATE CRACKING WITH EFFLORESCENCE AND LEAKAGE
ALONG WEST SIDE OF DRAIN CHASE APPROXIMATELY 227' FROM
NORTH PORTAL. PREVIOUSLY NOTED NON-FUNCTIONING DRAIN
CHASE APPROXIMATELY 275' FROM NORTH PORTAL COULD NOT BE
VERIFIED, NO LEAKAGE ONTO ROADWAY WAS NOTED DURING THIS
INSPECTION. PREVIOUS REPAIR OF DRAIN CHASES EVIDENT.
TRANSVERSE AND HORIZONTAL CRACKS WITH EFFLORESCENCE AT
SEVERAL LOCATIONS OF EAST AND WEST LINER.
59.2 MINOR TO MODERATE EFFLORESCENCE ON MASONRY RING
STONES AT BOTH PORTALS. MODERATE VEGETATION GROWTH ON
RING STONES OF BOTH PORTALS.
59.4 INLET ON WEST SIDE OF SOUTH APPROACH IS CLOGGED WITH
DEBRIS.
59.8 MISSING AND DAMAGED REFLECTORS ALONG EAST AND WEST
LINING. MOST REFLECTORS ARE MISSING FROM CENTERLINE OF
ROADWAY STRIPING.
222.4 MINOR TRANSVERSE CRACKING OF PAVEMENT AT BOTH
APPROACHES.
222.7 13'-11" VERTICAL CLEARANCE AND "TURN LIGHTS ON" SIGNS
POSTED AT SOUTH APPROACH. DUE TO CLOSENESS BETWEEN
TUNNELS, 13'-11" VERTICAL CLEARANCE SIGN IS POSTED AT NORTH
APPROACH TO TUNNEL #145. "FERRIN KNOB TUNNEL NO. 3" SIGNS
AT BOTH APPROACHES.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-146P
ADDITIONAL ITEM REFERENCE AND REMARKS
222.9 MINOR TO MODERATE DETERIORATION OF EDGE OF ROADWAY STRIPING AT BOTH APPROACHES.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-146P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... FERRIN KNOB TUNNEL #3 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............3 - TUNNEL (3) COUNTY CODE: ........................ 089 - HENDERSON
(204) STRUCTURE NUMBER: ..... 5140-146P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... FERRIN KNOB
(207) ROAD SECTION NO: .......... 146P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140146P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 7.9 MILES TO NC ROUTE 191
(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 14.00 FT (4.27 M)
(211) PROJECT NO(S): ................ 2S2,2S9,2S14 (11) MILE POINT: ............................. 401.33 (KM PT 645.86)
(212) DRAWING NUMBERS: ....... (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
28.8 FT (8.8 M)
402.0 FT (122.5 M)
6 - N/A
6 - N/A
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... R - POSTED (OTHER)
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-146P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 28.8 FT (8.8 M) (16) LATITUDE: ............................. 35°27'15.40"
(17) LONGITUDE: ......................... 82°40'31.90"
(19) DETOUR LENGTH: ............... 40 MI (64 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
0.0 FT (0.0 M)
38.0 FT (11.6 M)
22.0 FT (6.7 M)
8.0 FT (2.4 M)
8.0 FT (2.4 M)
0 - NO MEDIAN
99 °
NO
21.8 FT (6.6 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - N/A
0 - N/A
0 - N/A
0.00 FT (0.00 M)
14.50 FT (4.42 M)
14.50 FT (4.42 M)
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
$6,000
$40,000
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-LINING REHABILITATION.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-146P
PHOTOGRAPHS STRUCTURE NO. 5140-146P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #4 - MISSING REFLECTORS ALONG BOTH SIDES STARTING
APPROXIMATELY 100' FROM NORTH PORTAL; NOTE ALSO MISSING
REFLECTORS ALONG CENTER LINE
PHOTO #5 - DISPLACED REFLECTOR AT EAST
WALL NEAR NORTH PORTAL
PHOTO #6 - CRACKING WITH
EFFLORESCENCE ON WEST LINING AT NORTH
PORTAL
PHOTO #7 - TYPICAL EFFLORESCENCE ON
RING STONES, EAST SIDE OF NORTH PORTAL
SHOWN
PHOTO #8 - SPALLING WITH EXPOSED REBAR
ON EAST LINING APPROXIMATELY 79' FROM
NORTH PORTAL
PHOTO #9 - DIAGONAL CRACKING WITH
EFFLORESCENCE ON EAST LINING
APPROXIMATELY 100' FROM FROM NORTH
PORTAL
PHOTO #10 - CRACKING WITH
EFFLORESCENCE, WATER STAINING AND
ACTIVE WATER LEAKAGE ON EAST DRAIN
CHASE APPROXIMATELY 165' FROM NORTH
PORTAL
PHOTO #11 - SPALLING WITH EXPOSED REBAR ON CROWN
APPROXIMATELY 189' FROM NORTH PORTAL
PHOTO #12 - SPALLING WITH EXPOSED REBAR ON CROWN
APPROXIMATELY 202' FROM NORTH PORTAL
PHOTO #13 - SPALLING WITH EXPOSED
REBAR ON EAST LINING APPROXIMATELY 210'
FROM NORTH PORTAL; NOTE
EFFLORESCENCE
PHOTO #14 - SPALLING WITH EXPOSED
REBAR ON CROWN APPROXIMATELY 237'
FROM NORTH PORTAL
PHOTO #15 - GENERAL VIEW OF WEST DRAIN
CHASES APPROXIMATELY 275' FROM NORTH
PORTAL; NOTE PATCHING
PHOTO #16 - SPALLING WITH EXPOSED
REBAR ON WEST LINING APPROXIMATELY 282'
FROM NORTH PORTAL
PHOTO #17 - CRACKING WITH EFFLORESCENCE ON WEST LINING AT
SOUTH END
PHOTO #18 - CLOGGED INLET AT SOUTHWEST END; NOTE ALSO
TYPICAL DETERIORATION OF ROADWAY STRIPING