Bridge_Inspection_Rpt_STR_5140-123P.pdf

PDF 2 MB Posted

Attached to
Blue Ridge Parkway Pavement Preservation Federal contract opportunity
Solicitation number
693C73-18-R-000004
Issued by
Department of Transportation Federal Highway Administration

About this file

Bridge Inspection Report_STR_5140-123P

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway Pavement Preservation, newest first.
File Type Posted
69C37018R000004_Amendment_000001.pdf PDF
Bridge_Inspection_Rpt_STR_5140-157P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-146P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-156P.pdf PDF
NEPA_document_CE.pdf PDF
Bridge_Inspection_Rpt_STR_5140-186P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-117P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-116P.pdf PDF
Plans_Adv.pdf PDF
VETS-4212.pdf PDF
Bridge_Inspection_Rpt_STR_5140-194P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-149P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-118P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-124P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-143P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-139P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-120P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-185P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-147P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-155P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-141P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-122P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-129P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-119P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-144P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-173P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-126P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-150P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-158P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-148P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-193P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-140P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-142P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-151P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-127P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-153P.pdf PDF
RFP_Solicitation_NP-BLRI_PVT_PRES_FY17.pdf PDF
Bridge_Inspection_Rpt_STR_5140-145P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-125P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-121P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-131P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-203P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-197P.pdf PDF
Synopsis_-_BLRI_PVT_PRES_FY17.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

DINGLE CREEK BRIDGE

BLUE RIDGE PARKWAY OVER DINGLE CREEK

BLUE RIDGE PARKWAY

LS

STRUCTURE NO. 5140-123P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 6/11/15

Report prepared by: WD

MILE POINT: 390.94

Federal Highway Administration KILOMETER POINT: 628.96 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 5140-123P

DINGLE CREEK BRIDGE INSPECTION DATE: 6/11/15

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 75.0 FT (22.9 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 37.5 FT (11.4 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 36.7 FT (11.2 M) ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 33.2 FT (10.1 M)

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 2R2 / 41938 SKEW ANGLE: ..................... 29 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1985-JOINT REPAIR.

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 390.94 (KM PT 628.96)

STATE: ................................. NORTH CAROLINA LOCATION: 2.0 MILES TO U.S. ROUTE 25

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. DINGLE CREEK

STRUCTURE EVALUATION SUMMARY

This concrete slab bridge is in good condition. Problems include exposed rebar due to insufficient cover on the north face, west side of the pier cap, a fallen tree in the upstream channel, and two spalled concrete rail posts with exposed rebar on the east rail.

Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: C. CASTRO, R. SILVESTRY

CONDITION ASSESSMENT:

CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546

REPORT REVIEW:

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 12/31/15

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-123P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

60.15 CLEAN AND SEAL EXPOSED REBAR WITH APPROVED PROTECTIVE COATING. 1 LS $1,000 $1,000

61.4 REMOVE FALLEN TREE FROM UPSTREAM SIDE OF STRUCTURE. 1 LS $1,000 $1,000

58.6 REPAIR SPALLS WITH EXPOSED REBAR ON CONCRETE RAIL POSTS OF EAST

RAIL.

2 EA $500 $1,000

PRELIM. MAINTENANCE TOTAL : $3,000

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ...

TOTAL ITEMIZED COSTS:

$0 $0 $3,000

$3,000

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

$3,000

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-123P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N NOT APPLICABLE 3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

9 EXCELLENT CONDITION Fatigue cracks in steel or shear cracks in concrete may be present.

8 VERY GOOD CONDITION - no problems noted. 2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present

7 GOOD CONDITION - some minor problems. or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

6 SATISFACTORY CONDITION - structural elements show some minor deterioration. 1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal 5 FAIR CONDITION - all primary structural elements are sound but may have movement affecting structure stability. Structure is closed to traffic but minor section loss, cracking, spalling, or scour. corrective action may return structure to light service.

4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour. 0 FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 7 ITEM REFERENCE AND REMARKS

G1. DECK SLAB

G2. EXPANSION JOINTS

G3. WEARING SURFACE

G4. RIDEABILITY

N5. CURBS, SIDEWALKS, AND MEDIAN

G6. PARAPETS AND/OR RAILINGS

G7. DRAINS AND DRAINAGE

N8. UTILITIES

G9. DEFLECTION AND/OR VIBRATION

N10. OTHER

59. SUPERSTRUCTURE 7

N

2. GIRDERS OR BEAMS

1. BEARING DEVICES

N

G3. ARCH(ES) OR SLAB(S)

N4. FLOOR BEAMS AND STRINGERS

N5. TRUSSES

N6. DIAPHRAGMS AND BRACING

N7. PAINT

N8. FASCIA(E)

G9. DEFLECTION AND/OR VIBRATION

G10. ALIGNMENT

N11. OTHER

60. SUBSTRUCTURE 7

58.1, 59.3 MINOR CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE.

DECK UNDERSIDE HAS ISOLATED REBAR CHAIRS EXPOSED AND

MINOR STAINING OF SLAB EDGES.

58.2 EXPANSION JOINTS HAVE BEEN PAVED OVER; TRANSVERSE CRACK

IN PAVEMENT OVER JOINTS.

58.6 4TH AND LAST CONCRETE RAIL POSTS FROM NORTH ABUTMENT

ON EAST SIDE HAS EXPOSED REBAR ON SOUTH FACE (1'-0" LONG).

58.7 EVIDENCE OF MINOR PONDING AT SOUTHEAST CORNER OF

BRIDGE. MINOR ACCUMULATION OF DEBRIS AND MOSS ALONG

EAST EDGE OF DECK.

60.1,6,13 MINOR DETERIORATION OF MORTAR JOINTS WITH MINOR

EFFLORESCENCE ON BREASTWALLS AND WINGWALLS. MINOR TO

MODERATE VINE GROWTH AND MOSS ON WINGWALLS.

GRAFFITI HAS BEEN PLACED ON ABUTMENT BREASTWALLS AND

COLUMNS OF PIER.

60.15 CENTER PIER HAS EXPOSED REBAR (1'-0" LONG) DUE TO

INSUFFICIENT COVER ON NORTH FACE AT WEST SIDE. BOTH

FACES HAVE SOME MINOR EXPOSURE OF FORM SUPPORT STEEL.

60.19 TREE AND VINES ON WEST SIDE AT CENTER PIER HAVE BEEN

REMOVED.

ABUTMENTS

BREASTWALLS OR COLUMNS1. F

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. G

BACKWALLS AND/OR BULKHEADS 4. N

FOUNDATIONS 5. N

WINGWALLS 6. G

WEEP HOLES7. G

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR9. G

SETTLEMENT OR DEFLECTION10. G

SLOPE PROTECTION11. N

OTHER 12. N

PIER(S)

WALLS AND/OR COLUMNS 13. G

PILE BENTS 14. N

CAPS AND/OR BEARING SEATS 15. G

FOUNDATIONS 16. N

EROSION AND/OR SCOUR17. G

SETTLEMENT OR DEFLECTION18. G

OTHER 19. (VEGETATION) G

FIELD INSPECTION REPORT STRUCTURE NO. 5140-123P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL 7

G G G F N

MED

SUFF

20 FT.

ROCK, SILT

222. APPROACHES 7

OTHER 9.

ALIGNMENT8.

SIGNS 7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS2.

1. APPROACH SLABS N

N F G G G N G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 1

61.4 FALLEN TREE IN UPSTREAM CHANNEL.

222.3 MINOR CHECKING OF TIMBER APPROACH RAILS; MINOR

CORROSION ON BOLTS AND STEEL BACKING PLATES. ROTATED

TIMBER BLOCKS AT NORTH APPROACH RAILING, WEST SIDE; AND

AT SOUTH APPROACH, EAST SIDE.

222.6 DROPOFF OF SHOULDER OF NORTHBOUND LANE ON NORTH

APPROACH HAS BEEN REPAIRED SINCE PREVIOUS INSPECTION.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-123P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 21 19 36 32

TYPE 3 19 17 32 29

TYPE 3S2 29 26 48 44

TYPE 3-3 36 33 61 55

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-123P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)

(202) STRUCTURE NAME: .......... DINGLE CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 021 - BUNCOMBE

(204) STRUCTURE NUMBER: ..... 5140-123P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... DINGLE CREEK

(207) ROAD SECTION NO: .......... 123P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140123P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 2.0 MILES TO U.S. ROUTE 2

(210) OPERATING UNIT: ............. GILLESPE (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 2R2 (11) MILE POINT: ............................. 390.94 (KM PT 628.96)

(212) DRAWING NUMBERS: ....... 41938 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

01 - SLAB

37.5 FT (11.4 M)

75.0 FT (22.9 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 21.3 TONS (19.3 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 35.6 TONS (32.3 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-123P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(51) CURB TO CURB WIDTH: ........... 33.2 FT (10.1 M) (16) LATITUDE: ............................. 35°30'27.10"

(17) LONGITUDE: ......................... 82°33'35.20"

(19) DETOUR LENGTH: ............... 5 MI (8 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 02

(42A) SERVICE ON: ..................... 1 - HIGHWAY

(42B) SERVICE UNDER: .............. 6 - HIGHWAY-WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1111

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

36.7 FT (11.2 M)

38.0 FT (11.6 M)

22.0 FT (6.7 M)

8.0 FT (2.4 M)

8.0 FT (2.4 M)

0 - NO MEDIAN

29 °

NO

33.2 FT (10.1 M)

0.0 FT (0.0 M)

0.0 FT (0.0 M)

1 - FULL HEIGHT (NO PARAPE

8 - TIMBER/OTHER

3 - SIMPLE RAIL (joints at each

2.25 FT (0.69 M)

99.99 FT (99.99 M)

13.92 FT (4.24 M)

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

8 - Stable; scour above top of fo

1 - MAINTENANCE

D - MINOR

$3,000

$0

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1985-JOINT REPAIR.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 5140-123P

PHOTOGRAPHS STRUCTURE NO. 5140-123P

PHOTO #1 - LOOKING NORTH TOWARD ASHEVILLE

FLOW

PHOTO #2 - EAST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW

LOOKING SOUTH

PHOTO #4 - TRANSVERSE CRACKING OF

WEARING SURFACE AT NORTH END, TYPICAL

PHOTO #5 - SPLITTING OF 2ND RAIL POST

FROM NORTH OF EAST RAILING

PHOTO #6 - TYPICAL CHECKING OF TIMBER

RAILS, WEST RAIL NEAR NORTH END SHOWN

PHOTO #7 - EXPOSED REBAR ON SOUTH SIDE OF EAST RAILING 4TH

POST

PHOTO #8 - EXPOSED REBAR ON LAST SOUTH POST OF EAST RAILING

PHOTO #9 - TYPICAL RAIL END, SOUTHWEST RAIL SHOWN

PHOTO #10 - CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE,

NORTH SPAN SHOWN

PHOTO #11 - EXPOSED REBAR CHAIRS AT WEST SIDE OF SOUTH SPAN

PHOTO #12 - EXPOSED REBAR CHAIRS AT NORTH SPAN NEAR PIER

PHOTO #13 - GENERAL VIEW OF NORTH ABUTMENT

PHOTO #14 - EFFLORESCENCE ON MORTAR JOINTS AT WEST SIDE OF

NORTH ABUTMENT

PHOTO #15 - GENERAL VIEW OF SOUTH ABUTMENT

PHOTO #16 - GENERAL VIEW OF PIER

PHOTO #17 - EXPOSED REBAR AT NORTH FACE OF PIER, NEAR WEST

END

PHOTO #18 - UPSTREAM CHANNEL

PHOTO #19 - LOOKING DOWNSTREAM FROM STRUCTURE

PHOTO #20 - LOOKING UPSTREAM FROM STRUCTURE