657-23-113JB - Construction Drawings - 3 of 14 - HA.pdf

PDF 4 MB Posted

Attached to
Z1DA--Create Code Compliant Research Laboratory Space in Building 1, 657-23-113JB Federal contract opportunity
Solicitation number
36C25524R0053
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document is a set of construction drawings and related materials for a federal contract opportunity to create code compliant research laboratory space in Building 1 at the Saint Louis VA Health Care System, project number 657-23-113JB.

The key details include:

  • The project involves renovating existing spaces on multiple floors to create a code compliant research laboratory. Work includes demolition, construction of new walls and finishes, HVAC, plumbing, and electrical system upgrades.
  • Specific requirements are outlined for fire-rated construction, hazardous materials abatement, and infection control procedures (ICRA) for the construction area. Detailed plans, specifications, and general notes are provided.
  • The contract will be awarded by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15. No additional details on the procurement vehicle, response dates, or pricing terms are provided in this document.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Create Code Compliant Research Laboratory Space in Building 1, 657-23-113JB, newest first.
File Type Posted
S02-657-23-113JB - Create Code Compliant Research Laboratory Space Prebid Questions 20240422.pdf PDF
Pre-Bid Conference Sign-in Sheet 657-23-113 --- Scan04-09-2024-102719.pdf PDF
S02-3- As Built from-657-10-104JB_1C-A1.pdf PDF
36C25524R0053 0001.docx DOCX document
657-23-113JB - Construction Drawings - 14 of 14 - TT.pdf PDF
657-23-113JB - Construction Drawings - 12 of 14 - EP.pdf PDF
657-23-113JB - Construction Drawings - 9 of 14 - MG.pdf PDF
657-23-113JB - Construction Drawings - 8 of 14 - FP.pdf PDF
657-23-113JB - Construction Drawings - 1 of 14 - GI.pdf PDF
657-23-113JB - Construction Drawings - 11 of 14 - EG.pdf PDF
657-23-113JB - Construction Drawings - 2 of 14 - GJ.pdf PDF
657-23-113JB Specifications - Reduced File Size.pdf PDF
657-23-113JB - Construction Drawings - 13 of 14 - TG.pdf PDF
657-23-113JB - Construction Drawings - 7 of 14 - PM.pdf PDF
657-23-113JB - Construction Drawings - 6 of 14 - PL.pdf PDF
657-23-113JB - Construction Drawings - 5 of 14 - PG.pdf PDF
657-23-113JB - Construction Drawings - 4 of 14 - AE.pdf PDF
36C25524R0053_1.docx DOCX document
657-23-113JB - Construction Drawings - 10 of 14 - MH.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAB

3C17OFFICE

3C18

VACANT

3C21

MECHANICAL

3C23

HSPK

3C20

PROSTHETICS

3C26

CORRIDOR

H305

CORRIDOR

H304

OFFICE

2C14

OFFICE

2C13

OFFICE

2C12

EXAM

2C15

EXAM

C105

SHARED ROOM

C106A

OFFICE

C106

WAITING ROOM

H115A

LAB

2C19

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC.

01-18-2024

CONSTRUCTION DOCUMENTS

FCA - Create Code Compliant Research Laboratory Space in Building 1

657-23-113JB

Saint Louis VA Health Care System 1 Jefferson Barracks

Saint Louis, MO 63125

DEH DAE 44

100% SPRINKLERED

A-2

A-2

A-2 A-2

A-2

L-2

A-2

A-2

A-2

L-1L-1

A-1 A-2

L-1

L-1

A-1

L-1

A-3

A-2

L-2L-2 L-1

L-2L-1

A-2

A-2

AREA OF WORK

AREA OF WORK

AREA OF WORK AREA OF WORK AREA OF WORK

1-HA-001

HAZARDOUS MATERIALS PLANS

1.1.THE ABATEMENT CONTRACTOR (REFERRED TO "CONTRACTOR" ON THIS SHEET) SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS IN ORDER TO BE FAMILIAR W/ COORDINATION OF WORK

REQUIRED IN THIS DOCUMENT PACKAGE AND EXISTING CONDITIONS.

1. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.

2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE

WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.

3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE OWNER. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH MINIMUM INTERRUPTION. SCHEDULE ALL

ELECTRICAL/MECHANICAL OUTAGES 21 DAYS IN ADVANCE WITH THE OWNER.

4. PROTECT ALL WORK, MATERIALS AND EQUIPMENT. CAP OR PLUG TEMPORARY OPENINGS. DELIVER ALL WORK TO

THE OWNER CLEAN AND IN GOOD CONDITION.

5. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS SHALL BE KEPT CLEAR OF DEBRIS.

CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED BY NEW WORK SHALL BE INCLUDED AS

WORK PROVIDED UNDER THIS CONTRACT.

6. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING EQUIPMENT, CONNECTIONS, CONTROLS, ETC.

DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY CONTRACTOR

AT NO COST TO THE OWNER.

7. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.

8. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED AS BASIS OF DESIGN.

9. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.

10. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE

AND SATISFACTORY INSTALLATION.

11. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND WALLS SHALL BE PATCHED WITH LIKE

MATERIALS TO MATCH THE SURROUNDING SURFACES.

12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK

UNDER THIS CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION.

13. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT RATED CONSTRUCTION.

14.A FIRE STOP ALL PENETRATIONS WHERE NEW DEVICES/LINES RELOCATING EXISTING DEVICES/LINES

PENETRATING FLOORS, CEILINGS AND OTHER RATED BARRIERS.

14.B FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE EXISTING DEVICES/LINES PENETRATE

FLOOR, CEILINGS AND OTHER RATED BARRIERS.

14. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.

15. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD OR AS INDICATED ON DRAWINGS.

16. PROVIDE 16 GA. METAL BACKING PLATES, UNLESS OTHERWISE SHOWN, IN ALL WALLS TO RECEIVE EQUIPMENT, SHELVING AND ACCESSORIES, DOOR STOPS AND OTHER ITEMS REQUIRING REINFORCEMENT. NO WOOD BLOCKING IS

TO BE USED.

17. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES, CONVENIENCE OUTLETS, DOOR STOPS AND OTHER FINISH HARDWARE, ETC., SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF EXISTING

WALLS INDICATED TO REMAIN.

18. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE OWNER. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:

19.A OWNER'S EQUIPMENT REQUIREMENTS.

19.B CEILING SUPPORT SYSTEM.

19.C MECHANICAL DUCTWORK SYSTEM

19.D LIGHTING FIXTURES, ELECTRICAL WIRING AND CONDUIT SYSTEMS

19.E PLUMBING AND PIPING SYSTEMS.

19.F COMMUNICATIONS SYSTEMS.

19. OPTAIN PERMIT FOR AND CONSTRUCT FIRE-RESISTANT ANTE CHAMBER WITH DOOR AND APPOVED HARDWARE TO SEAL OFF CONSTRUCTION AREA FROM CORRIDOR. SEAL ANTE CHAMBER TO EXISTING CONSTRUCTION. PROVIDE WALK-OFF MATS OUTSIDE CORRIDOR AND ROOM SIDES OF CHAMBER. ANTE CHAMBER TO COMPLY WITH REQ'TS.

FOR ICRA LEVEL 4 PROTECTION - REVIEW & COORDINATE PERMIT & CONTSTRUCTION REQ'TS W/ COR AND STATION'S

INFECTION CONTROL OFFICER.

21 AT THE COMPLETION OF DEMOLITION THE CONTRACTOR SHALL HAVE A SITE MEETING WITH THE VA TO REVIEW

ASBUILT CONDITIONS OF THE EXISTING STRUCTURE.

22. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN QUESTION CONTRACTOR SHALL NOTIFY

THE VA IMMEDIATELY.

23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING, STORING, PROTECTING AND REINSTALLATION OF ALL OF THE VA'S EQUIPMENT AND FURNITURE, TO INCLUDE BOTH WALL MOUNTED ITEMS AND MOVABLE ITEMS FOR THE DURATION OF THE PROJECT. THIS COORDINATION OF OWNER'S (VA) ITEMS IS REQUIRED FOR ALL PHASES OF CONSTRUCTION. FURNITURE AND EQUIPMENT DAMAGED BY THE CONTRACTOR WILL BE REPLACED OR RESTORED TO

COMPLETE FUNCTIONALITY AND APPEARANCE BY THE CONTRACTOR AT NO COST TO THE VA.

24. CONTRACTOR TO USE BASEMENT DOCK EXTERIOR ENTRANCE FOR REMOVAL AND NEW MATERIAL DELIVERY.

CONTRACTOR TO PROVIDE NECESSARY EQUIPMENT TO PROTECT EXISTING FINISHES.

25. WORK THAT REQUIRES ACCESS TO SPACES OUTSIDE DESIGNATED AREA OF WORK SHALL BE COORDINATED WITH THE VA COR. WORK IN THOSE AREAS SHALL TAKE PLACE OUTSIDE REGULAR BUSINESS HOURS AND THE AREAS SHALL BE

CLEANED AND RETURNED TO SERVICE AT THE END OF EACH SHIFT.

26. UPON COMPLETION OF THE PROJECT. ALL AREAS AVAILABLE FOR CONSTRUCTION MATERIALS, VEHICLES, AND TRASH

RECEPTICLES MUST BE RETURNED TO THEIR ORIGINAL CONDITION.

GENERAL NOTES

1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL PENETRATIONS. CONSTRUCTION TO CONFORM TO

MANUFACTURER'S FIRE RATED/TEST ASSEMBLIES.

2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS/PARTITIONS AND FLOORS. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL WITH U.L. DESIGN

NUMBER AND ASTM. FIRE RATED WALLS SHOWN ON PLAN.

3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION.

4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-LABEL EXISTING WALL IF NECESSARY.

5. MAINTAIN 2-HR FIRE RATED FLOOR AT PENETRATIONS, EXISTING FLOOR SLAB, AND 2-HR DECK WITH

FIREPROOFING. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY.

FIRE PROOFING - FIRE STOPPING GENERAL NOTES

ASBESTOS AND LEAD BASED PAINT

1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING MATERIALS (ACM) PRIOR TO ANY DEMOLITION.

2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF ASBESTOS AND LEAD BASED PAINT REPORTS. REFER

TO DIVISION 2 IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD BASED PAINT ENCAPSULATION OR

REMOVAL SPECIFICATIONS.

3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS OBTAINED FROM THE COR FOR DETAILED INFORMATION AND LOCATIONS. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS CONTAINING (ACMs) ARE TO BE PROVIDE WITH APPROPRIATE OSHA ASBESTOS TRAINING PRIOR

TO START OF WORK.

4. REFER TO DEMOLITION SHEETS IN THESE DRAWINGS. ABATEMENT AND LBP REMOVAL ACTIVITIES SHALL BE CONDUCTED IN GENERAL ACCORDANCE WITH THE PROJECTS CONSTRUCTION STRATEGY. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA OF FACILITY IN QUESTION. REFER TO ABATEMENT SPECIFICATIONS FOR HANDLING OF MATERIALS THAT WERE NOT

DIRECTLY OBSERVED, BUT SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR.

5. ALL WORK IN CORRIDORS HAVE TO BE REMOVED BEFORE 6:00AM EACH MORNING.

1. DOOR COVERING TO MEET/EXCEED JEFFERSON BARRACKS ICRA STANDARDS. VERIFY WITH COR.

2. DOOR WITH WALKOFF MAT.

3. CONSTRUCTION BARRIER LIMITS.

PLAN NOTES (IN ADDITON TO OTHER NOTES ON THIS SHEET)

LEGEND:

NEGATIVE AIR PRESSURE ENCLOSURE

THREE-STAGE DECON AND TWO-STAGE LOADOUT IN ACCORDANCE

WITH THE SPECIFICATIONS

NEGATIVE AIR MACHINE WITH THREE-STAGE HEPA FILTERATION SYSTEM

IN ACCORDANCE WITH THE SPECIFICATIONS AND SUGGESTED DUCTING DIRECTION

ICRA BARRIER

CONSTRUCTION BARRIER ENCLOSURE

AutoCAD SHX Text

%%UFLOOR 01 PLAN

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

%%ULAB 2C19 PLAN

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

%%UFLOOR 02 PLAN

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text

%%UFLOOR 03 PLAN

AutoCAD SHX Text

SCALE: 1/4" = 1'-0"

AutoCAD SHX Text N

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text 062-073724

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

4" RUBBER COVE

WITH 16 GA. METAL

STUDS AT 16" O.C.

BOARD EACH SIDE.

WITH 5/8" GYPSUM

AS SCHEDULED

ACOUSTICAL CEILING

2' X 4' SUSPENDED

WALL CONST. TYPES (DETAILS)

TYPE A

BASE @ BOTH SIDES

4" RUBBER COVE

3 5/8" 16 GA. METAL

STUDS AT 16" O.C.

BOARD EACH SIDE.

WITH 5/8" GYPSUM

W A

LL

H

EI

G H T

V

ER

IE

S

TYPE B

C

EI

LI

N G

H

EI

G H T

'-0

ON FLOOR PLAN.

FI

EL

D V

ER

IF

Y

C

EI

LI

N G

H

EI

G H T

'-0

4 7/8"4 7/8"

W A

LL

H

EI

G H T

V

ER

IE

S

FI

EL

D V

ER

IF

Y

TO MATCH EXISTING AREA TO MATCH EXISTING AREA

ROOF METAL DECKING

BASE @ BOTH SIDES

AS SCHEDULED

ACOUSTICAL CEILING

2' X 4' SUSPENDED

ON FLOOR PLAN.

3 5/8" INSULATED WALL

WALL TO EXTEND TO

ROOF METAL DECKING

OFFICE AREAS CARDIOLOGY CCU ANY AREA CARING FOR

ECHOCARDIOGRAPHY

ENDOSCOPY

NUCLEAR MEDICINE

PHYSICAL THERAPY

RADIOLOGY/MRI

RESPIRATORY THERAPY

EMERGENCY ROOM

LABOR & DELIVERY

LABORATORY (SPECIMEN)

NEWBORN NURSERY

OUTPATIENT SURGERY

PEDIATRICS

IMMUNOCOMPROMISED PATIENTS

BURN UNIT

CARDIAC CATH LAB

CENTRAL STERILE SUPPLY

INTENSIVE CARE UNITS

MEDICAL UNIT

PHARMACY

POST ANESTHESIA CARE UNIT

SURGICAL UNITS

NEGATIVE PRESSURE ISOLATION ROOMS

ONCOLOGY

OPERATING ROOMS INCLUDING

C-SECTION ROOMS

INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK

LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS IF INDICATED.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.

8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL

SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

6. WET MOP AREA WITH DISINFECTANT.

SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.

SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.

TYPE B

TYPE A

CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART

CLASS IV

TYPE IV ICRA CONSTRUCTION DETAILS

TYPICAL IDEAL CONSTRUCTION LAYOUT CLASS IV

ILSMICRA

MANOMETER

READING FORM

PROJECT

CONTACT

SHEET

POSTED ON THE CONTAINMENT DOOR IN CLEAR

PLASTIC SLEEVES

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC.

01-18-2024

CONSTRUCTION DOCUMENTS

FCA - Create Code Compliant Research Laboratory Space in Building 1

657-23-113JB

Saint Louis VA Health Care System 1 Jefferson Barracks

Saint Louis, MO 63125

DEH DAE 44

100% SPRINKLERED

1-HA-002

TYPE IV ICRA CONSTRUCTION DETAILS

AutoCAD SHX Text

%%UGENERAL NOTES:

AutoCAD SHX Text

2. ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.

AutoCAD SHX Text

3. PERMITS TO INCLUDE:

AutoCAD SHX Text

ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES,

AutoCAD SHX Text

UTILITY SHUT-DOWN, FIRE/SMOKE WALL, FIRE ALARM SYSTEM.

AutoCAD SHX Text

4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION.

AutoCAD SHX Text NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS.

AutoCAD SHX Text

1. ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT

AutoCAD SHX Text

AND SAFETY GLASSES ALONG WITH ANY OTHER PPE REQUIRED IN THAT AREA.

AutoCAD SHX Text

CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.

AutoCAD SHX Text

(WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY.

AutoCAD SHX Text

NEGATIVE PRESSURE MACHINES MUST BE ON AND OPERATIONAL 24/7.

AutoCAD SHX Text

MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.

AutoCAD SHX Text

5. CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMITY.

AutoCAD SHX Text

6. DURING CONSTRUCTION BE CERTAIN THAT:

AutoCAD SHX Text

BARRIERS ARE INTACT AND MAINTAINED.

AutoCAD SHX Text

PARTICAL COUNT METER IS AVAILABLE.

AutoCAD SHX Text

NEGATIVE INDICATOR IS AVAILABLE.

AutoCAD SHX Text

ICRA REQUIREMENTS ARE INTACT AND

AutoCAD SHX Text

VERIFY ARE BEING MAINTAINED.

AutoCAD SHX Text

LOW RISK

AutoCAD SHX Text

PATIENT RISK GROUPS

AutoCAD SHX Text

MEDIUM RISK

AutoCAD SHX Text

HIGH RISK

AutoCAD SHX Text

HIGHEST RISK

AutoCAD SHX Text

LOW RISK GROUP

AutoCAD SHX Text

CONSTRUCTION PROJECT TYPE

AutoCAD SHX Text

MEDIUM RISK GROUP

AutoCAD SHX Text

HIGH RISK GROUP

AutoCAD SHX Text

HIGHEST RISK GROUP

AutoCAD SHX Text

RISK RELATED GROUP

AutoCAD SHX Text

TYPE A

AutoCAD SHX Text

TYPE B

AutoCAD SHX Text

TYPE C

AutoCAD SHX Text

TYPE D

AutoCAD SHX Text I

AutoCAD SHX Text

II

AutoCAD SHX Text

II

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

II

AutoCAD SHX Text

II

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

III

AutoCAD SHX Text

III/IV

AutoCAD SHX Text

IV

AutoCAD SHX Text

IV

AutoCAD SHX Text

IV

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text

II

AutoCAD SHX Text

CONSTRUCTION PROJECT BY PATIENT RISK

AutoCAD SHX Text

IC MATRIX - CLASS OF PRECAUTIONS:

AutoCAD SHX Text

%%UNOTE:

AutoCAD SHX Text

TYPE A

AutoCAD SHX Text

TYPE B

AutoCAD SHX Text

TYPE C

AutoCAD SHX Text

TYPE D

AutoCAD SHX Text

MATRIX OF PRECAUTIONS FOR

AutoCAD SHX Text

CONSTRUCTION & RENOVATION

AutoCAD SHX Text

NFECTION

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text

ONTROL

AutoCAD SHX Text

ISK

AutoCAD SHX Text

SSESSMENT

AutoCAD SHX Text (I

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text A)

AutoCAD SHX Text

CLASS 1V

AutoCAD SHX Text

%%UPRIOR TO ANY CONSTRUCTION

AutoCAD SHX Text

%%UPOST CONSTRUCTION

AutoCAD SHX Text

TEMP. ANTE ROOM

AutoCAD SHX Text

HARD BARRIER

AutoCAD SHX Text

EITHER KEEP RUNNING

AutoCAD SHX Text

COVER ALL RETURNS

AutoCAD SHX Text

HEPA NEGATIVE AIR UNIT

AutoCAD SHX Text

TAPE ALL SERVICES

AutoCAD SHX Text

ABC TYPE FIRE EXTINGUISHER ON

AutoCAD SHX Text

FIRE RATED PLYWOOD

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text V

AutoCAD SHX Text

WEEKLY CHANGED

AutoCAD SHX Text

(OR MORE AS NEEDED)

AutoCAD SHX Text

MONTHLY CHANGED

AutoCAD SHX Text

HEPA FILTER

AutoCAD SHX Text

PRE-FILTER

AutoCAD SHX Text

SUPPLY DUCTS

AutoCAD SHX Text

OR COVER WITH FIRE

AutoCAD SHX Text

AT THE GRATE/DIFFUSERS

AutoCAD SHX Text

TO PROTECT AGAINST

AutoCAD SHX Text

PORTABLE FLOOR BRACKET

AutoCAD SHX Text

CONTAMINATION

AutoCAD SHX Text

(REFER TO ELEVATION)

AutoCAD SHX Text

FLEX DUCT

AutoCAD SHX Text

EXISTING WINDOW FRAME

AutoCAD SHX Text

FIRE RATED PLYWOOD

AutoCAD SHX Text

(TEMP. REMOVE

AutoCAD SHX Text

HEPA NEGATIVE AIR UNIT

AutoCAD SHX Text

EXISTING FIRE

AutoCAD SHX Text

SPRINKLER SYSTEM

AutoCAD SHX Text

EXISTING CONCRETE SLAB FLOORING

AutoCAD SHX Text

FIRE/U.L. RATED PLASTIC

AutoCAD SHX Text

TO PREVENT DUST

AutoCAD SHX Text

GLASS PANEL)

AutoCAD SHX Text E

AutoCAD SHX Text

OPTIONAL EXHAUST DUCTS

AutoCAD SHX Text

(COVER THE GRATES

AutoCAD SHX Text

AND THE DIFFUSERS)

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

EXISTING WALL

AutoCAD SHX Text

INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE

AutoCAD SHX Text

(VERIFY DAILY), IF NOT VERIFY ALL OPENING

AutoCAD SHX Text

SUCH AS DOORS ARE CLOSED AND/OR CHANGE

AutoCAD SHX Text

OUT NEGATIVE AIR PRE-FILTER.

AutoCAD SHX Text

(LOCKED AT ALL TIMES)

AutoCAD SHX Text

BLUE CORE LOCKSET

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text

OUTSIDE OF BUILDING

AutoCAD SHX Text

ELEVATION

AutoCAD SHX Text

AutoCAD SHX Text

FINISHED FLOORING TO BE KEPT CLEAN.

AutoCAD SHX Text

FLOORS NOT BEING REPLACED TO BE

AutoCAD SHX Text

WITH FIRE RATED PLASTIC

AutoCAD SHX Text

SHEETING AND SECURE

AutoCAD SHX Text

WITH DUCT TAPE.

AutoCAD SHX Text

RATED PLASTIC SHEETING

AutoCAD SHX Text

AND SECURE WITH DUCT

AutoCAD SHX Text

TAPE TO KEEP DUST OUT.

AutoCAD SHX Text

(ILSM MAY REQUIRE MORE

AutoCAD SHX Text

THAN ONE OR WALL MOUNTED).

AutoCAD SHX Text

PROVIDE STICKY MATS

AutoCAD SHX Text

(CHANGED END OF SHIFT

AutoCAD SHX Text

OR MORE IF NECESSARY

AutoCAD SHX Text

TO MAINTAIN CLEANLINESS).

AutoCAD SHX Text

(TYPICAL REGULATOR INSTALLATION).

AutoCAD SHX Text

PRIOR TO CONSTRUCTION).

AutoCAD SHX Text

FLEX DUCT

AutoCAD SHX Text

CART WITH CANVAS/

AutoCAD SHX Text

1-1/4" SQUARE

AutoCAD SHX Text

TUBE FRAME AND

AutoCAD SHX Text

ZIPPER SIDE ENTRY

AutoCAD SHX Text

PLASTIC WINDOW

AutoCAD SHX Text

HEPA NEGATIVE AIR UNIT

AutoCAD SHX Text

MOBILE CONTAINMENT

AutoCAD SHX Text

FLEX DUCT

AutoCAD SHX Text

NEED INSPECTION TAG AND

AutoCAD SHX Text

MONTHLY INSPECTION).

AutoCAD SHX Text

(INITIALS/DATED).

AutoCAD SHX Text

INFILTRATION (INSTALL

AutoCAD SHX Text

(REFER TO

AutoCAD SHX Text

ELEV. DETAIL)

AutoCAD SHX Text

SCALE: 1/2"=1'-0"

AutoCAD SHX Text

SCALE: 1/2"=1'-0"

AutoCAD SHX Text

SCALE: 1/2"=1'-0"

AutoCAD SHX Text

PROTECTED OR COVERED WITH ROSEN

AutoCAD SHX Text

PAPER/FIRE RATED PLYWOOD.

AutoCAD SHX Text

THE REQUIRED INFECTION CONTROL RISK ASSESSMENT FORMS

AutoCAD SHX Text

MUST BE COMPLETED AND POSTED IN THE PROPER AREA.

AutoCAD SHX Text

%%UINTERIM LIFE SAFETY MEASURES:

AutoCAD SHX Text

%%UINFECTION CONTROL RISK ASSESSMENT:

AutoCAD SHX Text

THE REQUIRED INTERIM LIFE SAFETY MEASURES FORMS

AutoCAD SHX Text

MUST BE COMPLETED AND POSTED IN THE PROPER AREA.

AutoCAD SHX Text

DAILY FIRE WATCH INSPECTIONS MUST BE PROVIDED DAILY BY THE

AutoCAD SHX Text

PROJECT ENGINEER OR PERSON(S) ASSIGNED BY THE PROJECT

AutoCAD SHX Text

ENGINEER. THIS MUST BE LOGGED IN WITH DOCUMENTATION.

AutoCAD SHX Text

PICRA:

AutoCAD SHX Text

%%UUTILITIES SHUT-DOWNS:

AutoCAD SHX Text

THE AREA. PROJECT ENGINEER TO HAVE DOCUMENTED PROOF OF

AutoCAD SHX Text

THE PROJECT ENGINEER SHALL NOTIFY THE PROPER SHOP

AutoCAD SHX Text

PERSONNEL AND STAFF MEMBERS WITH A MIN. OF 21 DAYS

AutoCAD SHX Text

IN ADVANCE FOR ANY UTILITIES SHUT-DOWN(S) THAT WILL EFFECT

AutoCAD SHX Text

ICRA

AutoCAD SHX Text

ILSM

AutoCAD SHX Text

REQUIREMENT. (NOT APPLICABLE ON SOME PROJECTS).

AutoCAD SHX Text

TO BE PROVIDED WHEN APPLICABLE WITH PROJECT

AutoCAD SHX Text

THIS ACTION.

AutoCAD SHX Text

LOGGED IN WITH DOCUMENTATION.

AutoCAD SHX Text

INTERIM LIFE SAFETY MEASURES FORM WILL BE SIGNED BY

AutoCAD SHX Text

THE COR AND SAFETY REPRESENTATIVE.

AutoCAD SHX Text

SITE TO BE INSPECTED ON A DAILY BASES AND MUST BE

AutoCAD SHX Text

SITE AREA PLASTIC WALL AND/OR ANTE ROOM ENCLOSURE WILL

AutoCAD SHX Text

BE INSPECTED BY INFECTION CONTROL PREVENTION COORDINATOR,

AutoCAD SHX Text

SAFETY REPRESENTATIVE AND CONTRACT OFFICER REPRESENTATIVE

AutoCAD SHX Text

(COR) FOR APPROVAL PRIOR TO PROJECT START/RELEASE DATE.

AutoCAD SHX Text

REMOVAL OF PLASTIC WALLS AND ENCLOSURES TO BE REMOVED

AutoCAD SHX Text

UPON THEIR APPROVAL.

AutoCAD SHX Text Work can be completed in a single shift, not to exceed 10 hours. Patients and/or employees may be in the area depending on the activity & location, excluding patient care rooms. Work that does not create dust or debris. Removal of ceiling tile or access to mechanical or electrical chase for visual inspection limited to 1 tile per 50 square feet with limited exposure time (not to exceed an hour for each tile) within the shift. Minor interior updates (e.g., replacing up to 2 floor or ceiling tiles, carpentry work to include hanging signage, and painting without sanding) that do not create dust or debris. Limited building system maintenance such as plumbing on potable systems limited to faucet replacement etc. and electrical work such as replacement of bulbs, receptacles, or switches.

AutoCAD SHX Text

INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:

AutoCAD SHX Text Prolonged inspection and work that may take longer than a single shift but not exceeding a week. Patients and employees are not to be in the area until activity is completed. Work that creates minimal dust and debris. Interior finish or surface repairs, updates, or modifications such as repair of firewalls and barriers, and new flooring that produces minimal dust and debris. Controlled sanding activities (e.g., wet or HEPA vacuum dry sanding) that produce minimal dust and debris. Access to chase spaces using doors and hatches (not cutting). Plumbing work such as installation or replacement of a single fixture or piping for a single fixture. Any work on sanitary plumbing including snaking of drains. Electrical work such as installation of cabling/wiring/conduit for a single device, installation of new device such as a light fixture that produces minimal dust and debris. Air Handler and/or fan shutdown/startup and HVAC work such as replacement of a single diffuser, single terminal unit or a single device that produces minimal dust and debris.

AutoCAD SHX Text

GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:

AutoCAD SHX Text

FIRE/U.L. RATED PLASTIC TO PREVENT DUST (INSTALL PRIOR TO CONSTRUCTION).

AutoCAD SHX Text SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:

AutoCAD SHX Text Patients and employees are not to be in the area until activity is completed. Demolition/removal of preexisting floor covering, casework, lay-in ceiling, or other architectural elements. Demolition/removal of drywall/framing, hard ceilings, and doors/framing and minimal infrastructure such as electrical circuits and branch piping. Installation of new walls, ceilings and doors including framing, drywal lor plaster, and associated work. Plumbing work such as the installation of new sinks, showers and toilets and associated plumbing. Shut down of sections of potable water systems. Electrical work such as installation of conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc. Non-existing (new) cable pathway or invasive (new runs) electrical work above ceilings. Modification of existing fire alarm and suppression systems. Mechanical work such as the installation of ductwork, diffusers, and terminal units for an area.

AutoCAD SHX Text LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:

AutoCAD SHX Text Patients and employees are not to be in the area until activity is completed. Renovation work in two or more rooms. Invasive large-scale new building construction. Large-scale demolition of building components and infrastructure including removal of multiple doors, walls, framing, ceilings, flooring, piping, electrical and HVAC. The installation building components such as new walls, ceilings and doors including framing, drywall, and associated plaster work. Plumbing work such as the installation of: a. new medical gas systems, b. steam/heating hot water, condensate systems, c. multiple sinks, showers and toilets including associated plumbing. Shutdown of potable water, steam/heating hot water, condensate, and medical gas systems. Electrical work such as installation of electrical feeders, distribution panels, conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc. Installation of fire alarm and suppression systems. Electrical shutdown of multiple panels. Mechanical work such as the installation of air handling equipment, associated ductwork, diffusers, heat exchangers, terminal units and controls.

AutoCAD SHX Text 3'-8"

AutoCAD SHX Text

POST ICRA, ILSM, FIRE INSPECTION SHEETS VISIBLE TO PUBLIC

AutoCAD SHX Text

MUST MAINTAIN 44" CLEAR (MINIMUM) IN ALL CORRIDOR

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text I

AutoCAD SHX Text 062-073724

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text R

File details come from the government source that posted it. Updated .