657-23-113JB - Construction Drawings - 3 of 14 - HA.pdf
PDF 4 MB Posted
- Attached to
- Z1DA--Create Code Compliant Research Laboratory Space in Building 1, 657-23-113JB Federal contract opportunity
- Solicitation number
- 36C25524R0053
About this file
This document is a set of construction drawings and related materials for a federal contract opportunity to create code compliant research laboratory space in Building 1 at the Saint Louis VA Health Care System, project number 657-23-113JB.
The key details include:
- The project involves renovating existing spaces on multiple floors to create a code compliant research laboratory. Work includes demolition, construction of new walls and finishes, HVAC, plumbing, and electrical system upgrades.
- Specific requirements are outlined for fire-rated construction, hazardous materials abatement, and infection control procedures (ICRA) for the construction area. Detailed plans, specifications, and general notes are provided.
- The contract will be awarded by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15. No additional details on the procurement vehicle, response dates, or pricing terms are provided in this document.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAB
3C17OFFICE
3C18
VACANT
3C21
MECHANICAL
3C23
HSPK
3C20
PROSTHETICS
3C26
CORRIDOR
H305
CORRIDOR
H304
OFFICE
2C14
OFFICE
2C13
OFFICE
2C12
EXAM
2C15
EXAM
C105
SHARED ROOM
C106A
OFFICE
C106
WAITING ROOM
H115A
LAB
2C19
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC.
01-18-2024
CONSTRUCTION DOCUMENTS
FCA - Create Code Compliant Research Laboratory Space in Building 1
657-23-113JB
Saint Louis VA Health Care System 1 Jefferson Barracks
Saint Louis, MO 63125
DEH DAE 44
100% SPRINKLERED
A-2
A-2
A-2 A-2
A-2
L-2
A-2
A-2
A-2
L-1L-1
A-1 A-2
L-1
L-1
A-1
L-1
A-3
A-2
L-2L-2 L-1
L-2L-1
A-2
A-2
AREA OF WORK
AREA OF WORK
AREA OF WORK AREA OF WORK AREA OF WORK
1-HA-001
HAZARDOUS MATERIALS PLANS
1.1.THE ABATEMENT CONTRACTOR (REFERRED TO "CONTRACTOR" ON THIS SHEET) SHALL INSPECT THE SITE, STUDY EXISTING CONDITIONS, REVIEW DRAWINGS AND SPECIFICATIONS IN ORDER TO BE FAMILIAR W/ COORDINATION OF WORK
REQUIRED IN THIS DOCUMENT PACKAGE AND EXISTING CONDITIONS.
1. CONTRACTOR SHALL ADJUST FOR ACTUAL FIELD CONDITIONS AT NO ADDITIONAL EXPENSE TO THE OWNER.
2. CONTRACTOR SHALL TAKE ALL MEASUREMENTS FOR THE WORK AND BE RESPONSIBLE FOR SAME. COORDINATE THE
WORK AND SHOP DRAWINGS WITH ALL OTHER TRADES AFFECTED AND MAKE ANY NECESSARY OFFSETS TO CONCEAL PIPING AND DUCTWORK AND TO CLEAR EQUIPMENT, STRUCTURAL MEMBERS AND OTHER OBSTRUCTIONS.
3. ALL UTILITIES AND SERVICES SHALL BE KEPT IN CONTINUOUS OPERATION UNLESS WRITTEN PERMISSION IS OTHERWISE GRANTED BY THE OWNER. TEMPORARY ALTERATIONS AND CONNECTIONS REQUIRED BY THIS CONTRACT SHALL BE MADE SO THAT ALL BUILDING SERVICES ARE MAINTAINED WITH MINIMUM INTERRUPTION. SCHEDULE ALL
ELECTRICAL/MECHANICAL OUTAGES 21 DAYS IN ADVANCE WITH THE OWNER.
4. PROTECT ALL WORK, MATERIALS AND EQUIPMENT. CAP OR PLUG TEMPORARY OPENINGS. DELIVER ALL WORK TO
THE OWNER CLEAN AND IN GOOD CONDITION.
5. ALL OCCUPIED WORK AREAS, BUILDING CORRIDORS AND EXTERIOR AREAS SHALL BE KEPT CLEAR OF DEBRIS.
CUTTING AND PATCHING OF EXISTING WALLS, FLOORS OR CEILINGS REQUIRED BY NEW WORK SHALL BE INCLUDED AS
WORK PROVIDED UNDER THIS CONTRACT.
6. CUTTING SHALL BE DONE WITH CARE SO AS NOT TO DAMAGE EXISTING EQUIPMENT, CONNECTIONS, CONTROLS, ETC.
DAMAGE CAUSED BY SUCH CUTTING SHALL BE REPLACED OR REPAIRED TO ORIGINAL CONDITION BY CONTRACTOR
AT NO COST TO THE OWNER.
7. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, OF THE BEST QUALITY AND FREE FROM DEFECTS.
8. MANUFACTURER AND MODEL NUMBERS SPECIFIED ESTABLISH THE TYPE AND QUALITY REQUIRED AS BASIS OF DESIGN.
9. ALL WORK SHALL COMPLY WITH APPLICABLE REGULATIONS, CODES AND ORDINANCES.
10. THE CONTRACTOR SHALL PERFORM ALL TESTS AS SPECIFIED OR AS NECESSARY TO DEMONSTRATE A COMPLETE
AND SATISFACTORY INSTALLATION.
11. ALL EXPOSED PENETRATIONS MADE THROUGH EXISTING ROOFS, FLOORS, AND WALLS SHALL BE PATCHED WITH LIKE
MATERIALS TO MATCH THE SURROUNDING SURFACES.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING MATERIALS RESULTING FROM WORK
UNDER THIS CONTRACT AND SHALL RESTORE SUCH TO ITS ORIGINAL CONDITION.
13. INSTALL THE SPECIFIED FIRE STOPPING (SLEEVES, WRAP, CONDUIT, ETC.) AT RATED CONSTRUCTION.
14.A FIRE STOP ALL PENETRATIONS WHERE NEW DEVICES/LINES RELOCATING EXISTING DEVICES/LINES
PENETRATING FLOORS, CEILINGS AND OTHER RATED BARRIERS.
14.B FIRE STOP ALL NEWLY CREATED PENETRATIONS WHERE EXISTING DEVICES/LINES PENETRATE
FLOOR, CEILINGS AND OTHER RATED BARRIERS.
14. ALL NEW STUD WALLS AND GYPSUM BOARD SHALL EXTEND TO STRUCTURE UNLESS NOTED OTHERWISE.
15. ALL GYPSUM BOARD SHALL BE TYPE 'X' FIRE CODE GYPSUM BOARD OR AS INDICATED ON DRAWINGS.
16. PROVIDE 16 GA. METAL BACKING PLATES, UNLESS OTHERWISE SHOWN, IN ALL WALLS TO RECEIVE EQUIPMENT, SHELVING AND ACCESSORIES, DOOR STOPS AND OTHER ITEMS REQUIRING REINFORCEMENT. NO WOOD BLOCKING IS
TO BE USED.
17. ALL ITEMS AND DEVICES, SUCH AS COVER PLATES, SWITCH PLATES, CONVENIENCE OUTLETS, DOOR STOPS AND OTHER FINISH HARDWARE, ETC., SHALL BE REMOVED AND REINSTALLED AS PART OF THE REFINISHING OF EXISTING
WALLS INDICATED TO REMAIN.
18. THE CONTRACTOR SHALL WORK WITH THE CONDITIONS AS THEY EXIST AT THE SITE. ALL ABOVE CEILING CONDITIONS SHALL BE REVIEWED, AND MODIFICATIONS IDENTIFIED, COORDINATED AND INCORPORATED INTO THE SHOP DRAWING PROCESS. COORDINATE ALL ABOVE CEILING WORK TO ENSURE A COMPLETE AND OPERATIONAL SYSTEM AT NO ADDITIONAL COST TO THE OWNER. COORDINATION SHALL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING:
19.A OWNER'S EQUIPMENT REQUIREMENTS.
19.B CEILING SUPPORT SYSTEM.
19.C MECHANICAL DUCTWORK SYSTEM
19.D LIGHTING FIXTURES, ELECTRICAL WIRING AND CONDUIT SYSTEMS
19.E PLUMBING AND PIPING SYSTEMS.
19.F COMMUNICATIONS SYSTEMS.
19. OPTAIN PERMIT FOR AND CONSTRUCT FIRE-RESISTANT ANTE CHAMBER WITH DOOR AND APPOVED HARDWARE TO SEAL OFF CONSTRUCTION AREA FROM CORRIDOR. SEAL ANTE CHAMBER TO EXISTING CONSTRUCTION. PROVIDE WALK-OFF MATS OUTSIDE CORRIDOR AND ROOM SIDES OF CHAMBER. ANTE CHAMBER TO COMPLY WITH REQ'TS.
FOR ICRA LEVEL 4 PROTECTION - REVIEW & COORDINATE PERMIT & CONTSTRUCTION REQ'TS W/ COR AND STATION'S
INFECTION CONTROL OFFICER.
21 AT THE COMPLETION OF DEMOLITION THE CONTRACTOR SHALL HAVE A SITE MEETING WITH THE VA TO REVIEW
ASBUILT CONDITIONS OF THE EXISTING STRUCTURE.
22. WHEN ALTERING THE BUILDING, IF STRUCTURAL INTEGRITY APPEARS TO BE IN QUESTION CONTRACTOR SHALL NOTIFY
THE VA IMMEDIATELY.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING, STORING, PROTECTING AND REINSTALLATION OF ALL OF THE VA'S EQUIPMENT AND FURNITURE, TO INCLUDE BOTH WALL MOUNTED ITEMS AND MOVABLE ITEMS FOR THE DURATION OF THE PROJECT. THIS COORDINATION OF OWNER'S (VA) ITEMS IS REQUIRED FOR ALL PHASES OF CONSTRUCTION. FURNITURE AND EQUIPMENT DAMAGED BY THE CONTRACTOR WILL BE REPLACED OR RESTORED TO
COMPLETE FUNCTIONALITY AND APPEARANCE BY THE CONTRACTOR AT NO COST TO THE VA.
24. CONTRACTOR TO USE BASEMENT DOCK EXTERIOR ENTRANCE FOR REMOVAL AND NEW MATERIAL DELIVERY.
CONTRACTOR TO PROVIDE NECESSARY EQUIPMENT TO PROTECT EXISTING FINISHES.
25. WORK THAT REQUIRES ACCESS TO SPACES OUTSIDE DESIGNATED AREA OF WORK SHALL BE COORDINATED WITH THE VA COR. WORK IN THOSE AREAS SHALL TAKE PLACE OUTSIDE REGULAR BUSINESS HOURS AND THE AREAS SHALL BE
CLEANED AND RETURNED TO SERVICE AT THE END OF EACH SHIFT.
26. UPON COMPLETION OF THE PROJECT. ALL AREAS AVAILABLE FOR CONSTRUCTION MATERIALS, VEHICLES, AND TRASH
RECEPTICLES MUST BE RETURNED TO THEIR ORIGINAL CONDITION.
GENERAL NOTES
1. MAINTAIN FIRE RATED CONSTRUCTION AT WALL PENETRATIONS. CONSTRUCTION TO CONFORM TO
MANUFACTURER'S FIRE RATED/TEST ASSEMBLIES.
2. FIRE CAULK ALL SLEEVES AND PENETRATIONS AT FIRE WALLS/PARTITIONS AND FLOORS. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY. USE RED FIRE CAULK AND LABEL WALL WITH U.L. DESIGN
NUMBER AND ASTM. FIRE RATED WALLS SHOWN ON PLAN.
3. PATCH AND REPAIR ALL EXISTING FIREPROOFING ON EXISTING STRUCTURAL MEMBERS, INCLUDING THAT WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION.
4. PATCH AND REPAIR ALL EXISTING FIRE CAULKING AT EXISTING RATED WALLS WHICH IS UNCOVERED NEEDING REPAIR AND THAT WHICH IS DISTURBED DURING CONSTRUCTION. RE-LABEL EXISTING WALL IF NECESSARY.
5. MAINTAIN 2-HR FIRE RATED FLOOR AT PENETRATIONS, EXISTING FLOOR SLAB, AND 2-HR DECK WITH
FIREPROOFING. CONFORM WITH THE TESTED/SUBMITTED FIRE RATED ASSEMBLY.
FIRE PROOFING - FIRE STOPPING GENERAL NOTES
ASBESTOS AND LEAD BASED PAINT
1. CONTRACTOR TO VERIFY THE ABSENCE OF ASBESTOS CONTAINING MATERIALS (ACM) PRIOR TO ANY DEMOLITION.
2. CONTACT THE COR TO OBTAIN MOST-CURRENT COPIES OF ASBESTOS AND LEAD BASED PAINT REPORTS. REFER
TO DIVISION 2 IN THE SPECIFICATIONS FOR ASBESTOS ABATEMENT AND LEAD BASED PAINT ENCAPSULATION OR
REMOVAL SPECIFICATIONS.
3. SCOPE OF ASBESTOS CONTAINING MATERIALS (ACM) AND LEAD BASED PAINT (LBP) DISCLOSED IN THE REPORT HAS BEEN GENERALLY NOTED ON THIS DEMOLITION PLAN: REFER TO REPORTS OBTAINED FROM THE COR FOR DETAILED INFORMATION AND LOCATIONS. IF THE CONTRACTOR ENCOUNTERS MATERIAL THAT COULD BE HAZARDOUS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) IMMEDIATELY FOR DIRECTION. CONTRACTORS' PERSONNEL INVOLVED WITH WORK IN AREAS FOUND TO HAVE ASBESTOS CONTAINING (ACMs) ARE TO BE PROVIDE WITH APPROPRIATE OSHA ASBESTOS TRAINING PRIOR
TO START OF WORK.
4. REFER TO DEMOLITION SHEETS IN THESE DRAWINGS. ABATEMENT AND LBP REMOVAL ACTIVITIES SHALL BE CONDUCTED IN GENERAL ACCORDANCE WITH THE PROJECTS CONSTRUCTION STRATEGY. HAZARDOUS MATERIALS DISCLOSED IN THE ACM AND LBP REPORTS MAY NOT BE A FULL ACCOUNTING OF SUCH MATERIALS IN THE AREA OF FACILITY IN QUESTION. REFER TO ABATEMENT SPECIFICATIONS FOR HANDLING OF MATERIALS THAT WERE NOT
DIRECTLY OBSERVED, BUT SHOULD BE EXPECTED BY THE ABATEMENT CONTRACTOR.
5. ALL WORK IN CORRIDORS HAVE TO BE REMOVED BEFORE 6:00AM EACH MORNING.
1. DOOR COVERING TO MEET/EXCEED JEFFERSON BARRACKS ICRA STANDARDS. VERIFY WITH COR.
2. DOOR WITH WALKOFF MAT.
3. CONSTRUCTION BARRIER LIMITS.
PLAN NOTES (IN ADDITON TO OTHER NOTES ON THIS SHEET)
LEGEND:
NEGATIVE AIR PRESSURE ENCLOSURE
THREE-STAGE DECON AND TWO-STAGE LOADOUT IN ACCORDANCE
WITH THE SPECIFICATIONS
NEGATIVE AIR MACHINE WITH THREE-STAGE HEPA FILTERATION SYSTEM
IN ACCORDANCE WITH THE SPECIFICATIONS AND SUGGESTED DUCTING DIRECTION
ICRA BARRIER
CONSTRUCTION BARRIER ENCLOSURE
AutoCAD SHX Text
%%UFLOOR 01 PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text N
AutoCAD SHX Text
%%ULAB 2C19 PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text N
AutoCAD SHX Text
%%UFLOOR 02 PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text N
AutoCAD SHX Text
%%UFLOOR 03 PLAN
AutoCAD SHX Text
SCALE: 1/4" = 1'-0"
AutoCAD SHX Text N
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text 062-073724
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
4" RUBBER COVE
WITH 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
WALL CONST. TYPES (DETAILS)
TYPE A
BASE @ BOTH SIDES
4" RUBBER COVE
3 5/8" 16 GA. METAL
STUDS AT 16" O.C.
BOARD EACH SIDE.
WITH 5/8" GYPSUM
W A
LL
H
EI
G H T
V
ER
IE
S
TYPE B
C
EI
LI
N G
H
EI
G H T
'-0
ON FLOOR PLAN.
FI
EL
D V
ER
IF
Y
C
EI
LI
N G
H
EI
G H T
'-0
4 7/8"4 7/8"
W A
LL
H
EI
G H T
V
ER
IE
S
FI
EL
D V
ER
IF
Y
TO MATCH EXISTING AREA TO MATCH EXISTING AREA
ROOF METAL DECKING
BASE @ BOTH SIDES
AS SCHEDULED
ACOUSTICAL CEILING
2' X 4' SUSPENDED
ON FLOOR PLAN.
3 5/8" INSULATED WALL
WALL TO EXTEND TO
ROOF METAL DECKING
OFFICE AREAS CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.
TYPE B
TYPE A
CROSS-SECTION 'A-A' MOBILE CONTAINMENT CART
CLASS IV
TYPE IV ICRA CONSTRUCTION DETAILS
TYPICAL IDEAL CONSTRUCTION LAYOUT CLASS IV
ILSMICRA
MANOMETER
READING FORM
PROJECT
CONTACT
SHEET
POSTED ON THE CONTAINMENT DOOR IN CLEAR
PLASTIC SLEEVES
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC.
01-18-2024
CONSTRUCTION DOCUMENTS
FCA - Create Code Compliant Research Laboratory Space in Building 1
657-23-113JB
Saint Louis VA Health Care System 1 Jefferson Barracks
Saint Louis, MO 63125
DEH DAE 44
100% SPRINKLERED
1-HA-002
TYPE IV ICRA CONSTRUCTION DETAILS
AutoCAD SHX Text
%%UGENERAL NOTES:
AutoCAD SHX Text
2. ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.
AutoCAD SHX Text
3. PERMITS TO INCLUDE:
AutoCAD SHX Text
ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES,
AutoCAD SHX Text
UTILITY SHUT-DOWN, FIRE/SMOKE WALL, FIRE ALARM SYSTEM.
AutoCAD SHX Text
4. THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION.
AutoCAD SHX Text NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS.
AutoCAD SHX Text
1. ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT
AutoCAD SHX Text
AND SAFETY GLASSES ALONG WITH ANY OTHER PPE REQUIRED IN THAT AREA.
AutoCAD SHX Text
CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.
AutoCAD SHX Text
(WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY.
AutoCAD SHX Text
NEGATIVE PRESSURE MACHINES MUST BE ON AND OPERATIONAL 24/7.
AutoCAD SHX Text
MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.
AutoCAD SHX Text
5. CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMITY.
AutoCAD SHX Text
6. DURING CONSTRUCTION BE CERTAIN THAT:
AutoCAD SHX Text
BARRIERS ARE INTACT AND MAINTAINED.
AutoCAD SHX Text
PARTICAL COUNT METER IS AVAILABLE.
AutoCAD SHX Text
NEGATIVE INDICATOR IS AVAILABLE.
AutoCAD SHX Text
ICRA REQUIREMENTS ARE INTACT AND
AutoCAD SHX Text
VERIFY ARE BEING MAINTAINED.
AutoCAD SHX Text
LOW RISK
AutoCAD SHX Text
PATIENT RISK GROUPS
AutoCAD SHX Text
MEDIUM RISK
AutoCAD SHX Text
HIGH RISK
AutoCAD SHX Text
HIGHEST RISK
AutoCAD SHX Text
LOW RISK GROUP
AutoCAD SHX Text
CONSTRUCTION PROJECT TYPE
AutoCAD SHX Text
MEDIUM RISK GROUP
AutoCAD SHX Text
HIGH RISK GROUP
AutoCAD SHX Text
HIGHEST RISK GROUP
AutoCAD SHX Text
RISK RELATED GROUP
AutoCAD SHX Text
TYPE A
AutoCAD SHX Text
TYPE B
AutoCAD SHX Text
TYPE C
AutoCAD SHX Text
TYPE D
AutoCAD SHX Text I
AutoCAD SHX Text
II
AutoCAD SHX Text
II
AutoCAD SHX Text
III/IV
AutoCAD SHX Text
II
AutoCAD SHX Text
II
AutoCAD SHX Text
III/IV
AutoCAD SHX Text
III/IV
AutoCAD SHX Text
III
AutoCAD SHX Text
III/IV
AutoCAD SHX Text
IV
AutoCAD SHX Text
IV
AutoCAD SHX Text
IV
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text
II
AutoCAD SHX Text
CONSTRUCTION PROJECT BY PATIENT RISK
AutoCAD SHX Text
IC MATRIX - CLASS OF PRECAUTIONS:
AutoCAD SHX Text
%%UNOTE:
AutoCAD SHX Text
TYPE A
AutoCAD SHX Text
TYPE B
AutoCAD SHX Text
TYPE C
AutoCAD SHX Text
TYPE D
AutoCAD SHX Text
MATRIX OF PRECAUTIONS FOR
AutoCAD SHX Text
CONSTRUCTION & RENOVATION
AutoCAD SHX Text
NFECTION
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text
ONTROL
AutoCAD SHX Text
ISK
AutoCAD SHX Text
SSESSMENT
AutoCAD SHX Text (I
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text A)
AutoCAD SHX Text
CLASS 1V
AutoCAD SHX Text
%%UPRIOR TO ANY CONSTRUCTION
AutoCAD SHX Text
%%UPOST CONSTRUCTION
AutoCAD SHX Text
TEMP. ANTE ROOM
AutoCAD SHX Text
HARD BARRIER
AutoCAD SHX Text
EITHER KEEP RUNNING
AutoCAD SHX Text
COVER ALL RETURNS
AutoCAD SHX Text
HEPA NEGATIVE AIR UNIT
AutoCAD SHX Text
TAPE ALL SERVICES
AutoCAD SHX Text
ABC TYPE FIRE EXTINGUISHER ON
AutoCAD SHX Text
FIRE RATED PLYWOOD
AutoCAD SHX Text A
AutoCAD SHX Text O
AutoCAD SHX Text V
AutoCAD SHX Text
WEEKLY CHANGED
AutoCAD SHX Text
(OR MORE AS NEEDED)
AutoCAD SHX Text
MONTHLY CHANGED
AutoCAD SHX Text
HEPA FILTER
AutoCAD SHX Text
PRE-FILTER
AutoCAD SHX Text
SUPPLY DUCTS
AutoCAD SHX Text
OR COVER WITH FIRE
AutoCAD SHX Text
AT THE GRATE/DIFFUSERS
AutoCAD SHX Text
TO PROTECT AGAINST
AutoCAD SHX Text
PORTABLE FLOOR BRACKET
AutoCAD SHX Text
CONTAMINATION
AutoCAD SHX Text
(REFER TO ELEVATION)
AutoCAD SHX Text
FLEX DUCT
AutoCAD SHX Text
EXISTING WINDOW FRAME
AutoCAD SHX Text
FIRE RATED PLYWOOD
AutoCAD SHX Text
(TEMP. REMOVE
AutoCAD SHX Text
HEPA NEGATIVE AIR UNIT
AutoCAD SHX Text
EXISTING FIRE
AutoCAD SHX Text
SPRINKLER SYSTEM
AutoCAD SHX Text
EXISTING CONCRETE SLAB FLOORING
AutoCAD SHX Text
FIRE/U.L. RATED PLASTIC
AutoCAD SHX Text
TO PREVENT DUST
AutoCAD SHX Text
GLASS PANEL)
AutoCAD SHX Text E
AutoCAD SHX Text
OPTIONAL EXHAUST DUCTS
AutoCAD SHX Text
(COVER THE GRATES
AutoCAD SHX Text
AND THE DIFFUSERS)
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
AutoCAD SHX Text
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
AutoCAD SHX Text
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
AutoCAD SHX Text
OUT NEGATIVE AIR PRE-FILTER.
AutoCAD SHX Text
(LOCKED AT ALL TIMES)
AutoCAD SHX Text
BLUE CORE LOCKSET
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
OUTSIDE OF BUILDING
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
AutoCAD SHX Text
FINISHED FLOORING TO BE KEPT CLEAN.
AutoCAD SHX Text
FLOORS NOT BEING REPLACED TO BE
AutoCAD SHX Text
WITH FIRE RATED PLASTIC
AutoCAD SHX Text
SHEETING AND SECURE
AutoCAD SHX Text
WITH DUCT TAPE.
AutoCAD SHX Text
RATED PLASTIC SHEETING
AutoCAD SHX Text
AND SECURE WITH DUCT
AutoCAD SHX Text
TAPE TO KEEP DUST OUT.
AutoCAD SHX Text
(ILSM MAY REQUIRE MORE
AutoCAD SHX Text
THAN ONE OR WALL MOUNTED).
AutoCAD SHX Text
PROVIDE STICKY MATS
AutoCAD SHX Text
(CHANGED END OF SHIFT
AutoCAD SHX Text
OR MORE IF NECESSARY
AutoCAD SHX Text
TO MAINTAIN CLEANLINESS).
AutoCAD SHX Text
(TYPICAL REGULATOR INSTALLATION).
AutoCAD SHX Text
PRIOR TO CONSTRUCTION).
AutoCAD SHX Text
FLEX DUCT
AutoCAD SHX Text
CART WITH CANVAS/
AutoCAD SHX Text
1-1/4" SQUARE
AutoCAD SHX Text
TUBE FRAME AND
AutoCAD SHX Text
ZIPPER SIDE ENTRY
AutoCAD SHX Text
PLASTIC WINDOW
AutoCAD SHX Text
HEPA NEGATIVE AIR UNIT
AutoCAD SHX Text
MOBILE CONTAINMENT
AutoCAD SHX Text
FLEX DUCT
AutoCAD SHX Text
NEED INSPECTION TAG AND
AutoCAD SHX Text
MONTHLY INSPECTION).
AutoCAD SHX Text
(INITIALS/DATED).
AutoCAD SHX Text
INFILTRATION (INSTALL
AutoCAD SHX Text
(REFER TO
AutoCAD SHX Text
ELEV. DETAIL)
AutoCAD SHX Text
SCALE: 1/2"=1'-0"
AutoCAD SHX Text
SCALE: 1/2"=1'-0"
AutoCAD SHX Text
SCALE: 1/2"=1'-0"
AutoCAD SHX Text
PROTECTED OR COVERED WITH ROSEN
AutoCAD SHX Text
PAPER/FIRE RATED PLYWOOD.
AutoCAD SHX Text
THE REQUIRED INFECTION CONTROL RISK ASSESSMENT FORMS
AutoCAD SHX Text
MUST BE COMPLETED AND POSTED IN THE PROPER AREA.
AutoCAD SHX Text
%%UINTERIM LIFE SAFETY MEASURES:
AutoCAD SHX Text
%%UINFECTION CONTROL RISK ASSESSMENT:
AutoCAD SHX Text
THE REQUIRED INTERIM LIFE SAFETY MEASURES FORMS
AutoCAD SHX Text
MUST BE COMPLETED AND POSTED IN THE PROPER AREA.
AutoCAD SHX Text
DAILY FIRE WATCH INSPECTIONS MUST BE PROVIDED DAILY BY THE
AutoCAD SHX Text
PROJECT ENGINEER OR PERSON(S) ASSIGNED BY THE PROJECT
AutoCAD SHX Text
ENGINEER. THIS MUST BE LOGGED IN WITH DOCUMENTATION.
AutoCAD SHX Text
PICRA:
AutoCAD SHX Text
%%UUTILITIES SHUT-DOWNS:
AutoCAD SHX Text
THE AREA. PROJECT ENGINEER TO HAVE DOCUMENTED PROOF OF
AutoCAD SHX Text
THE PROJECT ENGINEER SHALL NOTIFY THE PROPER SHOP
AutoCAD SHX Text
PERSONNEL AND STAFF MEMBERS WITH A MIN. OF 21 DAYS
AutoCAD SHX Text
IN ADVANCE FOR ANY UTILITIES SHUT-DOWN(S) THAT WILL EFFECT
AutoCAD SHX Text
ICRA
AutoCAD SHX Text
ILSM
AutoCAD SHX Text
REQUIREMENT. (NOT APPLICABLE ON SOME PROJECTS).
AutoCAD SHX Text
TO BE PROVIDED WHEN APPLICABLE WITH PROJECT
AutoCAD SHX Text
THIS ACTION.
AutoCAD SHX Text
LOGGED IN WITH DOCUMENTATION.
AutoCAD SHX Text
INTERIM LIFE SAFETY MEASURES FORM WILL BE SIGNED BY
AutoCAD SHX Text
THE COR AND SAFETY REPRESENTATIVE.
AutoCAD SHX Text
SITE TO BE INSPECTED ON A DAILY BASES AND MUST BE
AutoCAD SHX Text
SITE AREA PLASTIC WALL AND/OR ANTE ROOM ENCLOSURE WILL
AutoCAD SHX Text
BE INSPECTED BY INFECTION CONTROL PREVENTION COORDINATOR,
AutoCAD SHX Text
SAFETY REPRESENTATIVE AND CONTRACT OFFICER REPRESENTATIVE
AutoCAD SHX Text
(COR) FOR APPROVAL PRIOR TO PROJECT START/RELEASE DATE.
AutoCAD SHX Text
REMOVAL OF PLASTIC WALLS AND ENCLOSURES TO BE REMOVED
AutoCAD SHX Text
UPON THEIR APPROVAL.
AutoCAD SHX Text Work can be completed in a single shift, not to exceed 10 hours. Patients and/or employees may be in the area depending on the activity & location, excluding patient care rooms. Work that does not create dust or debris. Removal of ceiling tile or access to mechanical or electrical chase for visual inspection limited to 1 tile per 50 square feet with limited exposure time (not to exceed an hour for each tile) within the shift. Minor interior updates (e.g., replacing up to 2 floor or ceiling tiles, carpentry work to include hanging signage, and painting without sanding) that do not create dust or debris. Limited building system maintenance such as plumbing on potable systems limited to faucet replacement etc. and electrical work such as replacement of bulbs, receptacles, or switches.
AutoCAD SHX Text
INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:
AutoCAD SHX Text Prolonged inspection and work that may take longer than a single shift but not exceeding a week. Patients and employees are not to be in the area until activity is completed. Work that creates minimal dust and debris. Interior finish or surface repairs, updates, or modifications such as repair of firewalls and barriers, and new flooring that produces minimal dust and debris. Controlled sanding activities (e.g., wet or HEPA vacuum dry sanding) that produce minimal dust and debris. Access to chase spaces using doors and hatches (not cutting). Plumbing work such as installation or replacement of a single fixture or piping for a single fixture. Any work on sanitary plumbing including snaking of drains. Electrical work such as installation of cabling/wiring/conduit for a single device, installation of new device such as a light fixture that produces minimal dust and debris. Air Handler and/or fan shutdown/startup and HVAC work such as replacement of a single diffuser, single terminal unit or a single device that produces minimal dust and debris.
AutoCAD SHX Text
GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:
AutoCAD SHX Text
FIRE/U.L. RATED PLASTIC TO PREVENT DUST (INSTALL PRIOR TO CONSTRUCTION).
AutoCAD SHX Text SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
AutoCAD SHX Text Patients and employees are not to be in the area until activity is completed. Demolition/removal of preexisting floor covering, casework, lay-in ceiling, or other architectural elements. Demolition/removal of drywall/framing, hard ceilings, and doors/framing and minimal infrastructure such as electrical circuits and branch piping. Installation of new walls, ceilings and doors including framing, drywal lor plaster, and associated work. Plumbing work such as the installation of new sinks, showers and toilets and associated plumbing. Shut down of sections of potable water systems. Electrical work such as installation of conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc. Non-existing (new) cable pathway or invasive (new runs) electrical work above ceilings. Modification of existing fire alarm and suppression systems. Mechanical work such as the installation of ductwork, diffusers, and terminal units for an area.
AutoCAD SHX Text LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
AutoCAD SHX Text Patients and employees are not to be in the area until activity is completed. Renovation work in two or more rooms. Invasive large-scale new building construction. Large-scale demolition of building components and infrastructure including removal of multiple doors, walls, framing, ceilings, flooring, piping, electrical and HVAC. The installation building components such as new walls, ceilings and doors including framing, drywall, and associated plaster work. Plumbing work such as the installation of: a. new medical gas systems, b. steam/heating hot water, condensate systems, c. multiple sinks, showers and toilets including associated plumbing. Shutdown of potable water, steam/heating hot water, condensate, and medical gas systems. Electrical work such as installation of electrical feeders, distribution panels, conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc. Installation of fire alarm and suppression systems. Electrical shutdown of multiple panels. Mechanical work such as the installation of air handling equipment, associated ductwork, diffusers, heat exchangers, terminal units and controls.
AutoCAD SHX Text 3'-8"
AutoCAD SHX Text
POST ICRA, ILSM, FIRE INSPECTION SHEETS VISIBLE TO PUBLIC
AutoCAD SHX Text
MUST MAINTAIN 44" CLEAR (MINIMUM) IN ALL CORRIDOR
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text 062-073724
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text R
File details come from the government source that posted it. Updated .