65 DD Drawings_Part 2.pdf

PDF 64 MB Posted

Attached to
Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park
Solicitation number
33330226RT0010015
Issued by

About this file

This file appears to be architectural/engineering drawings (Part 2) for the Arabian Leopard Facility at the Smithsonian National Zoological Park. The drawings are referenced in the Phase 2 construction solicitation (33330226RT0010015) dated June 14, 2026, for SF Project No. 2533105. These technical drawings supplement the project specifications and serve as contract documents that define the construction requirements for the Habitats & Animal Care Building phase of the project.

The drawings provide detailed design specifications for critical construction elements including animal containment systems, radiant flooring installations, specialty animal doors and transfer mechanisms with remote controls, shotcrete faux rock and tree installations, and fencing/mesh systems. These drawings are essential reference documents for contractors submitting proposals and will be binding contract documents for the successful Firm Fixed Price contractor, with the Smithsonian's current cost estimate exceeding $10 million. The drawings reflect the specialized requirements of zoo construction, including considerations for sound and vibration mitigation during work in proximity to occupied animal habitats within the historic, active National Zoological Park campus in Washington, DC.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .