2026-10-09 PN 2533105 CALF Phase 2 Step 2 Bid Schedule FINAL r3.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 33330226RT0010015
- Issued by
-
Smithsonian Institution
About this file
This is a Firm Fixed Price Bid Schedule for construction services on Phase 2 of the Arabian Leopard Facility (ALF) at the Smithsonian National Zoological Park. The document is structured as a blank pricing template requiring offerors to complete cost estimates across 27 Divisions of Work organized by the Construction Specifications Institute (CSI) format, including General Requirements, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Systems, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. Offerors must provide line-item pricing for Material, Labor, Equipment, and Overhead & Profit for each division, with subtotals for Direct Costs, Home Office Overhead, Profit/Fee, and Bonds and Insurance leading to a Total Firm Fixed Price.
The document includes a second sheet containing separate unit pricing instructions for micropiles under Specification Section 31 6333, requiring pricing for four line items: additional micropile length beyond contract requirements (per linear foot), deduction for reduced micropile length (per linear foot), and two separate sacrificial micropile load test scenarios (compression/tension and lateral, each priced per unit). The instructions explicitly state that micropile unit prices are not to be included in the Total Firm Fixed Price but will be incorporated into the awarded contract for measuring and paying authorized change orders. All work references the 100% Final Specifications and Drawings for SF Project No. 2533105, dated June 14, 2026, related to construction of the Habitats & Animal Care Building for Phase 2 of the Arabian Leopard Facility, with the Smithsonian Institution estimating the total fixed price to exceed $10 Million.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITEM 0001 (Rev. 10/09/2026) | ||||||
| Bid Schedule (Firm Fixed Price) | ||||||
| Construct Arabian Leopard Facility (ALF) | ||||||
| Construction Services Phase 2 – Habitats & Animal Care Building | ||||||
| All work associated with Phase 2 – Habitats & Animal Care Bldg. as described in the 100% Final specifications and drawings. | ||||||
| Div | Description | Material | Labor | Equipment | OH & Profit | TOTAL |
| 1 | General Reqs / General Conditions | $ - | $ - | $ - | $ - | $ - 0 |
| 2 | Existing Conditions | $ - | $ - | $ - | $ - | $ - 0 |
| HAZMAT | $ - | $ - | $ - | $ - | $ - 0 | |
| 3 | Concrete | $ - | $ - | $ - | $ - | $ - 0 |
| 4 | Masonry | $ - | $ - | $ - | $ - | $ - 0 |
| 5 | Metals | $ - | $ - | $ - | $ - | $ - 0 |
| 6 | Wood, Plastics, and Composites | $ - | $ - | $ - | $ - | $ - 0 |
| 7 | Thermal and Moisture Protection | $ - | $ - | $ - | $ - | $ - 0 |
| 8 | Openings | $ - | $ - | $ - | $ - | $ - 0 |
| 9 | Finishes | $ - | $ - | $ - | $ - | $ - 0 |
| 10 | Specialties | $ - | $ - | $ - | $ - | $ - 0 |
| 11 | Equipment | $ - | $ - | $ - | $ - | $ - 0 |
| 12 | Furnishings | $ - | $ - | $ - | $ - | $ - 0 |
| 13 | Special Construction | $ - | $ - | $ - | $ - | $ - 0 |
| 14 | Conveying Systems | $ - | $ - | $ - | $ - | $ - 0 |
| 21 | Fire Suppression | $ - | $ - | $ - | $ - | $ - 0 |
| 22 | Plumbing | $ - | $ - | $ - | $ - | $ - 0 |
| 23 | Heating, Ventilating and Air Conditioning | $ - | $ - | $ - | $ - | $ - 0 |
| 25 | Integrated Automation | $ - | $ - | $ - | $ - | $ - 0 |
| 26 | Electrical | $ - | $ - | $ - | $ - | $ - 0 |
| 27 | Communications | $ - | $ - | $ - | $ - | $ - 0 |
| 28 | Electronic Safety and Security | $ - | $ - | $ - | $ - | $ - 0 |
| 31 | Earthwork | $ - | $ - | $ - | $ - | $ - 0 |
| 32 | Exterior Improvements | $ - | $ - | $ - | $ - | $ - 0 |
| 33 | Utilities | $ - | $ - | $ - | $ - | $ - 0 |
| SUBTOTAL OF DIRECT COSTS: | $ - 0 | |||||
| Home Office Overhead: | $ - | |||||
| Profit / Fee: | $ - | |||||
| Bonds and Insurance: | $ - | |||||
| TOTAL FIRM FIXED PRICE: | $ - 0 | |||||
| Prepared by: _____________________________________________ | Company: ___________________________ | |||||
| Date: ______________ | ||||||
| PLEASE DO NOT ALTER THE FORM | ||||||
| Page 1 of 2 |
Sheet2
| Micropile Unit Prices - NOT INCLUDED IN TOTAL FIRM FIXED PRICE | |||
| Construct Arabian Leopard Facility (ALF) | |||
| Construction Services Phase 2 – Habitats & Animal Care Building | |||
| Reference Phase 2 – Habitats & Animal Care Bldg. 100% Final submission. Unit prices shall be provided for the items listed below in accordance with Specification Section 31 6333 – Micropiles. The unit prices shall be based on pricing assumptions consistent with those used to develop the micropile portion of the Total Firm Fixed Price on Page 1. These unit prices are provided solely for pricing authorized additions or deductions to the base contract work and shall not be added to the Total Firm Fixed Price. Unit prices shall be incorporated into the awarded Contract and applied to authorized changes in accordance with the measurement and payment provisions of Section 31 6333. | |||
| Item No. | Description | Unit of Issue | Unit Price |
31 6333-1 Additional micropile length beyond the contract-required length Linear foot $ _________/ LF
31 6333-2 Deduction for reduced micropile length below the contract-required length Linear foot $ _________/ LF
31 6333-3 Additional sacrificial micropile and load test for compression and tension allowable loads Each $ ____________
31 6333-4 Additional sacrificial micropile and load test for lateral allowable loads Each $ ____________
| Prepared by: _________________________________ Company: ______________________________ | |
| Date: ______________ | |
| PLEASE DO NOT ALTER THE FORM | |
| Page 2 of 2 |
File details come from the government source that posted it. Updated .