2026-09-08 PN 2533105 ALF Phase 2 Step 2 Bid Schedule FINAL DRAFT.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 33330226RT0010015
- Issued by
-
Smithsonian Institution
About this file
This is a bid schedule template in spreadsheet format for Phase 2 of the Arabian Leopard Facility (ALF) construction project at the Smithsonian National Zoological Park in Washington, DC. The document is dated September 8, 2026, and serves as a pricing template for offerors responding to Solicitation Number 33330226RT0010015. The project involves constructing the Habitats & Animal Care Building as part of Phase 2, with the Smithsonian Institution estimating the total fixed price contract value will exceed $10 million. This is a Firm Fixed Price construction contract being awarded by the Smithsonian Institution's procurement office for SF Project No. 2533105, with specifications and drawings dated June 14, 2026.
The bid schedule is designed for contractors to submit detailed cost proposals for construction services including work within the occupied, historic zoo campus with coordination of specialty trades such as animal doors, transfer systems, radiant flooring, animal containment systems, shotcrete faux rock installations, and sound/vibration mitigation measures. Offerors must demonstrate experience and qualifications in managing construction activities in active zoo environments while coordinating with zoo operations. As indicated by the "FINAL DRAFT" designation in the filename, this appears to be the finalized pricing template that offerors are required to complete and submit as part of their Technical and Cost Proposals in response to the solicitation.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITEM 0001 | ||||||
| Bid Schedule (Firm Fixed Price) | ||||||
| Construct Arabian Leopard Facility (ALF) | ||||||
| Construction Services Phase 2 – Habitats & Animal Care Building | ||||||
| All work associated with Phase 2 – Habitats & Animal Care Bldg. as described in the 100% Final specifications and drawings. | ||||||
| Div | Description | Material | Labor | Equipment | OH & Profit | TOTAL |
| 1 | General Reqs / General Conditions | $ - | $ - | $ - | $ - | $ - 0 |
| 2 | Existing Conditions | $ - | $ - | $ - | $ - | $ - 0 |
| HAZMAT | $ - | $ - | $ - | $ - | $ - 0 | |
| 3 | Concrete | $ - | $ - | $ - | $ - | $ - 0 |
| 4 | Masonry | $ - | $ - | $ - | $ - | $ - 0 |
| 5 | Metals | $ - | $ - | $ - | $ - | $ - 0 |
| 6 | Wood, Plastics, and Composites | $ - | $ - | $ - | $ - | $ - 0 |
| 7 | Thermal and Moisture Protection | $ - | $ - | $ - | $ - | $ - 0 |
| 8 | Openings | $ - | $ - | $ - | $ - | $ - 0 |
| 9 | Finishes | $ - | $ - | $ - | $ - | $ - 0 |
| 10 | Specialties | $ - | $ - | $ - | $ - | $ - 0 |
| 11 | Equipment | $ - | $ - | $ - | $ - | $ - 0 |
| 12 | Furnishings | $ - | $ - | $ - | $ - | $ - 0 |
| 13 | Special Construction | $ - | $ - | $ - | $ - | $ - 0 |
| 14 | Conveying Systems | $ - | $ - | $ - | $ - | $ - 0 |
| 21 | Fire Suppression | $ - | $ - | $ - | $ - | $ - 0 |
| 22 | Plumbing | $ - | $ - | $ - | $ - | $ - 0 |
| 23 | Heating, Ventilating and Air Conditioning | $ - | $ - | $ - | $ - | $ - 0 |
| 25 | Integrated Automation | $ - | $ - | $ - | $ - | $ - 0 |
| 26 | Electrical | $ - | $ - | $ - | $ - | $ - 0 |
| 27 | Communications | $ - | $ - | $ - | $ - | $ - 0 |
| 28 | Electronic Safety and Security | $ - | $ - | $ - | $ - | $ - 0 |
| 31 | Earthwork | $ - | $ - | $ - | $ - | $ - 0 |
| 32 | Exterior Improvements | $ - | $ - | $ - | $ - | $ - 0 |
| 33 | Utilities | $ - | $ - | $ - | $ - | $ - 0 |
| SUBTOTAL OF DIRECT COSTS: | $ - 0 | |||||
| NOTE: If there are any assumptions, exclusions or qualifications that affect the firm fixed price, a separate detailed breakdown sheet must be provided. | ||||||
| Home Office Overhead: | $ - | |||||
| Profit / Fee: | $ - | |||||
| Bonds and Insurance: | $ - | |||||
| TOTAL FIRM FIXED PRICE: | $ - 0 | |||||
| Prepared by: _____________________________________________ | Company: ___________________________ | |||||
| Date: ______________ | ||||||
| PLEASE DO NOT ALTER THE FORM |
File details come from the government source that posted it. Updated .