2026-09-29 PN 2533105 CALF Phase 2 Step 2 Bid Schedule FINAL r1.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Phase 2 Construct Arabian Leopard Exhibit at the National Zoological Park
Solicitation number
33330226RT0010015
Issued by

About this file

This is a Bid Schedule document for Phase 2 of the Arabian Leopard Facility (ALF) construction project at the Smithsonian National Zoological Park. The schedule outlines the pricing structure and cost breakdown for the construction services required to complete the Habitats & Animal Care Building phase of the project. The document serves as the template for offerors to submit their cost proposals in response to Solicitation Number 33330226RT0010015, which was issued by the Smithsonian Institution for a Firm Fixed Price construction contract estimated to exceed $10 Million.

The bid schedule provides line items and cost categories that contractors must complete when submitting their proposals, organizing the construction work into discrete bid elements to facilitate accurate cost estimation and comparison of competing proposals. Offerors are required to price all work associated with Phase 2, including coordination of specialty trades, installation of animal containment systems, radiant flooring, faux rock and tree structures, door systems, and construction activities that must be coordinated with active Zoo operations to prevent disruption to animals and staff. The document was finalized on September 29, 2026, as indicated by its filename, and reflects revisions made through Amendment 0002 to the solicitation, which included updated responses to Requests for Information and a revised bid schedule to guide contractor submissions.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEM 0001 (Rev. 9/29/2026)
Bid Schedule (Firm Fixed Price)
Construct Arabian Leopard Facility (ALF)
Construction Services Phase 2 – Habitats & Animal Care Building
All work associated with Phase 2 – Habitats & Animal Care Bldg. as described in the 100% Final specifications and drawings.
DivDescriptionMaterialLaborEquipmentOH & ProfitTOTAL
1General Reqs / General Conditions$ -$ -$ -$ -$ - 0
2Existing Conditions$ -$ -$ -$ -$ - 0
HAZMAT$ -$ -$ -$ -$ - 0
3Concrete$ -$ -$ -$ -$ - 0
4Masonry$ -$ -$ -$ -$ - 0
5Metals$ -$ -$ -$ -$ - 0
6Wood, Plastics, and Composites$ -$ -$ -$ -$ - 0
7Thermal and Moisture Protection$ -$ -$ -$ -$ - 0
8Openings$ -$ -$ -$ -$ - 0
9Finishes$ -$ -$ -$ -$ - 0
10Specialties$ -$ -$ -$ -$ - 0
11Equipment$ -$ -$ -$ -$ - 0
12Furnishings$ -$ -$ -$ -$ - 0
13Special Construction$ -$ -$ -$ -$ - 0
14Conveying Systems$ -$ -$ -$ -$ - 0
21Fire Suppression$ -$ -$ -$ -$ - 0
22Plumbing$ -$ -$ -$ -$ - 0
23Heating, Ventilating and Air Conditioning$ -$ -$ -$ -$ - 0
25Integrated Automation$ -$ -$ -$ -$ - 0
26Electrical$ -$ -$ -$ -$ - 0
27Communications$ -$ -$ -$ -$ - 0
28Electronic Safety and Security$ -$ -$ -$ -$ - 0
31Earthwork$ -$ -$ -$ -$ - 0
32Exterior Improvements$ -$ -$ -$ -$ - 0
33Utilities$ -$ -$ -$ -$ - 0
SUBTOTAL OF DIRECT COSTS:$ - 0
Home Office Overhead:$ -
Profit / Fee:$ -
Bonds and Insurance:$ -
TOTAL FIRM FIXED PRICE:$ - 0
Prepared by: _____________________________________________Company: ___________________________
Date: ______________
PLEASE DO NOT ALTER THE FORM