600B193E-A6DE-E459-0374B7046DEB49BE.xlsx
XLSX spreadsheet 11 KB Posted
- Attached to
- Process Server
- Solicitation number
- RFP# 2026-08-05
- Issued by
- Franklin County, Ohio
About this file
This is a Pricing Sheet for the FCEMHS EOC Upgrade Project, a state or local contract opportunity related to emergency operations center infrastructure improvements. The project encompasses six distinct cost areas: Network Server, System Control, Network Cabling, Emergency Operations Center (EOC), Assessment Center, and JIC/Training Room. Vendors are required to submit itemized cost breakdowns for each project area, with a consolidated total cost figure. The pricing form serves as the standardized template for all bidders to present their proposed costs in a consistent format, enabling direct comparison of vendor proposals across all designated work areas.
The pricing sheet requires vendors to provide detailed notes on specific area costs for each of the six project components, ensuring transparency in cost allocation and allowing the evaluating agency to assess value and reasonableness across different aspects of the upgrade initiative. This structured approach to pricing facilitates procurement compliance and enables stakeholders to understand the cost distribution across network infrastructure, control systems, cabling work, and facility-specific improvements. Vendors must complete all cost fields and provide supporting documentation justifying their pricing methodology for each designated area.
View the file
Other files
Show 40 more
Latest 50 of 148 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| Pricing Form | |||
| RFP Title | Vendor Name | Date Submitted | |
| FCEMHS EOC Upgrade Project | |||
| Area | Cost | Notes on specific area costs | |
| 1. Network Server | $ | ||
| 2. System Control | $ | ||
| 3. Network Cabling | $ | ||
| 4. EOC | $ | ||
| 5. Assessment Center | $ | ||
| 6. JIC/Training Room | $ |
| Total Cost | $ |
| *Itemized breakdown of costs per area should be listed in proposals |
File details come from the government source that posted it. Updated .