6-Required Document 4 - GAM 1st Floor Bid Breakdown.pdf

PDF 443 KB Posted

Attached to
Golden Age Manor First Floor Improvements and Accessible Front Entrance
Solicitation number
Not on record
Issued by
Montgomery County, Polk Borough, Pennsylvania

About this file

This document is a bid cost breakdown for the Golden Age Manor First Floor Improvements and Accessible Front Entrance project, prepared by the Montgomery County Housing Authority (MCHA) for a property located at 400 Walnut Street, Royersford, Pennsylvania. The project encompasses four separate prime construction contracts: General Construction, Plumbing, Mechanical, and Electrical work. The General Construction contract includes 21 line items covering mobilization, bonds, permits, general conditions, selective demolition, concrete and exterior improvements, metals, canopy construction, rough carpentry, doors and hardware, drywall partitions, architectural millwork, acoustical ceilings, flooring, painting and finishes, wall protection, tile and restroom finishing, window treatments, furnishings and accessories, landscape work, and four deduct alternates related to landscape options and park benches. The Plumbing contract includes 13 line items addressing mobilization, bonds, permits, general conditions, plumbing demolition, domestic water systems, community kitchen plumbing, ADA unit plumbing, public restroom plumbing, laundry plumbing, utility service modifications, building sanitary modifications, and existing sanitary stack replacements. The Mechanical contract comprises 11 line items covering mobilization, bonds, permits, general conditions, mechanical demolition, air distribution, ductwork, through-wall units, hydronic systems, testing and balancing, and a mini-split system installation. The Electrical contract includes 10 line items encompassing mobilization, bonds, permits, general conditions, electrical demolition, branch power, lighting fixtures, lighting controls, fire alarm work, and communications and security systems. Electronic bids via the PennBid Program are due by 1:00 P.M. on Thursday, November 19, 2026, with public bid opening at Robert P. Smith Towers in Pottstown, Pennsylvania. Bidding documents are available on PennBid beginning Thursday, October 29, 2026. A non-mandatory pre-bid meeting is scheduled for Thursday, November 5, 2026, at 10:00 A.M. at Golden Age Manor.

Bidders must submit a bid bond equal to five percent of their total bid amount and, if selected, will be required to furnish Performance and Payment Bonds. General conditions, profit, and overhead are limited to 20 percent of all line items except bond premiums across all four contracts. The project is funded through HUD and subject to Section 3 of the Housing and Urban Development Act of 1968, which requires that training, employment, and economic opportunities be directed to low- and very low-income persons, particularly HUD assistance recipients. Contractors must comply with prevailing wage requirements and ensure non-discrimination in employment practices. The Build America, Buy America Act requirements apply, mandating that all iron, steel, manufactured products, and construction materials be produced in the United States. No specific budget range is provided in the cost breakdown document, which explicitly states that the bid cost breakdown serves as information to MCHA and shall not alter the bidder's bid price or limit the scope of work required by the contract documents.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID COST BREAKDOWN

GOLDEN AGE MANOR FIRST FLOOR IMPROVEMENTS ACCESSIBLE FRONT ENTRANCE

GENERAL CONSTRUCTION CONTRACT

Item # Description of Work Unit of Measure Total Cost

GENERAL CONTRACT

1 Mobilization LS

2 Bonds LS

3 Permits LS

4 General Conditions LS

Mobilization, Temporary facilities, Temporary partitions for occupied building phasing, Protection of existing finishes, Construction scheduling, Cleanup, Closeout documents, Attic stock requirements.

(Bidders are advised that general conditions, profit and overhead are limited to 20% of all line items except bond premium)

5 Selective Demolition LS

Interior wall demolition, Flooring demolition, Ceiling demolition,Countertop demolition, Cabinet demolition, Door and frame removals, Transaction window removal and relocation, Salvage and storage of owner items, Relocation of area of refuge equipment, Bathroom Accessories. Disposal and hauling

6 Concrete and Exterior Improvements LS

Demolish existing concrete, New accessible ramp/landings, New concrete walks/slab, Concrete repair at front entry stair rail locations, Replace CIP stair on Walnut Street, Accessible entrance improvements, sawcuts, tie ins, replace flag pole/footings, replace exterior building sign/footings, exterior light footings, erosion sedimentation control, interior sawcuts

7 Metals LS

Aluminum handrails, Interior handrails, Metal supports, Mailbox framing, Miscellaneous metals

8 Canopy Construction LS

Nichiha wood-look soffit system, Associated structural repairs and prep, paint and finishes, Associated structural modifications

9 Rough Carpentery/Framing LS

New wall framing, ADA unit framing, Furred walls, Temporary partitions, Blocking for accessories, Thru-wall unit pentrations (masonry cuts, framing, flashing/caulk/waterproofing, etc).

10 Doors, Frames & Hardware LS

HM & Wood Doors, Door painting and hardware upgrades, Card reader coordination, Kick plates and specialty hardware

11 Drywall Partitions LS

New rated partitions, New gypsum board walls, CMU infill, Acoustical insulation, Fire-rated walls at ADA units, Lobby modifications, Management office modifications

12 Architectural Millwork & Casework LS

Community Kitchen: Solid surface counters, counter modifications, cabinet modifications, apron cabinetry

Management Office: Transaction counter, File sotrage cabinetry

ADA Units - ADA kitchen cabinetry, ADA vanity cabinetry, closet shelves

Public Spaces: Mailbox Assemblies, Check-drop installation

13 Acoustical Ceilings LS

ACT-1 ceiling systems, ACT-2 feature ceilings, Grid replacement, Axiom trim, Ceiling modifications throughout first floor

14 Flooring LS

LVT-1, LVT-2, LVT-3, Epoxy Flooring, Transitions/Base

15 Painting & Finishes LS

Storefront coating system, Door and frame refinishing, Existing metal painting, Accent walls, Typical Walls/ Baseboard heat cover painting , Provide/Install Mural.

16 Wall Protection LS

Acrovyn wall protection, Corner guards, Aluminum trim, Handrail, Solid surface wall caps

17 Tile and Restroom Finishing LS

CT-1 through CT-5 tile, Restroom wall tile, ADA shower surrounds, Privacy panels, Wet wall systems

18 Window Treatments LS

Draper Shades

19 Furnishings & Accessories LS

Mailboxes, Check drop, Fire extinguisher cabinets, Toilet accessories, ADA accessories, Mirrors, Medicine cabinets, Grab bars, Shower seats, Signage

20 Landscape

Removal of Existing Landscape, installation of plants (trees, shrubs, perennials/groundcover, etc)

21 Deduct Alternates

Alternate No. 1: Landscape on Walnut LS

Alternate No. 2: Landscape near Main Entry LS

Alternate No. 3: Landscape near Driveway LS

Alternate No. 4: New Park Benches LS

Base Bid - General Construction Contract - Construction Cost Total $ -

The Bid Cost Breakdown is provided as information to the MCHA. The Bid Cost Breakdown shall in no way alter the Bidder’s bid price, nor shall it serve to limit the scope of work required by Contract Documents

PLUMBING CONSTRUCTION CONTRACT

Item # Description of Work Unit of Measure Total Cost

PLUMBING CONTRACT

1 Mobilization LS

2 Bonds LS

3 Permits LS

4 General Conditions LS

Mobilization, Temporary facilities, Temporary partitions for occupied building phasing, Protection of existing finishes, Construction scheduling, Cleanup, Closeout documents, Attic stock requirements. (Bidders are advised that general conditions, profit and overhead are limited to 20% of all line items except bond premium) 5 Plumbing Demolition LS

Existing domestic water modifications, Existing waste piping modifications, Fixture removals, Sink removals

6 Domestic Water System LS

New domestic Water piping, new branch piping, Insulation, Valves, Tie -ins

7 Community Kitchen Plumbing LS

Hand sink, Dishwashing sink, Counter penetrations, Waste and vent connections, etc.

8 ADA Unit Plumbing LS

Kitchen sink connections, Bathroom sink connections, Shower assemblies, Water closets, Floor drains, ADA pipe wraps

9 Public Restroom Plumbing, Corridor LS Lavatory modifications, Water closets, Accessories requiring plumbing coordination, water fountain

10 Laundry Plumbing LSAdditional washer connection, Laundry utility connections

11 Utility Service Modifications LS

Relocate laundry sink, Utility room modifications, Final tie-ins and testing

12 Building Sanitary Modification LS

Sawcut, excavate, backfill and infill concrete slab for first floor where below slab sanitary is to be modified

13 Existing Sanitary Stacks LS replace existing exposed sanitary stacks with PVC and provide wall cleanouts and access panels

Base Bid - Plumbing Construction Contract - Construction Cost Total $ - The Bid Cost Breakdown is provided as information to the MCHA. The Bid Cost Breakdown shall in no way alter the Bidder’s bid price, nor shall it serve to limit the scope of work required by Contract Documents

MECHANICAL CONSTRUCTION CONTRACT

Item # Description of Work Unit of Measure Total Cost

MECHANICAL CONTRACT

1 Mobilization LS

2 Bonds LS

3 Permits LS

4 General Conditions LS

Mobilization, Temporary facilities, Temporary partitions for occupied building phasing, Protection of existing finishes, Construction scheduling, Cleanup, Closeout documents, Attic stock requirements.

(Bidders are advised that general conditions, profit and overhead are limited to 20% of all line items except bond premium)

5 Mechanical Demolition LS

Duct demolition, Hydronic modifications, HVAC demolition, Existing equipment disconnects

6 Air Distribuition LS

Flex duct modifications, branch ductwork, balancing dampers, smoke damper coordination

7 Ductwork LS

Main duct modifications, Branch ductwork, Balancing dampers, Smoke damper coordination, exaust installation

8 Thru Wall Units LS

Two through-wall units

9 Hydronic System LS

Hydronic piping, Valves, Balancing, Insulation, Tie-ins

10 Testing and Balancing LS

Testing, Adjusting, Balancing, Final reports

11 Mini Split System LS

Indoor and outdoor unit with condensate pump, condensate piping, refrigerant piping and wall mounted thermostat.

Base Bid - Mechanical Construction Contract - Construction Cost Total -$

The Bid Cost Breakdown is provided as information to the MCHA. The Bid Cost Breakdown shall in no way alter the Bidder’s bid price, nor shall it serve to limit the scope of work required by Contract

Documents

ELECTRICAL CONSTRUCTION CONTRACT

Item # Description of Work Unit of Measure Total Cost

ELECTRICAL CONTRACT

1 Mobilization LS

2 Bonds LS

3 Permits LS

4 General Conditions LS

Mobilization, Temporary facilities, Temporary partitions for occupied building phasing, Protection of existing finishes, Construction scheduling, Cleanup, Closeout documents, Attic stock requirements.

(Bidders are advised that general conditions, profit and overhead are limited to 20% of all line items except bond premium)

5 Electrical Demolition LS

Existing lighting removal, Power demolition, Fire alarm modifications, Device removals

6 Branch Power LS

Receptacles, Dedicated circuits, Branch wiring/circuits, Device relocation, Apartment Panels.

7 Lighting Fixtures LS

Type A 2x2 Fixtures, Type B 2x4 Fixtures, Emergency Fixtures, Recessed Downlights, Surface

Fixtures, Pendant Fixtures, Vanity Lights, Exit Signs, Exterior Light Fixtures for Canopy, Exterior Light

Fixtures at front entry

8 Lighting Controls LS

Occupancy sensors, Switching modifications, Control wiring

9 Fire Alarm LS

Device relocation, Interface work, Testing and certification

10 Communications and Security LS

Camera relocation, Server equipment relocation, Area of refuge system relocation, Data modifications

Base Bid - Electrical Construction Contract - Construction Cost Total -$

The Bid Cost Breakdown is provided as information to the MCHA. The Bid Cost Breakdown shall in no way alter the Bidder’s bid price, nor shall it serve to limit the scope of work required by Contract