6-2026.01.15 Sidney Pollock SPECS.pdf

PDF 6 MB Posted

Attached to
Golden Age Manor First Floor Improvements and Accessible Front Entrance
Solicitation number
Not on record
Issued by
Montgomery County, Polk Borough, Pennsylvania

About this file

This document consists of contract specifications and technical requirements for mechanical, electrical, and plumbing (MEP) construction work prepared by the Montgomery County Housing Authority (MCHA) for the Sidney Pollock House Boiler Replacement and Domestic Hot Water Heaters Installation project located at 450 East High Street, Pottstown, Pennsylvania 19464. The project scope encompasses the installation of new boilers, pumps, direct control systems, thermostats, domestic hot water heaters, and associated MEP components. The work is organized under three prime contracts: mechanical (boiler replacement and heating systems), plumbing (domestic water distribution and hot water systems), and electrical (power distribution and controls). Sealed bids are due electronically via the PennBid Program by 2:00 P.M. prevailing time on Thursday, January 29, 2026, with public opening at Robert P. Smith Towers, 501 East High Street, Pottstown, PA 19464. A non-mandatory pre-bid meeting is scheduled for 10:00 A.M. prevailing time on Tuesday, January 20, 2026 at the Sidney Pollock House. A bid bond equal to five percent of the bid amount is required, with successful bidders required to furnish Performance and Payment Bonds. The project specifications reference standards including ASME, NFPA 70 (National Electrical Code), and ASHRAE/IES 90.1, with detailed requirements for materials, testing, and commissioning activities.

The contract is subject to Section 3 of the Housing and Urban Development Act of 1968, requiring that training, employment, and economic opportunities be directed to low- and very low-income persons. Prevailing wage requirements apply to all workers on the project. The specifications require coordination among three prime contractors with the mechanical contractor designated as the project coordinator. The work must comply with requirements for phased construction during partial owner occupancy, with work hours limited to 7:00 a.m. to 3:30 p.m., Monday through Friday. The project includes comprehensive testing, adjusting, and balancing requirements; factory startup services; operator training; and the submission of extensive documentation including operation and maintenance manuals, warranty information, and record drawings. The mechanical contractor is responsible for temporary heating, cooling, and ventilation, and common-use field facilities. The construction documents specify that no work shall commence until systems have been tested and inspected by authorities having jurisdiction, with all work to be completed in compliance with applicable federal, state, and local codes and regulations.

View the file

Other files

File Type Posted
8-Golden Age Manor 1st Floor Improvements and Accessible Front Entrance Issued 10-26-2026.pdf PDF
4-20261029 Golden Age Manor-Issued for Bid Drawings.pdf PDF
6-Required Document 4 - GAM 1st Floor Bid Breakdown.pdf PDF
2-Required Document 3 - HUD 5369-a.pdf PDF
7-Required Document 5 - BABA Bidder Certificaqtion.pdf PDF
3-Required Document 2 - Non-Collusion Affidavit.pdf PDF
5-20261029 Golden Age Manor-Issued for Bid Specifications.pdf PDF
7-2548 - Golden Age Manor Project Manual - ISSUED FOR BID 2026.03.05.pdf PDF
6-2548 - Golden Age Manor Drawings - ISSUED FOR BID 2026.03.05 R1.pdf PDF
1-Required Document 1 - Bid Bond.pdf PDF
4-Required Document 4 - Bid Cost Breakdown.pdf PDF
2-Required Document 2 - Non-Collusion Affidavit.pdf PDF
5-Required Document 5 - BABA Bidder Certification.pdf PDF
3-Required Document 3 - HUD 5369-a.pdf PDF
8-Roof Replacement at Golden Age Manor Issued 3-9-25.pdf PDF
4-Required Document 4 - SPH Boiler Bid Cost Breakdown.pdf PDF
5-2025.01.15 Sidney Pollock DWGS.pdf PDF
1-Required Document 1 - Bid Bond.pdf PDF
7-Boiler Replacement at Sidney Pollock House - Issued 1-15-2026.pdf PDF
2-Required Document 2 - Non-Collusion Affidavit.pdf PDF
3-Required Document 3 - HUD 5369-a.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Documents and Specifications

FOR

Sidney Pollock House Boiler Replacement

Owner:

Montgomery County Housing Authority 501 East High Street Pottstown, PA 19464

Date: January 15, 2026 Project #: 1091224.002

Table of Contents

TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

011000 Summary

01200 Multiple Contract Summary

012500 Substitution Procedures

012600.31 Contract Modification Procedures

012900.31 Payment Procedures

013100 Project Management and Coordination

013300 Submittal Procedures

015000.00 Temporary Facilities

017300 Execution

017700 Closeout Procedures

DIVISION 22 – PLUMBING

220500 Common Work Results for Plumbing.

220513 Common Motor Requirements for Plumbing Equipment

220519 Meters and Gauges for Plumbing Piping

220523 General-Duty Valves for Plumbing Piping

220529 Hangers and Supports for Plumbing, Piping and Equipment

220548 Vibration Controls for Plumbing Piping and Equipment

220553 Identification for Plumbing Piping and Equipment

220719 Plumbing Piping Insulation

220800 Plumbing Systems Commissioning

221116 Domestic Water Piping

221119 Domestic Water Piping Specialties

221123.13 Domestic Water Packaged Booster Pumps

221123.21 Inline Domestic Water Pumps

221124 Facility Natural Gas Piping

223400 Fuel Fired Domestic Water Heaters

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230513 Common Motor Requirements for HVAC

230519 Meters and Gauges for HVAC Piping

230523 General Duty Valves for HVAC Piping

230529 Hangers and Supports for HVAC Piping and Equipment

230548 Vibration Controls for HVAC

230553 Identification for HVAC Piping and Equipment

230593 Testing, Adjusting, and Balancing for HVAC

230716 HVAC Equipment Insulation

230719 HVAC Piping Insulation

230800 HVAC Systems Commissioning

Table of Contents

230923.11 Control Valves

230995 Variable Frequency Controllers

232113 Hydronic Piping

232116 Hydronic Piping Specialties

232123 Hydronic Pumps

235100 Breechings, Chimneys, and Stacks

235216 Condensing Boilers

DIVISION 26 – ELECTRICAL

260511 Requirements for Electrical Systems

260519 Low Voltage Electrical Power Conductors and Cables

260529 Hangers and Supports for Electrical Systems

260533 Raceways and Boxes for Electrical Systems

260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

260553 Identification for Electrical Systems

262813 Fuses

262816 Enclosed Switches and Circuit Breakers

262702 Equipment Connections

Sidney Pollock House – Boiler Replacement

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Phased construction.

4. Construction Schedule.

5. One Work Package.

6. Coordination with occupants.

7. Work restrictions.

8. Specification and Drawing conventions.

1.3 PROJECT INFORMATION

A. Project Identification: Montgomery County Housing Authority

Sidney Pollock House Boiler Replacement and Related Work

1. Project Location: 450 East high Street

Pottstown, PA 19464

B. Owner: Montgomery County Housing Authority

Attn: Becky Schaeffer, Manager of Capital Projects

501 E. High Street, Pottstown, PA 19464 bschaeffer@montcoha.org

C. Engineer: Barry Isett & Associates, Inc.

Attn: Matthew Carpenter

400 Cresson Blvd Suites 105-108

Phoenixville, PA 19460 mcarpenter@barryisett.com

SUMMARY 011000 - 2

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following:

1. All labor, materials, oversight, bonds, and permits required to provide MEP base services that include the installation of new boilers, pumps, direct control systems, thermostats, new domestic hot water heaters, and associated parts.

B. Type of Contract:

1. Project will be constructed under coordinated, concurrent multiple contracts. See

Section 011200 "Multiple Contract Summary" for a list of multiple contracts, a description of work included under each of the multiple contracts, and the responsibilities of Project coordinator.

1.5 ONE WORK PACKAGE

A. Construction Documents for this Project will be issued in one package, with defined scope of work per Prime Contractor. The package will define the Work under individual primes

Contracts. Coordinate the Work under this Contract with separate contracts defined by other disciplines in package. Below shows the responsible primes scope of work.

1. Mechanical Construction. Drawings M0.0 – MD1.0. Mechanical Contractor is the project coordinator responsible for all ‘M’ Drawings, Division 23 specifications, and any specific mechanical notes on the other drawings. Mechanical contractor is responsible for their own cutting, patching, and temporary facilities including any additional larger/general temporary facilities for the overall project.

2. Electrical Construction. Drawings E0.0 – ED1.0. Electrical Contractor is responsible for all ‘E’ drawings, Division 26 specifications, and specific electrical notes on other drawings. Electrical Contractor is responsible for their own cutting, patching, and temporary facilities.

3. Plumbing Construction. Drawings P0.0 – PD1.0. Plumbing Contractor is responsible for all ‘P’ drawings, Division 22 specifications, and specific plumbing notes on other drawings. Plumbing Contractor is responsible for their own cutting, patching, and temporary facilities.

1.6 COORDINATION WITH OCCUPANTS

A. Partial Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits unless otherwise indicated.

SUMMARY 011000 - 3

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.

2. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's operations.

1.7 WORK RESTRICTIONS

A. Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets, work on public streets, rights of way, and other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work to between 7:00 a.m. to 3:30 p.m., Monday through Friday, unless otherwise indicated. Work hours may be modified to meet Project requirements if approved by Owner and authorities having jurisdiction.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging for temporary utility services according to requirements indicated:

1. Notify Owner and Engineer not less than two days in advance of proposed utility interruptions.

2. Obtain Owner’s written permission before proceeding with utility interruptions.

D. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner and Engineer not less than two days in advance of proposed disruptive operations.

1.8 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 00 Contracting Requirements: General provisions of the Contract, including General and Supplementary Conditions, apply to all Sections of the Specifications.

C. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

SUMMARY 011000 - 4

D. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

MULTIPLE CONTRACT SUMMARY 011200 - 1

SECTION 011200 - MULTIPLE CONTRACT SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes a summary of each contract, including responsibilities for coordination and temporary facilities and controls.

B. Specific requirements for Work of each contract are also indicated in individual Specification

Sections and on Drawings.

C. Related Requirements:

1. Section 011000 "Summary" for the Work covered by the Contract Documents, restrictions on use of Project site, phased construction, coordination with occupants, and work restrictions.

2. Section 013100 "Project Management and Coordination" for general coordination requirements.

1.2 PROJECT COORDINATOR

A. The Mechanical Contract shall be identified as the Project Coordinator.

B. Project coordinator shall be responsible for coordination between the Plumbing Contract and

Electrical Contract.

1.3 PROJECT COORDINATOR RESPONSIBILITIES

A. Project coordinator shall perform Project coordination activities for the multiple contracts, including, but not limited to, the following:

1. Provide typical overall coordination of the Work.

2. Coordinate shared access to workspaces.

3. Coordinate product selections for compatibility.

4. Provide overall coordination of temporary facilities and controls.

5. Coordinate, schedule, and approve interruptions of permanent and temporary utilities, including those necessary to make connections for temporary services.

6. Coordinate construction and operations of the Work with work performed by each

Contract.

7. Prepare coordination drawings in collaboration with each contractor to coordinate work by more than one contract.

8. Coordinate sequencing and scheduling of the Work.

a. Prepare combined Contractors' Construction Schedule for entire Project Base schedule on preliminary construction schedule. Secure time commitments for performing critical construction activities from contractors. Show activities of each

MULTIPLE CONTRACT SUMMARY 011200 - 2

contract on a separate sheet. Prepare a simplified summary sheet indicating combined construction activities of contracts.

1) Submit schedules for approval.

2) Distribute copies of approved schedules to contractors.

9. Provide information necessary to adjust, move, or relocate existing utility structures affected by construction.

10. Locate existing permanent benchmarks, control points, and similar reference points, and establish permanent benchmarks on Project site.

11. Provide field surveys of in-progress construction and site work.

12. Provide progress cleaning of common areas and coordinate progress cleaning of areas or pieces of equipment where more than one contractor has worked.

13. Coordinate cutting and patching.

14. Coordinate protection of the Work.

15. Coordinate firestopping.

16. Coordinate completion of interrelated punch list items.

17. Coordinate preparation of Project Record Documents if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

18. Print and submit Record Documents if installations by more than one contractor are indicated on the same Contract Drawing or Shop Drawing.

19. Coordinate preparation of operation and maintenance manuals if information from more than one contractor is to be integrated with information from other contractors to form one combined record.

B. Responsibilities of Project coordinator for temporary facilities and controls include, but are not limited to, the following:

1. Provide common-use field office for use by all personnel engaged in construction activities.

2. Provide temporary sanitary facilities for use by all personnel engaged in construction activities.

1.4 GENERAL REQUIREMENTS OF CONTRACTS

A. Extent of Contract: Unless the Agreement contains a more specific description of the Work of each Contract, requirements indicated on Drawings and in Specification Sections determine which contract includes a specific element of Project.

1. Unless otherwise indicated, the work described in this Section for each contract shall be complete systems and assemblies, including products, components, accessories, and installation required by the Contract Documents.

2. Trenches and other excavation for the work of each contract shall be the work of each contract for its own work.

3. Blocking, backing panels, sleeves, and metal fabrication supports for the work of each contract shall be the work of each contract for its own work.

4. Furnishing of access panels for the work of each contract shall be the work of each contract for its own work. Installation of access panels shall be the work of each contract for its own work.

MULTIPLE CONTRACT SUMMARY 011200 - 3

5. Equipment pads for the work of each contract shall be the work of each contract for its own work.

6. Roof-mounted equipment curbs for the work of each contract shall be the work of each contract for its own work.

7. Painting for the work of each contract shall be the work of each contract for its own work.

8. Cutting and Patching: Provided under each contract for its own work. Each contract shall perform its own cutting; patching shall be under the General Construction

Contract.

9. Through-penetration firestopping for the work of each contract shall be provided by each contract for its own work.

10. Coordinate sequence of activities to accommodate tests and inspections, and coordinate schedule of tests and inspections of each contract.

11. Contractors' Startup Construction Schedule: Within five working days after startup horizontal bar-chart-type construction schedule submittal has been received from Project coordinator, submit a matching startup horizontal bar-chart schedule showing construction operations sequenced and coordinated with overall construction.

B. Substitutions: Each contractor shall cooperate with other contractors involved to coordinate approved substitutions with remainder of the work.

1. The Project Coordinator shall coordinate substitutions.

C. Temporary Facilities and Controls: In addition to specific responsibilities for temporary facilities and controls indicated in this Section and in Section 015000 "Temporary Facilities and

Controls," each contractor is responsible for the following:

1. Installation, operation, maintenance, and removal of each temporary facility necessary for its own normal construction activity, and costs and use charges associated with each facility, except as otherwise provided for in this Section.

2. Plug-in electric power cords and extension cords, supplementary plug-in task lighting, and special lighting necessary exclusively for its own activities.

3. Its own field office, complete with necessary furniture, and utilities.

4. Its own storage and fabrication units.

5. Temporary enclosures for its own construction activities.

6. Staging and scaffolding for its own construction activities.

7. General hoisting facilities for its own construction activities.

8. Waste disposal facilities, including collection and legal disposal of its own hazardous, dangerous, unsanitary, or other harmful waste materials.

9. Progress cleaning of work areas affected by its operations on a daily basis.

10. Secure lockup of its own tools, materials, and equipment.

11. Construction aids and miscellaneous services and facilities necessary exclusively for its own construction activities.

D. Temporary Heating, Cooling, and Ventilation: Project coordinator is responsible for temporary heating, cooling, and ventilation, including utility-use charges, temporary meters, and temporary connections.

MULTIPLE CONTRACT SUMMARY 011200 - 4

1.5 PLUMBING CONTRACT

A. Work of the Plumbing Contract includes, but is not limited to, the following:

1. Domestic water distribution.

2. Domestic water heating

3. Special plumbing systems, including the following:

a. Natural gas.

1.6 MECHANICAL CONTRACT

A. Work of the HVAC Contract includes, but is not limited to, the following:

1. HVAC systems and equipment.

2. HVAC instrumentation and controls.

3. HVAC testing, adjusting, and balancing.

1.7 ELECTRICAL CONTRACT

A. Work of the Electrical Contract includes, but is not limited to, the following:

1. Electrical service and distribution.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 011200

SUBSTITUTION PROCEDURES 012500 - 1

SECTION 012500 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

1.2 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents.

1. Substitutions for Cause: Changes proposed by Contractors that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

1.3 ACTION SUBMITTALS

A. Substitution Requests: Submit documentation identifying product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Submit executed Substitution Request Form for each proposed substitution.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation cannot be provided, if applicable.

b. Coordination information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors, that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable Specification Section.

Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

SUBSTITUTION PROCEDURES 012500 - 2

f. Certificates and qualification data, where applicable or requested.

g. List of similar installations completed by the Contractor for completed projects with project names and addresses and names and addresses of architects and owners.

h. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.

i. Research reports evidencing compliance with applicable building codes.

j. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work, including effect on the overall

Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Engineer's Action: If necessary, Engineer will request additional information or documentation for evaluation within seven days of receipt of a request for substitution.

Engineer will notify Contractor of acceptance or rejection of proposed substitution within

15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or

Engineer’s Supplemental Instructions for minor changes in the Work.

b. Use product specified if Engineer does not issue a decision on use of a proposed substitution within time allocated.

1.4 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

SUBSTITUTION PROCEDURES 012500 - 3

1.5 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.6 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

1. Conditions: Engineer will consider Contractor's request for substitution when the following conditions are satisfied:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Requested substitution will not adversely affect Contractor's construction schedule.

c. Requested substitution has received necessary approvals of authorities having jurisdiction.

d. Requested substitution is compatible with other portions of the Work.

e. Requested substitution has been coordinated with other portions of the Work.

f. Requested substitution provides specified warranty.

g. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Not allowed.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 012500

CONTRACT MODIFICATION PROCEDURES 012600 - 1

SECTION 012600 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing

Contract modifications.

1.2 MINOR CHANGES IN THE WORK

A. Engineer will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time.

1.3 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Engineer will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Work Change Proposal Requests issued by Engineer are not instructions either to stop work in progress or to execute the proposed change.

2. Within time specified in Proposal Request after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change.

d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

B. Contractor-Initiated Work Change Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Engineer.

1. Include a statement outlining reasons for the change and the effect of the change on the

Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

CONTRACT MODIFICATION PROCEDURES 012600 - 2

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change.

5. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the

Contract Time.

6. Comply with requirements in Section 012500 "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.

1.4 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Work Changes Proposal Request, Engineer will issue a Change Order for signatures of Owner and Contractor on AIA Document G701.

1.5 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Engineer may issue a Construction Change Directive on

AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the

Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the

Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 012600

PAYMENT PROCEDURES 012900 - 1

SECTION 012900 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process

Applications for Payment.

1.2 DEFINITIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract

Sum to various portions of the Work and used as the basis for reviewing Contractor's

Applications for Payment.

1.3 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Coordinate line items in the schedule of values with other required administrative forms and schedules, including the following:

a. Application for Payment forms with continuation sheets.

b. Submittal schedule.

c. Items required to be indicated as separate activities in Contractor's construction schedule.

2. Submit the schedule of values to Engineer at earliest possible date, but no later than seven days before the date scheduled for submittal of initial Applications for Payment.

B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location.

b. Name of Engineer.

c. Engineer's project number.

d. Contractor's name and address.

e. Date of submittal.

PAYMENT PROCEDURES 012900 - 2

2. Arrange schedule of values consistent with format of AIA Document G703.

3. Arrange the schedule of values in tabular form with separate columns to indicate the following for each item listed:

a. Related Specification Section or Division.

b. Description of the Work.

c. Name of subcontractor.

d. Name of manufacturer or fabricator.

e. Name of supplier.

f. Change Orders (numbers) that affect value.

g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.

1) Labor.

2) Materials.

3) Equipment.

4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with Project

Manual table of contents. Provide multiple line items for principal subcontract amounts in excess of five percent of the Contract Sum.

5. Round amounts to nearest whole dollar; total shall equal the Contract Sum.

6. Provide a separate line item in the schedule of values for each part of the Work where

Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

a. Differentiate between items stored on-site and items stored off-site. If required, include evidence of insurance.

7. Provide separate line items in the schedule of values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.

8. Each item in the schedule of values and Applications for Payment shall be complete.

Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at Contractor's option.

PAYMENT PROCEDURES 012900 - 3

9. Schedule Updating: Update and resubmit the schedule of values before the next

Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.

1.4 APPLICATIONS FOR PAYMENT

A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments as certified by Engineer and paid for by Owner.

1. Initial Application for Payment, Application for Payment at time of Substantial

Completion, and final Application for Payment involve additional requirements.

B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction work covered by each Application for Payment is the period indicated in the Agreement.

C. Payment Application Times: Submit Application for Payment to Engineer by the first of the month. The period covered by each Application for Payment is one month, ending on the last day of the month.

1. Submit draft copy of Application for Payment at least three days prior to the first of the month.

2. Projections on Applications for Payment are not permitted.

3. Provide three (3) hard copies of Application for Payment or one (1) electronic copy.

D. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form for Applications for Payment.

E. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Engineer will return incomplete applications without action.

1. Entries shall match data on the schedule of values and Contractor's construction schedule.

Use updated schedules if revisions were made.

2. Include amounts for work completed following previous Application for Payment, whether or not payment has been received. Include only amounts for work completed at time of Application for Payment.

3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

F. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored, but not yet installed. Differentiate between items stored on-site and items stored off-site.

1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of surety to payment, for stored materials.

PAYMENT PROCEDURES 012900 - 4

2. Provide supporting documentation that verifies amount requested, such as paid invoices.

Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.

3. Provide summary documentation for stored materials indicating the following:

a. Value of materials previously stored and remaining stored as of date of previous

Applications for Payment.

b. Value of previously stored materials put in place after date of previous Application for Payment and on or before date of current Application for Payment.

c. Value of materials stored since date of previous Application for Payment and remaining stored as of date of current Application for Payment.

G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors.

2. Schedule of values.

3. Contractor's construction schedule (preliminary if not final).

4. Products list (preliminary if not final).

5. Schedule of unit prices.

6. Submittal schedule (preliminary if not final).

7. List of Contractor's staff assignments.

8. List of Contractor's principal consultants.

9. Copies of building permits.

10. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.

11. Initial progress report.

12. Report of preconstruction conference.

13. Certificates of insurance and insurance policies.

14. Performance and payment bonds.

15. Data needed to acquire Owner's insurance.

H. Application for Payment at Substantial Completion: After Engineer issues the Certificate of

Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

PAYMENT PROCEDURES 012900 - 5

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificate(s) of Substantial Completion issued previously for Owner occupancy of designated portions of the Work.

I. Final Payment Application: After completing Project closeout requirements, submit final

Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid.

3. Updated final statement, accounting for final changes to the Contract Sum.

4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims."

5. AIA Document G706A, "Contractor's Affidavit of Release of Liens."

6. AIA Document G707, "Consent of Surety to Final Payment."

7. Evidence that claims have been settled.

8. Final liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 012900

PROJECT MANAGEMENT AND COORDINATION 013100 - 1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project, including, but not limited to, the following:

1. General coordination procedures.

2. RFIs.

3. Digital project management procedures.

4. Project meetings.

B. Each contractor shall participate in coordination requirements. Certain areas of responsibility are assigned to a specific contractor.

1.2 DEFINITIONS

A. RFI: Request for Information. Request from Contractor seeking information required by or clarifications of the Contract Documents.

1.3 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

1.4 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the

Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results, where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

PROJECT MANAGEMENT AND COORDINATION 013100 - 2

B. Coordination of Multiple Contracts: Each contractor shall cooperate with Project coordinator, who shall coordinate its construction operations with those of other contractors and entities to ensure efficient and orderly installation of each part of the Work. Each contractor shall coordinate its own operations with operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results, where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other contractors to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

C. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their

Work is required.

D. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and scheduled activities of other contractors and direction of Project coordinator to avoid conflicts and to ensure orderly progress of the Work.

Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

1.5 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Engineer will return RFIs submitted to Engineer by other entities controlled by Contractor with no response.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.

2. Owner name.

3. Date.

PROJECT MANAGEMENT AND COORDINATION 013100 - 3

4. Name of Contractor.

5. RFI number, numbered sequentially.

6. RFI subject.

7. Specification Section number and title and related paragraphs, as appropriate.

8. Drawing number and detail references, as appropriate.

9. Field dimensions and conditions, as appropriate.

10. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract

Time or the Contract Sum, Contractor shall state impact in the RFI.

11. Contractor's signature.

12. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Engineer.

1. Attachments shall be electronic files in PDF format.

D. Engineer’s Action: Engineer will review each RFI, determine action required, and respond. Allow seven days for Engineer's response for each RFI. RFIs received by Engineer after 1:00 p.m. will be considered as received the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for coordination information already indicated in the Contract Documents.

d. Requests for adjustments in the Contract Time or the Contract Sum.

e. Requests for interpretation of Engineer's actions on submittals.

f. Incomplete RFIs or inaccurately prepared RFIs.

2. Engineer's action may include a request for additional information, in which case

Engineer's time for response will date from time of receipt of additional information.

3. Engineer's action on RFIs that may result in a change to the Contract Time or the Contract

Sum may be eligible for Contractor to submit Change Proposal according to

Section 012600 "Contract Modification Procedures."

a. If Contractor believes the RFI response warrants change in the Contract Time or the

Contract Sum, notify Engineer in writing within 10 days of receipt of the RFI response.

4. Identification of related Minor Change in the Work, Construction Change Directive, and

Proposal Request, as appropriate.

PROJECT MANAGEMENT AND COORDINATION 013100 - 4

1.6 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Use of Engineer's Digital Data Files: Digital data files of Engineer's CAD drawings will be provided by Engineer for Contractor's use during construction.

1. Digital data files may be used by Contractor in preparing coordination drawings, Shop

Drawings, and Project Record Drawings.

2. Engineer makes no representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings.

3. Contractor shall execute a data licensing agreement form provided by the Engineer upon the Contractor’s formal request for Data Files.

1.7 PROJECT MEETINGS

A. General: Engineer will schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

B. Preconstruction Conference: Engineer will schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Engineer.

C. Construction Progress Meetings: Engineer will conduct progress meetings at biweekly intervals.

D. Attendees: In addition to representatives of Owner, Utility Companies and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

E. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to

Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

a. Review schedule for next period.

b. Review present and future needs of each entity present.

F. Minutes: Engineer will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PROJECT MANAGEMENT AND COORDINATION 013100 - 5

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013100

SUBMITTAL PROCEDURES 013300 - 1

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Engineer responsive action.

B. Informational Submittals: Written and graphic information and physical samples that do not require Engineer responsive action. Submittals may be rejected for not complying with requirements.

1.3 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or modifications to submittals noted by the Engineer and additional time for handling and reviewing submittals required by those corrections.

1.4 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. Engineer’s Digital Data Files: Electronic copies of CAD Drawings of the Contract Drawings will not be provided by Engineer for Contractor's use in preparing submittals.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Engineer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Engineer’s receipt of submittal.

SUBMITTAL PROCEDURES 013300 - 2

No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Engineer will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal.

D. Identification and Information: Place a permanent label or title block on each paper copy submittal item for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 6 by 8 inches on label or beside title block to record

Contractor's review and approval markings and action taken by Engineer.

3. Include the following information for processing and recording action taken:

a. Project name.

b. Date.

c. Name of Engineer.

d. Name of Contractor.

e. Name of subcontractor.

f. Name of supplier.

g. Name of manufacturer.

h. Submittal number or other unique identifier, including revision identifier.

i. Number and title of appropriate Specification Section.

j. Drawing number and detail references, as appropriate.

k. Location(s) where product is to be installed, as appropriate.

l. Other necessary identification.

E. Identification and Information: Identify and incorporate information in each electronic submittal file as follows:

1. Name file with submittal number or other unique identifier, including revision identifier.

2. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Engineer.

SUBMITTAL PROCEDURES 013300 - 3

3. Include the following information on an inserted cover sheet:

a. Project name.

b. Date.

c. Name and address of Engineer.

d. Name of Contractor.

e. Name of firm or entity that prepared submittal.

f. Name of subcontractor.

g. Name of supplier.

h. Name of manufacturer.

i. Number and title of appropriate Specification Section.

j. Drawing number and detail references, as appropriate.

k. Location(s) where product is to be installed, as appropriate.

l. Related physical samples submitted directly.

m. Other necessary identification.

F. Options: Identify options requiring selection by the Engineer.

G. Deviations: Identify deviations from the Contract Documents on submittals.

H. Copies: Unless additional copies are required for final submittal, and unless Engineer observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

1. Submit one electronic copy of submittal to concurrent reviewer in addition to specified number of copies to Engineer.

I. Transmittal: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Engineer will discard submittals received from sources other than Contractor.

J. Resubmittals: Make resubmittals in the same form as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked with approval notation from Engineer’s action stamp.

SUBMITTAL PROCEDURES 013300 - 4

K. Distribution: Furnish copies of final submittals to…

This is the start of the file's text. The full file is on GovTribe.