5-2025.01.15 Sidney Pollock DWGS.pdf
PDF 2 MB Posted
- Solicitation number
- Not on record
- Issued by
- Montgomery County, Polk Borough, Pennsylvania
About this file
This is a construction drawing package for the Montgomery County Housing Authority's boiler replacement, thermostat upgrade, and domestic hot water heater installation project at Sidney Pollock House, located at 450 East High Street, Pottstown, Pennsylvania 19464. The project scope includes the replacement of existing boiler systems with two new AERCO BMK-1000 condensing boilers (B-1 and B-2), each with 1000 MBH input and 960 MBH output, installation of new hot water heating pumps (HWP-1 and HWP-2) manufactured by Grundfos, replacement of thermostats and control valves in all 102 apartments with Honeywell TH1010D2000 models, installation of two new gas-fired instant water heaters (GWH-1 and GWH-2) manufactured by AERCO, and installation of a new duplex domestic water booster pump system. The mechanical work includes new piping configurations with 3-inch hot water supply and return mains, a new 3-inch tangential air separator, a 5-gallon chemical feeder, flue and combustion air intake systems extending through the roof, and air vent replacement on all baseboard radiators. Electrical work encompasses new circuit breaker installations, VFD motor controllers for pump operation, emergency boiler shutdown controls, and 24-volt thermostat wiring throughout the building. Plumbing modifications include new domestic water piping connections, thermostatic mixing valve installation set to 110 degrees Fahrenheit, condensate neutralizers, and expansion tank provisions. The drawings were issued for bid on January 15, 2026, with bids due electronically through PennBid on January 29, 2026 at 2:00 P.M. prevailing time, with public bid opening at Robert P. Smith Towers. A non-mandatory pre-bid meeting is scheduled for January 20, 2026 at 10:00 A.M. at Sidney Pollock House.
The contract requires all contractors to provide comprehensive labor, material, and equipment for complete system installation in strict accordance with the 2018 International Building Code, International Mechanical Code, International Plumbing Code, National Electrical Code 2017, and all applicable local codes and ordinances. A bid bond equal to five percent of the bid amount is required upon submission, with the successful bidder required to furnish Performance and Payment Bonds. All contractors must visit the site and become familiar with existing conditions prior to bid submission, verify all dimensions and existing building information, submit shop drawings for review with a minimum two-week review period, and coordinate work across mechanical, electrical, and plumbing trades. The project is subject to Section 3 of the Housing and Urban Development Act of 1968, requiring that training, employment, and economic opportunities be directed to low- and very low-income persons to the greatest extent feasible. Contractors must comply with prevailing wage requirements and ensure non-discrimination in employment. All materials, equipment, and workmanship must be unconditionally guaranteed in writing for three years from the date of owner acceptance, with as-built drawings and operation and maintenance manuals required upon project completion.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
C O
VE
R
S H
EE
T
CS
JMM SA
SA
MWZ
MC
SIDNEY POLLOCK HOUSE BOILER REPLACEMENT
450 EAST HIGH STREET
POTTSTOWN, PA 19464
SITE MAP
Montgomery County Housing Authority 501 East High Street Pottstown, PA 19464
KEY MAP
Barry Isett & Associates, Inc.
5420 Crackersport Rd
Allentown, PA 18104 610-398-0904
Contact: Matthew Carpenter
APPLICABLE CODES GENERAL NOTES
1. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS UNLESS NOTED OTHERWISE TO COMPLETE THE WORK.
2. ALL WORK WILL BE SUBJECT TO THE APPROVAL OF THE BUILDING OWNER AND PRIME DESIGN PROFESSIONAL.
3. ALL WORK IS TO BE COORDINATED WITH THE BUILDING OWNER, INCLUDING WORKING HOURS, DUMPSTER LOCATIONS, LOADING AREAS, ETC.
4. ALL WORK SHOWN ON THESE DRAWINGS HAS BEEN DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE "2018 INTERNATIONAL BUILDING CODE"
5. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND ORDINANCES.
6. MECHANICAL AND ELECTRICAL SYSTEMS SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL CODES AND ORDINANCES.
7. CONTRACTOR SHALL BE COMPLETELY FAMILIARIZED WITH ALL CONTRACT DOCUMENTS. BY SUBMITTING A COST PROPOSAL TO COMPLETE THE WORK, THE CONTRACTOR REPRESENTS THAT THEY HAVE VISITED THE SITE AND ARE FAMILIAR WITH THE
CONDITIONS UNDER WHICH THE WORK WILL BE PERFORMED.
8. WORK NOT INDICATED ON A PART OF THE DRAWINGS BUT REASONABLY IMPLIED TO BE SIMILAR TO THAT SHOWN AT CORRESPONDING PLACES SHALL BE REPEATED.
9. JOBSITE SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. REVIEW OF THE CONSTRUCTION BY THE DESIGN PROFESSIONAL IS FOR GENERAL CONFORMANCE WITH DESIGN ASPECTS ONLY, NOT TO REVIEW THE CONTRACTOR'S PROVISIONS FOR JOBSITE SAFETY. LACK OF COMMENT ON THE PART OF THE DESIGN PROFESSIONAL WITH REGARD TO JOBSITE SAFETY IS NOT TO BE INTERPRETED AS APPROVAL OF JOBSITE SAFETY PRACTICES.
10. THE CONTRACTOR SHALL COORDINATE OPENINGS, SLEEVES, CONCRETE HOUSEKEEPING PADS, INSERTS, AND DEPRESSIONS SHOWN ON THE PRIME PROFESSIONAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS.
11. ALL COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR IMPROPER INSTALLATION OF ELEMENTS OR OTHER ITEMS NOT IN CONFORMANCE WITH THE CONTRACT DOCUMENTS SHALL BE AT THE CONTRACTOR'S EXPENSE.
12. ALL DRAWINGS SHALL BE USED IN CONJUNCTION WITH EACH OTHER. IF THERE IS A DISCREPANCY BETWEEN DRAWINGS AND SPECIFICATIONS, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PRIME PROFESSIONAL PRIOR TO PERFORMING THE WORK.
IN THE CASE OF A CONFLICT, THE MORE STRINGENT IN COST OR QUALITY SHALL APPLY.
13. THE CONTRACTOR SHALL VERIFY ALL EXISTING BUILDING INFORMATION SHOWN (DIMENSIONS, EXISTING CONDITIONS, ELEVATIONS, ETC.) AND NOTIFY THE PRIME PROFESSIONAL OF ANY DISCREPANCIES PRIOR TO FABRICATION OR INSTALLATION OF ANY COMPONENTS. FAILURE TO NOTIFY PRIME PROFESSIONAL OF UNSATISFACTORY CONDITIONS CONSTITUTES ACCEPTANCE OF UNSATISFACTORY CONDITIONS.
14. IF THE EXISTING FIELD CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE WORK IN ACCORDANCE WITH THE DETAILS SHOWN, THE CONTRACTOR SHALL NOTIFY THE PRIME PROFESSIONAL IMMEDIATELY AND PROVIDE A SKETCH OF THE CONDITION WITH THE PROPOSED MODIFICATION OF THE DETAILS SHOWN ON THE CONTRACT DOCUMENTS. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IS APPROVED BY THE PRIME PROFESSIONAL.
15. SHOP DRAWINGS FOR ALL MATERIALS ARE TO BE SUBMITTED TO THE PRIME DESIGN PROFESSIONAL FOR REVIEW PRIOR TO THE START OF FABRICATION OR COMMENCEMENT OF WORK. REVIEW PERIOD SHALL BE A MINIMUM OF TWO (2) WEEKS.
16. REPRODUCTION OF ANY PORTION OF THE CONTRACT DRAWINGS FOR RESUBMITTAL AS SHOP DRAWINGS IS PROHIBITED. SHOP DRAWINGS PRODUCED IN SUCH A MANNER WILL BE REJECTED AND RETURNED.
17. SHOP DRAWINGS SUBMITTED FOR REVIEW SHALL CONSIST OF THREE (3) SETS OF PRINTS. ONLY ONE (1) MARKED UP SET WITH THE COMMENTS WILL BE RETURNED TO THE CONTRACTOR.
18. SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S STAMP OF APPROVAL WHICH SHALL CONSTITUTE CERTIFICATION THAT THE CONTRACTOR HAS VERIFIED ALL CONSTRUCTION CRITERIA, MATERIALS, AND SIMILAR DATA AND HAS CHECKED EACH DRAWING FOR
COMPLETENESS, COORDINATION, AND COMPLIANCE WITH THE CONTRACT DOCUMENTS.
19. THE DRAWINGS HAVE BEEN PRODUCED ENTIRELY ON A CAD SYSTEM. ANY OTHER LETTERING, LINES OR SYMBOLS, OTHER THAN PROFESSIONAL STAMPS AND SIGNATURES, HAVE BEEN MADE WITHOUT THE AUTHORIZATION OF BIA AND ARE NOT VALID.
20. ALL MATERIALS SHALL BE STORED TO PROTECT THEM FROM EXPOSURE TO THE ELEMENTS, IN ACCORDANCE WITH MANUFACTURERS WRITTEN INSTRUCTIONS.
21. DEBRIS, WASTE OR OTHER UNUSED CONSTRUCTION MATERIALS SHALL NOT BE PERMITTED TO ACCUMULATE. EACH TRADE IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF THEIR RESPECTIVE DEBRIS. LOCATION OF DUMPSTERS IS TO BE APPROVED BY
THE BUILDING OWNER.
22. UPON COMPLETION OF THE WORK, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR LEAVING THE SITE IN "BROOM-CLEAN" CONDITION.
23. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL FINISHES TO REMAIN, INCLUDING COMMON CORRIDORS, LOBBIES, STAIRS, LANDSCAPING, ELEVATOR CABS, ETC.
24. GENERAL CONTRACTOR SHALL PROVIDE AN ESTIMATED CONSTRUCTION WORK SCHEDULE. SCHEDULE SHALL BE UPDATED AS REQUIRED DUE TO CHANGES IN THE PROGRESS OF WORK AND UPON THE REQUEST OF THE BUILDING OWNER AND/OR PRIME DESIGN
PROFESSIONAL.
25. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE THE FOLLOWING SANITARY FACILITIES: TEMPORARY TOILETS, WASH FACILITIES, AND DRINKING WATER FOR USE OF CONSTRUCTION PERSONNEL. COMPLY WITH AUTHORITIES HAVING JURISDICTION FOR TYPE, NUMBER, LOCATION, OPERATION, AND MAINTENANCE OF FIXTURES AND FACILITIES.
26. CONTRACTOR SHALL BE RESPONSIBLE TO SECURE ALL PERMITS REQUIRED BY AUTHORITIES HAVING JURISDICTION.
THIS PROJECT IS DESIGNED AND SHALL BE BUILT TO COMPLY WITH
THE FOLLOWING CODES LISTED BELOW:
INTERNATIONAL BUILDING CODE 2018
INTERNATIONAL EXISTING BUILDING CODE 2018
INTERNATIONAL MECHANICAL CODE 2018
INTERNATIONAL PLUMBING CODE 2018
NATIONAL FIRE PREVENTION CODE 2016/2017/2018
NATIONAL ELECTRIC CODE 2017
ICC / ANSI A 117.1-7 2017
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH
ALL APPLICABLE CODES OF THE AUTHORITY HAVING JURISDICTION
AND MUST NOTIFY THE PROJECT ENGINEER OF ANY DISCREPANCIES
INDICATED BY THESE DOCUMENTS FOUND PRIOR TO OR DURING
CONSTRUCTION. NOTIFICATION MUST BE GIVEN TO THE ENGINEER
PRIOR TO PROCEEDING WITH CONSTRUCTION.
A.F.F. Above Finish Floor BCX Bottom Chord Extension B.O.F. Bottom of Footing B.S. Brick Shelf Elevation (plans) B.S. Both Sides (sections) CANT. Cantilever CJ Control Joints CL Center Line CMU Concrete Masonry Units CONT. Continuous DIA. Diameter DBA Deformed Bar Anchor E.E. Each End E.F. Each Face E.S. Each Side E.W. Each Way EXIST Existing F.F. Finish Floor F.S. Flat Strap GA Gage GALV Galvanized HORIZ Horizontal HSS Hollow Structural Section L Angle
ABBREVIATION LIST
LG Long LLH Long Leg Horizontal LLV Long Leg Vertical LSH Long Side Horizontal LSV Long Side Vertical N.T.S. Not To Scale o.c. On Center PL Plate REINF. Reinforcing REM. To Remain S.F. Step Footing STIFF PL Stiffener Plate T.B.R. To Be Removed T&B Top and Bottom T.F. Top of Footing T.O.S. Top of Steel T.O.W. Top of Wall T.P. Top of Pier TYP Typical U.N.O. Unless Noted Otherwise VERT. Vertical V.I.F. Verify In Field WWF Welded Wire Fabric XE Extended End - Type R
SHEET SHEET TITLE
CS COVER SHEET
M0.0 MECHANICAL INFORMATION SHEET
M1.0 FIRST FLOOR PLAN - MECHANICAL
M2.0 2ND THRU 9TH FLOOR PLAN - MECHANICAL
M3.0 MECHANICAL DETAILS & DIAGRAMS
MD1.0 FIRST FLOOR PLAN - DEMOLITION - MECHANICAL
P0.0 PLUMBING INFORMATION SHEET
P1.0 FIRST FLOOR PLAN - DOMESTIC WATER
P2.0 PLUMBING DETAILS & DIAGRAMS
PD1.0 FIRST FLOOR PLAN - DEMOLITION - DOMESTIC WATER
E0.0 ELECTRICAL INFORMATION SHEET
E1.0 FIRST FLOOR PLAN - POWER
E2.0 2ND THRU 9TH FLOOR PLANS - POWER
ED1.0 FIRST FLOOR PLAN - DEMOLITION - ELECTRICAL
AREA OF WORK
LIST OF DRAWINGS
AutoCAD SHX Text FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\M_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:51 PM
AutoCAD SHX Text CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS FOR THE ENTIRE PROJECT BEFORE PROCEEDING WITH THE WORK.
NOTE:
NOT ALL ABBREVIATIONS AND SYMBOLS INDICATED MAY
APPEAR ON THESE CONTRACT DRAWINGS. THIS IS FOR
REFERENCE ONLY.
PRESSURE REDUCING VALVE
ABBREVIATIONS
ENTERING AIR TEMPERATURE
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
FLOAT & THERMOSTATIC
EER
BBD BOILER BLOW DOWN
BRITISH THERMAL UNIT
CO
COL
CL
CAP.
CLEANOUT
COLUMN
CAST IRON
CENTER LINE
BOT
BP
BSMT
CI
C TO C
BTU
BF
BHP
BOD
BOP
BOTTOM
BACK PRESSURE
CENTER TO CENTER
COMPRESSED AIR
BASEMENT
BOILER FEED
BOTTOM OF DUCT
BOTTOM OF PIPE
FDW
FLA
EXT
FC
F&T
EXST
FEED WATER
FULL LOAD AMPS
EXTERNAL
EXISTING
ELEC
ENT
ESP
EXH
EXP
EWT
EVAP
EJ
EFF
ELB
EL
ELECTRICAL
ENTERING
EXPANSION
EXHAUST
EVAPORATOR
EFFICIENCY
ELEVATION
EXPANSION JOINT
ELBOW
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ATC
AUX
AVG
AUTO.
AL
AMB
AMP
AP
ARR
APROX
AUTOMATIC
AUXILIARY
AVERAGE
ACCESS PANEL
ARRANGEMENT
APPROXIMATE
ALUMINUM
AMPERE
AMBIENT
A/C
AFF
AFG
AIR CONDITIONING
EA
EDR
EAT
DWG
DEG
DN
DIA,Ø
DISC.
DET
DRAWING
EACH
DIAMETER
DISCONNECT
DEGREE
DOWN
DETAIL
D
DB
DDC
DRY BULB
DRAIN OR DEEP
REFRIGERANT LIQUID
NOT APPLICABLE
NORMALLY OPEN
NOT TO SCALE
OPEN END DUCT
OUTSIDE AIR
NORMALLY CLOSED
NOT IN CONTRACT
PRESSURE DROP
PRESSURE GAUGE
OUTLET VELOCITY
HMD HUMIDITY
OV
LOCKED ROTOR AMPS
LEAVING AIR TEMPERATURE
MAN.
MAX
LVL
LVR
LWT
MAXIMUM
MANUAL
LOUVER
LEVEL
HORIZ
INSUL
INTL
LRA
LAT
LIN
LP
LBS
Hz
HP
INTERNAL
LOW PRESSURE
POUNDS
LINEAL
HERTZ
HORSEPOWER
HORIZONTAL
INSULATION
RL
ROOMRM
RECOVERY
REQUIRED
REFERENCE
REVISION
QUANTITY
REF
REV
QTY
RECOV
REQD
PLATEPL
PRESSURE
PNEUMATIC
PROPELLERPROP.
PSIG
PRESS.
PNEU
PD
PG
PCR
GALLONS PER SECOND
GALLONS PER MINUTE
GALLONS PER HOUR
FOOT (FEET) PER MINUTE
FOOT (FEET) PER SECOND
GALV
HGT
HG
HTD
HD
HTR
GPM
GPS
GR
GND
GPH
HEATER
HEATED
HEIGHT
HOT GAS
HEAD
GRAIN
GROUND
GALVANIZED
FPM
FPS
FT
FS
GAL
GA
FLR
FO
FOOT (FEET)
FLOW SWITCH
GALLONS
GAUGE
FLOOR
FUEL OIL
OVERFLOW
OED
OFCI
OF
OA
NEGATIVE
NTS
NIC
NO
NC
NEG
NA
MOUNTED
MOUNTING
MODEL
MINIMUM
MAKEUP
MTD
MOD.
MOUNT.
MIN
MU
MBH
TD
THERMOMETER
VACUUM BREAKER
VENT OR VOLT
VIBRATION
WET BULB
VENT THRU ROOF
TOTAL STATIC PRESSURE
VARIABLE SPEED DRIVE
WATT, WIDTH OR WIDE
VARIABLE AIR VOLUME
TEMPERATURE
WB
VTR
VSD
VOL
VIB
W
VOLUME
VEL
VB
VAV
VAC
V
VERT
VELOCITY
VACUUM
VERTICAL
TSP
THK
TH
TEMP
THICK
REFRIGERANT SUCTION
SCHEDULE
SEQUENCE
SEPARATE
SENSIBLE
STAINLESS STEEL
STATIC PRESSURE
SOLENOID
SECONDARY,SECONDS
STL
SS
SP
SPLY
SUCT
STEEL
SUPPLY
SUCTION
SER
SEQ
SEP
SOL
SHT
SERV
SERIES
SERVICE
SHEET
SEC
SD
S
SENS
SCH
SWITCH
RTN
RS
RETURN
THERMAL EXPANSION VALVE
AUTOMATIC AIR VENT
ORIFICE PLATE
PIPE GUIDE
EXPANSION JOINT
THERMOMETER
PIPE ANCHOR
PRESSURE GAUGE W/COCK
FLEXIBLE CONNECTOR
UNION
SIGHT GLASS
FLOW SENSOR
BUTTERFLY VALVE
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
BACK PRESSURE VALVE
CHECK VALVE
FLOW SETTER
SOLENOID VALVE
ANGLE GATE VALVE
RELIEF OR SAFETY VALVE
GLOBE VALVE
SHUT-OFF VALVE
SYMBOL DESCRIPTION
CONDENSER WATER SUPPLY
END OF MAIN DRIP
BUCKET TRAP
CONCENTRIC REDUCER
ECCENTRIC REDUCER
PIPE DOWN
PIPE THROUGH
TOP TAKE-OFF
PIPE UP
VENT LINE
EMD
MEDIUM PRESSURE CONDENSATE RETURN
REFRIGERANT SUCTION
MEDIUM PRESSURE STEAM SUPPLY
PUMPED CONDENSATE RETURN
MAKE UP WATER
REFRIGERANT LIQUID
CONDENSATE DRAIN OR DRAIN
FUEL OIL TANK VENT
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM SUPPLY
HEATING RETURN
HEATING SUPPLY
LOW PRESSURE CLEAN STEAM
LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM SUPPLY
FUEL OIL RETURN
FUEL OIL SUPPLY
HOT GAS
EXISTING TO BE REMOVED
CONDENSER WATER RETURN
CHILLED WATER RETURN
BOILER BLOWDOWN - CONTINUOUS
CHILLED WATER SUPPLY
DIRECTION OF FLOW
BOILER FEED WATER
COMPRESSED AIR
CHEMICAL FEED
DIRECTION OF SLOPE
NEW WORK
EXISTING TO REMAIN
CAPACITY CHEMICAL
FEED CUBIC FOOT (FEET)
PER MINUTE
CA
STRAINER W/BLOW-OFF & CAP
FLOAT AND THERMOSTATIC
TRAP
PIPING SYMBOLS
CENTER
CONTINUATION
CONN
CONC
CTR
CF
CONT
CUBIC FOOT (FEET)
CONNECT OR CONNECTION
CONCRETE OR CONCENTRIC
A
MANUAL AIR VENT
M
(CFM) (CFM)
36x14Ø"
UP DN
24x36
DOUBLE LINE
ROUND DUCT UP
DUCT HUMIDITY SENSOR
DUCT WITH INTERNAL LINING
45°ELBOW (NO VANES)
DIRECTION OF FLOW
ROUND DUCT DOWN
36x14Ø"
UP DN
24x36
H
H
SINGLE LINE
NEW WORK
SUPPLY AIR DOWN
SUPPLY AIR UP
EXISTING TO BE REMOVED
EXISTING TO REMAIN
DESCRIPTION
(CFM)
(CFM)
4-WAY DIFFUSER (D)
EXHAUST OR RETURN GRILLE (G)
FLAT OVAL DUCT SIZE (FIRST
FIGURE-SIDE SHOWN)
DUCT INCLINED RISE OR DROP IN
DIRECTION OF FLOW
90° ELBOW WITH TURNING
VANES
SUPPLY OR RETURN BRANCH CONNECTION
SUPPLY BRANCH WITH SPIN COLLAR
CONNECTION
LATERAL CONNECTION ROUND
DUCTWORK
CONICAL TEE ROUND
DUCTWORK
EXHAUST OR RETURN AIR UP
EXHAUST OR RETURN AIR DOWN
DUCTWORK SYMBOLS
(CFM)
(CFM)
POUNDS PER SQUARE INCH
GAUGE
PUMPED CONDENSATE
RETURN
OWNER FURNISHED
CONTRACTOR INSTALLED
THOUSAND BRITISH
THERMAL UNITS PER HOUR
SMOKE DAMPER WITH
ACCESS DOOR
TEMPERATURE
DIFFERENTIAL
LEAVING WATER
TEMPERATURE
DIRECT DIGITAL
CONTROL
EQUIVALENT DIRECT
RADIATION
ENERGY EFFICIENCY
RATIO
FLEXIBLE CONNECTOR /
FLEXIBLE CONNECTION
BOILER HORSEPOWER OR
BRAKE HORSEPOWER
AUTOMATIC TEMPERATURE
CONTROL
3-WAY, 2-WAY, OR 1-WAY GRILLE (G)
GENERAL NOTES
RECTANGULAR DUCT SIZE SHOWN IN INCHES
(FIRST FIGURE-SIDE SHOWN)
UNLESS OTHERWISE NOTEDUON
WIRE MESH SCREENWMS
DUCT SMOKE DETECTOR
SDT
T
SDT
T
MOTORIZED DAMPER
BACK DRAFT DAMPER
VOLUME DAMPER
MD
FLEXIBLE DUCTWORK DUCT PRESSURE
CLASS
SMOKE DAMPER WITH ACCESS
DOOR
FIRE DAMPER WITH ACCESS DOOR
COMBINATION FIRE & SMOKE
DAMPER WITH ACCESS DOOR
DUCT TEMPERATURE SENSOR
MD
BDD
BDD
BYPASS DAMPER
BD
BD
STATIC PRESSURE SENSOR
SP
SP
POINT OF CONNECTION-NEW TO EXISTING
H HUMIDISTAT
# DRAWING NOTE SYMBOL
# REVISION SYMBOL
# SECTION NUMBER
# DETAIL OR SECTION NUMBER
DIRECTION OF VIEW
MISCELLANEOUS SYMBOLS
T THERMOSTAT
DRAWING FROM WHICH SECTION OR
DETAIL IS TAKEN
DRAWING ON WHICH SECTION OR
DETAIL IS SHOWN
DESIGNATES SUPPLY DIFFUSER TYPE IN AREAS*
DESIGNATES RETURN DIFFUSER TYPE IN AREAR*
DESIGNATES EXHAUST GRILLE TYPE IN AREAE*
S SWITCH
POINT OF DEMOLITION CONCLUSION
CS
V
LPR
LPS
LPCS
PCR
MU
MPS
RS
RL
MPR
FOR
FOS
HG
FOV
HPR
HPS
HR
HS
D
BBD
CHS
CA
CF
BF
CHR
CR
TYPICALTYP.
T
VFD (VARIABLE FREQUENCY DRIVE)
1. MECHANICAL CONTRACTOR IS THE PROJECT COORDINATOR &
RESPONSIBLE FOR ALL 'M' DRAWINGS, DIV. 23 SPECIFICATIONS, AND ANY
SPECIFIC MECHANICAL NOTES ON OTHER DRAWINGS. MECHANICAL
CONTRACTOR IS RESPONSIBLE FOR THEIR OWN CUTTING, PATCHING,
AND TEMPORARY FACILITIES INCLUDING ANY ADDITIONAL
LARGER/GENERAL TEMPORARY FACILITIES FOR THE OVERALL PROJECT.
2. CONTRACT DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE
RELATION OF PIPING, DUCTWORK, CONNECTIONS, AND EQUIPMENT. THE
DRAWINGS DO NOT INDICATE ALL OFFSETS, ELBOWS, AND FITTINGS
THAT MAY BE REQUIRED. THEREFORE, THE CONTRACTOR SHALL
CAREFULLY INVESTIGATE THE STRUCTURAL AND FINISH CONDITIONS
AFFECTING THE WORK AND ACTUAL EQUIPMENT PROVIDED. THE
CONTRACTOR SHALL FURNISH ALL OFFSETS, ELBOWS, FITTINGS,
HANGERS, AND ACCESSORIES AS MAY BE REQUIRED TO MEET THESE
CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
3. INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH
THE CURRENTLY ADOPTED INTERNATIONAL MECHANICAL CODE, ALL
PERTINENT CODES, LAWS, ORDINANCES, REGULATIONS, AND
RESPECTIVE MANUFACTURER'S WRITTEN INSTRUCTIONS.
4. ALL DUCTWORK SHALL BE CONSTRUCTED AND INSTALLED IN STRICT
ACCORDANCE WITH SMACNA AND ASHRAE STANDARDS.
5. COORDINATE HVAC WORK WITH THE WORK OF ALL OTHER
CONTRACTORS AND OWNER.
6. THE HVAC CONTRACTOR SHALL ARRANGE THE PROGRESS OF HIS WORK
SO AS TO CONFORM TO THE PROGRESS OF THE TRADES AND SHALL
COMPLETE THE ENTIRE INSTALLATION AS SOON AS THE CONDITION OF
THE PROJECT WILL PERMIT.
7. ALL ITEMS OF LABOR, MATERIAL, AND EQUIPMENT NOT SPECIFICALLY
DESCRIBED HEREIN NOR DETAILED ON THE DRAWINGS BUT INCIDENTAL
TO OR NECESSARY FOR THE COMPLETION OF THE WORK, SHALL BE
CONSIDERED AS INCLUDED WITHOUT EXTRA COST.
8. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL
MATERIALS, EQUIPMENT, AND WORKMANSHIP FOR A PERIOD OF THREE
YEARS FROM DATE OF ACCEPTANCE BY OWNER.
9. MOUNT ALL THERMOSTATS AT 48" AFF, TO THE TOP OF THE
THERMOSTAT BOX. COORDINATE ALL LOCATIONS WITH BUILDING
OWNER PRIOR TO ROUGH-IN AND INSTALLATION.
10. PROVIDE PROTECTION FOR ALL PENETRATIONS OF FIRE RESISTANCE
RATED ASSEMBLIES IN ACCORDANCE WITH THE REQUIREMENTS OF THE
CURRENTLY ADOPTED INTERNATIONAL BUILDING CODE.
S*
SUPPLY/RETURN DIFFUSER TYPE
NECK SIZE
CFM
M0.0: MECHANICAL INFORMATION SHEET
M1.0: FIRST FLOOR PLAN - MECHANICAL
M2.0: 2ND THRU 9TH FLOOR PLANS - MECHANICAL
M3.0: MECHANICAL DETAILS & DIAGRAMS
MD1.0: FLOOR PLAN - DEMOLITION - MECHANICAL
DRAWING LIST
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
M
EC
H
AN
IC
AL
IN
FO
R M
AT
IO
N S
H
EE
T
M0.0
JMM SA
SA
MWZ
MC
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\M_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:51 PM
B-1
3" HWR
HWP-1
HWP-2
B-2
3" HWS
(E)EXPANSION
TANK TO REMAIN
(E )3
" H W
S (E
)3 " H
W R
1- 1/
2"
(E)3/4" HWR
(E)3/4" HWS
(E)EQUIPMENT
PAD TO REMAIN
(E)EQUIPMENT
PAD TO REMAIN
FIRST FLOOR PLAN - MECHANICAL
SCALE: 1/4"=1'-0"
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
FI
R
ST
F
LO
O
R P
LA
N
M
EC
H
AN
IC
AL
M1.0
JMM SA
SA
MWZ
MC
BOILER SCHEDULE
TAG NO. MNUFACTURER MODEL NO. TYPE
COMBUSTION
AIR INLET SIZE
(IN.)
FLUE OUTLET
SIZE (IN.) EFFICIENCY
HOT WATER DATA FUEL-GAS BURNER DATA
TURNDOWN
RATIO V/PH/HZ MCA MOCP
WEIGHT
(LBS.) REMARKSMIN. FLOW
(GPM)
MAX. FLOW
(GPM)
PRESS. DROP
@ 100 GPM
(PSIG)
TEMP. °F GAS
TYPE
INPUT
(MBH)
OUTPUT
(MBH)
GAS INLET PRESS.
(IN.W.G.)ENT. LVG.
B-1 AERCO BMK-1000 CONDENSING 6" 6" 86.5 12 175 3 160 180 NAT. 1000 960 4-14 20:1 120/1/60 13 20 700 1-14
B-2 AERCO BMK-1000 CONDENSING 6" 6" 86.5 12 175 3 160 180 NAT. 1000 960 4-14 20:1 120/1/60 13 20 700 1-14
REMARKS:
1. PROVIDE WITH VENTLESS GAS TRAIN.
2. MINIMUM TURNDOWN: 15:1.
3. BOILER SHALL BE CAPABLE OF UTILIZING NON-METALLIC VENT.
4. ON-BOARD CONTROLLER TO PROVIDE OPTIMIZED BOILER SEQUENCING. PROVIDE WITH HW RESET BASE ON OUTDOOR AIR TEMPERATURE.
5. CONTROLLER SHALL DISPLAY AN ALERT WHEN O2 LEVEL IS ABOVE OR BELOW CRITICAL VALUES.
6. COMBUSTION O2 LEVELS SHALL NOT EXCEED 7% THROUGHOUT ENTIRE FIRING RANGE. COMBUSTION SYSTEM SHALL BE CAPABLE OF O2 TRIM IN ORDER TO SELF-CALIBRATE COMBUSTION SETTINGS TO COMPENSATE FOR CHANGING CONDITIONS WHICH CAN IMPACT EFFICIENCY, MAINTENANCE, AND SAFETY FACTOR.
7. BOILER MANUFACTURER TO PROVIDE AND CONTROL, FIELD INSTALLED, MODULATING MOTORIZED VALVES ON EACH BOILER.
8. PROVIDE CHECK VALVE FOR EACH INLET CONNECTION.
9. BOILER MANUFACTURER TO PROVIDE ONBOARD TOUCH SCREEN CONTROLLER.
10. BOILER MANUFACTURER TO PROVIDE LETTER OF GUARANTEE FOR AS BUILT FLUE AND COMBUSTION AIR INSTALLATION.
11. PROVIDE CONDENSATE NEUTRALIZER FOR EACH BOILER AND FLUE DRAIN.
12. THE BOILERS SHALL HAVE AN O2 TRIM SYSTEM WITH ACTIVE DEW-POINT CONTROL FACTORY INSTALLED.
13. BOILER MANUFACTURE TO PROVIDE INTEGRATED FLOW BALANCING BETWEEN BOILERS INSTALLED IN THE BOILER PLANT.
14. BOILER MANUFACTURE TO PROVIDE INTEGRATED O2 SENSOR AND LOGIC TO AUTOMATICALLY CALIBRATE COMBUSTION POINTS IN CONTROLLER WITH START-UP TECHNICIAN APPROVAL.
PUMP SCHEDULE
SYMBOL TYPE MANUFACTURER MODEL NO. MOUNTING/
SUPPORT
INLET/OUTLET
CONNECTIONS
GPM FT. HD. MOTOR
HP. SPEED FLA LRA ELECTRIC NOTES
IN OUT
HWP-1 HOT WATER HEATING
PUMP GRUNDFOS NK 015-070-40 BASE MOUNTED 2.5" 1.5" 130 45 3 1760 - - 208/3/60 1,2
HWP-2 HOT WATER HEATING
PUMP GRUNDFOS NK 015-070-40 BASE MOUNTED 2.5" 1.5" 130 45 3 1760 - - 208/3/60 1,2
NOTES:
1. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
2. PROVIDE VFD WITH INTREGRAL DISCONNECT.
1. CONTRACTOR TO VERIFY ALL CONDITIONS IN FIELD PRIOR TO PERFORMING ANY WORK.
2. REFER TO DETAILS AND DIAGRAMS FOR COMPLETE INSTALLATION REQUIREMENTS.
3. CONDENSATE FROM EQUIPMENT TO BE DRAINED TO NEAREST FLOOR DRAIN.
4. EXISTING MECHANICAL ROOM ROOF IS UNDER WARRANTY. ALL MODIFICATIONS TO THE
ROOF SHALL BE DONE BY U.S. ROOFING TO MAINTAIN WARRANTY.
GENERAL NOTES:
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
CONNECT TO EXISTING 3" HWS/R MAINS AND EXTEND AS SHOWN.
EXISTING EXPANSION TANK TO BE DRAINED AND CLEANED. PROVIDE NEW RELIEF VALVE.
PROVIDE 3" TANGENTIAL AIR SEPARATOR.
PROVIDE 5 GALLON BYPASS CHEMICAL FEEDER. REFER TO DIAGRAMS FOR PIPING
CONFIGURATION.
PROVIDE 6"Ø FLUE UP THRU ROOF. EXTERIOR FLUE PIPING TO BE PAINTED CUSTOM COLOR
SELECTED BY BUILDING OWNER.
PROVIDE 6"Ø COMBUSTION AIR INLET UP THRU ROOF AND TERMINATE WITH GOOSENECK.
EXTERIOR INTAKE PIPING TO BE PAINTED CUSTOM COLOR SELECTED BY BUILDING OWNER.
CONNECT TO EXISTING 1-1/2" BOILER FILL ASSEMBLY.
EXTEND EXISTING 3/4" HWS/R AND CONNECT TO NEW MAINS.
EXISTING ELECTRICAL SWITCHGEAR.
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text
MAINT RM
AutoCAD SHX Text
MAIL RM
AutoCAD SHX Text
OFFICE
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\M_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:51 PM
T T T T T
T
T
T
T T T
T
T
1 1 1
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
M2.0
JMM SA
SA
MWZ
MC
2ND THRU 9TH FLOOR PLANS - MECHANICAL
SCALE: 1/8"=1'-0"
2N D
T H
R U
TH
F
LO
O R
P
LA
N
M
EC
H
AN
IC
AL
1. CONTRACTOR TO VERIFY ALL CONDITIONS IN FIELD PRIOR TO PERFORMING ANY WORK.
2. PROVIDE NEW THERMOSTATS AND CONTROL VALVES FOR BASEBOARD RADIATORS IN
ALL 102 APARTMENTS. COORDINATE FINAL THERMOSTAT LOCATIONS WITH BUILDING
OWNER. MC TO RUN 24V WIRING FROM THERMOSTAT TO VALVE ACTUATOR.
3. NEW THERMOSTATS SHALL BE HONEYWELL MODEL TH1010D2000, OR APPROVED
EQUAL.
4. REPLACE AIR VENTS ON BASEBOARD RADIATORS IN ALL APARTMENTS. DRAIN, FLUSH,
AND BLEED AIR FROM HEATING SYSTEM ONCE WORK IS COMPLETED.
GENERAL NOTES:
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
REMOVE EXISTING CONTROL VALVE AND AIR VENT FOR BASEBOARD RADIATOR. PROVIDE
NEW AIR VENT AND 3/4" ON/OFF CONTROL VALVE WITH 24V ELECTRIC ACTUATOR.
PROVIDE COVER FOR HOLE LEFT AFTER REMOVAL OF EXISTING CONTROL VALVE.
AutoCAD SHX Text B
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\M_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:51 PM
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
M
EC
H
AN
IC
AL
D
ET
AI
LS
D
IA
G
R
AM
S
M3.0
JMM SA
SA
MWZ
MC
FLUE THRU ROOF DETAIL
NO SCALE
NOTE: CLEARANCES AROUND FLUE PER THE INTERNATIONAL MECHANICAL CODE
EXTEND AND CONNECT
TO UNIT FLUE OUTLET
VENTILATED ROOF THIMBLE
ROOF THIMBLE, STORM
COLLAR SECURED TO VENT
PIPE AND UNDERSIDE OF DECK
ROOF DECK
CUT OPENING THRU EXISTING
CONCRETE OR METAL DECK
FLASHING OF ROOF CURBS
AND PENETRATIONS SHALL
BE BY THE M.C.
STORM COLLAR
SEAL PER MANUFACTURER'S
RECOMMENDATIONS
STORM CAP
MIN. 36"
ABOVE ANY
WALL
WITHIN
10'-0"
DIAMETER ROOF
OPENING FLUE O.D. PLUS 2"
DOUBLE WALL VENT
(SEE FLOOR PLAN FOR SIZE)
EXISTING EQUIPMENT PAD
INCREASER
MECHANICAL ROOM FLOOR
PIPE SUPPORT
SUCTION DIFFUSER WITH
BUILT IN STRAINER
PETE'S PLUGS ON SUCTION
AND DISCHARGE OF PUMP
BASE MOUNTED PUMP AS
SCHEDULED
O-50 PSI GAGE WITH VALVE
AND DAMPENER
METRAFLEX FLEXIBLE PUMP
CONNECTOR
SILENT SPRING LOADED GLOBE
CHECK VALVE
BALANCING VALVE WITH TEST
PORTS
BALL VALVE
GROOVED PIPING SYSTEM
VIBRATION HANGERS
BASE MOUNTED PUMP DETAIL
NO SCALE
METHOD OF SUPPORTING PIPES
CLEVIS ROLLER HANGER CLEVIS HANGER
INSULATION
TRAPEZE HANGER
ANGLE IRON
HANGER RODINSULATION
PIPE
CLEVIS HANGER
PIPE
HANGER ROD
SEMI- CYLINDRICAL GALVANIZED
IRON SHIELD. FOR HOT PIPES 2" &
OVER, USE PROTECTIVE SADDLE
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
SPECIFICATIONS)
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
SPECIFICATIONS)
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
SPECIFICATIONS)SEMI- CYLINDRICAL
GALVANIZED IRON SHIELD. FOR
HOT PIPES 2" & OVER, USE
PROTECTIVE SADDLE SEMI- CYLINDRICAL GALVANIZED
IRON SHIELD. FOR HOT PIPES 2" &
OVER, USE PROTECTIVE SADDLE
LOAD BEARING
CALCIUMSILICATE
INSULATION AT ALL
HANGER POINTS
LOAD BEARING CALCIUM
SILICATE INSULATION AT
ALL HANGER POINTS
LOAD BEARING CALCIUM
SILICATE INSULATION AT
ALL HANGER POINTS
NO SCALE
SUCTION HEADER
DISCHARGE HEADER
3/4"
FILL CAP
NEPTUNE MODEL FTF-5HP
5-GALLON FEEDER FILTER
WITH STAINLESS STEEL
BASKET, LEGS AND SOCK
FILTER. PROVIDE 20 MICRON
FILTER AT SYSTEM START-UP
AND SPARE 5 MICRON FILTER
FOR OWNER.
FLOOR
1/2" SAMPLE OUTLET
PRESSURE GAUGE
3/4" BALL VALVE
UNION(TYP)
DRAIN VALVE
CONCRETE PAD
NO SCALE
CHEMICAL FEEDER DETAIL
UNION (TYPICAL)
W/ LOCK SHIELD (TYPICAL)
SHUT-OFF VALVE (TYPICAL)
TO PUMPS
VALVE W/ HOSE END
FULL SIZE DRAIN
T&P RELIEF VALVE (TYPICAL)
TO DOMESTIC CW SYSTEM
EXISTING SYSTEM FILL ASSEMBLY
PIPE DRAIN TO
FLOOR DRAIN
(E)EXPANSION TANK
NO SCALE
SEPARATOR AND EXPANSION TANK DETAIL
HOT WATER SYSTEM AIR
TANGENTIAL AIR SEPARATOR
AUTO AIR VENT W/ 1/2"
DRAIN LINE TO FLOOR DRAIN
HWS
BOILERS TO BE INSTALLED TO MEET PA DEPARTMENT OF LABOR AND
INDUSTRY BOILER DIVISION. CONTRACTOR TO SUBMIT APPLICATION AND
COORDINATE INSPECTION:
1. PROVIDE NEW RELIEF VALVE ON EXPANSION TANK SIZED TO MEET
REQUIREMENTS.
2. PROVIDE LOW WATER CUTOUT FOR BOILER.
3. PROVIDE TWO HIGH LIMIT OPERATING CONTROLS FOR BOILER.
4. PROVIDE MINIMUM 30" CLEARANCE AROUND BOILERS AND 80"
OVERHEAD CLEARANCE.
HWS
AIR SEPARATOR
TO FD
AUTOMATIC AIR VENT
TO FD
TO FD
DV
C H
F
3/4"
C H
F C
H F
C H
F C
H F
BYPASS
CHEMICAL
FEEDER
FC FC
HWS
MIN BOILER FLOW
12 GPM
3"
3" 3"
DV
(E) EXPANSION
TANK
B-1
HOUSEKEEPING PAD (TYP.)
TO FD
6"
3" 3"
CHF CHF
HWR
H W
R
HWR HWR
3" 3"
3"
3"
HWP-1
FC FC
PROVIDE SUCTION
DIFFUSER (TYP. 2)
HWS
3"
3"
1-1/2"
3"
HEATING WATER FLOW DIAGRAM
NO SCALE
TO FD
HWP-2B-2
TO FD
3" 3"
CONTROL VALVE PROVIDED
BY BOILER MANUFACTURER
AND WIRED TO BOILER (TYP.)
T
T
SUPPLY HEADER
TEMPERATURE SENSOR
WIRED TO BOILER CONTROLS
RETURN HEADER
TEMPERATURE SENSOR
WIRED TO BOILER CONTROLS
T
OUTDOOR AIR TEMPERATURE SENSOR
WIRED TO BOILER CONTROLS FOR
OUTDOOR AIR RESET
DPT
DIFFERENTIAL PRESSURE
TRANSMITTER FOR
CONTROL OF PUMP VFDS
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\M_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:51 PM
(E )3
" H W
S (E
)3 " H
W R
(E)3/4" HWR
(E)3/4" HWS
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
FL
O
O R
P
LA
N
D
EM
O
LI
TI
O
N
M
EC
H
AN
IC
AL
MD1.0
JMM SA
SA
MWZ
MC
FLOOR PLAN - DEMOLITION - MECHANICAL
SCALE: 1/4"=1'-0"
1. CONTRACTOR TO VERIFY ALL CONDITIONS IN FIELD PRIOR TO PERFORMING ANY WORK.
2. IF ANY SUSPECT MATERIAL IS FOUND ON THE INTERIOR OF THE BOILERS THAT MAY BE
ASBESTOS, STOP WORK UNTIL MATERIAL IS PROPERLY SAMPLED.
GENERAL NOTES:
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
REMOVE EXISTING BOILER PIPING AND ASSOCIATED APPURTENANCES BACK TO
INDICATED POINT AND PREPARE FOR RECONNECTION.
DISCONNECT EXISTING 3/4" HWS/R PIPING AND PREPARE FOR RECONNECTION.
REMOVE (3) HEATING HOT WATER BOILERS AND ASSOCIATED PIPING AND
APPURTENANCES BACK TO INDICATED POINT.
REMOVE BRANCH PIPING TO EXPANSION TANK. EXPANSION TANK TO REMAIN.
DISCONNECT SYSTEM FILL ASSEMBLY AND PREPARE FOR RECONNECTION TO NEW
SYSTEM.
REMOVE EXISTING PUMPS AND ASSOCIATED APPURTENANCES.
REMOVE EXISTING FLUE BACK TO INDICATED POINT. CAP EXISTING CHIMNEY IN
MECHANICAL ROOM AND AT TERMINATION ABOVE ROOF.
EXISTING ELECTRICAL SWITCHGEAR.
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text
MAINT RM
AutoCAD SHX Text
MAIL RM
AutoCAD SHX Text
OFFICE
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\M_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:51 PM
NOTE:
NOT ALL ABBREVIATIONS AND SYMBOLS
INDICATED MAY APPEAR ON THESE
CONTRACT DRAWINGS. THIS IS FOR
REFERENCE ONLY.
AC AQUATICS CONTRACTOR
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AMP AMPERE
AP ACCESS PANEL
APPROX APPROXIMATE
AVG AVERAGE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BOT BOTTOM
BP BACK PRESSURE
BSMT BASEMENT
BWV BACK WATER VALVE
CI CAST IRON
CL CENTER LINE
CO CLEANOUT
COL COLUMN
CONC CONCRETE OR CONCENTRIC
DF DRINKING FOUNTAIN
DIA, Ø DIAMETER
DIP DUCTILE IRON PIPE
DN DOWN
DN DOWNSPOUT NOZZLE
DW DISHWASHER
EC ELECTRICAL CONTRACTOR
ECO EXTERIOR CLEANOUT
ERD EMERGENCY OVERFLOW ROOF
DRAIN
EL ELEVATION
ESP ELEVATOR SUMP PUMP
(E), EXIST EXISTING
EW EMERGENCY EYE WASH
FCO FLOOR CLEANOUT
ABBREVIATIONS
FD FLOOR DRAIN
FFD FUNNELED FLOOR DRAIN
FF ELEV FINISHED FLOOR ELEVATION
FSC FOOD SERVICE CONTRACTOR
FS1 FLOOR SINK
FLA FULL LOAD AMPS
FLR FLOOR
FPM FOOT/FEET PER MINUTE
FPS FOOT/FEET PER SECOND
FT FOOT/FEET
GAL GALLONS
GD GARBAGE DISPOSAL
GC GENERAL CONTRACTOR
GND GROUND
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GPS GALLONS PER SECOND
GF GLASS FILLER
GSV GAS SOLENOID VALVE
GT GREASE TRAP
HB HOSE BIBB
HC HVAC CONTRACTOR
HEWC HANDICAP ELECTRIC WATER
COOLER
HGT HEIGHT
HP HORSE POWER
HLAV HANDICAP LAVATORY
HS HAND SINK
HSH HANDICAP SHOWER
HUR HANDICAP URINAL
HWC HANDICAP WATER CLOSET
IB ICE MAKER BOX
INV INVERT OF PIPE
KD KITCHEN DRAIN
KS KITCHEN SINK
LAV LAVATORY
LS LAB SINK
MAX MAXIMUM
MIN MINIMUM
MS MOP SINK
MTD MOUNTED
NA, N/A NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
PC PLUMBING CONTRACTOR
PT PLASTER TRAP
RD ROOF DRAIN
SE SEWAGE EJECTOR
SH SHOWER
SI SEDIMENT INTERCEPTOR
SK SINK
SS SERVICE SINK
TEMP TEMPERATURE
TP TRAP PRIMER
TUB TUB/SHOWER
UR URINAL
WB WASHER BOX
WC WATER CLOSET
WCO WALL CLEAN OUT
WF WASHFOUNTAIN
WHA WATER HAMMER ARRESTER
WH WALL HYDRANT
WPV WHIRLPOOL VALVE
WS WASHSTATION
WSV WATER SOLENOID VALVE
VTR VENT THROUGH ROOF
MISCELLANEOUS SYMBOLS
DIRECTION OF VIEW
OR DETAIL IS SHOWN
OR DETAIL IS TAKEN
DRAWING FROM WHICH SECTION
DETAIL OR SECTION NUMBERX
X
SECTION NUMBER
DRAWING ON WHICH SECTION
X X
REVISION SYMBOLX
DRAWING NOTE SYMBOLX
POINT OF CONNECTION-NEW TO EXISTING
POINT OF DEMOLITION CONCLUSION
1. PLUMBING CONTRACTOR IS RESPONSIBLE FOR ALL 'P' DRAWINGS, DIV. 22 SPECIFICATIONS, AND SPECIFIC PLUMBING NOTES ON OTHER DRAWINGS. PLUMBING CONTRACTOR IS RESPONSIBLE FOR THEIR OWN CUTTING, PATCHING, AND TEMPORARY FACILITIES
2. CONTRACTOR SHALL PROVIDE A COMPLETE AND WORKING SYSTEM WITH ALL NECESSARY PERMITS AND
APPROVALS FROM AUTHORITIES HAVING JURISDICTION.
3. INSTALL ALL EQUIPMENT AND MATERIALS IN STRICT ACCORDANCE WITH CURRENT ADOPTED I.P.C. ALL PERTINENT CODES, LAWS, ORDINANCES, REGULATIONS, AND RESPECTIVE MANUFACTURER'S WRITTEN INSTRUCTIONS.
4. COORDINATE PLUMBING WORK WITH THE WORK OF ALL OTHER CONTRACTORS AND OWNER.
5. PLUMBING DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES PERMIT AND ACTUAL LINE LOCATIONS SHALL BE DETERMINED BY THE P.C. IN THE FIELD.
HOWEVER, THE PLUMBING CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE PROPER INSTALLATION OF ALL MATERIALS AND EQUIPMENT REQUIRED FOR A COMPLETE INSTALLATION WITHIN THE INTENT AND MEANING OF
THE CONTRACT DOCUMENTS.
6. THE PLUMBING CONTRACTOR SHALL ARRANGE THE PROGRESS OF HIS WORK SO AS TO CONFORM TO THE PROGRESS OF THE TRADES AND SHALL COMPLETE THE ENTIRE INSTALLATION AS SOON AS THE CONDITION OF
THE PROJECT WILL PERMIT.
7. ALL ITEMS OF LABOR, MATERIAL, AND EQUIPMENT NOT SPECIFICALLY DESCRIBED HEREIN NOR DETAILED ON THE DRAWINGS BUT INCIDENTAL TO OR NECESSARY FOR THE COMPLETION OF THE WORK, SHALL BE CONSIDERED AS
INCLUDED WITHOUT EXTRA COST.
8. PROVIDE NECESSARY SUPPORTS, HANGERS, AND HARDWARE TO PROPERLY SECURE PIPING AND EQUIPMENT TO
BUILDING STRUCTURE.
9. LABEL ALL DOMESTIC COLD WATER, AND DOMESTIC HOT WATER PIPING WITH COLORED, WATERPROOF, ALL TEMPERATURE, SELF-ADHERING LABELS AND DIRECTIONAL ARROWS AS MANUFACTURED BY SETON OR EQUAL.
10. FURNISH AND INSTALL ACCESS PANELS WHERE REQUIRED FOR ACCESS TO ALL CONCEALED VALVES, TRAPS, OR EQUIPMENT WHERE NO OTHER MEANS IS PROVIDED. COORDINATE ACCESS LOCATIONS WITH ARCHITECT AND GC.
11. DO NOT INSTALL PIPING OR ANY OTHER PLUMBING EQUIPMENT OVER ELECTRICAL PANELS. MAINTAIN A MINIMUM
OF 36" CLEAR IN FRONT OF ELECTRICAL PANELS.
12. THE PLUMBING CONTRACTOR SHALL PROVIDE INSTRUCTIONS TO THE OWNER FOR EACH SYSTEM INSTALLED AND
THE OPERATION OF ALL EQUIPMENT IN HIS CONTRACT.
13. CHECK AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AT THE SITE. FAILURE TO VISIT AND INSPECT THE EXISTING CONDITIONS SHALL NOT BE VALID REASON FOR AUTHORIZATION OF A CHANGE ORDER.
14. CONTRACTOR SHALL UNCONDITIONALLY GUARANTEE IN WRITING ALL MATERIALS, EQUIPMENT, AND
WORKMANSHIP FOR A PERIOD OF THREE YEARS FROM DATE OF ACCEPTANCE BY OWNER.
15. PROVIDE SHOCK ABSORBING DEVICES WHICH WILL PROTECT WATER SUPPLY PIPING FROM WATER HAMMER.
REFER TO PLUMBING EQUIPMENT SCHEDULE FOR TYPES. LOCATE AT THE ENDS OF ALL BRANCH PIPING RUNS.
16. THE PLUMBING CONTRACTOR SHALL SUBMIT TO THE ARCHITECT/ENGINEER AS-BUILT DRAWINGS AND OPERATION AND MAINTENANCE MANUALS INCLUDING ALL NAME PLATE DATA, WIRING DIAGRAMS, MAINTENANCE
INSTRUCTIONS, AND PARTS LIST UPON PROJECT COMPLETION.
17. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND SAFE WORK AREA AT ALL TIMES. ALL SAFETY PROCEDURES AND ENFORCEMENT IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL CONFORM TO ALL OSHA
STANDARDS.
18. BACK FLOW PREVENTERS AND/OR VACUUM BREAKERS SHALL BE INSTALLED WHERE REQUIRED TO PREVENT
CONTAMINATION OF POTABLE WATER SYSTEM.
19. CONTRACTOR SHALL PAY FOR AND OBTAIN ALL FEES, PERMITS, AND INSPECTIONS. ALL CHARGES BY UTILITY
COMPANIES SHALL BE PAID BY THIS CONTRACTOR.
20. EXCEPT WHERE OTHERWISE INDICATED, ALL CUTTING, EXCAVATION, FILL, AND PATCHING REQUIRED FOR THE PLUMBING WORK SHALL BE BY THE PLUMBING CONTRACTOR. DO NOT CUT STRUCTURAL MEMBERS.
PLUMBING GENERAL NOTES: PLUMBING SYMBOLS
140°F HOT WATER
SANITARY - ABOVE FLOOR
SANITARY - BELOW FLOOR
SANITARY - CAST IRON PIPING - ABOVE FLOOR
GREASE LADEN WASTE - ABOVE FLOOR
GREASE LADEN WASTE - BELOW FLOOR
RAIN/STORM WATER - ABOVE FLOOR
RAIN/STORM WATER - BELOW FLOOR
RAIN/STORM WATER -CAST IRON PIPING- ABOVE FLOOR
VENT
GAS
AIR
SPRINKLER
EXISTING TO REMAIN
EXISTING TO BE REMOVED
GATE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
MIXING VALVE
OS&Y VALVE
SOLENOID VALVE
PIPE CAP
PIPE RISE
ACCESS PANEL
PRESSURE & TEMPERATURE RELIEF VALVE
THERMOMETER
HWR
SAN
GW
AW
RWC
RWC
RWC
AIR
AP
DOMESTIC COLD WATER
FILTERED COLD WATER
110°F HOT WATER
110°F HOT WATER RETURN
140°F HOT WATER RETURN
SANITARY - CAST IRON PIPING - BELOW FLOOR
ACID WASTE
RAIN/STORM WATER -CAST IRON PIPING- BELOW FLOOR
VENT - CAST IRON PIPING
VACUUM
GAS VALVE
WATER HAMMER ARRESTER
BACKFLOW VALVE
BALANCING VALVE
PIPE DROP
UNION
ELBOW
TEE
AIR STATION
AQUASTAT
CW
FCW
HW
140HW
140HWR
SAN
SAN
SAN
GW
RWC
V
V
VAC
G
SPRK
(E)
A1
P0.0: PLUMBING INFORMATION SHEET
P1.0: FIRST FLOOR PLAN - DOMESTIC WATER
P2.0: PLUMBING DETAILS & DIAGRAMS
PD1.0: FIRST FLOOR PLAN - DEMOLITION - DOMESTIC WATER
DRAWING LIST
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
PL
U
M
BI
N G
IN
FO
R M
AT
IO
N S
H
EE
T
P0.0
JMM SA
SA
MWZ
MC
AutoCAD SHX Text
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\P_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:49 PM
TO BUILDING
GWH-1
(E)3"G i
DBP-1
TO LAUNDRY
ROOM
2" G
(E )3
" C W
(E )1
-1
2" H
W R (E )2
" 1
°H W
HWRP-1
(E )3
" H W
GWH-2
TMV-1
3" CW
2" 140°HW
3" HW
2" G
(E)EQUIPMENT
PAD TO REMAIN
FIRST FLOOR PLAN - DOMESTIC WATER
SCALE: 1/4"=1'-0"
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
FI
R
ST
F
LO
O
R P
LA
N
D
O M
ES
TI
C W
AT
ER
P1.0
GAS WATER HEATER SCHEDULE
SYMBOL EQUIPMENT TYPE MANUFACTURER MODEL MOUNTING/
SUPPORT
TANK
VOLUME
(GAL.)
CONNECTION DATA VENTING DATA FUEL DATA ELECTRICAL DATA OPERATING
WEIGHT
(LBS.)
NOTES
HW CW GAS INTAKE EXHAUST TYPE MATERIAL FUEL
INPUT
(MBH)
GPH
(100°F ΔT)
MIN.
PRESSURE FLA MOP V/Ph/Hz
GWH-1 INSTANT WATER HEATER AERCO INN 1350N HOUSEKEEPING
PAD N/A 2" 2" 1-1/2" 6" 6" FLUE PVC/CPVC/PP/AL29-4C N.G. 1350 1560 160 11 20 120/1/60 1,225 1-7
GWH-1 INSTANT WATER HEATER AERCO INN 1350N HOUSEKEEPING
PAD N/A 2" 2" 1-1/2" 6" 6" FLUE PVC/CPVC/PP/AL29-4C N.G. 1350 1560 160 11 20 120/1/60 1,225 1-7
NOTES:
1. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
2. FINAL LOCATION TO BE DETERMINED IN THE FIELD UNLESS NOTED OTHER WISE.
3. PROVIDE WITH ALL NECESSARY VALVES AND FITTINGS FOR A COMPLETE INSTALLATION PER DETAIL. PROVIDE WITH HEAT TRAP FITTINGS FOR TOP CONNECTIONS.
4. PROVIDE WITH T&P VALVE TO DISCHARGE WITH AIR GAP TO FLOOR DRAIN.
5. VENTING TO BE INSTALLED ACCORDING TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR FINAL DEVELOPED LENGTH AND APPLICABLE FUEL GAS CODE.
6. PROVIDE WITH CONDENSATE NEUTRALIZATION KIT AND PIPE TO APPROVED DRAIN LOCATION PER PLANS.
7. PROVIDE MANUFACTURER'S MUFFLER ON EXHAUST OUTLET.
PUMP SCHEDULE
SYMBOL TYPE MANUFACTURER MODEL NO. MOUNTING/
SUPPORT
INLET/OUTLET
CONNECTIONS
GPM FT. HD. MOTOR
HP. SPEED FLA LRA ELECTRIC NOTES
IN OUT
DBP-1 DUPLEX DOMESTIC
BOOSTER PUMP TIGERFLOW VMS-4000-VFD-NSF BASE MOUNTED 3" 3" 50 88 2 @ 2.5 3500 - - 208/3/60 1-4
HWRP-1 HOT WATER RETURN
PUMP GRUNDFOS UPS 26-99 SFC INLINE 1-1/2" 1-1/2" 17 11 1/4 1750 - - 115/1/60 1-4
NOTES:
1. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
2. PROVIDE WITH ELECTRICAL DISCONNECT.
3. PROVIDE WITH AQUASTAT TO CONTROL PUMP OPERATION.
4. PUMP BODY SHALL BE STAINLESS STEEL DESIGNED FOR POTABLE WATER SYSTEMS.
THERMOSTATIC MIXING VALVE SCHEDULE
SYMBOL TYPE MANUFACTURER MODEL STANDARD
MIN.
FLOW
(GPM)
MAX. FLOW
(GPM) SETPOINT
IN/OUT
DIAMETER
(IN.)
NOTES
TMV-1 MASTER MIXING
VALVE LAWLER SERIES 800 ASSE 1017 5 96 110°F 2" 1-3
NOTES:
1. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS. BASIS OF DESIGN PRODUCT INDICATED.
2. PROVIDE SURFACE-MOUNTED ENCLOSURE, CARBON STEEL WITH BAKED ENAMEL FINISH.
3. PROVIDE WITH UNIONS AND SHUTOFF VALVES AT ALL INLETS AND OUTLETS. PROVIDE TEMPERATURE GAUGE ON OUTLET WITH THERMOWELL.
JMM SA
SA
MWZ
MC
1. CONTRACTOR TO VERIFY ALL CONDITIONS IN FIELD PRIOR TO PERFORMING ANY WORK.
2. REFER TO DETAILS AND DIAGRAMS FOR COMPLETE INSTALLATION REQUIREMENTS.
3. CONSTRUCTION SHALL BE SEQUENCED TO MINIMIZE DURATION OF DOMESTIC WATER
SYSTEM SHUTDOWN.
4. CONDENSATE FROM EQUIPMENT TO BE DRAINED TO NEAREST FLOOR DRAIN.
GENERAL NOTES:
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
CONNECT TO EXISTING 3" CW AND EXTEND TO NEW BOOSTER PUMP.
CONNECT TO EXISTING 3" GAS MAIN AND EXTEND NEW PIPING AS SHOWN.
EXTEND EXISTING EQUIPMENT PAD AS NEEDED TO ACCOMMODATE NEW DUPLEX
BOOSTER PUMP SYSTEM.
PROVIDE NEW 4" HOUSEKEEPING PAD FOR NEW WATER HEATERS.
INSTALL NEW HOT WATER RETURN PUMP. REFER TO DETAILS FOR COMPLETE
INSTALLATION REQUIREMENTS.
CONNECT TO EXISTING 3" CW, 3" HW, 2" 140°HW, & 1-1/2" HWR AND EXTEND PIPING
AS SHOWN.
INSTALL NEW EXPANSION TANK ON EXISTING EQUIPMENT PAD.
(E)1-1/4" CW FOR BOILER SYSTEM FILL.
EXISTING ELECTRICAL SWITCHGEAR.
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\P_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:49 PM
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
P2.0
CONTROL
PANEL
3"
NORMALLY CLOSED, FULL
SIZE, BYPASS, BALL VALVE
(TYP. OF 2)3"3"
CHECK
VALVE
3"3"
SUCTION HEADER
DISCHARGE HEADER
FLANGED
CONNECTIONS
(TYP.)
FABRICATED STEEL
BASE PLATE
DUPLEX BOOSTER
PUMP SET
4" HIGH REINFORCED CONCRETE
HOUSEKEEPING PAD BY PLUMBING
CONTRACTORFINISHED FLOOR ELEVATION
NOTES:
1. PLUMBING CONTRACTOR SHALL FURNISH
AND INSTALL ALL PIPING AND FITTINGS AS
SHOWN.
2. PLUMBING CONTRACTOR SHALL COORDINATE
ALL PIPING AND INSTALLATION DETAILS WITH
THE MANUFACTURER'S RECOMMENDATIONS.
PROVIDE ALL PIPING AND ACCESSORIES AS
REQUIRED FOR A COMPLETE AND
FUNCTIONAL INSTALLATION.
3. PLUMBING CONTRACTOR SHALL COORDINATE
ALL DUPLEX BOOSTER PUMP COMPONENT
RATINGS AND LINE VOLTAGE WIRING
REQUIREMENTS WITH THE ELECTRICAL
CONTRACTOR.
4. PLUMBING CONTRACTOR SHALL FURNISH
AND INSTALL ALL CONTROLS, SENSORS AND
LOW VOLTAGE WIRING AS REQUIRED FOR A
COMPLETE AND FUNCTIONAL INSTALLATION.
DOMESTIC BOOSTER PUMP DETAIL
NO SCALE
A
CHECK VALVE
PUMP
FLANGES
(TYP.)
1/2" PIPE WITH
BALL VALVE (TYP.)
BALL
VALVE
(TYP.)
THERMOMETER
PRESSURE GAUGE
AQUASTAT
STRAINER
HOSE END AND CAP
INLINE CIRCULATOR PUMP
DISCHARGE
SUCTION
NO SCALE
HOT WATER RETURN PUMP DETAIL
METHOD OF SUPPORTING PIPES
CLEVIS ROLLER HANGER CLEVIS HANGER
INSULATION
TRAPEZE HANGER
ANGLE IRON
HANGER RODINSULATION
PIPE
CLEVIS HANGER
PIPE
HANGER ROD
SEMI- CYLINDRICAL GALVANIZED
IRON SHIELD. FOR HOT PIPES 2" &
OVER, USE PROTECTIVE SADDLE
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
SPECIFICATIONS)
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
SPECIFICATIONS)
VIBRATION ELIMINATORS
WHERE REQUIRED (SEE
SPECIFICATIONS)SEMI- CYLINDRICAL
GALVANIZED IRON SHIELD. FOR
HOT PIPES 2" & OVER, USE
PROTECTIVE SADDLE
SEMI- CYLINDRICAL GALVANIZED
IRON SHIELD. FOR HOT PIPES 2"
& OVER, USE PROTECTIVE
SADDLE
LOAD BEARING
CALCIUMSILICATE
INSULATION AT ALL
HANGER POINTS
LOAD BEARING CALCIUM
SILICATE INSULATION AT
ALL HANGER POINTS
LOAD BEARING CALCIUM
SILICATE INSULATION AT
ALL HANGER POINTS
NO SCALE
JMM SA
SA
MWZ
MC
PL
U
M
BI
N G
D
ET
AI
LS
D
IA
G
R
AM
S
NOTE:
MAINTAIN MINIMUM CLEARANCES IN
ACCORDANCE WITH ALL APPLICABLE
CODES AND INSTALLATION REQUIREMENTS
PROVIDE 4" CONCRETE PAD TO EXTEND 6" BEYOND
EQUIPMENT FOOTPRINT IN ALL DIRECTIONS
DRAIN
VALVE
(TYP)
PIPE T&P VALVE
FULL SIZE TO FLOOR
THERMOMETER
(TYP)
BALL
VALVE
3" CW
HWRP-1 120V BY EC
2"G
AQUASTAT BY
PC, WIRED BY
EC
DETAIL NOTES:
GAS FIRED WATER HEATER - SEE WATER HEATER SCHEDULE FOR MANUFACTURER AND MODEL NUMBER.
LAWLER 800 SERIES THERMOSTATIC MIXING VALVE. SET OUTLET TO 110°F.
PROVIDE 4" CPVC VENT AND COMBUSTION AIR. INSTALL PER MANUFACTURER'S WRITTEN INSTRUCTIONS.
AMTROL THERM-X-TROL MODEL ST-449C EXPANSION TANK, 106 GALLON TOTAL VOLUME.
GWH-1
140°F2"
C
W GWH-2
140°F
1-1/2"G
GAS SHUT-OFF
(TYP)
SHUT-OFF (TYP)
UNION
(TYP)
HEAT
TRAP
THERMOSTAT
2"140HW
1 1
2"
H
W
VACUUM
BREAKER (TYP)
2"
H
W
3"CW
1-1/2" HWR
3"HW
NO SCALE
WATER HEATER PIPING DETAIL
2" C
W
2" C
W
2"140HW
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\P_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:49 PM
TO LAUNDRY
ROOM
(E )3
" C W
(E )1
-1
2" H
W R (E )2
" 1
°H W
(E )3
" H W
(E)3"G
FIRST FLOOR PLAN - DEMOLITION - DOMESTIC WATER
SCALE: 1/4"=1'-0"
JOB:
1091224.002
COPYRIGHT 2025
DRAWN:
SCALE:
DATE:
01/15/2026
P MGR:
APPRD:
CHK
DSGN:
SI
D
N
EY
P O
LL
O
C K
H O
U
SE
B O
IL
ER
R
EP
LA
C
EM
EN
T M
O N
TG
O
M
ER
Y C
O U
N
TY
H O
U
SI
N G
A U
TH
O
R
IT
Y
EA
ST
H
IG
H
S
TR
EE
T
PO
TT
ST
O
W N
, P A
R
EV
IS
IO
N S
D
AT
E
BY
SHEET:
AS NOTED
IS
SU
ED
F
O R
B
ID
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
/1 5/
FI
R
ST
F
LO
O
R P
LA
N
D
EM
O
LI
TI
O N
D
O M
ES
TI
C W
AT
ER
PD1.0
JMM SA
SA
MWZ
MC
1. CONTRACTOR TO VERIFY ALL CONDITIONS IN FIELD PRIOR TO PERFORMING ANY WORK.
2. CONSTRUCTION SHALL BE SEQUENCED TO MINIMIZE DURATION OF DOMESTIC WATER
SYSTEM SHUTDOWN.
3. IF ANY SUSPECT MATERIAL IS FOUND ON THE INTERIOR OF THE BOILERS THAT MAY BE
ASBESTOS, STOP WORK UNTIL MATERIAL IS PROPERLY SAMPLED.
GENERAL NOTES:
NOTES BY SYMBOL:
(THIS DRAWING ONLY)
REMOVE (4) DOMESTIC WATER BOILERS, ASSOCIATED APPURTENANCES, AND PIPING
BACK TO INDICATED POINT.
REMOVE EXISTING SHELL AND TUBE HEAT EXCHANGER, ASSOCIATED APPURTENANCES,
AND PIPING BACK TO INDICATED POINT.
REMOVE EXISTING PLATE AND FRAME HEAT EXCHANGER, ASSOCIATED APPURTENANCES,
AND PIPING BACK TO INDICATED POINT.
REMOVE EXISTING THERMOSTATIC MIXING VALVE, ASSOCIATED APPURTENANCES, AND
PIPING BACK TO INDICATED POINT.
REMOVE DOMESTIC BOOSTER PUMP SYSTEM, ASSOCIATED APPURTENANCES, AND PIPNG
BACK TO INDICATED POINTS.
REMOVE DOMESTIC WATER PIPING BACK TO THIS POINT AND PREPARE FOR
RECONNECTION.
REMOVE EXISTING HOT WATER RETURN PUMP AND PREPARE TO INSTALL NEW PUMP.
REMOVE EXISTING GAS PIPING FROM EXISTING BOILERS BACK TO INDICATED POINT.
EXISTING ELECTRICAL SWITCHGEAR.
AutoCAD SHX Text
MECH RM
AutoCAD SHX Text
MAINT RM
AutoCAD SHX Text
MAIL RM
AutoCAD SHX Text
OFFICE
FILENAME: C:\Users\jmantz\DC\ACCDocs\Barry Isett and Associates\1091224.002_Sidney_Pollock_House_Boiler_Replacement\Project Files\MEP-CAD\P_1091224.002_Sidney_Pollock_House_Boiler_Replacement.dwg - January 7, 2026 2:49 PM
E0.0: ELECTRICAL INFORMATION SHEET
E1.0: FIRST FLOOR PLAN - POWER
E2.0: 2ND THRU 9TH FLOORS - POWER
ED1.0: FLOOR PLAN - DEMOLITION - POWER
DRAWING LIST
GENERAL ELECTRICAL DEMOLITION NOTES:
1. DEMOLITION OF ALL EXISTING ELECTRICAL EQUIPMENT AND ASSOCIATED PIPING SHALL BE
COORDINATED WITH NEW WORK INSTALLATION.
2. THIS CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY/ALL DAMAGES TO EXISTING FLOORS, FLOOR TILES, WALLS, CEILINGS, FURNISHINGS, ETC. DUE TO THE REMOVAL PROCESS OF
ELECTRICAL EQUIPMENT AND ALL ASSOCIATED ITEMS.
3. ALL MATERIAL AND EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF BY THE
CONTRACTOR.
4. CONTRACTOR SHALL REMOVE ALL EXISTING LIGHTING FIXTURES WHERE NEW FIXTURES ARE
SHOWN. THIS SHALL INCLUDE FITTINGS, SUPPORT DEVICES, ETC AND MAKE PROVISIONS TO
EXISTING CEILING SO THAT THE NEW FIXTURE MAY BE PROPERLY INSTALLED.
5. MAINTAIN CONTINUITY OF ALL EXISTING CIRCUITS REMAINING IN OTHER AREAS.
6. ALL EXISTING CONDUITS AND WIRING NOT BEING USED SHALL BE REMOVED BACK TO SOURCE.
7. WHERE MODIFICATIONS OR ADDITIONS TO EXISTING WORK IS TO BE DONE BY ANOTHER
CONTRACTOR, EXISTING EQUIPMENT, CONDUIT, DEVICES, SUPPORTS, AND APPURTENANCES
SHALL BE REMOVED AND REINSTALLED TO ACCOMMODATE MODIFICATIONS OR ADDITIONS.
8. DEVICES SHOWN ARE BASED ON EXISTING DRAWINGS AND SITE SURVEY WHILE BUILDING WAS IN
OPERATION. ACTUAL LOCATIONS AND QUANTITIES MAY VARY. VERIFY IN FIELD.
9. ALL DORMANT CABLING AND WIRING SHALL BE REMOVED UNLESS NOTED AS FOR FUTURE OR AS
INSTRUCTED OTHERWISE BY OWNER.
10. COORDINATE THE REMOVAL OF THE POWER CONNECTIONS TO ALL MECHANICAL EQUIPMENT TO
BE REMOVED WITH THE MECHANICAL CONTRACTOR.
11. ALL CIRCUTI BREAKERS WHERE THE LOAD SERVING HAS BEEN REMOVED SHALL BE MARKED AS
SPARE.
12. ALL PANELBOARDS MODIFIED UNDER THE WORK SHALL RECEIVE REVISED, TYPED PANEL
SCHEDULES AS PROVIDED WITH ALL NEW PANELBOARDS.
13. REPLACE ANY DAMAGED EXISTING TO REMAIN ELECTRICAL, LIGHTING, AND LOW VOLTAGE
EQUIPMENT IN KIND.
14. EXTEND WIRING IN KIND FOR DEVICES TO BE REINSTALLED IN NEW CEILING AS NECESSARY.
15. ALL SURFACE MOUNTED DEVICES SHALL BE INSTALLED IN 1 OR 2 SECTION SURFACE MOUNTED
RACEWAY AS REQUIRED TO ACCOMODATE BOTH LOW VOLTAGE AND LINE VOLTAGE CABLES IN
THE SAME RACEWAY. REFER TO SURFACE MOUNTING DETAIL FOR MORE INFORMATION.
16. VERIFY IF BUILDING HAS PLENUM RETURN. IF PLENUM RETURN EXISTS, PROVIDE ALL EXPOSED
CABLING INSTALLED WITHIN PLENUM AS PLENUM RATED CABLE.
ABBREVIATIONS & SYMBOL
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ATS AUTOMATIC TRANSFER SWITCH
CT COUNTERTOP
DC DUCT COIL
DF DRINKING FOUNTAIN
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
ERL EXISTING TO BE RELOCATED
ETD EXISTING TO BE DEMOLISHED
ETR EXISTING TO REMAIN
GC GENERAL CONTRACTOR
GF GROUND FAULT INTERRUPTER
HC HVAC CONTRACTOR
HP HEAT PUMP
HV HIGH VOLUME
KES KITCHEN EQUIPMENT SUPPLIER
MW MICROWAVE
PC PLUMBING CONTRACTOR
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSER
WM WALL MOUNTED
WP WEATHERPROOF
DRAWING NOTE BY SYMBOL
CIRCUITING
JUNCTION BOX
BRANCH CIRCUIT NUMBER FOR ALL ITEMS IN THIS ROOM
UNLESS OTHERWISE INDICATED - (*) INDICATES CONNECTION
TO CIRCUIT NUMBER SHOWN NEXT TO DEVICE
DEMOLITION DRAWING LINETYPE DESIGNATIONS
EXISTING TO REMAIN
EXISTING TO BE REMOVED
NOTE:
NOT ALL ABBREVIATIONS AND SYMBOLS INDICATED MAY APPEAR ON THESE
CONTRACT DRAWINGS. THIS IS FOR REFERENCE ONLY.
JB
P-1
ROOM #
ROOM NAME
CONTROL EQUIPMENT
MANUAL MOTOR STARTER - OVERLOADS SIZED TO
ACCOMODATE MOTOR - 4'-0" AFF UNLESS OTHERWISE NOTED
COMBINATION MOTOR STARTER - TYPE/SIZE/NEMA
ENCLOSURE AS INDICATED - MOUNT 4'-6" AFF TO CENTERLINE
OF OPERATING HANDLE. PROVIDE OVERCURRENT AND
OVERLOADS IN ACCORDANCE WITH MANUFACTURERS'
RECOMMENDATIONS FOR MOTOR HP
MOTOR - HORSEPOWER AS INDICATED
DISCONNECT SWITCH - AMPS/POLES/FUSES/NEMA
ENCLOSURE AS INDICATED - MOUNT 4'-6" AFF TO CENTERLINE
OR OPERATING HANDLE
TRANSFORMER
PUSHBUTTON EMERGENCY SHUT-OFF SWITCH
M
T
30/3/NF/12
FVNR/SIZE1/3R
MS
PANELBOARDS
SURFACE MOUNTED PANEL
FLUSH MOUNTED PANEL
EXISTING SURFACE MOUNTED PANEL
EXISTING FLUSH MOUNTED PANEL
WIRING DEVICES
SINGLE POLE SWITCH - 3'-10" AFF UNLESS OTHERWISE NOTED
3-WAY SWITCH - 3'-10" AFF UNLESS OTHERWISE NOTED
4-WAY SWITCH - 3'-10" AFF UNLESS OTHERWISE NOTED
KEY SWITCH - 3'-10" AFF UNLESS OTHERWISE NOTED
SPRING WOUND TIME SWITCH, 5-MINUTE MAXIMUM DURATION
- 3'-10" AFF UNLESS OTHERWISE NOTED
SPRING WOUND TIME SWITCH, 1-HOUR MAXIMUM DURATION -
3'-10" AFF UNLESS OTHERWISE NOTED
DIMMER SWITCH - 3'-10" AFF UNLESS OTHERWISE NOTED
MANUAL MOTOR STARTER SWITCH - 3'-10" AFF UNLESS
OTHERWISE NOTED
3-WAY DIMMER SWITCH - 3'-10" AFF UNLESS OTHERWISE
NOTED
OCCUPANCY SENSOR SWITCH - 3'-10" AFF UNLESS OTHERWISE
NOTED
PILOT LIGHT SWITCH - 3'-10" AFF UNLESS OTHERWISE NOTED
MANUAL OVERRIDE
SWITCH WITH OCCUPANCY SENSOR AND DIMMING CAPABILITY
- 3'-10" AFF UNLESS NOTED OTHERWISE
DUAL TECHNOLOGY OCCUPANCY SENSOR - 360°
DUAL TECHNOLOGY OCCUPANCY SENSOR - CORRIDOR
PATTERN
DUAL TECHNOLOGY OCCUPANCY SENSOR - CORNER MOUNT
CEILING MOUNTED DAYLIGHT SENSOR
MULTIPLE BUTTON DIGITAL CONTROL STATION WITH ON/OFF -
3'-10" AFF UNLESS OTHERWISE NOTED
DUPLEX RECEPTACLE - NEMA 5-20R, MOUNT 1'-6" AFF UNLESS
OTHERWISE NOTED
COUNTERTOP DUPLEX RECEPTACLE MOUNT 3" ABOVE
BACKSPLASH OR AT 3'-10"
TAMPERPROOF DUPLEX RECEPTACLE - NEMA 5-20R, MOUNT
1'-6" AFF UNLESS OTHERWISE NOTED
DUPLEX RECEPTACLE WITH USB PORT - MOUNT AT 1'-6"
UNLESS OTHERWISE NOTED
SINGLE RECEPTACLE - MOUNT 1'-6" AFF UNLESS OTHERWISE
NOTED
GFI DUPLEX RECEPTACLE - MOUNT AT 1'-6" AFF UNLESS
OTHERWISE NOTED
DUPLEX RECEPTACLE WITH TOP SWITCHED - 1'-8" AFF UNLESS
OTHERWISE NOTED
QUAD RECEPTACLE - NEMA 5-20R, MOUNT 1'-6" AFF UNLESS
OTHERWISE NOTED
SINGLE PHASE SPECIAL RECEPTACLE - MOUNT 1'-6" AFF
UNLESS OTHERWISE NOTED
THREE PHASE SPECIAL RECEPTACLE - MOUNT 1'-6" AFF
UNLESS OTHERWISE NOTED
FLOOR MOUNTED DUPLEX RECEPTACLE
COMBINATION POWER/COMMUNICATIONS FLOOR BOX -
DEVICES AS INDICATED
CORD REEL
TELEVISION CABLE OUTLET
OS
S
CT
FB
T
DS
OS
USB
Dos
TV
R
S
4S
KS
T5S
TS
DS
MS
3DS
OSS
PS
MOS
S
OS
LCS
GENERAL NOTES:
1. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL 'E' DRAWINGS, DIV. 26 SPECS, AND SPECIFIC ELECTRICAL NOTES ON OTHER DRAWINGS. ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR THEIR OWN CUTTING, PATCHING, AND
TEMPORAR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .