This is a Bid Cost Breakdown document prepared by the Montgomery County Housing Authority (MCHA) for the Roof Replacement project at Golden Age Manor in Pennsylvania. The project encompasses three primary construction scopes: Selective Demolition, New Roof Installation, Mechanical work, and Electrical work. The Selective Demolition section includes removal of existing built-up roofing, insulation, flashing, and metal roofing at the entry. The New Roof Installation scope involves installation of fully adhered 90 mil EPDM roofing with 1/2-inch protection board and two layers of 2-inch polyiso insulation, metal coping caps and drip edges, concrete roof deck and canopy repair, and stair preparation and painting. The Mechanical scope includes demolition of existing exhaust fans, installation of new curbs, and installation of new exhaust fans. The Electrical scope addresses disconnection and reconnection of exhaust fan electrical systems and lighting work. Sealed bids are due electronically via PennBid by 2:00 P.M. on Monday, March 30, 2026, with public bid opening at Robert P. Smith Towers in Pottstown, Pennsylvania. A non-mandatory pre-bid meeting is scheduled for 1:00 P.M. on Thursday, March 19, 2026, at Golden Age Manor, 400 Walnut Street, Royersford, Pennsylvania.
The Bid Cost Breakdown serves as an informational document for MCHA and does not alter the bidder's total bid price or limit the scope of work required by the contract documents. Bidders must submit cost data only for the scope of work they are bidding on and must provide a bid bond equal to five percent of their total bid amount. The successful bidder will be required to furnish Performance and Payment Bonds. The project is funded through Community Development Block Grant (CDBG) and is subject to Section 3 of the Housing and Urban Development Act of 1968, requiring that training, employment, and economic opportunities be directed to low- and very low-income persons. Contractors must comply with prevailing wage requirements and ensure non-discrimination in employment practices. The contract term and specific liquidated damages provisions are subject to the complete contract documents.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Cost Breakdown Montgomery County Housing Authority Roof Replacement at Golden Age Manor
A Selective Demolition Unit Approximate
Quantity Cost Total
Removal of existing built up roofing, Insulation, flashing, etc. SF 0.00
2 Demolish metal roofing at entry SF 0.00 $0.00
B New 30 year Roof Installation and Awning Unit Approximate
Quantity Cost Total
Fully adhered 90 mil EPDM, 1/2" protection Bd.,One layers of 2" polyiso insul., tapered insulation, curb flashing and penetrations. SF 0.00
2 Metal roofing at entry SF 0.00 3 Metal coping caps and drip edges LF 0.00 4 Concrete roof deck and canopy repair SF 0.00 5 Stair prep and painting LS 0.00
$0.00
C Mechanical Unit Quantity Cost Total 1 Exhaust Fan Demolition EA 0.00 2 New Curbs EA 0.00 2 New Exhaust Fans and installation EA 0.00 3 Attic Stock Materials LS 0.00
$0.00
C Electrical Unit Quantity Cost Total 1 Exhaust Fan Electrical Disconnection EA 0.00 2 New Exhaust Fan electrical connections EA 0.00 3 Lighting LS 0.00
$0.00
2. Bidders will only provide pricing for the scope of work they are bidding on.
Selective Demolition Subtotal
Mechanical Construction Subtotal
Roof Construction Construction Subtotal
Electrical Construction Subtotal
1. The Bid Cost Breakdown is provided as information to the MCHA. The Bid Cost Breakdown shall in no way alter the Bidder’s bid price, nor shall it serve to limit the scope of work required by Contract Documents.