6-Consent of Surety-Change Order.pdf.pdf

PDF 648 KB Posted

Attached to
Pipeline Work Order Construction Services - WORCs 6
Solicitation number
IFB-26-00426
Issued by
Hillsborough County, Florida

About this file

This is a Consent of Surety to Change Order form used by Hillsborough County, Florida for construction contracts. The form serves as a formal acknowledgment by a surety company that it consents to modifications of an existing contract between the county and a contractor. The document allows the surety to recognize changes to the contract amount (either increases or decreases) and extensions to the completion date, with corresponding adjustments to both performance and payment bonds. The form requires authorized signature by the surety, notarization by a Florida notary public in Hillsborough County, and includes spaces for the specific change order number, dollar amount of adjustment, calendar days of time extension, and execution date.

This blank template is associated with the Pipeline Work Order Construction Services - WORCs 6 opportunity for Hillsborough County Capital Projects Department, a $12,075,000 estimated construction contract for water main, reclaimed water main, and wastewater force main installation and modifications at various county facilities. The contract includes a Small Business Enterprise (SBE) subcontractor participation goal of 6 percent. The Consent of Surety form would be utilized when change orders are issued during the contract performance period to ensure the surety's bond coverage remains adequate for any modifications to scope, cost, or schedule.

View the file

Other files

File Type Posted
25-Payment Bond.pdf PDF
7-Payment Assistance (SBE Set-Aside).pdf.pdf PDF
4-Allowance Authorization Release Form.pdf.pdf PDF
20-Attachment A - Supplemental Specifications - 10.09.2026.pdf PDF
5-Application for Payment.pdf.pdf PDF
12-Substitute W9 Form.pdf.pdf PDF
17-SBE Goal Participation SBE-1 Form Tutorial.mp4 MP4 file
16-Subcontractor Letter of Intent .pdf PDF
9-Consent of Surety to Final Payment.pdf.pdf PDF
18-Attachment B - Utility Accomodation Guide and ROW Use Procedures.pdf PDF
14-Contractors Affidavit for Payment of Debts and Claims 02.18.2026.pdf PDF
22-1. Terms and Conditions.pdf PDF
8-Subcontractors Statement of Satisfaction.pdf.pdf PDF
15-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
24-Bid Bond.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
19-Attachment C - Insurance Requirements.pdf PDF
23-Agreement - IFB-26-00426.pdf PDF
21-NEW SBE Subcontractors Material Suppliers List SBE-1 Form-10.2026.pdf PDF
13-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
3-Vendor Eligibility Check Prior to Contract Award.pdf.pdf PDF
11-Insurance Certificate.doc.doc DOC document
10-Change Order Form.pdf.pdf PDF
26-Performance Bond.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSENT OF SURETY TO CHANGE ORDER

CONTRACT TITLE:

CONTRACTOR (PRINCIPAL):

SURETY:

AGENT:

The SURETY does hereby acknowledge and agree to Change Order No. to the above referenced contract with Hillsborough County, the contract amount

(increasing/decreasing) by $ , and/or extending the completion date by ( ) calendar days. The SURETY further acknowledges that the performance bond and/or payment bond furnished under the aforementioned contract is accordingly changed to reflect the change in contract amount, and/or time included in Change Order No. .

This Consent is dated this day of , 20 .

SURETY:

BY: (SEAL)

Authorized Signature

-OR-

BY: (SEAL)

As Attorney in Fact (Attach Power of Attorney)

Printed Name

STATE OF FLORIDA

COUNTY OF HILLSBOROUGH

The foregoing instrument was acknowledged before me by means of physical presence or online notarization this ___ day of ____________, 20___, __________________________ by (Name of person)

________________________ for _________________________________________________.

(ie. Officer, attorney in fact) (Name of party on behalf of whom instrument was executed.)

(Signature of Notary Public)

(Print, Type, or Stamp Name of Notary Public)

Personally Know OR Produced Identification

Type of Identification Produced __________________

Revised 03.09.2020

File details come from the government source that posted it. Updated .