21-NEW SBE Subcontractors Material Suppliers List SBE-1 Form-10.2026.pdf
PDF 112 KB Posted
- Solicitation number
- IFB-26-00426
- Issued by
- Hillsborough County, Florida
About this file
This is a Small Business Encouragement (SBE) Subcontractors/Material Suppliers List form (SBE-1 Form, Revised 10/2026) issued by Hillsborough County in Florida for a pipeline work order construction services contract. Bidders are required to complete this form to identify all registered Small Business Enterprise subcontractors and material suppliers they intend to utilize on the project, along with their respective scopes of work and estimated dollar amounts. The form requires bidders to list both SBE and non-SBE subcontractors/material suppliers, with failure to complete the requirements potentially resulting in rejection of the entire bid. All listed SBEs must be either registered with Hillsborough County or possess reciprocal eligibility from another jurisdiction, with supporting documentation required for reciprocal registrants. Material suppliers that furnish but do not manufacture supplies receive fifty percent credit toward SBE participation goals. Letters of Intent between the bidder and each named SBE firm must be attached using the County's standard form included in the solicitation documents.
The contract relates to Hillsborough County's Pipeline Work Order Construction Services project (WORCs 6), valued at an estimated $12,075,000.00 for construction and installation of water mains, reclaimed water mains, and wastewater force mains at various County water, reclaimed water, and wastewater facilities and pumping stations operated by the Water Resources Department. An SBE participation goal of 6% has been established for this work order term contract. This form serves as the mechanism for bidders to demonstrate their commitment to the County's Small Business Encouragement Program and compliance with the specified SBE participation requirements.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBE – 1 FORM
(Revised 10/2026)
HILLSBOROUGH COUNTY
SMALL BUSINESS ENCOURAGEMENT PROGRAM
SUBCONTRACTORS/MATERIAL SUPPLIERS LIST (SBE-1 FORM)
BID NO.: BIDDER NAME:
List all registered Small Business Enterprise (SBE) subcontractors1/material suppliers2 to be utilized on this project.
Include business name, scope of work to be performed, and estimated dollar amount of each item. If the solicitation is a “Work Order/Term Contract”, the “Estimated Dollar Amount” column may be left blank. All SBEs that are listed as “registered” must either be registered with Hillsborough County or have reciprocal eligibility (provide supporting documentation) as specifically set forth in the County’s solicitation document.
A Bidder’s failure to complete the requirements of this page may result in rejection of their entire Bid.
Registered SBE Subcontractors1/Material Suppliers2 Scope of Work Estimated
Dollar Amount
Letter of Intent3
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
1Attach a copy of the/each named SBE firm’s current SBE registration. If the SBE firm is not a registered SBE firm with
Hillsborough County but is seeking reciprocal registration with the County, then a letter from the registering jurisdiction or copy of the registration document evidencing registration by the registering jurisdiction must be attached.
2Material Suppliers: Registered SBE firms that furnish supplies for projects, but do not manufacture the supplies, will be partially credited at fifty percent (50%) towards the project’s SBE participation goal.
3Attach a copy of the Letter of Intent between the Bidder and the/each named SBE firm for the above referenced bid. **The form Letter of Intent is included with the County’s solicitation document and must be completed and submitted to the County to ensure that all required information is provided.
List all other subcontracted scopes of work or work item numbers to be performed by non-registered SBE subcontractors/material suppliers on this project and estimated dollar amount of each item:
Non-SBE Subcontractors/Material Suppliers Scope of Work Estimated
Dollar Amount
| BID NO: |
| BIDDER NAME: |
| Registered SBE Subcontractors1Material Suppliers2Row1: |
| Scope of WorkRow1: |
| Estimated Dollar AmountRow1: |
| Registered SBE Subcontractors1Material Suppliers2Row2: |
| Scope of WorkRow2: |
| Estimated Dollar AmountRow2: |
| Registered SBE Subcontractors1Material Suppliers2Row3: |
| Scope of WorkRow3: |
| Estimated Dollar AmountRow3: |
| Registered SBE Subcontractors1Material Suppliers2Row4: |
| Scope of WorkRow4: |
| Estimated Dollar AmountRow4: |
| Registered SBE Subcontractors1Material Suppliers2Row5: |
| Scope of WorkRow5: |
| Estimated Dollar AmountRow5: |
| Registered SBE Subcontractors1Material Suppliers2Row6: |
| Scope of WorkRow6: |
| Estimated Dollar AmountRow6: |
| NonSBE SubcontractorsMaterial SuppliersRow1: |
| Scope of WorkRow1_2: |
| Estimated Dollar AmountRow1_2: |
| NonSBE SubcontractorsMaterial SuppliersRow2: |
| Scope of WorkRow2_2: |
| Estimated Dollar AmountRow2_2: |
| NonSBE SubcontractorsMaterial SuppliersRow3: |
| Scope of WorkRow3_2: |
| Estimated Dollar AmountRow3_2: |
| NonSBE SubcontractorsMaterial SuppliersRow4: |
| Scope of WorkRow4_2: |
| Estimated Dollar AmountRow4_2: |
| NonSBE SubcontractorsMaterial SuppliersRow5: |
| Scope of WorkRow5_2: |
| Estimated Dollar AmountRow5_2: |
| NonSBE SubcontractorsMaterial SuppliersRow6: |
| Scope of WorkRow6_2: |
| Estimated Dollar AmountRow6_2: |
| NonSBE SubcontractorsMaterial SuppliersRow7: |
| Scope of WorkRow7: |
| Estimated Dollar AmountRow7: |
| Yes/No: [Yes] |
File details come from the government source that posted it. Updated .