This federal contract opportunity is for renovation services at the Richard L. Roudebush VA Medical Facility in Indianapolis, Indiana. The scope of work involves relocating the Nuclear Medicine department to a new suite in the basement of the existing facility, including replacing and adding new PET/CT and SPECT/CT scanners. The renovation area encompasses approximately 13,000 square feet of existing space. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 10 for the relocation of Nuclear Medicine services under opportunity number 36C25021B0036. The response deadline and award date are not specified in the opportunity details provided.

View the file

Other files

File Type Posted
Amendment A00006.docx DOCX document
Amendment A00006 RFI Responses.docx DOCX document
Amendment 36C25021B0036 A00005.pdf PDF
A00004- Corrected Statement of Work.pdf PDF
Amendment 36C25021B0036 A00004.pdf PDF
A00004 - RFI Responses.docx DOCX document
A0004 - 08 71 00 - Door Hardware.pdf PDF
A00004 - 10 25 13 - Patient Bed Service Walls.pdf PDF
A00004 - Door Schedule.pdf PDF
Amendment 36C25021B0036 A00003.pdf PDF
Amendment A00002.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
A0001 - RFI 1 ShieldingReportComplete.pdf PDF
A0001 - RFI 2- GC101.pdf PDF
A0001 - RFI Responses.docx DOCX document
Amendment A0001.docx DOCX document
A0001 - RFI 4- Door Schedule.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part1.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part12.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part18.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part10.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part5.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part23.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part22.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part7.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part14.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part11.pdf PDF
Specifications.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part21.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part13.pdf PDF
Wage Determination.txt TXT text file
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part15.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part16.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part4.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part9.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part20.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part5.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part8.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part10.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part7.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part12.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part6.pdf PDF
36C25021B0036 Solicitation Document.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part11.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part14.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part16.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part24.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part9.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part1.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part3.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NO WORK

UP

F.E.C.

F.E.C. F.E.C.

F.E.C.

F.E.C.

F.E.C. F.E.C.

F.E.C.

M E C H

R M

CB-33

CB-35

IM

S

IM

S

R A M P

U P

R A M P

RAMPRAMP

R A M P

U P

R A M P

U P

R A M P

RAMPRAMP

ELEV. ELEV.

G-1 G-2

ELEV. ELEV.

G-1 G-2

ELEV. ELEV.

G-1 G-2

ELEV. ELEV.

G-1 G-2

ELEV. ELEV.

G-1 G-2

ELEV. ELEV.

G-1 G-2

ELEV. ELEV.

G-1 G-2

ENVIRONMENTAL

WATER SOFTENER

OUTDOOR

STORAGE

A-B114

A-B113

AND WASHDOWN

MAINTENANCE

WASH

A-B109A

REPAIR

WHEELCHAIR

LOBBY

A-B115A

PAINT

SHOP

A-B115

A-B125

COLLECT.

DUST

CB-3

LOBBY

CARPENTER

SHOP

A-B121

C O

RR

ID

O R

BL

UE

A- B1

MACHINE AND

WELDING SHOP

A-B108A

A- B1

CORRIDOR ELEC.

OFFICE

A-B040

A-B043

OFFICE

A-B136A-B135

REPAIR

BED

A-B141

LOCKSMITH

ENG.

SERVICE

A-B142

C O

R

RI

D O

R

ELECTRICAL

SWITCHGEAR

A-B139

A-B143

MECHANICAL

A-B148

ROOM

A-B147

C O

R

RI

D O

R

CORRIDOR

B-B033 B-B045

ROOM

RECEPT.

OFFICE

ROOM

B-B034 B-B044

B-B035

UTILITY

B-B041

DRESS

B-B014

ROOM

TREATMENT

CORRIDOR

CB-11

TREATMENT

ROOM

B-B015

AREA WELL

A-B137

C-B067

ROOM

C-B065

C-B129

STORAGE

CHUTE

LINEN

C-B039

C-B037

C B -3

C O

RR

ID

O R

C- B03

EN

GIN

EE

R

BI

OMED

IC

AL

C-B035

MACHINE SHOP

C -B

C-B033

C-B034

C-B144

C-B146

FR

EE

ZE

R

C- B0

69GE

NE

RA

TO

R

EM

ER

GE

NC

Y

C-B118

C-B120

C-B091

TOILET

C -B

C-B110A

C-B102

C-B103

C-B097

C-B110

C-B108

C-B109

C-B098 C-B095C-B096 C-B094

C O

N

TR

O L

C -B

C O

RR

ID

O R

C-B092

STOR.

EL

EC

TR

O

N

IC

S

SUPPORT

CLERICAL

MANUAL

SHIPPING

CB-52

CORRIDOR

CB-55

CORRIDOR

C-B063

FIRE EQUIP.

MAIL

C-B170

STOR.

MAINT.

ROOM

STAIR #3-B

MECH.

R O

O M

RECEIVING

CANTEEN STORAGE

EQUIP.

FIRE

CHASE

AUTOPSY

C-B123

SUITE

C O

RR

ID

O R

SW

ITC

HG

EA

R

RO

OM

C-B074

SERVICE

CANTEEN

C-B072

SERVICE

CANTEEN

C B

- 4

C O

R R

ID

O R

C-B066

STORAGE

PHARMACY

STORAGE

EMS

R.

O. E

QUI

PM

EN

T

A- B1

51 CHIEF

C-B031

REPAIR & DEVELOPMENT

COOLER #1

WALK-IN

C-B145

C-B077

RECEIVING

CANTEEN

C-B076

CLOSET

C- B1

FR

EE

ZE

R

CHASE 1B

A-B150

MECHANICAL ROOM

ELEV.

P-14

ELEV.

P-13

ELEV.

TE

LE

PH

O

N E

R O

O M

P-16

A-B153

ROOM

A-B154

A-B155

TOILET

#1-B

P-1 S-5

TELE. ROOM

P-3P-2 P-4 S-6

P-10 D-B008

LOBBY

ROOM

GENERATOR

D-B011

D-B009

D-B004

#7-B

MECHANICAL

ROOM

MECHANICAL

ROOM

LO

C

KE

R

RO

O

M C

-B

C O

RR

ID

O R

C B -3

A

#2-B

EMPLOYEE

EXERCISE

ROOM

C-B008

CORRIDOR

C O

RR

ID

O R

C B -3

MEN

LOCKERS

C-B006

CHUTE

C-B004

LINEN

C-B003

MECH.

ROOM

C-B203

OFFICE

C-B016

PI

PE

C H A S E

LOBBY

C-B179

RADIATION

ONCOLOGY

RECEPT.

OFFICE

B-B029

MECH. ROOM

C-B021

EL

EC

TR

IC

SH

OP

ELECTRICAL

SWITCHGEAR

A-B140

C- B1

FR

EE

ZE

R

C-B152

C-B153

CONTROL

INGREDIENT

C-B155

CORRIDOR CB-46

CORRIDOR

C-B156

CLEAN EQUIP.

DISHWASH./

CLEAN LINEN

C-B196

C -B

FO

R M

AN

EM

S G

EN

C H U

TE

LI

N

EN

C-B187

C-B191

A-B045

MANAGEMENT

PARTS

STORAGE

C-B032

MECH.

ROOM

STORAGE

MATERIALS

FLAMMABLE

C -B

FIRE

C-B012

LOBBY

C-B121

VIEWING ROOM

VESTIBULE

C-B122

COLD ROOM

C-B119

ENV. SERV.

C- B12

ST

ORA

GE

BI

OM

ED

IC

AL

SU

PE

RV

IS

OR

ELEV.

CORRIDOR

C-B071

SVCS.

ENG.

ELEV.

S-11

ELEV.

S-12

ELEV.

P-15

SUPPLIES/EQUIPMENT

STORAGE/

A-B001

A-B126

DOCK

LOADING

C-B115

CORRIDOR

ELEV.

C-B019

SWITCH GEAR

MEN

TOILET

C-B007

STORAGE

ELECTRICAL

STORAGE

A-B138

ELECTRICAL

SHOP

A-B144

A-B146

CHUTE

LINEN

C-B157

C-B180

OPEN

CORRIDOR

EQUIP.

FIRE

EL

EV

A

TO

R M

A C

H

IN

E

EQ

U

IP

M

EN

T

CHASE

CHASE

D -B

EL

EC

TR

IC

AL

R O

O M

P-9 P-8

ELEV. ELEV.

ELEV.

ELEV.

ELEV.ELEV.ELEV. ELEV. ELEV.

A

RE

A

AREA

AREA

AREA

AREA

A

RE

A

G-1 G-2

FREIGHT

ELEVATOR

LOBBY

EMERGENCY

GENERATOR

SUBSTATION

EM

S

SWITCH GEAR

C-B105 C-B106

C-B099

FUTURE

S-13

C-B178

SERVICE

ENVIRO.

ROOM

ELEC.

A R

EA

W

AY

S

CHASE

C O

O R

ID

O R

CHASE

CORRIDOR

CB-36

CH

UT

E

LIFT

W O

M

EN

C H A S E

CHASE

C H A S E

CHASE

CHASE

C H A S E

C H A S E

C H A S E

CHASE

"E

"F

"G

"H

"K" "J"

TO

IL

ET

CH

AS

E

CHASE

M

EC

H

CB-38

C O

RR

ID

O R

C O

R

RI

D O

R

STAIRCASE

ROOM

CONFERENCE

STAIR

STAIR

A-B123

E-B004

#14-B

STAIR

BREAK

ROOM

B-B047

B-B043

OFFICE

DCS

WAITING

SU

PE

RV

IS

OR

OFFICE

E-B029

C O

RR

ID

O R

MEN

TOILET

SHOP

MASONRY

A-B102

C

LO

S

ET

A- B

C

LO

S

ET

A- B

AC SHOP

A-B106

CORRIDOR

CB-7

A-B135

PLUMBING

SHOP

A-B107

TOILET

WOMEN

PLUMBING

SHOP

A-B108

A-B109

SHOP

A-B080

CHIEF, LOG ASST. LOG

P-13 P-16

TOILET

WOMEN

TEAM

ROOM

ACOS

FOR QCIS

C-B188

P-1

ELEV.

O

FF

IC

E

C -B

C-B055

HELP

D-B010

ROOM

GENERATOR

C-B191

C-B192

SERVICES

RECEIVING

CHASE CHASE

"K" "J"

IMS

QCIS/QM

PROSTHETICS

ENVIRONMENTAL

WATER SOFTENER

A-B114A OUTDOOR

STORAGE

A-B114

A-B113

AND WASHDOWN

MAINTENANCE

WASH

A-B110

REPAIR

WHEELCHAIR

CB-5

LOBBY

PAINT

SHOP

A-B125

COLLECT.

DUST

LOBBY

CARPENTER

SHOP

C O

RR

ID

O R

ST

OAR

GE

BL

UE

PR

IN

TS

MACHINE AND

WELDING SHOP

MAI

NT

EN

AN

CE

SU

PE

RV

IS

OR

CORRIDOR

OFFICE

A-B040

A-B047

A-B043

COPY

A-B136A-B135

REPAIR

BED

A-B141

LOCKSMITH

ENG.

SERVICE

A-B142

C O

R

RI

D O

R

C B -1

ELECTRICAL

SWITCHGEAR

A-B139

A-B143

MECHANICAL

A-B148

ELEC.

ROOM

A-B147

S

TA

IR

-B

C O

R

RI

D O

R

C B

-1

TELE.

ROOM

B-B051

CORRIDOR

CB-20

EQUIP RM

B-B033

TE

LE

RO

O M

CORRIDOR

B -B

B-B045

ROOM

RECEPT.

OFFICE

B-B046

CONTROL

B-B034 B-B044

B-B035

MRI SOILED

B-B042

B-B041

ROOM

B-B014

ROOM

TREATMENT

CORRIDOR

CB-11

TREATMENT

ROOM

B-B015

AREA WELL

B-B022 B-B023

SUPERVISOR

OFFICE

A-B137

C-B067

ROOM

C-B065

H.A.C.

C-B129

STORAGE

C-B040

CHUTE

LINEN

C-B039

C-B037

C B -3

C O

RR

ID

O R

C -B

A

S

EC

C- B03

0A

EN

GIN

EE

R

BI

OMED

IC

AL

C-B028

C-B035

MACHINE SHOP

C -B

C-B033

C-B127

C -B

C-B034

C-B144

C-B146

C- B1

FR

EE

ZE

R

C- B0

69GE

NE

RA

TO

R

EM

ER

GE

NC

Y

STORAGE

C-B118

C-B120

C-B091

TOILET

C -B

C-B113

C-B112

C-B110A

C-B117A

C-B114

C-B103

C-B097

C-B110

C-B108

C-B107 C-B109

C-B093C-B098 C-B095C-B096 C-B094

C O

N

TR

O L

C -B

C O

RR

ID

O R

C-B092

STOR.

MISC.

CORRIDOR

EL

EC

TR

O

N

IC

S

SUPPORT

CLERICAL

MANUAL

SHIPPING

C O

RR

ID

O R

CB-52

CORRIDOR

CB-55

CORRIDOR

C-B063

FIRE EQUIP.

MAIL

C-B170

STOR.

MAINT.

ROOM

C-B064

STAIR #3-B

MECH.

R O

O M

RECEIVING

CANTEEN STORAGE

FIRE

C-B100

CHASE

AUTOPSY

C-B123

SUITE

C O

RR

ID

O R

C B -3

SW

ITC

HG

EA

R

RO

OM

C-B074

SERVICE

CANTEEN

C-B072

SERVICE

CANTEEN

C-B073

C B

- 4

C O

R R

ID

O R

ELEC.

ROOM

C-B066

STORAGE

PHARMACY

STORAGE ROOM

STORAGE

EMS

R.

O. E

QUI

PM

EN

T

A- B1

TE

LE

R M

CHIEF

C-B031

REPAIR & DEVELOPMENT

COOLER #1

WALK-IN

C-B145

C-B077

RECEIVING

CANTEEN

C-B076

CLOSET

C- B1

FR

EE

ZE

R

CHASE 1B

A-B150

MECHANICAL ROOM

TE

LE

R M

STAIR #9-B

TOILET

ELEV.

P-14

ELEV.

P-13

ELEV.

A- B

TE

LE

PH

O

N E

R O

O M

MEN

P-16

A-B153

ROOM

ELEC.

A-B154

A-B155

TOILET

#1-B

P-1 S-5

TELE. ROOM

P-3P-2 P-4 S-6

P-10 D-B008

LOBBY

ROOM

GENERATOR

D-B011

D-B002

D-B009 D-

B0

D-B004

STAIR

MECHANICAL

ROOM

TO

IL

ET

MECHANICAL

ROOM

LO

C

KE

R

RO

O

M C

-B

LOCKERS

C-B010

C O

RR

ID

O R

C B -3

A

#2-B

LOBBY

EMPLOYEE

EXERCISE

ROOM

C-B008

CORRIDOR

C O

RR

ID

O R

C B -3

MEN

LOCKERS

C-B006

CHUTE

C-B004

LINEN

IMS

C-B003

MECH.

ROOM

C-B203

C-B017

UPS ROOM

OFFICE

C-B016

PI

PE

C H A S E

C- B01

LOBBY

C-B179

C -B

ONCOLOGY

RECEPT.

OFFICE

B-B029

MECH. ROOM

C-B021

SU

PE

RV

IS

OR

EL

EC

TR

IC

SH

OP

A- B1

ELECTRICAL

SWITCHGEAR

A-B140

COMMUNICATIONS ROOM

STAIR

C- B1

FR

EE

ZE

R

C-B152

C-B153

CONTROL

INGREDIENT

C-B154

INVENTORY

C-B155

CORRIDOR CB-46

CORRIDOR

C-B156

CLEAN EQUIP.

DISHWASH./

EFFECTS

PATIENT

C-B197

CLEAN LINEN

C-B196

C -B

FO

R M

AN

EM

S G

EN

C -B

C

H U

TE

LI

N

ENC

LO

S

ET

C -B

C-B187

TRAINING

C-B191

EQUIP

FIRE

PARTS

STORAGE

C-B032

S

TA

IR

-B

MECH.

ROOM

C -B

CLOSET

C-B018

STORAGE

MATERIALS

FLAMMABLE

ADMIN.

SUPV.

V O

C R

EH

A B

C O

M

PU

TE

R L

A B

C -B

FIRE

EQUIP.

C-B012

CB-31

LOBBY

C-B121

VIEWING ROOM

VESTIBULE

C-B122

COLD ROOM

C-B119

ENV. SERV.

C- B12

ST

ORA

GE

EN

G.BI

OM

ED

IC

AL

SU

PE

RV

IS

OR

C- B0

ELEV.

CB-2

CORRIDOR

C-B071

SVCS.

ENG.

ELEV.

S-11

ELEV.

S-12

ELEV.

P-15

SUPPLIES/EQUIPMENT

STORAGE/

A-B001

A-B126

DOCK

LOADING

C-B115

CORRIDOR

STAIR

ELEV.

MECH ROOM

C-B019

SWITCH GEAR

MEN

TOILET

C-B007

STORAGE

ELECTRICAL

STORAGE

A-B138

ELECTRICAL

SHOP

A-B144

A-B146

CHUTE

LINEN

TOILET

CB-21

CORRIDOR

WASH

C-B157

C-B180

OPEN

D -B

EQUIP.

FIRE

EL

EV

A

TO

R M

A C

H

IN

E

EQ

U

IP

M

EN

T

CHASE

CHASE

D -B

EL

EC

TR

IC

AL

R O

O M

P-9 P-8

ELEV. ELEV.

ELEV.

ELEV.

ELEV.

ELEV.ELEV.ELEV. ELEV. ELEV.

A

RE

A

A

RE

A

AREA

AREA

AREA

AREA

A

RE

A

A

RE

A

G-1 G-2

FREIGHT

ELEVATOR

LOBBY

EMERGENCY

GENERATOR

SUBSTATION

SU

PR

VI

SO

RS

EM

S

SUBSTATION

SWITCH GEAR

C-B104 C-B105 C-B106

C-B099

FUTURE

S-13

ELEV.

S-7

C H A S E

C H

A S

E

A R

EA

W

AY

S

C-B178

SERVICE

ENVIRO.

ROOM

ELEC.

CHASE

A R

EA

W

AY

S

CHASE

C O

O R

ID

O R

CHASE

C H A S E

CORRIDOR

CB-36

CH

UT

E

C H A S E

LIFT

WOMEN

W O

M

EN

B-B028

C H A S E

CHASE

C H A S E

CHASE

CHASE

C H A S E

C H A S E

CHASE

C H A S E

CHASE

"A" "B" "C"

"D

"E

"F

"G

"H

"K" "J"

TO

IL

ET

CH

AS

E

CHASE

M

EC

H

PASSAGE

CB-38

C O

RR

ID

O R

C O

R

RI

D O

R

C B -1

STAIRCASE

STAIRCASE

ROOM

CONFERENCE

LAUNDRY

STAIR

STAIR

#4-B

A-B123

ENGINEERING INTERIOR DESIGN

C-B056

C-B111

#14-B

STAIR

BREAK

ROOM

B-B047

PACS & MRI

B-B043

OFFICE

DCS

WAITING

WAR

EH

OUS

E

EB

-0

SU

PE

RV

IS

OR

OFFICE

C O

RR

ID

O R

C B-

MEN

TOILET

SHOP

MASONRY

A-B102

A- B

C

LO

S

ET

C

LO

S

ET

A- B

C

LO

S

ET

A- B

AC SHOP

A-B106

CORRIDOR

CB-7

A-B135

PLUMBING

SHOP

A-B107

TOILET

WOMEN

PLUMBING

SHOP

A-B108

A-B109

A-B080

CHIEF, LOG ASST. LOG

A-B050A

A- B0

A- B0

P-13

A-B156 A-B157

P-16

TOILET

WOMEN

A-B042

A-B041

TEAM

ROOM

ACOS

FOR QCIS

P-1

ELEV.

O

FF

IC

E

PR

O

S

TH

ET

IC

S

C -B

OFF

IC

E

C-B058

C-B055

HELP

D-B010

STAIR

ROOM

GENERATOR

C-B191

EMS

OFFICE

C-B192

SERVICES

C-B189

RECEIVING

C- B06

CHASE CHASE

"K" "J"

IMS

QCIS/QM

A-B050

FOODSERVICE

PROSTHETICS

IMS CLO

E-B002A

ELEV. ELEV.

G-1 G-2

CORRIDOR

ELEV. ELEV.

G-1 G-2

CORRIDOR

CB-17

A-B016

R0I

ELEV. ELEV.

G-1 G-2 CLOSET

CHASE

STAIR

#12-B

DOSIMETRY

B-B009

B-B010

PHYSICIST

B-B011

ONCOLOGY

RADIATION

CHIEF

B-B008

CHIEF

PHYSICIST

TOILET

WOMEN

B-B031 B-B030

TOILET

MEN

ONC

OLO

GI

ST

B- B0

NURSES

B-B005 B-B004

EXAM3 EXAM2

B-B003

EXAM1

B-B002

WAITING ROOM

B-B001

B-B020

TOILET

B-B021

BREAK ROOM

HEALTH TECH

B-B017

MECH.

ROOM

B-B018

B-B019

CLOSET

JANITOR

B-B026

B-B012

OFFICE

MANAGER

UTILITY

TOILET

HANDICAP

C H

A S

E

C-B059

OFFICE

CONFERENCE

ROOM

B-B006

B-B013

C O

RR

ID

O R

CB-3 C

O

R

RI

D O

R

B-B014A

ROOM

MODULATOR

ENG.

LOCKSMITH

ENG.

SERVICE

C- B1

EMS

C -B

A

C-B003B

EL

EC

T.

R O

O

M MECH.

ROOM

AUDITORIUM

A-B066

IMS

C-B001

IMS

C-B002

IMS

OI&T FIBER

OI&T APP DEVP/SUPPORT

CB-25

COMMON

OI&T PC STOR./DEVP.

C-B014

OI&T CS

C-B013

OI&T IS/

C-B202

IMS

OI&T CSU

IMS

WAREHOUSE

IMS

OI&T SUPV

IMS

C-B029

OI&T MGR

C-B030

OI&T ASSIST.

IM

S

O I&

T R

EC

P.

PR

IN

T

AR

EA

C-B025

IMS

OI&T FCIO

C-B026

OI&T SYSTEMS

C-B022

TELECOM

LO

C

KE

R

C-B130

CORRIDOR

C-B128

TOILET

C-B126

C-B174

WOMEN

TOILET

C-B175

CORRIDOR

NON/

FOOD&/

SUPPLY

STOR.

C-B162

C-B164

COOLER

C-B173

C O

R

RI

D O

R

CLOSET

CLEANING

C -B

LIFT

C-3

LOCKER

TO

IL

ET

S

TA

FF

C H A S E

OFFICE

C -B

C-B158

ROOM

WAITING ROOM

C-B136 C-B137

DIETICIAN

C-B138

MOVE

C-B135

DIETICIAN

C-B176

CAFETERIA

PA

PE

R S

TO

R

AG

E

C-B134C-B133

C-B132

C-B131

C-B163

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ROOM

IMS

FOOD

SERVICE

FOREMEN

C-B142

SUPPLY

C-B143 H.A.C.

C-B141

C B -3

CB-26

CORRIDOR

C-B024

SEC

C-B024

O I&

T

OI&T

OFF

IC

E

CH

IEF

'S

C-B117

D -B

C -B

A

OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC.OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC. OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC.

OFFICE

EDU SVC.

EDU SVC.

EDU SVC.

SAFETY

CHIEF

ADMIN

SAFETY

INDUSTRIAL

HYGIENIST

STORAGE

CANTEEN

DISTRIBUTION

C -B

A

BREAK ROOM

E-B002

C -B

A

O

FF

IC

E

PR

O

S

TH

ET

IC

S

OFFICE

E-B029A

GIP

COMMMECH

ROOM

A-B101 A-B100

A -B

A-B159

CB-22

CONTROL ROOM

CORRIDOR

C B

-1

C B

-2

ROOM

C O

R

RI

D O

R C O

R

RI

D O

R

C B

-1

CB-10

LOBBY

CB-11

LOBBY

CB-41

C-B014A

OI&T TURN-IN

C-B148

C-B159

C-B125

D-B001

CT SIMULATOR

CONTROL RM.

CHASE

SOILED

EXAM 4

B-B024

EXAM 5

EB-C02

E-B027

EB-028

E-B026

B -B

A

C

LE

AN

S

U

PP

LY

RESIDENT'S

B-B027

FCIO

DIETITIAN

WAN TEAM

ELEC. EQUIP.

ROOM

COOR

W O

M

EN

CART

OI&T IT STOR

#8-B

#5-B

STAIR

#14-B

MAIN WAREHOUSE

LOGISTICS

LOGISTICS

LOGISTICS

LO

GIS

TIC

S

LO

GIS

TIC

S

SOUND

BOOTH

TRAINING

BLOCK

ROOM

LEAD

WALLS

B-B016

SIMULATOR

ROOM

A- B0

A

ST

ORA

GE

A-B066B

STORAGE

BUSINESS

RA

DI

AT

IO

N

CT

C-B198

PURCHASING

EMS

RECEIVING

C-B188

RECEIVING

CHIEF

C-B155

ROOM

LOGISTICS

E-B004A

STORAGE

PROSTHETICS

E-B025

STORAGE

CYLINDER GAS

NON-OXYGENCYLINDER

OXYGEN

STORAGE

RESTROOM

E-B003

ASSIST.

SYSTEM

KEYPER

S

YS

TEM

KEYPER

S

YS

TEM

KEYP

ER

S H O

PS

EMS

EM

S

B-B015A

ROOM

MODULATOR

STERILE SUPPLY

SHOP

SUPPLIES

C O

R R

ID

O R

M

EC

H

C-B118A

WOMEN

C O

R R

ID

O R

ST

AI

R #6

-B C

H

AS

E

TOILET

M

EC

H

C -3

S

TE

PS

D

N

CONC. WALKWAY PLATFORM

STEP

DOWN

ADMIN

SAFETY

ADMIN

SAFETY

S

TE

PS

C-1

BREAKOUT

CLEAN EQUIP.

STORAGE

A-B082

SPD

A-B085

SUPPLY

CLERKS

A-B074

CB-7

LOUNGE

A-B071

A -B

EQ

U

IP

M

EN

T

LI

FT

CORRIDOR

CB-30

A- B0

LI

FT

EQ

P.

A- B

6 LIFT

A-B089

STORAGE

ELEC.

ROOM

A-B090 A-B075

AREA

STERILE SUPPLY

SUPPLY STORAGE

A-B079

SERVICE

WASH

A-B068

CHIEF

ASST.

CHIEF

A-B087

CLERK

A-B078

PLUMBING

SHOP

A-B108

A-B109

SHOP

RECEPTION

BULK/

STORAGE

A-B080

CASE CART

DECON

EQUIPMENT

A -B

A-B061

STERILIZATION

PREPARATION/

ASSEMBLY/

STERILIZATION

A-B065

CART WASH

A-B077

ETO

TOILET

SPD

DECONTAMINATION

A-B063

ENVIR.

C-1

C-2BREAKOUT

A-B081

CLEAN EQUIP.

STORAGE

A-B082

SPD

A-B085

SUPPLY

CLERKS

A-B074

CB-7

LOUNGE

A-B071

A -B

EQ

U

IP

M

EN

T

LI

FT

CORRIDOR

CB-30

SU

PE

RV

IS

OR

A- B0

LI

FT

EQ

P.

A- B

6 LIFT

A-B089

STORAGE

ELEC.

ROOM

A-B090 A-B075

AREA

STERILE SUPPLY

SUPPLY STORAGE

A-B079

SERVICE

ENVIRO.

WASH

A-B068

LIFT

CHIEF

ASST.

CHIEF

A-B087

A-B084

CLERK

A-B078

PLUMBING

SHOP

A-B108

A-B109

A-B083

RECEPTION

BULK/

STORAGE

A-B080

CASE CART

DECON

EQUIPMENT

STORAGE

EQUIPMENT

A-B069

V

ES

TI

B U

LE

A -B

A-B061

STERILIZATION

A-B067

PREPARATION/

ASSEMBLY/

STERILIZATION

A-B065

CART WASH

A-B077

ETO

MEN

TOILET

SPD

DECONTAMINATION

A-B063

C H A S E

ENVIR.

SERVICE

A -B

S

TE

R

IL

IZ

A

TI

O N

ET

O

STERILE SUPPLY

A-B072

WOMEN

TOILETA-B073

MEN

TOILET

C-B005

C-B005A

ROOM

SCAN

B-B036

ROOM

SCAN

B-B039

ROOM

EQUIPMENT

B-B038

ROOM

CONTROL

B-B037 ROOMSTO

RA

GE

B-B 039A

DRESS

B-B040

ROOM

MRI

MRI

A- B1

PIP

E S

HO

P

SU

PE

RV

IS

OR

A- B1

H.

V.

A.

C.

SU

PE

RV

IS

OR

A- B1

MAI

NT

EN

AN

CE

SU

PE

RV

IS

OR

M&O

PURCHASING

ENGINEERING

PR

OST

HE

TIC

S

C- B06

PR

OST

HE

TIC

S

C-B062

CONFERENCE

ROOM

STORAGE

C-B075A

CANTEEN

C-B075

CANTEEN

COOKING KITCHEN

STORAGE ROOM

DRY FOOD

SH

OP'S

LOGISTICS

LOGISTICS

C -B

O

111 SEATS

CU-2

CU-3

UP

DN

UP

DN

UPUP

DN

UP

DN

UPUP

DN

UP

UP

UP

UP

U P

UP

UP

UP

UP

UP

UP

DN

UP

DN

DN

DN

R A M P

RAMP UP

DN

UP

DN

UP

DN

UP

DN

UP

DN

DN

R A M P

DN

UP

UP

UP

UP

U P

UP

UP

UP

UP

UP

UP

DN

UP

DN

DN

DN

R A M P

RAMP UP

UP

DN

UP

UP

DN

UP

DN

UP

DN

UP

DN

DN

R A M P

UP

DN

UP

DN

UP

DNDN

UP

LOCK OFF

DOOR

DISCONNECT

AUTO-OPENING

LOCK OFF DOOR

AND

LOCK OFF

DOOR

DISCONNECT

AUTO-OPENING

LOCK OFF DOOR

AND

LOCK OFF

DOOR

LOCK OFF

DOOR

UP

GI102

E X

IT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

EXIT

10738 SF

100111

B

792 SF

A

EXIT

NOTE:

REFER TO SHEET GI102 FOR TRAVEL DISTANCES,

EXIT SEPARATIONS, AND DETAILS.

GC101A

TEMPORARY RAMP ACCESS

- REFER TO DETAIL

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2016

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2016 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2016 EDITION.

NFPA 54 NATIONAL FUEL GAS CODE, 2015 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA

PROCESSING EQUIPMENT, 2017 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS, 2015 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION

NFPA 101, LIFE SAFETY CODE, 2015 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017

EDITION

NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF

NFPA 5000 AND NFPA 900

ASHRAE 90.1-2016 HVAC SYSTEMS

ASHRAE 180 - 2012 VENTILATION FOR HEALTH CARE FACILITIES

ASHRAE 62.1 - 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

ASHRAE 1.1 - 2007 HVAC & R TECHNICAL REQUIREMENTS FOR COMMISSIONING

PROCESS

ASHRAE 0 - 2013 COMMISSIONING PROCESS

ASHRAE 55- 2013 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY

ASHRAE 15 – 2013 SAFETY STANDARD FOR REFRIGERATION SYSTEMS

ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2015

ENERGY SUSTAINABILITY, MAY 2014

EQUIPMENT, JANUARY 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR

PROJECTS SEPTEMBER 30, 2010

EPA GUIDELINES CHECKLIST

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.0

N u c M e d v d c h ri s te n s e n M

N F

X

.r v t

/2

/2

:2

:3

P

M

GI101

OVERALL LOWER LEVEL LIFE

SAFETY PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

HEAPY

1400 W. DOROTHY LANE

DAYTON, OH 45409

937.224.0861

RELOCATE NUCLEAR MEDICINE

SERVICES FOR CENTRALIZED

SERVICES

INDIANAPOLIS, IN

583-20-102

01/28/2021 JLG ELB

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 3/64" = 1'-0"GI101

1 OVERALL LIFE SAFETY PLAN

N

Revisions: Date:

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

B

1500 SF

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2016

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2016 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2016 EDITION.

NFPA 54 NATOINAL FUEL GAS CODE, 2015 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA

PROCESSING EQUIPMENT, 2017 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS, 2015 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION

NFPA 101, LIFE SAFETY CODE, 2015 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017

EDITION

NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF

NFPA 5000 AND NFPA 900

ASHRAE 90.1-2016 HVAC SYSTEMS

ASHRAE 180 - 2012 VENTILATION FOR HEALTH CARE FACILITIES

ASHRAE 62.1 - 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

ASHRAE 1.1 - 2007 HVAC & R TECHNICAL REQUIREMENTS FOR COMMISSIONING

PROCESS

ASHRAE 0 - 2013 COMMISSIONING PROCESS

ASHRAE 55- 2013 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY

ASHRAE 15 – 2013 SAFETY STANDARD FOR REFRIGERATION SYSTEMS

ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2015

ENERGY SUSTAINABILITY, MAY 2014

EQUIPMENT, JANUARY 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR

PROJECTS SEPTEMBER 30, 2010

ELEVATOR DESIGN MANUAL, AUGUST 2016

EPA GUIDELINES CHECKLIST

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC

HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN USED.

PROJECT SCOPE

THE PROJECT SCOPE INCLUDES RENOVATION OF APPROX. 13,000 SF OF EXISTING SPACE IN THE BASEMENT OF THE EXISTING BUILDING, INCLUDING THE CURRENT PET/CT CLINIC AND ADJACENT OFFICE SUITES TO FORM A NEW NUCLEAR MEDICINE SERVICES SUITE. APPROXIMATELY 3,100 SF OF THE EXISTING SPACE IN THE CURRENT PET/CT CLINIC WILL REMAIN LARGELY INTACT. THE CURRENT PET/CT SCANNER WILL BE REPLACED AND AN ADDITIONAL PET/CT SCANNER WILL BE ADDED. IN ADDITION, A NEW SPECT/CT SCANNER WILL BE ADDED AND A NEWER EXISTING SPECT/CT SCANNER WILL BE RELOCATED FROM THE EXISTING SECOND FLOOR NUCLEAR MEDICINE SUITE.

THE EXISTING OFFICE SUITES WILL BE RELOCATED. THE OVERALL FACILITY IS EXISTING AND THE SMOKE ZONES WILL REMAIN WITH MINIMAL MODIFICATIONS TO EXISTING SMOKE BARRIER LOCATIONS IN ORDER TO ACCOMADATE THE NUCLEAR MEDICINE SUITE BOUNDARY. THE EXISTING OVERALL BUILDING IS A HOSPITAL, CHAPTER 19 OF NFPA 101 LSC. MUCH OF THE AREA BEING RENOVATED IS A BUSINESS OCCUPANCY AND SHALL COMPLY WITH BOTH CHAPTERS 18 AND 19 IN ORDER TO MAINTAIN THE OVERALL INTEGRITY OF THE BUILDING. THE INTERIOR ELEMENTS SHALL COMPLY WITH CHAPTER 38 IN ORDER TO ACCOMADATE THE SUITE OCCUPANCY CLASSIFICATION.

CODE ANALYSIS

THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE I-B, ASSUMED. CONSTRUCTION IS EXISTING AND NOT TO BE CHANGED:

1. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE

2. CONSTRUCTION TYPE: I-B (IBC CHAPTER 5)

3. FIRE RESISTIVE RATINGS TYPE I-B CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, VARIES PER TABLE 602

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC. BUILDING STRUCTURE IS EXISTING AND NOT TO BE CHANGED

5. ALLOWABLE HEIGHT: BUILDING IS EXISTING AND NOT TO BE CHANGED (IBC, TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: BUILDING IS EXISTING AND NOT TO BE CHANGED (IBC, TABLE 504.4)

7. ALLOWABLE AREA: BUILDING IS EXISTING AND NOT TO BE CHANGED (IBC, TABLE 506.2)

8. BUILDING SEPARATION: BUILDING IS EXISTING AND NOT TO BE CHANGED (IBC, TABLE 602)

9. OCCUPANCY SEPARATION: BASEMENT CONSTRUCTION OCCUPACNY IS HEALTHCARE, NO OCCUPANCY SEPERATION REQUIRED. SUITE IS FOR OUTPATIENT CARE, A

BUSINESS CLASSIFIATION OCCUPANCY, LSC CHAPTER 38.

10. MEANS OF EGRESS

• AISLES, CORRIDORS, AND RAMPS REQUIRED FOR EXIT ACCESS IN A HOSPITAL SHALL BE NOT LESS THAN 8 FT IN CLEAR AND UNOBSTRUCTED WIDTH.

• AISLES, CORRIDORS, AND RAMPS IN ADJUNCT AREAS NOT INTENDED FOR THE HOUSING, TREATMENT, OR USE OF INPATIENTS SHALL BE NOT LESS THAN 44 IN. (1120

MM) IN CLEAR AND UNOBSTRUCTED WIDTH.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 42 INCHES FROM SLEEPING ROOMS; DIAGNOSTIC AND TREATMENT AREAS, SUCH AS X-RAY, SURGERY, OR PHYSICAL

THERAPY.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES.

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 200 FEET (LSC 18.2.6.2.1)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 18.2.5.3)

• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 18.2.5.2)

• MEANS OF EGRESS SHALL BE ILLUMINATED PER 7.9. (LSC 18.2.6.2.1)

• EMERGENCY LIGHTING SHALL BE PER 7.9. (LSC 18.2.9)

• EXIT SIGNAGE SHALL BE PROVIDED 7.10. (LSC 18.2.10)

11. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AND ESSENTIAL ELECTRICAL SYSTEM PER NFPA 99 SHALL BE PROVIDED.

12. PATIENT CARE NON-SLEEPING SUITE (LSC 18.2.5.7): SUITE IS LESS THAN 12,500 SQ.FT.

• NOT LESS THAN 2 REMOTE EXITS SHALL BE PROVIDED FOR THE SUITE.

• MAXIMUM TRAVEL DISTANCE WITHIN SUITE TO EXIT: 200 FEET

TRAVEL DISTANCE IN ZONE 1 IB-06 AND COMMON PATH OF TRAVEL ARE EXCEEDED, EQUIVALENCY DATED 9-6-12 ON FILE- PER VA STATEMENT OF CONDITIONS DATED 11/15/15.

13. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1 SHALL BE

PROTECTED AS INDICATED. (LSC 18.3.2.1)

TABLE 18.3.2.1

• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL (242 L)1 HOUR

• STORAGE ROOMS LARGER THAN 50 FT2(4.6 M2) BUT NOT EXCEEDING 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL SHALL BE PROTECTED WITH A SMOKE

PARTITION.

• STORAGE ROOMS LARGER THAN 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL SHALL PROTECTED WITH A 1 HOUR FIRE BARRIER.

• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL (242 L)1 HOUR† MINIMUM FIRE RESISTANCE RATING.

14. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS SERVING

AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD METHODS OF

FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

15. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.

16. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)

17. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF VETERANS

AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.

18. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.

CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18

A

457 3.5

B

C

D

E

F

2.58910

D.5

10738 SF

100111

B

150 SF

A-B002

DOSE ADMIN. ROOM

NMRI1

150 SF

A-B003

DOSE ADMIN. ROOM

NMRI1

112 SF

A-B004a

PET EQUIPMENT

ROOM

XMRC2

464 SF

A-B004

PET / CT 2

NMSS1

126 SF

A-B006a

PET EQUIPMENT

ROOM

XMRC2

488 SF

A-B006

PET / CT 1

NMSS1

270 SF

A-B005

COMBINED PET

CONTROL ROOM

NMCR1

316 SF

A-B007

HOT LAB

NMRP1

114 SF

A-B008

DOSE ADMIN. ROOM

NMIR1

114 SF

A-B009

DOSE ADMIN. ROOM

NMIR1

145 SF

A-B010

DOSE ADMIN. ROOM

NMIR1

520 SF

A-B013

READING &

CONSULTATION

XVC01

106 SF

A-B012

DOSE ADMIN. ROOM

NMIR1

235 SF

A-B014

EQUIP CALIBRATION

NMDC1

92 SF

A-B01

SOILED UTILITY

USCL1

65 SF

A-B026

TOILET, STAFF

TNPG1

59 SF

A-B027

TOILET, STAFF

TNPG1

64 SF

A-B028

PET TOILET,

PATIENT

TPG01

456 SF

A-B029b

NM SCAN 2

NMGS1

452 SF

A-B029a

NM SCAN 1

NMGS1

338 SF

A-B029

NM CONTROL RM

NMCR1

69 SF

A-B016

NM TOILET, PATIENT

TPG01

60 SF

A-B017

NM TOILET, PATIENT

TPG01

130 SF

A-B018

SUPERVISOR

OFFICE

OFA09

136 SF

A-B031

CLEAN SUPPLY

UCCL1

123 SF

A-B022

THYROID UPTAKE

NMUR1

457 SF

A-B023

CARDIAC STRESS

TESTING

OPPE2

136 SF

A-B024

PATIENT INTERVIEW

ROOM

PAIA1

202 SF

A-B021

INPATIENT HOLDING

ORPP1

760 SF

A-B020

OUTPATIENT

WAITING

WTG06

150 SF

A-B030

DIGI ROD, MOBILE

EQUIPMENT

XRM01

1190 SF

CB-9

CORRIDOR

717 SF

CB-10

AUDITORIUM

CORRIDOR

897 SF

C-2

NORTH CORRIDOR

17 SF

A-B025

ELEC ROOM

32 SF

C-5A

ALCOVE

SB001

215 SF

A-B019

MSA / SCHEDULING

RCP02

DIA

GONAL D

IS

TANCE =

9'-

3"

EXIT

S

EPARATIO

N =

2'-

9"

T R

A V

E L

D

IS

T A

N C

E

'-4

S U

IT

E

E X

IT

SUITE EXIT

SUITE EXIT

E X

IS

T

IN

G

D E

F

IC

IE

N

C Y

: T R

A V

E L

D

IS

T A

N C

E

'-1 0"

E X

IT

TRAVEL DISTANCE = 139'-10"

T R

A V

E L

D

IS

T A

N C

E

'-3

TRAVEL DISTANCE = 172'-4"

E X

IT

E X

IT

792 SF

A

FEC

FEC

FEC

E X

IS

T

F

E C

FEC

BUILDING EXIT

BUILDING EXIT

FEC

HOLDING

BAY 1

HOLDING

BAY 2

HOLDING

BAY 3

STAIR

#9B

PUBLIC

TOILET,

MEN'S

A-B156

PUBLIC

TOILET,

WOMEN'S

A-B157

ELEV.

P-15

ELEV.

P-16

ELEV.

P-14

ELEV.

P-13

ELEV.

S-11

ELEV.

S-12

FUTURE

S-13

LOBBY

CB-11

LOBBY

CB-10

UP

ELEC.

A-B153

CORRIDOR

CB-7

102 SF

RADIOACTIVE

WASTE STORAGE

A-B007a

401 SF

STAFF LOUNGE

A-B015

153 SF

QCIS

A-B039

234 SF

TEAM ROOM

A-B038

105 SF

PATIENT SAFETY

MANAGER

A-B043

76 SF

RISK MANAGER

A-B044

118 SF

CHIEF QUALITY

MANAGEMENT

A-B04568 SF

INFECTION

CONTROL MANAGER

A-B046

152 SF

CHIEF LOG.

A-B042

270 SF

ASSISTANT LOG

A-B041

84 SF

NOURISHMENT

A-B047

1741 SF

OFFICE

A-B040

2092 SF

AUDITORIUM

A-B066

FEC

MECHANICAL ROOM

A-B048

N

KEY PLAN

PROJECT

LOCATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.0

N u c M e d v d c h ri s te n s e n M

N F

X

.r v t

/2

/2

:5

:4

A

M

GI102

ENLARGED LOWER LEVEL LIFE

SAFETY PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

HEAPY

1400 W. DOROTHY LANE

DAYTON, OH 45409

937.224.0861

RELOCATE NUCLEAR MEDICINE

SERVICES FOR CENTRALIZED

SERVICES

INDIANAPOLIS, IN

583-20-102

01/28/2021 PAE, II PAE, II

BID DOCUMENTS

FULLY SPRINKLERED

LIFE SAFETY OCCUPANCY COUNT

AREA SF OCC OCC FACTOR # OF OCC

LOWER LEVEL PLAN

AMBULATORY CARE 10738 SF B 100 111

WAITING 792 SF A 15 50

11530 SF 161

11530 SF 161

AMBULATORY CARE TOTAL:

N

SCALE: 1/8" = 1'-0"GI102

2 ENLARGED LIFE SAFETY PLAN

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION BATT.

5/8" TYPE X GYPSUM BOARD, BOTH SIDES

3 5/8" METAL STUD @ 16" O.C. WITH

RUNNER CHANNELS ALONG TOP

AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY ADHERE

TO THE STRUCTURAL DECK ABOVE AND

TO THE FLOOR BELOW WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING: U465

COORDINATE WITH EXISTING CEILING

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

5/8" TYPE X GYP BD

3 5/8" STEEL STUDS @ 16" O.C.

BEAD OF CONT. SEALANT

6-MIL FIRE RETARDENT POLY INTERIOR SIDE

CEILING

2" DEEP LEG 3 5/8" STEEL SLIP TRACK

3 5/8" STEEL STUD TRACK

6" M

IN

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDENT

POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER,

HARDWARE AND CLOSER

TRIATEK MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE FOR

REQUIRED CONDITION TO STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

INFECTION CONTROL PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: TYPE D

PATIENT RISK GROUP: MEDIUM

CLASS OF PRECAUTION MATRIX: IV

1. PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 1/GC101.

2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH

CARD READER ACCESS. REFER TO ELEVATION 3/GC101

3. PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GC101.

4. PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

5. PROVIDE TEMPORARY ANTE ROOM CONSTRUCTION. COORDINATE WITH VA.

A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

C. PROJECT SHALL BE COMPLETED IN 3 PHASES.

D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING INFORMATION FOR

ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED CMP SCHEDULE FOR

WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED

IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED

AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"

STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR

LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED

WITH 4 MIL. POLY SHEET.

N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

Q. PROVIDE ICRA ANTEROOMS WHERE REQUIRED. COORDINATE LOCATIONS

WITH VA.

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES #

A. PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION.

B. PROJECT SHALL BE COMPLETED DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM. COORDINATE WITH

COR. ALL WORK TO BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S

WORK.

C. CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS SHALL BE COMPLETED

DURING NIGHT SHIFTS, 5:00 PM TO 5:00 AM.

D. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION FOR EACH PHASE

AND AREA OF WORK.

CONTRACTOR TO INSTALL TEMPORARY RAMP CONSTRUCTION IN CORRIDOR

CB-7 - REFER TO SHEET GC101A. EXISTING CEILING TILE, GRID, AND LIGHTING TO

BE TEMPORARILY REMOVED IN CORRIDOR - SALVAGE FOR REINSTALLATION.

EXISTING DUCTWORK TO BE REMOVED AND REPLACED WITH NEW - COORDINATE

WITH MECHANICAL DRAWINGS. ONCE NEW DUCTWORK IS COMPLETED,

CONTRACTOR SHALL REINSTALL SALVAGED CEILING GRID TILE, GRID, AND

LIGHTING. CONTRACTOR TO COMPLETE WORK DURING THE WEEKEND ONLY.

(FRIDAY 5PM THROUGH MONDAY 5AM)

PHASE 1A-

EXISTING CEILING TILE, GRID, AND LIGHTING TO BE TEMPORARILY REMOVED IN

CORRIDOR - SALVAGE FOR REINSTALLATION. EXISTING DUCTWORK TO BE

REMOVED AND REPLACED WITH NEW - COORDINATE WITH MECHANICAL

DRAWINGS. ONCE NEW DUCTWORK IS COMPLETED, CONTRACTOR SHALL

REINSTALL SALVAGED CEILING GRID TILE, GRID, AND LIGHTING. CONTRACTOR TO

TAKE CARE AROUND EXISTING FURNITURE LOCATED IN THIS AREA. CONTRACTOR

TO COMPLETE WORK DURING BUSINESS HOURS.

PHASE 1B-

PHASING LEGEND AND NARRATIVE

REMOVE INDICATED WALLS, CASEWORK, PLUMBING FIXTURES, HANDRAILS,

CEILING PANELS AND GRID, LIGHTING FIXTURES, PORTIONS OF FLOOR SLAB,

DOORS AND FRAMES AS INDICATED ON SHEET AD101. INSTALL NEW WALLS,

HANDRAILS, CEILING PANELS AND GRID, LIGHTING, DUCTWORK, DOORS AND

FRAMES AS INDICATED ON SHEET AE101 & AE102. CONTRACTOR TO COMPLETE

WORK DURING BUSINESS HOURS.

PHASE 3-

PHASE APPROX.

3 DAYS

PHASE APPROX.

21 DAYS

PHASE APPROX.

260 DAYS

REMOVE INDICATED WALLS, HANDRAILS, CEILING PANELS AND GRID, LIGHTING

FIXTURES, DOORS AND FRAMES AS INDICATED ON SHEET AD101. INSTALL NEW

WALLS, HANDRAILS, CEILING PANELS AND GRID, LIGHTING, DUCTWORK, DOORS

AND FRAMES AS INDICATED ON SHEET AE101 & AE102. CONTRACTOR TO COMPLETE

WORK DURING BUSINESS HOURS.

PHASE 2-

PHASE APPROX.

30 DAYS

N

KEY PLAN

PROJECT

LOCATION

A

3.5

B

C

D

E

F

2.5

D.5

C

LR

5'

2'

111213

PHASE 3

PHASE 1A

7' -0

13'-0" 5'-4"

7'-0" 18'-3"

3' -2

/2

PHASE 1B

PHASE 2

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS DOORS

AREA OF WORK BEYOND PROJECT BOUNDARY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.0

N u c M e d v d c h ri s te n s e n M

N F

X

.r v t

/2

/2

:3

:3

A

M

GC101

LOWER LEVEL INFECTION

CONTROL / PHASING PLANGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

HEAPY

1400 W. DOROTHY LANE

DAYTON, OH 45409

937.224.0861

RELOCATE NUCLEAR MEDICINE

SERVICES FOR CENTRALIZED

SERVICES

INDIANAPOLIS, IN

583-20-102

01/28/2021 JLG ELB

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1 1/2" = 1'-0"GC101

TEMPORARY 1 HR FIRE RATED SMOKE BARRIER

WALL CONSTRUCTION NFPA 241

SCALE: 1 1/2" = 1'-0"GC101

2 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION

SCALE: 1/4" = 1'-0"GC101

3 TEMPORARY WALL CONSTRUCTION ELEVATION

SCALE: 1/8" = 1'-0"GC101

4 INFECTION CONTROL / PHASING PLAN

N

WALL

WALL

WALL WALL

ELEVATION BELEVATION A

EXIST.

ELEC.

SHOP STEPS

EXIST. RAIL

'-1

4'-3"4'-1"

(PASSAGE)

'-1

8'-4"

(CORRIDOR)

8'-4"

(CORRIDOR)

(RAMP WIDTH)

(CB-18)

(CB-7)

C O R R

ID

O R

C O R R

ID

O R

B

A

RAMP

R A M P

RAILING

STEPS

CORRIDORCORRIDOR

ELECTRICAL

SHOP

ELECTRICAL

SHOP

STORAGE

CORRIDORCORRIDOR

TO CORRIDOR

STEPS LEADING

C B

(T O

M R I)

CB-7

A-B144A-B144 A-B148A

CB-7

CB-18

(TO MRI)

'-6

'-1

12'-7"

'-6

3'-3"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

U s e rs \d c h ri s te n s e n \D o c u m e n ts \1

.1

.0

N u c M e d v d c h ri s te n s e n M

N F

X

.r v t

/2

/2

:3

:2

A

M

GC101A

TEMPORARY RAMP

CONSTRUCTION DETAILGUIDON DESIGN, INC.

1221 N. PENNSYLVANIA STREET

SUITE 200

INDIANAPOLIS, INDIANA 46202

317.800.6388

HEAPY

1400 W. DOROTHY LANE

DAYTON, OH 45409

937.224.0861

RELOCATE NUCLEAR MEDICINE

SERVICES FOR CENTRALIZED

SERVICES

INDIANAPOLIS, IN

583-20-102

01/28/2021 JLG DMC

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 1/2" = 1'-0"GC101A

2 TEMPORARY RAMP ELEVATIONS

CONSTRUCTION NOTE:

DURING PHASE 1A CONTRACTOR IS TO CONSTRUCT AND BUILD A TEMPORARY RAMP DOWN THE

HALL IN THE BASEMENT CORRIDOR #CB-7.

THIS SHOULD TAKE PLACE BEFORE THE START OF THE WEEKEND DUCTWORK SHIFT.

1. RAMP AND HANDRAILS TO BE CONSTRUCTED OF WOOD.

SCALE: 1/4" = 1'-0"GC101A

1 TEMPORARY RAMP PLAN

File details come from the government source that posted it. Updated .