A0001 - RFI 1 ShieldingReportComplete.pdf

PDF 3 MB Posted

Attached to
Z1DA--Renovate Nuclear Med 583-20-102 (VA-21-00037478)
Solicitation number
36C25021B0036
Issued by

About this file

This solicitation is for relocating the Nuclear Medicine department at the Richard L. Roudebush VA Medical Facility in Indianapolis, Indiana. Key details include relocating the department to a new space, shielding the rooms including walls, doors and ceilings, and calculating shielding requirements. The solicitation involves calculating shielding needs for PET/CT, SPECT/CT, uptake rooms and a bathroom. Shielding materials, thicknesses and locations are specified for various radiation barriers. The required services also include assessing cardiac, bone and other nuclear imaging workload and procedures. The solicitation number is 36C25021B0036 and was issued by the Department of Veterans Affairs Veterans Health Administration VISN 10. The response is due by July 19, 2020.

View the file

Other files

File Type Posted
Amendment A00006.docx DOCX document
Amendment A00006 RFI Responses.docx DOCX document
Amendment 36C25021B0036 A00005.pdf PDF
A00004- Corrected Statement of Work.pdf PDF
Amendment 36C25021B0036 A00004.pdf PDF
A00004 - RFI Responses.docx DOCX document
A0004 - 08 71 00 - Door Hardware.pdf PDF
A00004 - 10 25 13 - Patient Bed Service Walls.pdf PDF
A00004 - Door Schedule.pdf PDF
Amendment 36C25021B0036 A00003.pdf PDF
Amendment A00002.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
A0001 - RFI 2- GC101.pdf PDF
A0001 - RFI Responses.docx DOCX document
Amendment A0001.docx DOCX document
A0001 - RFI 4- Door Schedule.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part1.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part12.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part18.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part10.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part5.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part23.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part22.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part7.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part14.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part11.pdf PDF
Specifications.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part21.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part13.pdf PDF
Wage Determination.txt TXT text file
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part15.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part16.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part4.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part9.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part20.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part5.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part8.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part10.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part7.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part12.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part6.pdf PDF
36C25021B0036 Solicitation Document.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part11.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part14.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part16.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part24.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-2_Part9.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part1.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part2.pdf PDF
583-20-102 Relocate Nuclear Medicine Drawing SetPart-1_01_Part3.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

214 E. Huron Street 50 E. 91st Street, Suite 211 1731 E. Imperial Park Square N7375 Crystal Ridge Drive

Ann Arbor, MI 48104 Indianapolis, IN 46240 Salt Lake City, UT 84106 Beaver Dam, WI 53916

(734) 662-9224 Fax (317) 581-1931 Fax (734) 662-9224 Fax (734) 662-9224 Fax

(734) 662-3197 (317) 581-1911 (801) 272-2952 (920) 885-9870 www.mpcphysics.com

September 17, 2020

James Gooden, AIA, LEED AP BD+C, NCARB, CSI Sr. Project Manager + Architectural Team Leader Guidon Design

Mr. Gooden:

Enclosed, please find the calculations for the amount of shielding required in the Redesign of the Nuclear Medicine Suite at the Indianapolis Roudebush Veterans Administration Medical Center in Indianapolis, Indiana. This report covers both the SPECT/CT as well as PET/CT rooms in the department. Installing the specified required shielding will reduce the exposure to less than the most restrictive recommended levels, i.e. 2 mrem per week (100 mrem per year) to the general public, and 10 mrem per week (500 mrem per year) for radiation monitored employees.

When practical, shielding has been selected to further reduce the radiation exposures to individuals to a level that is As Low As Reasonably Achievable (ALARA). A copy of the architectural drawings of the department and a copy of this report with calculations should be kept on file for review by regulatory auditors.

Occupancy factors for all areas were determined in accordance with National Council on Radiation Protection and Measurements (NCRP) Report Number 147, Table 4.1 Suggested Occupancy Factors.

The following values were used in the shielding calculations and were supplied by your facility. If you do not agree with these factors and assumptions and find them insufficient, please contact me at once, as my calculations may not be valid. A narrative description of the shielding requirements and recommendations follows.

PET Patient Estimates:

➢ Number of PET patients per day: 20

➢ Number of imaging days per week: 5

➢ Injected dose: 12 millicuries F-18 FDG

➢ Uptake time: 60 minutes

➢ Imaging time: 30 minutes

➢ Imaging takes place in rooms A-B004 and A-B006

➢ Uptakes take place in rooms A-B002, A-B003, A-B012, A-B010, A-B009, and A-

B008 o Each uptake room holds 25 injected patients per week

Roudebush VAMC September 17, 2020

CT Workload of PET Scanner:

➢ 40 head/neck scans per week with a DLP of 1200 mGy*cm

➢ 120 body scans per week with a DLP of 550 mGy*cm

➢ 40% of patients receive contrast and are scanned twice

➢ The CT scanner will be used for attenuation correction of PET scans as well as overflow of diagnostic CT scans.

SPECT/CT Workload:

➢ Number of cardiac scans per week: 40 (20 stress and 20 rest)

➢ Cardiac dosages: 36 mCi for stress, 12 mCi for rest

➢ Number of bone scans per week: 10

➢ Bone dosage: 35 mCi

➢ Cardiac DLP of 1200 mGy*cm

➢ Bone DLP of 1200 mGy*cm

➢ Imaging takes place in rooms A-B029a and A-B029b

General Comments:

➢ Walls are to be constructed with leaded (Pb) drywall of specified thickness with the lead (Pb) extending from the floor to a height of at least seven feet. Shielding must be lapped along corners and any pull-out sections. The screws/nails do NOT need to be capped with lead (Pb).

➢ The patient viewing window and windowsill, door and jamb are to be lined with the same thickness of lead (Pb) as the wall that they penetrate, unless specified otherwise.

Be sure that the leaded frames overlap the lead (Pb) in the gypsum drywall.

➢ All electrical outlets, switches, and other penetrations of all shielded walls are to be backed with the same thickness of lead (Pb) as the wall that they penetrate.

➢ Shielding in the Hot Lab is to be accomplished through localized source shielding, rather than general room shielding.

➢ The following calculations are based on NCRP Report 147 and the report of AAPM Task Group 108.

Architectural Information

1. Diagrams of the scan and injection/uptake rooms, along with the adjacent areas, are enclosed.

2. The Nuclear Medicine department is located on the basement floor. There is not an occupied floor below the department. There is an occupied floor above the department. Occupancy of the adjacent areas as assumed in my calculations is stated in the following section.

3. Any change in the occupancy of surrounding areas will require the shielding requirements to be re-evaluated.

4. This is a redesign of the department. There is currently installed shielding in several of the walls. If the currently installed shielding meets or exceeds what I am recommending, no additional shielding need be installed in the specified wall.

5. The floor to ceiling height is 13 feet, 8 inches.

6. There is 9 inches of standard density concrete in the ceiling.

PET-CT Scan Room 1, Number A-B006

Wall Adjoining Area Weekly Exposure Rate Occupancy Factor(T)

North Exterior 2 mR/week (uncontrolled) 0.0 (earth)

East Equipment Room 10 mR/week (controlled) 0.05

West Control Room 10 mR/week (controlled) 1.0

South Corridor 10 mR/week (controlled) 0.2

Ceiling Another Department 2 mR/week (uncontrolled) 1.0

PET-CT Scan Room 2, Number A-B004

North Exterior 2 mR/week (uncontrolled) 0.0 (earth)

East Control Room 10 mR/week (controlled) 1.0

West Equipment Room 10 mR/week (controlled) 0.2

Uptake Room A-B002

North Exterior 2 mR/week (uncontrolled) 0.0 (earth)

East Uptake Rm A-B003 10 mR/week (controlled) 0.2

West Storage 2 mR/week (uncontrolled) 0.05

West Office 2 mR/week (uncontrolled) 1.0

Uptake Room A-B003

Wall Adjoining Area Weekly Exposure Rate Occupancy Factor(T)

North Exterior 2 mR/week (uncontrolled) 0.0 (earth)

East Equipment Rm 10 mR/week (controlled) 0.05

West Uptake Rm A-B002 10 mR/week (controlled) 0.2

Uptake Room A-B012

North Corridor 10 mR/week (controlled) 0.2

North Control Room 10 mR/week (controlled) 1.0

East Utility Room 2 mR/week (uncontrolled) 0.05

East Reading Room 10 mR/week (controlled) 1.0

West Corridor/Lounge 10 mR/week (controlled) 0.2

Uptake Room A-B010

North Uptake Rm A-B009 10 mR/week (controlled) 0.2

East Exterior 2 mR/week (uncontrolled) 0.05

West Corridor 10 mR/week (controlled) 0.2

South Reading Room 10 mR/week (controlled) 1.0

Uptake Room A-B009

North Uptake Rm A-B008 10 mR/week (controlled) 0.2

East Exterior 2 mR/week (uncontrolled) 0.05

West Corridor 10 mR/week (controlled) 0.2

South Uptake Rm A-B010 10 mR/week (controlled) 0.2

Uptake Room A-B008

North Hot Lab 10 mR/week (controlled) 0.2

East Exterior 2 mR/week (uncontrolled) 0.05

West Corridor 10 mR/week (controlled) 0.2

South Uptake Rm A-B009 10 mR/week (controlled) 0.2

Bathroom A-B028

North Scan Room 10 mR/week (controlled) 0.2

East Corridor 10 mR/week (controlled) 0.2

West Rest Room A-B027 10 mR/week (controlled) 0.05

SPECT-CT Scan Room 1, Number A-B029a

North Corridor 10 mR/week (controlled) 0.2

East Corridor 10 mR/week (controlled) 0.2

West Scan Room 2 10 mR/week (controlled) 0.2

South Control Room 10 mR/week (controlled) 1.0

SPECT-CT Scan Room 2, Number A-B029b

North Corridor 10 mR/week (controlled) 0.2

East Scan Room 1 10 mR/week (controlled) 0.2

West Corridor 10 mR/week (controlled) 0.2

South Control Room 10 mR/week (controlled) 1.0

Shielding Recommendations:

PET-CT Scan Room 1, Number A-B006 North Wall (Exterior):

Required shielding: No shielding necessary Comment: This wall is occupied by earth on the other side

East Wall and Door (Equipment Room):

Required shielding: 1/32 inch lead Comment: This was the original PET/CT control room and should already have more than 1/32 inch of lead installed in the wall.

South Wall and Door (Corridor, Rest Room, Waste Storage):

Required shielding: 1/16 inch of lead equivalent

West Wall (Control Room):

Required shielding: 1/16 inch of lead equivalent Comment: The required shielding must be installed in the wall, viewing window, and door.

Ceiling:

Required shielding: 4.39 inches of standard weight concrete Comment: The currently installed amount of concrete should provide adequate shielding such that no additional shielding need be installed.

PET-CT Scan Room 2, Number A-B004

Required shielding: No shielding necessary Comment: This wall is occupied by earth on the other side

East Wall and Door (Control Room):

Required shielding: 1/16 inch lead Comment: The required shielding must be installed in the wall, viewing window, and door.

South Wall and Door (Corridor, Rest Room):

Required shielding: 1/16 inch of lead equivalent

West Wall (Equipment Room):

Required shielding: 1/32 inch of lead equivalent

Ceiling:

Required shielding: 4.39 inches of standard weight concrete

Uptake Room A-B002

Required shielding: No shielding necessary Comment: This wall is occupied by earth on the other side

East Wall (Uptake Room A-B003):

Required shielding: No additional shielding Recommended shielding: 0.25 inch of lead Comment: Installation of the recommended amount of lead will reduce exposure in uptake room A-B003 to staff.

West Wall (Storage Room):

Required shielding: 0.25 inch of lead or 3.65 inches of standard density concrete Comment: Installation of the required shielding will adequately shield the area beyond the adjoining storage room.

South Wall (Corridor):

Required shielding: No shielding necessary Recommended shielding: 1/8 inch Comment: The installed shielding will reduce potential dose rates in the corridor.

Shielding should be installed in both walls and doors.

Ceiling:

Required shielding: 3.86 inches of standard weight concrete

Uptake Room A-B003

Required shielding: No shielding necessary Comment: This wall is occupied by earth on the other side

East Wall (Equipment Room):

Required shielding: No additional shielding Recommended shielding: 0.25 inch of lead Comment: Installation of the recommended amount of lead will reduce potential interference with the PET/CT scanner located in A-B004.

West Wall (Uptake Room A-B002):

Required shielding: No additional shielding Recommended shielding: 0.25 inch of lead or 3.65 inches of standard density concrete Comment: Installation of the recommended shielding will reduce dose rates to staff in uptake room A-B002. The recommended shielding is the total amount in the wall separating A-B002 and A-B003. It is not necessary to shield both the east wall of A-B002 and the west wall of A-B003.

South Wall (Corridor):

Required shielding: No shielding necessary Recommended shielding: 1/8 inch Comment: The installed shielding will reduce potential dose rates in the corridor.

Shielding should be installed in both walls and doors.

Ceiling:

Required shielding: 3.86 inches of standard weight concrete

Uptake Room A-B012

North Wall (Corridor):

Required shielding: No shielding necessary Recommended shielding: 1/8 inch Comment: The installed shielding will reduce potential dose rates in the corridor.

Shielding should be installed in both walls and doors.

East Wall (Reading Room, Utility Room):

Required shielding: 0.25 inch of lead Comment: Installation of the recommended amount of lead will reduce potential doses in the reading room.

West Wall (Corridor, Lounge):

Required shielding: 0.25 inch of lead

South Wall (Corridor):

Required shielding: 0.25 inch of lead

Ceiling:

Required shielding: 3.86 inches of standard weight concrete

Uptake Room A-B010

North Wall (Uptake Room A-B009):

Required shielding: No shielding necessary Recommended shielding: 1/4 inch Comment: The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

East Wall (Exterior):

Required shielding: No shielding necessary

West Wall (Corridor):

Required shielding: No shielding necessary Recommended shielding: 1/8 inch in walls and doors Comment: The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

South Wall (Reading Room):

Required shielding: 0.5 inch of lead Recommended shielding: 1 inch of lead Comment: The required shielding (1/2 inch) should already be installed in the wall.

Installation of an additional ½ inch of lead will bring the total to 1 inch and will reduce the dose in the reading room to below 100 mrem per year.

Ceiling:

Required shielding: 3.86 inches of standard weight concrete

Uptake Room A-B009

North Wall (Uptake Room A-B008):

Required shielding: No shielding necessary Recommended shielding: 1/4 inch Comment: Installation of the recommended shielding will reduce dose rates to staff in uptake room A-B008. The recommended shielding is the total amount in the wall separately A-B009 and A-B008. It is not necessary to shield both the south wall of A- B008 and the north wall of A-B009. The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

East Wall (Exterior):

Required shielding: No shielding necessary

West Wall (Corridor):

Required shielding: No shielding necessary Recommended shielding: 1/8 inch in walls and doors Comment: The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

South Wall (Uptake Room A-B010):

Required shielding: No shielding necessary Recommended shielding: 1/4 inch Comment: Installation of the recommended shielding will reduce dose rates to staff in uptake room A-B010. The recommended shielding is the total amount in the wall separating A-B010 and A-B009. It is not necessary to shield both the south wall of A- B009 and the north wall of A-B010. The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

Ceiling:

Required shielding: 3.86 inches of standard weight concrete

Uptake Room A-B008

North Wall (Hot Lab):

Required shielding: No shielding necessary Recommended shielding: 1/4 inch Comment: Installation of the recommended shielding will reduce dose rates to staff in the Hot Lab. The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

East Wall (Exterior):

Required shielding: No shielding necessary

West Wall (Corridor):

Required shielding: No shielding necessary Recommended shielding: 1/8 inch in walls and doors Comment: The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

South Wall (Uptake Room A-B009):

Required shielding: No shielding necessary Recommended shielding: 1/4 inch Comment: Installation of the recommended shielding will reduce dose rates to staff in uptake room A-B009. The recommended shielding is the total amount in the wall separating A-B008 and A-B009. It is not necessary to shield both the south wall of A- B008 and the north wall of A-B009. The recommended shielding should already be installed in the wall. If that is the case, no additional shielding need be installed.

Ceiling:

Required shielding: 3.86 inches of standard weight concrete

Bathroom Room A-B028

North Wall (Scan Room A-B006):

Required shielding: No additional shielding needed

East Wall (Corridor):

Required shielding: No additional shielding needed

South Wall (Corridor):

Required shielding: No additional shielding needed

West Wall (Restroom A-B027):

Required shielding: No additional shielding needed

SPECT-CT Scan Room 1, Number A-B029a

Required shielding: 1/16 inch of lead Recommended shielding: 0.25 inch of lead Comment: Installation of the recommended shielding will reduce interference with the gamma camera as PET patients traverse the corridor.

East Wall (Corridor):

Required shielding: 1/16 inch of lead Recommended shielding: 0.25 inch of lead Comment: Installation of the recommended shielding will reduce interference with the gamma camera as PET patients traverse the corridor.

East Wall and Door (Corridor):

Required shielding: 1/16 inch of lead

South Wall (Control Room):

Required shielding: No additional shielding Recommended shielding: 1/16 inch of lead Comment: Installation of the recommended shielding will reduce doses to the control room.

West Wall (Scan Room 2):

Required shielding: No additional shielding Recommended shielding: 1/8 inch of lead equivalent Comment: Installation of the recommended shielding will prevent interference between the two gamma cameras.

Ceiling:

Required shielding: No additional shielding

SPECT-CT Scan Room 2, Number A-B029b

Required shielding: 1/16 inch of lead Recommended shielding: 0.25 inch of lead Comment: Installation of the recommended shielding will reduce interference with the gamma camera as PET patients traverse the corridor.

West Wall (Corridor):

Required shielding: 1/16 inch of lead Recommended shielding: 0.25 inch of lead Comment: Installation of the recommended shielding will reduce interference with the gamma camera as PET patients traverse the corridor.

West Wall and Door (Corridor):

Required shielding: 1/16 inch of lead

South Wall (Control Room):

Required shielding: No additional shielding Recommended shielding: 1/16 inch of lead Comment: Installation of the recommended shielding will reduce doses to the control room.

East Wall (Scan Room 1):

Required shielding: No additional shielding Recommended shielding: 1/8 inch of lead equivalent Comment: Installation of the recommended shielding will prevent interference between the two gamma cameras.

Required shielding: No additional shielding

Radioactive Waste Storage Room, Number A-B007a North Wall (PET/CT 1 Room):

Recommended shielding: 0.25 inch of lead

West Wall (Corridor):

Recommended shielding: 0.25 inch of lead

South Wall and Door (Hot Lab):

Recommended shielding: 0.25 inch of lead

East Wall (Exterior):

Recommended shielding: No additional shielding

Recommended shielding: No additional shielding

If you have any questions regarding this report or if I may be of assistance, please contact me by phone at 877-317-5811 or by e-mail at pbyrne@mpcphysics.com.

Respectfully yours, Patrick J. Byrne, DABR, CHP, DABSNM American Board of Radiology Certified

Administered Activity (Ao) Scanner Reduction

PET-CT IMAGING ROOM (mCi) Factor (Sf)

PET SHIELDING CALCULATIONS Enter 12.0 0.850

Imaging Time (ti) Urine Void

Facility: Roudebush VA Medical Center (min) Reduction Factor (Uf)

Enter 60 0.850

Date: 7/20/2020

Uptake Time (Tu) Decay Reduction

Physicist: Patrick J. Byrne (min) Factor (Rti)

Enter 60 0.832

Room Number: PET/CT 1 A-B006

Patients per Week (Nw) Imaging Room

Enter 50 Decay Factor (Fu)

0.685

Equation #9 AAPM TG 108 Patient Dose Rate (F-18)

Weekly Dose = ((0.092 uSv m2 /MBq h) x Nw x Ao(MBq) x Sf x Uf x Fu x ti(h) x Rti / d(m)2) x T uSv-m2/MBq-h

Equation #10 AAPM TG 108 0.092

Transmission Factor (B) = 10.9 x P x d(m)2 /(T x Nw x Ao(MBq) x Sf x Fu x tI(h) x Rti)

Barrier: North Wall East Wall South Wall West Wall Ceiling Floor

Description: Exterior Equip Rm Corridor Control Rm On grade

Occupancy Factor (T) 0.050 0.050 0.200 1.000 1.000

Annual Limit (mSv) (P) 1.0 5.0 5.0 5.0 1.0

(100 mRem = 1 mSv)

Distance (inches) 113.00 124.00 120.00 249.00 164.00 uSv per week 5.11 4.24 18.12 21.04 48.51

Equation #9 AAPM TG 108

B* Transmission Factor 3.93 23.64 5.53 4.77 0.41

Equation #10 AAPM TG 108

Pb Thickness (mm) 0.00 0.00 0.00 0.00 6.61

Concrete Thickness (cm) 0.00 0.00 0.00 0.00 9.73

Pb Thickness (in) 0.00 0.00 0.00 0.00 0.26

Concrete Thickness (in) 0.00 0.00 0.00 0.00 3.83

Dose equivalent Rate Constants and Barrier Transmission Data from

PET-CT1 Shielding.xlsm

Facility: Roudebush VA Medical Center Imaging Room Page Two

Date: 7/20/2020

Physicist: Patrick J. Byrne

Room Number: PET/CT 1 A-B006

Barrier: North Wall East Wall South Wall West Wall 0 Ceiling Floor

Description: Exterior Equip Rm Corridor Control Rm 0 0 On grade

Pb Thickness (mm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 0.26 0.21 0.91 1.05 2.43

1 0.23 0.19 0.81 0.94 2.16

2 0.20 0.17 0.71 0.83 1.91

3 0.18 0.15 0.63 0.73 1.67

4 0.15 0.13 0.55 0.63 1.46

5 0.13 0.11 0.47 0.55 1.27

6 0.12 0.10 0.41 0.48 1.10

7 0.10 0.08 0.35 0.41 0.95

8 0.09 0.07 0.30 0.35 0.82

9 0.07 0.06 0.26 0.30 0.70

10 0.06 0.05 0.23 0.26 0.60

12 0.05 0.04 0.17 0.19 0.44

14 0.03 0.03 0.12 0.14 0.33

16 0.03 0.02 0.09 0.10 0.24

18 0.02 0.02 0.07 0.08 0.18

20 0.01 0.01 0.05 0.06 0.13

25 0.01 0.01 0.02 0.03 0.06

30 0.00 0.00 0.01 0.01 0.03

40 0.00 0.00 0.00 0.00 0.01

50 0.00 0.00 0.00 0.00 0.00

Concrete Thickness (cm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 0.26 0.21 0.91 1.05 2.43

1 0.24 0.20 0.87 1.01 2.32

2 0.23 0.19 0.82 0.96 2.20

3 0.22 0.18 0.77 0.90 2.07

4 0.20 0.17 0.71 0.83 1.91

5 0.18 0.15 0.65 0.76 1.75

6 0.17 0.14 0.59 0.69 1.58

7 0.15 0.12 0.53 0.61 1.42

8 0.13 0.11 0.47 0.54 1.26

9 0.12 0.10 0.41 0.48 1.11

10 0.10 0.08 0.36 0.42 0.97

12 0.08 0.06 0.27 0.32 0.73

14 0.06 0.05 0.20 0.24 0.54

16 0.04 0.04 0.15 0.17 0.40

18 0.03 0.03 0.11 0.13 0.30

20 0.02 0.02 0.08 0.10 0.22

25 0.01 0.01 0.04 0.04 0.10

30 0.00 0.00 0.02 0.02 0.05

40 0.00 0.00 0.00 0.00 0.01 PET-CT1 Shielding.xlsm

50 0.00 0.00 0.00 0.00 0.00

Facility: Roudebush VA Medical Center Imaging Room Page Three

Date: 7/20/2020

Physicist: Patrick J. Byrne

Room Number: PET/CT 1 A-B006

Barrier: North Wall East Wall South Wall West Wall 0 Ceiling Floor

Description: Exterior Equip Rm Corridor Control Rm 0 0 On grade

Pb Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 0.23 0.19 0.83 0.96 2.22

1/16 0.21 0.18 0.75 0.87 2.01

3/32 0.19 0.16 0.68 0.79 1.82

1/8 0.17 0.14 0.61 0.71 1.64

3/16 0.14 0.11 0.49 0.57 1.31

1/4 0.11 0.09 0.39 0.45 1.04

5/16 0.09 0.07 0.31 0.36 0.82

3/8 0.07 0.06 0.24 0.28 0.65

7/16 0.05 0.04 0.19 0.22 0.51

1/2 0.04 0.03 0.15 0.17 0.40

5/8 0.03 0.02 0.09 0.11 0.24

3/4 0.02 0.01 0.06 0.07 0.15

7/8 0.01 0.01 0.03 0.04 0.09

1 0.01 0.00 0.02 0.02 0.06

1 1/32 0.01 0.00 0.02 0.02 0.05

1 1/16 0.00 0.00 0.02 0.02 0.04

1 3/32 0.00 0.00 0.01 0.02 0.04

1 1/8 0.00 0.00 0.01 0.01 0.03

1 3/16 0.00 0.00 0.01 0.01 0.03

1 1/4 0.00 0.00 0.01 0.01 0.02

Concrete Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0.5 0.24 0.20 0.86 0.99 2.29

1.0 0.22 0.19 0.80 0.92 2.13

1.5 0.20 0.17 0.73 0.84 1.94

2.0 0.18 0.15 0.65 0.75 1.74

2.5 0.16 0.13 0.57 0.66 1.52

3.0 0.14 0.12 0.49 0.57 1.32

3.5 0.12 0.10 0.42 0.49 1.12

4.0 0.10 0.08 0.35 0.41 0.95

4.5 0.08 0.07 0.30 0.34 0.79

5.0 0.07 0.06 0.25 0.29 0.66

5.5 0.06 0.05 0.20 0.24 0.55

6.0 0.05 0.04 0.17 0.20 0.45

6.5 0.04 0.03 0.14 0.16 0.37

7.0 0.03 0.03 0.11 0.13 0.31

7.5 0.03 0.02 0.09 0.11 0.25

8.0 0.02 0.02 0.08 0.09 0.21

8.5 0.02 0.02 0.06 0.07 0.17

9.0 0.01 0.01 0.05 0.06 0.14

9.5 0.01 0.01 0.04 0.05 0.12

10.0 0.01 0.01 0.04 0.04 0.10

10.5 0.01 0.01 0.03 0.03 0.08 PET-CT1 Shielding.xlsm

PET-CT IMAGING ROOM Head/Neck Procedures / Week Technique (DLP) Head/Neck

CT SHIELDING CALCULATIONS Enter 40 Enter 1200

Whole Body Procedures / Week Technique (DLP) Whole Body

Facility: Roudebush VA Medical Center Enter 120 Enter 550

Date: 7/20/2020 % of these procedures that are scanned twice. (Contrast) Technique (kVp)

Physicist: Patrick J. Byrne Enter 40 Enter 120

Room Number: PET/CT 1 A-B006 Total # Procedures / Week

NCRP 147 Equation A2

Barrier: North Wall East Wall South Wall West Wall Ceiling Floor

Description: Exterior Equip Rm Corridor Control Rm On grade

Occupancy Factor (T) 0.0 0.050 0.200 1.000 1.000

Annual Limit (mSv) (P) 1.0 5.0 5.0 5.0 1.0

100 mRem = 1 mSv

Distance (inches) 113.00 124.00 120.00 249.00 164.00

Exposure Limit (mSv) 0.02 0.1 0.1 0.1 0.02

Weekly (P)

Distance (m) 2.87 3.15 3.05 6.32 4.17

Incident Scatter 4.77 3.96 4.23 0.98 2.27

(mGy/wk) (Sc)

Transmission Factor (B) 0.335 0.505 0.118 0.102 0.009

Pb Thickness (mm) (X) 0.17 0.10 0.39 0.43 1.22

Concrete Thickness (cm) (X) 2.26 1.38 4.67 5.03 11.16

Steel Thickness (cm) (X) 0.08 0.04 0.23 0.25 0.96

Pb Thickness (in) 0.01 0.00 0.02 0.02 0.05

Concrete Thickness (in) 0.89 0.54 1.84 1.98 4.39

Steel Thickness (in) 0.03 0.02 0.09 0.10 0.38

Physicist: Patrick J. Byrne

Room Number: PET/CT 1 A-B006

Barrier: North Wall East Wall South Wall West Wall 0 Ceiling Floor

Description: Exterior Equip Rm Corridor Control Rm 0 0 On grade

Pb Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 0.09 0.29 1.25 1.45 #VALUE! #VALUE! 3.35 #VALUE!

1/16 0.01 0.03 0.14 0.17 #VALUE! #VALUE! 0.38 #VALUE!

3/32 0.00 0.00 0.02 0.02 #VALUE! #VALUE! 0.06 #VALUE!

1/8 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.01 #VALUE!

3/16 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1/4 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

5/16 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

3/8 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

7/16 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1/2 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

5/8 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

3/4 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

7/8 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1 1/32 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1 1/16 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1 3/32 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1 1/8 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1 3/16 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

1 1/4 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

Steel Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 1.01 3.35 14.30 16.61 #VALUE! #VALUE! 38.29 #VALUE!

1/16 0.53 1.77 7.55 8.76 #VALUE! #VALUE! 20.20 #VALUE!

3/32 0.33 1.10 4.69 5.45 #VALUE! #VALUE! 12.56 #VALUE!

1/8 0.22 0.74 3.18 3.69 #VALUE! #VALUE! 8.51 #VALUE!

3/16 0.12 0.39 1.67 1.94 #VALUE! #VALUE! 4.48 #VALUE!

1/4 0.07 0.23 0.98 1.14 #VALUE! #VALUE! 2.62 #VALUE!

5/16 0.04 0.14 0.60 0.70 #VALUE! #VALUE! 1.62 #VALUE!

3/8 0.03 0.09 0.39 0.45 #VALUE! #VALUE! 1.03 #VALUE!

7/16 0.02 0.06 0.25 0.29 #VALUE! #VALUE! 0.68 #VALUE!

1/2 0.01 0.04 0.17 0.20 #VALUE! #VALUE! 0.45 #VALUE!

5/8 0.01 0.02 0.08 0.09 #VALUE! #VALUE! 0.20 #VALUE!

3/4 0.00 0.01 0.04 0.04 #VALUE! #VALUE! 0.09 #VALUE!

7/8 0.00 0.00 0.02 0.02 #VALUE! #VALUE! 0.04 #VALUE!

1 0.00 0.00 0.01 0.01 #VALUE! #VALUE! 0.02 #VALUE!

1 1/32 0.00 0.00 0.01 0.01 #VALUE! #VALUE! 0.02 #VALUE!

1 1/16 0.00 0.00 0.01 0.01 #VALUE! #VALUE! 0.01 #VALUE!

1 3/32 0.00 0.00 0.00 0.01 #VALUE! #VALUE! 0.01 #VALUE!

1 1/8 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.01 #VALUE!

1 3/16 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.01 #VALUE!

1 1/4 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

Physicist: Patrick J. Byrne

Room Number: PET/CT 1 A-B006

Barrier: North Wall East Wall South Wall West Wall 0 Ceiling Floor

Description: Exterior Equip Rm Corridor Control Rm 0 0 On grade

Concrete Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0.5 1.58 5.26 22.46 26.08 #VALUE! #VALUE! 60.13 #VALUE!

1.0 0.88 2.93 12.51 14.53 #VALUE! #VALUE! 33.50 #VALUE!

1.5 0.51 1.68 7.19 8.35 #VALUE! #VALUE! 19.25 #VALUE!

2.0 0.30 0.99 4.22 4.90 #VALUE! #VALUE! 11.29 #VALUE!

2.5 0.18 0.59 2.51 2.91 #VALUE! #VALUE! 6.71 #VALUE!

3.0 0.11 0.35 1.51 1.75 #VALUE! #VALUE! 4.03 #VALUE!

3.5 0.06 0.21 0.91 1.06 #VALUE! #VALUE! 2.44 #VALUE!

4.0 0.04 0.13 0.55 0.64 #VALUE! #VALUE! 1.48 #VALUE!

4.5 0.02 0.08 0.34 0.39 #VALUE! #VALUE! 0.90 #VALUE!

5.0 0.01 0.05 0.21 0.24 #VALUE! #VALUE! 0.55 #VALUE!

5.5 0.01 0.03 0.13 0.15 #VALUE! #VALUE! 0.34 #VALUE!

6.0 0.01 0.02 0.08 0.09 #VALUE! #VALUE! 0.21 #VALUE!

6.5 0.00 0.01 0.05 0.05 #VALUE! #VALUE! 0.13 #VALUE!

7.0 0.00 0.01 0.03 0.03 #VALUE! #VALUE! 0.08 #VALUE!

7.5 0.00 0.00 0.02 0.02 #VALUE! #VALUE! 0.05 #VALUE!

8.0 0.00 0.00 0.01 0.01 #VALUE! #VALUE! 0.03 #VALUE!

9.0 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.01 #VALUE!

9.5 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.01 #VALUE!

10.0 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

10.5 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

11.0 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

11.5 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

12.0 0.00 0.00 0.00 0.00 #VALUE! #VALUE! 0.00 #VALUE!

Administered Activity (Ao) Scanner Reduction

PET-CT IMAGING ROOM (mCi) Factor (Sf)

PET SHIELDING CALCULATIONS Enter 12.0 0.850

Imaging Time (ti) Urine Void

Facility: Roudebush VA Medical Center (min) Reduction Factor (Uf)

Enter 60 0.850

Date: 7/20/2020

Uptake Time (Tu) Decay Reduction

Physicist: Patrick J. Byrne (min) Factor (Rti)

Enter 60 0.832

Room Number: PET/CT 2 A-B004

Patients per Week (Nw) Imaging Room

Enter 50 Decay Factor (Fu)

0.685

Equation #9 AAPM TG 108 Patient Dose Rate (F-18)

Weekly Dose = ((0.092 uSv m2 /MBq h) x Nw x Ao(MBq) x Sf x Uf x Fu x ti(h) x Rti / d(m)2) x T uSv-m2/MBq-h

Equation #10 AAPM TG 108 0.092

Transmission Factor (B) = 10.9 x P x d(m)2 /(T x Nw x Ao(MBq) x Sf x Fu x tI(h) x Rti)

Barrier: North Wall East Wall South Wall West Wall West Wall Ceiling Floor

Description: Exterior Control Room Corridor Equip Rm Uptake Rm On grade

Occupancy Factor (T) 0.050 1.000 0.200 0.200 0.200 1.000

Annual Limit (mSv) (P) 1.0 5.0 5.0 5.0 5.0 1.0

Distance (inches) 113.00 216.00 120.00 212.00 300.00 164.00 uSv per week 5.11 27.96 18.12 5.81 2.90 48.51

Equation #9 AAPM TG 108

B* Transmission Factor 3.93 3.59 5.53 17.27 34.59 0.41

Equation #10 AAPM TG 108

Pb Thickness (mm) 0.00 0.00 0.00 0.00 0.00 6.61

Concrete Thickness (cm) 0.00 0.00 0.00 0.00 0.00 9.73

Pb Thickness (in) 0.00 0.00 0.00 0.00 0.00 0.26

Concrete Thickness (in) 0.00 0.00 0.00 0.00 0.00 3.83

Dose equivalent Rate Constants and Barrier Transmission Data from

PET-CT2 Shielding.xlsm

Physicist: Patrick J. Byrne

Room Number: PET/CT 2 A-B004

Barrier: North Wall East Wall South Wall West Wall West Wall Ceiling Floor

Description: Exterior Control Room Corridor Equip Rm Uptake Rm 0 On grade

Pb Thickness (mm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 0.26 1.40 0.91 0.29 0.14 2.43

1 0.23 1.25 0.81 0.26 0.13 2.16

2 0.20 1.10 0.71 0.23 0.11 1.91

3 0.18 0.97 0.63 0.20 0.10 1.67

4 0.15 0.84 0.55 0.17 0.09 1.46

5 0.13 0.73 0.47 0.15 0.08 1.27

6 0.12 0.63 0.41 0.13 0.07 1.10

7 0.10 0.55 0.35 0.11 0.06 0.95

8 0.09 0.47 0.30 0.10 0.05 0.82

9 0.07 0.40 0.26 0.08 0.04 0.70

10 0.06 0.35 0.23 0.07 0.04 0.60

12 0.05 0.26 0.17 0.05 0.03 0.44

14 0.03 0.19 0.12 0.04 0.02 0.33

16 0.03 0.14 0.09 0.03 0.01 0.24

18 0.02 0.10 0.07 0.02 0.01 0.18

20 0.01 0.07 0.05 0.02 0.01 0.13

25 0.01 0.03 0.02 0.01 0.00 0.06

30 0.00 0.02 0.01 0.00 0.00 0.03

40 0.00 0.00 0.00 0.00 0.00 0.01

50 0.00 0.00 0.00 0.00 0.00 0.00

Concrete Thickness (cm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 0.26 1.40 0.91 0.29 0.14 2.43

1 0.24 1.34 0.87 0.28 0.14 2.32

2 0.23 1.27 0.82 0.26 0.13 2.20

3 0.22 1.19 0.77 0.25 0.12 2.07

4 0.20 1.10 0.71 0.23 0.11 1.91

5 0.18 1.01 0.65 0.21 0.10 1.75

6 0.17 0.91 0.59 0.19 0.09 1.58

7 0.15 0.82 0.53 0.17 0.08 1.42

8 0.13 0.72 0.47 0.15 0.08 1.26

9 0.12 0.64 0.41 0.13 0.07 1.11

10 0.10 0.56 0.36 0.12 0.06 0.97

12 0.08 0.42 0.27 0.09 0.04 0.73

14 0.06 0.31 0.20 0.07 0.03 0.54

16 0.04 0.23 0.15 0.05 0.02 0.40

18 0.03 0.17 0.11 0.04 0.02 0.30

20 0.02 0.13 0.08 0.03 0.01 0.22

25 0.01 0.06 0.04 0.01 0.01 0.10

30 0.00 0.03 0.02 0.01 0.00 0.05

40 0.00 0.01 0.00 0.00 0.00 0.01 PET-CT2 Shielding.xlsm

50 0.00 0.00 0.00 0.00 0.00 0.00

Date: 7/20/2020

Physicist: Patrick J. Byrne

Room Number: PET/CT 2 A-B004

Barrier: North Wall East Wall South Wall West Wall West Wall Ceiling Floor

Description: Exterior Control Room Corridor Equip Rm Uptake Rm 0 On grade

Pb Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 0.23 1.28 0.83 0.27 0.13 2.22

1/16 0.21 1.16 0.75 0.24 0.12 2.01

3/32 0.19 1.05 0.68 0.22 0.11 1.82

1/8 0.17 0.94 0.61 0.20 0.10 1.64

3/16 0.14 0.76 0.49 0.16 0.08 1.31

1/4 0.11 0.60 0.39 0.12 0.06 1.04

5/16 0.09 0.47 0.31 0.10 0.05 0.82

3/8 0.07 0.37 0.24 0.08 0.04 0.65

7/16 0.05 0.29 0.19 0.06 0.03 0.51

1/2 0.04 0.23 0.15 0.05 0.02 0.40

5/8 0.03 0.14 0.09 0.03 0.01 0.24

3/4 0.02 0.09 0.06 0.02 0.01 0.15

7/8 0.01 0.05 0.03 0.01 0.01 0.09

1 0.01 0.03 0.02 0.01 0.00 0.06

1 1/32 0.01 0.03 0.02 0.01 0.00 0.05

1 1/16 0.00 0.03 0.02 0.01 0.00 0.04

1 3/32 0.00 0.02 0.01 0.00 0.00 0.04

1 1/8 0.00 0.02 0.01 0.00 0.00 0.03

1 3/16 0.00 0.02 0.01 0.00 0.00 0.03

1 1/4 0.00 0.01 0.01 0.00 0.00 0.02

Concrete Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0.5 0.24 1.32 0.86 0.27 0.14 2.29

1.0 0.22 1.23 0.80 0.26 0.13 2.13

1.5 0.20 1.12 0.73 0.23 0.12 1.94

2.0 0.18 1.00 0.65 0.21 0.10 1.74

2.5 0.16 0.88 0.57 0.18 0.09 1.52

3.0 0.14 0.76 0.49 0.16 0.08 1.32

3.5 0.12 0.65 0.42 0.13 0.07 1.12

4.0 0.10 0.55 0.35 0.11 0.06 0.95

4.5 0.08 0.46 0.30 0.09 0.05 0.79

5.0 0.07 0.38 0.25 0.08 0.04 0.66

5.5 0.06 0.32 0.20 0.07 0.03 0.55

6.0 0.05 0.26 0.17 0.05 0.03 0.45

6.5 0.04 0.22 0.14 0.04 0.02 0.37

7.0 0.03 0.18 0.11 0.04 0.02 0.31

7.5 0.03 0.15 0.09 0.03 0.02 0.25

8.0 0.02 0.12 0.08 0.02 0.01 0.21

8.5 0.02 0.10 0.06 0.02 0.01 0.17

9.0 0.01 0.08 0.05 0.02 0.01 0.14

9.5 0.01 0.07 0.04 0.01 0.01 0.12

10.0 0.01 0.06 0.04 0.01 0.01 0.10

10.5 0.01 0.05 0.03 0.01 0.00 0.08 PET-CT2 Shielding.xlsm

PET-CT IMAGING ROOM Head/Neck Procedures / Week Technique (DLP) Head/Neck

Whole Body Procedures / Week Technique (DLP) Whole Body

Facility: Roudebush VA Medical Center Enter 120 Enter 550

Date: 7/20/2020 % of these procedures that are scanned twice. (Contrast) Technique (kVp)

Physicist: Patrick J. Byrne Enter 40 Enter 120

Room Number: PET/CT 2 A-B004 Total # Procedures / Week

Barrier: North Wall East Wall South Wall West Wall West Wall Ceiling Floor

Description: Exterior Control Room Corridor Equip Rm Uptake Rm On grade

Occupancy Factor (T) 0.1 1.000 0.200 0.200 0.200 1.000

Annual Limit (mSv) (P) 1.0 5.0 5.0 5.0 5.0 1.0

100 mRem = 1 mSv

Distance (inches) 113.00 216.00 120.00 212.00 280.00 164.00

Exposure Limit (mSv) 0.02 0.1 0.1 0.1 0.1 0.02

Distance (m) 2.87 5.49 3.05 5.38 7.11 4.17

Incident Scatter 4.77 1.31 4.23 1.36 0.78 2.27

(mGy/wk) (Sc)

Transmission Factor (B) 0.084 0.077 0.118 0.369 0.643 0.009

Pb Thickness (mm) (X) 0.48 0.51 0.39 0.15 0.06 1.22

Concrete Thickness (cm) (X) 5.50 5.72 4.67 2.05 0.87 11.16

Steel Thickness (cm) (X) 0.29 0.31 0.23 0.07 0.03 0.96

Pb Thickness (in) 0.02 0.02 0.02 0.01 0.00 0.05

Concrete Thickness (in) 2.17 2.25 1.84 0.81 0.34 4.39

Steel Thickness (in) 0.12 0.12 0.09 0.03 0.01 0.38

Physicist: Patrick J. Byrne

Room Number: PET/CT 2 A-B004

Barrier: North Wall East Wall South Wall West Wall West Wall Ceiling Floor

Description: Exterior Control Room Corridor Equip Rm Uptake Rm 0 On grade

Pb Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 0.35 1.93 1.25 0.40 0.23 #VALUE! 3.35 #VALUE!

1/16 0.04 0.22 0.14 0.05 0.03 #VALUE! 0.38 #VALUE!

3/32 0.01 0.03 0.02 0.01 0.00 #VALUE! 0.06 #VALUE!

1/8 0.00 0.01 0.00 0.00 0.00 #VALUE! 0.01 #VALUE!

3/16 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1/4 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

5/16 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

3/8 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

7/16 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1/2 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

5/8 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

3/4 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

7/8 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1 1/32 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1 1/16 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1 3/32 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1 1/8 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1 3/16 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

1 1/4 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

Steel Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 4.03 22.07 14.30 4.58 2.63 #VALUE! 38.29 #VALUE!

1/16 2.13 11.64 7.55 2.42 1.39 #VALUE! 20.20 #VALUE!

3/32 1.32 7.24 4.69 1.50 0.86 #VALUE! 12.56 #VALUE!

1/8 0.90 4.90 3.18 1.02 0.58 #VALUE! 8.51 #VALUE!

3/16 0.47 2.58 1.67 0.54 0.31 #VALUE! 4.48 #VALUE!

1/4 0.28 1.51 0.98 0.31 0.18 #VALUE! 2.62 #VALUE!

5/16 0.17 0.93 0.60 0.19 0.11 #VALUE! 1.62 #VALUE!

3/8 0.11 0.60 0.39 0.12 0.07 #VALUE! 1.03 #VALUE!

7/16 0.07 0.39 0.25 0.08 0.05 #VALUE! 0.68 #VALUE!

1/2 0.05 0.26 0.17 0.05 0.03 #VALUE! 0.45 #VALUE!

5/8 0.02 0.12 0.08 0.02 0.01 #VALUE! 0.20 #VALUE!

3/4 0.01 0.05 0.04 0.01 0.01 #VALUE! 0.09 #VALUE!

7/8 0.00 0.03 0.02 0.01 0.00 #VALUE! 0.04 #VALUE!

1 0.00 0.01 0.01 0.00 0.00 #VALUE! 0.02 #VALUE!

1 1/32 0.00 0.01 0.01 0.00 0.00 #VALUE! 0.02 #VALUE!

1 1/16 0.00 0.01 0.01 0.00 0.00 #VALUE! 0.01 #VALUE!

1 3/32 0.00 0.01 0.00 0.00 0.00 #VALUE! 0.01 #VALUE!

1 1/8 0.00 0.01 0.00 0.00 0.00 #VALUE! 0.01 #VALUE!

1 3/16 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.01 #VALUE!

1 1/4 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

Physicist: Patrick J. Byrne

Room Number: PET/CT 2 A-B004

Barrier: North Wall East Wall South Wall West Wall West Wall Ceiling Floor

Description: Exterior Control Room Corridor Equip Rm Uptake Rm 0 On grade

Concrete Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0.5 6.33 34.66 22.46 7.20 4.13 #VALUE! 60.13 #VALUE!

1.0 3.53 19.31 12.51 4.01 2.30 #VALUE! 33.50 #VALUE!

1.5 2.03 11.10 7.19 2.30 1.32 #VALUE! 19.25 #VALUE!

2.0 1.19 6.51 4.22 1.35 0.77 #VALUE! 11.29 #VALUE!

2.5 0.71 3.87 2.51 0.80 0.46 #VALUE! 6.71 #VALUE!

3.0 0.42 2.32 1.51 0.48 0.28 #VALUE! 4.03 #VALUE!

3.5 0.26 1.40 0.91 0.29 0.17 #VALUE! 2.44 #VALUE!

4.0 0.16 0.85 0.55 0.18 0.10 #VALUE! 1.48 #VALUE!

4.5 0.09 0.52 0.34 0.11 0.06 #VALUE! 0.90 #VALUE!

5.0 0.06 0.32 0.21 0.07 0.04 #VALUE! 0.55 #VALUE!

5.5 0.04 0.19 0.13 0.04 0.02 #VALUE! 0.34 #VALUE!

6.0 0.02 0.12 0.08 0.02 0.01 #VALUE! 0.21 #VALUE!

6.5 0.01 0.07 0.05 0.02 0.01 #VALUE! 0.13 #VALUE!

7.0 0.01 0.04 0.03 0.01 0.01 #VALUE! 0.08 #VALUE!

7.5 0.01 0.03 0.02 0.01 0.00 #VALUE! 0.05 #VALUE!

8.0 0.00 0.02 0.01 0.00 0.00 #VALUE! 0.03 #VALUE!

9.0 0.00 0.01 0.00 0.00 0.00 #VALUE! 0.01 #VALUE!

9.5 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.01 #VALUE!

10.0 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

10.5 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

11.0 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

11.5 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

12.0 0.00 0.00 0.00 0.00 0.00 #VALUE! 0.00 #VALUE!

PET F-18 UPTAKE ROOM CALCULATIONS Administered Activity (Ao) Decay Reduction

(mCi) Factor (Rtu)

Enter 12.0 0.832

Facility: Roudebush VA Medical Center

Uptake Time (Tu) Patient Dose Rate

Date: 7/20/2020 (min) uSv-m2/MBq-h

Enter 60 0.092

Physicist: Patrick J. Byrne

Studies per Week (Nw)

Room Number: Uptake Room A-B002 Enter 25

Equation #3 AAPM TG 108

Weekly Dose = 0.092 uSv m2 / MBq-h x ((Nw x Ao(MBq) x Tu(h) x Rtu) / d(m)2) x T)

Equation #4 AAPM TG 108

Transmission Factor (B) = 10.9 x P x d(m)2 / (T x Nw x Ao(MBq) x Tu(h) x Rtu]

Barrier: North Wall East Wall South Wall South Door West Wall West Wall Ceiling Floor

Description: Exterior Up Rm A-B003 Corridor Corridor Storage Office On Grade

Occupancy Factor (T) 0.050 0.200 0.200 0.125 0.050 1.000 1.000

Annual Limit (mSv) (P) 1 5 5 5 1 1 1

Distance (inches) 55.00 108.00 144.00 144.00 48.00 170.00 164.00

Distance (m) 1.40 2.74 3.66 3.66 1.22 4.32 4.17 uSv per week 21.78 22.59 12.71 7.94 28.59 45.59 48.99

Equation #3 TG-108

B Transmission Factor 0.92 4.44 7.89 12.63 0.70 0.44 0.41

Equation #4 TG-108

Pb Thickness (mm) 0.72 0 0 0 2.88 6.19 6.68

Concrete Thickness (cm) 1.77 0.00 0.00 0.00 5.30 9.27 9.80

Pb Thickness (in) 0.03 0.00 0.00 0.00 0.11 0.24 0.26

Concrete Thickness (in) 0.70 0.00 0.00 0.00 2.09 3.65 3.86

Facility: Roudebush VA Medical Center Uptake Room Page Two

Physicist: Patrick J. Byrne

Room Number: Uptake Room A-B002

Barrier: North Wall East Wall South Wall South Door West Wall West Wall Ceiling Floor

Description: Exterior Up Rm A-B003 Corridor Corridor Storage Office 0 On Grade

Pb Thickness (mm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 1.09 1.13 0.64 0.40 1.43 2.28 2.45

1 0.97 1.01 0.57 0.35 1.27 2.03 2.18

2 0.86 0.89 0.50 0.31 1.13 1.79 1.93

3 0.75 0.78 0.44 0.27 0.99 1.57 1.69

4 0.66 0.68 0.38 0.24 0.86 1.37 1.47

5 0.57 0.59 0.33 0.21 0.75 1.19 1.28

6 0.49 0.51 0.29 0.18 0.65 1.03 1.11

7 0.42 0.44 0.25 0.15 0.56 0.89 0.96

8 0.37 0.38 0.21 0.13 0.48 0.77 0.82

9 0.31 0.33 0.18 0.11 0.41 0.66 0.71

10 0.27 0.28 0.16 0.10 0.36 0.57 0.61

12 0.20 0.21 0.12 0.07 0.26 0.42 0.45

14 0.15 0.15 0.09 0.05 0.19 0.31 0.33

16 0.11 0.11 0.06 0.04 0.14 0.23 0.24

18 0.08 0.08 0.05 0.03 0.10 0.17 0.18

20 0.06 0.06 0.03 0.02 0.08 0.12 0.13

25 0.03 0.03 0.02 0.01 0.04 0.06 0.06

30 0.01 0.01 0.01 0.00 0.02 0.03 0.03

40 0.00 0.00 0.00 0.00 0.00 0.01 0.01

50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Concrete Thickness (cm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 1.09 1.13 0.64 0.40 1.43 2.28 2.45

1 1.04 1.08 0.61 0.38 1.37 2.18 2.35

2 0.99 1.03 0.58 0.36 1.30 2.07 2.23

3 0.93 0.96 0.54 0.34 1.22 1.94 2.09

4 0.86 0.89 0.50 0.31 1.13 1.80 1.93

5 0.79 0.82 0.46 0.29 1.03 1.65 1.77

6 0.71 0.74 0.41 0.26 0.93 1.49 1.60

7 0.64 0.66 0.37 0.23 0.84 1.33 1.43

8 0.56 0.59 0.33 0.21 0.74 1.18 1.27

9 0.50 0.51 0.29 0.18 0.65 1.04 1.12

10 0.43 0.45 0.25 0.16 0.57 0.91 0.98

12 0.33 0.34 0.19 0.12 0.43 0.69 0.74

14 0.24 0.25 0.14 0.09 0.32 0.51 0.55

16 0.18 0.19 0.11 0.07 0.24 0.38 0.41

18 0.13 0.14 0.08 0.05 0.18 0.28 0.30

20 0.10 0.10 0.06 0.04 0.13 0.21 0.22

25 0.05 0.05 0.03 0.02 0.06 0.10 0.10

30 0.02 0.02 0.01 0.01 0.03 0.04 0.05

40 0.00 0.00 0.00 0.00 0.01 0.01 0.01

50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Facility: Roudebush VA Medical Center Uptake Room Page Three

Physicist: Patrick J. Byrne

Room Number: Uptake Room A-B002

Barrier: North Wall East Wall South Wall South Door West Wall West Wall Ceiling Floor

Description: Exterior Up Rm A-B003 Corridor Corridor Storage Office 0 On Grade

Pb Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 0.99 1.03 0.58 0.36 1.31 2.08 2.24

1/16 0.90 0.94 0.53 0.33 1.19 1.89 2.03

3/32 0.82 0.85 0.48 0.30 1.07 1.71 1.84

1/8 0.73 0.76 0.43 0.27 0.96 1.54 1.65

3/16 0.59 0.61 0.34 0.21 0.77 1.23 1.32

1/4 0.47 0.49 0.27 0.17 0.61 0.98 1.05

5/16 0.37 0.38 0.22 0.13 0.49 0.77 0.83

3/8 0.29 0.30 0.17 0.11 0.38 0.61 0.65

7/16 0.23 0.24 0.13 0.08 0.30 0.48 0.51

1/2 0.18 0.19 0.10 0.07 0.24 0.37 0.40

5/8 0.11 0.11 0.06 0.04 0.14 0.23 0.25

3/4 0.07 0.07 0.04 0.02 0.09 0.14 0.15

7/8 0.04 0.04 0.02 0.02 0.05 0.09 0.09

1 0.03 0.03 0.01 0.01 0.03 0.05 0.06

1 1/32 0.02 0.02 0.01 0.01 0.03 0.05 0.05

1 1/16 0.02 0.02 0.01 0.01 0.03 0.04 0.04

1 3/32 0.02 0.02 0.01 0.01 0.02 0.04 0.04

1 1/8 0.02 0.02 0.01 0.01 0.02 0.03 0.03

1 3/16 0.01 0.01 0.01 0.00 0.02 0.03 0.03

1 1/4 0.01 0.01 0.01 0.00 0.01 0.02 0.02

Concrete Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0.5 1.03 1.07 0.60 0.38 1.35 2.16 2.32

1.0 0.96 0.99 0.56 0.35 1.26 2.00 2.15

1.5 0.87 0.91 0.51 0.32 1.15 1.83 1.96

2.0 0.78 0.81 0.46 0.28 1.02 1.63 1.75

2.5 0.68 0.71 0.40 0.25 0.90 1.43 1.54

3.0 0.59 0.61 0.34 0.22 0.78 1.24 1.33

3.5 0.50 0.52 0.29 0.18 0.66 1.05 1.13

4.0 0.42 0.44 0.25 0.15 0.56 0.89 0.96

4.5 0.36 0.37 0.21 0.13 0.47 0.74 0.80

5.0 0.30 0.31 0.17 0.11 0.39 0.62 0.67

5.5 0.25 0.25 0.14 0.09 0.32 0.51 0.55

6.0 0.20 0.21 0.12 0.07 0.27 0.42 0.46

6.5 0.17 0.17 0.10 0.06 0.22 0.35 0.38

7.0 0.14 0.14 0.08 0.05 0.18 0.29 0.31

7.5 0.11 0.12 0.07 0.04 0.15 0.24 0.26

8.0 0.09 0.10 0.05 0.03 0.12 0.20 0.21

8.5 0.08 0.08 0.04 0.03 0.10 0.16 0.17

9.0 0.06 0.07 0.04 0.02 0.08 0.13 0.14

9.5 0.05 0.05 0.03 0.02 0.07 0.11 0.12

10.0 0.04 0.04 0.03 0.02 0.06 0.09 0.10

10.5 0.04 0.04 0.02 0.01 0.05 0.07 0.08

11.0 0.03 0.03 0.02 0.01 0.04 0.06 0.07PET-CT2 Shielding.xlsm

Enter 12.0 0.832

Facility: Roudebush VA Medical Center

Uptake Time (Tu) Patient Dose Rate

Date: 7/20/2020 (min) uSv-m2/MBq-h

Enter 60 0.092

Physicist: Patrick J. Byrne

Studies per Week (Nw)

Room Number: Uptake Room A-B003 Enter 25

Equation #3 AAPM TG 108

Weekly Dose = 0.092 uSv m2 / MBq-h x ((Nw x Ao(MBq) x Tu(h) x Rtu) / d(m)2) x T)

Equation #4 AAPM TG 108

Transmission Factor (B) = 10.9 x P x d(m)2 / (T x Nw x Ao(MBq) x Tu(h) x Rtu]

Barrier: North Wall West Wall South Wall South Door East Wall East Wall Ceiling Floor

Description: Exterior Up Rm A-B002 Corridor Corridor Equip Rm Scan Room On Grade

Occupancy Factor (T) 0.050 0.200 0.200 0.125 0.050 0.200 1.000

Annual Limit (mSv) (P) 1 5 5 5 5 5 1

Distance (inches) 55.00 100.00 144.00 144.00 48.00 132.00 164.00

Distance (m) 1.40 2.54 3.66 3.66 1.22 3.35 4.17 uSv per week 21.78 26.35 12.71 7.94 28.59 15.12 48.99

Equation #3 TG-108

B Transmission Factor 0.92 3.81 7.89 12.63 3.51 6.63 0.41

Equation #4 TG-108

Pb Thickness (mm) 0.72 0 0 0 0 0 6.68

Concrete Thickness (cm) 1.77 0.00 0.00 0.00 0.00 0.00 9.80

Pb Thickness (in) 0.03 0.00 0.00 0.00 0.00 0.00 0.26

Concrete Thickness (in) 0.70 0.00 0.00 0.00 0.00 0.00 3.86

UptakeA-B002.xlsm

Physicist: Patrick J. Byrne

Room Number: Uptake Room A-B003

Barrier: North Wall West Wall South Wall South Door East Wall East Wall Ceiling Floor

Description: Exterior Up Rm A-B002 Corridor Corridor Equip Rm Scan Room 0 On Grade

Pb Thickness (mm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 1.09 1.32 0.64 0.40 1.43 0.76 2.45

1 0.97 1.17 0.57 0.35 1.27 0.67 2.18

2 0.86 1.04 0.50 0.31 1.13 0.60 1.93

3 0.75 0.91 0.44 0.27 0.99 0.52 1.69

4 0.66 0.79 0.38 0.24 0.86 0.46 1.47

5 0.57 0.69 0.33 0.21 0.75 0.40 1.28

6 0.49 0.60 0.29 0.18 0.65 0.34 1.11

7 0.42 0.51 0.25 0.15 0.56 0.30 0.96

8 0.37 0.44 0.21 0.13 0.48 0.25 0.82

9 0.31 0.38 0.18 0.11 0.41 0.22 0.71

10 0.27 0.33 0.16 0.10 0.36 0.19 0.61

12 0.20 0.24 0.12 0.07 0.26 0.14 0.45

14 0.15 0.18 0.09 0.05 0.19 0.10 0.33

16 0.11 0.13 0.06 0.04 0.14 0.07 0.24

18 0.08 0.10 0.05 0.03 0.10 0.06 0.18

20 0.06 0.07 0.03 0.02 0.08 0.04 0.13

25 0.03 0.03 0.02 0.01 0.04 0.02 0.06

30 0.01 0.02 0.01 0.00 0.02 0.01 0.03

40 0.00 0.00 0.00 0.00 0.00 0.00 0.01

50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Concrete Thickness (cm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 1.09 1.32 0.64 0.40 1.43 0.76 2.45

1 1.04 1.26 0.61 0.38 1.37 0.72 2.35

2 0.99 1.20 0.58 0.36 1.30 0.69 2.23

3 0.93 1.12 0.54 0.34 1.22 0.64 2.09

4 0.86 1.04 0.50 0.31 1.13 0.60 1.93

5 0.79 0.95 0.46 0.29 1.03 0.55 1.77

6 0.71 0.86 0.41 0.26 0.93 0.49 1.60

7 0.64 0.77 0.37 0.23 0.84 0.44 1.43

8 0.56 0.68 0.33 0.21 0.74 0.39 1.27

9 0.50 0.60 0.29 0.18 0.65 0.34 1.12

10 0.43 0.53 0.25 0.16 0.57 0.30 0.98

12 0.33 0.40 0.19 0.12 0.43 0.23 0.74

14 0.24 0.30 0.14 0.09 0.32 0.17 0.55

16 0.18 0.22 0.11 0.07 0.24 0.13 0.41

18 0.13 0.16 0.08 0.05 0.18 0.09 0.30

20 0.10 0.12 0.06 0.04 0.13 0.07 0.22

25 0.05 0.06 0.03 0.02 0.06 0.03 0.10

30 0.02 0.03 0.01 0.01 0.03 0.01 0.05

40 0.00 0.01 0.00 0.00 0.01 0.00 0.01

50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Physicist: Patrick J. Byrne

Room Number: Uptake Room A-B003

Barrier: North Wall West Wall South Wall South Door East Wall East Wall Ceiling Floor

Description: Exterior Up Rm A-B002 Corridor Corridor Equip Rm Scan Room 0 On Grade

Pb Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

1/32 0.99 1.20 0.58 0.36 1.31 0.69 2.24

1/16 0.90 1.09 0.53 0.33 1.19 0.63 2.03

3/32 0.82 0.99 0.48 0.30 1.07 0.57 1.84

1/8 0.73 0.89 0.43 0.27 0.96 0.51 1.65

3/16 0.59 0.71 0.34 0.21 0.77 0.41 1.32

1/4 0.47 0.57 0.27 0.17 0.61 0.32 1.05

5/16 0.37 0.45 0.22 0.13 0.49 0.26 0.83

3/8 0.29 0.35 0.17 0.11 0.38 0.20 0.65

7/16 0.23 0.28 0.13 0.08 0.30 0.16 0.51

1/2 0.18 0.22 0.10 0.07 0.24 0.12 0.40

5/8 0.11 0.13 0.06 0.04 0.14 0.08 0.25

3/4 0.07 0.08 0.04 0.02 0.09 0.05 0.15

7/8 0.04 0.05 0.02 0.02 0.05 0.03 0.09

1 0.03 0.03 0.01 0.01 0.03 0.02 0.06

1 1/32 0.02 0.03 0.01 0.01 0.03 0.02 0.05

1 1/16 0.02 0.02 0.01 0.01 0.03 0.01 0.04

1 3/32 0.02 0.02 0.01 0.01 0.02 0.01 0.04

1 1/8 0.02 0.02 0.01 0.01 0.02 0.01 0.03

1 3/16 0.01 0.01 0.01 0.00 0.02 0.01 0.03

1 1/4 0.01 0.01 0.01 0.00 0.01 0.01 0.02

Concrete Thickness (inches) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0.5 1.03 1.25 0.60 0.38 1.35 0.72 2.32

1.0 0.96 1.16 0.56 0.35 1.26 0.66 2.15

1.5 0.87 1.06 0.51 0.32 1.15 0.61 1.96

2.0 0.78 0.94 0.46 0.28 1.02 0.54 1.75

2.5 0.68 0.83 0.40 0.25 0.90 0.48 1.54

3.0 0.59 0.72 0.34 0.22 0.78 0.41 1.33

3.5 0.50 0.61 0.29 0.18 0.66 0.35 1.13

4.0 0.42 0.51 0.25 0.15 0.56 0.29 0.96

4.5 0.36 0.43 0.21 0.13 0.47 0.25 0.80

5.0 0.30 0.36 0.17 0.11 0.39 0.21 0.67

5.5 0.25 0.30 0.14 0.09 0.32 0.17 0.55

6.0 0.20 0.25 0.12 0.07 0.27 0.14 0.46

6.5 0.17 0.20 0.10 0.06 0.22 0.12 0.38

7.0 0.14 0.17 0.08 0.05 0.18 0.10 0.31

7.5 0.11 0.14 0.07 0.04 0.15 0.08 0.26

8.0 0.09 0.11 0.05 0.03 0.12 0.07 0.21

8.5 0.08 0.09 0.04 0.03 0.10 0.05 0.17

9.0 0.06 0.08 0.04 0.02 0.08 0.04 0.14

9.5 0.05 0.06 0.03 0.02 0.07 0.04 0.12

10.0 0.04 0.05 0.03 0.02 0.06 0.03 0.10

10.5 0.04 0.04 0.02 0.01 0.05 0.02 0.08

11.0 0.03 0.04 0.02 0.01 0.04 0.02 0.07 UptakeA-B002.xlsm

Enter 12.0 0.832

Facility: Roudebush VA Medical Center

Uptake Time (Tu) Patient Dose Rate

Date: 7/20/2020 (min) uSv-m2/MBq-h

Enter 60 0.092

Physicist: Patrick J. Byrne

Studies per Week (Nw)

Room Number: Uptake Room A-B008 Enter 25

Equation #3 AAPM TG 108

Weekly Dose = 0.092 uSv m2 / MBq-h x ((Nw x Ao(MBq) x Tu(h) x Rtu) / d(m)2) x T)

Equation #4 AAPM TG 108

Transmission Factor (B) = 10.9 x P x d(m)2 / (T x Nw x Ao(MBq) x Tu(h) x Rtu]

Barrier: North Wall East Wall West Wall West Door South Wall Ceiling

Description: Hot Lab Exterior Corridor Corridor Up Rm A-B009

Occupancy Factor (T) 0.200 0.050 0.200 0.200 0.200 1.000

Annual Limit (mSv) (P) 5 1 5 5 5 1

Distance (inches) 55.00 77.00 96.00 96.00 60.00 164.00

Distance (m) 1.40 1.96 2.44 2.44 1.52 4.17 uSv per week 87.11 11.11 28.59 28.59 73.20 48.99

Equation #3 TG-108

B Transmission Factor 1.15 1.80 3.51 3.51 1.37 0.41

Equation #4 TG-108

Pb Thickness (mm) 0 0 0 0 0 6.68

Concrete Thickness (cm) 0.00 0.00 0.00 0.00 0.00 9.80

Pb Thickness (in) 0.00 0.00 0.00 0.00 0.00 0.26

Concrete Thickness (in) 0.00 0.00 0.00 0.00 0.00 3.86

UptakeA-B008.xlsm

Physicist: Patrick J. Byrne

Room Number: Uptake Room A-B008

Barrier: North Wall East Wall West Wall West Door South Wall 0 0 Ceiling

Description: Hot Lab Exterior Corridor Corridor Up Rm A-B009 0 0 0

Pb Thickness (mm) mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year mSv / year

0 4.36 0.56 1.43 1.43 3.66 2.45

1 3.88 0.50 1.27 1.27 3.26 2.18

2 3.43 0.44 1.13 1.13 2.88 1.93

3 3.01 0.38 0.99 0.99 2.53 1.69

4 2.62 0.33 0.86 0.86 2.20 1.47

5 2.28 0.29 0.75 0.75 1.91 1.28

6 1.97 0.25 0.65 0.65 1.66 1.11

7 1.70 0.22 0.56 0.56 1.43 0.96

8 1.46 0.19 0.48 0.48 1.23 0.82

9 1.26 0.16 0.41 0.41 1.06 0.71

10 1.08 0.14 0.36 0.36 0.91 0.61

12 0.80 0.10 0.26 0.26 0.67 0.45

14 0.59 0.07 0.19 0.19 0.49 0.33

16 0.43 0.06 0.14 0.14 0.36 0.24

18 0.32 0.04 0.10 0.10 0.27 0.18

20 0.23 0.03 0.08 0.08 0.20 0.13

25 0.11 0.01 0.04 0.04 0.09 0.06

30 0.05 0.01 0.02 0.02…