580-18-118 Project Drawings - Dated 3-6-2020 - Part III.pdf
PDF 15 MB Posted
- Solicitation number
- 36C25620R0113
About this file
This notice provides details for a solicitation seeking construction services. The Michael E. DeBakey VA Medical Center in Houston, Texas is soliciting proposals for a renovation project of approximately 12,400 square feet of Pathology and Laboratory Space on the third floor of Building 100 under solicitation number 36C25620R0113. The project scope includes demolition, structural, architectural, mechanical, electrical, plumbing, communications, fire protection and interior finish work. The period of performance is 810 calendar days from notice to proceed. The solicitation will be issued as a request for proposals on July 21, 2020 and is available only to service-disabled veteran-owned small businesses with average annual receipts less than $39.5 million over the past three years. A firm-fixed price construction contract is anticipated with performance and payment bonds required from the contractor receiving award. The estimated value is between $2 million and $5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25620R0113 0002.docx | DOCX document | |
| 28 13 00 Physical Access Control Specification.pdf | ||
| VAHPLB100_PHASE III_Delta 1 Drawings.pdf | ||
| 580-18-118 Structural Sheets.pdf | ||
| Revised Proposal Submission Requirements 8-17-20.docx | DOCX document | |
| 36C25620R0113 0001.docx | DOCX document | |
| 087100r2 Door Hardware_08-07-2020.docx | DOCX document | |
| 580-18-118 Pneumatic Sheets.pdf | ||
| 085113 Aluminum Windows.doc | DOC document | |
| Egress Plan.pdf | ||
| 580-18-118 Project Statement of Work.docx | DOCX document | |
| 36C25620R0113_1.docx | DOCX document | |
| SF24 BID BOND.pdf | ||
| 580-18-118 Project Drawings - Dated 3-6-2020 - Part II.pdf | ||
| Site Visit Instructions for Project 580-18-118.docx | DOCX document | |
| DOL Wage Determinations TX20200253 02-14-2020.pdf | ||
| 580-18-118 Project Specifications.pdf | ||
| 580-18-118 Project Drawings - Dated 3-6-2020 - Part I.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
PANEL SCHEDULES
VB RS
E502
310 NLA SEC. 2 310 NHB 310 NLB SEC. 2
310 NLC SEC. 2 310 CHA 310 CLA SEC. 1
310 CLA 4 310 SHA 310 SLA
GENERAL NOTES
1. THE CONTRACTOR MAY REUSE EXISTING BOXES, CONDUIT AND WIRING WHERE
APPLICABLE TO NEW CONSTRUCTION AND NEW CIRCUITING INDICATED ON
DRAWINGS, PROVIDE NEW WHERE SPECIFICALLY INDICATED ON DRAWINGS.
2. ALL CONSTRUCTION ACTIVITIES SHALL NOT IMPACT THE DAY TO DAY OPERATION
OF BUILDING AND THE FACILITY.
3. NEW CIRCUIT BREAKER SHALL MATCH THE AIC RATING AND BE COMPATIBLE WITH
EXISTING PANELS.
PANEL SCHEDULES
NTS
KEY NOTES
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text C
PANEL BOARD DESIGNATIONS
3 0 9 N H A
A,B,C,..... FOR PANEL NUMBER
H= 480/277 VOLT
L=208/120 VOLT
N= NORMAL POWER
S= LIFE SAFETY
C= CRITICAL
E= EQUIPMENT TIME
( EMERGENCY POWER)
01 THRU. 13 FOR SERVICE BAY
B,1,2,3.... FOR FLOOR LEVELS
COMMUNICATION PANEL DESIGNATIONS
I 01 PATC
PATC= PUBLIC ADDRESS
TERMINATION CABINET
TTB= TELEPHONE TERMINAL BOX
01 THRU. 12 FOR SERVICE BAY
B,1,2,3....FOR FLOOR LEVELS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
ELECTRICAL DETAILS - AREA K
VB RS
E600
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
ELECTRICAL DETAILS - AREA F
VB RS
E601
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
NEMA L6-30R
NEMA L6-20R
NEMA L6 RECEPTACLE
TYP. NEMA L6 OUTLET
NTS
DATA JACK
VOICE JACK
TYP. COMMUNICATION/DATA OUTLET
NTS
DATA JACK
BLANK
STEM MOUNTED OUTLET DETAIL
NTS
NOTES:
1. OUTLET(S) SHALL BE PLACED IN AREAS WHERE THEY DO
NOT PRESENT A TRIPPING HAZARD.
CONDUIT
IN FLOOR
FLUSH
CONDUIT
COUPLING
FINISHED
FLOOR
CLOSED NIPPLE
RECEPTACLE /
COMMUNICATION OUTLET
6' 6" MAX.
TO TOP
BREAKER
TO DISCONNECT
USE 3/8"Ø LAG BOLT @ WOOD STUD WALL,
MINIMUM PENETRATION 3"
USE 3/8"Ø HILTI KWIK BOLT II @ CONCRETE
WALL WITH MINIMUM 2 1/2"
EMBEDMENTPER ICC-ESR-1385.
USE 3/8"Ø SIMPSON WEDGE-ALL ANCHOR
@ CMU WALL WITH 2 1/2" MINIMUM
EMBEDMENT ICBO #3631
(N) FASTENERS TO WALL ON BOTH SIDES
OF PULL BOXES
FROM MAIN PANEL
SURFACE MOUNTED PANEL DETAIL
NTS
FLOOR GRADE
TRANSFORMER MOUNTING DETAIL
NTS
* SEE STRUCTURAL DRAWING S-202 DETAIL #3 FOR
TRANSFORMER ANCHORAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
ELECTRICAL DETAILS
VB RS
E602
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
PLUMBING SHEET INDEX
NUMBER SHEET TITLE
P001
FLOOR CLEANOUT
FLOOR DRAIN
FIXTURE UNITS
EXISTING
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DEIONIZED WATER
DOWN
DEPARTMENT OF ENERGY
DOWNSPOUT
DRAWING
DOMESTIC WATER HEATER
DRAIN WASTE VENT
CHEMICAL RESISTANT PIPE
COMPRESSED GAS ASSOCIATION
CAST IRON
CLEANOUT
CONTROL VALVE
REDUCED PRESSURE BACKFLOW PREVENTOR
BREAK HORSEPOWER
BLACK STEEL PIPE
BATHTUB
ARCHITECT / ENGINEER
AREA DRAIN
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
AIR GAP
ACCESS PANEL
AUTOMATIC SPRINKLER
ADJUSTABLE SPEED DRIVES
AUTOMATIC SPRINKLER DRAIN
AMERICAN SOCIETY MECHANICAL ENGINEERS
AMERICAN SOCIETY PLUMBING ENGINEERS
AUTOMATIC SPRINKLER RISER
LITER PER SECOND
LAVATORY
POUNDS PER HOUR
METER
MEDICAL AIR
MANUAL AIR VENT
MEDICAL
MECHANICAL EQUIPMENT ROOM
MANHOLE
MEMORANDUM OF UNDERSTANDING
MOP SERVICE BASIN
MEDICAL VACUUM
NITROGEN
NITROUS OXIDE
NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOMINAL
NON POTABLE WATER
NOT TO SCALE
OXYGEN
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN
OPERATING ROOM
OVERFLOW
KILOWATT
KILOWATT-HOUR
INDUSTRIAL COLD WATER
INVERT
INTERNATIONAL PLUMBING CODE
IRRIGATION WATER
INDIRECT WASTE
INSTANTANEOUS WATER HEATER
HOSE BIBB
HUB DRAIN
HEAT EXCHANGER
HORSEPOWER
HAND SINK
HOT WATER STORAGE TANK (DOMESTIC)
HOT WATER BOILER
HOT WATER CIRCULATING PUMP
HOT WATER PUMP
HYDRANT
GALLON
GRADE CLEANOUTS
GALLONS PER DAY
GALLONS PER HOUR
GALLONS PER MINUTE
PASCAL
PRESSURE DROP OR DIFFERENCE
PLUMBING AND DRAINAGE INSTITUTE
PRESSURE GAGE
PLUMBING PUMP
POINT OF CONNECTION
POINT OF DISCONNECTION
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH ATMOSPHERE
POUNDS PER SQUARE INCH GAUGE
PRESSURE TEMPERATURE RELIEF VALVE
POTABLE WATER
ROOF DRAIN
ROOF DRAIN LEADER
ROOF LEADER
REVERSE OSMOSIS WATER
RAIN WATER LEADER
SANITARY SEWER
STANDARD CUBIC FOOT/MINUTE
SOFTENED COLD WATER
STORM DRAIN MANHOLE
SUMP PUMP
SPRINKLER LINE
SQUARE FEET
STAINLESS STEEL
TEMPERATURE CONTROL VALVE
TEMPERATURE DIFFERENCE
TRENCH DRAIN
TOTAL DYNAMIC HEAD
TEMPERATURE
THERMOSTATIC MIXING VALVE
TRAP PRIMER
THERMOSTAT
TYPICAL
UNIFORM PLUMBING CODE
VENT
VACUUM
VACUUM BREAKER
VACUUM CLEANER OUTLET
VACUUM PUMP
VENT STACK
VENT THROUGH ROOF
WASTE
WATER CLOSET
WALL CLEANOUT
WATER GAGE
WALL HYDRANT
WATER HEATER
WATER HAMMER ARRESTER
WATER LINE
WATER METER
WATER PRESSURE DROP
WASTE STACK
YARD CLEANOUT
YARD HYDRANT
PL105
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
PL105
ANCHOR
DIRECTION OF FLOW
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
DRAWING SYMBOLS
SYMBOL DESCRIPTION
FCO
FD
FU
(E)
CW
HW
DI
DN
DOE
DS
DWG
DWH
DWV
CRP
CGA
CI
CO
CV
BFP
BHP
BSP
BT
A/E
AD
AFF
AFG
AG
AP
AS
ASD
ASD
ASHRAE
ASME
ASPE
ASR
L/S
LAV
LBS/HR
M
MA
MAV
MED
MER
MH
MOU
MSB
MV
N2 N20
NC
NIC
NO
NOM
NPW
NTC
O2
OC
OD
OFD
OR
OVFL
KW
KWHR
ICW
INV
IPC
IRR
IW
IWH
HB
HD
HEX
HP
HS
HST
HWB
HWCP
HWP
HYD
GAL
GCO
GPD
GPH
GPM
PA
PD
PDI
PG
PP
POC
POD
PRV
PSI
PSIA
PSIG
PTRV
PW
RD
RDL
RL
RO
RWL
SAN
SMACNA
SCFM
SCW
SDMH
SP
SPR
SQFT
SS
TCV
TD
TD
TDH
TEMP
TMV
TP
TSTAT
TYP
UPC
V
VAC
VB
VCO
VP
VS
VTR
W
WC
WCO
WG
WH
WH
WHA
WL
WM
WPD
WS
YCO
YH
AMERICAN SOCIETY HEATING,REFRIGERATION, AIR
CONDITIONING ENGINEERS
SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL
ASSOCIATION
ABBREVIATION DESCRIPTION ABBREVIATION DESCRIPTION
POINT OF CONNECTION BETWEEN NEW AND
EXISTING WORK
CODES AND STANDARDS
PLUMBING GENERAL NOTES
SHUT-OFF VALVESOV
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
GATE VALVE
GLOBE VALVE
VALVE SYMBOLS
SYMBOL DESCRIPTION
POINT OF DISCONNECTION
2015 INTERNATIONAL BUILDING CODE
INTERNATIONAL PLUMBING CODE
INTERNATIONAL FIRE CODE
ASHRAE 90.1 - 2013
VETERANS AFFAIRS PLUMBING DESIGN MANUAL
VETERANS AFFAIRS SEISMIC DESIGN REQUIREMENTS
ALL WORK SHALL COMPLY WITH THE FOLLOWING
CODES AND STANDARDS, AS ADOPTED BY THE GOVERNING
AUTHORITIES:
VENT THRU ROOF
TYPICAL
VTR
TYP
SHT SHEET
NOT TO SCALE
INVERT ELEVATION
NTS
IE
(E) EXISTING
FLOOR CLEANOUT
FLOOR DRAIN
CLEANOUT
TRAP PRIMER
FD
FS
TP
FLOOR SINK
FCO
CO
PIPE CAP
POINT OF CONNECTION
PLUMBING LEGEND
SOIL, WASTE, OR SANITARY SEWER
VENT (SANITARY) PIPING
SS
V
SYMBOL ABBR
POC
DESCRIPTION
CRP CHEMICAL RESISTANT PIPE
LV LAB VACUUM
GAS PIPINGG
SAN SAN SANITARY SEWER, BELOW GRADE
CONDENSATE DRAINAGE PIPINGCD
G
LA LAB AIR
DN DOWN
HOT WATER PIPINGHW
SOV ISOLATION/SHUT-OFF VALVE
COLD WATER PIPINGCW
HOT WATER RETURN PIPINGHWR
CD
REDUCED PRESS. PRINCIPLE BACKFLOW PREVENTERRPPB
PRV PRESSURE REDUCING VALVE
SD SD STORM DRAINAGE PIPING ABOVE SLAB/GRADE
AD AREA DRAIN
GAS COCK
OD OD OVERFLOW DRAIN
DRAIN PIPINGDD
PLUMBING PIPE MATERIALS
REMARKS
FROM EXTERIOR WALL OR BELOW
GROUND TO 5'-0"
OUTSIDE OR
BELOW GROUND
INSIDE ABOVE
GROUND
INSIDE ABOVE
OUTSIDE
CONDENSATE
DRAINAGE
SANITARY
DRAINAGE
SANITARY VENT
WATER
SERVICES
TY
PE
"L " C
O
PP
ER
A
ST
M
B
TY
PE
"K " C
OP
PE
R A
ST
M
B8
LOCATION
BL
AC
K
ST
EE
L
AS
TM
SC
HE
DU
LE
CA
ST
IR
ON
N
O-
HU
B
PI
PE
F
IT
TI
NG
S
AC
RY
LO
NI
TR
IL
E-
BU
TA
DI
EN
E-
TY
PE
"M " C
O
PP
ER
PO
LY
E
TH
YL
EN
E
PI
PE
W / F
US
IO
N
W
EL
DE
D
JO
IN
TS
(1
S M
AL
LE
R)
RESISTANT
WASTE PIPING
INSIDE ABOVE GROUND
FROM EXTERIOR WALL OR BELOW
GROUND TO 5'-0"
CR
O
SS
LI
NK
ED
P O
LY
ET
HY
LE
NE
AQ
UA
PE
X
PE
X
, W
IT
H
AS
TM
(P
EX
) U
PO
NO
R
(B
LU
E
RE
D)
F1
UP
O
NO
R
PR
O
PE
X
FI
TT
IN
G S
ST
YR
EN
E
(A
BS
) A
ST
M D
W / A
BS
FI
TT
IN
G
S, S
O
LV
EN
T
W
EL
DE
D
JO
IN
TS
HI
G
H
SI
LI
CO
N
CA
ST
IR
O N
AS
TM
A
HI
G
H
SI
LI
CO
N
IR
O N
PI
PE
A
ND
D
RA
IN
AG
E
PA
TT
ER
N
FI
TT
IN
G
S
AS
TM
A
8/
A5
M
INSIDE ABOVE GROUND
FROM EXTERIOR WALL OR BELOW
GROUND TO 5'-0"
FIRE SPRINKLER
PIPING
INSIDE ABOVE
GROUND
OUTSIDE OR BELOW
GROUND
INSIDE ABOVE
GROUND
BALANCING VALVE
MIXING VALVE
PLUMBING FRONT SHEET
PP103i
3.
4.
2.
5.
6.
CONTRACTOR SHALL COORDINATE ROUTING OF SANITARY WASTE PIPING WITH STRUCTURAL BEAMS AND CONCRETE FOOTINGS, SIZES, P.O.C.'S, INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY MATERIAL OR
EQUIPMENT.
THESE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC AND ARE NOT INTENDED TO INDICATE ALL DETAILS AND NECESSARY OFFSETS OF PIPING. THE CONTRACTOR SHALL INSTALL MATERIAL AND EQUIPMENT IN A MANNER AS TO CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM, AND KEEP OPENINGS AND PASSAGEWAYS CLEAR. ALL INSTALLATIONS SHALL BE CONSISTENT WITH NORMALLY
ACCEPTABLE INDUSTRY STANDARDS.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE CODES. NOTHING SHOWN ON THE PLANS OR STATED IN THE SPECIFICATIONS IS INTENDED TO INDICATE THAT THE INSTALLATIONS OR CONNECTIONS OF ANY ITEM OR DEVICE SHOULD BE DONE CONTRARY TO MANUFACTURERS INSTRUCTIONS AND ALL APPLICABLE CODES AND REGULATIONS. THE CONTRACTOR IS RESPONSIBLE TO INSURE THAT THE
INSTALLATIONS AND CONNECTIONS OF ALL ITEMS AND DEVICES CONFORMS TO MANUFACTURERS
INSTRUCTIONS AND TO ALL APPLICABLE CODES AND REGULATIONS.
SANITARY WASTE DRAINAGE PIPING SHALL SLOPE AT 1/4" PER FOOT UNLESS OTHERWISE NOTED ON THE
DRAWINGS.
ALL PLUMBING SOLDER SHALL BE LEAD FREE.
CONTRACTOR SHALL CAREFULLY REVIEW THESE PLANS AND SPECIFICATIONS PRIOR TO BID. CONTRACTOR SHALL ALSO REVIEW PLANS AND SPECIFICATIONS OF OTHER RELATED TRADES (INCLUDING MECHANICAL, STRUCTURAL, AND ELECTRICAL) PRIOR TO BID TO INSURE AN ACCURATE UNDERSTANDING OF EXACT SCOPE OF WORK. ANY ITEMS REQUIRING CLARIFICATION SHALL BE BROUGHT TO THE ATTENTION OF THE
GOVERNMENT IN SUFFICIENT TIME TO BE INCORPORATED INTO THE BID.
1.
7.
8.
PLUMBING OVER ELECTRICAL ROOMS CONTAINING MAIN DISTRIBUTION PANELS OR MOTOR
CONTROL CENTERS SHALL BE AVOIDED. WHEN PIPING IS NECESSARY IN THESE AREAS
LEAKAGE PROTECTION SUCH AS DRAIN PANS SHALL BE PROVIDED.
ALL PENETRATIONS THROUGH FIRE AND SMOKE BARRIERS AND FLOOR/CEILING
ASSEMBLIES SHALL BE PROTECTED ACCORDING TO THE LATEST EDITION OF THE
INTERNATIONAL BUILDING CODE (IBC).
DEMO DEAD LEGS WHEN ENCOUNTERED.9.
P002
3RD INTERSTITIAL - TRACK 1A/1B
PLUMBING SCHEDULES
LA
LV
THE SCOPE OF WORK IS TO RENOVATE PART OF THE 12,400 SF OF THE PATHOLOGY AND
LABORATORY SPACE ON THE 3RD FLOOR OF BUILDING 100 PER PHASES. THE RENOVATION
INCLUDES THE RELOCATION AND ADDITION OF SPECIALIZED SPACE SUCH THAT
LABORATORY EQUIPMENT IS TO BE REMOVED. NEW LABORATORY EQUIPMENT IS TO BE
ADDED ALONG WITH REQUIRED MEDICAL GASES AND OTHER UTILITY DEMAND. THE
INTERSTITIAL SPACE SERVING THE 3RD FLOOR IS OF HIGHLY AFFECTED AREAS WHERE
RE-REROUTING AND OR THE ADDITION OF NEW PIPING SHALL BE REQUIRED. UTILITY LOAD
WILL BE TAKEN INTO ACCOUNT IN ORDER TO MAINTAIN AN OPERATING PLUMBING SYSTEM
WITHOUT NEGATIVELY AFFECTING ALTERATIONS.
SCOPE OF WORK
SEE F.P. PLANS
SEE F.P. PLANS
PLUMBING EQUIPMENT AND FIXTURE CONNECTION
CRP
MA MEDICAL AIRMA
DE DEIONIZED WATERDE
CA COMPRESSED AIRCA
O OXYGENO
F FIRE PROTECTIONF
CHEMICAL
P003 PLUMBING DETAILS
P004 PLUMBING RISER DIAGRAMS
PP103 3RD FLOOR PLAN - TRACK 1A/1B
PP102i 2ND INTERSTITIAL - TRACK 1A/1B
PP203i 3RD INTERSTITIAL - TRACK 2A/2B
PP203 3RD FLOOR PLAN - TRACK 2A/2B
PP202i 2ND INTERSTITIAL - TRACK 2A/2B
PP303i 3RD INTERSTITIAL - TRACK 3A/3B
PP303 3RD FLOOR PLAN - TRACK 3A/3B
PP302i 2ND INTERSTITIAL - TRACK 3A/3B
PP403i 3RD INTERSTITIAL - TRACK 4A
PP403 3RD FLOOR PLAN - TRACK 4A
PP402i 2ND INTERSTITIAL - TRACK 4A
PP503i 3RD INTERSTITIAL - TRACK 5A/5B
PP503B 3RD FLOOR PLAN - TRACK 5B
PP502i 2ND INTERSTITIAL - TRACK 5A/5B PP603i 3RD INTERSTITIAL - TRACK 6A/7A
PP603 3RD FLOOR PLAN - TRACK 6A/7A
PP602i 2ND INTERSTITIAL - TRACK 6A/7A
PP703i 3RD INTERSTITIAL - TRACK 8
PP703 3RD FLOOR PLAN - TRACK 8
PP702i 2ND INTERSTITIAL - TRACK 8
PP503A 3RD FLOOR PLAN - TRACK 5A
DES DES DEIONIZED WATER SUPPLY
DER DER DEIONIZED WATER RETURN
CRPV CHEMICAL RESISTANT PIPE VENTCRPV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
PLUMBING FRONT SHEET
MR MP
P001
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
SPECIALTY EQUIPMENT SCHEDULE
ROOM
NAME EQUIPMENT
CHEMISTRY
ANALYZER
DESCRIPTIONMANUFACTURER
MODEL NO
SPECL. CHEM.
COLD WATER
YES
COMPRESSED
AIR
PLUMBING FIXTURE SCHEDULE
P-NUMBER
MANUFACTURER
AMERICAN STANDARDP-110
DESCRIPTIONMODEL NUMBER DFU
CW CRP VENT DE PIPE
WSFU PIPE SIZE PIPE SIZE SUPPLY REMARKS
MODEL: 3351.101.020 4 10 2''
WALL HUNG, VITREOUS CHINA, 1.28GPF, ELECTRIC SENSOR AUTOMATIC
FLUSH VALVE. ELONGATED OPEN FRONT SEAT.
INSTALL PER MANUFACTURER RECOMMENDATIONS.ABOTT ARCHITECT
PLUS i1000SR
ABBOTT
ARCHITECT PLUS - INSTALL PER MANUFACTURER RECOMMENDATIONS.ABOTT ARCHITECT
PLUS
ABBOTT
ARCHITECT ARM - INSTALL PER MANUFACTURER RECOMMENDATIONS.ABOTT ARCHITECT
PLUS
- INSTALL PER MANUFACTURER RECOMMENDATIONS.
- INSTALL PER MANUFACTURER RECOMMENDATIONS.POLYMEDCO
OC-AUTO
- INSTALL PER MANUFACTURER RECOMMENDATIONS.
ELECTROPHORESIS
SYSTEM - INSTALL PER MANUFACTURER RECOMMENDATIONS.SEBIA ASSIST
- INSTALL PER MANUFACTURER RECOMMENDATIONS.SEBIA HYDRASYS 2
SCAN
- INSTALL PER MANUFACTURER RECOMMENDATIONS.
IMMUNOASSAY
SYSTEM - INSTALL PER MANUFACTURER RECOMMENDATIONS.BECKMAN COULTER
DxI 600
MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.BECKMAN COULTER
AIRFUGE
AIR-DRIVEN
ULTRACENTRIFUGE
HEMOGLOBIN
ANALYZER
TOSOH BIOSCIENCE
G8 HPLC ANALYZER
MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.
MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.
WATER CLOSET
HW PIPE
SUPPLY
AMERICAN STANDARD
MODEL: 0954.904EC/0062.00ECP-418 1 2 1-1/2''LAVATORY
WALL HUNG, VITREOUS CHINA, HARD-WIRED SENSOR FAUCET.
THERMOSTATIC MIXING VALVE.1/2''
WASTE
PIPE SIZE
4''
2''
CW PIPE
SUPPLY
1/2''
1/2''
DURCON SINK
MODEL: DRS12
FAUCET: CHICAGO FAUCETS
MODEL: LWM1-A13-F
MODEL: LWS1-A15-E
P-528A 3 2 1-1/2''LAB. SINK
(DIRTY)
COUNTERTOP (DROP IN) SINK, EPOXY RESIN WITH CORNER OUTLET.
16''X16''X7-1/2'' DEEP.
SOLID BRASS, SINGLE HOLE DECK MOUNTED DUAL INLET WATER
FAUCET. METAL WRIST BLADE HANDLES.
INCLUDE DEIONIZED WATER FAUCET BY CHICAGO FAUCETS MODEL
LWS1-A15-E.
1/2''1/2'' 1/2''1-1/2''
GUARDIAN EYEWASH
MODEL: G1805/G1805LHP-710 EMERGENCY
EYEWASH
DECK MOUNTED SWIVEL ACTIVATION EMERGENCY EYEWASH. INCLUDE
THERMOSTATIC MIXING VALVE MODEL: G3600LF AND STAINLESS STEEL
DUST COVER FOR EACH SPRAY HEAD.
1/2''1/2'' --
DURCON SINK
MODEL: D20
FAUCET: CHICAGO FAUCETS
MODEL: LWM1-A13-F
P-528 3 2 1-1/2''LAB. SINK
COUNTERTOP (DROP IN) SINK, EPOXY RESIN WITH CORNER OUTLET.
16''X16''X7-1/2'' DEEP.
SOLID BRASS, SINGLE HOLE DECK MOUNTED DUAL INLET WATER
FAUCET. METAL WRIST BLADE HANDLES.
1/2''1/2''2'' 1-1/2''
JAY R. SMITH
MODEL: 2005YFD-B FLOOR DRAIN
CAST IRON BODY WITH NICKEL BRONZE STRAINER. INCLUDE MIFAB
OVAL FUNNEL MODEL: F1100-EG.--2'' 1-1/2'' - -
*P-528A IS OF SAME FAUCET MODEL AS P-528. P-528A IS PAIRED WITH A SECOND FAUCET FOR DEIONIZED WATER.
- MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.
DRAIN
YES
YES
YES
YES
YES
-ICE MAKER
SCOTSMAN
PRODIGEL ICE MAKER MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES
YES
PLASMA BATH
WARMER
HELMER PLASMA
BATH WARMER MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES
- MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES
-CELL WASHER
HELMER ULTRA CW II
CELL WASHER MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
- MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
EQUIP
NO
AB1
AB2
AB3
PM1
PM2
EL1
EL2
BC3
SPECL. CHEM.
SPECL. CHEM.
SPECL. CHEM.
SPECL. CHEM.
SPECL. CHEM.
SPECL. CHEM.
SPECL. CHEM.
SPECL. CHEM.
SPECL. CHEM.
IDS
EL3
BLOOD ANALYZER BLOOD ANALYZER
POLYMEDCO
OC-AUTO
POLYMEDCO
OC-AUTO
POLYMEDCO
OC-AUTO
DEIONIZED
WATER
ELECTROPHORESIS
SYSTEM
SEBIA CAPILLARY 2ELECTROPHORESIS
SYSTEM
CHEMISTRY
CHEMISTRY
CHEMISTRY
CHEMISTRY
AF1
AF2
HA2
HA1
BECKMAN COULTER
AIRFUGE
AIR-DRIVEN
ULTRACENTRIFUGE
HEMOGLOBIN
ANALYZER
TOSOH BIOSCIENCE
G8 HPLC ANALYZER
BIOFRIG
BLOOD BANK LAB
BLOOD BANK LAB
BLOOD BANK LAB
BLOOD BANK LAB
- MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
FOLLET SYMPHONY
SERIES ICE MAKER MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
BLOOD BANK LAB
BREAK
BW1
IM1
CW1
BW2
CW3
CW2
IM2
PLASMA BATH
WARMER
HELMER PLASMA
BATH WARMER
CELL WASHER
HELMER ULTRA CW II
CELL WASHER
CELL WASHER
THERMO SCIENTIFIC
SORVALL BLOOD CW
ICE MAKER
COAGULATION
ANALYZER
STAR2R EVOLUTION MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
- MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
HEMA
- MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
FOLLET SYMPHONY
SERIES ICE MAKER MANUFACTURER TO INSTALL AND CONNECT TO UTILITY.YES-
IRRADIATOR
CA1
IA1
CA2
IA2
BEST THERATRONICS
RAYCELL MK2
IRRADIATOR
3A-121A
HEMA COAGULATION
ANALYZER
STAR2R EVOLUTION
IRRADIATION
ANALYZER
COOLING WATER
SUPPLY
YES
YES
YES-
YES
YES
2''
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
3A-120
3A-120
3A-120
3A-120
3A-120
3A-120
3A-120
3A-120
3A-120
3A-120
3A-120B
3A-120B
3A-120B
3A-120B
3A-121D
3A-121
3A-121
3A-121
3A-121
3A-121
3A-117
3A-120C
3A-120C
3A-121A
TP-E
PRECISION PLUMBING PRODUCTS
MODEL: 2005Y - - - - - - -1/2''
MP-500-115V TRAP PRIMER VALVE WITH DU WATER DISTRIBUTION.
INSTALL BY MANUFACTURER RECOMMENDATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
PLUMBING SCHEDULES
MR MP
P002
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
EXISTING TOPPING
SLAB
NEW 3/8" X LENGTH
REQUIRED X WIDTH
REQUIRED STEEL PLATE
EXISTING METAL DECK
TACK WELD AT 3" O.C.
INFILL EXISTING OPENING
WITH NEW LATICRETE
TOPPING SLAB
EXISTING 4" X 4" STEEL
ANGLES
NOTE: FILL EXISTING INTERSTITIAL
OPENING (WITH EXISTING
STEEL ANGLES AT OPENING)
WITH LATICRETE
WATER CLOSET DETAIL - SENSOR OPERATED (P-110)
NTS
FINISHED
FLOOR
FINISHED WALL
[4 m m
2' -9
[8 m m
2' -7
[7 m m
SOLENOID OPERATED
FLUSH VALVEGRAB BAR, SEE
ARCH. DRAWINGS
BACK CHECK
ANGLE STOP
FOR FIXTURE
HEIGHTS SEE
ARCHITECTURAL
DRAWINGS
MANUAL OVER-RIDE
BUTTON
SENSOR
GRAB BAR SUPPORT
(TYPICAL)
WALL
FLOOR
VENT IN THE WALL
CHROME PLATED TRAP
2" W. BELOW GRADE
2" WALL CLEANOUT
PROVIDE SHUT-OFF VALVE BEHIND LOCKABLE ACCESS PANEL
3/4" COLD WATER SUPPLY
CONCEALED ARMS
WALL MOUNTED SINK, SEE ARCHITECTURAL
DRAWINGS FOR MOUNTING HEIGHT
HEAVY DUTY MOUNTING PLATE
34" M
AX
LAVATORY MOUNTING DETAIL (P-421)
NTS
LAVATORY MOUNTING DETAIL - (P-421)
NTS
VA
R
IE
S
PIPE PENETRATION THROUGH WALLS BELOW GRADE
NTS
EXISTING INTERSTITIAL SLAB OPENING WITH STEEL
NTS
TYPE "F" FLOOR DRAIN DETAIL
NTS
OVAL FUNNEL FLOOR DRAIN DETAIL
NTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
PLUMBING DETAILS
MR MP
P003
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text MINIMUM 16 GAGE GALVANIZED STEEL PLATE 12"x48" [300x1200mm] MIN. SECURED TO A MIN. 4 STUDS PER LAVATORY
AutoCAD SHX Text 1/4" [6mm] MOLLY BOLT HOLLOWWALL ANCHOR (1 EA. SIDE OF LAV)
AutoCAD SHX Text MIN. (3) 1/4" [6mm] MACHINE BOLTS W/DOUBLE LOCK NUTS ON BACK SIDE
AutoCAD SHX Text MIN. 5 1/4" [131mm] GALV.MACHINE BOLTS WELDED TO PLATE
AutoCAD SHX Text 1/4" [6mm]
AutoCAD SHX Text TYP. 1/8" TYP. [3mm]
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
SECTION A
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
1. 2.
AutoCAD SHX Text AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE AN ADDITIONAL 16 GAGE GALVANIZED STEEL PLATE 12"x16" [300x600mm] SECURED TO A MINIMUM OF 2 STUDS PER FOOT PEDAL. PROVIDE 20 GAGE STUDS WHEN HEIGHT EXCEEDS 12'-0" [3600mm]
AutoCAD SHX Text
STEEL HANGER BY LAV MFGR
AutoCAD SHX Text
STEEL WALL PLATE
AutoCAD SHX Text
WALL ANCHOR
AutoCAD SHX Text
STUDS
AutoCAD SHX Text 3'-3"
AutoCAD SHX Text [975mm] TO FLOOR
AutoCAD SHX Text
FOR FIXTURE HEIGHT SEE ARCHITECTURAL DRAWINGS
AutoCAD SHX Text
EXTERIOR SIDE OF CONCRETE WALL
AutoCAD SHX Text 1/4" [6mm] STEEL PLATE WATER STOP & ANCHOR COLLAR
AutoCAD SHX Text [50mm]
AutoCAD SHX Text FLEXIBLE EXPANSION JOINT MIN. DEFLECTION 15" [375mm] MIN. EXPANSION 4" [100mm]
AutoCAD SHX Text
RESILIENT WATERPROOF CAULKING
AutoCAD SHX Text 5/8" [16mm] ROD
AutoCAD SHX Text
WELD
AutoCAD SHX Text
PIPE CENTERED IN SLEEVE
AutoCAD SHX Text 1/4"x1/4" [6x6mm] IRON PIPE CLAMP
AutoCAD SHX Text
STANDARD WEIGHT GAL. STEEL PIPE SLEEVE
AutoCAD SHX Text 1/4"x1/4" [6x6mm] IRON PIPE STRAP
AutoCAD SHX Text
MODULAR TYPE WALL PENETRATION SEAL
AutoCAD SHX Text
FLANGED CONNECTION
AutoCAD SHX Text [100mm]
AutoCAD SHX Text
INTERIOR SIDE OF WALL
AutoCAD SHX Text
STAINLESS STEEL BOLTS, NUTS & WASHERS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 9" [225mm] DIA. TWO-PIECE NICKEL BRONZE FLASHING STRAINER (FLUSH WITH FINISHED FLOOR)
AutoCAD SHX Text
FLASHING PAN
AutoCAD SHX Text
SEAMLESS VINYL FLOORING
AutoCAD SHX Text FLASHING MEMBRANE, MIN. 24" [600mm] SQUARE 2 1/2 LB. [1.1kg] TO 4 LB. [1.8kg] LEAD OR 16 OZ. [453g] COPPER
AutoCAD SHX Text
CAULKED, NO-HUB OR THREADED CONNECTION
AutoCAD SHX Text
FLASHING COLLAR WITH WEEP HOLES
AutoCAD SHX Text
LOOSE GRAVEL AT WEEP HOLES
AutoCAD SHX Text PROVIDE A METAL SUPPORT PLATE WHEN DRAIN IS INSTALLED IN AN EXISTING FLOOR- CAULK AROUND DRAIN PRIOR TO RE-GROUTING
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. SLOPE MEMBRANE LINER 2% TO DRAIN. SLOPE MEMBRANE LINER 2% TO DRAIN. 2. PROVIDE FLASHING MEMBRANE WHEN DRAIN IS INSTALLED IN A NON-MEMBRANE FLOOR.PROVIDE FLASHING MEMBRANE WHEN DRAIN IS INSTALLED IN A NON-MEMBRANE FLOOR.
AutoCAD SHX Text
(SEE CHART)
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text
WEEPHOLES FOR
AutoCAD SHX Text
DOUBLE DRAINAGE
AutoCAD SHX Text %%C
AutoCAD SHX Text
(SEE CHART)
AutoCAD SHX Text
ADJUSTMENT
AutoCAD SHX Text
BODY HEIGHT
AutoCAD SHX Text
4[100]NPS-8
AutoCAD SHX Text
X1.3[33] DP
AutoCAD SHX Text
TRAP PRIMER
AutoCAD SHX Text
BOSS
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text
F1100-EG
AutoCAD SHX Text 9 [229]
AutoCAD SHX Text
3.85 [98]
AutoCAD SHX Text 5"(127)
AutoCAD SHX Text %%c
AutoCAD SHX Text
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
BASEMENT
3RD FLOOR
2ND FLOOR INTERSTITIAL
3RD FLOOR INTERSTITIAL
RISER DRAIN VA.
3'' (22 FU)
3/4'' HWR
1-1/2'' (2`` GPM)
2-1/2'' (53 GPM)
4'' (36 FU)
4'' W
4'' V
4'' CW
2-1/2'' HW
1'' HWR
3/4'' HWR
1-1/2'' (28 GPM)
2-1/2'' (66 GPM)
4'' (45 FU)
3'' CAPPED
6TH FLOOR
4'' V.T.R.
P
3'' (30 FU)
4'' (46 FU)
4'' W STACK
4'' V STACK
4'' (12 FU)
3'' (32 FU)
4'' V.T.R.
P
3'' CAPPED
4'' PLUGGED
4'' W STACK
4'' V STACK
4'' (30 FU)
3'' (20 FU)
4'' V.T.R.
P
3'' VENT CAPPED FOR
4'' (78 FU)
4'' CRP STACK
4'' V STACK
4'' (20 FU)
3'' (20 FU)
4'' V.T.R. (CRP)
CRP
FUTURE CONNECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
PLUMBING EXISTING
MR MP
P004
RISER DIAGRAMS
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
UP
E
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
MATCH LINE MATCH LINE
3/4" HWR UP & 1'' DN
2" HW UP & 2-1/2'' DN
3" CW UP & 4'' DN
4" VENT UP & DN
4" SAN UP & DN
D
ES
D
ES
DES DES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
DESDER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
DESDER
DERDERDER
DER DER
D
ER
D
ER
D
ER
D
ER
D
ER
DER DER DER DER DER DER DER DER
D
ER
D
ES
DESDESDESDESDESDES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
1/2"
1/2" 1/2"
1/2"
1/2"
1-1/2" 3/4"
1/2"
1-1/2"
1-1/2"
1-1/2" 1/2"
1-1/2"
1/2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
3RD INTERSTITIAL - TRACK 1A/1B
MR MP
PP103i
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXACT LOCATION OF PIPING.
2. CONCEAL INTERSTITIAL OPENINGS AFTER PERMANENTLY REMOVING PIPING. SEE
DETAIL 4, SHEET PL600.
PLUMBING TRACK 1A/1B
1/8" = 1'-0"1
N
REMOVE EXISTING VENT,CW, AND HW PIPES FROM SINK BELOW IN ELECTRON
MICROSCOPY 3A-215C AND CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING GAS VALVE PIPING IN ELECTRON MICROSCOPY 3A-215C
AND CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING VENT AND CW FROM DRINKING FOUNTAIN BELOW IN WAIT
ROOM 3A-119B. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING VENT AND CW FROM WATER CLOSET BELOW IN TOILET
ROOMS 3A-119E. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING VENT, HW AND CW FROM LAVATORY BELOW IN TOILETS
ROOM 3A-119F. CAP UP TO THE POINT OF DISCONNECTION.
TRACK 1A DEMOLITION NOTES
TRACK 1B DEMOLITION NOTES
REMOVE EXISTING OXYGEN VALVE PIPING IN WAIT ROOM 3A-121A UP TO
POINT OF DISCONNECTION.
TRACK 1A
TRACK 1B
REMOVE EXISTING VENT AND CW FROM DRINKING FOUNTAIN BELOW IN
BLOOD DONOR ROOM 3A-121B. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING VENT AND CW FROM WATER CLOSET BELOW IN TOILET
ROOMS 3A-119F. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING VENT, HW AND CW FROM LAVATORY BELOW IN TOILETS
ROOM 3A-119E. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING VENT, HW AND CW FROM LAVATORY BELOW IN ANTE
ROOM 3A-119D. CAP UP TO THE POINT OF DISCONNECTION.
AutoCAD SHX Text
CRP
AutoCAD SHX Text
CRP
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text
CS
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
FHV
AutoCAD SHX Text
CS
AutoCAD SHX Text
(E)DE
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
(E)DE
AutoCAD SHX Text
(E)DE
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
(E)CRP
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
(E)DE
AutoCAD SHX Text
(E)DE
AutoCAD SHX Text
(E)DE
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text
CRPV.
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WAIT
3A-119B
TOILET
3A-119F
ANTE
3A-119D
TOILET
3A-119E
SPEC
ACCS
DIST
3A-119
STORAGE
3A-119A
CYTOLOGY
OFFICE
3A-215G
ELECTRON
MICROSCOPY
OFFICE
3A-215C
ELECTRON
LAIS
MICROSCOPY
3A-215
CORR
C3A-103
LAB
MNGR
3A-201
ELECTRON
MICROSCOPY
3A-215B
PATH
OFFICE
3A-215A
BLOOD
DONOR
3A-121B
BLOOD
BANK
3A-121
MEDIA
PREP
3A-205
BLOOD
SPEC
COLL
3A-119C
WAIT
3A-121A
E
F
G
14 13
H
J
K
CW4
FD-B
TP-E
FD-B
TP-E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
3RD FLOOR PLAN - TRACK 1A/1B
MR MP
PP103
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXACT LOCATION OF PIPING.
2. CONTRACTOR TO PATCH ALL HOLES DUE TO DEMOLISHED FLOOR DRAINS. MATCH
FLOOR TILE AS SPECIFIED IN ARCHITECTURAL DRAWINGS.
3. FOR COMPLETE EQUIPMENT SCHEDULE, REFER TO ARCH. DRAWINGS.
TRACK 1A DEMOLITION NOTES
PLUMBING TRACK 1A/1B
1/8" = 1'-0"1
N
REMOVE EXISTING FLOOR DRAIN WITH ALL RELATED ACCESSORIES DOWN
TO POINT OF DISCONNECTION.
REMOVE EXISTING SINK WITH ALL RELATED ACCESSORIES UP TO POINT OF
CONNECTION.
REMOVE EXISTING DRINKING FOUNTAIN WITH ALL RELATED ACCESSORIES
UP TO POINT OF DISCONNECTION.
REMOVE EXISTING WATER CLOSET WITH ALL RELATED ACCESSORIES UP TO
POINT OF CONNECTION.
REMOVE EXISTING LAVATORY WITH ALL RELATED ACCESSORIES UP TO
POINT OF CONNECTION.
EXISTING SINK WITH EYEWASH TO REMAIN.9
REMOVE EXISTING OXYGEN VALVE UP TO POINT OF DISCONNECTION.4
REMOVE EXISTING GAS VALVE UP TO POINT OF DISCONNECTION.8
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
TRACK 1B DEMOLITION NOTES
TRACK 1A
TRACK 1B
TRACK 1B TEMPORARY NOTES
10 PROVIDE AND CONNECT TEMPORARY FLOOR DRAIN WITH ALL RELATED
ACCESSORIES FOR CELL WASHER. RUN WASTE DOWN TO POINT OF
TEMPORARY CONNECTION.
TRACK 1A RENOVATION NOTES
PROVIDE AND CONNECT NEW FLOOR DRAIN WITH ALL RELATED
ACCESSORIES. RUN WASTE DOWN TO POINT OF NEW CONNECTION.
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ELEVATOR
P-13
ELEVATOR
P-16
FIRE STAIR
ST-13
UNOCCUPIED
MECHANICAL &
SERVICE
E
F
G
H
J
K
(E)CRP(E)CRP
(E)CRP
(E)CRP
(E)CRP
(E)CRP
(E)CRP
F
(E)CRP
F
(E)CRP
(E)CRP
(E)CRP
CONNECT TO
SPRINKLER
SYSTEM SZCV
(E )C
A
(E )M
A
3"
4"
(E)MA
(E)CA
(E )C
A (E
)C A
3"
(E)CRP
(E)CRP
(E)CRP
(E)CRP
(E)CRP
MATCH LINE MATCH LINE
(E )C
R P
(E)CRP
(E)CRP
(E )C
R P
(E)CRP
(E )C
R P
(E)CRP
(E )C
R P
4'' SAN, 4'' VENT
4'' CW UP & DN
2-1/2 HW UP - 3'' DN
1-1/4'' HWR UP & DN
4"
DES DES DES DES
D
ES
D
ES
D
ES
DER DER DER DER
D
ER
D
ER
D
ER
DER DER
D
ER
DER
DER
DER DER DER DER DER DERDES DES DES DES
D
ES
D
ES
D
ES
D
ES
D
ER
D
ER
D
ER
D
ER
DER DER DER DER DER DER DER DER DER DER
D
ER
DER DER
DES DES
D
ES
D
ES
D
ES
D
ES
DER
D
ER
D
ER
D
ER
D
ER
D
ES
D
ES
D
ES
D
ES
7 8
1 1/2"
1 1/2"
1 1/2"
2"
3"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
2ND INTERSTITIAL - TRACK 1A/1B
MR MP
PP102i
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXACT LOCATION OF PIPING.
2. CONCEAL INTERSTITIAL OPENINGS AFTER PERMANENTLY REMOVING PIPING. SEE
DETAIL 4, SHEET PL600.
PLUMBING TRACK 1A/1B
1/8" = 1'-0"1
N
REMOVE EXISTING WASTE PIPE FROM FLOOR DRAIN ABOVE IN ELECTRON
MICROSCOPY 3A-215C AND CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING WASTE PIPE FROM SINK ABOVE IN ELECTRON
MICROSCOPY 3A-215C AND CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING WASTE PIPE FROM DRINKING FOUNTAIN ABOVE IN WAIT
ROOM 3A-119B AND BLOOD DONOR ROOM 3A-121B. CAP UP TO THE POINT OF
DISCONNECTION.
REMOVE EXISTING WASTE PIPE FROM WATER CLOSET ABOVE IN TOILET
ROOMS 3A-119F. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING WASTE PIPE FROM LAVATORY ABOVE IN TOILETS ROOM
3A-119F. CAP UP TO THE POINT OF DISCONNECTION.
TRACK 1A DEMOLITION NOTES
TRACK 1B DEMOLITION NOTES
TRACK 1A
TRACK 1B DEMOLITION
REMOVE EXISTING WASTE PIPE FROM WATER CLOSET ABOVE IN TOILET
ROOMS 3A-119E. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING WASTE PIPE FROM LAVATORY ABOVE IN TOILETS ROOM
3A-119E. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING WASTE PIPE FROM LAVATORY ABOVE IN TOILETS ROOM
ANTE ROOM 3A-119D. CAP UP TO THE POINT OF DISCONNECTION.
TRACK 1B TEMPORARY NOTES
11 PROVIDE AND CONNECT TEMPORARY FLOOR DRAIN ABOVE IN PATH OFFICE
3A-215A TO TEMPORARY 2'' WASTE AT POINT OF CONNECTION TO EXISTING
WASTE LINE.
12 PROVIDE AND CONNECT TEMPORARY FLOOR DRAIN ABOVE IN PATH OFFICE
3A-215A TO TEMPORARY 1/2'' CW TRAP PIPE AT POINT OF CONNECTION TO
EXISTING COLD WATER.
PROVIDE AND CONNECT NEW FLOOR DRAIN ABOVE IN COMPRESSOR ROOM
3A-119 TO NEW 2'' WASTE AT POINT OF CONNECTION TO EXISTING WASTE
LINE.
PROVIDE AND CONNECT NEW FLOOR DRAIN ABOVE IN COMPRESSOR ROOM
3A-119 TO NEW 1/2'' CW TRAP PIPE AT POINT OF CONNECTION TO EXISTING
COLD WATER.
TRACK 1A RENOVATION NOTES
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
MATCH LINE MATCH LINE
4" SAN UP & DN
3/4" HWR UP & 1'' DN
2" HW UP & 2-1/2'' DN
3" CW UP & 4'' DN
4" VENT UP & DN
4" SAN UP & DN
D
ES
D
ES
DES DES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
DESDER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
D
ER
DESDER
DERDERDER
DER DER
D
ER
D
ER
D
ER
D
ER
D
ER
DER DER DER DER DER DER DER DER
D
ER
D
ES
DESDESDESDESDESDES
D
ES
D
ES
D
ES
D
ES
D
ES
D
ES
3/4"
1-1/2"
3/4"
1/2"
1/2"
1/2"
3/4"
1-1/2" 3/4"
3/4" 3/4"
3/4"
1-1/2"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
3RD INTERSTITIAL - TRACK 2A/2B
MR MP
PP203i
GENERAL NOTES
1. CONTRACTOR TO VERIFY EXACT LOCATION OF PIPING.
2. CONCEAL INTERSTITIAL OPENINGS AFTER PERMANENTLY REMOVING PIPING. SEE
DETAIL 4, SHEET PL600.
PLUMBING TRACK 2A/2B
1/8" = 1'-0"1
N
REMOVE EXISTING CRP, CW, AND HW PIPES FROM SINK BELOW IN LOUNGE
ROOM 3A-117. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING OXYGEN VALVE PIPING IN BLOOD DONOR 3A-121B UP TO
POINT OF DISCONNECTION.
REMOVE EXISTING 3/4'' CW IN ELECTRON MICROSCOPY 3A-215B UP TO POINT
OF DISCONNECTION.
REMOVE EXISTING GAS AND LV PIPING IN MEDIA PREP 3A-205 UP TO POINT
OF DISCONNECTION.
TRACK 2A
TRACK 2B
REMOVE EXISTING VENT, CW, AND HW PIPES FROM SINK BELOW IN LAB
MANAGER 3A-201. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING VENT, CW, AND HW PIPES FROM LAVATORY BELOW IN
BLOOD DONOR 3A-121B. CAP UP TO THE POINT OF DISCONNECTION.
REMOVE EXISTING CRP, CW, AND HW PIPES FROM SINK BELOW IN MEDIA
PREP 3A-205. CAP UP TO THE POINT OF DISCONNECTION.
TRACK 2A DEMOLITION NOTES
TRACK 2B DEMOLITION NOTES
REMOVE EXISTING OXYGEN VALVE PIPING IN BLOOD COLLECTION 3A-121C
UP TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .