580-18-118 Project Drawings - Dated 3-6-2020 - Part II.pdf
PDF 15 MB Posted
- Solicitation number
- 36C25620R0113
About this file
This notice provides details for a federal construction contract opportunity for renovation of pathology and laboratory space at the Michael E. DeBakey VA Medical Center in Houston, Texas. The solicitation number is 36C25620R0113 and seeks a contractor to furnish all labor, materials, tools and equipment for demolition, structural, architectural, mechanical, electrical, plumbing, communications, fire protection and interior finishes work. The period of performance is 810 calendar days from notice to proceed. The estimated value is between $2-5 million. This opportunity is only available to service-disabled veteran-owned small businesses. At least 15% of labor costs must be spent on SDVOSB or veteran employees. The solicitation will be issued on July 21, 2020 as a request for proposals with a 90-day acceptance period. Offerors must register in various systems including SAM and ORCA prior to the due date. The assigned NAICS code is 236220 for commercial and institutional building construction with a size standard of $39.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25620R0113 0002.docx | DOCX document | |
| 28 13 00 Physical Access Control Specification.pdf | ||
| VAHPLB100_PHASE III_Delta 1 Drawings.pdf | ||
| 580-18-118 Structural Sheets.pdf | ||
| Revised Proposal Submission Requirements 8-17-20.docx | DOCX document | |
| 36C25620R0113 0001.docx | DOCX document | |
| 087100r2 Door Hardware_08-07-2020.docx | DOCX document | |
| 580-18-118 Pneumatic Sheets.pdf | ||
| 085113 Aluminum Windows.doc | DOC document | |
| Egress Plan.pdf | ||
| 580-18-118 Project Statement of Work.docx | DOCX document | |
| 36C25620R0113_1.docx | DOCX document | |
| SF24 BID BOND.pdf | ||
| 580-18-118 Project Drawings - Dated 3-6-2020 - Part III.pdf | ||
| Site Visit Instructions for Project 580-18-118.docx | DOCX document | |
| DOL Wage Determinations TX20200253 02-14-2020.pdf | ||
| 580-18-118 Project Specifications.pdf | ||
| 580-18-118 Project Drawings - Dated 3-6-2020 - Part I.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
E
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
6"Ø
TU-50-11
ATU
(N)TU-50-13
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-24
TU-54-13
TU-54-12
TU-54-14
TU-54-20
TU-54-21
TU-54-15
TU-54-16
TU-54-11
TU-54-10
TU-54-7
TU-54-8
TU-54-4
TU-54-6
TU-54-5
(N)TU-50-12
TU-54-18
TU-54-19
10"Ø
6"Ø
8"Ø
16"Ø
6"Ø EXH
12"Ø
6"Ø
16/12
15"Ø DN
X
Ø
12"Ø DN
6"Ø
Ø
10"Ø
6"Ø
15"Ø
15"Ø
Ø
Ø
8"Ø
Ø
10"Ø
12"Ø
8"Ø
24/12
8"Ø
12"Ø
TU-54-22
18/14 20/1422/14
8"Ø
8"Ø
Ø
6"Ø
6"Ø
8"Ø
24"Ø
14"Ø
14"Ø
(N)TU-54-22
10"Ø
10"Ø
(N)TU-54-24
8"Ø
8"Ø
6"Ø
6"Ø
14"Ø
14"Ø
14"Ø
Ø
Ø
Ø
18"Ø
18"Ø
Ø
8"Ø
16"Ø
4 13
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e ITRACK 2B, 3A, 3B WORK 1/8" = 1'-0"
N
TAG
T3A-D
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
3.3A
2 T3A-S 1.3A
5 T3B-D -
4 T3B-S 1.3B
1 T2B-R 3.2B
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
DEMOLISH SUPPLY AND EXHAUST DUCTWORK FROM
TU-54-14 & TU-54-10 AT POINTS OF DISCONNECT.
PROVIDE NEW SUPPLY AND EXHAUST DUCTWORK FOR
TU-54-8 AT POINTS OF CONNECTION. INSTALL NEW
TU-54-24 WITH SUPPLY DUCTWORK TO SUPPLY AIR TO
TEMPORARY SWINGSPACE.
· BLOOD BANK: INSTALL (N) TU-54-22 AND SUPPLY
DUCTWORK AT POINTS OF CONNECTION TO SUPPLY AIR
TO SWINGSPACE & FINAL USE. PROVIDE NEW SUPPLY
DUCTWORK FROM TU-54-11. PROVIDE EXHAUST
DUCTWORK AT POINTS OF CONNECTION.
· 3A-121D: INSTALL (N)TU-50-12 AND PROVIDE NEW SUPPLY
AND EXHAUST DUCTWORK AT POINTS OF CONNECTION
TO PROVIDE AIR TO SWINGSPACE & FINAL USE.
· 3A-121B & 3A-121C: INSTALL (N)TU-50-13 AND PROVIDE
NEW SUPPLY AND EXHAUST DUCTWORK AT POINTS OF
CONNECTION TO PROVIDE AIR TO SWINGSPACE & FINAL
USE.
MECHANICAL TRACK 2A, 2B, 3A, 3B
AG JG
MH303i
3RD FLOOR INTERSTITIAL PLAN
· INSTALL NEW TU-50-12 TO EXISTING DUCTWORK AT
POINTS OF CONNECTION.
· PROVIDE NEW SUPPLY AND EXHAUST DUCTWORK FOR
TU-50-12 & -25 AT POINTS OF CONNECTION.
DEMOLISH SUPPLY AND EXHAUST DUCTWORK FROM
TU-54-18 & TU-54-22 AT POINTS OF DISCONNECT. DEMOLISH
AND REPLACE TU-54-18 & TU-54-22.
EXISTING DUCTWORK NOTES
1 63/32" Ø EXH 100-EF70
2 38/32" Ø EXH 100-EF70
3 50/32" Ø SA 100-AH54
4 16" Ø EXH 100-EF70A
5 44/20" Ø SA TO 100-AH50
6 38/32" Ø EXH 100-EF36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HEMATOLOGY
LAB
3A-120C
BREAK
ROOM
3A-117
ELECTRO
MICROSCOPY
3A-215
CORR
C3A-209A
BB
BREAK
ROOM
3A-121B
BIOFRIDGE
3A-121D
EDUCATION
3A-118
BLOOD
BANK
LAB
3A-121
IRRADIATOR
RM
3A-121A
STERILE
STORAGE
3A-119C
FUTURE
CYTOMETRY
3A-122A
FIRE
STAIR
ST-13
3A-110
CHEM/
HEMA
IMMED
RESP
LAB
E
F
G
14 13
H
J
K
TEMPORARY
SPECIAL CHEMISTRY
LAB
BB
SUPERVISOR
C3A-103
BULK
STO.
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
FREEZER
STO.
3A-119A
CORR.
C3A-102
COMPRESSOR
RM.
3A-119
SUP
D7-750
SUP
D7-950
SUP
SUPD5-500
SUP
D5-460
SUP
D5-460
SUP
D5-550
SUP
D2-110
E3-670
E4-1500
E4-1350
E4-1350
E4-1350
EXH
EXH
EXH
EXH
EXH
TU54-2
TU54-3
SUP L9-180
SUP L9-180
SUP
L9-180
SUP
L9-180
SUPL10-380
SUP L10-380
L9-180
SUP L10-360
SUP L10-360
SUPD3-210
SUP L10-360
SUP L10-360
SUP L10-360
SUP L9-180
SUP L9-180
SUP
L9-180
SUP L9-180
SUP L9-180
SUP
L10-360
SUP L10-360
E
G
C
F
M
UC-1
UC-2
UC-3
SD-15-08
175 CFM
TYP FOR 2
EG-27-22X10
300 CFM
TU50-13
EG26
SD15
SD15
SD15
SD15
EG26
SD15
SD15
SD15
TU54-25
TU50-12
EG26
SD15
EG26
EG26
50 CFM
50 CFM
50 CFM
SD-15-14"Ø
560 CFM
TYP FOR 5
EG-26-22
900 CFM
TYP FOR 3
SD-15-12"Ø
275 CFM
TYP FOR 2
EG-26-22
750 CFM
SD-15-08"Ø
150 CFM
EG-27-22x10
200 CFM
SD-15-06
125 CFM
EG-27-22X10
75 CFM
SD-15-06
100 CFM
TU-54-11
TU-54-7
240 CFM
SD-15-12"Ø
380 CFM
TYP FOR 5
EG-26-22
950 CFM
TYP FOR 2
120 CFM
SD-15-12"Ø
415 CFM
TYP FOR 6
EG-26-22
950 CFM
TYP FOR 3
SD-15-08"Ø
200 CFM
TYP FOR 4
SD-15-12"Ø
300 CFM
TYP FOR 2
50 CFM
EG-26-18
550 CFM
SD-15-10
250 CFM
TU50-25
SD-15-08"Ø
200 CFM
TU54-14
TU54-22
TU50-11
TU50-12
TU54-27
TU54-10
SD-15-10
250 CFM
EG-26-12
250 CFM
EG-28-6
80 CFM
EG-26-12
180 CFM
SD-15-10"Ø
240 CFM
EG-28-6
80 CFM
SD-40-06
50 CFM
TU54-8
TU54-24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
TRACK 3A, 3B, 4A WORK
1/8" = 1'-0"1
N
TAG
T3A-R
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
4.3A
4 T4A-D 3.4A
2 T3B-R 4.3B
3 T4A-S 1.4A, 2.4A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
DEMOLISH SUPPLY DIFFUSERS AND EXHAUST GRILLES
SERVING (E) HEMA LAB. DEMO AND/OR RELOCATE WALL
THERMOSTATS.
PROVDE TEMP SUPPLY DIFFUSERS & EXHAUST
GRILLES IN TEMP SPEC CHEM LAB ACCORDING TO
BALANCE TABLE.
PROVIDE NEW SUPPLY AND EXHAUST DIFFUSERS AND GRILLES
FOR (N) HEMA LAB. PROVIDE AND CONNECT NEW DUCTWORK
BELOW 3RD FLOOR INTERSTITIAL SPACE. PROVIDE
THERMOSTATS AND CONNECT TO (E)TU-54-7,-10 & (N)TU-54-27.
PROVIDE NEW SUPPLY AND EXHAUST DIFFUSERS AND
GRILLES FOR 3A-121, 3A-119C, 3A-122A & 3A-121A. PROVIDE
AND CONNECT NEW DUCTWORK BELOW 3RD FLOOR
INTERSTITIAL SPACE. PROVIDE THERMOSTAT AND CONNECT
TO (N)TU-54-25.
MECHANICAL TRACK 3A, 3B, 4A
AG JG
MH403
PLAN
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
9"Ø
12"Ø
Ø
12"Ø
Ø
Ø
8"Ø
Ø
Ø
Ø
Ø
24/12
32/12
18/12 SA
10"Ø
14"Ø
14"Ø
Ø
TU-50-11
ATU
TU-50-13
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-24
TU-54-13
TU-54-12
TU-54-14
TU-54-20
TU-54-21
TU-54-15
TU-54-16
TU-54-11
TU-54-10
TU-54-7
TU-54-8
TU-54-4
TU-54-6
TU-54-5
TU-50-12
(N)TU-54-18
TU-54-19
18"Ø
10"Ø
8"Ø
10"Ø
8"Ø
10"Ø
10"Ø
10"Ø
6"Ø
6"Ø
Ø
16"Ø
6"Ø EXH
12"Ø
6"Ø
10"Ø
6"Ø
8"Ø
8"Ø
8"Ø
22x22
(N)TU-54-25
(N)ATU-54-27
X
14"Ø
12"Ø
10"Ø
14"Ø
14"Ø
14"Ø
14"Ø
14"Ø
20"Ø
10"Ø
10"Ø
10"Ø
10"Ø
10"Ø
10"Ø
24"Ø
14"Ø
14"Ø
(N)TU-54-22
16"Ø
4 13
TU-54-24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e ITRACK 3A, 2B, 4A WORK 1/8" = 1'-0"
N
TAG
T3A-R
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
4.3A
4 T4A-D 3.4A
2 T3B-R 4.3B
3 T4A-S 1.4A, 2.4A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
DEMOLISH SUPPLY AND EXHAUST DUCTWORK FROM
TU-54-9, -24, -23, -3, & -2 AT POINTS OF DISCONNECT.
DEMOLISH AND REPLACE TU-54-9 AT POINTS OF
DISCONNECT. DEMOLISH TU-54-24.
SUPPLY AND EXHAUST DUCTWORK PROVIDED IN
TRACK 3A-S TO REMAIN FOR TEMP SPECL CHEM
SWINGSPACE.
PROVIDE NEW SUPPLY AND EXHAUST DUCTWORK FOR
TU-54-10, -7, & -14 AT POINTS OF CONNECTION. INSTALL (N)
TU-54-27 WITH SUPPLY DUCTWORK TO MAIN SUPPLY DUCT AT
POINT OF CONNECTION. INSTALL (N)TU-54-18 WITH SUPPLY
DUCTWORK AT POINT OF CONNECTION.
PROVIDE EXHAUST DUCTWORK AND INSTALL (N) TU-54-25
WITH SUPPLY DUCTWORK AT POINTS OF CONNECTION TO
SERVE IRRADIATOR ROOM. PROVIDE EXHAUST DUCTWORK
AND SUPPLY DUCTWORK FROM (N) TU-54-22 AT POINTS OF
CONNECTION.
MECHANICAL TRACK 3A, 3B, 4A
AG JG
MH403i
3RD FLOOR INTERSTITIAL PLAN
EXISTING DUCTWORK NOTES
1 63/32" Ø EXH 100-EF70
2 38/32" Ø EXH 100-EF70
3 50/32" Ø SA 100-AH54
4 16" Ø EXH 100-EF70A
5 44/20" Ø SA TO 100-AH50
6 38/32" Ø EXH 100-EF36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BREAK
ROOM
3A-117
STERILE
STORAGE
3A-119C
FUTURE
CYTOMETRY
3A-122A
SUPERVISOR
SPECIAL
CHEMISTRY
3A-120K
SUPERVISOR
IN-PATIENT
3A-120L
E
F
G
14 13
H
SPECIAL
CHEMISTRY
LAB
3A-120
HEMATOLOGY
LAB
3A-120C
BREAK
ROOM
3A-117
ELECTRO
MICROSCOPY
3A-215
BB
BREAK
ROOM
3A-121B
BIOFRIDGE
3A-121D
EDUCATION
3A-118
BLOOD
BANK
LAB
3A-121
IRRADIATOR
RM
3A-121A
STERILE
STORAGE
3A-119C
FUTURE
CYTOMETRY
3A-122A
CHEM/
HEMA
IMMED
RESP
LAB
BB
SUPERVISOR
C3A-103
BULK
STO.
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
FREEZER
STO.
3A-119A
CORR.
C3A-102
COMPRESSOR
RM.
3A-119
CORR
C3A-209A
SD-15-08"Ø
200 CFM
TYP FOR 2
CD-30-10"Ø
320 CFM
TYP FOR 5
EG-26-18
680 CFM
TYP FOR 3
CD-30-10"Ø
320 CFM
SD-15-08"Ø
190 CFM
TYP FOR 2
EG-26-14
680 CFM
TYP FOR 2
CD-30-10"Ø
320 CFM
TYP FOR 3
CD-30-10"Ø
320 CFM
TYP FOR 3
SD-15-08"Ø
200 CFM
TYP FOR 5
EG-26-18
500 CFM
TYP FOR 6
SD-15-08"Ø
200 CFM
SD-15-08"Ø
200 CFM
EG-27-22x10
160 CFM
EG-27-22x10
160 CFM
100-H69
SD-15-10
250 CFM
EG-26-12
250 CFM
EG-28-6
80 CFM
EG-26-12
180 CFM
SD-15-10"Ø
240 CFM
EG-28-6
80 CFM
SD-40-06
50 CFM
TU54-22
TU50-12
50 CFM
50 CFM
50 CFM
TU50-25
TU54-8
TU54-24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
TRACK 4A, 5A WORK
1/8" = 1'-0"1
N
TAG
T4A-R
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
4.4A
2 T5A-S 2.5A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
PROVIDE NEW SUPPLY AND EXHAUST DIFFUSERS AND GRILLES
FOR 3A-120K, 3A-120L & 3A-120B. PROVIDE AND CONNECT NEW
DUCTWORK BELOW 3RD FLOOR INTERSTITIAL SPACE. PROVIDE
THERMOSTATS AND CONNECT TO (E)TU-54-2, -3 & (N)TU-54-9.
PROVDE TEMP SUPPLY DIFFUSERS & EXHAUST
GRILLES IN TEMP WORK AREA ACCORDING TO
BALANCE TABLE.
MECHANICAL TRACK 4A, 5A
AG JG
MH503-A
3RD FLOOR PLAN
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
G
14 13
H
SPECIAL
CHEMISTRY
LAB
3A-120
HEMATOLOGY
LAB
3A-120C
BREAK
ROOM
3A-117
ELECTRO
MICROSCOPY
3A-215
BB
BREAK
ROOM
3A-121B
BIOFRIDGE
3A-121D
EDUCATION
3A-118
BLOOD
BANK
LAB
3A-121
IRRADIATOR
RM
3A-121A
STERILE
STORAGE
3A-119C
FUTURE
CYTOMETRY
3A-122A
CHEM/
HEMA
IMMED
RESP
LAB
BB
SUPERVISOR
C3A-103
BULK
STO.
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
FREEZER
STO.
3A-119A
CORR.
C3A-102
COMPRESSOR
RM.
3A-119
SPECIMEN
COLLECTION
WAITING
3A-115
TOILET
3A-115B
SPECIMEN
COLLECTION
3A-115A
TOILET
3A-115C
CORR
C3A-209A
TU54-22
TU50-12
50 CFM
50 CFM
50 CFM
TU50-25
E4-1500EXH
SUP
D7-750
E4-1500
EXH
SD-15-10
250 CFM
EG-26-12
250 CFM
EG-28-6
80 CFM
EG-26-12
180 CFM
SD-15-10"Ø
240 CFM
EG-28-6
80 CFM
SD-40-06
50 CFM
TU54-8
TU54-24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
TRACK 4A, 5A WORK
1/8" = 1'-0"1
N
TAG TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
1 T5A-R 3.5A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
SUPPLY DIFFUSERS & EXHAUST GRILLES IN TEMP
WORK AREA TO REMAIN FOR FINAL USE. BALANCE TO
AIRFLOWS SHOWN ON PLAN.
MECHANICAL TRACK 5A, 5B
AG JG
MH503-B
3RD FLOOR PLAN
2 T5B-D 1.5B DEMOLISH SUPPLY DIFFUSERS & EXHAUST GRILLES IN
WORK AREA. DISCONNECT TU-54-24 THERMOSTAT, IT WILL
BE RELOCATED IN FUTURE TRACK, SEE SHEET MH703-A.
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
10"Ø
6"Ø
8"Ø
8"Ø
8"Ø
Ø
16"Ø
6"Ø EXH
12"Ø
6"Ø
TU-50-11
ATU
TU-50-13
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-13
TU-54-12
TU-54-14
TU-54-20
TU-54-21
TU-54-15
TU-54-16
TU-54-11
TU-54-10
TU-54-7
TU-54-8
TU-54-4
TU-54-6
TU-54-5
TU-50-12
TU-54-18
TU-54-19
12"Ø
8"Ø
8"Ø
8"Ø
8"Ø
8"Ø
8"Ø
Ø
22"Ø
14"Ø
12"Ø
10"Ø
10"Ø
10"Ø
12"Ø
10"Ø
10"Ø
10"Ø
10"Ø
10"Ø
14"Ø
24"Ø
22"Ø
Ø
Ø
Ø
Ø
Ø
16"Ø
18"Ø
Ø
Ø
14"Ø
4 13
10"Ø
12"Ø
16"Ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e ITRACK 4A, 5A WORK 1/8" = 1'-0"
N
TAG
T4A-R
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
4.4A
2 T5A-S 2.5A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
INSTALL (N) TU-54-9 AT POINTS OF CONNECTION. PROVIDE
NEW SUPPLY AND EXHAUST DUCTWORK FROM (N)TU-54-9, -23,
-3, & -2 AT POINTS OF CONNECTION.
MECHANICAL TRACK 4A, 5A
AG JG
MH503i-A
3RD FLOOR INTERSTITIAL PLAN
DEMOLISH SUPPLY DUCTWORK FROM TU-54-24 AT
POINTS OF DISCONNECT.
EXISTING DUCTWORK NOTES
1 63/32" Ø EXH 100-EF70
2 38/32" Ø EXH 100-EF70
3 50/32" Ø SA 100-AH54
4 16" Ø EXH 100-EF70A
5 44/20" Ø SA TO 100-AH50
6 38/32" Ø EXH 100-EF36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
15"Ø
DN.
UP
E
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
10"Ø
6"Ø
8"Ø
8"Ø
8"Ø
Ø
16"Ø
6"Ø EXH
12"Ø
6"Ø
TU-50-11
ATU
TU-50-13
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-13
TU-54-12
TU-54-14
TU-54-20
TU-54-21
TU-54-15
TU-54-16
TU-54-11
TU-54-10
TU-54-7
TU-54-8
TU-54-4
TU-54-6
TU-54-5
TU-50-12
TU-54-18
TU-54-19
4 13
10"Ø
12"Ø
16"Ø
14"Ø
16"Ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e ITRACK 4A, 5A WORK 1/8" = 1'-0"
N
TAG
T4A-R
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
4.4A
2 T5A-S 2.5A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
NO NEW WORK NEEDED.
3 T5B-D 1.5B
MECHANICAL TRACK 4A, 5A
AG JG
MH503i-B
3RD FLOOR INTERSTITIAL PLAN
PROVIDE NEW SUPPLY DUCTWORK FROM TU-54-1 AT
POINTS OF CONNECTION.
DEMOLISH SUPPLY DUCT FROM TU-54-24 & TU-54-1 AT POINTS
OF DISCONNECT. DEMOLISH EXHAUST DUCTWORK AT POINTS
OF DISCONNECT.
EXISTING DUCTWORK NOTES
1 63/32" Ø EXH 100-EF70
2 38/32" Ø EXH 100-EF70
3 50/32" Ø SA 100-AH54
4 16" Ø EXH 100-EF70A
5 44/20" Ø SA TO 100-AH50
6 38/32" Ø EXH 100-EF36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BLOOD
BANK
LAB
3A-121
IRRADIATOR
RM
3A-121A
BREAK
ROOM
3A-117
ELECTRO
MICROSCOPY
3A-215
C
O
R
R
C
A
A
BB
REAK
ROOM
3A-121B
BULK
STORAGE
3A-119D
WALK-IN
REFRIGERATOR
3A-119B
FREEZER
3A-119A
COMPRESSOR
3A-119
STERILE
STORAGE
3A-119C
FUTURE
CYTOMETRY
3A-122A
HEMATOLOGY
3A-120C
SPECIAL
CHEMISTRY
LAB
3A-120
BB
SUPERVISOR
3A-121B
BIOFRIDGE
3A-121D
EDUCATION
3A-118
CHEMISTRY
LAB
3A-120B
C
O
R
R
C
A
SUPERVISOR
SPECIAL
CHEMISTRY
3A-120K
SUPERVISOR
IN-PATIENT
3A-120L
E
F
G
14 13
H
SPECIMEN
COLLECTION
WAITING
3A-115
TOILET
3A-115B
SPECIMEN
COLLECTION
3A-115A
TOILET
3A-115C
CORR
C3A-209A
TU54-22
TU50-12
50 CFM
50 CFM
50 CFM
TU50-25
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D6-525
SUP
D6-525
SUP
D6-525
SUP
D6-525
SUP
L8-300
SUP L7-300
SUP L8-320
E2-260
E2-240
E2-240
EXH
EXH
EXH
E4-1500
E4-1500
E4-1500
E4-1500
EXH
EXH
EXH
EXH
TU-54-6
TU-54-5
100-H71
TEMP
SUP
500 CFM
TEMP
SUP
500 CFM
TEMP
EXH
500 CFM
TEMP
EXH
500 CFM
14"
14"
SD-15-12"Ø
300 CFM
EG-26-18
460 CFM
SD-15-12"Ø
300 CFM
EG-26-18
460 CFM
TU54-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
TRACK 6A, 7A WORK
1/8" = 1'-0"1
N
TAG
T6A-D
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
2.6A
3 T7A-D 2.7A
1 T5B-R 1.6A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
PROVIDE NEW SUPPLY DIFFUSERS & EXHAUST
GRILLES. PROVIDE AND CONNECT NEW DUCTWORK
BELOW 3RD FLOOR INTERSTITIAL SPACE.
DEMOLISH SUPPLY DIFFUSERS AND EXHAUST GRILLES
SERVING 3A-120B. DEMO AND/OR RELOCATE WALL
THERMOSTATS.
DEMOLISH SUPPLY DIFFUSERS AND EXHAUST GRILLES
SERVING 3A-120C, 3A-120D & 3A-120E. DEMO AND/OR
RELOCATE WALL THERMOSTATS.
MECHANICAL TRACK 6A, 7A
AG JG
MH603
3RD FLOOR PLAN
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3A-120C
CHEMISTRY
LAB
3A-120B
E
14 13
TOILET
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D7-750
SUP
D6-525
SUP
D6-525
SUP
D6-525
SUP
D6-525
SUP
L8-300
SUP L7-300
SUP L8-320
E2-260
E2-240
E2-240
EXH
EXH
EXH
E4-1500
E4-1500
E4-1500
E4-1500
EXH
EXH
EXH
EXH
TU-54-6
TU-54-5
100-H71
TEMP
SUP
500 CFM
TEMP
SUP
500 CFM
TEMP
EXH
500 CFM
TEMP
EXH
500 CFM
14"
14"
SD-15-12"Ø
300 CFM
EG-26-18
460 CFM
SD-15-12"Ø
300 CFM
EG-26-18
460 CFM
TU54-8
E
UNOCCUPIED
MECHANICAL &
SERVICE
12"Ø
10"Ø
12"Ø
10"Ø
10"Ø
10"Ø
10"Ø
10"Ø
14"Ø
24"Ø
Ø
Ø
16"Ø
18"Ø
Ø
14"Ø
10"Ø
14"Ø
14"Ø
14"Ø
14"Ø
20"Ø
10"Ø
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-11
TU-54-10
TU-54-7
TU-54-8
TU-54-4
TU-54-6
TU-54-5
14"Ø DN
14"Ø DN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
GENERAL NOTES
KEY NOTES
MECHANICAL TRACK 6A, 7A CONT
AG JG
MH603-A
3RD FLOOR PLAN
PROVIDE TEMPORARY SUPPLY DUCT FROM TU-54-5 DOWN THROUGH INTERSTITIAL SPACE. TO BE REMOVED
AND CAPPED AFTER NEW SUPPLY DUCT INSTALLED.
PROVIDE TEMPORARY SUPPLY DUCT AND DIFFUSER THRU TEMPORARY BARRIER TO SUPPLY AIR
TO GEN CHEM AREA. TO BE REMOVED AFTER TRACK 6A RENOVATION WORK
PROVIDE TEMPORARY EXHAUST GRILLE THRU TEMPORARY BARRIER TO EXHAUST AIR
FROM GEN CHEM AREA. TO BE REMOVED AFTER TRACK 6A RENOVATION WORK.
CONTRACTOR TO PROVIDE TEMPORARY ENCLOSURE FOR GENERAL CHEM AREA.
TRACK 6A TEMP 3RD FLOOR
1/8" = 1'-0"1
N
TRACK 6A TEMP 3RD FLOOR INTERSTITIAL
1/8" = 1'-0"1
N
5 DEMOLISH TU-54-5 AT POINTS OF DISCONNECT. REPLACE TO (N)TU-54-5 BEFORE START OF
TEMPORARY WORK FOR THIS AREA.
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
12"Ø
16"Ø
Ø
16"Ø
6"Ø EXH
12"Ø
6"Ø
10"Ø
6"Ø
8"Ø
8"Ø
8"Ø
TU-50-11
ATU
TU-50-13
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-13
TU-54-12
TU-54-14
TU-54-20
TU-54-21
TU-54-15
TU-54-16
TU-54-11
TU-54-10
TU-54-7
TU-54-8
TU-54-4
TU-54-6
TU-54-5
TU-50-12
TU-54-18
TU-54-19
15"Ø
DN
15"Ø
DN
Ø
D
N
14"Ø
14"Ø
16/12
16/12
Ø
10"Ø
DN
DN
DN
Ø
6"Ø
6"Ø
(N)TU-54-10
14"Ø
14"Ø
Ø
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e ITRACK 6A, 7A WORK 1/8" = 1'-0"
N
TAG
T6A-D
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
2.6A
3 T7A-D 2.7A
1 T6A-S 1.6A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
DEMOLISH SUPPLY AND EXHAUST DUCTWORK FROM
TU-54-1 & -4 AT POINTS OF DISCONNECT. DEMOLISH AND
REPLACE TU-54-4 AT POINTS OF DISCONNECT.
MECHANICAL TRACK 6A, 7A
AG JG
MH603i
3RD FLOOR INTERSTITIAL PLAN
SUPPLY AND EXHAUST DUCTWORK PROVIDED IN
TRACK 3A-S TO REMAIN FOR GENERAL CHEM
SWINGSPACE.
DEMOLISH SUPPLY AND EXHAUST DUCTWORK FROM
TU-54-5 & -6 AT POINTS OF DISCONNECT. DEMOLISH AND
REPLACE TU-54-5 AT POINTS OF DISCONNECT.
EXISTING DUCTWORK NOTES
1 63/32" Ø EXH 100-EF70
2 38/32" Ø EXH 100-EF70
3 50/32" Ø SA 100-AH54
4 16" Ø EXH 100-EF70A
5 44/20" Ø SA TO 100-AH50
6 38/32" Ø EXH 100-EF36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SUPERVISOR
3A-120E
TOILET
3A-115C
CHEMISTRY
SUPERVISOR
3A-120F
LAB
ASSISTANT
MANAGER
3A-120I
LAB
MANAGER
3A-120H
STAFF
PHYSICIAN
3A-120D
HEMATOLOGY
3A-120C
SPECIAL
CHEMISTRY
LAB
3A-120
CHEMISTRY
LAB
3A-120B
SUPERVISOR
SPECIAL
CHEMISTRY
3A-120K
SUPERVISOR
IN-PATIENT
3A-120L
E
F
G
14 13
J
K
H
ELECTRO
MICROSCOPY
3A-215
BB
BREAK
ROOM
3A-121B
BIOFRIDGE
3A-121D
EDUCATION
3A-118
BLOOD
BANK
LAB
3A-121
IRRADIATOR
RM
3A-121A
STERILE
STORAGE
3A-119C
FUTURE
CYTOMETRY
3A-122A
BB
SUPERVISOR
C3A-103
BULK
STO.
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
FREEZER
STO.
3A-119A
CORR.
C3A-102
COMPRESSOR
RM.
3A-119
SPECIMEN
COLLECTION
WAITING
3A-115
TOILET
3A-115B
SPECIMEN
COLLECTION
3A-115A
BREAK
ROOM
3A-117
CORR
C3A-209A
TU50-25
TU50-13
TU54-22
TU50-12
50 CFM
50 CFM
50 CFM
SD-15-14"Ø
620 CFM
TYP FOR 4
EG-26-22
875 CFM
TYP FOR 3
SD-15-12"Ø
355 CFM
TYP FOR 7
EG-26-22
830 CFM
TYP FOR 3
SD-15-12"Ø
300 CFM
TYP FOR 4
EG-26-18
460 CFM
TYP FOR 2
SD-15-12"Ø
300 CFM
SD-15-12"Ø
300 CFM
EG-27-22x10
250 CFM
EG-27-22x10
250 CFM
EG-27-22x10
400 CFM
SD-15-12"Ø
300 CFM
SD-15-12"Ø
300 CFM
SD-15-12"Ø
300 CFM
EG-27-22x10
255 CFM
EG-27-22x10
260 CFM
SD-15-12"Ø
300 CFM
EG-27-22x10
260 CFM
SD-15-10
250 CFM
EG-26-12
250 CFM
EG-28-6
80 CFM
EG-26-12
180 CFM
SD-15-10"Ø
240 CFM
EG-28-6
80 CFM
SD-40-06
50 CFM
SD-40-06
50 CFM
TU-54-26
TU-54-6
TU-54-8
TU54-14
TU50-11
TU54-22
TU-54-7
TU54-27
TU54-10
TU54-9
TU54-3
TU54-2
TU54-1
TU54-5
TU54-4
TU54-26
TU54-6
TU54-8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
FINAL WORK
1/8" = 1'-0"1
N
TAG
T6A-R
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
2.6A
2 T7A-R 3.7A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
PROVIDE NEW SUPPLY AND EXHAUST DIFFUSERS AND
GRILLES FOR 3A-120B. PROVIDE AND CONNECT NEW
DUCTWORK BELOW 3RD FLOOR INTERSTITIAL SPACE.
PROVIDE THERMOSTATS AND CONNECT TO (E)TU-54-1, -4, & -5.
PROVIDE NEW SUPPLY AND EXHAUST DIFFUSERS AND
GRILLES FOR 3A-120I, 3A-120H, 3A-120F, 3A-120E, 3A-120D.
PROVIDE AND CONNECT NEW DUCTWORK BELOW 3RD FLOOR
INTERSTITIAL SPACE. PROVIDE THERMOSTATS AND CONNECT
TO (E)TU-54-6 & (N)TU-54-26.
MECHANICAL FINAL TRACK 6A, 7A
AG JG
MH703
3RD FLOOR PLAN
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
3A-115C
SPECIAL
CHEMISTRY
LAB
3A-120
CHEMISTRY
LAB
3A-120B
SUPERVISOR
SPECIAL
CHEMISTRY
3A-120K
SUPERVISOR
IN-PATIENT
3A-120L
E
F
G
H
BULK
STO.
3A-119D
SPECIMEN
COLLECTION
WAITING
3A-115
TOILET
3A-115B
SPECIMEN
COLLECTION
3A-115A
BREAK
ROOM
3A-117
EG-26-10
290 CFM
(E)SUP
D3-170
(E)SUP
D3-170
(E)SUP
D3-130
75CFM
75CFM
2 2
TOILET'S NEW
THERMOSTAT AND
CONDUIT FOR THE NEW
BOX TU-54-24
TU-54-7
TU54-9
TU54-3
TU54-2
TU54-1
TU54-5
TU54-4
TU54-24
UP
E
F
G
H
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
10"Ø
8"Ø
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-13
TU-54-12
TU-54-7
TU-54-8
16"Ø
9"Ø
Ø
(N)TU-54-24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e I
----- CONSTRUCTION ZONE
----- TEMPORARY ZONE
----- RENOVATED ZONE
TRACK 6A, 7A 3RD FLOOR PLAN
1/8" = 1'-0"2
N
GENERAL NOTES
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
6. REBALANCE NEW EXHAUST GRILLES AND SUPPLY DIFFUSERS TO AIRFLOW AS SHOWN ON DRAWING.
DEMOLITION:
1. ALL DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. THE CONTRACTOR SHALL FIELD SURVEY THE EXISTING CONDITIONS PRIOR TO STARTING ANY WORK.
3. DURING DEMOLITION, THE CONTRACTOR SHALL ALWAYS BE AWARE OF THE INTENDED FINAL RENOVATED
CONDITIONS OF THE BUILDING AND THE REASON OF DEMOLITION WORK IS BEING DONE.
4. THE CONTRACTOR SHALL RESTORE TO ITS EXISTING CONDITION ANY EXISTING WORK DAMAGED DURING
DEMOLITION INDICATED "EXISTING TO REMAIN" ON THE DRAWINGS.
5. THE CONTRACTOR SHALL TURN OVER ALL DEMOLISHED EQUIPMENT AND MATERIALS, OR DISPOSE AS DIRECTED BY THE OWNER. CONTRACTOR SHALL INCLUDE ANY DISPOSAL FEE AS REQUIRED AS PART OF BASE BID.
6. WHEN EXISTING INTERSTITIAL SPACE FLOOR SLAB OPENING FOR DEMOLISHED DUCTWORK WILL NOT BE RE-USED, THEN PATCH OPENING WITH METAL DECK TO MATCH EXISTING. PROVIDE UL APPROVED FIREPROOFING FOR
THE PATCHED SLAB AND STRUCTURAL SUPPORT TO MATCH EXISTING.
7. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE
SAFETY ORDINANCES PRIOR TO START OF DEMOLITION. REMOVE WHEN NO LONGER NEEDED.
8. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
9. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF 2 HOUR RESPONSE TIME FOR ANY
OUTAGES.
MECHANICAL FINAL TRACK 6A, 7A
AG JG
MH703-A
3RD FLOOR PLAN CONT
TRACK 6A,7A 3RD FLOOR INTERSTITIAL PLAN
1/8" = 1'-0"1
N
KEY NOTES
1 PROVIDE NEW SUPPLY DUCTWORK CONNECTION FROM (N)TU-54-24 TO EXISTING SUPPLY DUCTWORK SERVING MEN/WOMEN'S RESTROOMS. CONTRACTOR TO COORDINATE DOWNTIME WITH VA SO AS TO
REROUTE GUESTS TO OTHER BATHROOMS DURING CONSTRUCTION.
2 RE-BALANCE SUPPLY DIFFUSERS IN MEN/WOMEN RESTROOMS TO 225 CFM EACH.
3 RE-BALANCE EXHAUST GRILLES IN MEN/WOMEN RESTROOMS TO 300 CFM EACH.
4 RE-BALANCE SUPPLY DIFFUSER IN CORRIDOR TO 150 CFM.
5 INSTALL NEW THERMOSTAT IN WOMEN'S BATHROOM, RUN NEW WIRE AND CONDUIT TO (N) TU-54-24.
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
F
G
H
J
K
STAIR
ST-13
ELEVATOR
P-13
ELEVATOR
P-16
UNOCCUPIED
MECHANICAL &
SERVICE
10"Ø
6"Ø
8"Ø
8"Ø
8"Ø
TU-50-11
ATU
TU-50-13
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
ATU
TU-54-1
TU-54-2
TU-54-3
TU-54-9
TU-54-23
TU-54-13
TU-54-12
TU-54-14
TU-54-20
TU-54-21
TU-54-15
TU-54-16
TU-54-11
TU-54-10
TU-54-7
TU-54-8
(N)TU-54-4
TU-54-6
(N)TU-54-5
TU-50-12
TU-54-18
TU-54-19
10"Ø
Ø
16"Ø
6"Ø EXH
12"Ø
6"Ø
(N)TU-54-25
(N)ATU-54-26
(N)ATU-54-27
14"Ø
14"Ø
16"Ø
10"Ø
8"Ø
8"Ø
12"Ø
14"Ø
Ø
14"Ø
14"Ø
14"Ø
14"Ø
16"Ø
Ø
10"Ø
10"Ø
12"Ø
14"Ø
14"Ø
10"Ø
10"Ø
10"Ø
Ø
Ø
Ø
18"Ø
18"Ø
18"Ø
20"Ø
10"Ø
10"Ø
12"Ø
10"Ø
16"Ø
16"Ø DN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
RENOVATION OF PATHOLOGY AND
LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100 Project Director
Revisions: Date:
315 Arden Ave. Suite 26 t: 888.900.3823 www.schwabeng.com
GLENDALE, CA 81203
PROJECT NO.: S6128180.00
March 06, 2020
Bi d D oc um en ts
Su bm itta l -
Ph as e ITRACK 6A, 7A FINAL WORK 1/8" = 1'-0"
N
TAG
T6A-R
TRACK ARCH REF. REMARKS
GENERAL NOTES
PHASING NOTES
2.6A
2 T7A-R 3.7A
REMODEL:
1. ALL REMODEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
2. PROVIDE TEMPORARY ENCLOSURE/PROTECTION/BARRICADES OR WARNING WHERE REQUIRED BY APPLICABLE SAFETY ORDINANCES PRIOR TO START EACH PHASE OF CONSTRUCTION. REMOVE WHEN NO
LONGER NEEDED.
3. REFER TO CONSTRUCTION PHASING FOR INSTALLATION SEQUENCE.
4. CONSTRUCTION FOR EACH PHASE SHOULD BE PERFORMED WITHOUT LABORATORY SUITE INTERRUPTION.
5. COORDINATE WITH VA ANY DOWN TIME WHICH REQUIRES A MAXIMUM OF…