580-18-118 Project Drawings - Dated 3-6-2020 - Part I.pdf
PDF 17 MB Posted
- Solicitation number
- 36C25620R0113
About this file
This document provides details for a federal contract opportunity to renovate pathology and laboratory space at the Michael E. DeBakey VA Medical Center in Houston, Texas. The solicitation number is 36C25620R0113 and seeks to award a firm-fixed price construction contract between $2 million and $5 million to furnish all labor, materials, tools and equipment for demolition, structural, architectural, mechanical, electrical, plumbing, communications, fire protection and interior finishes work. The period of performance is 810 calendar days from notice to proceed. This opportunity is only available to service-disabled veteran-owned small businesses. At least 15% of contract costs must be spent on employees of SDVOSBs. The solicitation will be issued as a request for proposals on July 21, 2020. The North American Industry Classification System code assigned is 236220 and the small business size standard is $39.5 million in average annual receipts. Offerors must register on various websites and have certifications completed by the solicitation due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25620R0113 0002.docx | DOCX document | |
| 28 13 00 Physical Access Control Specification.pdf | ||
| VAHPLB100_PHASE III_Delta 1 Drawings.pdf | ||
| 580-18-118 Structural Sheets.pdf | ||
| Revised Proposal Submission Requirements 8-17-20.docx | DOCX document | |
| 36C25620R0113 0001.docx | DOCX document | |
| 087100r2 Door Hardware_08-07-2020.docx | DOCX document | |
| 580-18-118 Pneumatic Sheets.pdf | ||
| 085113 Aluminum Windows.doc | DOC document | |
| Egress Plan.pdf | ||
| 580-18-118 Project Statement of Work.docx | DOCX document | |
| 36C25620R0113_1.docx | DOCX document | |
| SF24 BID BOND.pdf | ||
| 580-18-118 Project Drawings - Dated 3-6-2020 - Part III.pdf | ||
| 580-18-118 Project Drawings - Dated 3-6-2020 - Part II.pdf | ||
| Site Visit Instructions for Project 580-18-118.docx | DOCX document | |
| DOL Wage Determinations TX20200253 02-14-2020.pdf | ||
| 580-18-118 Project Specifications.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALL SECTION AND DETAIL SYMBOLS:
BUILDING SECTIONS:
SHEET NUMBER
SHEET NUMBER
DRAWING NUMBER
DIRECTION
BUILDING SECTION
NUMBER
ELEVATION SYMBOLS:
SHEET NUMBER
DRAWING NUMBER
DIRECTION
SHEET NUMBER
DRAWING NUMBER
DIRECTION
EXTERIOR
INTERIOR
DIRECTION
A101 ##
A101
A101
A101
A101
DRAWING NUMBER
KEYNOTE TAG
DETAILS:
SHEET NUMBER
NOTE TAGS:
SIGNAGE TAG
DRAWING OR DETAIL NUMBER
ROOM FINISH TAG
RE: A6/ A101
ROOM NAME/NUMBER:
REFERENCE MARK:
NORTH ARROW SYMBOL
SHEET NUMBER
A101
SHEET NUMBER:
DISCIPLINE
SHEET IN SERIES
DEPARTMENT (B)
SUB ROOM NUMBER (A)
OFFICE
A101
ROOM NAME
B206A
ROOM NUMBER (206)20 SF
ACTUAL SQUARE FOOTAGE
N
GRID
1i EQUIPMENT, FIXTURE & ACCESSORY TAG
FURNITURE TAG
1i
1i
DOOR TAG
1t WINDOW TAG
AREA OF WORK
RENOVATE APPROXIMATELY 12,400 SF OF EXISTING PATHOLOGY AND LABORATORY SPACE ON
THE 3RD FLOOR OF B-100. THE CONSTRUCTION SHALL BE PHASED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
Renovation of Pathology and Laboratory Phase I
Michael E. DeBakey VA Medical Center Houston, Texas
580-18-118
Building 100
Bi d D oc um en ts
SU
BM
IT
TA
L - P
HA
SE
I
March 6th, 2020 SH/JARK
C :\R ev it
Lo ca l\V
AH
PL
B1
_P
H
AS
E
III
_j al la m
U 6H
AA
.rv t 8/
8/
:1 9:
P
M
GI000
TITLE SHEET
DEPARTMENT OF VETERANS AFFAIR
Michael E. DeBakey VA Medical Center VA Medical Center Houston, Texas
"RENOVATION OF PATHOLOGY AND LABORATORY PHASE I"
VICINITY MAP
LOCATION MAP SYMBOLS AND LEGEND
SCOPE OF WORK
PROJECT DIRECTORY
ARCHITECT
KAL ARCHITECTS, INC.
12-J MAUCHLY,
IRVINE, CA 92618
CONTACT: RITA KALWANI
MECHANICAL / PLUMBING
ELECTRICAL AND FIRE PROTECTION
SCHWAB
315 ARDEN AVE.,
SUITE 26
GLENDALE, CA 91203
CONTACT: SAEID HASHEMI
TEL. 949-450-8420
FAX. 949-450-8424
TEL. 818-696-2557
CELL. 818-572-3347
CODE REFERENCES
IBC 2018 INTERNATIONAL BUILDING CODE
IMC 2018 INTERNATIONAL MECHANICAL CODE
IPC 2018 INTERNATIONAL PLUMBING CODE
NFPA 70 NATIONAL ELECTRICAL CODE (NEC), 2014
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING
CODE, 2013
NFPA 101 LIFE SAFETY CODE, 2015
ANSI/IEEE C2 NATIONAL ELECTRICAL SAFETY CODE,
ADA AMERICANS WITH DISABILITIES ACT TITLE II
VA STANDARDS, MANUALS, & DESIGN GUIDES
ABAAS ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS
Project no. 580-18-118
Revisions: Date:
NUMBER SHEET TITLE
PLUMBING SHEET INDEX
P001 PLUMBING FRONT SHEET
PP103i
P002
3RD INTERSTITIAL - TRACK 1A/1B
PLUMBING SCHEDULES
P003 PLUMBING DETAILS
P004 PLUMBING RISER DIAGRAMS
PP103 3RD FLOOR PLAN - TRACK 1A/1B
PP102i 2ND INTERSTITIAL - TRACK 1A/1B
PP203i 3RD INTERSTITIAL - TRACK 2A/2B
PP203 3RD FLOOR PLAN - TRACK 2A/2B
PP202i 2ND INTERSTITIAL - TRACK 2A/2B
PP303i 3RD INTERSTITIAL - TRACK 3A/3B
PP303 3RD FLOOR PLAN - TRACK 3A/3B
PP302i 2ND INTERSTITIAL - TRACK 3A/3B
PP403i 3RD INTERSTITIAL - TRACK 4A
PP403 3RD FLOOR PLAN - TRACK 4A
PP402i 2ND INTERSTITIAL - TRACK 4A
PP503i 3RD INTERSTITIAL - TRACK 5A/5B
PP503 3RD FLOOR PLAN - TRACK 5A
PP502i 2ND INTERSTITIAL - TRACK 5A/5B PP603i 3RD INTERSTITIAL - TRACK 6A/7A
PP603 3RD FLOOR PLAN - TRACK 6A/7A
PP602i 2ND INTERSTITIAL - TRACK 6A/7A
PP703i 3RD INTERSTITIAL - TRACK 8
PP703 3RD FLOOR PLAN - TRACK 8
PP702i 2ND INTERSTITIAL - TRACK 8
NUMBER SHEET TITLE
ELECTRICAL SHEET INDEX
FIRE PROTECTION FRONT SHEETFP001
NUMBER SHEET TITLE
FIRE PROTECTION SHEET INDEX
NUMBER SHEET TITLE
STRUCTURAL SHEET INDEX
S101 GENERAL NOTES & TYPICAL DETAILS
S201 THIRD FLOOR FRAMING PLAN
S202 SECTION & DETAILS
PT-1.00 MECHANICAL RISER DIAGRAM
PT-3.00 STANDARD SUPPORT DETAILS
PT-3.01 STANDARD STATION DETAILS
NUMBER SHEET TITLE
PNEUMATIC SHEET INDEX
PT-2.03 THIRD FLOOR PLAN
MECHANICAL SHEET INDEX
NUMBER SHEET TITLE
MECHANICAL FRONT SHEET
M-002 MECHANICAL SCHEDULES
M-001
M-007
M-003
MECHANICAL EQUIPMENT LIST HEAT LOADSM-004
MECHANICAL EQUIPMENT LIST HEAT LOADSM-005
MECHANICAL EQUIPMENT LIST HEAT LOADSM-006
MECHANICAL HEAT LOADS ZONING PLAN
MECHANICAL SCHEDULES
M-008 MECHANICAL CONTROLS
MH103 MECHANICAL TRACK 1A, 1B 3RD FLOOR PLAN
MH103i MECHANICAL TRACK 1A, 1B 3RD FLOOR INTERSTITIAL PLAN
MH203 MECHANICAL TRACK 1A, 1B, 2A, 2B 3RD FLOOR PLAN
MH203i MECHANICAL TRACK 1A, 1B, 2A, 2B 3RD FLOOR INTERSTITIAL PLAN
MH303 MECHANICAL TRACK 2B, 3A, 3B 3RD FLOOR PLAN
MH303i MECHANICAL TRACK 2A, 2B, 3A, 3B 3RD FLOOR INTERSTITIAL PLAN
MH403 MECHANICAL TRACK 3A, 3B, 4A 3RD FLOOR PLAN
MH403i MECHANICAL TRACK 3A, 3B, 4A 3RD FLOOR INTERSTITIAL PLAN
MH503 MECHANICAL TRACK 4A, 5A 3RD FLOOR PLAN
MH503i-A MECHANICAL TRACK 4A, 5A 3RD FLOOR INTERSTITIAL PLAN
MH603 MECHANICAL TRACK 6A, 7A 3RD FLOOR PLAN
MH603i MECHANICAL TRACK 6A, 7A 3RD FLOOR INTERSTITIAL PLAN
MH703 MECHANICAL FINAL TRACK 6A, 7A 3RD FLOOR PLAN
MH703i MECHANICAL FINAL TRACK 6A, 7A 3RD FLOOR INTERSTITIAL PLAN
MH102i MECHANICAL TRACK 1A 2ND FLOOR INTERSTITIAL PLAN MH102i-A MECHANICAL TRACK 1A CONT 2ND FLOOR INTERSTITIAL PLAN
M-003-A MECHANICAL SCHEDULES
MD100 MECHANICAL DEMO PIPING 3RD FLOOR INTERSTITIAL
MH100 MECHANICAL NEW PIPING 3RD FLOOR INTERSTITIAL
MH603-A MECHANICAL TRACK 6A, 7A CONT 3RD FLOOR PLAN
MH703-A MECHANICAL FINAL TRACK 6A, 7A CONT 3RD FLOOR PLAN
M-009 MECHANICAL DETAILS
M-010 MECHANICAL DETAILS
M-011 MECHANICAL DETAILS
M-012 MECHANICAL DETAILS
M-013 MECHANICAL DETAILS
MH101 MECHANICAL WORK FOR MECHANICAL ROOMS
ARCHITECTURAL SHEET INDEX
NUMBER SHEET TITLE
GI001 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
GI002 LIFE SAFETY PLAN
GI003 SIGNAGE PLAN
GI004 ACCESSIBILITY STANDARD
GC101 PHASING PLAN TRACK 1A & 1B
GC102 PHASING PLAN TRACK 2A & 2B
GC103 PHASING PLAN TRACK 3A & 3B
GC104 PHASING PLAN TRACK 4A
GC105 PHASING PLAN TRACK 5A
GC106 PHASING PLAN TRACK 6A & 7A
GC107 PHASING PLAN TRACK 8
AD101 3RD FLOOR PHASE 1 DEMOLITION PLAN
AD102 3RD FLOOR PHASE 1 REFLECTED CEILING DEMOLITION PLAN
AE100 3RD FLOOR DIMENSION PLAN
AE101 3RD FLOOR PHASE 1 OVERALL PLAN
AE102 PHASE 1 ENLARGED PLAN AREA A
AE103 PHASE 1 ENLARGED PLAN AREA B
AE104 PHASE 1 ENLARGED PLAN AREA C
AE105 3RD FLOOR PHASE 3 OVERALL REFLECTED CEILING PLAN
AE301 BUILDING SECTIONS
AE400 ENLARGED TOILET PLAN & INTERIOR ELEVATIONS
AE402 CASEWORK ELEVATIONS
AE403 CASEWORK ELEVATIONS
AE404 CASEWORK ELEVATIONS
AE501 CEILING DETAILS
AE502 WALL TYPES
AE503 DETAILS
AE504 DETAILS
AE505 CASEWORK DETAILS
AE600 DOORS AND WINDOWS SCHEDULE
AE601 EXISTING SPECIALTY EQUIPMENT LIST
AE401 INTERIOR ELEVATIONS
AE602 SPECIAL EQUIPMENT SCHEDULE
AE603 FURNITURE SYSTEM, OTHER EQUIPMENT & ACCESSORIES SCHEDULE
AF101 FINISH FLOOR PLAN
FIRE PROTECTION 3RD FLOOR PIPING PLANFP103
FIRE PROTECTION 3RD FLOOR PIPING PLANFP203
FIRE PROTECTION 3RD FLOOR PIPING PLANFP303
FIRE PROTECTION 3RD FLOOR PIPING PLANFP403
FIRE PROTECTION 3RD FLOOR PIPING PLANFP503A
FIRE PROTECTION 3RD FLOOR PIPING PLANFP603
FIRE PROTECTION 3RD FLOOR PIPING PLANFP703
AF601 FINISH SCHEDULE
PP503 3RD FLOOR PLAN - TRACK 5B
MH503i-B MECHANICAL TRACK 4A, 5A 3RD FLOOR INTERSTITIAL PLAN
ELECTRICAL COVER SHEET
E002 LEGENDS SYMBOLS AND ABBREV.
E001
LIGHTING PLAN TRACK 1A & 1B
LIGHTING PLAN TRACK 1A,1B,2A & 2B
LIGHTING PLAN TRACK 3A,3B & 4A
E101
E102
E104
E105B LIGHTING PLAN TRACK 5A & 5B
E106 LIGHTING PLAN TRACK 6A & 7A
E107 LIGHTING PLAN TRACK 6A & 7A
E205A POWER PLAN TRACK 4A & 5A
E302 SIGNAL PLAN TRACK 1A,1B,2A & 2B
E303 SIGNAL PLAN TRACK 2B, 3A & 3B
E201 POWER PLAN TRACK 1A & 1B
E202 POWER PLAN TRACK 1A,1B,2A & 2B
E203 POWER PLAN TRACK 2B, 3A & 3B
E206 POWER PLAN TRACK 6A & 7A
E207 POWER PLAN TRACK 6A & 7A
E301 SIGNAL PLAN TRACK 1A & 1B
E304 SIGNAL PLAN TRACK 3A,3B & 4A
E305A SIGNAL PLAN TRACK 4A & 5A
E306 SIGNAL PLAN TRACK 6A & 7A
E307 SIGNAL PLAN TRACK 6A & 7A
LIGHTING PLAN TRACK 2B,3A & 3BE103
E204 POWER PLAN TRACK 3A,3B & 4A
E403 AUXILIARY PLAN TRACK 2B,3A & 3B
E407 AUXILIARY PLAN TRACK 6A & 7A
E500 PARTIAL SINGLE LINE DIAGRAM
E401 AUXILIARY PLAN TRACK 1A & 1B
E404 AUXILIARY PLAN TRACK 3A,3B & 4A
E405A AUXILIARY PLAN TRACK 4A,5A
E406 AUXILIARY PLAN TRACK 6A & 7A
E501 PANEL SCHEDULES
E502 PANEL SCHDEULES
E600 ELECTRICAL DETAILS AREA K
E601 ELECTRICAL DETAILS AREA F
E602 ELECTRICAL DETAILS
E402 AUXILIARY PLAN TRACK 1A,1B,2A & 2B
E208 POWER PLAN TERMINAL UNIT
E105A LIGHTING PLAN TRACK 4A & 5A
E205B POWER PLAN TRACK 5A & 5B
E305B SIGNAL PLAN TRACK 5A & 5B
E405B AUXILIARY PLAN TRACK 5A & 5B
FIRE PROTECTION 3RD FLOOR PIPING PLANFP503B
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text
EXP. 06-30-21
AutoCAD SHX Text No. 29448
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text G.
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text C
GENERAL NOTES
1. THE INTENT OF THESE DRAWINGS AND SPECIFICATIONS IS TO INCLUDE ALL
LABOR, MATERIALS AND SERVICES NECESSARY FOR COMPLETION OF ALL
WORK SHOWN, PRESCRIBED, OR REASONABLY IMPLIED BUT NOT LIMITED
TO THAT EXPLICITLY INDICATED IN THE CONTRACT DOCUMENTS.
2. ALL WORK SHALL CONFORM TO ALL APPLICABLE VA STANDARDS, BUILDING
CODES, ORDINANCES, AND REGULATIONS AS ADOPTED BY LOCAL
AUTHORITIES HAVING JURISDICTION.
3. DIMENSIONS ON DRAWINGS ARE SHOWN TO CENTER LINE OF COLUMNS
AND TO FACE OF CONCRETE OR FACE OF STUD AT WALLS AND
PARTITIONS UNLESS NOTED OTHERWISE.
4. DO NOT SCALE DRAWINGS.
5. STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, FIRE ALARM
DRAWINGS ARE SUPPLEMENTAL TO THE ARCHITECTURAL DRAWINGS. THE
CONTRACTOR SHALL REVIEW ALL PLANS AND DRAWINGS. IN THE EVENT OF
CONFLICTING STATEMENTS, INSUFFICIENT INFORMATION, OR ERRORS, THE
CONTRACTOR SHALL IMMEDIATELY NOTIFY CONSTRUCTION
SUPERINTENDENT AND OBTAIN CLARIFICATION BEFORE ANY WORK IS
BEGUN. WORK INSTALLED WHERE CONFLICTING CONDITIONS EXIST SHALL
BE CORRECTED AT CONTRACTOR'S EXPENSE.
6. DIMENSIONS, DETAILS, NOTES, AND/OR SYMBOLS THAT APPLY TO ONE UNIT,
APPLY TO ALL UNITS IN LIKE SITUATIONS UNLESS NOTED OTHERWISE.
7. DETAILS NOTED AS 'TYPICAL' SHALL APPLY IN ALL LIKE CONDITIONS
UNLESS SPECIFICALLY SHOWN OR NOTED OTHERWISE. WHERE NO
SPECIFIC DETAIL IS SHOWN, THE FRAMING OR CONSTRUCTION SHALL BE
IDENTICAL OR SIMILAR TO THAT INDICATED FOR LIKE CASES OF
CONSTRUCTION IN THIS PROJECT.
8. WHENEVER AN ARTICLE, DEVICE, OR PIECE OF EQUIPMENT IS SHOWN,
INDICATED, OR REFERRED TO ON THE DRAWINGS OR IN THESE NOTES IN
THE SINGULAR NUMBER, SUCH REFERENCES APPLY TO AS MANY SUCH
ARTICLES AS ARE REQUIRED TO COMPLETE THE INSTALLATION.
9. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY
ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE PRIOR TO BEGINNING
CONSTRUCTION AND SHALL REPORT ANY DISCREPANCIES OR UNIDENTIFIED
CONDITIONS TO THE CONTRACTING OFFICER FOR RESOLUTION BEFORE
ANY WORK IS BEGUN.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MEANS, METHODS,
TECHNIQUES AND PROCEDURES EMPLOYED IN THE PERFORMANCE OF
WORK IN, ON, OR ABOUT THE JOB SITE; THE CONTRACTOR SHALL
COORDINATE AND VERIFY ALL WORK PERFORMED BY SUBCONTRACTORS.
11. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK ON,
OR RELATED TO THIS PROJECT SHALL CONDUCT THEIR OPERATIONS SO
THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE
PUBLIC IS PROTECTED, AND SHALL COMPLY WITH THE "OCCUPATIONAL
SAFETY AND HEALTH ACT" OF THE U.S. DEPARTMENT OF LABOR AND WITH
ANY AND ALL OTHER APPLICABLE STATE AND/OR LOCAL SAFETY
REGULATIONS. THE CONTRACTOR AGREES TO ASSUME SOLE AND
COMPLETE RESPONSIBILITY FOR JOB SITE SAFETY CONDITIONS DURING
THE COURSE OF CONSTRUCTION OF THIS PROJECT; THAT THIS
REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
NORMAL WORKING HOURS. AND THAT THE CONTRACTOR SHALL DEFEND,
INDEMNIFY AND HOLD HARMLESS THE GOVERNMENT AND ARCHITECT FROM
ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH
PERFORMANCE OF WORK ON THIS PROJECT.
12. UNLESS SPECIFICALLY SHOWN OR NOTED ON THE DRAWINGS, NO
STRUCTURAL MEMBER SHALL BE CUT, NOTCHED, BORED, OR OTHERWISE
MODIFIED WITHOUT PERMISSION OF THE OWNER.
13. WHETHER OR NOT DETAILED ON DRAWINGS, THE CONTRACTOR SHALL
PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BACK-UP PLATES, AND
SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL
CASEWORK AND OF ALL WALL-MOUNTED OR SUSPENDED MECHANICAL,
ELECTRICAL, OR MISCELLANEOUS EQUIPMENT.
14. NEITHER THE ARCHITECT'S REVIEW NOR APPROVAL OF SHOP DRAWINGS
SHALL RELIEVE THE GENERAL CONTRACTOR FROM RESPONSIBILITY FOR
DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS UNLESS HE HAS CALLED
THE ARCHITECT'S ATTENTION (IN WRITING) TO SUCH DEVIATIONS AT THE
TIME OF SUBMISSION, NOR SHALL IT RELIEVE HIM OF RESPONSIBILITY FOR
ERRORS OF ANY SORT IN THE SHOP DRAWINGS.
15. THE CONTRACTOR IS RESPONSIBLE TO VERIFY LOCATION OF ALL SITE
UTILITIES AND TO COORDINATE AND AVOID CONFLICT IN THE LOCATIONS OF
NEW UTILITIES. THE CONTRACTOR SHALL INCLUDE ALL NECESSARY
REROUTING CONNECTIONS IN HIS BID.
16. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE GOVERNMENT SHOULD
UNIDENTIFIED FIELD CONDITIONS BE DISCOVERED.
17. ON A SET OF DRAWINGS, THE CONTRACTOR SHALL KEEP AN UP-TO-DATE
RECORD OF "AS BUILT" CONDITIONS OF THE WORK. UPON COMPLETION OF
THE WORK, THAT SET SHALL BE RETURNED TO THE GOVERNMENT
COMPLETELY AND NEATLY POSTED SHOWING ALL ADDITIONS, DELETIONS,
CORRECTIONS, AND REVISIONS IN THE ACTUAL CONSTRUCTION OF THE
PROJECT. RECORD DRAWINGS SHALL BE SIGNED BY SUBCONTRACTORS
REPRESENTING ALL MAJOR TRADES FOR THE PROJECT AS WELL AS THE
GENERAL CONTRACTOR.
18. CONTRACTOR TO PROVIDE 3D SCANS OF THE RENOVATED AREA, IF 3D
SCANS ARE NOT AVAILABLE, CONTRACTOR TO PROVIDE LENGTH (X), DEPTH
(Y) & HEIGHT (Z) DIMENSIONS OF ALL ARCHITECTURAL ELEMENTS, TO
DEVELOP THE AS-BUILT "REVIT" FILES OF THE RENOVATED AREA.
DEMOLITION NOTES
1. SEE DEMOLITION PLANS FOR ADDITIONAL NOTES AND INFORMATION.
2. THE CONTRACTOR SHALL VISIT THE SITE TO DETERMINE THE FULL EXTENT OF
THE DEMOLITION. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AND
AREAS TO BE DEMOLISHED PRIOR TO THE COMMENCEMENT OF WORK. BRING
TO THE ATTENTION OF THE GOVERNMENT AND ARCHITECT ANY
DISCREPANCIES PRIOR TO AND DURING CONSTRUCTION.
3. MATERIALS, EQUIPMENT, OR CONSTRUCTION NOT NOTED IN THE
CONSTRUCTION DOCUMENTS ARE NOT PART OF THE NEW WORK. IF SUCH IS
DISCOVERED DURING THE COURSE OF THE WORK, CONTRACTOR SHALL
REPORT TO THE CONTRACTING OFFICER FOR FURTHER INSTRUCTION
4. COORDINATE ALL DEMOLITION WORK WITH RENOVATION WORK. COORDINATE
ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, PLUMBING AND
FIRE PROTECTION WORK WITH EACH OTHER FOR LOCATIONS, EXTENT OF
WORK AND SIZES.
5. PROTECT ADJACENT SPACES FROM DAMAGE DURING THE PROGRESS OF THE
WORK. PROVIDE TEMPORARY SAFETY BARRIERS REQUIRED BY CODE & VA
SAFETY OFFICER TO ENSURE PUBLIC SAFETY TO ALLOW BUILDING
OCCUPANCY.
6. PROVIDE TEMPORARY DUST PROOF PARTITIONS WHERE NECESSARY TO
PREVENT INFILTRATION OF DUST INTO OCCUPIED AREAS. PROVIDE
TEMPORARY WEATHER PROTECTION AS NECESSARY TO PREVENT DAMAGE TO
EXISTING FACILITIES AND TO PREVENT DISCOMFORT TO PERSONS IN
OCCUPIED AREAS.
7. NOTIFY CONTRACTING OFFICER ONE WEEK IN ADVANCE PRIOR TO CORE
DRILLING, JACK HAMMERING, CONCRETE SAWING OR OTHER NOISY VIBRATING
WORK. THIS WORK SHALL BE DONE DURING UNOCCUPIED HOURS TO MINIMIZE
THE IMPACT TO THE HOSPITAL OPERATIONS. COORDINATE W/ VA FOR THIS
WORK.
8. VERIFY DISPOSAL AND SALVAGE WITH CONTRACTING OFFICER. GOVERNMENT
RESERVES THE RIGHT TO SALVAGE ANY DEMOLITION ITEM. REMOVE, PROTECT
AND TURN OVER SUCH ITEMS TO THE GOVERNMENT.
9. ALL SALVAGEABLE ITEMS SHALL BE PROPERTY OF THE OWNER AND SHALL BE
REUSED OR STORED WHERE DESIGNATED BY THE OWNER.
10. RECEIVE CONTRACTING OFFICER APPROVAL OF DEBRIS HAULING ROUTE AND
DUMPSTER LOCATION PRIOR TO START OF WORK.
11. ALL DEBRIS SHALL BE PROMPTLY REMOVED FROM THE SITE.
12. REMOVAL OF ALL DEBRIS SHALL BE DONE CAREFULLY SO AS NOT TO DAMAGE
THE EXISTING STRUCTURE, WORK AND/OR FINISHES. IN THE EVENT ANY
DAMAGES OCCUR, THEY SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE
OWNER.
13. IN ADDITION TO DEMOLITION SHOWN: CUT, MOVE OR REMOVE ITEMS AS
NECESSARY TO PROVIDE ACCESS AND ALLOW REPAIR OR NEW WORK TO
PROCEED. INCLUDE SUCH ITEMS AS:
14. REPAIR OR REMOVAL OF HAZARDOUS OR UNSANITARY CONDITIONS
15. REMOVAL OF ABANDONED ITEMS AND ITEMS SERVING NO USEFUL PURPOSE
SUCH AS: ALL PIPING, DEAD-LEGS, CONDUIT, WIRING, DUCTWORK, DIFFUSERS
AND ANY ASSOCIATED HARDWARE/ FIXTURES ETC.
16. REMOVAL OF UNSUITABLE OR EXTRANEOUS MATERIALS NOT MARKED FOR
SALVAGE. SUCH ITEMS MAY INCLUDE ABANDONED FURNISHINGS, EQUIPMENT
AND DEBRIS SUCH AS ROTTED WOOD, RUSTED METALS AND DETERIORATED
CONCRETE.
17. CLEANING OF SURFACES OR REMOVAL OF SURFACE FINISHES AS NEEDED TO
INSTALL NEW WORK AND FINISHES.
18. ALL ABANDONED PLUMBING LINES, ELECTRICAL CONDUIT OR BOXES, A/C
DUCTS OR DIFFUSERS AND TELEPHONE CABLES SHALL BE REMOVED BACK TO
CLOSEST FEEDER POINT, AND PROPERLY CAPPED, SEALED, ETC.
19. VERIFY LOCATION OF ELECTRICAL, PLUMBING AND MECHANICAL UTILITIES,
LOCATE AND PROTECT UTILITIES TO REMAIN.
20. PROVIDE RE-ROUTING OF UTILITIES SERVING ADJACENT AREAS AS REQUIRED
FOR UNINTERRUPTED SERVICES.
21. VERIFY WITH PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS FOR ANY
ADDITIONAL DEMOLITION WORK THAT MAY BE REQUIRED FOR THE PROPER
INSTALLATION OF NEW WORK.
22. COORDINATE NEW OPENING IN EXISTING WALLS AND FLOORS WITH
MECHANICAL AND ELECTRICAL DRAWINGS FOR EXISTING PIPE AND CONDUIT
LOCATIONS.
23. WHERE EXISTING CONSTRUCTION IS CUT OR OTHERWISE DISTURBED TO
PERMIT INSTALLATION OF NEW WORK, REPAIR AND PATCH TO MATCH EXISTING
CONSTRUCTION. USE METHODS AND MATERIALS WHICH ARE SIMILAR IN
APPEARANCE AND EQUAL IN QUALITY TO THOSE AREAS BEING REPAIRED.
24. WHEN PROVIDING A CRAFTSMANLIKE TRANSITION BETWEEN THE EXISTING AND
NEW CONSTRUCTION: PATCH, REPAIR AND REFINISH EXISTING ITEMS TO THE
NEAREST ORIGINAL QUALITY OF SUCH MATERIALS AS NECESSARY TO MAKE
THE TRANSITION SEAMLESS.
25. PATCH, EXTEND AND REPAIR WORK SHALL MATCH EXISTING WORK BY USING
SKILLED WORKERS WHO ARE CAPABLE OF MATCHING THE EXISTING QUALITY
OF WORKSMANSHIP. QUALITY OF PATCHED OR EXTENDED WORK SHALL NOT
BE LESS THAN THAT SPECIFIED FOR THE NEW WORK.
26. PRODUCTS USE FOR PATCHING, EXTENDING AND MATCHING SHALL BE OF THE
SAME OR EQUAL QUALITY TO THE PRODUCTS THAT ARE USED WITHIN THE
EXISTING STRUCTURE. GENERALLY CONTRACT DOCUMENTS WILL NOT DEFINE
PRODUCTS. THE CONTRACTOR SHALL VERIFY PRODUCTS TO BE USED BY
REPORTING, INSPECTING AND TESTING. THE WORKSMANSHIP SHALL MATCH IN
ALL RESPECTS TO EXISTING CONSTRUCTION.
27. WHERE REMOVAL OF PARTITIONS RESULT IN ADJACENT SPACES BECOMING
ONE, REWORK FLOORS AND CEILINGS TO PROVIDE SMOOTH PLANES WITHOUT
BREAKS, STEPS, OR BULKHEADS. WHERE CHANGES OF PLANE OCCUR,
PROVIDE A SMOOTH TRANSITION AFTER REPORTING AND RECEIVING
INSTRUCTION FOR REPAIR.
28. PATCH OR REPLACE ANY PORTION OF AN EXISTING FINISHED SURFACE THAT IS
FOUND DAMAGED, LIFTED, DISCOLORED OR SHOWING ANY SIGNS OF
IMPERFECTION WITH MATCHING MATERIALS.
A. PROVIDE ADEQUATE SUPPORT OF SUBSTRATE PRIOR TO PATCHING THE
FINISH
B. REFINISH PATCHED PORTIONS OF PAINTED OR COATED SURFACES IN
SUCH A MANNER AS TO PRODUCE UNIFORM COLOR AND TEXTURE OVER
THE ENTIRE SURFACE.
C. WHEN EXISTING SURFACE FINISH CANNOT BE MATCHED, REFINISH
ENTIRE SURFACE TO NEAREST INTERSECTIONS.
A.F.F. - ABOVE FINISH FLOOR
ACC. - ACCESSIBLE
ACOUS. - ACOUSTICAL
ALUM. - ALUMINUM
AL/GL. - ALUMINUM STOREFRONT W/ GLASS
ANOD. - ANODIZED
AS. - ALUMINUM STOREFRONT
AUTO. - AUTOMATIC
BLDG. - BUILDING
BLK. - BLOCK
BLKG. - BLOCKING
BOT. - BOTTOM
BSMT. - BASEMENT
C.G. - CORNER GUARD
C.H. - CEILING HEIGHT
C.T. - CERAMIC TILE
CAB. - CABINET
CEM. - CEMENT
CER. - CERAMIC
CLR. - CLEAR
CLG. - CEILING
CNTR. - COUNTER
COL. - COLUMN
CONC. - CONCRETE
CONF. - CONFERENCE
CORR. - CORRIDOR
CR. - CARPET
CTR. - CENTER
DBL. - DOUBLE
DET. - DETAIL
DEMO. - DEMOLISH OR DEMOLITION
DIA. - DIAMETER
DIM. - DIMENSION
DN. - DOWN
DS. - DOWNSPOUT
DTL. - DETAIL
DW. - DRYWALL
DWG. - DRAWING
E.I.F.S. - EXTERIOR INSULATION FINISH SYSTEM
E.J. - EXPANSION JOINT
E.P. - ELECTRICAL PANEL
E.W.C. - ELECTRIC WATER COOLER
EA. - EACH
ELECT. - ELECTRICAL
ELEV. - ELEVATION OR ELEVATOR
EMER. - EMERGENCY
EQ. - EQUAL
EQUIP. - EQUIPMENT
EXIST. - EXISTING
EXP. - EXPANSION
EXT. - EXTERIOR
F.D. - FLOOR DRAIN
F.E.C. - FIRE EXTINGUISHER CABINET
F.F. - FINISH FLOOR
F.H. - FIRE HYDRANT
FIN. - FINISH
FLR. - FLOOR
FT. - FEET
G.C. - GENERAL CONTRACTOR
GA. - GAUGE
GALV. - GALVANIZED
GEN. - GENERAL
GL. - GLASS
GYP. - GYPSUM
G.W.B. - GYPSUM WALL BOARD
H.M. - HOLLOW METAL
HORIZ. - HORIZONTAL
INSUL. - INSULATION
INT. - INTERIOR
JAN. - JANITOR
JT. - JOINT
MAX. - MAXIMUM
MECH. - MECHANICAL
MEMB. - MEMBRANE
MFGR./MFR.- MANUFACTURER
MIN. - MINIMUM
MISC. - MISCELLANEOUS
MTL. - METAL
N.I.C. - NOT IN CONTRACT
N.T.S. - NOT TO SCALE
NO. - NUMBER
O.C. - ON CENTER
O.D. - OUTSIDE DIA.
O.H. - OVERHEAD OR OPPOSITE HAND
OPP. - OPPOSITE
P. LAM. - PLASTIC LAMINATE
PART. - PARTITION
PLBG. - PLUMBING
PLWD. - PLYWOOD
PUB. - PUBLIC
R.C.P. - REFLECTED CEILING PLAN
R.D. - ROOF DRAIN
R.O. - ROUGH OPENING
REC. - RECESSED
REF. - REFRIGERATOR OR REFERENCE
REINF. - REINFORCEMENT
REQ'D - REQUIRED
S.S. - STAINLESS STEEL
S.V. - SHEET VINYL
SECT. - SECTION
SIM. - SIMILAR
SPEC. - SPECIFICATION
SQ. - SQUARE
STL. - STEEL
STRUCT. - STRUCTURE
SUSP. - SUSPENDED
T.C. - TOP OF CONCRETE
T.O. - TOP OF
TYP. - TYPICAL
U.N.O. - UNLESS NOTED OTHERWISE
VCT - VINYL COMPOSITION TILE
V.I.F. - VERIFY IN FIELD
V.J. - VISION PANEL
VERT. - VERTICAL
W/ - WITH
W/O - WITHOUT
WD. - WOOD
ABBREVIATIONS
WALL SECTION AND DETAIL SYMBOLS:
BUILDING SECTIONS:
SHEET NUMBER
SHEET NUMBER
DRAWING NUMBER
DIRECTION
BUILDING SECTION
NUMBER
ELEVATION SYMBOLS:
SHEET NUMBER
DRAWING NUMBER
DIRECTION
SHEET NUMBER
DRAWING NUMBER
DIRECTION
EXTERIOR
INTERIOR
DIRECTION
A101 ##
A101
A101
A101
A101
DRAWING NUMBER
KEYNOTE TAG
DETAILS:
SHEET NUMBER
NOTE TAGS:
SIGNAGE TAG
DRAWING OR DETAIL NUMBER
ROOM FINISH SYMBOL
RE: A6/ A101
ROOM NAME/NUMBER:
REFERENCE MARK:
NORTH ARROW SYMBOL
SHEET NUMBER
A101
SHEET NUMBER:
DISCIPLINE
SHEET IN SERIES
DEPARTMENT (B)
SUB ROOM NUMBER (A)
OFFICE
A101
ROOM NAME
B206A
ROOM NUMBER (206)20 SF
ACTUAL SQUARE FOOTAGE
N
GRID
1i EQUIPMENT, FIXTURE & ACCESSORY TAG
FURNITURE TAG
1i
1i
DOOR TAG
SYMBOLS AND LEGEND
WALL TYPE TAG 1t
AT
T S
XETE FO
SA
R.
KALWANI
2 4 0 11
R
EG
IS
TE
RED ARCHITEC
T
03/31/20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
RENOVATION OF PATHOLOGY
AND LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100
Bi d D oc um en ts
Su bm itta l -
Ph as e I
March 06, 2020 SH/JARK
C :\U se rs
\N ih al C in az
\D oc um en ts \V
AH
PL
B1
_P H
AS
E
III
_N ih al
C in az .rv t 3/
6/
:2 5:
P
M
GI001
GENERAL NOTES, SYMBOLS AND
ABBREVIATIONS
Revisions: Date:
CG
C G
CG
CG
E
F
G
14 13 1215
H
J
K
2'<
0'
2'<
0'
'<1
'<3
240 0.2
240 0.2
240 0.2
240 0.2
240 0.2
0'<
0'
AREA OF
WORK
A1
A2
LEGEND:
(E) WALL
(N) WALL
(N) 1 HR FIRE RATED WALL
2 HR FIRE RATED WALL
HAZARDOUS MATERIAL
NOT IN SCOPE
TRAVEL DISTANCE
COMMON PATH OF TRAVEL
WX
Y Z
W = CLEAR WIDTH AND LIMITING COMPONENT
X = NO OF OCCUPANTS USING EXIT
Y = EXIT CAPACITY
Z = EXIT WIDTH PER OCCUPANT
PROJECT DATA:
APPLICABLE CODES
& STANDARDS
OCCUPANCY (LAB AREA)
CONSTRUCTION
AUTOMATIC SPRINKLERS
AREA OF WORK
AREA OF RENOVATION:
LAB AREA
BLOOD BANK
OCCUPANT LOAD FACTOR
NO. OF OCCUPANTS
NO. OF EXITS REQUIRED
NO. OF EXITS PROVIDED
COMMON PATH OF
EGRESS TRAVEL
EXIT ACCESS TRAVEL
DISTANCE
DEAD END LIMIT
MINIMUM CORRIDOR
WIDTH
2018 INTERNATIONAL BUILDING CODE (IBC)
2018 INTERNATIONAL MECHANICAL CODE (IBC)
2018 INTERNATIONAL PLUMBING CODE (IPC) (IBC)
NATIONAL ELECTRICAL CODE
NFPA 101 LIFE SAFETY CODE
NATIONAL FIRE CODES WITH THE EXCEPTION OF
NFPA 5000 AND NFPA 900
OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) STANDARDS
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENTAL BARRIER FREE DESIGN GUIDE
(PG-18-13)\
VA FIRE PROTECTION MANUAL
GROUP 'B' (BUSINESS)
TYPE I
FULLY SPRINKLERED
3RD FLOOR (K SECTION)
12,979 SF
(10,852 SF)
(2,127 SF)
150 SF PER PERSON
100'-0" MAXIMUM
300'-0" MAXIMUM
50'-0" MAXIMUM
44"
D
E
14 13
D.2
2'<
0'
0'
AT
T S
XETE FO
SA
R.
KALWANI
2 4 0 11
R
EG
IS
TE
RED ARCHITEC
T
03/31/20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
RENOVATION OF PATHOLOGY
AND LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100
Bi d D oc um en ts
Su bm itta l -
Ph as e I
March 06, 2020 SH/JARK
C :\U se rs
\N ih al C in az
\D oc um en ts \V
AH
PL
B1
_P H
AS
E
III
_N ih al
C in az .rv t 3/
6/
:2 5:
P
M
GI002
LIFE SAFETY PLAN
1/8" = 1'-0"
1 LIFE SAFETY PLAN
1" = 160'-0" 3 Key Plan - B100 - Life Safety
4'0 8' 16'
N
1/8" = 1'-0"
2 LIFE SAFETY PLAN - MECH BAY 10
BLOOD
BANK
LAB AREA
MECH
ROOM
AREA A2 - SEE 2/GI002
AREA A1 - SEE 1/GI002
G
CG
1"
1/ 2"
1/ 2"
1" 1/
2"9" 5'
-0 " T
O F
.F
3" 6"
1"
1/
2" 1/
2" 1"
XYZ
TACTILE ROOM
NUMBER WITH
BRAILE
ROOM NAME
1" 1"
1/
2" 1/
2" 1"
1/ 2"
1/ 2"
1/ 2"
1/ 2"
3" 3"
6"
9"
5' -0
" T O
F .F 000
XYZ
TACTILE ROOM
NUMBER WITH
BRAILE
ROOM NAME
1'
1/
2"
3"
1/ 2"
1/ 2"
1/ 2"
1"
1" 1"
1/
2" 1/
2"
6" 1"
1"
9"
5' -0
" T O
F .F
UNISEX
TACTILE ROOM
NUMBER WITH
BRAILE
E
F
G
14 13 1215
H
J
K
SPECIAL
CHEMISTRY
LAB
3A-120
(E)
HAC
H5
(E) MT
3A-104
(E) FT
3A-102
ELEVATOR
P-16
ELEVATOR
P-13
(E)
BMS
STOR
3A-101
(E)
CORR
C3A-305
(E)
FIRE
STAIR
ST-13
CHIEF
OFFICE
3A-130E
HEMATOLOGY
SUPERVISOR
3A-120E
SPECIMEN
COLLECTION
WAITING
3A-115
TOILET
3A-115C
TOILET
3A-115B
SPECIMEN
COLLECTION
3A-115A
BREAK
ROOM
3A-117
SPECIMEN
ACCESSIONING
3A-120A
STERILE
STORAGE
3A-119C
HEMATOLOGY
LAB
3A-120C
CHEMISTRY
LAB
3A-120B
STAFF
PHYSICIAN
3A-120D
BULK
STORAGE
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
EDUCATION
3A-118
ELEVATOR
J28
ELEVATOR
J29
(E)
PASS
ELEV
LOBBY
C3A-303
(E)
MICROBIO
3A-130
(E)
CTR
3A-130G
(E)
MICRO
SUPERVISOR
OFFICE
3A-147
(E)
COMP
3A-210A
(E)
SUP &
PORT
EQ
STOR
3A-210
(E) TB
LAB
3A-130A
(E)
MYC
LAB
3A-130B
(E)
LAB
3A-130H
(E)
CTR
3A-130C
(E)
COMP
3A-130D
(E)
PLATING
3A-122
(E)
DEVEL/PRINT
ENLARGING
3A-215D
BLOOD
BANK
LAB
3A-121
ELECTRO
MICROSCOPY
3A-215
(E)
PREP
3A-215E
(E)
CUTTING
3A-215F
HIST
3A-130Z
Z3F03 3A-129
(E)
AUTOCLAVE
3A-205A
(E)
AUTOCLAVE
RM
STER
3A-207
(E)
FLOW
CYTOMETRY
SOL
3A-209
SCIENTIST
3A-211B
FLOUR
MICRO
3A-130FF
(E)
HAC
3A-212
(E)
TOXICOLOGY
3A-211
FUTURE
CYTOMETRY
3A-122A
SUPERVISOR
SPECIAL
CHEMISTRY
3A-120K
SUPERVISOR
IN-PATIENT
3A-120L
CHEMISTRY
SUPERVISOR
3A-120F
BB
BREAK
ROOM
3A-121C
BLOOD
BANK
SUPERVISOR
3A-121B
BIOFRIG
3A-121D
(E)
CORRIDOR
C3A-304 CORR.
C3A
-20 9A
CORR.
C3A-100
CORR
C3A
-10
(E)
CORR
C3A-209
(E)
CORR
C3A-208
(E)
CORR
C3A-207
LAB
ASSISTANT
MANAGER
3A-120I
LAB
MANAGER
3A-120H
FREEZER
STORAGE
3A-119A
COMPRESSOR
RM.
3A-119
IRRADIATOR
ROOM
3A-121A
S1
S1
S1
S1
S2
S1
S3
S2
S2
S2
S1
S1
S1
S1
S1
S1
S2
S3
S2
S1
S1
S1
S1
S1
S1
S1
S2
S1
5'
3"
9"
B
AS
E
LI
N E
O F
TH
E
LE
TT
ER
" M
IN
T
O
0" M
AX
H
EI
G H
TA
BO
VE
F
F
TO
FF
B
AS
E
LI
N E
O F
TH
E
LE
TT
ER
" M
IN
T
O
0"
AX
H
EI
G H
TA
BO
VE
F
F
TO
FF
AT
T S
XETE FO
SA
R.
KALWANI
2 4 0 11
R
EG
IS
TE
RED ARCHITEC
T
03/31/20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
RENOVATION OF PATHOLOGY
AND LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100
Bi d D oc um en ts
Su bm itta l -
Ph as e I
March 06, 2020 SH/JARK
C :\U se rs
\N ih al C in az
\D oc um en ts \V
AH
PL
B1
_P H
AS
E
III
_N ih al
C in az .rv t 3/
6/
:2 6:
P
M
GI003
SIGNAGE PLAN
3" = 1'-0"
2 SIGN TYPE - S1
3" = 1'-0"
3 SIGN TYPE - S2
3" = 1'-0"
4 SIGN TYPE - S3
SIGNAGE SCHEDULE
ROOM
NUMBER ACTUAL MESSAGE Comments
SIGN
TYPE
3A-115 SPECIMEN COLLECTION
WAITING
S-1
3A-115A SPECIMEN COLLECTION S-2
3A-115B UNISEX S-3
3A-115C UNISEX S-3
3A-117 BREAK ROOM S-2
3A-118 EDUCATION S-1
3A-119 COMPRESSOR RM. S-2
3A-119A FREEZER STORAGE USE ABUSE & MOLD RESISTANT GYPSUM
BOARD ON ALL WALLS
S-2
3A-119B REFRIGERATOR AND
FREEZER
USE ABUSE & MOLD RESISTANT GYPSUM
BOARD ON ALL WALLS
S-2
3A-119C STERILE STORAGE USE ABUSE & MOLD RESISTANT GYPSUM
BOARD ON ALL WALLS
S-2
3A-119D BULK STORAGE USE ABUSE & MOLD RESISTANT GYPSUM
BOARD ON ALL WALLS
S-2
3A-120 PATHOLOGY LAB S-1
3A-120A SPECIMEN ACCESSING S-1
3A-120B PATHOLOGY LAB S-1
3A-120C PATHOLOGY LAB S-1
3A-120D STAFF PHYSICIAN S-1
3A-120E HEMATOLOGY
SUPERVISOR
S-1
3A-120F CHEMISTRY SUPERVISOR S-1
3A-120G CART STAGING S-1
3A-120H LAB MANAGER S-1
3A-120I LAB ASSISTANT
MANAGER
S-1
3A-120K SUPERVISOR SPECIAL
CHEMISTRY
S-1
3A-120L SUPERVISOR IN-PATIENT S-1
3A-121 BLOOD BANK S-1
3A-121
3A-121A IRRADIATOR ROOM S-2
3A-121B BLOOD BANK
SUPERVISOR
S-1
3A-121C BREAK ROOM S-2
3A-121D BLOOD BANK CHECK-IN S-1
3A-122A FUTURE CYTOMETRY S-1
3A-215 ELECTRO MICROSCOPY S-1
3A-215A
C3A-100 PATHOLOGY LAB S-1
C3A-100 USE ABUSE & MOLD RESISTANT GYPSUM
BOARD ON ALL WALLS
C3A-102 PATHOLOGY LAB USE ABUSE & MOLD RESISTANT GYPSUM
BOARD ON ALL WALLS
S-1
C3A-209A USE ABUSE & MOLD RESISTANT GYPSUM
BOARD ON ALL WALLS
NOTE: VA TO APPROVE MESSAGE ON ALL SIGNS
1. NOTE: ALL DIMENSIONS ARE MEASURED FROM FLOOR, UNLESS
NOTED OR SHOWN OTHERWISE.
2. ABA UNOBSTRUCTED REACH RANGES: ABA FORWARD REACH =
48” MAX. & 15” MIN. ABA SIDE REACH = 48” MAX. & 15” MIN.
3. ELEVATORS: STANDARD CALL BUTTONS: 35” TO 48” TO C.L. &
PROTRUDE 1” MAX. ABA CALL BUTTONS: 42” TO C.L. (TYP.) & 48”
MAX. (3/4” SMALLEST DIM.). ABA VISIBLE SIGNALS: 72” MIN. TO
C.L. (2 1/2” SMALLEST DIM.). TACTILE SIGNAL ON HOISTWAY: 60”
TO BASE OF CHARACTERS W/ TACTILE STAR & 2” HIGH
CHARACTERS.
4. DOOR HARDWARE (TO CENTER OF HARDWARE): STANDARD
MOUNTING HEIGHTS: PUSH PLATES = 42", PULL HANDLES = 42",
KNOBS/ LEVERS = 40", PANIC EXIT = 42" CENTERLINE OF BAR,
KICKPLATES: WIDTH = DOOR WIDTH MINUS 2”, CENTER, HEIGHT
= 16” FROM B.O. DOOR. THRESHOLDS: STANDARD = 1/2" MAX. AT
EXT. SLIDING DOORS = 3/4” MAX., ABA HARDWARE = 34” MIN. TO
48” MAX.
5. DRINKING FOUNTAINS & EWC'S (TO SPOUT): STANDARD = 40”
TYP., 42" MAX. ABA =36" MAX. (27" MIN. CLEAR KNEE SPACE)
6. COUNTERTOPS (TO SINK RIM/ COUNTERTOP): ABA = 28” MIN. TO
34" MAX.
7. WATER CLOSETS (TO TOP OF SEAT): STANDARD = 14” TO 15".
ABA (TO TOP OF SEAT) = 17" TO 19”. ABA FLUSH CONTROLS = 44"
MAX.
8. URINALS (TO RIM): STANDARD = 24" MAX. ABA =17" MAX. ABA
FLUSH CONTROLS = 44" MAX.
9. LAVATORIES (TO SINK RIM/ COUNTERTOP): STANDARD = 36"
MAX. ABA = 34" MAX. (29" MIN. CLEAR KNEE SPACE)
10. MIRRORS (TO B.O. REFLECTIVE SURFACE): STANDARD =
VARIES. ABA = 40" MAX.
11. GRAB BARS - ABA (TO TOP OF BAR): WATER CLOSETS = 33” MIN.
TO 36" MAX. SHOWERS = 33” MIN. TO 36" MAX. (FROM
B.O.SHOWER). BATHTUBS: TOP BAR = 33” MIN. TO 36" MAX.
BOT. BAR = 9” ABOVE T.O. TUB
12. FIRE ALARM PULL STATIONS (TO LEVER): STANDARD = 48" MAX.
ABA FORWARD REACH = 48” MAX. ABA SIDE REACH = 48” MAX.
13. SMOKE AND/OR HEAT DETECTORS: STANDARD = CEILING
HEIGHT
14. HORN/ SPEAKER/ VISUAL SIGNALS: STANDARD = 80” AFF. OR 6”
BELOW CEILING - WHICHEVER IS LOWER.
15. ROOM SIGNAGE (TO C.L.): STANDARD = 60” HIGH AFF. & WITHIN
18” OF LATCH SIDE OF DOOR
16. TOILET PAPER DISPENSERS (TO C.L. OF OUTLET): STANDARD =
24". ABA = 19” MIN. TO 24" MAX.
17. WALL MOUNTED SOAP DISPENSERS (TO C. L. OF PUSH
BUTTON): STANDARD = 40". ABA = VARIES. RE: OBSTRUCTED
AND UNOBSTRUCTED REACH RANGES. ABA SIDE REACH = 46”
MAX. ABOVE SINK IN COUNTER.
18. PAPER TOWEL DISPENSER/ WASTE RECEPTACLE (TO TOWEL
SLOT): STANDARD = 40" MAX. ABA FORWARD REACH = 48” MAX.
& 15” MIN. ABA SIDE REACH = 48” MAX. & 15” MIN.
19. WARM AIR HAND DRYER (TO PUSH SWITCH): STANDARD = 44"
MAX. ABA FORWARD REACH = 48” MAX. & 15” MIN. ABA SIDE
REACH = 48” MAX. & 15” MIN.
20. SANITARY NAPKIN DISPENSER (TO C.L. OF COIN SLOT):
STANDARD = 40" MAX. ABA FORWARD REACH = 48” MAX. & 15”
MIN. ABA SIDE REACH = 48” MAX. & 15” MIN.
21. SANITARY NAPKIN DISPOSAL (TO TOP OF UNIT): STANDARD = 28"
MAX. ABA = 19” MIN. TO 24" MAX. (TO OPNG.)
22. TOILET SEAT COVER DISPENSERS (TO OPNG.): STANDARD = 40"
MAX. ABA FORWARD REACH = 48” MAX. & 15” MIN. ABA SIDE
REACH = 48” MAX. & 15” MIN.
23. SHELVES: ABA = 48" MAX.
24. COAT HOOKS: STANDARD = 68". ABA = 48" MAX.
25. CHALKBOARDS, TACKBOARDS,& MARKERBOARDS: STANDARD =
32" TO 39” (TO B.O. BOARD OR CHALK TRAY). STANDARD = 80”
(RECOMMENDED, TO T.O. BOARD)
26. THERMOSTATS & CONTROL DEVICES (TO TOP): ABA FORWARD
REACH = 48” MAX. ABA SIDE REACH = 48” MAX.
27. LIGHT SWITCHES & CARD READERS (TO C.L.): LOCATE 6” FROM
DOOR JAMB. ABA = 48” MAX.
28. CONVENIENCE RECEPTACLES – ELECTRICAL/ TELEPHONE/
DATA (TO C.L.): STANDARD = 18". ABA = 15” MIN.
29. EXIT LIGHTS - WALL MOUNTED: 2" MIN. BELOW CEILING. 2” MIN.
ABOVE DOOR FRAME. EQUAL SPACE FROM CEILING TO TOP OF
FRAME
30. FIRE EXTINGUISHERS (TO TOP, U.N.O.): GROSS WT. 40 LBS. OR
LESS = 60" MAX. GROSS WT. MORE THAN 40 LBS. = 42" MAX. ABA
= 40" MAX. (B.O. CABINET)
GENERAL NOTES - ACCESSIBILITY GUIDELINES:
*THESE SPECIFIC DIMENSIONS ARE
APPLICABLE ONLY AT LOCATIONS
WHERE ALL NOTED EQUIPMENT IS
SHOWN ON WALL WITH DOOR
LIGHT SWITCH
TO
O
PE
RA
BL
E
PA
RT
4'
- 0
" M
AX
. 1' - 0" 10" 6"
7" (DOUBLE SWITCH)
6" (SINGLE SWITCH)
THERMOSTAT
1'
- 3
" M
IN
RECEPTACLE
PHONE
HAND
SANITIZER
m in m ax
48 min m in
20 max m ax
510-635 >20-25 max m ax
10 max m in m ax
2' - 6" m ax 12 m ax
48 min
48 min
(a) (b)
(c)
48 min
(c) push side, door provided with both closer and latch
(b) push side
(a) pull side
(k) latch approach push side, door provided with closer
(g) hinge approach, push side, door provided with both closer and latch (f) hinge approach, push side
(e) hinge approach, pull side
(d) hinge approach, pull side
(j) latch approach, push side
(i) latch approach, pull side door provided with closer
(h) latch approach, pull side
(c) front approach, push side, door provided with both closer and latch
(b) front approach, push side
(a) front approach, pull side x>
12 min m in x> 8 12 m in
24 min 12 m in m in 445 18 min x>
22 min m in
22 min
42 min m in m in m in610 24 min 610
24 min m in
24 min
12 min
18 min m in
5'
6"
5' - 6"
12 min
36 min base ar m ar m
12 min
60 min m in91 m in m in
CENTERLINE
OF HANDLE
TO
O
PE
RA
BL
E
PA
RT
4'
- 0
" M
AX
FIRE
EXTINGUISHER
CABINET
8 min m in
9" m in
11 min 635
25 max m in
(a) elevation
(b) plan
CLEAR
FLOOR
SPACE
11" MIN.
9" M
IN
2'
- 3
" M
IN
2' - 1" MAX.
1' - 5" MIN.
TO
P
OF
S
IN
K
RI
M
O R
CO
UN
TE
R
2'
- 1
0" M
AX
T
O
HI
GH
ER
O F
2' - 6" MIN.
4'
- 0
" M
IN
.2'
- 1
' M
AX
1'
- 5 " M
IN
PLAN
SECTION
6" MAX.
8" MIN.
9"
6 max
430-635 17_25
(a) elevation
(b) plan
CLEAR
FLOOR
SPACE
1 1/2" O.D. (SS OR CHROME)
GRAB BAR SUPPORTS
250 LBS FORCE (TYP.)
4'
- 1
1" F
OR
F
LO
OR
M
TD
. W .C
4'
- 8 " F
OR
W
AL
L
M
OU
NT
ED
W .C
3' - 6" MIN.
MAX.
1' - 6"
NOTE:
PARTITIOIN DOOR IS TO BE
LOCATED OPPOSITE OF
W.C. LOCATION
1-1/2" Ø S.S.
GRAB BARS
TOILET
TISSUE
DISPENSER
"-3
6"
18" MIN
WATER
CLOSET
1-1/4" Ø S.S.
GRAB
BARS
36" MIN
"-1
9"
IN
MAX
36"
42" MIN
12" MAX
M
AX
2'
CLR
1' - 6"
WHEELCHAIR
USERS
LAVATORY
INSULATION @ HOT
AND COLD WATER
SUPPLY AND DRAIN
CLR
1' - 6"
TYPICAL
LAVATORY
SOAP
DISPENSER
MIRROR PAPER
TOWEL
DISPENSER
SEAT COVER
DISPENSER SANITARY
NAPKIN
DISPOSAL
WASTE
RECEPTACLE
40" TO BOTTOM OF
REFLECTIVE SURFACE,
EXCLUDING FRAME
0"
" M
AX
" M
AX
4'
0"
GLOVE
DISPENSER BOX
6" MAX
A.
F.
F.
8"
M A
X
4'
0"
5'
0"
6'
0"
3'
7"
AT
T S
XETE FO
SA
R.
KALWANI
2 4 0 11
R
EG
IS
TE
RED ARCHITEC
T
03/31/20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
RENOVATION OF PATHOLOGY
AND LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100
Bi d D oc um en ts
Su bm itta l -
Ph as e I
March 06, 2020 SH/JARK
C :\U se rs
\N ih al C in az
\D oc um en ts \V
AH
PL
B1
_P H
AS
E
III
_N ih al
C in az .rv t 3/
6/
:2 6:
P
M
GI004
ACCESSIBLITY STANDARD
N.T.S.
15 SWITCH AT DOOR
N.T.S.
11 ACCESIBLE REACH RANGE
N.T.S.
ACCESSIBLE CLEARENCE
@ DOOR IN SERIES
N.T.S.
4 ACCESSIBLE SWING DOOR CLEARANCE
N.T.S.
ACCESSIBLE TOURING
ROUTE
N.T.S.
22 FE CABINET
N.T.S.
13 KNEE CLEARANCE
N.T.S.
SINK COUNTER
CLEARANCES
N.T.S.
14 TOE CLEARANCE
N.T.S.
WC ACCESSIBLE CLEAR
FLOOR SPACE
N.T.S.
2 PLUMBING FIXTURES AND ACCESSORIES MOUNTING HEIGHTS
N.T.S.
3 CARD READER
N.T.S.
5 FIRE ALARM PULL STATION
N.T.S.
WALL MOUNTED
OCCUPANCY SENSOR
1/2" = 1'-0"
7 CASEWORK OUTLET
G
CG
E
F
G
14 13 1215
H
J
K
B
A
C
C
D
SUPERVISOR
SPECIAL
CHEMISTRY
3A-120K
SUPERVISOR
IN-PATIENT
3A-120L
LAB
ASSISTANT
MANAGER
3A-120I
LAB
MANAGER
3A-120H
CHEMISTRY
SUPERVISOR
3A-120F
HEMATOLOGY
SUPERVISOR
3A-120E
STAFF
PHYSICIAN
3A-120D
BULK
STORAGE
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
FREEZER
STORAGE
3A-119A
STERILE
STORAGE
3A-119C
BLOOD
BANK
SUPERVISOR
3A-121B
BB
BREAK
ROOM
3A-121C
BIOFRIG
3A-121D
EDUCATION
3A-118
BID DEDUCTS AREA
BID DEDUCTS:
A. DO NOT CONSTRUCT OFFICES – ROOM 3A-120K
SUPERVISOR, SPECIAL CHEMISTRY AND ROOM
3A-120L SUPERVISOR, IN-PATIENT. CONSTRUCT
ONE WALL OF ROOM 3A-120L SUPERVISOR, IN-
PATIENT, WHICH WILL PROVIDE UTILITIES AND
SUPPORT TO THE RELOCAED HOOD (FH-1) AND
RELOCATED REFRIGERATORS (RF-25 AND RF-2)
DEMOLISH EXISTING IN THIS AREA AND FINISH
THIS AREA WITH NEW FLOORING AND CEILING AS
ADJACENT AREAS (ROOM 3A-120, SPECIAL
CHEMISTRY LAB AND ROOM 3A-120B, CHEMISTRY
LAB)
B. DO NOT CONSTRUCT OFFICES – ROOM 3A-120I LAB
ASSISTANT MANAGER, ROOM 3A-120H LAB
MANAGER, ROOM 3A-120F CHEMISTRY
SUPERVISOR, ROOM 3A-120E HEMATOLOGY
SUPERVISOR, AND ROOM 3A-120D STAFF
PHYSICIAN. DO NOT CONSTRUCT THE CASEWORK
ON WALL (FACING THE OPEN AREA OF ROOM
3A-120B CHEMISTRY LAB) OF THE ROOM 3A-120F
CHEMISTRY SUPERVISOR. DEMOLISH EXISTING IN
THIS AREA AND FINISH THIS AREA WITH NEW
FLOORING AND CEILING AS ADJACENT AREAS
(ROOM 3A-120B, CHEMISTRY LAB)
C. DO NOT CONSTRUCT STORAGE SHELVING IN THE
FOLLOWING ROOMS:
• ROOM 3A-119A FREEZER STORAGE
• ROOM 3A-119B WALK-IN REFRIGERATOR
STORAGE
• ROOM 3A-119C STERILE STORAGE
• ROOM 3A-119D BULK STORAGE
DO NOT CONSTRUCT FLOOR STRENTHENING FOR
THESE SHELVING
D. DO NOT INSTALL THE CASEWORK/FURNISH WITH
FURNITURE & EQUIPMENT IN THE FLOORING
ROOMS
• ROOM 3A-118 EDUCATION
• ROOM 3A-121B BLOOD BANK SUPERVISOR
• ROOM 3A-121C BB BREAK ROOM (DO NOT
INSTALL SINK IN CASEWORK)
• ROOM 3A-121D BIOFRIG
DEMOLISH EXISTING IN THIS AREA AND FINISH
THIS AREA WITH NEW FLOORING AND CEILING AS
INDICATED IN PLANS
AT
T S
XETE FO
SA
R.
KALWANI
2 4 0 11
R
EG
IS
TE
RED ARCHITEC
T
03/31/20
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
RENOVATION OF PATHOLOGY
AND LABORATORY PHASE I
MICHAEL E. DEBAKEY VA MEDICAL CENTER
580-18-118
Building 100
Bi d D oc um en ts
Su bm itta l -
Ph as e I
March 06, 2020 SH/JARK
C :\U se rs
\N ih al C in az
\D oc um en ts \V
AH
PL
B1
_P H
AS
E
III
_N ih al
C in az .rv t 3/
6/
:2 6:
P
M
GI005
BID DEDUCTS
1/8" = 1'-0"
1 DEDUCTIVE BID - FLOOR PLAN
TRACK - 1B
TRACK - 1A
6'
- 0
RF17
IN5
CRY1
RF18
FR7
CRY1
RF17
IN5IN5
IN5
FR7
RF18
WS-4HS
WS-4HS
IC2
RF15
WS-50
PR29
PR28
WS-51
PR27
WS-52
PR26 WS-1BB
PR25
RF14
IC2
WS-51
PR28
PR29
WS-50
PR27
RF14
WS-1BB
PR25
CW4
CF23
CF24
CF23
CF24
CW4
WS-1HS
PR26
WS-52
RF15
(WS-57)
RF8
PWR2
PR36
WS-54
BC3
RF9
(BC1) (WS-56)
(PT-1)
(WS-55)
(RF27)
AF1
RF4
RF24
FR4
RF7
WP3
WP1
WP2
WS-E1
PR-E1
PR-E2
WS-E2
WS-E3
WS-E4
WS-E5
M-E1
WS-E6
M-E2
PR-E3
WS-E7PR-E4
M12
M12
(WS-2) (RF31)
SC3
DXC800
PHASING LEGEND:
UNDER CONSTRUCTION IN THIS PHASE
RENOVATED SPACE
INDICATES AREAS AFTER HOURS
CONSTRUCTION WORK
OVERHEAD CEILING WORK ABOVE
EQUIPMENT
TEMPORARY CONSTRUCTION PARTITION
AND DOOR
CONTRACTOR ACCESS PATH
OCCUPANTS ACCESS
DURING CONSTRUCTION
(E) DOORS AND WALLS TO
REMAIN IN THIS PHASE
TEMPORARY FLOAT SPACE/ WORKING
OFFICE SPACE FOR STAFF DISPLACED
BY THIS PHASE'S CONSTRUCTION
(E) DOORS AND WALLS TO BE
DEMOLISHED IN THIS PHASE
(NOT APPLICABLE TO ALL SHEETS)
(N) DOORS AND WALLS BUILT IN
PREVIOUS PHASE
AREA OF WORK IN THIS PHASE
WAIT
3A-119B
BLOOD
SPEC
COLL
3A-119C
WAIT
3A-121A
TOILET
3A-119F
ANTE
3A-119D
TOILET
3A-119E
SPEC
ACCS
DIST
3A-119
STORAGE
3A-119A
PATH
OFFICE
3A-215A
CYTOLOGY
OFFICE
3A-215G
ELECTRON
MICROSCOPY
OFFICE
3A-215C
ELECTRON
LAIS
MICROSCOPY
3A-215
LAB
MNGR
3A-201
ELECTRON
MICROSCOPY
3A-215B
MEDIA
PREP
3A-205
DARK
ROOM
3A-215D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
RENOVATION OF PATHOLOGY
AND LABORATORY PHASE I
Michael E. DeBakey VA Medical Center Houston, Texas
580-18-118
Building 100
Bi d D oc um en t S ub mi tta l -
Ph as e I
February 28, 2020 SH/JARK
C :\U se rs
\ja ys o\ D oc um en ts
\V
AH
PL
B1
_P
H
AS
E
III
_P ha si ng
_j al la m
U 6H
AA
.rv t 3/
6/
:5 8:
P
M
GC101
PHASING PLAN TRACK 1A & 1B
1/8" = 1'-0" 1 Phase 1 - Demolition of Track 1A and 1B
WORK SEQUENCE:
1.1A (PRE-TRACK 1A) PROVIDE TEMPORARY
CONSTRUCTION WALL AROUND CONSTRUCTION
AREA.
2.1A MOVE EQUIPMENT FROM 3A-119, 119A, 119C,
3A-121A TO TEMPORARY FLOAT SPACES.
3.1A VACATE AND DEMOLISH ROOMS:
STORAGE 3A-119A, SPEC ACCS & DIST 3A-119, WAIT
3A-119B, BLOOD SPECIMEN COLLECTION 3A-119C &
WAIT 3A-121A
4.1A CONSTRUCT NEW BULK STORAGE 3A-119D,
PORTION OF CORR. C3A-102, WALK-IN
REFRIGERATOR STORAGE 3A-119B, FREEZER
STORAGE 3A-119A AND COMPRESSOR ROOM 3A-119
(SEE NEW LAYOUT FOR THESE ROOM NUMBERS)
NOTE:
REFRIGERATORS / FREEZER SHALL BE OPERATIONAL AND
SHELVING INSTALLED IN ROOMS 3A-119A, 119B AND 119D
PRIOR TO PROCEEDING TO TRACK 2A. (SEE NEW LAYOUT
FOR THESE ROOM NUMBERS)
WORK SEQUENCE:
1.1B CONSTRUCT TEMPORARY ACCESS DOOR TO ROOMS 3A-215B
AND 215A.
2.1B MOVE EQUIPMENT FROM EXISTING ROOMS 3A-215, 215C, 215G
TO ROOMS 3A-201, 205, AND 215A. PROVIDE TEMPORARY
POWER AS NECESSARY.
3.1B CONSTRUCT NEW ELECTRO MICROSCOPY 3A-215 (SEE NEW
LAYOUT FOR THIS ROOM NUMBER)
NOTE:
VA STAFF MAY NEED TO OCCASIONALLY ACCESS DARK ROOM
3A-215D (ONCE EVERY 10 DAYS). WHICH IS ACCESSIBLE ONLY FROM
ROOM 3A-215 (SEE NEW LAYOUT FOR THIS ROOM NUMBER)
PHASING KEYNOTES
Key Number Description
1 DOOR TO REMAIN CLOSED DURING CONSTRUCTION
2 PROVIDE TEMPORARY ACCESS DOOR
GENERAL PHASING NOTES:
1. THE PATHOLOGY AND LABORATORY IS TO REMAIN IN FULL
OPERATION DURING THE CONSTRUCTION PERIOD. WORK
PRODUCING OBJECTIONABLE DUST, ODORS, VAPORS, ETC., SHALL BE
REQUIRED TO BE PERFORMED DURING UN-OCCUPIED HOURS OR AS
DIRECTED BY THE HOSPITAL.
2. THIS WORK WILL BE CONDUCTED INCREMENTALLY. THE
CONTRACTOR MAY SUBMIT THE SEQUENCE OF WORK FOR THE
CONTRACTING OFFICER'S APPROVAL. EACH DESIGNATED AREA
SHALL DEFINE CONTRACTOR'S ACCESS LIMITATIONS CLEARLY. EACH
INCREMENT IS TO BE ACCEPTED BY THE CONTRACTING OFFICER
PRIOR TO EXECUTING THE NEXT INCREMENT OF WORK.
3. THESE DRAWINGS HAVE BEEN DEVELOPED TO PROVIDE GUIDANCE
TO THE CONTRACTOR WITH REGARDS TO WORK SEQUENCING, BUT
METHODS OF CONSTRUCTION ARE BY THE CONTRACTOR.
4. UTILITY INTERRUPTION SHALL NOT EXCEED 45-MINUTES FOR ANY AND
ALL UTILITIES, UNLESS OTHERWISE APPROVED BY COR.
5. SOME TASKS (E.G., UTILITY SHUT DOWN, ACTIVITIES THAT CREATE
VIBRATION, DUST, OR NOISE, & OTHER WORK IMPACTING VA MC
OPERATIONS) TO BE PERFORMED DURING UNOCCUPIED HOURS
(EVENING AND WEEKENDS) COORDINATE CONSTRUCTION ACTIVITIES
WITH GOVERNMENT, WITH NO ADDITIONAL COST TO GOVERNMENT.
6. PROVIDE TEMPORARY CONSTRUCTION WALL AROUND EACH PHASE.
7. PROVIDE TEMPORARY SIGNAGE TO DIRECT EXIT PATHWAY AND
WAYFINDING DURING EACH PHASE.
8. SUBMIT TEMPORARY SIGNAGE VERBIAGE, TYPE AND LOCATION FOR
GOVERNMENT'S APPROVAL.
9. MAINTAIN 2 EXITS AT ALL TIMES.
10. CONTRACTOR MAY PROPOSE AN ALTERNATE PHASING/WORK
SEQUENCE BUT MUST INCLUDE FULL SCHEDULE FOR GOVERNMENT
AND ARCHITECT'S APPROVAL & CONSIDERATION. COORDINATE ALL
WORK WITH GOVERNMENT REPRESENTATIVE
11. FOR PHASING/ WORK SEQUENCING OF NON-ARCHITECTURAL WORK,
SEE OTHER DISCIPLINE'S DRAWINGS.
12. MAINTAIN ACCESS TO (E) CRAWL SPACE AT ALL TIMES.
13. VENTILATE/ PROVIDE FORCED AIR FLOW IN CRAWL SPACE DURING
CONSTRUCTION.
14. COORDINATE WORK WITH GOVERNMENT FURNISHED AND
GOVERNMENT INSTALLED (GFGI) EQUIPMENT.
15. PROVIDE ALL UTILITIES REQUIRED FOR GFGI EQUIPMENT
(GOVERNMENT VENDOR = GE).
16. MAINTAIN INFECTION CONTROL BARRIERS AT TEMPORARY TYP.
CONSTRUCTION WALLS. REFER TO DIAGRAM ON THIS SHEET.
17. SEE SHEET GI009 & AD101
18. ALL WORK IN TEMPORARY FLOAT SPCE/WORKING OFFICE SPACE TO
OCCUR DURING UNOCCUPIED HOURS.
19. FOR UTILITIES, SEE OTHER DISCIPLINE DRAWINGS.
TRACK - 2A
TRACK - 2B
5'
- 0
ELECTRON
MICROSCOPY
3A-215
BULK
STO.
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
FREEZER
STO.
3A-119A
COMPRESSOR
RM.
3A-119
CORR.
C3A
-10
FR7
RF18
IN5
WS-4HS
ST2
ST3
INT1
RF18
FR7
IN5
RF17
CRY1
WS-4HS
WS-1HS
WS-3HS
WS-2HS
CRY1
RF17
INT1
WS-3HS WS-2HS
ST3
ST2
(RF31)(WS-2) (RF31)
IM1
AS1
AS2
AS3
BF5
BF2
BF4
BF3
BF1
WS-2BB WS-3BB
IA2
IA1
BF5
BF2
BF3
BF4
BF1
WS-2BB
IA1
IA2
WS-3BB
PR24
PR24
MW4
RF20
MW3
MW1
RF22
MW2
RF21
(RF19)IM2
IC2
RF14
PR25
WS-1BB
CW4
CF23
CF24
AS3
AS2
AS1
IM1
CF24
CF23
CW4
(E)
STA.
#30
(E)
STA.
#32
MW5
PHASING LEGEND:
UNDER CONSTRUCTION IN THIS PHASE
RENOVATED SPACE
INDICATES AREAS AFTER HOURS
CONSTRUCTION WORK
OVERHEAD CEILING WORK ABOVE
EQUIPMENT
TEMPORARY CONSTRUCTION PARTITION
AND DOOR
CONTRACTOR ACCESS PATH
OCCUPANTS ACCESS
DURING CONSTRUCTION
(E) DOORS AND WALLS TO
REMAIN IN THIS PHASE
TEMPORARY FLOAT SPACE/ WORKING
OFFICE SPACE FOR STAFF DISPLACED
BY THIS PHASE'S CONSTRUCTION
(E) DOORS AND WALLS TO BE
DEMOLISHED IN THIS PHASE
(NOT APPLICABLE TO ALL SHEETS)
(N) DOORS AND WALLS BUILT IN
PREVIOUS PHASE
AREA OF WORK IN THIS PHASE
BLOOD
PREP
3A-121D
CORR
C3A
-10
C TR
COLD
3A-115
LOUNGE
3A-117
FRZ
3A-116A
REF
3A-111
CORR
C3A-103
DONOR
COLLECTION
3A-121C
LAB
MNGR
3A-201
FRZ
SEC
LAB
Room 3A-109
CORR
C3A-103
ELECTRON
MICROSCOPY
3A-215B
PATH
OFFICE
3A-215A
BLOOD
DONOR
3A-121B
BLOOD
BANK
3A-121
MEDIA
PREP
3A-205
CHEMISTRY
LAB
3A-120B
DARK
ROOM
3A-215D
CORR
C3A
-10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden Ave, Suite 26 Glendale, CA 91203 t: 888.900.3823 www.schwabeng.com
PROJECT NO.:
RENOVATION OF PATHOLOGY
AND LABORATORY PHASE I
Michael E. DeBakey VA Medical Center Houston, Texas
580-18-118
Building 100
Bi d D oc um en t S ub mi tta l -
Ph as e I
February 28, 2020 SH/JARK
C :\U se rs
\ja ys o\ D oc um en ts
\V
AH
PL
B1
_P
H
AS
E
III
_P ha si ng
_j al la m
U 6H
AA
.rv t 3/
6/
:5 8:
P
M
GC102
PHASING PLAN TRACK 2A & 2B
1/8" = 1'-0"
1 Phase 2 - Renovation of Track 2A and 2B
WORK SEQUENCE:
NOTE:
REFRIGERATOR / FREEZER SHALL BE OPERATIONAL AND SHELVING
INSTALLED IN ROOMS PRIOR TO PROCEEDING TO TRACK 2A.
1.2A (PRE-TRACK 2A) PROVIDE NEW TEMPORARY CONSTRUCTION
WALL AROUND CONSTRUCTION AREA
2.2A VACATE AND DEMOLISH ROOMS 3A-117, 3A-115, 3A-116A, 3A-111,
3A-109, PORTION OF CORRIDORS C3A-102 AND C3A-103
3.2A CONSTRUCT NEW FLOAT SPACE FOR TEMPORARY
HEMATOLOGY. PROVIDE TEMPORARY POWER FOR EQUIPMENT
AS NECESSARY. (ALL WORK DURING UNOCCUPIED HOURS)
NOTE:
CONSTRUCT (N) CEILING IN TEMPORARY FLOAT SPACE PER NEW
LAYOUT SHEET AE105. CONSTRUCT TEMPORARY BULKHEAD
WALLS AS REQUIRED @ 8'-0" CLEAR A.F.F. WHERE NEW WALLS
OCCUR WITHIN THE SWING SPACE.
REFER TO OTHER DISCIPLINE DRAWINGS FOR ADDITIONAL
WORK WITHIN THE FLOAT SPACE.
WORK SEQUENCE:
1.2B MOVE EQUIPMENT FROM ROOMS 3A-201, 215A, 215B AND 205
TO NEW ROOM 3A-215.
2.2B MOVE EQUIPMENT IN ROOMS 3A-121B, 3A-121C AND 3A-121D
AND PROVIDE TEMPORARY POWER AS NECESARY TO
CORRIDOR C3A-103
3.2B DEMOLISH ROOMS 3A-215B, 3A-201, 3A-215A, 3A-205, 3A-121C,
3A-121B AND PORTION OF 3A-121D.
4.2B BUILD-OUT NEW TEMPORARY BLOOD LAB AREA AND
ROOMS 3A-118, 3A-121B, 3A-121C, 3A-121D AND CORRIDOR
C3A-209A (SEE NEW LAYOUT FOR THESE ROOM NUMBERS).
5.2B CONSTRUCT NEW TUBE STATION #32 FOR BLOOD LAB
NOTE:
VA REQUIRES ADVANCE NOTICE TO RELOCATE EQUIPMENT IA1
AND IA2 IN ROOM 3A-121A. (2 TO 4 WEEKS NOTICE). RELOCATION
BY VA VENDOR. (SEE NEW LAYOUT FOR THIS ROOM NUMBER).
PHASING KEYNOTES
Key Number Description
1 DOOR TO REMAIN CLOSED DURING CONSTRUCTION
GENERAL PHASING NOTES:
1. SEE SHEET GC101 FOR PHASING NOTES
TRACK - 3A
TRACK - 3B
TEMPORARY
HEMATOLOGY LAB
(N)
TEMPORARY
BLOOD LAB
3'
- 1
1"
5' - 0"
CORR.
C3A
-20 9A
ELECTRON
MICROSCOPY
3A-215
CORR.
C3A
-20 9A
BB
BREAK
ROOM
3A-121C
3'
- 0
BB
SUPERVISOR
3A-121B
BIOFRIDGE
3A-121D
EDUCATION
3A-118
BF5
BF4
BF3
BF2
BF1
BF-N
BF-N
BF-N
BF-N
IM1
AS1
AS2
AS3
BF5
BF2
BF3
BF4
BF1
IA1
IA2
CW2
IN4
FR6
IN3
RF10FR1
FR2
RF11
RF12
RF13
WS-4BB
CF22
H2
H3
PR32
PR31
PR30
WS-5BB CF20
BW2
BW1
CW3
CW1
CF21
WS-6BB
CF13
CF12
IN2
WS-8BB
CF14
WS-2BB
WS-3BB
PR24
FX3
PR23
IM1
PR25
WS-1BB
RF13
RF12
RF11
FR2
FR1 RF10
RF16
PR20
(WS-35)
(WS-34)
PR21
H1
H4
TR1
PR22
WS-26
PR19
(WS-29)
(WS-30)
(WS-31)
(WS-32)
CT3
WS-25
WS-24
CT2
CT1
WS-23
PA1
WS-20
PA2
IS2
RF30
RF29
CA2
WS-19
PR18
CA1
WS-21
PR17
WS-22
CF10
CF11
(WS-35) (WS-34)
PR21
H1 H4
TR1 PR22
ST1
CY1
CY1ST1
PA1
WS-20
PA2
IS2
RF30RF29
(WS-32)
(WS-31)
(WS-30)
PR19
(WS-29)
ST1CY1
CF11
CF10
WS-22
WS-21
PR17
CA1
PR18
WS-19
CA2
WS-25
CT3CT2
WS-24WS-23
WS-26
PR20
AV1
WS-7BB
SC6
CW4
CF23
CF24
WS-1HS
WS-4HS
WS-2HS
WS-3HS
ST2
ST3
INT1
RF18
FR7
IN5
RF17
CRY1
IC2
FR6
IA1
IA2
CW2
IN3
IN4
AS1
AS2
AS3
MW5
RF14
PR24
WS-3BB
CW2
CW1
CF21
BW2
IN1
BW1
WS-6BB
WS-4BB
CF22
H2
H3
SC8
SC7
WS-2BB
CF14
WS-8BB
SC5
IN2
CF13
CF20
WS-5BB
PR30
PR31
PR32
CW3
SC7
WS-7BB
SC6
CF12
(E)
HEMATOLOGY
LAB
(AR1)
BULK
STO.
3A-119D
WALK-IN
REFRIGERATOR
STORAGE
3A-119B
FREEZER
STO.
3A-119A
COMPRESSOR
RM.
3A-119
PP1
CT1
BF6
BF6
RF16
RF16
PR23
FX3
SC8
AV1
IN1
(N)
STA.
#32
(E)
STA.
#32
PHASING LEGEND:
UNDER CONSTRUCTION IN THIS PHASE
RENOVATED SPACE
INDICATES AREAS AFTER HOURS
CONSTRUCTION WORK
OVERHEAD CEILING WORK ABOVE
EQUIPMENT
TEMPORARY CONSTRUCTION PARTITION
AND DOOR
CONTRACTOR ACCESS PATH
OCCUPANTS ACCESS
DURING CONSTRUCTION
(E) DOORS AND WALLS TO
REMAIN IN THIS PHASE
TEMPORARY FLOAT SPACE/ WORKING
OFFICE SPACE FOR STAFF DISPLACED
BY THIS PHASE'S CONSTRUCTION
(E) DOORS AND WALLS TO BE
DEMOLISHED IN THIS PHASE
(NOT APPLICABLE TO ALL SHEETS)
(N) DOORS AND WALLS BUILT IN
PREVIOUS PHASE
AREA OF WORK IN THIS PHASE
SUPPLY
3A-119G
BLOOD
PREP
3A-121D
FIRE
STAIR
ST-13
CORR
C3A-103
BLOOD
BANK
3A-121
PLATING
3A-122
CHEMISTRY
LAB
3A-120B
DARK
ROOM
3A-215D
CORR
C3A
-10
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
315 Arden…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .