528-18-109_9C DRAWINGS.pdf

PDF 42 MB Posted

Attached to
Z1DA--528-18-109 WARD 9C RENOVATIONS
Solicitation number
36C24222B0069
Issued by

About this file

This federal contract opportunity notice seeks proposals for the 9C Renovation at the Buffalo VA Medical Center. The solicitation number is 36C24222B0069 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 for renovations to Ward 9C. The opportunity type is a solicitation and the description provided is for renovations to Ward 9C at the Buffalo VAMC. No further details are included regarding products or services required, pricing terms, response dates, or other salient information.

View the file

Other files

File Type Posted
AA-102.pdf PDF
A-406.pdf PDF
AD-102.pdf PDF
A-604.pdf PDF
A-405.pdf PDF
AA-101.pdf PDF
A-404.pdf PDF
AD-100.pdf PDF
AA-100.pdf PDF
A-109.pdf PDF
117300.pdf PDF
A-108.pdf PDF
36C24222B0069 0005.docx DOCX document
36C24222B0069 0004.docx DOCX document
Abatement Ward 9c Report.pdf PDF
36C24222B0069 0003.docx DOCX document
36C24222B0069 0002.docx DOCX document
36C24222B0069 0001.docx DOCX document
528-18-109 Pre Bid Attendance.pdf PDF
SPECS 3.pdf PDF
36C24222B0069_1.docx DOCX document
SPECS 1.pdf PDF
WAGE RATE.pdf PDF
LIMITATION ON SUBCONTRACTING.docx DOCX document
SPECS 2.pdf PDF
FAR 52.225-2 Buy American Certification.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:3

:5

P

M

G-000

TITLE SHEET

February 25, 2022 RAS RLB

VA PROJECT #:

CONSULTANT PROVIDING

ARCHITECTURAL &

ENVIRONMENTAL

SERVICES:

PATHFINDER ENGINEERS &

ARCHITECTS LLP

134 SOUTH FITZHUGH STREET

ROCHESTER, NY 14608

PHONE: (585) 325 6004

FAX: (585) 325 6005

DEPARTMENT OF VETERANS AFFAIRS

WARD 9C RENOVATIONS - WNYHS BUFFALO, NY

3495 BAILEY AVENUE

BUFFALO, NY 14215

DEPARTMENT OF VETERANS AFFAIRS

528-18-109

PRIME CONSULTANT PROVIDING

MECHANICAL, ELECTRICAL,

PLUMBING & FIRE PROTECTION

SERVICES:

WATTS ARCHITECTURE &

ENGINEERING

95 PERRY STREET, SUITE 300

BUFFALO, NEW YORK 14203

PHONE: (716) 206-5100

FAX: (716) 206-5199

BAILEY AVE

DRAWING INDEX:

GENERAL

ASBESTOS ABATEMENT

FIRE PROTECTION

ELECTRICAL

N O

R T

H

MECHANICAL CONT'D

MECHANICAL

D C

B A

ARCHITECTURAL

EI-702 ELECTRICAL CRITICAL POWER PARTIAL RISER DIAGRAM

EI-703 ELECTRICAL FIRE ALARM RISER DIAGRAM

EI-704 ELECTRICAL NURSE CALL RISER DIAGRAM

EI-705 IT PARTIAL RISER DIAGRAM

EI-706 LIFE SAFETY RISER ARC FLASH STUDY

EI-800 ELECTRICAL SCHEDULES

EI-801 ELECTRICAL SCHEDULES

EI-802 ELECTRICAL SCHEDULES

E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED-100 ELECTRICAL DEMOLITION PLAN - WING 8C

ED-101 ELECTRICAL DEMOLITION PLAN - WING 9C

EP-101 POWER PLAN - WING 8C

EP-102 POWER PLAN - WING 9C

EP-103 POWER PLAN - ROOF

EP-104 FIRST FLOOR POWER PLAN

EP-105 BASEMENT POWER PLAN

EP-106 SUB-BASEMENT POWER PLAN

EL-201 LIGHTING PLAN - WING 8C

EL-202 LIGHTING PLAN - WING 9C

EY-301 FIRE ALARM PLAN - WING 8C

EY-302 FIRE ALARM PLAN - WING 9C

EY-401 DATA SYSTEMS PLAN - WING 9C

EY-402 NURSE CALL SYSTEMS PLAN - WING 9C

EY-403 SECURITY SYSTEMS PLAN - WING 9C

EI-600 ELECTRICAL DETAILS

EI-601 ELECTRICAL DETAILS

EI-700 ELECTRICAL NORMAL POWER PARTIAL RISER DIAGRAM

EI-701 ELECTRICAL LIFE SAFETY POWER PARTIAL RISER DIAGRAM

F-000 FIRE PROTECTION SYMBOLS, NOTES & ABBREVIATIONS

FD-100 FIRE PROTECTION DEMOLITION PLAN - WING 8C

FD-101 FIRE PROTECTION DEMOLITION PLAN - WING 9C

F-100 FIRE PROTECTION PLAN - WING 8C

F-101 FIRE PROTECTION PLAN - WING 9C

PP-000 PLUMBING SYMBOLS, NOTES & ABBREVIATIONS

PD-100 PLUMBING DEMOLITION PLAN - WING 8C

PD-101 PLUMBING DEMOLITION PLAN - WING 9C

PD-102 MEDICAL GAS DEMOLITION PLAN - WING 9C

PG-300 MEDICAL GAS PLAN - WING 9C

PL-200 SANITARY PLAN - WING 8C

PL-201 SANITARY PLAN - WING 9C

PP-100 PLUMBING PLAN - WING 8C

PP-101 PLUMBING PLAN - WING 9C

PP-200 PLUMBING ENLARGED PLANS

PP-201 PLUMBING ENLARGED PLANS

PP-202 PLUMBING ENLARGED PLANS

PP-300 PLUMBING SCHEMATICS

PP-301 SANITARY SCHEMATICS

PP-400 PLUMBING DETAILS

MI-302 HVAC SCHEMATICS AHU-9C-3

MI-303 HVAC SCHEMATICS AHU-9C-4

MI-304 HVAC SCHEMATICS AHU-9C-5

MI-305 HYDRONIC SCHEMATICS

MI-500 AIR DISTRIBUTION DETAILS I

MI-501 AIR DISTRIBUTION DETAILS II

MI-502 AIR DISTRIBUTION DETAILS III

MI-503 HYDRONIC DETAILS I

MI-504 HYDRONIC DETAILS II

MI-505 STEAM DETAILS

MI-506 ROOF DETAILS

MI-600 MECHANICAL CONTROLS

MI-601 MECHANICAL CONTROLS

MI-602 MECHANICAL CONTROLSM-001 GENERAL MECHANICAL SCHEDULES

M-002 MECHANICAL SCHEDULES AHU-9C-1

M-003 MECHANICAL SCHEDULES AHU-9C-2

M-004 MECHANICAL SCHEDULES AHU-9C-3

M-005 MECHANICAL SCHEDULES AHU-9C-4

M-006 MECHANICAL SCHEDULES AHU-9C-5

MD-101 HVAC DEMOLITION PLAN - WING 9C

MH-101 HVAC PLAN - WING 8C

MH-102 HVAC PLAN - WING 9C

MH-103 HVAC PLAN - WING 10C & 11C

MH-104 HVAC PLAN - ROOF AREA C

MH-401 ENLARGED HVAC PLANS I

MH-402 ENLARGED HVAC PLANS II

MP-201 HYDRONIC PIPING PLAN - WING 8C

MP-202 HYDRONIC PIPING PLAN - WING 9C

MP-401 ENLARGED HYDRONIC PLANS

MI-300 HVAC SCHEMATICS AHU-9C-1

MI-301 HVAC SCHEMATICS AHU-9C-2

A-501 SECTIONS & DETAILS

A-502 PLAN DETAILS

A-503 TYPICAL DETAILS & SECTION DETAILS

A-504 TYPICAL DETAILS

A-505 MILLWORK ELEVATIONS & SECTIONS

A-506 MILLWORK SECTIONS & DETAILS

A-507 MILLWORK SECTIONS & DETAILS

A-601 PARTITION TYPES, WINDOW TYPES & DETAILS

A-602 DOOR TYPES, SCHEDULE & DETAILS, LOUVER DETAILS

A-603 ROOM FINISH SCHEDULE

A-604 EQUIPMENT SCHEDULE

M-000 MECHANICAL SYMBOLS, NOTES & ABBREVIATIONS

AD-100 7TH FLOOR DEMOLITION CEILING PLAN

AD-101 8TH FLOOR DEMOLITION PLAN

AD-102 8TH FLOOR DEMOLITION CEILING PLAN

AD-103 9TH FLOOR DEMOLITION PLAN

AD-104 9TH FLOOR DEMOLITION CEILING PLAN

AD-105 10TH FLOOR & PARTIAL 11TH FLOOR DEMOLITION PLAN

A-100 8C OVERALL FLOOR PLAN

A-101 9C OVERALL FLOOR PLAN

A-102 10C OVERALL FLOOR PLAN

A-103 11C OVERALL FLOOR PLAN, ROOF PLAN

A-104 9TH FLOOR EQUIPMENT PLAN

A-105 9TH FLOOR FINISH PLAN

A-106 MILLWORK PLAN & SCHEDULE

A-107 9TH FLOOR - SIGNAGE

A-108 7C REFLECTED CEILING PLAN

A-109 8C REFLECTED CEILING PLAN

A-110 9C REFLECTED CEILING PLAN

A-201 INTERIOR ELEVATIONS

A-202 INTERIOR ELEVATIONS

A-203 INTERIOR ELEVATIONS

A-204 INTERIOR ELEVATIONS

A-205 CORRIDOR ELEVATIONS

A-206 CORRIDOR ELEVATIONS

A-401 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'A'

A-402 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'B'

A-403 9TH FLOOR - PARTIAL FLOOR PLAN - AREA 'C'

A-404 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'A'

A-405 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'B'

A-406 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'C'

S-001 GENERAL NOTES

S-100 8TH FLOOR FRAMING PLAN

S-101 9TH FLOOR FRAMING PLAN

S-102 10TH FLOOR FRAMING PLAN

S-103 11TH & PARTIAL 12TH FLOOR FRAMING PLANS

S-500 STRUCTURAL DETAILS

AA-100 8TH FLOOR ASBESTOS ABATEMENT PLAN

AA-101 9TH FLOOR ASBESTOS ABATEMENT PLAN AND DETAIL

AA-102 10TH & 11TH FLOOR ASBESTOS ABATEMENT PLANS

G-000 TITLE SHEET

G-001 GENERAL NOTES, ABBREVIATIONS, AND LEGENDS

G-002 8TH FLOOR CODE COMPLIANCE DRAWINGS

G-003 9TH FLOOR CODE COMPLIANCE DRAWINGS

G-004 10TH FLOOR CODE COMPLIANCE DRAWINGS

G-005 7TH FLOOR - PHASING FLOOR PLAN

G-006 8TH FLOOR - PHASING FLOOR PLAN

G-007 10TH FLOOR - PHASING FLOOR PLAN

G-008 11TH FLOOR - PHASING FLOOR PLAN

G-009 INTERIM LIFE SAFETY MEASURES

G-010 INFECTION CONTROL RISK PLAN

STRUCTURAL

PLUMBING

ARCHITECTURAL CONT'D ELECTRICAL CONT'D

Revisions: Date:

GENERAL NOTES

PROJECT COORDINATION

1. THE CONTRACTOR SHALL REVIEW CONSTRUCTION DOCUMENTS AND NOTIFY THE VA COR OF ANY INACCURACIES OR DISCREPANCIES IN THE DOCUMENTS AND IN FIELD CONDITIONS SHOWN ON THE

DRAWINGS IN A TIMELY MANNER.

2. THE CONTRACTOR SHALL VISIT THE SITE TO VERIFY FIELD CONDITIONS, NO ADDITIONAL PAYMENT WILL

BE MADE FOR FAILURE TO ACCOUNT FOR OBSERVABLE CONDITIONS.

3. SOME WORK INCLUDED IN THIS CONTRACT MUST BE PERFORMED ON SECOND AND/OR THIRD SHIFTS, INCLUDING ASBESTOS ABATEMENT, PLUMBING WORK AT 8C & 10C AND ASSOCIATED ARCHITECTURAL

INFILL CONSTRUCTION & FINISH RESTORATION

CODE CONFORMANCE

1. THE CONTRACTOR SHALL PERFORM WORK IN STRICT ACCORDANCE WITH VA STANDARDS AND FEDERAL CODES, RULES, REGULATIONS AND ORDINANCES INCLUDING, BUT NOT LIMITED TO, NFPA 101, THE INTERNATIONAL BUILDING CODE, AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)

WHETHER OR NOT INFORMATION AND/OR WORK IS SPECIFICALLY SHOWN ON THE DRAWINGS.

2. THE EXISTING FIRE RATING OF CHASE, WALL AND FLOOR ASSEMBLIES MUST BE MAINTAINED OR MADE TO

COMPLY WITH FIRE RATING REQUIREMENTS AS ESTABLISHED BY THIS CONTRACT AND CURRENT

BUILDING CODE REQUIREMENTS. SEE CODE DIAGRAMS FOR RATINGS OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR FIRE STOPPING AROUND ITEMS WHICH PENETRATE ANY RATED ASSEMBLY. SUBMIT

FIRE STOPPING SYSTEM FOR APPROVAL.

3. CONTRACTOR SHALL RESTORE EXISTING CHASE WALL, FLOOR AND CEILING ASSEMBLIES TO MATCH FIRE RATINGS AND FINISH OF EXISTING ADJACENT CONSTRUCTION AT PENETRATIONS AND OPENINGS.

4. INFILL FLOOR SLAB PENETRATIONS AFTER REMOVAL OF SYSTEMS PENETRATIONS. PATCH VOID LEVEL AND PLUMB WITH SURROUNDING FLOOR. PROVIDE APPROVED FIRESTOPPING WHERE REQUIRED. EACH

TRADE SHALL BE RESPONSIBLE TO INFILL PENETRATIONS RESULTING FROM THEIR REMOVALS.

CONTRACT CONFORMANCE

1. THIS FACILITY IS OCCUPIED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR METHODS AND MEANS OF

CONSTRUCTION AND SHALL BE RESPONSIBLE TO THE VA COR FOR PROVIDING A SAFE WORK

ENVIRONMENT DURING THE CONSTRUCTION PERIOD. EVERY EFFORT SHALL BE MADE BY THE

CONTRACTOR TO PROTECT THE OCCUPANTS, VISITORS AND CUSTOMERS FROM THE HAZARDS OF

CONSTRUCTION.

2. SECURITY AND WORK SITE PROTECTION SHALL BE PROVIDED BY THE CONTRACTOR, INCLUDING

PROTECTION OF STORE MATERIALS AND DUMPSTERS.

3. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PREVENT THE SPREAD OF DUST, SMOKE, FUMES, ETC., THROUGHOUT THE BUILDING.

4. CONTRACTOR TO PROVIDE FIRE PREVENTION PLAN TO VA COR FOR REVIEW AND APPROVAL.

5. IF A SAFETY SYSTEM IS OUT OF SERVICE FOR MORE THAN (4) HOURS OR A SITUATION OCCURS THAT

AFFECTS SAFETY TO PATIENT OCCUPANTS, VISITORS, OR THE HOSPITAL STAFF FOR MORE THAN (4) HOURS, THE CONTRACTOR IS TO NOTIFY VA COR A MINIMUM OF 48 HOURS IN ADVANCE TO COORDINATE

INTERIM LIFE SAFETY MEASURES (ILSM).

TEMPORARY FACILITIES

1. COORDINATE WITH COR FOR MATERIAL STAGING, DELIVERIES, USE OF ELEVATOR, ETC. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE MATERIAL DELIVERIES WITH VA COR AND VA STAFF IN CHARGE OF THE LOADING DOCK. NO CONTRACTOR MATERIAL WILL BE STORED ON OR AROUND LOADING DOCK UNLESS AUTHORIZED BY THE VA COR. THE VA WILL NOT RECEIVE CONTRACTOR MATERIAL.

2. THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES INCLUDING, ADEQUATE LIGHTING, WATER, TOILETS, POWER, HEAT, WORK PROTECTION, ETC. OR AS ADDITIONALLY DISCUSSED BY AND OWED TO

THE VA COR. MAINTAIN TEMPORARY FACILITIES AND CONTROLS UNTIL NO LONGER NEEDED OR

REPLACED BY AUTHORIZED USE OF PERMANENT FACILITIES. COORDINATE REMOVAL OF TEMPORARY

FACILITIES WITH THE OWNER.

3. CONTRACTOR TO PLACE DUMPSTERS WITHIN 10 FEET OF A BUILDING. ANY DUMPSTER WITHIN 20 FEET OF A BUILDING WILL REMAIN COVERED WHEN NOT IN USE. CONTRACTOR SHALL USE TEMPORARY MARKINGS

AND SIGNAGE TO INDICATE DUMPSTER PLACEMENT.

4. CONTRACTOR TO PROVIDE MULTIPLE CHUTES TO CONVEY CONSTRUCTION BY THE VA COR DOWN TO

GROUND LEVEL. CONTRACTOR TO PROVIDE TEMPORARY WASTE RECEPTACLES UNDER OUTPUT OF

CHUTES TO TRANSPORT WASTE BETWEEN CHUTES AND DUMPSTER. PROTECT AREAS THAT TEMPORARY WASTE RECEPTACLES TRAVERSE. WASTE SHALL NOT PILE UP ON GROUND. IMMEDIATELY RELOCATE

WASTE TO DUMPSTER. NO CHUTES SHALL BE USED FOR ASBESTOS CONTAINING MATERIAL.

PROTECTION OF THE WORK

1. TEMPORARY CONTROLS, INCLUDING TEMPORARY SHORING AND TEMPORARY PROTECTION OF EXISTING

CONDITIONS SHALL BE PROVIDED BY THE CONTRACTOR.

2. CONTRACTOR TO TEMPORARILY PROTECT, ENCLOSE AND/OR WEATHERIZE EXTERIOR ENVELOPE WHERE

DISTURBED FOR THE DURATION OF THE CONTRACT TO PROTECT THE WORK AREA AND BUILDING

OCCUPANTS IN ADJACENT AREAS AND ON FLOORS BELOW.CONTRACTOR SHALL BE RESPONSIBLE TO

PROVIDE PROTECTION FOR INSTALLED WORK.

3. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND NOT DAMAGE EXISTING TO REMAIN FINISHES, EQUIPMENT, ETC. DURING THE WORK. DAMAGED AREAS SHALL BE REPAIRED/RESTORED TO

THEIR ORIGINAL CONDITIONS.

4. HOT WORK SHALL FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR TIME IN REGARDS TO FIRE

WATCHES.

QUALITY

1. CONTRACTOR MUST COORDINATE ACTIVITIES SO THAT WORK IS COMPLETED IN A TIMELY FASHION AND

FINISHED ON OR BEFORE THE PROJECT COMPLETION DATE AS SET BY THE CONTRACT.

2. WORK SHALL BE PERFORMED IN THE BEST AND MOST PROFESSIONAL MANNER BY CONTRACTORS

SKILLED IN THEIR RESPECTIVE TRADES.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING AND CORRECTING HIS OWN WORKMANSHIP

TO THE EXTENT THAT SATISFIES THE VA COR.

EXISTING CONDITIONS

1. THE CONTRACTOR SHALL BE AWARE THAT THE EXISTING FACILITY HAS THE POTENTIAL OF HAVING

OTHER CONSTRUCTION PROJECTS OCCURRING AT THE SAME TIME. COORDINATE WITH VA COR.

2. IF CONTRACTOR ENCOUNTERS MECHANICAL EQUIPMENT PREVIOUSLY ABANDONED IN PLACE,

COORDINATE REMOVAL AND REPAIR WITH THE COR ON A CASE BY CASE BASIS.

DIMENSIONS AND DIMENSIONING

1. DIMENSIONS AND DETAILS ARE BASED ON THE BEST AVAILABLE INFORMATION AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING FIELD CONDITIONS. REPORT ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS TO THE COR AND ARCHITECT BEFORE ORDERING MATERIALS AND

PREFABRICATED ITEMS.

2. EXISTING CONDITIONS INCLUDE CONDITIONS ABOVE AND BELOW WORK AREAS, AND FIELD DIMENSIONS

AND ELEVATIONS.

COORDINATING WORK OF THE CONTRACT

1. CONTRACTOR TO COORDINATE WORK WITH HAZARDOUS MATERIALS ABATEMENT WORK.

2. THE CONTRACTOR SHALL COORDINATE WORK ASSOCIATED WITH THIS PROJECT WITH THE SUB-

CONTRACTORS TO PROVIDE A COMPLETE AND FINISHED PROJECT.

3. TRADES SHALL COORDINATE INSTALLATION OF HVAC, SPRINKLER, ELECTRICAL, AND PLUMBING TO

MINIMIZE CEILING HEIGHT AND CLEARANCE ISSUES. CONTRACTOR TO SUBMIT SYSTEMS COORDINATION

SHOP DRAWINGS SHOWING HVAC, ELECTRICAL, PLUMBING, FIRE PROTECTION, MEDICAL GAS,

STRUCTURAL, AND CEILING SYSTEMS PRIOR TO INSTALLATION OF NEW WORK.

MATERIALS AND INSTALLATION

1. THE CONTRACTOR SHALL PROVIDE MATERIALS INDICATED GRAPHICALLY OR AS NOTED. CONTRACTOR

SHALL NOTIFY COR OF ANY DISCREPANCIES IN IDENTIFICATION OF REQUIRED MATERIALS.

2. THE CONTRACTOR AND VA COR SHALL BE RESPONSIBLE FOR SPECIFICATIONS OF MATERIALS NOT SPECIFIED ON THE DRAWINGS OR IN THE SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE THE SELECTION OF COMPONENT COLORS, MODEL NUMBERS, SIZES, ETC. OF BUILDING ELEMENTS WITH THE

VA COR BEFORE ORDERING MATERIALS.

3. INSTALL MATERIALS ACCORDING TO THE MANUFACTURER'S WRITTEN INSTRUCTIONS AND

RECOMMENDATIONS, AND TO ACCEPTABLE PROFESSIONAL TRADE INDUSTRY STANDARDS FOR FIRST

CLASS WORK OF SIMILAR NATURE AND CHARACTER.

4. PROVIDE INCIDENTAL WOOD BLOCKING AND/OR METAL STRAPPING FOR ATTACHMENT OF FINISHES, ACCESSORIES, MILL WORK, INCLUDING BUT NOT LIMITED TO CASEWORK, COUNTERTOPS, HAND AND

BUMPER RAILS & TOILET ROOM ACCESSORIES.

CONTRACT CLOSEOUT

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING/RECONDITIONING ANY SITE FEATURES DISTURBED BY CONSTRUCTION OPERATIONS INCLUDING BUT NOT LIMITED TO CONCRETE WORK, PAVING

LAWNS AND PLANTINGS.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING/RECONDITIONING ANY CONSTRUCTION IDENTIFIED AS EXISTING TO REMAIN TO A LEVEL EQUAL TO OR GREATER THAN THE ADJACENT

CONSTRUCTION.

3. THE CONTRACTOR SHALL PROVIDE THE VA COR COMPLETE MAINTENANCE & OPERATION INSTRUCTIONS

IN BOTH WRITTEN & VERBAL FORM FOR CONTRACTOR PROVIDED EQUIPMENT.

4. WORKMANSHIP AND MATERIALS, UNLESS CARRYING A GUARANTEE BY A MANUFACTURER FOR A LONGER PERIOD OF TIME, SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL

PAYMENT TO THE CONTRACTOR.

GRAPHIC LEGEND

MTL. STUD WALL

EXISTING WALL TO REMAIN

DOOR

EXISTING DOOR TO REMAIN

DEMOLITION DOOR

EXISTING TO REMAIN FEC

ACCESS PANEL

EXISTING WINDOW

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:4

:5

A

M

G-001

GENERAL NOTES,

ABBREVIATIONS, AND LEGENDS

February 25, 2022 RAS AHE

GENERAL ABBREVIATIONS

A AMPERES

AB ANCHOR BOLT

A/C AIR CONDITION(ING) (ED)

AC/HR AIR CHANGES PER HOUR

ACC ACCESSIBLE

ACCU AIR COOLED CONDENSING UNIT

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTICAL CEILING TILE

ACM ASBESTOS CONTAINING

MATERIAL

ACOUS PNL ACOUSTICAL PANEL

ACS PNL ACCESS PANEL

ADA AMERICANS WITH DISABILITIES

ACT

ADDL ADDITIONAL

ADJ ADJUSTABLE, ADJACENT

ADH ADHESIVE

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AISI AMERICAN IRON AND STEEL

INSTITUTE

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

ARD AUXILLARY ROOF DRAIN

ASD ALLOWABLE STRESS DESIGN

ASTM AMERICAN SOCIETY FOR

TESTING AND MATERIALS

AT ACOUSTICAL CEILING TILE

AWP ACOUSTICAL WALL PANEL

AWS AMERICAN WELDING SOCIETY

BAT BATTEN

B/B BACK TO BACK

B BD BASE BOARD

BITUM BITUMINOUS

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM, BENCHMARK

BOT BOTTOM

BR BUMPER RAIL

BRG BEARING

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT UP ROOFING

BW BOTH WAYS

CAB CABINET

CB CATCH BASIN, CORNER BEAD

CBB CEMENTITIOUS BACKER BOARD

CC CONTRACTOR FURNISHED,

CONTRACTOR INSTALLED

CCTV CLOSED CIRCUIT TELEVISION

CH BD CHALKBOARD

CEM CEMENT

CF CONTRACTOR FURNISHED

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

CH COAT HOOK

CI CAST IRON

CIP CAST IN PLACE, CAST IRON PIPE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLO CLOSET

CLR CLEAR, COLOR

CMT CERAMIC MOSAIC TILE

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CLEANOUT, CASED OPENING,

COMPANY

COL COLUMN

CONC CONCRETE

CONC BD CONCRETE BOARD

CONF CONFERENCE

CONN CONNECT(ION)

CONSTR CONSTRUCTION

CONT CONTINUE(OUS)

CONTR CONTRACT(OR)

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CPT CARPET

CS CONCRETE SEALANT

CSJ CONSTRUCTION JOINT

CSK COUNTER SUNK

CT CERAMIC TILE, COUNT,

CURRENT TRANSFORMER

CTR CENTER

CW COLD WATER PIPING, CASEMENT

WINDOW

CU CUBIC

CUH CABINET UNIT HEATER

CU YD CUBIC YARD

D DEEP, DEPTH

D PENNY (NAIL)

db BAR DIAMETER

DBL DOUBLE

DEFS DIRECT-APPLIED EXTERIOR FINISH

SYSTEM

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA OR ø DIAMETER

DIAG DIAGONAL, DIAGRAM

DIM DIMENSION

DIFF DIFFUSER

DIR DIRECTION

DISP DISPENSER

DIV DIVISION

DMPF DAMP PROOFING

DL DEAD LOAD

DN DOWN

DO DITTO

DR DOOR, DRIVE

DS DOWNSPOUT

DW DISHWASHER

DWV DRAINAGE WASTE & VENT

DWG DRAWING

DWL DOWEL

E EAST

EA EACH

EC ELECTRICAL CONTRACTOR

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

ELAS ELASTOMERIC

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EM ENTRY MAT, EXPANDED METAL

EMER EMERGENCY

ENCL ENCLOSURE

ENGR ENGINEER

EOS EDGE OF SLAB

EP ELECTRIC PANEL

EQ EQUAL

EQUIP EQUIPMENT

ES EMERGENCY SHOWER

ETC ET CETERA

ETR EXISTING TO REMAIN

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXC EXCAVATION, EXCAVATE

EXP EXPAND, EXPANSION

EXT EXTERIOR, EXTERNAL,

EXTINGUISHER

F/F FACE TO FACE

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FC FOOT CANDLE

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FHC FIRE HOSE CABINET

FIN FINISH(ED)

FIXT FIXTURE

FLASH FLASHING

FLEX FLEXIBLE

FLOUR FLUORESCENT

FLG FLOORING, FLANGE

FLR FLOOR

FO FINISHED OPENING

FP FIRE PROTECTION, FIREPROOF

FRTW FIRE RETARDANT TREATED WOOD

FT FOOT, FEET

FTG FOOTING

FTR FINNED TUBE RADIATION

FURN FURNACE, FURNITURE, FURNISH

FUT FUTURE

FWC FABRIC WALL COVERING

GA GAGE

GAL GALLON

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACT(OR)

GFI GROUND FAULT CIRCUIT

INTERRUPTER

GFRC GLASS FIBER REINFORCED

CONCRETE

GFRG GLASS FIBER REINFORCED

GYPSUM

GL GLASS, GROUND LEVEL

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED BEAM

GR GRADE, GROSS

GWT GLAZED WALL TILE

GYP GYPSUM

GWB GYPSUM WALLBOARD

GYP PLAS GYPSUM PLASTER

H HOUR

HB HOSE BIBB

HC HOLLOW CORE, HOSE CABINET

HCP HANDICAPPED

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HO HOLD OPEN

HORIZ HORIZONTAL

HP HIGH POINT, HORSEPOWER

HR HOUR, HANDRAIL

HSS HOLLOW STRUCTURAL SECTION

HT HEIGHT

HTG HEATING

HTR HEATER

HVAC HEATING, VENTILATING AND AIR

CONDITIONING

HW HOT WATER

HYD HYDRANT

ID INSIDE DIAMETER

ILSM INTERIM LIFE SAFETY MEASURE

IN INCHES

INCL INCLUDED

INCAND INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INTERM INTERMEDIATE

INT INTERIOR

JAN JANITOR

JST JOIST

JT JOINT

K KILOWATT

KIP 1000 POUNDS

KIT KITCHEN

KO KNOCKOUT

KPL KICK PLATE

L LITER, ANGLE

LAM LAMINATE(D)

LAU LAUNDRY

LAV LAVATORY

LB POUND/POUNDS

LBL LABEL

LD LOAD

LF LINEAR FEET (FOOT)

LH LEFT HAND, LATENT HEAT

LIN LINEAR

LKR LOCKER

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LN LINOLEUM

LOC LOCATION

LRFD LOAD & RESISTANCE FACTOR

DESIGN

LT LIGHT

LTG LIGHTING

LWC LIGHT-WEIGHT CONCRETE

MACH MACHINE

MAINT MAINTENANCE

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MC MECHANICAL CONTRACTOR

MCB METAL CORNER BEAD

MDO MEDIUM DENSITY OVERLAY

MDF MEDIUM DENSITY FIBERBOARD

MECH MECHANICAL

MEP MECHANICAL, ELECTRICAL,

PLUMBING AND FIRE

PROTECTION

MEZZ MEZZANINE

MFR MANUFACTURER

MH MANHOLE

MM MILLIMETER

MIN MINIMUM

MISC MISCELLANEOUS

MLWK MILLWORK

MO MASONRY OPENING

MR MOISTURE RESISTANT

MRK BD MARKER BOARD

MTD MOUNTED

MTL METAL

MULL MULLION

N NORTH

NAT NATURAL

NCOMBL NONCOMBUSTIBLE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO OR # NUMBER

NOM NOMINAL

NORM NORMAL

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

NWC NORMAL WEIGHT CONCRETE

O/O OUT TO OUT

OA OVERALL, OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER

OF/CI OWNER FURNISHED, CONTACTOR

INSTALLED

OF/OI OWNER FURNISHED, OWNER

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OH OPPOSITE HAND

OH DR OVERHEAD (COILING) DOOR

OPNG OPENING

OPP OPPOSITE

OPT OPTIONAL, OPTIMUM

OZ OUNCE

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLEBOARD

PC PLUMBING CONTRACTOR,

PORTLAND CEMENT

PCC PRECAST CONCRETE

PCT PORCELAIN CERAMIC TILE

PED PEDESTAL

PEND PENDANT

PER PERIOD

PERF PERFORATED

PGBD PEG BOARD

PL PLATE, PROPERTY LINE

PLF PONDS PER LINEAR FOOT

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLB PLUMBING

PLYWD PLYWOOD

PNL PANEL

POL POLISHED

PORC PORCELAIN

POS POSITIVE, POSITION

PPT PRESSURE-PRESERVATIVE

TREATED

PR PAIR

PREFAB PREFABRICATE

PREFIN PREFINISH

PREP PREPARATION

PROJ PROJECT

PROJ SCRN PROJECTION SCREEN

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE, POST TENSION

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

QT QUARRY TILE

QTR QUARTER

QTY QUANTITY

R RISER, RADIUS, THERMAL

RESISTANCE

RB RUBBER BASE, RESILIENT BASE

RCP REINFORCED CONCRETE PIPE,

REFLECTED CEILING PLAN

RD ROOF DRAIN, ROAD

REC RECESSED

REF REFRIGERATOR

REFL REFLECT

REG REGISTER, REGULATION

REINF REINFORCED

REQD REQUIRED

RES RESINOUS FLOOR

RESIL RESILIENT

REV REVISION

RF RESILIENT FLOORING

RFG ROOFING

RH RIGHT HAND, ROOF HATCH

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RTU ROOF TOP UNIT

RV ROOF VENT

RWB RUBBER WALL BASE

S SOLID SURFACE, SOUTH

SAB SOUND ATTENUATION BATTS

SAN SANITARY

SC SOLID CORE, SHADING COEFFICIENT

SCHED SCHEDULE

SEAL SEALER ON FLOOR (FINISH)

SECT SECTION

SF SQUARE FOOT, SAFETY FACTOR

SGT STRUCTURAL GLAZED TILE

SHT SHEET

SHR SHOWER

SIM SIMILAR

SOG SLAB ON GRADE

SP STANDPIPE, SUMP PIT

SPA SPACES

SPKR SPEAKER

SPEC SPECIFICATION

SQ SQUARE

SRD SECONDARY ROOF DRAIN

SS SERVICE SINK, STAINLESS STEEL

SSM SOLID SURFACE MATERIAL

SSP STAINLESS STEEL PIPE

STA STATION

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIFF STIFFENER

STL STEEL

STOR STORAGE

STR STRAIGHT, STRINGERS

STRUCT STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SY SQUARE YARD

T TREAD

T/ TOP OF

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TEL TELEPHONE

TELEC TELECOMMUNICATIONS

THRES THRESHOLD

TEMP TEMPORARY

TER TERRAZZO

THK THICK(NESS)

TK BD TACK BOARD

TMPD TEMPERED

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOPO TOPOGRAPHY, TOPOGRAPHIC

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCL UNDER CABINET LIGHTING

UGND UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES

UNEX UNEXCAVATED

UNFIN UNFINISHED

UON UNLESS OTHERWISE NOTED

UTIL UTILITY

UV UNIT VENTILATOR

V VOLTS

VA DEPARTMENT OF VETERAN AFFAIRS

VAMC VETERANS AFFAIRS MEDICAL

CENTER

VARN VARNISH(ED)

VB VINYL BASE

VC VA FURNISHED, CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VIN VINYL

VOL VOLUME

VR VAPOR RETARDER

VT VINYL TILE

VV VA FURNISHED, VA INSTALLED

V SHT VINYL SHEET

VWC VINYL WALL COVERING

W WEST/WATTS

W/ WITH

WC WATER CLOSET, WALL COVERING

W/O WITHOUT

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WD GD WOOD GUARD

WH WATER HEATER

WI WROUGHT IRON

WM WIRE MESH

WP WATERPROOFING, WORKING POINT,

WALL PROTECTION

WR WATER REPELLENT, WEATHER

RESISTANT

W RECPT WASTE RECEPTACLE

WSCT WAINSCOT

WSF WELDED SEAMLESS FLOORING

W/SF WATTS PER SQUARE FOOT

WT WEIGHT, WATERTIGHT, WATER

TABLE

WWF WELDED WIRE FABRIC

X BY

YD YARD

0' 4' 8' 16' 32'

C12 A

C12

A-XXX

A-XXX

X

SCALE: X"=1'-0"

TITLE

B

A

8'-0" AFF

BATT INSULATION

RIGID INSULATION

WOOD BLOCKING OR SHIMSTONE WOOD FRAMING (CONTINUOUS)

FINISH WOOD

STEEL-LARGE-SCALE

STEEL-SMALL-SCALE

PLYWOOD

CONCRETE

CONCRETE MASONRY UNIT

BRICK

(Other metals as noted)

NOTATION

SECTION CUT

DETAIL-BLOW UP

ELEVATION

INTERIOR ELEVATIONS

PARTITION TYPE

ROOM NUMBER

DOOR NUMBERS

REVISION

OR

OR001 100

A

DETAIL NO.

STRUCTURAL

GRID

VIEWING DIRECTION

DETAIL NO.

SHEET NO.

DETAIL NO.

SHEET NO.

SHEET NO.

ELEVATIO

N

NO.

PLAN KEY NOTE

DEMOLITION KEY NOTE

CEILING TYPE AND ELEVATION

DRAWING SYMBOLS

MATERIAL SYMBOLS

(Other metals as noted)

A-XXX

X

A-XXX

X

GYPSUM, SAND, MORTAR

A-XXX

X

SHEET NO.

ELEVATION NO.

GRAPHIC SCALE

SOLID SURFACE

WINDOW NO.1

FLOOR INFILL

CC EQUIPMENT DESIGNATION

SPRAY APPLIED FIREPROOFING

E

E

E

E

2E2E

E

2E

2E

2E

2E

2E

E

E

2E

2E

E

2E

2E

E

E

E

2E 2E

E

2E

2E 2E

E

E

2E

E

E

2E

2E

E

E2 E

2E

2E

2E

2E

2E

2E

2E

S1

S1

S S

2E2E

D C B A

DD

C.1

5.1

EFGH

CC

BB

AA

2E

2E

2E

2E 2E

2E

2E

2E

2E

2E

2E

2E

2E

DN

UP

DN

UP

D N

U P

E

XIT AC

C

ES

S

TR

A

VE

L D

ISTA

N C E = 81'-2"

E X

IT

A

C C

E S

S T

R A

V E

L D

IS

T

A N

C E

EXIT ACCESS TRAVEL DISTANCE = 71'-5"

S7

813-C

816-C

817-C

818C-1

811-C

806-C

805-C

S9

800C-1

837-C

836-C

835-C

834-C

834C-2

834C-1

833-C

831-C

831C-1

830C-1831C-2

830-C

804-C

S8

825-C

825C-1

MECHANICAL

RM

814C

MECHANICAL

RM

810C

MECHANICAL

RM

829C

823C

822C

821C

820C

819C

818C

819C-1

820C-1

822C-1

EXIT ACCESS TRAVEL DISTANCE = 56'

EXIT ACCESS TRAVEL DISTANCE = 85'

SMOKE PARTITION - 30 MIN RATED CORRIDOR WALL

1 HOUR RATED FIRE BARRIER

EXISTING 2 HR FIRE BARRIER TO BE MAINTAINED

EXIT ACCESS TRAVEL DISTANCE

EXISTING DEAD END CORRIDOR

X SF

X OCCP.

FLOOR AREA OCCUPANCY

5' TURNING RADIUS

CLEAR FLOOR SPACE

2 HOUR RATED CONSTRUCTION AND COLUMN

ENCLOSURE UL #X527

2 HOUR RATED FIRE BARRIER

C

B A

D

KEY PLAN

1. CONTRACTOR SHALL NOT COMPROMISE EXISTING 2-HOUR RATED PARTITIONS

AT EXISTING STAIRS IN ANY WAY.

2. COLUMN ENCLOSURES ARE EXISTING, 2 HOUR FIRE RATED SYSTEMS. WHERE

THE INTEGRITY OF THE SYSTEM IS DISRUPTED BY CONSTRUCTION ACTIVITIES,

EXACTLY MATCH ADJACENT/REMAINING CONSTRUCTION. FIRE CAULK AT

UNDERSIDE OF CONCRETE DECK AND ANY JOINTS. LAPPED CONSTRUCTION IS

NOT ACCEPTABLE. SHOULD ANY CONDITIONS PERMANENTLY DISRUPT THE

INTEGRITY OF THE FIRE RATED CONSTRUCTION, NOTIFY THE COR

IMMEDIATELY.

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:5

:0

A

M

G-002

8TH FLOOR CODE COMPLIANCE

DRAWINGS

February 25, 2022 RAS AHE

1/8" = 1'-0"1

8TH FLOOR CODE COMPLIANCE & LIFE SAFETY PLAN

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS

• INTERNATIONAL BUILDING CODE (IBC), 2020 (ONLY WHEN SPECIFICALLY REFERENCED

IN VA DESIGN DOCUMENTS)

• INTERNATIONAL PLUMBING CODE (IPC) 2020

• NFPA 101 LIFE SAFETY CODE 2018

• NFPA 99 STANDARD FOR HEALTH CARE FACILITIES 2018

• NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS 2019

• NFPA 25 STANDARD FOR THE INSPECTION TESTING AND MAINTENANCE OF WATER

BASED FIRE PROTECTION SYSTEMS 2020

• NATIONAL ELECTRICAL CODE (NEC) 2020

• PLUMBING CODE OF NEW YORK STATE, 2020

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

• FGI GUIDELINE FOR DESIGN & CONSTRUCTION OF HEALTH CARE FACILITIES, 2010

• VA SPACE PLANNING CRITERIA, SEPS VERSION 1.6 CHAPTER 100 MS& N PATIENT UNIT

• VETERANS ADMINISTRATION ELECTRICAL DESIGN MANUAL

• DEPARTMENT OF VETERAN AFFAIRS FIRE PROTECTION DESIGN MANUAL

• VETERANS ADMINISTRATION PLUMBING DESIGN MANUAL REQUIREMENTS

APPLICABLE CODES & DESIGN GUIDELINES:

NOTES

CODE ANALYSIS SYMBOLS LEGEND

NORTH

1/8" = 1'-0"

0' 4' 8' 16' 32'

FULLY SPRINKLERED

S S

S S

S

S SS S S

S S

E

E

2E

2E 2E

2E 2E

S

S

S

S

S

S

2E

2E

2E

S S

2E 2E

S S

S S

S

S S

S

E

S

S

S

S

S

E

S SS

S S

S

2E 2E

2E

E

E

2E

2E 2E

2E

S S

S

S

S

S

S

S

S

S

S S

S S

2E2E

S S

2E

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

S

S

S S

S

2 2

2 2

2 S S

2 2

S S

2E2E

D C B A

DD

C.1

5.1

EFGH

CC

BB

AA

E

XIT AC

C

ES

S

TR

A

VE

L D

ISTA

N C E = 93'-11"

E X

IT

A

C C

E S

S T

R A

V E

L D

IS

T

A N

C E

DEAD END = 30'-0"

EXIT ACCESS TRAVEL DISTANCE = 67'-0"

OCCUP.2

334 SF

OCCUP.2

293 SF

OCCUP.2

330 SF

OCCUP.1

101 SF

OCCUP.2

322 SF

OCCUP.4

312 SF

OCCUP.2

136 SF

OCCUP.1

108 SF

OCCUP.1

117 SF

OCCUP.2

320 SF

OCCUP.2

120 SF

OCCUP.2

325 SF

OCCUP.2

329 SF

OCCUP.2

346 SF

OCCUP.1

125 SF

OCCUP.2

164 SF

OCCUP.1

58 SF

OCCUP.2

194 SF

OCCUP.2

290 SF

OCCUP.2

307 SF

OCCUP.2

308 SF

OCCUP.2

265 SF

OCCUP.2

280 SF

OCCUP.1

66 SF

OCCUP.1

64 SF

STAIR

STAIR

STAIR

FEC

EXISTING

TO

REMAIN

FEC EXISTING

TO REMAIN

FEC

EXISTING

TO

REMAIN

2 HR RATED

CONSTRUCTION

BARRIER

DOOR CAPACITY

45" 75

DOOR CAPACITY

44" 73

DOOR CAPACITY

45" 75

DOOR CAPACITY

45" 75

E X

IT

A

C C

E S

S T

R A

V E

L D

IS

T

A N

C E

DN

UP

DN

UP

D N

U P

OCCUP.2

304 SF

OCCUP.1

117 SF

OCCUP.1

11 SF

PATIENT

ROOM

932C

DATA RM

933C

HSKPG

934C

PATIENT

ROOM

904C

TLT. RM.

905-1C

TLT. RM.

904-1C

PATIENT

ROOM

905C

PATIENT

ROOM

931C

TLT. RM.

931-1C

TLT. RM.

932-1C

CLEAN

UTILITY

906C

SOILED

UTILITY

907C

NURSE

MANAGER

930C

CLEAN

LINEN

929C

LARGE

EQUIP.

RM.

908C

TLT. RM.

909-1C

PATIENT

ROOM

909C

TLT. RM.

-IIA

911-1C

PATIENT

ROOM -

IIA

911C

TLT. RM.

-IIA

913-1C

PATIENT

ROOM -

IIA

913C

ANTE

RM.

912C

PATIENT

ROOM -

IIA/BAR.

914C

TLT. RM.

- BAR

914-1C

ANTE

RM.

915C

PATIENT

ROOM -

IIA/BAR.

916C

TLT. RM.

- BAR

916-1C

CONF.

RM /

RESIDENT

OFFICE

917C

NURSE

STATION

918C

PATIENT

LOUNGE

928C

N.WK.RM

927C

MED RM

920C

OXYGEN

919C

TLT. RM.

921-1C

N.TR.

927-1C

PATIENT

ROOM

926C

PATIENT

ROOM

921C

PATIENT

ROOM

923C

TLT. RM.

925-1C

TLT. RM.

926-1C

PATIENT

ROOM

925C

TLT. RM.

924-1C

N. STN.

902C

TLT. RM.

923-1C

PATIENT

ROOM

924C

CORRIDOR

900C

OCCUP.1

85 SF ELECT.

CLOSET

908C-1

EXIT ACCESS TRAVEL DISTANCE = 52'-0"

SMOKE PARTITION - 30 MIN RATED CORRIDOR WALL

1 HOUR RATED FIRE BARRIER

EXISTING 2 HR FIRE BARRIER TO BE MAINTAINED

EXIT ACCESS TRAVEL DISTANCE

EXISTING DEAD END CORRIDOR

X SF

X OCCP.

FLOOR AREA OCCUPANCY

5' TURNING RADIUS

CLEAR FLOOR SPACE

2 HOUR RATED CONSTRUCTION AND COLUMN

ENCLOSURE UL #X527

2 HOUR RATED FIRE BARRIER

1. REFER TO PARTITION TYPES ON SHEET A-601 FOR DETAILS OF NEW RATED

PARTITIONS.

2. REFER TO DETAIL 2 ON SHEET A-601 FOR COLUMN ENCLOSURE DETAILS.

3. EXISTING FIRE EXTINGUISHER CABINETS AT EXISTING STAIR HALLS ARE TO REMAIN.

4. CONTRACTOR SHALL NOT COMPROMISE EXISTING 2-HOUR RATED PARTITIONS AT

EXISTING STAIRS IN ANY WAY.

5. REFER TO ELECTRICAL DRAWINGS FOR EXIT SIGN ARRANGEMENT.

C

B A

D

KEY PLAN

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:5

:1

A

M

G-003

9TH FLOOR CODE COMPLIANCE

DRAWINGS

February 25, 2022 RAS AHE

SINGLE

MIXED OCCUPANCY SEPARATED NON-SEPARATED

OCCUPANCY CLASSIFICATION(S):

CONSTRUCTION CLASSIFICATION :

AUTOMATIC SPRINKLER SYSTEM PROVIDED: YES

13R

NO

13D13NFPA STANDARD:

OCCUPANCY CLASSIFICATION:

MEANS OF EGRESS:

DESIGN OCCUPANT LOAD SUMMARY

AREA SQUARE FOOTAGE: 10,694

PATIENT BED CAPACITY: 14

TOTAL

MEANS OF EGRESS ELEMENT REQUIRED PROVIDED NFPA 101 SECTION

NUMBER OF EXITS

EXIT ACCESS TRAVEL DISTANCE

DEAD-END LIMIT

19.2.4.2

19.2.5.7.2.4 (B)

19.2.5.2

BUILDING DATA & CODE REVIEW

I-2, HEALTHCARE USE/INPATIENT TREATMENT DEPARTMENT

TYPE II (222)

200'

30'

Y

N - CODE COMPLIANT IF NOT

FEASIBLE IN EXISTING

CONDITION

X

X

FIRE RESISTANCE RATING FOR BUILDING ELEMENTS

STRUCTURAL FRAME: 2 HR

FLOOR: 2 HR

CODE ANALYSIS SYMBOLS LEGEND

NOTES

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS

• INTERNATIONAL BUILDING CODE (IBC), 2020 (ONLY WHEN SPECIFICALLY REFERENCED

IN VA DESIGN DOCUMENTS)

• INTERNATIONAL PLUMBING CODE (IPC) 2020

• NFPA 101 LIFE SAFETY CODE 2018

• NFPA 99 STANDARD FOR HEALTH CARE FACILITIES 2018

• NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS 2019

• NFPA 25 STANDARD FOR THE INSPECTION TESTING AND MAINTENANCE OF WATER

BASED FIRE PROTECTION SYSTEMS 2020

• NATIONAL ELECTRICAL CODE (NEC) 2020

• PLUMBING CODE OF NEW YORK STATE, 2020

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

• FGI GUIDELINE FOR DESIGN & CONSTRUCTION OF HEALTH CARE FACILITIES, 2010

• VA SPACE PLANNING CRITERIA, SEPS VERSION 1.6 CHAPTER 100 MS& N PATIENT UNIT

• VETERANS ADMINISTRATION ELECTRICAL DESIGN MANUAL

• DEPARTMENT OF VETERAN AFFAIRS FIRE PROTECTION DESIGN MANUAL

• VETERANS ADMINISTRATION PLUMBING DESIGN MANUAL REQUIREMENTS

APPLICABLE CODES & DESIGN GUIDELINES:

1/8" = 1'-0"1

9TH FLOOR CODE COMPLIANCE AND FIRE SAFETY PLAN

NORTH

1/8" = 1'-0"

0' 4' 8' 16' 32'

X

FULLY SPRINKLERED

9C ROOM SCHEDULE for G-003

NUMBER ROOM NAME AREA

900C CORRIDOR 2003 SF

901C CRASH CART 10 SF

902C N. STN. 10 SF

904-1C TLT. RM. 57 SF

904C PATIENT ROOM 262 SF

905-1C TLT. RM. 56 SF

905C PATIENT ROOM 257 SF

906C CLEAN UTILITY 114 SF

907C SOILED UTILITY 116 SF

908C LARGE EQUIP. RM. 94 SF

908C-1 ELECT. CLOSET 8 SF

909-1C TLT. RM. 47 SF

909C PATIENT ROOM 239 SF

910C N. STN. 21 SF

911-1C TLT. RM. -IIA 66 SF

911C PATIENT ROOM - IIA 261 SF

912C ANTE RM. 84 SF

913-1C TLT. RM. -IIA 62 SF

913C PATIENT ROOM - IIA 237 SF

914-1C TLT. RM. - BAR 64 SF

914C PATIENT ROOM - IIA/BAR. 250 SF

915C ANTE RM. 99 SF

916-1C TLT. RM. - BAR 55 SF

916C PATIENT ROOM - IIA/BAR. 268 SF

917C CONF. RM / RESIDENT OFFICE 138 SF

918C NURSE STATION 315 SF

919C OXYGEN 11 SF

920C MED RM 123 SF

921-1C TLT. RM. 55 SF

921C PATIENT ROOM 225 SF

922C CRASH CART 13 SF

923-1C TLT. RM. 55 SF

923C PATIENT ROOM 220 SF

924-1C TLT. RM. 50 SF

924C PATIENT ROOM 210 SF

925-1C TLT. RM. 60 SF

925C PATIENT ROOM 242 SF

926-1C TLT. RM. 58 SF

926C PATIENT ROOM 241 SF

927-1C N.TR. 29 SF

927C N.WK.RM 157 SF

928C PATIENT LOUNGE 161 SF

929C CLEAN LINEN 58 SF

930C NURSE MANAGER 122 SF

930C-1 N.STN. 13 SF

931-1C TLT. RM. 58 SF

931C PATIENT ROOM 280 SF

932-1C TLT. RM. 57 SF

932-2C N.STN. 10 SF

932C PATIENT ROOM 266 SF

933C DATA RM 54 SF

934C HSKPG 55 SF

E

E

2E 2E

2E

E

E

2E 2E

E

2E2E

2E 2E

E

E

E

E

2E 2E

2E

2E

2E

2E

2E

2E2E

2E

2E

2E 2E

2E

2E

2E

2E 2E

2E

2E

2E 2E

E

2E

E

2E2E

2E

2E

E

2 2

2 2 2

2 2

S S

2E2E

D C B A

DD

C.1

5.1

EFGH

CC

BB

AA

AD-103

D N

U P

DN

UP

DN

UP

STAIR

STAIR

STAIR

2E

2E

2E

2E

2E

2E2E

2E

2E

2E

2E

2E

2E

2E

2E

E

XIT AC

C

ES

S

TR

A

VE

L D

ISTA

N C E = 114'-6"

E X

IT

A

C C

E S

S T

R A

V E

L D

IS

T

A N

C E

EXIT ACCESS TRAVEL DISTANCE = 84'-6"

1014C3

1014C2-1 1014C2

1014C4

1014C1 1013C

1014C5 1015C 1015C2-1

1012C2 1012C1

1011C

1011C1 1009C

1010C

1008C

1007C

1005C

1004C1

1004C

1035C

1033C

1033C1

1031C1

1031C

1008C1

1008C2

1029C

1028C

1027C

1017C1

1018C

1020C

1024C

1024C

1021C

1022C

1006C

1016C1016C11016C2

1017C

1025C

1021C-1

1019C-1

DEAD END = 50'-0"

A-102

EXIT ACCESS TRAVEL DISTANCE = 43'

SMOKE PARTITION - 30 MIN RATED CORRIDOR WALL

1 HOUR RATED FIRE BARRIER

EXISTING 2 HR FIRE BARRIER TO BE MAINTAINED

EXIT ACCESS TRAVEL DISTANCE

EXISTING DEAD END CORRIDOR

X SF

X OCCP.

FLOOR AREA OCCUPANCY

5' TURNING RADIUS

CLEAR FLOOR SPACE

2 HOUR RATED CONSTRUCTION AND COLUMN

ENCLOSURE UL #X527

2 HOUR RATED FIRE BARRIER

1. CONTRACTOR SHALL NOT COMPROMISE EXISTING 2-HOUR RATED PARTITIONS

AT EXISTING STAIRS IN ANY WAY.

2. COLUMN ENCLOSURES ARE EXISTING, 2 HOUR FIRE RATED SYSTEMS. WHERE

THE INTEGRITY OF THE SYSTEM IS DISRUPTED BY CONSTRUCTION ACTIVITIES,

EXACTLY MATCH ADJACENT/REMAINING CONSTRUCTION. FIRE CAULK AT

UNDERSIDE OF CONCRETE DECK AND ANY JOINTS. LAPPED CONSTRUCTION IS

NOT ACCEPTABLE. SHOULD ANY CONDITIONS PERMANENTLY DISRUPT THE

INTEGRITY OF THE FIRE RATED CONSTRUCTION, NOTIFY THE COR

IMMEDIATELY.

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:5

:2

A

M

G-004

10TH FLOOR CODE COMPLIANCE

DRAWINGS

February 25, 2022 RAS AHE

1/8" = 1'-0"1

10TH FLOOR CODE COMPLIANCE PLAN

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS

• INTERNATIONAL BUILDING CODE (IBC), 2020 (ONLY WHEN SPECIFICALLY REFERENCED

IN VA DESIGN DOCUMENTS)

• INTERNATIONAL PLUMBING CODE (IPC) 2020

• NFPA 101 LIFE SAFETY CODE 2018

• NFPA 99 STANDARD FOR HEALTH CARE FACILITIES 2018

• NFPA 13 STANDARD FOR INSTALLATION OF SPRINKLER SYSTEMS 2019

• NFPA 25 STANDARD FOR THE INSPECTION TESTING AND MAINTENANCE OF WATER

BASED FIRE PROTECTION SYSTEMS 2020

• NATIONAL ELECTRICAL CODE (NEC) 2020

• PLUMBING CODE OF NEW YORK STATE, 2020

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

• FGI GUIDELINE FOR DESIGN & CONSTRUCTION OF HEALTH CARE FACILITIES, 2010

• VA SPACE PLANNING CRITERIA, SEPS VERSION 1.6 CHAPTER 100 MS& N PATIENT UNIT

• VETERANS ADMINISTRATION ELECTRICAL DESIGN MANUAL

• DEPARTMENT OF VETERAN AFFAIRS FIRE PROTECTION DESIGN MANUAL

• VETERANS ADMINISTRATION PLUMBING DESIGN MANUAL REQUIREMENTS

APPLICABLE CODES & DESIGN GUIDELINES:

NOTES

CODE ANALYSIS SYMBOLS LEGEND

NORTH

1/8" = 1'-0"

0' 4' 8' 16' 32'

D C B A

DD

C.1

5.1

EFGH

CC

BB

AA

PHASING FOR WORK ON 7C

GENERAL

GOVERNMENT WILL TEMPORARILY VACATE DESIGNATED PORTIONS OF THE 8TH FLOOR IN PHASES TO ALLOW CONTRACTOR ACCESS TO THE UTILITIES ABOVE THE CEILING (INCLUDING PIPE CHASES)

AFFECTED BY DEMOLITION AND RENOVATION WORK ON THE 9TH FLOOR, AS WELL AS WORK

RELATED TO CREATING NEW MECHANICAL ROOMS ON THE 8TH FLOOR. ALL OTHER AREAS OF THE 8TH FLOOR WILL REMAIN OCCUPIED FOR THE DURATION OF THE PROJECT. CONTRACTOR ACCESS TO AND USE OF SPACE ON THE 8TH FLOOR SHALL BE AS DIRECTED AND APPROVED BY THE COR.

THE PHASING SEQUENCE SHOWN IN THE CONTRACT DOCUMENTS INDICATES GENERAL AREAS OF

WORK. THE CONTRACTOR SHALL DEVELOP A DETAILED PLAN FOR ABATEMENT, DEMOLITION, AND INSTALLATION OF NEW WORK (INCLUDING ANY UTILITY INTERRUPTIONS) IN ACCORDANCE WITH THE REQUIREMENTS OF DIVISION 1 GENERAL REQUIREMENTS FOR APPROVAL BY THE COR. PLAN

AND EXECUTE WORK FOR SHORTEST DURATION OF EACH PHASE AND TO MINIMIZE IMPACT ON

MEDICAL CENTER.

GOVERNMENT SHALL REMOVE MOVABLE EQUIPMENT AND FURNISHINGS PRIOR TO EACH PHASE

OR SUB-PHASE. CONTRACTOR AND COR SHALL SURVEY EACH AREA PRIOR TO THE

COMMENCEMENT OF WORK. CONTRACTOR SHALL PROTECT EXISTING FINISHES, FURNISHING AND

EQUIPMENT THAT REMAINS IN PLACE DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR

SHALL RESTORE ANY EXISTING CONSTRUCTION, FINISHES, UTILITIES, OR EQUIPMENT DAMAGED

OR DISTURBED DURING THE WORK.

PRIOR TO COMMENCING WORK THE CONTRACTOR SHALL INSTALL AND MAINTAIN INFECTION

CONTROL MEASURES AS SPECIFIED IN DIVISION 1, INCLUDING DUST CONTROL PARTITIONS, WALK- OFF MATS, VENTILATION, AND CLEANING PROCEDURES, TO SEPARATE THE AREA OF WORK FROM

SPACES OCCUPIED BY THE MEDICAL CENTER. FIRE PROTECTION AND LIFE SAFETY FEATURES

SHALL BE MAINTAINED AT ALL TIMES. CORRIDOR WIDTHS SHALL NOT BE REDUCED TO LESS THAN

4'-0" FEET BY DUST BARRIER PARTITIONS OR CONTRACTOR OPERATIONS.

THE ABATEMENT DEMOLITION PORTION OF THE WORK ON 8C WILL OCCUR ON AN UNOCCUPIED

PORTION OF THE WARD. PARTIAL OCCUPATION MAY OCCUR FOLLOWING ABATEMENT AND

DEMOLITION FOR NEW WORK AS REQUIRED.

SUGGESTED PHASING INCLUDES 2 PARTS COMPRISING 12 TOTAL PHASES.

PART I: ABATEMENT, MEP REMOVALS, WALL & CEILING REMOVALS

PART I INCLUDES PHASES 1 THROUGH 6 FOR ABATEMENT, MEP REMOVALS, WALL & CEILING

REMOVALS. AFTER EACH ABATEMENT AND DEMOLITION PHASE IS COMPLETE, TEMPORARY

CONSTRUCTION BARRIERS WILL BE REMOVED AND THE AREA WILL BE OCCUPIED.

UPON COMPLETION OF WORK IN EACH PHASE, CONTRACTOR SHALL BROOM CLEAN ALL AREAS

WITHIN THAT PHASE. GOVERNMENT SHALL RE-OCCUPY ROOMS DESIGNATED UNDER COMPLETED

PHASE AND SHALL TEMPORARILY VACATE ROOMS DESIGNATED FOR WORK UNDER THE

FOLLOWING PHASE, INCLUDING 3'-0" CLEAR FEET OF CORRIDOR ADJACENT TO THESE ROOMS.

OTHER AREAS OF THE 8TH FLOOR WILL REMAIN OCCUPIED BY THE MEDICAL CENTER.

CONTRACTOR SHALL COORDINATE WORK HOURS WITH COR TO MINIMIZE DISRUPTIONS.

UPON COMPLETION OF WORK IN THE FINAL PHASE OF PART I, PHASE 6, CONTRACTOR SHALL

CLEAN AREAS OF PHASE 6. GOVERNMENT SHALL RE-OCCUPY AREAS OF THE 8TH FLOOR C-WING.

PART II: NEW WORK

PART II INCLUDES PHASES 7 THROUGH 12 FOR NEW WORK REQUIRED. THE WORK IS TO BE

COMPLETED AT NIGHT AND ALLOW FOR DAILY OCCUPANCY. UPON COMPLETION OF WORK EACH

NIGHT, CONTRACTOR SHALL CLEAN AFFECTED AREAS WITHIN THAT PHASE AND APPLY

PROTECTIVE SHEETING TO THE UNDERSIDE OF EXPOSED CEILINGS IN PREPARATION FOR

GOVERNMENT OCCUPANCY DURING THE DAY.

GENERAL PHASING AND INTERIM LIFE SAFETY NOTES

REFER TO SPECIFICATION SECTIONS 01 00 00, GENERAL REQUIREMENT PARAGRAPH: INFECTION

PREVENTION MEASURES AND 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. IMPLEMENT

REQUIREMENTS OF THE REFERENCED SPECIFICATION SECTIONS PRIOR TO ONSET OF WORK.

TEMPORARY CONSTRUCTION BARRIERS REQUIRED PER DETAILS 8 AND 9 ON SHEET G-009 PRIOR

TO COMMENCEMENT OF ABATEMENT AND CONSTRUCTION.

CONTRACTOR IS REQUIRED TO USE WALK OFF MAT FOR CORRIDOR RE-ENTRY LOCATIONS.

CONSTRUCTION AREA TO REMAIN NEGATIVELY PRESSURED WITH PRESSURE INDICATOR AT

ENTRANCE.

SIGNAGE REQUIRED INDICATING CONSTRUCTION AREA. POST AT MAIN ENTRY TO WARD 8C AND

9C.

NO PORTION OF THE EXISTING SPRINKLER SYSTEM AT WARD 8C SHALL BE DISRUPTED DURING

PHASED CONSTRUCTION. SYSTEM SHALL REMAIN OPERATIONAL FOR THE DURATION OF THE

WORK.

EXISTING SPRINKLER SYSTEM AT WARD 9C SHALL REMAIN OPERATIONAL UNTIL SUCH TIME THAT

THE NEW SPRINKLER SYSTEM IS FUNCTIONING. REFER TO FIRE PROTECTION DRAWINGS AND

SPECIFICATIONS.

AT 9C, CONTRACTOR TO MAINTAIN A MINIMUM OF 3 HEAT SENSING DEVICES, INSTALLED IN

ACCORDANCE WITH NFPA - ONE AT EACH "LEG" OF THE WARD, CENTRALLY LOCATED ALONG THE "LEG." ONE PULL STATION SHALL BE LOCATED AT THE Y INTERSECTION. DEVICES TO REMAIN IN

PLACE FOR THE DURATION OF CONSTRUCTION UNTIL PERMANENT SYSTEM IS FUNCTIONAL.

REFER TO FIRE PROTECTION DRAWINGS.

AT 9C, CONTRACTOR SHALL MAINTAIN ONE CENTRALLY LOCATED SPEAKER FOR THE DURATION

OF THE CONTRACT.

CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA AND ANY USED PORTIONS OF

CORRIDOR IN A CLEAN AND SAFE CONDITION.

CONTRACTOR SHALL TAKE NECESSARY MEASURES TO RESTRICT UNCERTIFIED PERSONNEL OR

UNAUTHORIZED VISITORS FROM ENTERING ACTIVE WORK AREAS AT ANYTIME.

CONTRACTOR SHALL RESTORE ANY EXISTING CONSTRUCTION, FINISHES, UTILITIES, OR

EQUIPMENT DAMAGED DURING THE COURSE OF WORK TO CONDITION OF SUCH PRIOR TO THE

START OF WORK OR BETTER. AREAS AFFECTED BY THE REMOVAL OF TEMPORARY

CONSTRUCTION BARRIERS SHALL BE FULLY RESTORED.

CONTRACTOR SHALL PATCH, PRIME, AND PAINT SURFACES AND/OR REPAIR FINISHES TO MATCH EXISTING ADJACENT CONSTRUCTION IN MATERIAL, COLOR, AND TEXTURE. PAINT FULL WALLS TO

A NATURAL BREAK AT INSIDE/OUTSIDE CORNER.

CONSTRUCTION BARRIER AT WARD 9C SHALL REMAIN IN PLACE FOR THE DURATION OF THE

WORK AT 9C. CONSTRUCTION BARRIERS AT 8C SHALL REMAIN IN PLACE FOR THE DURATION OF

THE WORK AT EACH PHASED ZONE OR AS DIRECTED BY COR.

CONTRACTOR SHALL COORDINATE WORK SO THAT ANY EQUIPMENT AND/OR COMPONENT PART

OF SYSTEMS TO REMAIN OR REMAIN OPERATIONAL DURING CONSTRUCTION WILL NOT BE

DISRUPTED.

INFECTION CONTROL RISK ASSESSMENT NOTES

MINIMUM REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS | BEFORE AND

DURING WORK ACTIVITY:

1. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241

REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS

REMOVED, TO THE DECK ABOVE.

2. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE

COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS

MUST BE EFFECTIVELY AFFIXED TO GROUND AND CEILING AND SECURE FROM

MOVEMENT OR DAMAGE. APPLY TAPE THAT WILL NOT LEAVE A RESIDUE TO SEAL

GAPS BETWEEN BARRIERS, CEILING OR FLOOR.

3. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND

CEILING, USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE

FOR BARRIER TYPE).

4. CONTAINMENT UNITS OR ENVIRONMENTAL CONTAINMENT UNITS (ECUS)

APPROVED FOR CLASS IV PRECAUTIONS IN SMALL AREAS TOTALLY CONTAINED BY

THE UNIT AND THAT HAS HEPA-FILTERED EXHAUST AIR.

5. REMOVE OR ISOLATE RETURN AIR DIFFUSERS TO AVOID DUST ENTERING THE

HVAC SYSTEM.

6. REMOVE OR ISOLATE THE SUPPLY AIR DIFFUSERS TO AVOID POSITIVE

PRESSURIZATION OF THE SPACE.

7. NEGATIVE AIRFLOW PATTERN MUST BE MAINTAINED FROM THE ENTRY POINT TO

THE ANTEROOM AND INTO THE CONSTRUCTION AREA. THE AIRFLOW MUST

CASCADE FROM OUTSIDE TO INSIDE THE CONSTRUCTION AREA. THE ENTIRE

CONSTRUCTION AREA MUST REMAIN NEGATIVELY PRESSURIZED.

8. MAINTAIN NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF

HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS. EXHAUST DISCHARGED

DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM ENTRANCES,

AIR INTAKES AND WINDOWS DOES NOT REQUIRE HEPA-FILTERED AIR.

9. IF EXHAUST IS DIRECTED INDOORS, THEN THE SYSTEM MUST BE HEPA FILTERED.

PRIOR TO START OF WORK, HEPA FILTRATION MUST BE VERIFIED BY PARTICULATE

MEASUREMENT AS NO LESS THAN 99.97% EFFICIENCY AND MUST NOT ALTER OR

CHANGE AIRFLOW/PRESSURE RELATIONSHIPS IN OTHER AREAS.

10. EXHAUST INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED

EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS NOT ACCEPTABLE.

11. INSTALL DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MONITORING) ON

EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR NEGATIVE

PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR APPARATUS ARE NOT

ACCEPTABLE.

12. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA.

13. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE

USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS.

THESE CONTAINERS MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE

DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

14. WORKER CLOTHING MUST BE CLEAN AND FREE OF VISIBLE DUST BEFORE

LEAVING THE WORK AREA. HEPA VACUUMING OF CLOTHING OR USE OF COVER

SUITES IS ACCEPTABLE.

15. WORKERS MUST WEAR SHOE COVERS PRIOR TO ENTRY INTO THE WORK AREA.

SHOE COVERS MUST BE CHANGED PRIOR TO EXITING THE ANTEROOM TO THE

OCCUPIED SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE

IMMEDIATELY CHANGED.

16. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK

AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY

AND WHEN VISIBLY SOILED.

17. CONSIDER COLLECTION OF PARTICULATE DATA DURING WORK TO MONITOR AND

ENSURE THAT CONTAMINATES DO NOT ENTER THE OCCUPIED SPACES. ROUTINE

COLLECTION OF PARTICULATE SAMPLES MAY BE USED TO VERIFY HEPA

FILTRATION EFFICIENCIES.

MINIMUM REQUIRED INFECTION CONTROL PRECAUTIONS - UPON COMPLETION OF

WORK ACTIVITY:

CLASS III (TYPE C ACTIVITIES ONLY), IV, AND V PRECAUTIONS REQUIRE INSPECTION

AND DOCUMENTATION FOR DOWNGRADED ICRA PRECAUTIONS.

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST OR

DESIGNEE AND ENGINEERING REPRESENTATIVE FOR DISCONTINUATION OR

DOWNGRADING OF ICRA PRECAUTIONS.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH

HORIZONTAL SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION

ON UPPER SURFACES AS WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING

DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE

TOUCH-UP WORK. THE BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA

CLEANING HAS BEEN PERFORMED.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN

A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING

PRECAUTIONS WHEN REMOVING HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-

HELD HEPA VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING

OUTER HARD BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE

GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINATES

FROM THE WORK AREA.

2. NEGATIVE AIR DEVICES MUST REMAIN OPERATIONAL AT ALL TIMES AND IN

PLACE FOR A PERIOD AFTER COMPLETION OF DUST CREATING ACTIVITIES TO

REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF

CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM

IN AREAS WHERE WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR EXCHANGE

DESIGN SPECIFICATIONS.

PART I: PHASE 1; PART II: PHASE 7

PART I: PHASE 2; PART II: PHASE 8

PART I: PHASE 3; PART II: PHASE 9

LEGEND

PART I: PHASE 4; PART II: PHASE 10

PART I: PHASE 5; PART II: PHASE 11

PART I: PHASE 6; PART II: PHASE 12

95 Perry Street, Suite 300 Buffalo, NY 14203

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT: WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109-

45% DESIGN SUBMISSION

DESIGN DOCUMENT SUBMISSION 3-15-2021

8-7-2020

90% SUBMISSION 6-18-2021

100% SUBMISSION 10-29-2021

BID DOCUMENTS 2-25-2022

B

IM

/B u ff a lo

V A

W a rd

C

R e d e s ig n

C o n s tr u c ti o n /1

A R

C H

.r v t

/2

/2

:5

:2

A

M

G-005

7TH FLOOR - PHASING FLOOR

PLAN

February 25, 2022 RAS RLB

1/8" = 1'-0"1

7TH FLOOR PHASING PLAN

PART I: PHASE 6

PART II: PHASE 12

PART I: PHASE 2

PART II: PHASE 8

PART I: PHASE 5

PART II: PHASE 11

DD

C.1

5.1

EFGH

CC

BB

AA

MOCK-UP ROOM

ABOVE @ 9C

DN

UP

DN

UP

D N

U P

GENERAL PHASING AND INTERIM LIFE SAFETY NOTES

REFER TO SPECIFICATION SECTIONS 01 00 00, GENERAL REQUIREMENT PARAGRAPH: INFECTION

PREVENTION MEASURES AND 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS. IMPLEMENT

REQUIREMENTS OF THE REFERENCED SPECIFICATION SECTIONS PRIOR TO ONSET OF WORK.

TEMPORARY CONSTRUCTION BARRIERS REQUIRED PER DETAILS 8 AND 9 ON SHEET G-009 PRIOR

TO COMMENCEMENT OF ABATEMENT AND CONSTRUCTION.

CONTRACTOR IS REQUIRED TO USE WALK OFF MAT FOR CORRIDOR RE-ENTRY LOCATIONS.

CONSTRUCTION AREA TO REMAIN NEGATIVELY PRESSURED WITH PRESSURE INDICATOR AT

ENTRANCE.

SIGNAGE REQUIRED INDICATING CONSTRUCTION AREA. POST AT MAIN ENTRY TO WARD 8C AND

9C.

NO PORTION OF THE EXISTING SPRINKLER SYSTEM AT WARD 8C SHALL BE DISRUPTED DURING

PHASED CONSTRUCTION. SYSTEM SHALL REMAIN…