This document contains demolition plans and notes for the VA Ward 9C Renovations project at the Buffalo VAMC. Key details include demolition of existing ceilings, flooring, partitions, plumbing fixtures, mechanical equipment, and electrical components on the 7th and 8th floors to prepare for renovations. Temporary barriers and fire protection measures are required during construction. Hazardous materials protocols and coordination with agency representatives are also noted. The related federal contract opportunity is solicitation number 36C24222B0069 for the VA Ward 9C Renovations project at the Buffalo VAMC to be awarded by the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AA-102.pdf | ||
| A-406.pdf | ||
| AD-102.pdf | ||
| A-604.pdf | ||
| A-405.pdf | ||
| AA-101.pdf | ||
| A-404.pdf | ||
| AA-100.pdf | ||
| A-109.pdf | ||
| 117300.pdf | ||
| A-108.pdf | ||
| 36C24222B0069 0005.docx | DOCX document | |
| 36C24222B0069 0004.docx | DOCX document | |
| Abatement Ward 9c Report.pdf | ||
| 36C24222B0069 0003.docx | DOCX document | |
| 36C24222B0069 0002.docx | DOCX document | |
| 36C24222B0069 0001.docx | DOCX document | |
| 528-18-109 Pre Bid Attendance.pdf | ||
| SPECS 3.pdf | ||
| 36C24222B0069_1.docx | DOCX document | |
| SPECS 1.pdf | ||
| WAGE RATE.pdf | ||
| LIMITATION ON SUBCONTRACTING.docx | DOCX document | |
| SPECS 2.pdf | ||
| 528-18-109_9C DRAWINGS.pdf | ||
| FAR 52.225-2 Buy American Certification.docx | DOCX document |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D C B A
DD
C.1
5.1
EFGH
CC
BB
AA
13 13
18 18
GENERAL DEMOLITION NOTES
CODE CONFORMANCE
1. THE CONTRACTOR SHALL PERFORM WORK IN STRICT ACCORDANCE WITH VA STANDARDS AND FEDERAL CODES, RULES, REGULATIONS AND ORDINANCES INCLUDING, BUT NOT LIMITED TO, NFPA 101, THE INTERNATIONAL BUILDING CODE, AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) WHETHER OR NOT INFORMATION AND/OR WORK IS SPECIFICY SHOWN ON
THE DRAWINGS.
2. CONTRACTOR SHALL MAINTAIN EXISTING FIRE RATINGS AT CHASES AND STAIR HALLS OR AS REQUIRED AT OTHER
LOCATIONS AS INDICATED. INFORM COR WHERE CONDITIONS DIFFER.
CONTRACT CONFORMANCE
1. INTERIM LIFE SAFETY MEASURES (ILSMS) INCLUDING CONSTRUCTION OF TEMPORARY BARRIERS SHALL BE STRICTLY ADHERED TO AT ALL TIMES FOR THE DURATION OF THE PROJECT. REFER TO SPECIFICATIONS AND GENERAL DRAWING
SHEET G-005 FOR SPECIFIC REQUIREMENTS.
TEMPORARY FACILITIES
1. SPRINKLER SYSTEM SHALL BE OFFLINE DURING CONSTRUCTION. HEAT DETECTORS SHALL BE INSTALLED, REFER TO FIRE
PROTECTION DRAWINGS.
2. CONTRACTOR SHALL REMOVE, TRANSPORT AND LEGALLY DISPOSE OF ALL DEMOLISHED MATERIALS OFF SITE AS
REQUIRED BY LOCAL AND STATE AUTHORITIES
PROTECTION OF THE WORK
1. TEMPORARY CONTROLS, INCLUDING TEMPORARY SHORING AND TEMPORARY PROTECTION OF EXISITNG CONDITIONS
SHALL BE PROVIDED BY THE CONTRACTOR.
2. CONTRACTOR TO TEMPORARILY PROTECT, ENCLOSE AND/OR WEATHERIZE EXTERIOR ENVELOPE WHERE DISTURBED FOR THE DURATION OF THE CONTRACT TO PROTECT THE WORK AREA AND BUILDING OCCUPANTS IN ADJACENT AREAS AND ON
FLOORS BELOW.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND NOT DAMAGE EXISTING TO REMAIN FINISHES, EQUIPMENT, ETC. DURING THE WORK. DAMAGED AREAS SHALL BE REPAIRED/RESTORED TO THEIR ORIGINAL CONDITIONS.
QUALITY
1. CONTRACTOR SHALL EXERCISE CAUTION WHEN REMOVING EXISTING TOPPING COURSE AS NOT TO DAMAGE OR DIMINISH EXISTING 4"
STRUCTURAL SLAB. IF SLAB IS DAMAGED, CONTACT COR IMMEDIATELY.
EXISTING CONDITIONS
1. CONTRACTOR SHALL SUBMIT PHOTOGRAPHS OF EXISTING CONDITIONS INCLUDING EXISTING STRUCTURE, EQUIPMENT, FINISHES AND PREVIOUS IMPROVEMENTS PRIOR TO THE START OF WORK. PHOTOGRAPHS SHALL HAVE RECORDED DATES.
2. IF CONTRACTOR ENCOUNTERS MECHANICAL EQUIPMENT PREVIOUSLY ABANDONED IN PLACE, COORDINATE REMOVAL AND REPAIR
WITH THE COR ON A CASE BY CASE BASIS.
COORDINATING WORK OF THE CONTRACT
1. COORDINATE DEMOLITION WORK AND SHUT DOWNS OF UTILITIES WITH COR.
2. COORDINATE DEMOLITION WORK WITH ABATEMENT WORK.
3. COORDINATE DEMOLITION WORK WITH DEMOLITION WORK INDICATED IN HVAC, PLUMBING, FIRE PROTECTION AND ELECTRICAL
DRAWING SHEETS.
4. COORDINATE DEMOLITION WORK WITH ACCEPTED ALTERNATES, ADDENDA, AND FIELD DIRECTION PROVIDED BY THE COR.
5. MECHANICAL, ELECTRICAL AND FIRE PROTECTION DEVICES AND EQUIPMENT ARE SHOWN FOR COORDINATION ONLY. REFER TO
RELATED DRAWING SHEETS FOR SCOPE.
6. COORDINATE RECONFIGURATION OF FIRE PROTECTION AND/OR ALARM DEVICES FOR USE DURING CONSTRUCTION WITH
ELECTRICAL DRAWINGS.
7. CONTRACTOR MUST COORDINATE WITH COR PRIOR TO REMOVAL OF TOPPING SLAB IN PREPARATION FOR FLOOR LEVELING.
PERFORMANCE OF THE WORK
1. CONTRACTOR TO PATCH AND REPAIR WALLS, SLABS, & CEILINGS TO REMAIN WHERE INTERSECTING WALLS WERE REMOVED.
2. EXISTING TO REMAIN FINISHED FLOOR LEVEL MAY VARY FROM ROOM TO ROOM. AT SUCH LOCATIONS, REMOVE TOPPING SLAB AT 36"
WIDE BY FULL LENGTH OF VARIATION. REFER TO CONSTRUCTION DETAILS.
3. UNLESS OTHERWISE INDICATED, CONTRACTOR IS TO REMOVE ANY REMAINING MOVABLE OR SEMI-FIXED CABINETRY, MILLWORK OR
FURNITURE NOT INDICATED AS EXISTING TO REMAIN. THIS INCLUDES BUT IS NOT LIMITED TO: DESKS, CABINETS, EQUIPMENT, ETC.
TURN OVER REMOVED ITEMS TO THE GOVERNMENT.
4. CONTRACTOR SHALL DEMOLISH ALL SURFACE MOUNTED PLATES, ACCESSORIES, GRILLES ETC. TO BE REMOVED RELATED TO
VARIOUS TRADES.
5. CUT-OFF ANCHOR BOLTS FROM EXISTING EQUIPMENT AND SYSTEMS TO BE REMOVED. GRIND PROTUSIONS FLUSH TO THE LEVEL OF
THE STRUCTURAL SLAB OR FACE OF WALL TO REMAIN.
KEYED DEMOLITION NOTES
NOT USED.
REMOVE EXISTING CURTAIN ROD AND ALL ASSOCIATED HARDWARE IN ITS ENTIRETY.
REMOVE EXISTING FLOORING INCLUDING BUT NOT LIMITED TO VCT, CARPET, CERAMIC TILE, TERRAZZO AND ALL OF THEIR ASSOCIATED COMPONENTS. REMOVE EXISTING MARBLE THRESHOLDS AND ALL OF THEIR ASSOCIATED COMPONENTS. REMOVE EXISTING WALL BASE INCLUDING BUT NOT LIMITED TO CONCRETE, VINYL AND CERAMIC TILE
AND ALL OF THEIR ASSOCIATED COMPONENTS.
REMOVE EXISTING FULL HEIGHT PARTITION/ENCLOSURE.
REMOVE EXISTING WALL MOUNTED TOILET ROOM ACCESSORIES IN THEIR ENTIRETY AND CONTRACTOR TO DISPOSE OF, INCLUDING BUT NOT LIMITED TO: TOILET PAPER DISPENSERS, SOAP DISPENSERS, GRAB BARS, TOILET PARTITIONS, COUNTERTOPS AND ALL ASSOCIATED HARDWARE. EXISTING PLUMBING FIXTURES TO BE REMOVED ARE SHOWN HERE FOR COORDINATION PURPOSES ONLY. REFER TO PLUMBING DRAWINGS FOR SCOPE AND EXTENT OF
PLUMBING REMOVALS.
REMOVE EXISTING TILE WAINSCOTING IN ITS ENTIRETY.
REMOVE EXISTING CHALKBOARDS, MARKERBOARDS, FRAMES, AND ALL ASSOCIATED HARDWARE IN THEIR ENTIRETY.
CONTRACTOR TO DISPOSE OF ITEMS.
REMOVE EXISTING WALL CABINETS, BASE CABINETS, BUILT-IN SHELVES, AND COUNTERTOPS IN THEIR ENTIRETY.
PATCH AND LEVEL FLOOR AS REQUIRED TO MATCH EXISTING DUE TO DEMOLITION OR CONCEALED CONDITIONS.
REMOVE EXISTING ACCESS PANEL(S) AND ALL ASSOCIATED HARDWARE IN ITS ENTIRETY.
REMOVE PLASTER AND SPEED TILE TO THE EXTENTS SHOWN.
REMOVE EXISTING DOOR, DOOR FRAME, AND DOOR HARDWARE IN ITS ENTIRETY.
REMOVE EXISTING BED BUMPERS AND ALL OTHER WALL PROTECTION DEVICES IN THEIR ENTIRETY. IF EXISTING WALL IS TO REMAIN, PATCH AND REPAIR. FILL IN ALL MOUNTING HOLES IN WALL SURFACE TO A FINISHED CONDITION AND
PREPARE FOR NEW FINISH.
REMOVE EXISTING CEILING PANELS, GRID, GYPSUM BOARD CEILING, CURTAIN CEILING TRACK, AND ALL ASSOCIATED
COMPONENTS IN THEIR ENTIRETY.
REMOVE WINDOW SYSTEM AND STOOL IN ITS ENTIRETY, PREP OPENING.
REMOVE WINDOW A/C UNIT FROM WINDOW ASSEMBLY. CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL OZONE DEPLETING SUBSTANCES (I.E. CHLOROFLUOROCARBONS, FREON ETC.) ASSOCIATED WITH THE AIR CONDITIONERS. ALL OZONE DEPLETING SUBSTANCES AND/OR OILS SHALL BE RECOVERED BY A LICENSED REFRIGERANT PROFESSIONAL AND SENT FOR PROPER DISPOSAL AND/OR RECYCLING IN COMPLIANCE WITH SECTION 608 OF THE FEDERAL CLEAN AIR ACT. CONTRACTOR PERFORMING WORK SHALL ALSO HAVE EPA
CERTIFICATION
REMOVE ALL REMAINING WALL AND CEILING MOUNTED EQUIPMENT AT CORRIDORS AND EXISTING LOUNGE AREA
NOT INDICATED. COORDINATE WITH COR FOR ITEMS TO BE TURNED OVER TO GOVERNMENT.
CAREFULLY REMOVE EXISTING ACOUSTIC PANEL CEILING SYSTEM AS REQUIRED TO ACCOMMODATE WORK. STORE
FOR REINSTALLATION.
CAREFULLY REMOVE CEILING COMPONENTS INCLUDING BUT NOT LIMITED TO CURTAIN TRACK(S), SPRINKLER HEADS, LIGHTING, DIFFUSERS AND GRILLES, ALARMS AND DETECTORS AND CEILING MOUNTED SIGNAGE. LABEL AND STORE
FOR REINSTALLATION.
REMOVE EXISTING GYPSUM CEILING SYSTEM IN ITS ENTIRETY. COORDINATE CEILING REMOVAL TO COMPLY WITH THE LOCATIONS AND OPERATIONS OF SPRINKLERS PER NFPA 13. COORDINATE CEILING REMOVAL AND CODE
COMPLIANCE WITH CONTACTING OFFICERS REPRESENTATIVE.
REMOVE EXISTING GYPSUM CEILING SYSTEM, CURTAIN CEILING TRACK, & ALL ASSOCIATED COMPONENTS IN THEIR ENTIRETY. REFER TO ELECTRICAL, MECHANICAL, AND FIRE PROTECTION DRAWINGS FOR ADDITIONAL REMOVALS.
REMOVE EXISTING GYPSUM CEILING SYSTEM CONCEALED ABOVE EXISTING ACOUSTICAL PANEL CEILING SYSTEM IN
ITS ENTIRETY.
REMOVE EXISTING INDIVIDUAL WINDOW, PREP OPENING.
TEMPORARY CONSTRUCTION BARRIER
EXISTING ACT CEILING SYSTEM TO BE REMOVED
EXISTING GWB CEILING SYSTEM TO BE REMOVED
RECESSED LIGHTING FIXTURES TO BE REMOVED.
REFER TO ED-100.
LEGEND
• ALL CONTRACTORS/SUBCONTRACTORS MUST COORDINATE THEIR WORK WITH THE GENERAL
CONTRACTOR & COR SO THAT THE WORK AND SCHEDULE ARE NOT IMPEDED. THE SCHEDULE OF WORK MUST BE FOR THE DURATION OF THE PROJECT TO PREVENT CONFLICTS AND INTERFERENCES. OBTAIN ALL NECESSARY INFORMATION SUCH AS SIZES, LOCATIONS, TEMPLATES, LAYOUT DIMENSIONS AND
OTHER INFORMATION NECESSARY FOR A PROPER AND WELL-COORDINATED INSTALLATION.
• IF ASBESTOS-CONTAINING MATERIALS ARE ACCIDENTALLY DISTURBED, UNIDENTIFIED SUSPECT
ASBESTOS-CONTAINING MATERIALS ARE DISCOVERED, OR UNKNOWN HAZARDOUS MATERIALS ARE
FOUND, CEASE WORK WITHIN THE AFFECTED AREA, CORDON OFF THE AFFECTED AREA AT 25 FEET
FROM THE LIMITS OF DISTURBANCE OF THE UNKNOWN MATERIALS, AND CONTACT THE COR.
• PRIOR TO CORING SLAB FOR SANITARY SEWER OR OTHER PLUMBING WORK, COORDINATE EXACT
LOCATIONS WITH GENERAL CONTRACTOR AND VA C.O.R.
• CONTRACTOR SHALL NOTE THAT DEEP CONCRETE BEAMS AND ONE-WAY SLAB RIBS ARE LOCATED
THROUGHOUT BOTH SLAB ABOVE AND BELOW 9C. SANITARY SEWER AND OTHER PLUMBING WORK
MUST BE CAREFULLY LAID OUT AND COORDINATED WITH THE COR.
• COORDINATE WITH COR FOR LOCATION OF HEAT DETECTION DEVICES IN SERVICE FOR DURATION OF
CONSTRUCTION WORK - REFER TO ILSMS PLAN SHEET G-005.
• EXISTING PATIENT LIFTS ARE TO BE REMOVED AND TURNED OVER TO THE VA.
COORDINATION NOTES
C
B A
D
KEY PLAN
95 Perry Street, Suite 300 Buffalo, NY 14203
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT: WARD 9C RENOVATIONS
3495 BAILEY AVENUE BUFFALO, NY 14215
528-18-109
528-18-109-
B
IM
/B u ff a lo
V A
W a rd
C
R e d e s ig n
C o n s tr u c ti o n /1
A R
C H
.r v t
/2 /2
:0
:4
A
M
AD-100
7TH FLOOR DEMOLITION CEILING
PLAN
February 25, 2022 RAS Author
1/8" = 1'-0"1
7TH FLOOR REFLECTED CEILING DEMOLITION PLAN
NORTH
1/8" = 1'-0"
0' 4' 8' 16' 32'
Revisions: Date:
BID ADDENDUM #1 2022/10/28
| Sheets |
| A-108 - 7C REFLECTED CEILING PLAN |
| A-109 - 8C REFLECTED CEILING PLAN |
| A-404 - 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'A' |
| A-405 - 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'B' |
| A-406 - 9TH FLOOR - PARTIAL CEILING PLAN - AREA 'C' |
| A-604 - EQUIPMENT SCHEDULE |
| AD-100 - 7TH FLOOR DEMOLITION CEILING PLAN |
| AD-102 - 8TH FLOOR DEMOLITION CEILING PLAN |
File details come from the government source that posted it. Updated .