This document includes plans and specifications for an asbestos abatement project at a Veterans Affairs Medical Center. The project involves removing and disposing of asbestos insulation from piping and radiator heat shields located throughout the 9th floor as well as limited areas on the 7th and 8th floors. The contractor must follow all applicable federal and state regulations for asbestos abatement work. Precautions must be taken to isolate the work areas, establish negative air pressure, and properly remove and dispose of asbestos-containing materials. The project will be conducted in phases to avoid disturbing occupied areas of the facility. The solicitation number for this opportunity is 36C24222B0069 and it was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 for a renovation project located at the Buffalo VAMC.

View the file

Other files

File Type Posted
AA-102.pdf PDF
A-406.pdf PDF
AD-102.pdf PDF
A-604.pdf PDF
A-405.pdf PDF
AA-101.pdf PDF
A-404.pdf PDF
AD-100.pdf PDF
A-109.pdf PDF
117300.pdf PDF
A-108.pdf PDF
36C24222B0069 0005.docx DOCX document
36C24222B0069 0004.docx DOCX document
Abatement Ward 9c Report.pdf PDF
36C24222B0069 0003.docx DOCX document
36C24222B0069 0002.docx DOCX document
36C24222B0069 0001.docx DOCX document
528-18-109 Pre Bid Attendance.pdf PDF
SPECS 3.pdf PDF
36C24222B0069_1.docx DOCX document
SPECS 1.pdf PDF
WAGE RATE.pdf PDF
LIMITATION ON SUBCONTRACTING.docx DOCX document
SPECS 2.pdf PDF
528-18-109_9C DRAWINGS.pdf PDF
FAR 52.225-2 Buy American Certification.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPERLY REMOVE AND DISPOSE OF THE

RECESSED RADIATOR HEAT SHIELD AND

ALL ASBESTOS INSULATION ON THE BACK

OF THE SHIELD. REMOVE ALL INSULATION

ON ANY PIPING. THE SHIELD AND ALL

INSULATION SHALL BE REMOVED AND

DISPOSED OF AS ASBESTOS-WASTE.

REMOVE EXISTING

COVER. REFER TO

DRAWING M-100.

REMOVE AND

PROPERLY DISPOSE

OF ALL INSULATION

ON EXISTING STEAM

RISERS WITHIN

EXTERIOR WALL

CAVITY. INSULATION

IS ASSUMED TO BE

ASBESTOS-CONTAINING.

NO INSULATION

SHALL REMAIN.

EL

PS

EL

PR

FINISHED FLOOR

EXISTING

WINDOW

REMOVE EXISTING BRANCH LPS & LPR PIPING TO THE EXTENT

SHOWN INCLUDING STEAM TRAP AND CONTROL VALVE. REFER

TO DRAWING M-100.

(CONTRACTOR SHALL ASSUME THAT CONCEALED LPS &

LPR PIPING IS COVERED WITH ASBESTOS INSULATION)

TYPICAL ELEVATION VIEW

EXISTING EXTERIOR

WALL

D C B A

D C B A

DD

C.1

5.1

EFGH

CC

BB

AA

13 13

1/8" = 1'-0"1

7TH FLOOR ASBESTOS ABATEMENT PLAN

ASBESTOS ABATEMENT NOTES

AA-1 NOT USED

AA-2 NOT USED

AA-3 NOT USED

AA-4 NOT USED

AA-5 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF THE ASBESTOS-CONTAINING RED-BROWN MASTIC ON THE NON-ASBESTOS-CONTAINING CORK PIPE

INSULATION. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF SUSPENDED CEILINGS TO ACCESS THE MASTIC.

AA-6 NOT USED

AA-7 NOT USED

AA-8 CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND MUD FITTING INSULATION THAT IS WITHIN WALL CHASES TO ACCOMMODATE ALL DEMOLITION, REMOVAL, AND INSTALLATION OF PIPING AND HVAC DUCTWORK. REFER TO PLUMBING AND MECHANICAL PLANS FOR APPROXIMATE LOCATIONS OF NEW PIPING AND DUCTS. ALL INSULATION AND PIPING WITHIN DESIGNATED CHASES SHALL BE REMOVED WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. CLEAN

CHASES TO ALLOW FOR INSTALLATION OF NEW PIPING AND DUCTWORK.

AA-9 NOT USED

AA-10 CONTRACTOR SHALL CONDUCT CEILING DEMOLITION WITHIN PROJECT LIMITS AND REMOVE AND PROPERLY DISPOSE OF ALL ASBESTOS-CONTAINING PIPE AND

MUD FITTING INSULATION THAT IS ABOVE CEILINGS THAT BECOME ACCESSIBLE AS A RESULT OF THE DEMOLITION/RENOVATION WORK. ALL CEILING

DEMOLITION SHALL OCCUR UNDER NEGATIVE PRESSURE WITHIN THE REGULATED ASBESTOS ABATEMENT WORK AREA. REFER TO ARCHITECTURAL

DEMOLITION PLANS FOR LIMITS OF CEILING DEMOLITION. ALL PIPE INSULATION, HARD CEILINGS, SUSPENDED CEILINGS AND ASSOCIATED SUPPORT GRID, AND

ASSOCIATED DEBRIS SHALL BE DISPOSED OF AS ASBESTOS-WASTE.

NORTH

KEY PLAN

C D

A B

0' 4' 8' 16' 32'

1/8" = 1'-0"

DRAWING NOTES

A. THERE IS AN ASBESTOS-CONTAINING INSULATION BOARD BEHIND THE RECESSED RADIATOR HEAT SHIELDS. ONLY THE RECESSED RADIATORS ON THE NINTH FLOOR ARE TO BE

DISTURBED. THE RADIATORS CAN ONLY BE SHUT DOWN DURING THE NON-HEATING SEASON. CAREFULLY COORDINATE WORK TO PERFORM THE REQUIRED ABATEMENT DURING THE

NON-HEATING PERIODS. ALL OTHER RADIATORS SHALL NOT BE REMOVED OR DISTURBED.

B. THERE IS AN ASBESTOS-CONTAINING BLACK PAPER AND TAR COVERING THE COPPER FLASHING BELOW THE WINDOWS. THE MATERIAL IS NOT SCHEDULED TO BE DISTURBED AS A

RESULT OF THIS PROJECT.

C. ALL CEILINGS WITHIN THE NINTH FLOOR PROJECT LIMITS SHALL BE DEMOLISHED. LIMITED CEILING DEMOLITION IS SCHEDULED TO TAKE PLACE ON THE EIGHTH FLOOR DIRECTLY

BELOW THE NINTH FLOOR TO REMOVE AND REPLACE THE WASTE PIPING AND TO PERFORM TIE-INS TO THE PLUMBING AND MECHANICAL LINES ASSOCIATED WITH THE NINTH FLOOR

RENOVATIONS. THERE IS ASBESTOS INSULATION ON THE HEATING AND DOMESTIC WATER LINES AND ASBESTOS DEBRIS ABOVE ALL HARD CEILINGS. CONTRACTOR SHALL ASSUME

THERE WILL BE SOME ABATEMENT WORK AT EACH RISER LOCATION ON THE EIGHTH FLOOR WHERE NEW CONNECTIONS WILL BE MADE FOR THE SANITARY LINES. THE CEILING TILES

AND CEILING PLASTER IN THE BUILDING DO NOT CONTAIN ASBESTOS AND THE WASTE PIPING IS NOT INSULATED. DEMOLITION OF CEILING AND REMOVAL OF ANY PLUMBING OR

WASTE PIPING ABOVE CEILINGS MUST BE CONDUCTED AS AN ASBESTOS PROJECT.

D. REFER TO MECHANICAL DEMOLITION DRAWINGS MD-101 AND MD-102 AND PLUMBING DEMOLITION DRAWINGS PD-100, PD-101, AND PD-102 FOR ADDITIONAL INFORMATION REGARDING

THE LOCATION OF ASBESTOS INSULATED PIPING. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR EXTENTS OF DEMOLITION.

E. REFER TO DRAWINGS G-005 THROUGH G-009 FOR REQUIREMENTS PERTAINING TO LIFE SAFETY MEASURES AND TO COORDINATE PHASING OF THE WORK.

F. REFER TO THE RECORD DRAWINGS THAT HAVE BEEN INCLUDED WITH THE BID DOCUMENTS FOR ADDITIONAL INFORMATION REGARDING THE LOCATION OF PLUMBING AND STEAM

LINES THAT MAY BE COVERED WITH ASBESTOS INSULATION. ASSUME ALL HOT AND COLD WATER LINES AND STEAM LINES HAVE ASBESTOS INSULATION. THE RECORD DRAWINGS

HAVE BEEN INCLUDED FOR REFERENCE ONLY.

G. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.

H. THE ABATEMENT WORK WILL OCCUR IN PHASES. REFER TO DRAWING G-005 AND G-006 FOR PHASING PLANS. ALL DEMOLITION OF CEILINGS AND WALL CHASES SHALL BE PERFORMED

WHILE THE ABATEMENT CONTRACTOR IS ON SITE AND THE AREA IS UNDER NEGATIVE PRESSURE. ABATEMENT CONTRACTOR SHALL VERIFY THAT ALL AREAS WHERE ASBESTOS PIPE

INSULATION MAY BE PRESENT, I.E. INSIDE WALL CHASES AND COLUMNS, IS REMOVED PRIOR TO THE ABATEMENT CONTRACTOR DEMOBILIZING.

I. ALL SHUT DOWNS MUST BE APPROVED BY VAMC FACILITIES DEPARTMENT PRIOR TO IMPLEMENTATION.

GENERAL NOTES

A. CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL APPLICABLE FEDERAL AND STATE RULES, REGULATIONS, GUIDELINES AND THE

CONTRACT DOCUMENTS.

B. ALL MATERIAL MEASUREMENTS AND/OR QUANTITIES AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. CONTRACTOR IS RESPONSIBLE

FOR FIELD VERIFICATION OF EXISTING CONDITIONS PRIOR TO BIDDING.

C. THE LOCATION OF ANY SITE STORAGE OF MATERIAL, EQUIPMENT, AND WASTE TRAILER/DUMPSTER SHALL BE COORDINATED WITH AND APPROVED BY THE

RESIDENT ENGINEER.

D. CONTRACTOR IS RESPONSIBLE FOR ALL TOOLS, EQUIPMENT AND SUPPLIES.

E. CONTRACTOR IS RESPONSIBLE FOR KEEPING THE WORK AREA IN A CLEAN AND SAFE CONDITION. CONTRACTOR SHALL ENSURE THAT UNCERTIFIED PERSONNEL

OR UNAUTHORIZED VISITORS DO NOT ENTER ACTIVE WORK AREAS AT ANY TIME.

F. THE REMOVAL OR DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL SHALL BE PERFORMED BY A NYS LICENSED ASBESTOS ABATEMENT CONTRACTOR.

REFER TO SPECIFICATION SECTIONS 028213.13 AND 028213.19 FOR ADDITIONAL REQUIREMENTS FOR THE REMOVAL OF ASBESTOS-CONTAINING MATERIALS.

G. THE CONSTRUCTION AREA SHALL BE COMPLETELY SEPARATED FROM OTHER PORTIONS OF THE BUILDING BY USING TEMPORARY CONSTRUCTION DETAILS AS

SHOWN ON DRAWING G-005.

H. NEGATIVE PRESSURE SHALL BE ESTABLISHED INSIDE THE INTERIOR WORK AREA(S) PRIOR TO THE DISTURBANCE OF ANY ASBESTOS-CONTAINING MATERIAL.

ROUTING OF THE NEGATIVE AIR EXHAUST DUCT SHALL BE DECIDED UPON AFTER CONSULTATION WITH VAMC AND VAMC'S REPRESENTATIVE.

I. CONTRACTOR SHALL COORDINATE THE REMOVAL OF THE ASBESTOS WASTE MATERIALS FROM THE BUILDING WITH VAMC AND VAMC'S REPRESENTATIVE. THE

REMOVAL OF THE ASBESTOS WASTE SHALL BE PERFORMED AT TIMES WHEN IT DOES NOT INTERFERE WITH NORMAL FACILITY ACTIVITIES.

J. ALL ASBESTOS-CONTAINING MATERIAL SHALL BE PROPERLY PACKAGED PRIOR TO BEING REMOVED FROM THE WORK AREA. ASBESTOS WARNING LABELS SHALL

BE APPLIED TO THE ASBESTOS WASTE BAGS. ALL ASBESTOS MATERIALS THAT ARE REMOVED FROM THE SITE SHALL BE ACCOMPANIED BY A WASTE SHIPMENT

RECORD. THE COMPLETED WASTE SHIPMENT RECORDS MUST BE PROVIDED TO THE VAMC AS PART OF THE CLOSEOUT DOCUMENTATION. ALL ORIGINAL WASTE

SHIPMENT RECORDS MUST BE PROVIDED WITHIN 35 DAYS OF THE WASTE LEAVING THE SITE.

K. CONTRACTOR SHALL CLEAN ALL AREAS OUTSIDE THE WORK AREA AND ANY AREAS WHERE CONTRACTOR'S PERSONNEL TRAVEL THROUGH THE BUILDING. THESE

AREAS SHALL BE LEFT IN A CONDITION AS CLEAN AS OR CLEANER THAN WHEN THE CONTRACTOR ARRIVED ON SITE.

L. THE OTHER THREE WINGS ON THE 9TH FLOOR AND WING C ON THE 7TH, 8TH AND 10TH FLOORS WILL REMAIN OCCUPIED DURING THE ABATEMENT PROJECT.

THEREFORE, ALL ABATEMENT WORK, INCLUDING PREPARATION, MUST BE PERFORMED OFF HOURS, EITHER AT NIGHT OR ON THE WEEKEND. WORK SHALL BE

PERFORMED IN PHASES.

M. IF A REMOTE DECONTAMINATION ENCLOSURE IS UTILIZED FOR THIS WORK, AN AIRLOCK MUST BE ATTACHED TO EACH WORK AREA. THE AIRLOCK SHALL BE SIZED

LARGE ENOUGH TO ALLOW FOR THE WORKERS TO CHANGE THEIR SUITS PRIOR TO LEAVING THE WORK AREA. THE DECONTAMINATION ENCLOSURE SHALL BE

CONSTRUCTED IN ACCORDANCE WITH 29 CFR 1926.

N. CONTRACTOR SHALL BE REQUIRED TO SUBMIT A DETAILED WORK PLAN DESCRIBING THE WORK AREA PREPARATION, REMOVAL AND HANDLING PROCEDURES, AS

WELL AS DECONTAMINATION ENCLOSURES AND NEGATIVE AIR EXHAUST LOCATIONS PRIOR TO BEING ALLOWED TO START THE PROJECT. THIS WORK PLAN WILL

NEED TO BE REVIEWED AND ACCEPTED BY VAMC HEALTH AND SAFETY PERSONNEL PRIOR TO THE START OF WORK.

AA-100

7TH FLOOR ASBESTOS

ABATEMENT PLAN

EJ CD

AA-5

AA-5

AA-5

AA-8

AA-10

AA-10

AA-10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of

Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ABATEMENT CONSULTANT:

Revisions: Date:

WARD 9C RENOVATIONS

3495 BAILEY AVENUE BUFFALO, NY 14215

528-18-109

528-18-109- BID ADDENDUM #1 2022/10/27 95 Perry Street, Suite 300

Buffalo, NY 14203 February 25, 2022

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

AA-10

AA-5

ENVIRONMENTAL NOTES

E-1 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BULBS IN LIGHTING SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK

AREA. REFER TO ELECTRICAL DEMOLITION PLANS. RECYCLE ALL REMOVED BULBS IN ACCORDANCE WITH THE 40 CFR PART 273 US EPA UNIVERSAL WASTE RULE.

ANY FLUORESCENT LAMPS BROKEN DURING DEMOLITION SHALL BE DISPOSED OF AS HAZARDOUS WASTE.

E-2 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND DISPOSE OF FLUORESCENT BALLASTS SCHEDULED FOR REMOVAL WITHIN THE PROJECT WORK AREA.

REFER TO ELECTRICAL DEMOLITION PLANS. THE BALLASTS REMOVED FOR THIS PROJECT MAY CONTAIN DEHP AND/OR PCBS. CONTRACTOR TO PROPERLY

DISPOSE OF ALL BALLASTS.

E-3 CONTRACTOR SHALL PROPERLY REMOVE, PACKAGE, AND RECYCLE BATTERIES IN EXIT LIGHTS SCHEDULED FOR DEMOLITION. REFER TO ELECTRICAL

DEMOLITION PLANS.

E-1

E-2

E-3

E-1

E-2

E-3

E-1

E-2

E-3

E-1

E-2

E-3

E-1

E-2

E-3

E-1

E-2

E-3

E-1

E-2

E-3

E-1

E-2

E-3

LEAD AWARENESS NOTES

1. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA 29 CFR 1926.62: LEAD EXPOSURE IN CONSTRUCTION; INTERIM FINAL RULE FOR ALL

ACTIVITIES DURING WHICH AN EMPLOYEE MAY BE OCCUPATIONALLY EXPOSED TO LEAD. ALL CONTRACTORS SHALL ENSURE THAT THEIR EMPLOYEES

WEAR PROPER PERSONAL PROTECTIVE EQUIPMENT AND/OR UTILIZE APPROPRIATE WORK METHODS TO PREVENT ELEVATED BLOOD LEAD LEVELS OR

EXPOSURE ABOVE THE PERMISSIBLE EXPOSURE LIMIT.

2. AREAS OF THE BUILDING HAVE BEEN INVESTIGATED FOR THE PRESENCE OF LEAD DURING PAST PROJECTS AND LEAD-BASED PAINT HAS BEEN

IDENTIFIED. SURFACES IDENTIFIED TO BE COATED WITH LEAD-BASED PAINT INCLUDE BUT ARE NOT LIMITED TO INCLUDE:

· GREEN CERAMIC WALL TILES.

· WHITE WITH BEIGE SPECKLES CERAMIC WALL TILES.

· TAN CERAMIC WALL TILES.

· WHITE BED PAN SINKS.

· BLACK WINDOW INFILL PANELS.

· OFF-WHITE METAL RADIATOR COVERS.

3. FURNISHING OF THIS INFORMATION IS NOT INTENDED TO RELIEVE THE CONTRACTOR OF ITS RESPONSIBILITIES UNDER OSHA TO DETERMINE THE

PRESENCE, LOCATION, AND QUANTITY OF EXISTING LEAD-CONTAINING MATERIALS THAT THEIR EMPLOYEES AND SUBCONTRACTORS MAY BE EXPOSED

TO, AND TO WARN THEIR EMPLOYEES OF THE POTENTIAL DANGERS OF THE DISTURBANCE OF LEAD-CONTAINING MATERIALS.

Sheets and Views