523A5-19-305-100 Percent FINAL BD DWGS VOL 2_STAMPED_210514_19101.pdf
PDF 34 MB Posted
- Solicitation number
- 36C24121R0163
About this file
This document summarizes a federal contract solicitation for outpatient mental health renovation services. Solicitation number 36C24121R0163 was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for the Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305. The solicitation seeks construction services to renovate outpatient mental health facilities. The awarded contractor will be required to complete renovations to building B5 of the specified VA medical center located in Veterans Integrated Service Network 1. The response due date and anticipated award date are not provided in this document.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 74
46 44
47 49
R A M P
E N C L O S E D W A L K
E N C L O S E D W A L K
E N C L O S
E D
W
A L K
VA
TENNINIS
COURT
CAMPUS MAP:
ABBREVIATIONS:
AB ANCHOR BOLT
A/C AIR CONDITIONING
ACCU AIR CONDITIONING CONDENSER UNIT
ACPLAS ACCOUSTICAL PLASTER
ACT ACOUSTIC CEILING TILE
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
AP ACCESS PANEL
APROX APPROXIMATE
ARCH ARCHITECTURAL
BCX BOTTOM CORD EXTENSION
BD BOARD
BIT BITUMINOUS
BLDG BUILDING
BLP BORROWED LIGHT PANEL
BO BOTTOM OF
BOF BOTTOM OF FOOTING
BOS BOTTOM OF STEEL
BOT BOTTOM
BRDG BRIDGING
BRG BEARING
BS BOTH SIDES
BSE BRICK SHELF ELEVATION
C CHANNEL
CB CATCH BASIN / CHALKBOARD
CEM BD CEMENTITIOUS BACKER BOARD
CFM CUBIC FEET PER MINUTE
CIP CAST IN PLACE
CJ CONTROL JOINT / CONSTRUCTION JOINT
CL CENTER LINE
CLL CONTRACT LIMIT LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CT CERAMIC TILE
CUH CABINET UNIT HEATER
D DIAMETER
DBL DOUBLE
DF DRINKING FOUNTAIN
DL DEAD LOAD
DR DISPLAY RAIL
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWV DRAIN/WASTE/VENT
EA EACH
EF EXHAUST FAN / EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FB FLAT BAR
FBO FURNISHED BY OTHERS
FCO FLOOR CLEA-OUT
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR / FAR FACE
FFE FINISH FLOOR ELEVATION
FO FRAMED OPENING
FRP FIBER REINFORCED PLASTIC
FS FAR SIDE
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GDT GYPSUM DROP-IN TILE
GV GRAVITY VENT
GWB GYPSUM WALL BOARD
H HORIZONTAL
HC HANDICAPPED / HOLLOW CORE
HORIZ HORIZONTAL
HM HOLLOW METAL
HRU HEAT RECOVERY UNIT
H&V HEATING AND VENTILATING
HVAC HEATING, VENTILATING AND AIR CONDITIONING
I INCLUDED ANGLE
ID INSIDE DIAMETER
IF INSIDE FACE
IJ ISOLATION JOINT
IMP IMPACT RESISTANT
INS INSULATED
INV INVERT
JS JOINT SUBSTITUTE
K KIPS
L ANGLE / LENGTH
LF LEFT
LINO SHEET LINOLEUM
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LIGHTING PANEL / LIQUIFIED PROPANE
MAX MAXIMUM
MB MARKER BOARD
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE-RESISTANT
MUA MAKE-UP AIR
N NOSING
NCB NEW CATCH BASIN
NDMH NEW DRAIN MANHOLE
NFM NEW FORCE MAIN
NIC NOT IN CONTRACT
NS NEAR SIDE
NSD NEW STORM DRAIN LINE
NSS NEW SANITARY SEWER LINE
NTS NOT TO SCALE
NW NEW WATER LINE
OC ON CENTER
OF OUTSIDE FACE
OH OVERHEAD
PA PUBLIC ADDRESS
PAF POWER-ACTUATED FASTENER
PDU POOL DEHUMIDIFICATION UNIT
PL PLATE / PROPERTY LINE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PP POWER PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE-TREATED
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
R RISER / RADIUS
RB RESILIENT BASE
RD ROOF DRAIN
REINF REINFORCED
REQ'D REQUIRED
RT RIGHT
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RUB-RAIL
RTU ROOF TOP UNIT (HVAC)
SACT SUSPENDED ACOUSTIC TILE CEILING
SC SOLID CORE
SF SQUARE FOOT / SUPPLY FAN
SFRM SPRAYED FIRE-RESISTIVE MATERIAL
SHT SHEET
SIM SIMILAR
SK SHEAR KEY
SN SANITARY NAPKIN (DISPENSER)
SP SPECIAL
SS STAINLESS STEEL
STA STATION
STL STEEL
STRUC STRUCTURAL
T TREAD
TB TACKBOARD
T&B TOP AND BOTTOM
TBM TEMPORARY BENCHMARK
TCE TOP CHORD EXTENSION
TJ TIE JOIST
TO TOP OF
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PIER
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOILET PAPER (DISPENSER) / TEST PIT
TS TUBE STEEL
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VENT PIPE / VERTICAL
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VP VISION PANEL
VTR VENT THROUGH THE ROOF
W/ WITH
WC WATER CLOSET
WD WOOD
WF WIDE FLANGE
WH WATER HEATER
W/O WITH OUT
WP WORKING POINT
WS WEB STIFFENER
WWF WELDED WIRE FABRIC
KEY NOTE
A
MAIN
LOBBY
A402
COLUMN BUBBLE AND
CENTER LINE
PARTITION TAG
DOOR TAG
ROOM TAG
EQUIPMENT/ACCESSORY TAG
A00
AE000
A00
AE000
A00
AE000
A00
AE000
INTERIOR ELEVATION
EXTERIOR ELEVATION
DATUM REFERENCE
BUILDING SECTION
WALL SECTION
DETAIL
A0
D0
C0
B0AE000
WINDOW TAG
SYMBOL LEGEND:
CUT DIRECTION
SECTION NUMBER
SHEET NUMBER
CUT DIRECTION
SECTION NUMBER
SHEET NUMBER
SECTION NUMBER
AREA OF DETAIL
SHEET NUMBER
ELEVATION DIRECTION
SECTION NUMBER
SHEET NUMBER
ELEVATION NUMBER/
DIRECTION
SHEET NUMBER
DOOR NUMBER
ROOM NAME
ROOM NUMBER
REVISION
REVISION NUMBER#
REVISION TAG
AREA OF REVISION
EXISTING COLUMN BUBBLE AND
CENTER LINEA
XXX SF ROOM AREA (WHEN APPLICABLE)
LOCATION MAP:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\J An de rs on \D oc um en ts
\1
_B ro ck to n_
B0 5_
Ar ch
_R
_J An de rs on .rv t 5/
/2
2:
:1
PM
GI001B
COVER SHEET VOLUME 2 BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 RJC LGC/EVR
BUILDING 5 OUTPATIENT MENTAL HEALTH RENOVATION
VA BOSTON HEALTHCARE SYSTEM - BROCKTON CAMPUS
BROCKTON, MASSACHUSETTS
VOLUME 2
DRAWING LIST
Sheet Number Sheet Name
15 - ELECTRICAL
E-001 LEGEND AND GENERAL NOTES
ED100.1 LEVEL 0 DEMOLITION PLAN - WINGS A AND B
ED100.2 LEVEL 0 DEMOLITION PLAN - WING C
ED101.1 LEVEL 1 DEMOLITION PLAN - WINGS A AND B
ED101.2 LEVEL 1 DEMOLITION PLAN - WING C
ED102.1 LEVEL 2 DEMOLITION PLAN - WINGS A AND B
ED102.2 LEVEL 2 DEMOLITION PLAN - WING C
ED103 ROOF AND PENTHOUSE DEMOLITION PLAN
EP100.1 LEVEL 0 POWER PLAN - WINGS A AND B
EP100.2 LEVEL 0 POWER PLAN - WING C
EP101.1 LEVEL 1 POWER PLAN - WINGS A AND B
EP101.2 LEVEL 1 POWER PLAN - WING C
EP102.1 LEVEL 2 POWER PLAN - WINGS A AND B
EP102.2 LEVEL 2 POWER PLAN - WING C
EP103 ROOF AND PENTHOUSE POWER PLAN
EP401 ENLARGED POWER PLANS
EP601 PANEL SCHEDULES
EP602 PANEL SCHEDULES
EP651 DEMOLITION ONE-LINE DIAGRAM
EP652 NEW WORK ONE LINE DIAGRAM
EL100.1 LEVEL 0 LIGHTING PLAN - WINGS A AND B
EL100.2 LEVEL 0 LIGHTING PLAN - WING C
EL101.1 LEVEL 1 LIGHTING PLAN - WINGS A AND B
EL101.2 LEVEL 1 LIGHTING PLAN - WING C
EL102.1 LEVEL 2 LIGHTING PLAN - WINGS A AND B
EL102.2 LEVEL 2 LIGHTING PLAN - WING C
EL601 LIGHT FIXTURE SCHEDULE AND DETAILS
EL602 LIGHTING CONTROL DETAILS
EL603 LIGHTING CONTROL DETAILS
EY100.1 LEVEL 0 SYSTEMS PLAN - WINGS A AND B
EY100.2 LEVEL 0 SYSTEMS PLAN - WING C
EY101.1 LEVEL 1 SYSTEMS PLAN - WINGS A AND B
EY101.2 LEVEL 1 SYSTEMS PLAN - WING C
EY102.1 LEVEL 2 SYSTEMS PLAN - WINGS A AND B
EY102.2 LEVEL 2 SYSTEMS PLAN - WING C
EY651 RISER DIAGRAMS
E-601 SCHEDULES
E-701 DETAILS
DRAWING LIST
Sheet Number Sheet Name
11 - GENERAL
GI001B COVER SHEET VOLUME 2
12 - PLUMBING
P-001 PLUMBING LEGEND AND ABBREVIATIONS
PD100.1-1 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WINGS
A AND B
PD100.1-2 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WING C
PD100.2-1 LEVEL 0 - PLUMBING DEMOLITION PLAN - WINGS A AND B
PD100.2-2 LEVEL 0 - PLUMBING DEMOLITION PLAN - WING C
PD101.1 LEVEL 1 - PLUMBING DEMOLITION PLAN - WINGS A AND B
PD101.2 LEVEL 1 - PLUMBING DEMOLITION PLAN - WING C
PD102.1 LEVEL 2 - PLUMBING DEMOLITION PLAN - WINGS A AND B
PD102.2 LEVEL 2 - PLUMBING DEMOLITION PLAN - WING C
PD103.1 PLUMBING ROOF AND PENTHOUSE DEMOLITION PLAN
PL100.1-1 PIPE BASEMENT - PLUMBING DWV PLAN - WINGS A AND B
PL100.1-2 PIPE BASEMENT - PLUMBING DWV PLAN - WING C
PL100.2-1 LEVEL 0 - PLUMBING DWV PLAN - WINGS A AND B
PL100.2-2 LEVEL 0 - PLUMBING DWV PLAN - WING C
PL101.1 LEVEL 1 - PLUMBING DWV PLAN - WINGS A AND B
PL101.2 LEVEL 1 - PLUMBING DWV PLAN - WING C
PL102.1 LEVEL 2 - PLUMBING DWV PLAN - WINGS A AND B
PL102.2 LEVEL 2 - PLUMBING DWV PLAN - WING C
PL103.1 PLUMBING ROOF AND PENTHOUSE PLAN
PP100.1-1 PIPE BASEMENT - PLUMBING SUPPLY PIPING PLAN -
WINGS A AND B
PP100.2-1 LEVEL 0 - PLUMBING SUPPLY PIPING PLAN - WINGS A
AND B
PP100.2-2 LEVEL 0 - PLUMBING SUPPLY PIPING - WING C
PP101.1 LEVEL 1 - PLUMBING SUPPLY PIPING - WINGS A AND B
PP101.2 LEVEL 1 - PLUMBING SUPPLY PIPING - WING C
PP102.1 LEVEL 2 - PLUMBING SUPPLY PIPING - WINGS A AND B
PP102.2 LEVEL 2 - PLUMBING SUPPLY PIPING - WING C
PP103.1 PLUMBING ROOF AND PENTHOUSE PLAN
PL401 PLUMBING PART PLANS
PP401 PLUMBING PART PLANS
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P601 PLUMBING SCHEDULES
14 - MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATIONS
M-002 MECHANICAL GENERAL NOTES
MD100.1-1 PIPE BASEMENT - HVAC DEMOLITION PLAN - WINGS A
AND B
MD100.1-2 PIPE BASEMENT - HVAC DEMOLITION PLAN - WING C
MD100.2-1 LEVEL 0 - HVAC DEMOLITION PLAN - WINGS A AND B
MD100.2-2 LEVEL 0 - HVAC DEMOLITION PLAN - WING C
MD101.1 LEVEL 1 - HVAC DEMOLITION PLAN - WINGS A AND B
MD101.2 LEVEL 1 - HVAC DEMOLITION PLAN - WING C
MD102.1 LEVEL 2 - HVAC DEMOLITION PLAN - WINGS A AND B
MD102.2 LEVEL 2 - HVAC DEMOLITION PLAN - WING C
MD111.1 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WINGS A
AND B
MD111.2 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WING C
MD112.1 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WINGS A
AND B
MD112.2 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WING C
MH100.1-1 PIPE BASEMENT - HVAC PLAN - WINGS A AND B
MH100.1-2 PIPE BASEMENT - HVAC PLAN - WING C
MH100.2-1 LEVEL 0 - HVAC PLAN - WINGS A AND B
MH100.2-2 LEVEL 0 - HVAC PLAN - WING C
MH101.1 LEVEL 1 - HVAC PLAN - WINGS A AND B
MH101.2 LEVEL 1 - HVAC PLAN - WING C
MH102.1 LEVEL 2 - HVAC PLAN - WINGS A AND B
MH102.2 LEVEL 2 - HVAC PLAN - WING C
MH130 MECHANICAL ROOF AND PENTHOUSE PLAN
MP111.1 LEVEL 1 - HVAC PIPING PLAN - WINGS A AND B
MP111.2 LEVEL 1 - HVAC PIPING PLAN - WING C
MP112.1 LEVEL 2 - HVAC PIPING PLAN - WINGS A AND B
MP112.2 LEVEL 2 - HVAC PIPING PLAN - WING C
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-604 MECHANICAL SCHEDULES
M-651 MECHANICAL SEQUENCE OF OPERATIONS
M-652 MECHANICAL SEQUENCE OF OPERATIONS
DRAWING LIST
Sheet Number Sheet Name
01 - GENERAL
GI001A COVER SHEET VOLUME 1
GI002 MOUNTING HEIGHTS, WALL AND ROOF TYPES, TOP OF
WALL DETAILS
GI003 LEVEL 0 - PHASE 0 FLOOR PLAN AND PHASING NOTES
GI004 LEVEL 0, 1, AND 2 - PHASE B-1 FLOOR PLANS
GI005 LEVEL 0, 1, AND 2 - PHASE B-2 FLOOR PLANS
GI006 LEVEL 0, 1, AND 2 - PHASE C-1 FLOOR PLANS
GI007 LEVEL 0, 1, AND 2 - PHASE C-2 FLOOR PLANS
GI008 LEVEL 0, 1, AND 2 - PHASE A-1 FLOOR PLANS
GI009 LEVEL 0, 1, AND 2 - PHASE A-2 FLOOR PLANS
GI010 TEMPORARY FACILITIES AND SITE PLAN
GI011 TEMPORARY SITE DETAILS
02 - HAZARDOUS MATERIALS
HA100-1 PIPE BASEMENT ABATEMENT PLAN
HA100-2 LEVEL 0 - ABATEMENT PLAN
HA101 LEVEL 1 - ABATEMENT PLAN
HA102 LEVEL 2 - ABATEMENT PLAN
HA130 ROOF - ABATEMENT PLAN
06 - ARCHITECTURAL
A000 CODE SUMMARY
A000-1 PIPE BASEMENT - CODE COMPLIANCE PLAN
A000-2 LEVEL 0 - CODE COMPLIANCE PLAN
A001 LEVEL 1 - CODE COMPLIANCE PLAN
A002 LEVEL 2 - CODE COMPLIANCE PLAN
A003 ROOF - CODE COMPLIANCE PLAN
AD100-1 PIPE BASEMENT DEMOLITION PLAN
AD100-2 LEVEL 0 - DEMOLITION PLAN
AD101 LEVEL 1 - DEMOLITION PLAN
AD102 LEVEL 2 - DEMOLITION PLAN
AD130 ROOF - DEMOLITION PLAN
A-100-1 PIPE BASEMENT - FACILITY PLAN
A-100-2 LEVEL 0 - FACILITY PLAN
A-101 LEVEL 1 - FACILITY PLAN
A-102 LEVEL 2 - FACILITY PLAN
AE100.1-1 PIPE BASEMENT FLOOR PLAN - WINGS A AND B
AE100.1-2 LEVEL 0 - FLOOR PLAN - WINGS A AND B
AE100.2-1 PIPE BASEMENT FLOOR PLAN - WING C
AE100.2-2 LEVEL 0 - FLOOR PLAN - WING C
AE101.1 LEVEL 1 - FLOOR PLAN - WINGS A AND B
AE101.2 LEVEL 1 - FLOOR PLAN WING C
AE102.1 LEVEL 2 - FLOOR PLAN - WINGS A AND B
AE102.2 LEVEL 2 - FLOOR PLAN - WING C
AE120.1 LEVEL 0 - REFLECTED CEILING PLAN - WINGS A AND B
AE120.2 LEVEL 0 - REFLECTED CEILING PLAN - WING C
AE121.1 LEVEL 1 - REFLECTED CEILING PLAN - WINGS A AND B
AE121.2 LEVEL 1 - REFLECTED CEILING PLAN - WING C
AE122.1 LEVEL 2 - REFLECTED CEILING PLAN - WINGS A AND B
AE122.2 LEVEL 2 - REFLECTED CEILING PLAN - WING C
AE130 ROOF AND PENTHOUSE PLAN
AE200 EXTERIOR ELEVATIONS
AE210 INTERIOR ELEVATIONS
AE211 INTERIOR ELEVATIONS
AE400 ENLARGED TOILET PLANS
AE401 ENLARGED PLANS
AE402 ENLARGED PLANS
AE500 DETAILS - BUILDING
AE501 DETAILS - ROOF
AE510 DETAILS - PLAN
AE520 DETAILS - CASEWORK
AE600 SCHEDULE - DOOR
AE601 DETAILS - DOOR
AE602 WINDOW TYPES AND DETAILS
07 - INTERIORS
ID100.1-2 LEVEL 0 - FINISH PLAN - WINGS A AND B
ID100.2-2 LEVEL 0 - FINISH PLAN - WING C
ID101.1 LEVEL 1 - FINISH PLAN - WINGS A AND B
ID101.2 LEVEL 1 - FINISH PLAN WING C
ID102.1 LEVEL 2 - FINISH PLAN - WINGS A AND B
ID102.2 LEVEL 2 - FINISH PLAN - WING C
ID600 PRODUCT INDEX SHEET
11 - FIRE PROTECTION
FP001 FIRE PROTECTION LEGEND AND ABBREVIATIONS
FP100.1 LEVEL 0 - FIRE PROTECTION PLAN - WINGS A AND B
FP100.2 LEVEL 0 - FIRE PROTECTION PLAN - WING C
FP101.1 LEVEL 1 - FIRE PROTECTION PLAN - WINGS A AND B
FP101.2 LEVEL 1 - FIRE PROTECTION PLAN - WING C
FP102.1 LEVEL 2 - FIRE PROTECTION PLAN - WINGS A AND B
FP102.2 LEVEL 2 - FIRE PROTECTION PLAN - WING C
FP501 FIRE PROTECTION DETAILS
DRAWING LIST - VOLUME 1 DRAWING LIST - VOLUME 2 DRAWING LIST - VOLUME 2 PROJECT LOCATION
Revisions: Date: 05-14-21
PLUMBING PIPING SYMBOLS GENERAL PLUMBING SYMBOLS
DRAWING SYMBOLS
PLUMBING VALVE SYMBOLS
PLUMBING ABBREVIATIONS
MA
MV
LA
LV
OA
IA
D
SAN
SD
SD
TWR
TWS
SS
SCW
FCW
NO2
N2
NG
NG
FOD
FOS
FOR
FOV
CW
HW
RHW
V
FE
CO AV
(R) SYS
(E) SYS
NPW
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
MEDICAL VACUUM
MEDICAL AIR
DOMESTIC HOW WATER RETURN, HOT WATER RETURN
STORM WATER, BELOW GRADE
STORM WATER
SANITARY SEWER, BELOW GRADE
DRAIN
NITROUS OXIDE
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
SOIL, WASTE, OR SANITARY SEWER
SOFTEN COLD WATER
FILTERED COLD WATER
OXYGEN
NITROGEN
NATURAL GAS, BELOW GRADE
NATURAL GAS
FUEL OIL DISCHARGE
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
VENT (SANITARY)
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
PIPE UP
PIPE DOWN
CLEAN OUT
HOSE BIB
PL105
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
PL105
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
(HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
E EXISTING
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF ECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM.A NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
KW KILOWATT
KWH KILOWATT-HOUR
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
EXISTING PIPE TO BE REMOVED (TYPE AS INDICATED)
EXISTING PIPE (TYPE AS INDICATED)
NON-POTABLE WATER
1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXTENT OF THE DEMOLITION SCOPE OF WORK AND AREA. THE DEMOLITION PLANS INDICATE THE GENERAL INTENT AND ARE NOT INTENDED TO SHALL ALL ITEMS TO BE REMOVED OR
RETAINED.
2. TRACE AND LABEL ALL EXISTING SYSTEMS WITHIN THE DEMOLITION AREA AND BEYOND PRIOR TO DISCONNECTION AND REMOVAL TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION AREA IS AFFECTED. REVIEW IN DETAIL WITH THE GENERAL CONTRACTOR AND OWNER WHAT IS TO BE REMOVED AND REMAIN PRIOR TO WORK COMMENCING. THERE SHALL BE NO INTERRUPTION OF SERVICES OUTSIDE THE DEMOLITION AREA WITHOUT APPROVAL FROM THE OWNERS
REPRESENTATIVE.
3. NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF ANY UNANTICIPATED HIDDEN CONDITIONS ENCOUNTERED DURING THE DEMOLITION. CONTRACTOR SHALL PROVIDE PHASING AND COORDINATION PLANS PRIOR TO THE COMMENSMENT OF WORK.
4. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER DOES NOT TAKE POSSESSION, DISPOSE OF ITEMS IN A SAFE AND LEGAL MANNER. ALL ITEMS CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A UNIFORM HAZARDOUS WASTE MANIFEST SHALL BE PROVIDED TO THE OWNER.
5. NOTIFY UTILITY COMPANIES IN ACCORDANCE WITH THEIR REQUIREMENTS PRIOR TO DEMOLITION VERIFY THAT THE UTILITIES HAVE BEEN DISCONNECTED, VALVED, CAPPED AND MADE SAFE PRIOR TO DEMOLITION.
6. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES
TO PREVENT WINDBLOWN DUST.
7. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS AT CONCEALED SPACES, SUCH AS PIPE INTERIORS OR SHAFTS. VERIFY CONDITION AND CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME CUTTING OPERATIONS. MAINTAIN FIRE WATCH AND PORTABLE FIRE-SUPPRESSION DEVICES DURING FLAME CUTTING
OPERATIONS. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.
8. DRAIN, PURGE, OR OTHERWISE REMOVE, COLLECT AND DISPOSE OF CHEMICALS, LIQUIDS, GASES, EXPLOSIVES, ACIDS, FLAMMABLES OR OTHER DANGEROUS MATERIALS BEFORE PROCEEDING.
9. PROPERLY LABEL ALL UNLABELED PIPES THAT REMAIN WITH COLOR PIPE MARKERS.
10. ALL DEMOLITION SCOPE ASSOCIATED WITH LOW VOLTAGE WIRING FOR CONTROLS AND ASSOCIATED INTERLOCKS
SHALL BE INCLUDED IN THIS CONTRACT.
11. ALL EQUIPMENT LOCATIONS AND PIPE AND DUCTWORK SIZES INDICATED ARE APPROXIMATE. VERIFY EXACT LOCATIONS
AND SIZES IN THE FIELD.
12. REFER TO THE PLUMBING DRAWINGS FOR THE FULL EXTENT OF THE SCOPE OF DEMOLITION. DISCONNECT AND MAKE SAFE ALL PLUMBING EQUIPMENT IDENTIFIED FOR REMOVAL ON THE PLUMBING DEMOLITION PLANS. THE PLUMBING SCOPE MAY EXTEND BEYOND THE AREA DEFINED BY THESE WORK SCOPE LIMITS TO FULLY COMPLY WITH THE VARIOUS
REQUIREMENTS DEIFNED BY THESE NOTES.
13. THE PLUMBING DEMOLITION PLANS INDICATE GENERAL INTENT AND ARE NOT INTENDED TO SHOW ALL COMPONENTS AND ITEMS TO BE REMOVED OR RETAINED. THE PLUMBING CONTRACTORS SHALL VISIT THE SITE PRIOR TO SUBMISSION OF THEIR BIDS TO BECOME FAMILIAR WITH THE ACTUAL WORKING CONDITIONS AND THE EXTENT OF WORK. EQUIPMENT AND CONTROLS DESIGNATED TO BE REMOVED SHALL BE DISCONNECTED AND MADE SAFE. THE PLUMBING CONTRACTORS SHALL IMMEDIATELY NOTIFY THE GENERAL CONTRACTOR AND THE OWNERS REPRESENTATIVE OF ANY
UNANTICIAPTED OR HIDDEN CONDITIONS ENCOUNTERED DURING DEMOLITION.
14. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ALL SYSTEMS OR BUILDING COMPONENTS DAMGED BY HIM AS A RESULT OF CONSTRUCTION DURING THE EXECUTION OF THE WORK. DAMAGE SHALL INCLUDE, BUT NOT BE LIMITED TO, THE DESTRUCTION OR DISPOSAL OF ITEMS INTENDED TO REMAIN OR BE SALVAGED.
15. THE PLUMBING CONTRACTOR SHALL SYSTEM TRACE AND LABEL ALL EXISTING BRANCH SUSTEMS AND MAINS WITHIN OR ASSOCIATED WITH THE DEMOLITION SCOPE, PRIOR TO DEMOLITION AND DISCONNECTION. ALL SYSTEMS IDENTIFIED FOR REMOVAL SHALL BE TRACED AND FIELD LABELED TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION SCOPE LIMIT IS
AFFECTED.
16. IN ANY AREA REQUIRING THE PERFORMANCE OF ANY OTHER TRADE'S WORK, THE PLUMBING CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ANY OR ALL PLUMBING ITEMS IN PATH OF WORK, REINSTALLING AND RECONNECTING
SAME AS REQUIRED, IN
17. THE PLUMBING CONTRACTOR SHALL IDENTIFY ALL BRANCH SYSTEM COMPONENTS WHICH ARE TO REMAIN WITHIN THE AREA OF DEMOLITION SCOPE. THERE SHALL BE NO INTERRUPTION OF SERVICE TO ANY AREA OUTSIDE THE SCOPE LIMITS WITHOUT WRITTEN APPROVAL FROM THE OWNER'S REPRESENTATIVE. EXISTING EQUIPMENT TO REMAIN SHALL BE LEFT IN
A CODE COMPLIANT CONDITION.
18. THE PLUMBING CONTRACTOR SHALL TAKE INVENTORY OF PLUMBING ITEMS THAT ARE REMOVED AND PROVIDE A LIST TO THE OWNER'S REPRESENTATIVE FOR HIS SELECTION OF ITEMS TO BE RETAINED. ALL ITEMS REJECTED BY THE REPRESENTATIVE SHALL BECOME THE PROPERTY OF THE PLUMBING CONTRACTOR AND SHALL BE REMOVED FROM THE SITE AND
DISPOSED OF LEGALLY.
19. THE PLUMBING CONTRACTOR SHALL TEMPORARILY SUPPORT ALL ITEMS TO REMAIN THAT ARE AFFECTED BY THE DEMOLITION OF BUILDING STRUCTURAL COMPONENTS (WALLS, CEILINGS, PARTITIONS, ECT). CONTRACTOR SHALL TEMPORARILY SUPPORT ITEMS AND SHALL PROVIDE PERMANENT SUPPORTS WHEN FINALIZED STRUCTURES ARE IN PLACE.
20. ALL EXISTING PLUMBING EQUIPMENT THAT IS TO BE RELOCATED SHALL BE STORED IN A SAFE MANNER UNTIL SUCH TIME AS TO BE REINSTALLED. ANY DAMAGE INCURRED TO EQUIPMENT SHALL BE RECTIFIED BY THE PLUMBING CONTRACTOR.
21. ALL REMOVED ITEMS SHALL BE LEGALLY DISPOSED OF BY THE PLUMBING CONTRACTOR UNLESS IDENTIFIED FOR REUSE.
THE OWNER'S REPRESENTATIVE SHALL INSPECT ALL RETAINED ITEMS, PRIOR TO PLACEMENT IN THE IDENTIFIED STORAGE LOCATION
BY THE MECHANICAL CONTRACTOR.
22. PLUMBING CONTRACTOR WORK SCOPE SHALL INCLUDE AND NOT BE LIMITED TO THE FOLLOWING ADDITIONAL ITEMS AS PER ALL LANDLORD STANDARDS AND PROCEDURES AND WITH PRIOR APPROCAL FROM THE OWNER'S REPRESENTATIVE.
a. AFTER INSTALLATION OF NEW WORK, PROVIDE TESTING OF ALL SYSTEMS IN ACCORDANCE TO THE SPECIFICATIONS.
b. CUTTING, CAPPING, & REMOVAL OF EXISTING DUCTWORK AND INSULATION SYSTEMS.
c. PROTECT ALL EXISTING EQUIPMENT FROM DAMAGE IN AND AROUND EACH INDIVIDUAL WORK SITE.
23. THE GENERAL CONTRACTOR AND THE PLUMBING CONTRACTOR WILL PROVIDE ALL NECESSARY EQUIPMENT TO
PERFORM THE DEMOLITION AND NEW WORK SCOPE.
24. PROVIDE ALL THE NECESSARY EQUIPMENT, MANPOWER, TOOLS, MISELLANEOUS SUPPORTS, MISCELLANEOUS
EQUIPMENT AND SUPPLIES TO PROPERLY EXECUTE THE DEMOLITION AND NEW WORK.
25. PROVIDE ALL PERMITS AND COMPLY WITH ALL OASHA SAFETY REGULATIONS. TAKE DUE DILLIGENCE IN THE PROTECTION OF ALL WORK PERSONNEL AND THE GENERAL POPULATION IN AND AROUND THE WORK SITE. PROVIDE ISOLATION BARRIERS BETWEEN ACTIVE WORK AREAS AND DEMOLITION ZONES. KEEP THE WORK SITE CLEAN, SAFE, AND SECURE
THROUGHOUT ALL PHASES OF THE WORK ORDER.
26. NOTIFY “THE OWNER'S” PROJECT MANAGER THROUGH THE GENERAL CONTRACTOR ONE WEEK IN ADVANCE OF ANY INTENDED SHUTDOWNS OF EXISTING SYSTEMS OF ANY SORT. NOTIFY “THE OWNER'S” PROJECT MANAGER THROUGH THE GENERAL CONTRACTOR TWO WEEKS IN ADVANCE OF REQUIRED ACCESS TO ADJACENT SPACES WHERE WORK IS TO BE PERFORMED. “THE OWNER'S” PROJECT MANAGER WILL CONFIRM WITH THE “USERS GROUP” THE TIME AND DURATION OF THE REQUIRED SHUT DOWN AND ACCESS REQUIREMENTS AND INFORM THE CONTRACTOR IN WRITING OF THE
APPROVAL.
27. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL EXISTING
CONDITIONS FOR
28. WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT CONSTRUCTION DEBRIS FROM ENTERING
DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO START OF WORK.
30. ALL WORK IN PIPE CRAWL SPACE REQUIRES COORDINATION WITH ASBESTOS SOIL REPORTS, SAFETY CONFINED SPACE, AND VA IH. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE TEMPORARY LIGHTING, VENTILATION, EMERGENCY
EXTRACTION EQUIPMENT, ETC. FOR ALL WORK IN THE PIPE BASEMENT.
PLUMBING DEMOLITION NOTES
(R) REMOVE
1. ALL PLUMBING GENERAL NOTES, SYMBOLS, LISTS AND DETAILS ARE TO BE CONSIDERED AS APPLICABLE TO ALL PLUMBING
DRAWINGS FOR THIS PROJECT.
2. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND EXACT LOCATIONS AND ARRANGEMENTS OF EXIST!NEW EQUIPMENT, DUCTWORK, PIPING AND OTHER COMPONENTS SHALL BE DETERMINED IN THE FIELD WITH DUE CONSIDERATION OF STRUCTURAL, ELECTRICAL AND ARCHITECTURAL SYSTEM. EXISTING STRUCTURAL SYSTEMS SHALL NOT BE MODIFIED WITHOUT THE EXPRESS
PERMISSION OF THE ENGINEER.
3. IF REQUIRED THE PROJECT SHALL BE PHASED IN ACCORDANCE WITH THE APPROVED PHASING PLAN. THE CONTRACTOR SHALL OBTAIN APPROVAL FOR THE SEQUENCING AND TIMING OF OPERATIONS PRIOR TO COMMENCING WORK. SEE SPECIFICATIONS.
4. CONTRACTOR IS TO MAINTAIN SERVICE TO ROOMS OUTSIDE THE PROJECT SCOPE OF WORK AND PHASING SCHEDULE. IF INTERRUPTION OF SERVICE IS REQUIRED COORDINATE SHUTDOWN WITH PROJECT ENGINEER AND OWNER.
5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SYSTEMS AND SURFACES TO REMAIN. RESTORE DAMAGED
AREAS THAT ARE BEYOND THE SCOPE OF THIS CONTRACT TO THEIR ORIGINAL CONDITION.
6. WHERE INDICATED ON THE DRAWINGS, REMOVE OR RELOCATE EXISTING COMPONENTS AS REQUIRED TO ACCOMMODATE THE
NEW WORK. REMOVALS SHALL INCLUDE ALL ASSOCIATED OFF-SITE DISPOSAL COSTS.
7. COORDINATE REMOVALS AND RELOCATION'S INCLUDING SELECTIVE CUTTING AND PENETRATIONS WITH ARCHITECTURAL, MECHANICAL STRUCTURAL AND ELECTRICAL CONTRACTORS.
8. MOST PARTITIONS ARE FULL HEIGHT AND REQUIRE UTILITIES PENETRATIONS TO BE SEALED, SEE ARCHITECTURAL DRAWINGS FOR PARTITION HEIGHTS. DUCTWORK SHOWN FOR CLARITY THAT MAY RUN PARALLEL TO WALL PARTITIONS WILL REQUIRE LOCATING IN
THE FIELD TO MINIMIZE CONFLICT WITH PARTITIONS.
9. FIELD VERIFY EXISTING EQUIPMENT AND PIPING PRIOR TO REMOVAL OR REUSE. CONFIRM WITH PROJECT ENGINEER THAT ALL EQUIPMENT AND PIPING DESIGNATED TO BE REMOVED IS NO LONGER IN SERVICE PRIOR TO ITS REMOVAL. PROJECT ENGINEER
SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL DEMO'D EQUIPMENT.
10. EXISTING EQUIPMENT AND PIPING TO REMAIN IN SERVICE SHALL BE INSPECTED. REPORT INOPERABLE EQUIPMENT TO PROJECT
ENGINEER.
11. ALL UNUSED (ABANDONED), PIPING AND EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED AND CAPPED.
12. TIE-IN POINT LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL DETERMINE EXACT LOCATIONS IN THE FIELD BASED ON
EXISTING CONDITIONS.
13. COORDINATE THE LOCATIONS OF ALL WALL MOUNTED EQUIPMENT WITH FINAL EQUIPMENT/FURNITURE LAYOUT.
14. AT THE END OF EACH WORKING DAY, THE CONSTRUCTION SITE SHALL BE LEFT IN A CLEAN AND NEAT CONDITION.
15. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND GOOD PRACTICE NORMAL TO THE TRADE. INSTALLATION SHALL INCLUDE PROVISIONS FOR ACCESS TO NORMAL MAINTENANCE ITEMS. PROVIDE ADEQUATE STRUCTURAL SUPPORTS AND SECURE MOUNTING METHODS WITH PROVISIONS FOR VIBRATION ISOLATION AND EXPANSION
WHERE REQUIRED.
16. COORDINATE ALL PENETRATIONS WITH GENERAL CONTRACTOR. SEE ARCHITECTURAL DRAWINGS FOR PENETRATION DETAILS.
PLUMBING CONTRACTOR SHALL PROVIDE FLASHING AND COUNTER FLASHING FOR ROOF PENETRATIONS AS REQUIRED.
17. PROVIDE PIPE SUPPORTS, GUIDES AND OFFSETS AS NECESSARY TO PREVENT UNDUE STRAIN ON PIPING.
18. SEE DETAILS, PIPING DIAGRAMS AND MANUFACTURER'S RECOMMENDATIONS FOR ADDITIONAL VALVES & FITTINGS NECESSARY FOR
COMPLETE PIPING SYSTEM.
19. CONTRACTOR TO COORDINATE ALL WORK WITH OTHER BUILDING TRADES, RELOCATION OF EXISTING UTILITIES MAY BE
NECESSARY TO ACCOMMODATE INSTALLATION OF NEW EQUIPMENT OR DUCTWORK.
20. SEE SPECIFICATIONS FOR OTHER REQUIREMENTS.
21. CONTRACTOR SHALL FIELD VERIFY ALL CLEARANCES AND DIMENSIONS.
22. PROVIDE ACCESS PANELS FOR ALL CONCEALED SHUT-OFF VALVES EXCEPT THOSE ABOVE SUSPENDED CEILING.
23. INFILL ALL NEW OR EXISTING ABANDONED FLOOR SLAB PENETRATIONS WITH GROUT, FULL THICKNESS OF SLAB. MAINTAIN FIRE
RATING. ALL EXISTING CONCRETE FLOORS AND CHASES ARE 2-HR FIRE RATED.
24. ALL DOMESTIC WATER SUPPLY, VENT AND MEDICAL GAS PIPING SHALL BE RUN ABOVE CEILINGS OR WITHIN PARTITIONS UNLESS
OTHERWISE NOTED.
25. PLUMBING RISERS SHALL BE RUN CONCEALED WITHIN WALLS OR CHASES. COORDINATE WITH ARCHITECTURAL DRAWINGS.
26. COORDINATE FINAL LOCATIONS OF MEDICAL GAS OUTLETS. AND VALVE BOXES WITH ARCHITECT.
27. SANITARY LINES SHALL SLOPE 1/4" PER FOOT UNLESS NOTED OTHERWISE.
28. COORDINATE WITH BUILDING OWNER PRIOR TO CUTTING OR GRINDING FLOORS.
29. INSTALLATION SHALL PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT OF EQUIPMENT PROVIDED. PROVIDE ACCESS PANELS TO ALLOW ACCESS TO SYSTEMS COMPONENTS THAT REQUIRE INSPECTION AND MAINTENANCE ACCORDING TO
MANUFACTURER'S LITERATURE.
30. NEW PIPING LOCATIONS ON THE PLANS ARE DIAGRAMMATICAL. TO THE EXTENT POSSIBLE THE CONTRACTOR SHALL INSTALL
PIPING SYSTEMS TO MINIMIZE RUN LENGTHS TO FIXTURES.
PLUMBING GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\R G
U
IL
\D oc um en ts \1
_B ro ck to n_ B0
5_ M ec h_
R
_R G
U
IL
.rv t
5/
/2
:0 0:
A
M
P-001
PLUMBING LEGEND AND ABBREVIATIONS BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJCRevisions: Date:
UP
INCOMING 4" DOMESTIC
WATER SERVICE
EXISTING WATER METER
TO BE REMOVED
EXISTING BACKFLOW
PREVENTER TO BE REMOVED
E1 E2 E3
EJ
EI
EG.1
EG
EF
EE
ED
EC.9
E4 E5 E6 E7
E8
E8
EA
EB
EC
E5.5 E6.5 E7.5
E9 E10 E11 E12 E13 E15
E4.12 E4.13
E14 E16 E17 E18
EH
(R) 4"S(R) 4"S
(R) 4"SD
(R) 4
"SD
(R ) 3
"S
(R) 6"SD (R) 5"SD (R) 5"SD
(R ) 4
"S
(R ) 8
"S D
(R ) 4
"S D
(R ) 4
"S D
(R ) 8
"S D
(R ) 8
"S D
(R) 4"S (R) 4"S (R) 4"S
(R) 4"S
(R) 1/2" RHW
(R) 1 1/4" HW
(R) 2 1/2" CW
(R) 3/4" RHW
(R) 3" CW (R) 3" CW (R) 3" CW (R) 3" CW (R) 3" CW
(R) 1 1/2" HW
(R) 4"S
(R) 3/4" CW
(R) 3/4" RHW (R) 3/4" RHW (R) 3/4" RHW (R) 3/4" RHW
(R) 4" S
(R) 2" HW (R) 2" HW
(R) 3
"SD
(R) 3"SD
(R) 3" SD-UP(R) 3" SD-UP
(R) 3" SD-UP
(R) 3" SD-UP
(R) 3" SD-UP (R) 3" SD-UP
(R) 4" SD-UP
(R) 3" SD-UP
(R) 4" SD-UP
(E) 2" SD-UP
(R ) 4
"S (R
) 5 "S
(R ) 1
" C W
(R ) 1
" H W
(R ) 1
/2 "R
HW
(R) 1 1/2" CW-UP
(R) 2" CW-UP
(R) 3/4" CW-UP
(R) 3/4" CW-UP
(R ) 3
/4 " C
W
(R) 3" S-UP
(R) 4" S-UP
(R) 2" HW
(R) 3" CW
(R) 3/4" RHW
(R) 2" HW
(R) 1/2" V-UP
(R) 3" S-UP
(R) 3" S-UP
(R) 4" S-UP
(R) 3" S-UP
(R) 2" V-UP
(R) 3" S-UP
(R) 4" S-UP
(R) 2" S-UP
(R) 2" S-UP
(R) 2" S-UP
(R) 3" W&T-UP (R) 3" W&T-UP
(R) 3" S-UP
(R )3
/4 " C
W
(R) 4" S-UP
(R) 4" S-UP
(R) 3 "S
(R ) 1
/2 " R
HW (R
) 3
/4 " H
W (R
) 2 " C
W
(R) 5" SD-UP
(R) 4" SD-UP
(R ) 4
"S D
(R ) 4
" S D
(R) 5" SD
(E ) 8
"S D
W
IN
G B
W
IN
G A
W
IN
G B
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
W
IN
G A
(R) 3" S-UP
(R) 3" S-UP
(R) 2" S-UP
(R) 2" S-UP
(E ) 4
"S
(CAP) (CAP)
2 2
B A C
NOTES:
1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.
2. REFER TO PHASING AND SEQUENCING PLANS,
SPECIFICATIONS AND GENERAL REQUIREMENTS IN
REFERENCE TO COORDINATION OF ALL WORK TO BE
PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL
ESTABLISH THE INFRASTRUCTURE REQUIRED TO
EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN
SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK
SHALL BE COORDINATED WITH OTHER ASSOCIATED
TRADES.
DEMOLITION NOTES:
1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL
BE REMOVED
2. REMOVE ALL HOT WATER AND HOT WATER RECIRC
PIPING. REMOVE ALL VALVES, GAUGES ETC.
3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING
IN FIELD BEFORE COMMENCMENT OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\R G
U
IL
\D oc um en ts \1
_B ro ck to n_ B0
5_ M ec h_
R
_R G
U
IL
.rv t
5/
/2
:0 0:
A
M
PD100.1-1
PIPE BASEMENT - PLUMBING DEMOLITION
PLAN - WINGS A AND B
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJC
1/8" = 1'-0"
AFL0 - PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WINGS A AND B F9 1/64" = 1'-0"
KEY PLAN - WINGS A AND B
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
1 (2)EXISTING STEAM WATER HEATER TO BE
REMOVED. CONTRACTOR SHALL REMOVE
ALL ASSOCIATED PIPING, VALVES, GAUGES
ETC.
EXISTING WATER HEATERS SHALL REMAIN
OPERATIONAL UNTIL DEMOLITION WORK HAS
BEEN COMPLETED AND NEW WATER
HEATERS HAVE BEEN INSTALLED.
2 REMOVE CW, HW AND RHW RISERS UP & DN
IN CHASE AND/OR WALL. REMOVE
ASSOCIATED BRANCH AND RUNOUT PIPING
COMPLETE TO FIXTURES. REMOVE ALL
ASSOCIATED HANGERS, SUPPORTS,VALVES,
ETC.
3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE
CW, HW, S & V SYSTEMS FOR CONNECTION
TO NEW FIXTURE.
Revisions: Date:
EJ
EI
EG.1
EG
EF
EE
ED
EC.9
EA
EB
EC
E17E18
E19 E20
E20.5
20.9
E21.5 E22.5 E23.5
21.6 22.4
EH
E26 E27
E.9
E25
E24E23E22E2120.4 21.3 21.9 22.9
C'
B'
A'
L*
K*
(R) 3" SD-UP
(R) 4" SD-UP
(R) 4" SD-UP
(R) 3" SD-UP
(R) 3" SD-UP(R) 3" SD-UP
(R) 2" CW-UP
(R) 2" CW-UP
(R) 2 1/2" CW
(R) 3/4" HW
(R) 1/2" RHW
(R) 2 1/2" CW
(R) 1 1/4" HW
(R) 3/4" RHW
(R ) 3
/4 " C
W (R
) 3 /4
" C W
(R) 3" CW(R) 3" CW
(R) 3/4" RHW(R) 3/4" RHW
(R) 1 1/4" HW(R) 1 1/2" HW
(R) 4" S
(R ) 5
" S (R
) 5 " S
(R ) 5
" S (R
) 5 " S
(R) 4" S-UP
(R) 3" S-UP
(R) 4" S-UP
(R) 1 1/2" V-UP
(R) 4" S(R) 4" S
(R) 4" S-UP
(R) 3" S-UP
(R) 3" S-UP
(E) 3" SD-UP
(E) 3" SD-UP
(R) 3 " S
D(R) 3" SD
(R ) 4
" S D
(R) 4" SD
(R ) 5
" S D
(R) 5" SD
(R ) 8
" S D
(R ) 8
" S D
(R ) 8
" S D
(R ) 4
" S D
(R) 4" SD
(R) 4" SD
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
(E ) 5
" S
(E ) 8
" S D
2 2
B A C
NOTES:
1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.
2. REFER TO PHASING AND SEQUENCING PLANS,
SPECIFICATIONS AND GENERAL REQUIREMENTS IN
REFERENCE TO COORDINATION OF ALL WORK TO BE
PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL
ESTABLISH THE INFRASTRUCTURE REQUIRED TO
EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN
SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK
SHALL BE COORDINATED WITH OTHER ASSOCIATED
TRADES.
DEMOLITION NOTES:
1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL
BE REMOVED
2. REMOVE ALL HOT WATER AND HOT WATER RECIRC
PIPING. REMOVE ALL VALVES, GAUGES ETC.
3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING
IN FIELD BEFORE COMMENCMENT OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\R G
U
IL
\D oc um en ts \1
_B ro ck to n_ B0
5_ M ec h_
R
_R G
U
IL
.rv t
5/
/2
:0 0:
A
M
PD100.1-2
PIPE BASEMENT - PLUMBING DEMOLITION
PLAN - WING C
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJC
1/8" = 1'-0"
ALF0 - PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WING C 1 1/64" = 1'-0"
KEY PLAN - WING C
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
1 (2)EXISTING STEAM WATER HEATER TO BE
REMOVED. CONTRACTOR SHALL REMOVE
ALL ASSOCIATED PIPING, VALVES, GAUGES
ETC.
EXISTING WATER HEATERS SHALL REMAIN
OPERATIONAL UNTIL DEMOLITION WORK HAS
BEEN COMPLETED AND NEW WATER
HEATERS HAVE BEEN INSTALLED.
2 REMOVE CW, HW AND RHW RISERS UP & DN
IN CHASE AND/OR WALL. REMOVE
ASSOCIATED BRANCH AND RUNOUT PIPING
COMPLETE TO FIXTURES. REMOVE ALL
ASSOCIATED HANGERS, SUPPORTS,VALVES,
ETC.
3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE
CW, HW, S & V SYSTEMS FOR CONNECTION
DN
E1
1.1 1.3
E2
2.1
E3
3.2 3.9 4.1 4.3
LEJ
K
EI
G.9
EG.1
EG
G
EF
EE
ED
EC.9
E4 E5 E6 E7 7.1
E8
8.1
EAA.1
EBA.9
B.5
EC
E5.5 E6.5 E7.5
E9 E10E11 E12 E13 E15
E4.12 E4.13
E14 E16 E17E18
EH
(R) 3" SD-
UP & DN
(R) 3" SD-
UP & DN
(R) 3" SD-UP & DN
(R) 3" SD-
UP & DN
(R) 3" SD-UP
(R) 3" SD-UP & DN
(E) 4" SD-DN
(E) 3" SD-UP
(R) 4" SD-DN
(E) 2" SD-UP
(R) 1 1/2" CW-UP
(R) 3/4" CW-UP
(R) 3/4" CW-UP
(R) 3/4" CW-UP
(R) 1/2" HW-UP
(R) 3" S-UP
(R) 4" S-UP
(R) 1/2" V-UP
(R) 4" S-UP
(R) 3" S-UP
(R) 3" S-UP
(R) 4" S-UP
(R) 2" S-UP
(R) 2" S-UP
(R) 3" SD-UP
(R) 3" SD-UP
(R) 5" SD-DN
(R) 4" SD-DN
(R) 3" SD-UP (R) 3" SD-UP
(R) 4" SD
(R) 4" SD
(R) 3" SD-UP
(R) 3" SD
(R ) 4
" S D
(R) 4" SD-DN
(R ) 4
" S D
(R) 3" SD-UP
(R) 3" SD
W
IN
G B
W
IN
G A
W
IN
G B
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
W
IN
G A
(R) 2" V-UP
3(R)-LAV
3(R)-UR
3(R)-WC
3(R)-WC
3(R)-SHWR
B A C
NOTES:
1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.
2. REFER TO PHASING AND SEQUENCING PLANS,
SPECIFICATIONS AND GENERAL REQUIREMENTS IN
REFERENCE TO COORDINATION OF ALL WORK TO BE
PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL
ESTABLISH THE INFRASTRUCTURE REQUIRED TO
EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN
SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK
SHALL BE COORDINATED WITH OTHER ASSOCIATED
TRADES.
DEMOLITION NOTES:
1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL
BE REMOVED
2. REMOVE ALL HOT WATER AND HOT WATER RECIRC
PIPING. REMOVE ALL VALVES, GAUGES ETC.
3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING
IN FIELD BEFORE COMMENCMENT OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\R G
U
IL
\D oc um en ts \1
_B ro ck to n_ B0
5_ M ec h_
R
_R G
U
IL
.rv t
5/
/2
:0 0:
A
M
PD100.2-1
LEVEL 0 - PLUMBING DEMOLITION PLAN -
WINGS A AND B
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJC
1/8" = 1'-0"
AFL00 - LEVEL 0 - PLUMBING DEMOLITION PLAN - WINGS A AND B 1 1/64" = 1'-0"
KEY PLAN - WINGS A AND B
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
1 (2)EXISTING STEAM WATER HEATER TO BE
REMOVED. CONTRACTOR SHALL REMOVE
ALL ASSOCIATED PIPING, VALVES, GAUGES
ETC.
EXISTING WATER HEATERS SHALL REMAIN
OPERATIONAL UNTIL DEMOLITION WORK HAS
BEEN COMPLETED AND NEW WATER
HEATERS HAVE BEEN INSTALLED.
2 REMOVE CW, HW AND RHW RISERS UP & DN
IN CHASE AND/OR WALL. REMOVE
ASSOCIATED BRANCH AND RUNOUT PIPING
COMPLETE TO FIXTURES. REMOVE ALL
ASSOCIATED HANGERS, SUPPORTS,VALVES,
ETC.
3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE
CW, HW, S & V SYSTEMS FOR CONNECTION
EG.1
EG
EF
EE
ED
EC.9
EA
EB
EC
E17E18
E19 E20
E20.5
20.9
E21.5 E22.5 E23.5
21.6 22.4
EH
E26 E27 C.7
D.8
E.9
E25
E24E23E22E2120.4 21.3 21.9 22.9
C'
B'
A'
L*
K*
7.1* 8.1*
(R ) 2
"C W
(R ) 1
"H W
(R ) 1
/2 "R
HW
(R ) 3
/4 "C
W (R
) 3 /4
"C W
(R ) 3
/4 "H
W (R
) 1 /2
" R
HW
(R) 2" CW-UP
(E) 3" SD-UP & DN
(E) 3" SD-UP & DN
(E) 3" SD-UP & DN(E) 3" SD-UP & DN
(R) 4" S-UP & DN
(R) 3" S-UP
(R) 4" S-UP
(E) 3" SD-UP & DN (E) 3" SD-UP & DN
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
(R) 3" S-UP
(R) 3" S-UP
(R) 3" S-UP
(R)-LAV
(R)-UR
(R)-WC
(R)-WC
(R)-LAV
(R)-SHWR
(R)-WC
(R)-WC
(R)-LAV
(R)-LAV
(R)-WC
(R) 3" SD-UP & DN (R) 3" SD-UP & DN
2 2
B A C
NOTES:
1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.
2. REFER TO PHASING AND SEQUENCING PLANS,
SPECIFICATIONS AND GENERAL REQUIREMENTS IN
REFERENCE TO COORDINATION OF ALL WORK TO BE
PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL
ESTABLISH THE INFRASTRUCTURE REQUIRED TO
EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN
SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK
SHALL BE COORDINATED WITH OTHER ASSOCIATED
TRADES.
DEMOLITION NOTES:
1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL
BE REMOVED
2. REMOVE ALL HOT WATER AND HOT WATER RECIRC
PIPING. REMOVE ALL VALVES, GAUGES ETC.
3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING
IN FIELD BEFORE COMMENCMENT OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\R G
U
IL
\D oc um en ts \1
_B ro ck to n_ B0
5_ M ec h_
R
_R G
U
IL
.rv t
5/
/2
:0 0:
A
M
PD100.2-2
LEVEL 0 - PLUMBING DEMOLITION PLAN -
WING C
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJC
1/8" = 1'-0"
AFL00 - LEVEL 0 - PLUMBING DEMOLITION PLAN - WING C 1 1/64" = 1'-0"
KEY PLAN - WING C
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
1 (2)EXISTING STEAM WATER HEATER TO BE
REMOVED. CONTRACTOR SHALL REMOVE
ALL ASSOCIATED PIPING, VALVES, GAUGES
ETC.
EXISTING WATER HEATERS SHALL REMAIN
OPERATIONAL UNTIL DEMOLITION WORK HAS
BEEN COMPLETED AND NEW WATER
HEATERS HAVE BEEN INSTALLED.
2 REMOVE CW, HW AND RHW RISERS UP & DN
IN CHASE AND/OR WALL. REMOVE
ASSOCIATED BRANCH AND RUNOUT PIPING
COMPLETE TO FIXTURES. REMOVE ALL
ASSOCIATED HANGERS, SUPPORTS,VALVES,
ETC.
3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE
CW, HW, S & V SYSTEMS FOR CONNECTION
EXISTING SAN STACK
EXISTING STORM RISER
(3)EXISTING SAN STACK
REMOVE EXISTING LAV CUT AND
CAP SERVICES BACK 4" FROM
CLOSEST ACTIVE MAIN TYP. FOR 3
REMOVE EXISTING
SANITARY STACK
REMOVE EXISTING
SANITARY RISER
REMOVE EXISTING
SANITARY RISER (R) 3"SD-UP & DN
REMOVE EXISTING
SANITARY STACK
REMOVE EXISTING MOP SINK
CUT AND CAP SERVICES
BACK 4" FROM
CLOSEST ACTIVE MAIN
E1
1.1 1.3
E2
2.1
E3
3.2 3.9 4.1 4.3
LEJ
K
EI
G.9
EG.1
EG
G
EF
EE
ED
EC.9
E4 E5 E6 E7 7.1
E8
8.1
EAA.1
EBA.9
B.5
EC
E5.5 E6.5 E7.5
E9 E10 E11 E12 E13 E15
E4.12 E4.13
E14 E16 E17 E18
EH
(R) 1 1/4" CW-DN
(R) 1 1/4" HW-DN
(R) 1/2" RHW- DN
(R) 2" CW-DN
(R) 3/4" HW-DN
(R) 1/2" RHW-DN
(R) 1 1/4" CW-UP
(R) 1 1/4" HW-UP
(R) 1/2" RHW-UP
(R) 2" CW-UP
(R) 3/4" HW-UP
(R) 1/2" RHW-UP
(R) WC
(R) WC
(R) UR
(R) UR (R) LAV
(R) LAV
(R) LAV
(R) SK
(R) WC
(R) WC
(R) WC
(R) LAV
(R) LAV
(R) LAV
(R) DF
(R) MK
(R) WC
(R) LAV
(R) MK
2 (R) WC 2
1 1
1 1
(R) 3"SD-UP & DN
(R) 3"SD-UP & DN
(R) 3"SD-UP & DN
(R) 3"SD-
UP & DN
(R) 3"SD-
UP & DN
(R) 3"SD-UP & DN
(R) 3"SD-
UP & DN
(R) 3"SD-
UP & DN
(R) 3"SD-DN
(R) 3"SD-UP
(R) 3"SD-DN
(R) 3"SD-UP
W
IN
G B
W
IN
G A
W
IN
G B
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
W
IN
G A
(R)FC-4
(R)FC-4
(E)FC-2
(R)FC-2(R)FC-2
(R)FC-7
(R)FC-5
(R)FC-5
(R)FC-5
(R)FC-4(R)FC-4
(R)FC-4(R)FC-4
(E)FC-1
(E)FC-6
(E)FC-2 (R) FC(E)FC-6
(E)FC-2
(E)FC-2
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-3(E)FC-3
(E)FC-3
(E)FC-3 (E)FC-3
(E)FC-1 (E)FC-1
(E)FC-2
(E)FC-1 (E)FC-1(E)FC-1
(E)FC-1 (E)FC-1 (E)FC-1
(R)FC-1
(R) FC
(E ) C
D
(E ) C
D (E
) C D
(E ) C
D
(E ) C
D
(E) CD
(E) CD
(E) CD (E) CD
(E ) C
D (E
) C D
(E ) C
D
(E) CD
(E) CD(E) CD
(E) CD(E) CD
(E) CD
(E) CD
(E) CD
(E ) C
D
(E ) C
D
(E) CD
(E) CD (E) CD
(E) CD(E) CD
(E ) C
D (E
) C D
(E ) C
D
(E ) C
D
(CAP)
(CAP)
(CAP)
(CAP)
(E ) C
D
(E ) C
D
(E) CD
(R) CD (R) CD
(R ) C
D (R
) C D
(R ) C
D (R
) C D
(CAP)
(CAP)
(R) CD
OFFICE
B121
STAIR
ST5B101
CORRIDOR
B151
CLOSET
5-B151A
CLOSET
5-B151B
OFFICE
B150
OFFICE
B149
OFFICE
B148
STAIR
ST2B101
STORAGE
B145
STORAGE
B144
CORRIDOR
B152
OFFICE
B102
OFFICE
B103
OFFICE
B104
OFFICE
B101
STORAGE
B104A
STAFF BREAK
ROOM
B106
STAFF
RESTROOM
B141
JANITOR
CLOSET
B127
OFFICE
B139
OFFICE
B138
OFFICE
B137
OFFICE
B136
OFFICE
B135
CORRIDOR
B134
CLOSET
B134A
CLOSET
B134B
OFFICE
B133
OFFICE
B128
OFFICE
B129
OFFICE
B130
OFFICE
B131
OFFICE
B132
CORRIDOR
B124D
CORRIDOR
B124E
OFFICE
B115
OFFICE
B117
EMER.
ELECTRICAL
B119A
STAIR
ST6B101
OFFICE
B114
STORAGE
B113B
OFFICE
B112
OFFICE
B109
OFFICE
B108
OFFICE
B107
CLOSET
A108
STAIR
ST1A101
ELEVATOR
A112
TEL ROOM
A102
OFFICE
A117
OFFICE LEAD
CLERK
A120B
VESTIBULE
A101E
LOBBY
A101A
CORRIDOR
A122
OFFICE
C151
STAIR
ST4B101
OFFICE
B123
OFFICE
B122
CORRIDOR
B143
CORRIDOR
B140
LOBBY
A110A
OFFICE
C101
W
IN
G B
W
IN
G A
W
IN
G B
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
W
IN
G A
MEN
B105
GROUP
THERAPY
B147
WOMEN
A114
OFFICE
B119
OFFICE
B120
OFFICE
A106
OFFICE
A107
OFFICE
A105
OFFICE
A104
OFFICE
A103
EXAM/ TX
A115
OFFICE
A118
OFFICE
A119
OFFICE
A116
GROUP THERAPY
B116
GROUP THERAPY
B125
JAN.
A113
B A C
NOTES:
1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.
2. REFER TO PHASING AND SEQUENCING PLANS,
SPECIFICATIONS AND GENERAL REQUIREMENTS IN
REFERENCE TO COORDINATION OF ALL WORK TO BE
PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL
ESTABLISH THE INFRASTRUCTURE REQUIRED TO
EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN
SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK
SHALL BE COORDINATED WITH OTHER ASSOCIATED
TRADES.
DEMOLITION NOTES:
1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL
BE REMOVED
2. REMOVE ALL HOT WATER AND HOT WATER RECIRC
PIPING. REMOVE ALL VALVES, GAUGES ETC.
3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING
IN FIELD BEFORE COMMENCMENT OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\R G
U
IL
\D oc um en ts \1
_B ro ck to n_ B0
5_ M ec h_
R
_R G
U
IL
.rv t
5/
/2
:0 1:
A
M
PD101.1
LEVEL 1 - PLUMBING DEMOLITION PLAN -
WINGS A AND B
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJC
1/8" = 1'-0"
AFL01 - LEVEL 1 - PLUMBING DEMOLITION PLAN - WINGS A AND B 1 1/64" = 1'-0"
KEY PLAN - WINGS A AND B
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
1 (2)EXISTING STEAM WATER HEATER TO BE
REMOVED. CONTRACTOR SHALL REMOVE
ALL ASSOCIATED PIPING, VALVES, GAUGES
ETC.
EXISTING WATER HEATERS SHALL REMAIN
OPERATIONAL UNTIL DEMOLITION WORK HAS
BEEN COMPLETED AND NEW WATER
HEATERS HAVE BEEN INSTALLED.
2 REMOVE CW, HW AND RHW RISERS UP & DN
IN CHASE AND/OR WALL. REMOVE
ASSOCIATED BRANCH AND RUNOUT PIPING
COMPLETE TO FIXTURES. REMOVE ALL
ASSOCIATED HANGERS, SUPPORTS,VALVES,
ETC.
3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE
CW, HW, S & V SYSTEMS FOR CONNECTION
(R) S-UP &DN
(E) 1 1/2" NG
(E) 1-1/2"NG UP
EJ
EI
EG.1
EG
EF
EE
ED
EC.9
EA
EB
EC
E17E18
E19 E20
E20.5 E21.5 E22.5 E23.5
EH
E26 E27 C.7
D.8
E.9
E25
E24E23E22E2120.4 21.3 21.9 22.9
C'
B'
A'
L*
K*
7.1* 8.1*
(R) LAV 1
(R) LAV 1
(R) LAV 1
(R) UR1
(R) UR1
(R) WC1
(R) WC1
(R) WC1
(R) WC1
(R) LAV1
(R) LAV1
(R) WC 1
(R) LAV 1
(R) SK1 (R) LAV1
(R) WC 1
(R) SH1
2 2
(R) SD-UP &DN
(R) S-UP &DN
(E ) 1
/2
" N G
(R) 3/4" CW-DN
(R) 3/4" HW-DN
(R) 1/2" RHW-DN
(R) 3/4" CW-DN
(R) 3/4" HW-DN
(R) 3" SD-
UP & DN
(R) 3" SD-
UP & DN
(R) 3" SD-
UP & DN
(R) 3" SD-UP & DN
(R) 4" S-
UP & DN
(R) 3" SD-
UP & DN
(R) 3" SD-
UP & DN
(R) 3" SD-
UP & DN
(R) 3" SD-
UP & DN
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
(R)FC-5
(E)FC-6
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-1 (E)FC-1
(E)FC-1(E)FC-1
(E)FC-2
(E)FC-2
(R)FC-2
(R)FC-2 (E)FC-1 (E)FC-1 (E)FC-1
(E)FC-1
(R)FC-1 (E)FC-1 (E)FC-1 (E)FC-1 (E)FC-2
(E)FC-2(E)FC-1
(E)FC-1
(E)FC-1
(E)FC-2(E)FC-2
(E)FC-3 (E)FC-3
(E)FC-3(E)FC-3
(E)FC-3 (E)FC-3
(E ) C
D (E
) C D
(CAP)
(E ) C
D (E
) C D
(E ) C
D
(E ) C
D
(E ) C
D
(E ) C
D (E
) C D
(E ) C
D
(E ) C
D (E
) C D
(E ) C
D
(E ) C
D (E
) C D
(E ) C
D
(E ) C
D
(E) CD
(E) CD (E) CD
(E) CD
(E) CD
(E) CD
(E) CD
(E) CD
(E) CD(E) CD
(E) CD(E) CD
(CAP)
(CAP)
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
TOILET
C147
OFFICE
C146
TOILET
C148
OFFICE
A116
OFFICE
C137
COPIER
C139
MEN'S
TOILET
C139OFFICE
A117
OFFICE
C151
H.A.C.
C143
SOCIAL
WORKER
C141
PSY. OFFICE
C140
OFFICE
C138
GROUP
THERAPY
C137A
OFFICE
C136
REC.
THERAPY
OFFICE
C135
PSY. OFFICE
C134
OFFICE
C133
STAFF
RESTROOM
C132
STAIR
ST3C101
OFFICE
C103
OFFICE
C104 OFFICE
C105
ELECTRICAL
C101A
STAFF BREAK
ROOM
C114
PUBLIC
RESTROOM -
F
C115A OFFICE
C116
OFFICE
C117
OFFICE
C118
OFFICE
C119
OFFICE
C121
OFFICE
C122
OFFICE
C123
OFFICE
C124OFFICE
C125
OFFICE
C126
TEL
C127
STORAGE
C128
CORRIDOR
C129A
CORRIDOR
C145
CORRIDOR
C154
OFFICE
C111
OFFICE
C112
OFFICE
C107
OFFICE
C108
CONFERENCE
C109
OFFICE
C110
STAIR
ST7C101
STAIR
ST9C101
CORRIDOR
C142
OFFICE
C106
CORRIDOR
C120
OFFICE
C101
OFFICE
C102
OFFICE
C150
B A C
NOTES:
1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.
2. REFER TO PHASING AND SEQUENCING PLANS,
SPECIFICATIONS AND GENERAL REQUIREMENTS IN
REFERENCE TO COORDINATION OF ALL WORK TO BE
PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL
ESTABLISH THE INFRASTRUCTURE REQUIRED TO
EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN
SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK
SHALL BE COORDINATED WITH OTHER ASSOCIATED
TRADES.
DEMOLITION NOTES:
1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL
BE REMOVED
2. REMOVE ALL HOT WATER AND HOT WATER RECIRC
PIPING. REMOVE ALL VALVES, GAUGES ETC.
3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING
IN FIELD BEFORE COMMENCMENT OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\R G
U
IL
\D oc um en ts \1
_B ro ck to n_ B0
5_ M ec h_
R
_R G
U
IL
.rv t
5/
/2
:0 1:
A
M
PD101.2
LEVEL 1 - PLUMBING DEMOLITION PLAN -
WING C
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJC
1/8" = 1'-0"
AFL01 - LEVEL 1 - PLUMBING DEMOLITION PLAN - WING C 1 1/64" = 1'-0"
KEY PLAN - WING C
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
1 REMOVE PLUMBING FIXTURE AND
ASSOCIATED SANITARY, VENT AND
DOMESTIC WATER PIPING COMPLETE BACK
TO MAINS. REMOVE ASSOCIATED HANGERS,
CARRIERS,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .