523A5-19-305-100 Percent FINAL BD DWGS VOL 2_STAMPED_210514_19101.pdf

PDF 34 MB Posted

Attached to
Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305
Solicitation number
36C24121R0163
Issued by

About this file

This document summarizes a federal contract solicitation for outpatient mental health renovation services. Solicitation number 36C24121R0163 was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for the Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305. The solicitation seeks construction services to renovate outpatient mental health facilities. The awarded contractor will be required to complete renovations to building B5 of the specified VA medical center located in Veterans Integrated Service Network 1. The response due date and anticipated award date are not provided in this document.

View the file

Other files

File Type Posted
36C24121R0163 0012.pdf PDF
36C24121R0163 0011.docx DOCX document
36C24121R0163 0010.docx DOCX document
36C24121R0163 0009.pdf PDF
36C24121R0163 0008.docx DOCX document
S04 - Site Visit Sign In Sheet 2-9-2023.pdf PDF
S06 General Decision Number MA20230012 1-27-2023.pdf PDF
36C24121R0163 0007.docx DOCX document
S06 Limitations on Subcontracting Certificate of Compliance 11-2022.pdf PDF
VHA COVID-19 Operational Plan 1-27-2023 (1).pdf PDF
36C24121R0163 0006.pdf PDF
S02 MA20230012.pdf PDF
36C24121R0163 0005.pdf PDF
36C24121R0163 0004.pdf PDF
S06 36C24121R0163 0003.docx DOCX document
S06 w7-r Sanitary - Profiles - Sewers.pdf PDF
S06 523A5-19-305-MD111-1.pdf PDF
S06 523A5-19-305-EP652.pdf PDF
S06 220927 19101 ADDENDUM 01_R5.docx DOCX document
S06 523A5-19-305-MD101-2.pdf PDF
S06 VA Brockton and Jamaica Plain Dust and Soil Rpt _FINAL 021716.pdf PDF
S06 Sommerville High School Drawings Renovation 1-23-18 - Room Number Marku....pdf PDF
S06 w4-r Sanitary - Location Plan - Sanitary-Sewer-Water.pdf PDF
36C24121R0163 0002.docx DOCX document
S02 General Decision Number MA20220012 09-02-2022.pdf PDF
S02 General Decision Number MA20220012 08122022.txt TXT text file
36C24121R0163 0001.docx DOCX document
S04 Sign In Sheet B5 MH Outpatient.pdf PDF
S02 36C24121R0163 Final.docx DOCX document
36C24121R0163.docx DOCX document
523A5-19-305 - B5 Outpatient MH Renovation 100 Percent Final Bid Documents - SPECS.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 1_STAMPED_210514_19101.pdf PDF
S02 SSJ - B5 MH Outpatient_R1SIGNED PA-DW.pdf PDF
EMR FORM.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 74

46 44

47 49

R A M P

E N C L O S E D W A L K

E N C L O S E D W A L K

E N C L O S

E D

W

A L K

VA

TENNINIS

COURT

CAMPUS MAP:

ABBREVIATIONS:

AB ANCHOR BOLT

A/C AIR CONDITIONING

ACCU AIR CONDITIONING CONDENSER UNIT

ACPLAS ACCOUSTICAL PLASTER

ACT ACOUSTIC CEILING TILE

AFF ABOVE FINISH FLOOR

AGG AGGREGATE

ALT ALTERNATE

AP ACCESS PANEL

APROX APPROXIMATE

ARCH ARCHITECTURAL

BCX BOTTOM CORD EXTENSION

BD BOARD

BIT BITUMINOUS

BLDG BUILDING

BLP BORROWED LIGHT PANEL

BO BOTTOM OF

BOF BOTTOM OF FOOTING

BOS BOTTOM OF STEEL

BOT BOTTOM

BRDG BRIDGING

BRG BEARING

BS BOTH SIDES

BSE BRICK SHELF ELEVATION

C CHANNEL

CB CATCH BASIN / CHALKBOARD

CEM BD CEMENTITIOUS BACKER BOARD

CFM CUBIC FEET PER MINUTE

CIP CAST IN PLACE

CJ CONTROL JOINT / CONSTRUCTION JOINT

CL CENTER LINE

CLL CONTRACT LIMIT LINE

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CT CERAMIC TILE

CUH CABINET UNIT HEATER

D DIAMETER

DBL DOUBLE

DF DRINKING FOUNTAIN

DL DEAD LOAD

DR DISPLAY RAIL

DTL DETAIL

DW DISHWASHER

DWG DRAWING

DWV DRAIN/WASTE/VENT

EA EACH

EF EXHAUST FAN / EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

EOP EDGE OF PAVEMENT

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EQ EQUAL

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FB FLAT BAR

FBO FURNISHED BY OTHERS

FCO FLOOR CLEA-OUT

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR / FAR FACE

FFE FINISH FLOOR ELEVATION

FO FRAMED OPENING

FRP FIBER REINFORCED PLASTIC

FS FAR SIDE

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GDT GYPSUM DROP-IN TILE

GV GRAVITY VENT

GWB GYPSUM WALL BOARD

H HORIZONTAL

HC HANDICAPPED / HOLLOW CORE

HORIZ HORIZONTAL

HM HOLLOW METAL

HRU HEAT RECOVERY UNIT

H&V HEATING AND VENTILATING

HVAC HEATING, VENTILATING AND AIR CONDITIONING

I INCLUDED ANGLE

ID INSIDE DIAMETER

IF INSIDE FACE

IJ ISOLATION JOINT

IMP IMPACT RESISTANT

INS INSULATED

INV INVERT

JS JOINT SUBSTITUTE

K KIPS

L ANGLE / LENGTH

LF LEFT

LINO SHEET LINOLEUM

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LP LIGHTING PANEL / LIQUIFIED PROPANE

MAX MAXIMUM

MB MARKER BOARD

MDO MEDIUM DENSITY OVERLAY

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MR MOISTURE-RESISTANT

MUA MAKE-UP AIR

N NOSING

NCB NEW CATCH BASIN

NDMH NEW DRAIN MANHOLE

NFM NEW FORCE MAIN

NIC NOT IN CONTRACT

NS NEAR SIDE

NSD NEW STORM DRAIN LINE

NSS NEW SANITARY SEWER LINE

NTS NOT TO SCALE

NW NEW WATER LINE

OC ON CENTER

OF OUTSIDE FACE

OH OVERHEAD

PA PUBLIC ADDRESS

PAF POWER-ACTUATED FASTENER

PDU POOL DEHUMIDIFICATION UNIT

PL PLATE / PROPERTY LINE

PLAM PLASTIC LAMINATE

PLF POUNDS PER LINEAR FOOT

PP POWER PANEL

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE-TREATED

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

R RISER / RADIUS

RB RESILIENT BASE

RD ROOF DRAIN

REINF REINFORCED

REQ'D REQUIRED

RT RIGHT

RO ROUGH OPENING

ROW RIGHT OF WAY

RR RUB-RAIL

RTU ROOF TOP UNIT (HVAC)

SACT SUSPENDED ACOUSTIC TILE CEILING

SC SOLID CORE

SF SQUARE FOOT / SUPPLY FAN

SFRM SPRAYED FIRE-RESISTIVE MATERIAL

SHT SHEET

SIM SIMILAR

SK SHEAR KEY

SN SANITARY NAPKIN (DISPENSER)

SP SPECIAL

SS STAINLESS STEEL

STA STATION

STL STEEL

STRUC STRUCTURAL

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

TBM TEMPORARY BENCHMARK

TCE TOP CHORD EXTENSION

TJ TIE JOIST

TO TOP OF

TOC TOP OF CONCRETE

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PIER

TOS TOP OF STEEL

TOW TOP OF WALL

TP TOILET PAPER (DISPENSER) / TEST PIT

TS TUBE STEEL

TYP TYPICAL

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

V VENT PIPE / VERTICAL

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VP VISION PANEL

VTR VENT THROUGH THE ROOF

W/ WITH

WC WATER CLOSET

WD WOOD

WF WIDE FLANGE

WH WATER HEATER

W/O WITH OUT

WP WORKING POINT

WS WEB STIFFENER

WWF WELDED WIRE FABRIC

KEY NOTE

A

MAIN

LOBBY

A402

COLUMN BUBBLE AND

CENTER LINE

PARTITION TAG

DOOR TAG

ROOM TAG

EQUIPMENT/ACCESSORY TAG

A00

AE000

A00

AE000

A00

AE000

A00

AE000

INTERIOR ELEVATION

EXTERIOR ELEVATION

DATUM REFERENCE

BUILDING SECTION

WALL SECTION

DETAIL

A0

D0

C0

B0AE000

WINDOW TAG

SYMBOL LEGEND:

CUT DIRECTION

SECTION NUMBER

SHEET NUMBER

CUT DIRECTION

SECTION NUMBER

SHEET NUMBER

SECTION NUMBER

AREA OF DETAIL

SHEET NUMBER

ELEVATION DIRECTION

SECTION NUMBER

SHEET NUMBER

ELEVATION NUMBER/

DIRECTION

SHEET NUMBER

DOOR NUMBER

ROOM NAME

ROOM NUMBER

REVISION

REVISION NUMBER#

REVISION TAG

AREA OF REVISION

EXISTING COLUMN BUBBLE AND

CENTER LINEA

XXX SF ROOM AREA (WHEN APPLICABLE)

LOCATION MAP:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\J An de rs on \D oc um en ts

\1

_B ro ck to n_

B0 5_

Ar ch

_R

_J An de rs on .rv t 5/

/2

2:

:1

PM

GI001B

COVER SHEET VOLUME 2 BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 RJC LGC/EVR

BUILDING 5 OUTPATIENT MENTAL HEALTH RENOVATION

VA BOSTON HEALTHCARE SYSTEM - BROCKTON CAMPUS

BROCKTON, MASSACHUSETTS

VOLUME 2

DRAWING LIST

Sheet Number Sheet Name

15 - ELECTRICAL

E-001 LEGEND AND GENERAL NOTES

ED100.1 LEVEL 0 DEMOLITION PLAN - WINGS A AND B

ED100.2 LEVEL 0 DEMOLITION PLAN - WING C

ED101.1 LEVEL 1 DEMOLITION PLAN - WINGS A AND B

ED101.2 LEVEL 1 DEMOLITION PLAN - WING C

ED102.1 LEVEL 2 DEMOLITION PLAN - WINGS A AND B

ED102.2 LEVEL 2 DEMOLITION PLAN - WING C

ED103 ROOF AND PENTHOUSE DEMOLITION PLAN

EP100.1 LEVEL 0 POWER PLAN - WINGS A AND B

EP100.2 LEVEL 0 POWER PLAN - WING C

EP101.1 LEVEL 1 POWER PLAN - WINGS A AND B

EP101.2 LEVEL 1 POWER PLAN - WING C

EP102.1 LEVEL 2 POWER PLAN - WINGS A AND B

EP102.2 LEVEL 2 POWER PLAN - WING C

EP103 ROOF AND PENTHOUSE POWER PLAN

EP401 ENLARGED POWER PLANS

EP601 PANEL SCHEDULES

EP602 PANEL SCHEDULES

EP651 DEMOLITION ONE-LINE DIAGRAM

EP652 NEW WORK ONE LINE DIAGRAM

EL100.1 LEVEL 0 LIGHTING PLAN - WINGS A AND B

EL100.2 LEVEL 0 LIGHTING PLAN - WING C

EL101.1 LEVEL 1 LIGHTING PLAN - WINGS A AND B

EL101.2 LEVEL 1 LIGHTING PLAN - WING C

EL102.1 LEVEL 2 LIGHTING PLAN - WINGS A AND B

EL102.2 LEVEL 2 LIGHTING PLAN - WING C

EL601 LIGHT FIXTURE SCHEDULE AND DETAILS

EL602 LIGHTING CONTROL DETAILS

EL603 LIGHTING CONTROL DETAILS

EY100.1 LEVEL 0 SYSTEMS PLAN - WINGS A AND B

EY100.2 LEVEL 0 SYSTEMS PLAN - WING C

EY101.1 LEVEL 1 SYSTEMS PLAN - WINGS A AND B

EY101.2 LEVEL 1 SYSTEMS PLAN - WING C

EY102.1 LEVEL 2 SYSTEMS PLAN - WINGS A AND B

EY102.2 LEVEL 2 SYSTEMS PLAN - WING C

EY651 RISER DIAGRAMS

E-601 SCHEDULES

E-701 DETAILS

DRAWING LIST

Sheet Number Sheet Name

11 - GENERAL

GI001B COVER SHEET VOLUME 2

12 - PLUMBING

P-001 PLUMBING LEGEND AND ABBREVIATIONS

PD100.1-1 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WINGS

A AND B

PD100.1-2 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WING C

PD100.2-1 LEVEL 0 - PLUMBING DEMOLITION PLAN - WINGS A AND B

PD100.2-2 LEVEL 0 - PLUMBING DEMOLITION PLAN - WING C

PD101.1 LEVEL 1 - PLUMBING DEMOLITION PLAN - WINGS A AND B

PD101.2 LEVEL 1 - PLUMBING DEMOLITION PLAN - WING C

PD102.1 LEVEL 2 - PLUMBING DEMOLITION PLAN - WINGS A AND B

PD102.2 LEVEL 2 - PLUMBING DEMOLITION PLAN - WING C

PD103.1 PLUMBING ROOF AND PENTHOUSE DEMOLITION PLAN

PL100.1-1 PIPE BASEMENT - PLUMBING DWV PLAN - WINGS A AND B

PL100.1-2 PIPE BASEMENT - PLUMBING DWV PLAN - WING C

PL100.2-1 LEVEL 0 - PLUMBING DWV PLAN - WINGS A AND B

PL100.2-2 LEVEL 0 - PLUMBING DWV PLAN - WING C

PL101.1 LEVEL 1 - PLUMBING DWV PLAN - WINGS A AND B

PL101.2 LEVEL 1 - PLUMBING DWV PLAN - WING C

PL102.1 LEVEL 2 - PLUMBING DWV PLAN - WINGS A AND B

PL102.2 LEVEL 2 - PLUMBING DWV PLAN - WING C

PL103.1 PLUMBING ROOF AND PENTHOUSE PLAN

PP100.1-1 PIPE BASEMENT - PLUMBING SUPPLY PIPING PLAN -

WINGS A AND B

PP100.2-1 LEVEL 0 - PLUMBING SUPPLY PIPING PLAN - WINGS A

AND B

PP100.2-2 LEVEL 0 - PLUMBING SUPPLY PIPING - WING C

PP101.1 LEVEL 1 - PLUMBING SUPPLY PIPING - WINGS A AND B

PP101.2 LEVEL 1 - PLUMBING SUPPLY PIPING - WING C

PP102.1 LEVEL 2 - PLUMBING SUPPLY PIPING - WINGS A AND B

PP102.2 LEVEL 2 - PLUMBING SUPPLY PIPING - WING C

PP103.1 PLUMBING ROOF AND PENTHOUSE PLAN

PL401 PLUMBING PART PLANS

PP401 PLUMBING PART PLANS

P501 PLUMBING DETAILS

P502 PLUMBING DETAILS

P601 PLUMBING SCHEDULES

14 - MECHANICAL

M-001 MECHANICAL LEGEND AND ABBREVIATIONS

M-002 MECHANICAL GENERAL NOTES

MD100.1-1 PIPE BASEMENT - HVAC DEMOLITION PLAN - WINGS A

AND B

MD100.1-2 PIPE BASEMENT - HVAC DEMOLITION PLAN - WING C

MD100.2-1 LEVEL 0 - HVAC DEMOLITION PLAN - WINGS A AND B

MD100.2-2 LEVEL 0 - HVAC DEMOLITION PLAN - WING C

MD101.1 LEVEL 1 - HVAC DEMOLITION PLAN - WINGS A AND B

MD101.2 LEVEL 1 - HVAC DEMOLITION PLAN - WING C

MD102.1 LEVEL 2 - HVAC DEMOLITION PLAN - WINGS A AND B

MD102.2 LEVEL 2 - HVAC DEMOLITION PLAN - WING C

MD111.1 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WINGS A

AND B

MD111.2 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WING C

MD112.1 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WINGS A

AND B

MD112.2 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WING C

MH100.1-1 PIPE BASEMENT - HVAC PLAN - WINGS A AND B

MH100.1-2 PIPE BASEMENT - HVAC PLAN - WING C

MH100.2-1 LEVEL 0 - HVAC PLAN - WINGS A AND B

MH100.2-2 LEVEL 0 - HVAC PLAN - WING C

MH101.1 LEVEL 1 - HVAC PLAN - WINGS A AND B

MH101.2 LEVEL 1 - HVAC PLAN - WING C

MH102.1 LEVEL 2 - HVAC PLAN - WINGS A AND B

MH102.2 LEVEL 2 - HVAC PLAN - WING C

MH130 MECHANICAL ROOF AND PENTHOUSE PLAN

MP111.1 LEVEL 1 - HVAC PIPING PLAN - WINGS A AND B

MP111.2 LEVEL 1 - HVAC PIPING PLAN - WING C

MP112.1 LEVEL 2 - HVAC PIPING PLAN - WINGS A AND B

MP112.2 LEVEL 2 - HVAC PIPING PLAN - WING C

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-604 MECHANICAL SCHEDULES

M-651 MECHANICAL SEQUENCE OF OPERATIONS

M-652 MECHANICAL SEQUENCE OF OPERATIONS

DRAWING LIST

Sheet Number Sheet Name

01 - GENERAL

GI001A COVER SHEET VOLUME 1

GI002 MOUNTING HEIGHTS, WALL AND ROOF TYPES, TOP OF

WALL DETAILS

GI003 LEVEL 0 - PHASE 0 FLOOR PLAN AND PHASING NOTES

GI004 LEVEL 0, 1, AND 2 - PHASE B-1 FLOOR PLANS

GI005 LEVEL 0, 1, AND 2 - PHASE B-2 FLOOR PLANS

GI006 LEVEL 0, 1, AND 2 - PHASE C-1 FLOOR PLANS

GI007 LEVEL 0, 1, AND 2 - PHASE C-2 FLOOR PLANS

GI008 LEVEL 0, 1, AND 2 - PHASE A-1 FLOOR PLANS

GI009 LEVEL 0, 1, AND 2 - PHASE A-2 FLOOR PLANS

GI010 TEMPORARY FACILITIES AND SITE PLAN

GI011 TEMPORARY SITE DETAILS

02 - HAZARDOUS MATERIALS

HA100-1 PIPE BASEMENT ABATEMENT PLAN

HA100-2 LEVEL 0 - ABATEMENT PLAN

HA101 LEVEL 1 - ABATEMENT PLAN

HA102 LEVEL 2 - ABATEMENT PLAN

HA130 ROOF - ABATEMENT PLAN

06 - ARCHITECTURAL

A000 CODE SUMMARY

A000-1 PIPE BASEMENT - CODE COMPLIANCE PLAN

A000-2 LEVEL 0 - CODE COMPLIANCE PLAN

A001 LEVEL 1 - CODE COMPLIANCE PLAN

A002 LEVEL 2 - CODE COMPLIANCE PLAN

A003 ROOF - CODE COMPLIANCE PLAN

AD100-1 PIPE BASEMENT DEMOLITION PLAN

AD100-2 LEVEL 0 - DEMOLITION PLAN

AD101 LEVEL 1 - DEMOLITION PLAN

AD102 LEVEL 2 - DEMOLITION PLAN

AD130 ROOF - DEMOLITION PLAN

A-100-1 PIPE BASEMENT - FACILITY PLAN

A-100-2 LEVEL 0 - FACILITY PLAN

A-101 LEVEL 1 - FACILITY PLAN

A-102 LEVEL 2 - FACILITY PLAN

AE100.1-1 PIPE BASEMENT FLOOR PLAN - WINGS A AND B

AE100.1-2 LEVEL 0 - FLOOR PLAN - WINGS A AND B

AE100.2-1 PIPE BASEMENT FLOOR PLAN - WING C

AE100.2-2 LEVEL 0 - FLOOR PLAN - WING C

AE101.1 LEVEL 1 - FLOOR PLAN - WINGS A AND B

AE101.2 LEVEL 1 - FLOOR PLAN WING C

AE102.1 LEVEL 2 - FLOOR PLAN - WINGS A AND B

AE102.2 LEVEL 2 - FLOOR PLAN - WING C

AE120.1 LEVEL 0 - REFLECTED CEILING PLAN - WINGS A AND B

AE120.2 LEVEL 0 - REFLECTED CEILING PLAN - WING C

AE121.1 LEVEL 1 - REFLECTED CEILING PLAN - WINGS A AND B

AE121.2 LEVEL 1 - REFLECTED CEILING PLAN - WING C

AE122.1 LEVEL 2 - REFLECTED CEILING PLAN - WINGS A AND B

AE122.2 LEVEL 2 - REFLECTED CEILING PLAN - WING C

AE130 ROOF AND PENTHOUSE PLAN

AE200 EXTERIOR ELEVATIONS

AE210 INTERIOR ELEVATIONS

AE211 INTERIOR ELEVATIONS

AE400 ENLARGED TOILET PLANS

AE401 ENLARGED PLANS

AE402 ENLARGED PLANS

AE500 DETAILS - BUILDING

AE501 DETAILS - ROOF

AE510 DETAILS - PLAN

AE520 DETAILS - CASEWORK

AE600 SCHEDULE - DOOR

AE601 DETAILS - DOOR

AE602 WINDOW TYPES AND DETAILS

07 - INTERIORS

ID100.1-2 LEVEL 0 - FINISH PLAN - WINGS A AND B

ID100.2-2 LEVEL 0 - FINISH PLAN - WING C

ID101.1 LEVEL 1 - FINISH PLAN - WINGS A AND B

ID101.2 LEVEL 1 - FINISH PLAN WING C

ID102.1 LEVEL 2 - FINISH PLAN - WINGS A AND B

ID102.2 LEVEL 2 - FINISH PLAN - WING C

ID600 PRODUCT INDEX SHEET

11 - FIRE PROTECTION

FP001 FIRE PROTECTION LEGEND AND ABBREVIATIONS

FP100.1 LEVEL 0 - FIRE PROTECTION PLAN - WINGS A AND B

FP100.2 LEVEL 0 - FIRE PROTECTION PLAN - WING C

FP101.1 LEVEL 1 - FIRE PROTECTION PLAN - WINGS A AND B

FP101.2 LEVEL 1 - FIRE PROTECTION PLAN - WING C

FP102.1 LEVEL 2 - FIRE PROTECTION PLAN - WINGS A AND B

FP102.2 LEVEL 2 - FIRE PROTECTION PLAN - WING C

FP501 FIRE PROTECTION DETAILS

DRAWING LIST - VOLUME 1 DRAWING LIST - VOLUME 2 DRAWING LIST - VOLUME 2 PROJECT LOCATION

Revisions: Date: 05-14-21

PLUMBING PIPING SYMBOLS GENERAL PLUMBING SYMBOLS

DRAWING SYMBOLS

PLUMBING VALVE SYMBOLS

PLUMBING ABBREVIATIONS

MA

MV

LA

LV

OA

IA

D

SAN

SD

SD

TWR

TWS

SS

SCW

FCW

NO2

N2

NG

NG

FOD

FOS

FOR

FOV

CW

HW

RHW

V

FE

CO AV

(R) SYS

(E) SYS

NPW

DOMESTIC HOT WATER, HOT WATER

DOMESTIC COLD WATER, COLD WATER

ORAL EVACUATION

LABORATORY VACUUM

LABORATORY AIR

MEDICAL VACUUM

MEDICAL AIR

DOMESTIC HOW WATER RETURN, HOT WATER RETURN

STORM WATER, BELOW GRADE

STORM WATER

SANITARY SEWER, BELOW GRADE

DRAIN

NITROUS OXIDE

TEMPERED WATER RETURN

TEMPERED WATER SUPPLY

INDUSTRIAL AIR

SOIL, WASTE, OR SANITARY SEWER

SOFTEN COLD WATER

FILTERED COLD WATER

OXYGEN

NITROGEN

NATURAL GAS, BELOW GRADE

NATURAL GAS

FUEL OIL DISCHARGE

FUEL OIL SUPPLY

FUEL OIL RETURN

FUEL OIL VENT

VENT (SANITARY)

LIMIT OF DEMOLITION

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

AND EXISTING WORK

POINT OF CONNECTION BETWEEN NEW

PRESSURE GAGE

THERMOMETER

STRAINER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES

PIPING ACCESSORIES

INVERTED BUCKET TRAP SET INCLUDING

PIPE UP

PIPE DOWN

CLEAN OUT

HOSE BIB

PL105

A

26-P 3

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

PUMP NO.3 IN BUILDING NO.26

EQUIPMENT ABBREVIATION (PUMP)

DRAWING NUMBER WHERE DRAWN

PL105

BALL VALVE

GATE VALVE WITH 3/4 " HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

GATE VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

(HOSE) CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FS FLOW SWITCH

FU FIXTURE UNITS

EL ELEVATION

EMCS ENERGY MONOSERRAT

AND CENTRAL SYSTEM

EPA ENVIROMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EWS/SH EYE WASH/DRENCH SHOWER

E EXISTING

DCW DOMESTIC COLD WATER

DFU DRAINAGE FIXTURE UNITS

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

C CELSIUS

CA COMPRESSED AIR

CGA COMPRESSED GAS ASSOCIATION

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

CV CONTROL VALVE

BFP REDUCED PRESSURE BACKFLOW

PREVENTER

BHP BREAK HORSEPOWER

BSP BLACK STEEL PIPE

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

A/E ARCHITECT / ENGINEER

AD AREA DRAIN/ACCESS DOOR

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASD ADJUSTABLE SPEED DRIVES

ASD AUTOMATIC SPRINKLER DRAIN

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATION, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF ECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH 1000 BTUH

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTADING

MSB MOP SERVICE BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N20 NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM.A NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

KW KILOWATT

KWH KILOWATT-HOUR

ID INSIDE DIAMETER

IE INVERT ELEVATION

ICW INDUSTRIAL COLD WATER

IHW INDUSTRIAL HOT WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

H&CW HOT AND COLD WATER

HB HOSE BIBB

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

PA PASCAL

PD PRESSURE DROP OR DIFFERENCE

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAGE

PTRV PRESSURE TEMPERATURE RELIEF VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RP RECIRCULATION PUMP

RO REVERSE OSMOSIS WATER

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATION

SCFM STANDARD CUBIC FOOT/MINUTE

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SMH SANITARY MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT/SF SQUARE FEET

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

V VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VSD VARIABLE SPEED DRIVE

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAGE

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

WSFU WATER SUPPLY FIXTURE UNITS

YCO YARD CLEANOUT

YH YARD HYDRANT

EXISTING PIPE TO BE REMOVED (TYPE AS INDICATED)

EXISTING PIPE (TYPE AS INDICATED)

NON-POTABLE WATER

1. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE EXTENT OF THE DEMOLITION SCOPE OF WORK AND AREA. THE DEMOLITION PLANS INDICATE THE GENERAL INTENT AND ARE NOT INTENDED TO SHALL ALL ITEMS TO BE REMOVED OR

RETAINED.

2. TRACE AND LABEL ALL EXISTING SYSTEMS WITHIN THE DEMOLITION AREA AND BEYOND PRIOR TO DISCONNECTION AND REMOVAL TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION AREA IS AFFECTED. REVIEW IN DETAIL WITH THE GENERAL CONTRACTOR AND OWNER WHAT IS TO BE REMOVED AND REMAIN PRIOR TO WORK COMMENCING. THERE SHALL BE NO INTERRUPTION OF SERVICES OUTSIDE THE DEMOLITION AREA WITHOUT APPROVAL FROM THE OWNERS

REPRESENTATIVE.

3. NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY OF ANY UNANTICIPATED HIDDEN CONDITIONS ENCOUNTERED DURING THE DEMOLITION. CONTRACTOR SHALL PROVIDE PHASING AND COORDINATION PLANS PRIOR TO THE COMMENSMENT OF WORK.

4. ALL ITEMS REMOVED SHALL BE OFFERED TO THE OWNER FOR SALVAGE. IF THE OWNER DOES NOT TAKE POSSESSION, DISPOSE OF ITEMS IN A SAFE AND LEGAL MANNER. ALL ITEMS CLASSIFIED AS HAZARDOUS SHALL BE DISPOSED AS HAZARDOUS WASTES AND A UNIFORM HAZARDOUS WASTE MANIFEST SHALL BE PROVIDED TO THE OWNER.

5. NOTIFY UTILITY COMPANIES IN ACCORDANCE WITH THEIR REQUIREMENTS PRIOR TO DEMOLITION VERIFY THAT THE UTILITIES HAVE BEEN DISCONNECTED, VALVED, CAPPED AND MADE SAFE PRIOR TO DEMOLITION.

6. ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION. PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED. TAKE EFFECTIVE MEASURES

TO PREVENT WINDBLOWN DUST.

7. DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS AT CONCEALED SPACES, SUCH AS PIPE INTERIORS OR SHAFTS. VERIFY CONDITION AND CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME CUTTING OPERATIONS. MAINTAIN FIRE WATCH AND PORTABLE FIRE-SUPPRESSION DEVICES DURING FLAME CUTTING

OPERATIONS. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING TORCHES.

8. DRAIN, PURGE, OR OTHERWISE REMOVE, COLLECT AND DISPOSE OF CHEMICALS, LIQUIDS, GASES, EXPLOSIVES, ACIDS, FLAMMABLES OR OTHER DANGEROUS MATERIALS BEFORE PROCEEDING.

9. PROPERLY LABEL ALL UNLABELED PIPES THAT REMAIN WITH COLOR PIPE MARKERS.

10. ALL DEMOLITION SCOPE ASSOCIATED WITH LOW VOLTAGE WIRING FOR CONTROLS AND ASSOCIATED INTERLOCKS

SHALL BE INCLUDED IN THIS CONTRACT.

11. ALL EQUIPMENT LOCATIONS AND PIPE AND DUCTWORK SIZES INDICATED ARE APPROXIMATE. VERIFY EXACT LOCATIONS

AND SIZES IN THE FIELD.

12. REFER TO THE PLUMBING DRAWINGS FOR THE FULL EXTENT OF THE SCOPE OF DEMOLITION. DISCONNECT AND MAKE SAFE ALL PLUMBING EQUIPMENT IDENTIFIED FOR REMOVAL ON THE PLUMBING DEMOLITION PLANS. THE PLUMBING SCOPE MAY EXTEND BEYOND THE AREA DEFINED BY THESE WORK SCOPE LIMITS TO FULLY COMPLY WITH THE VARIOUS

REQUIREMENTS DEIFNED BY THESE NOTES.

13. THE PLUMBING DEMOLITION PLANS INDICATE GENERAL INTENT AND ARE NOT INTENDED TO SHOW ALL COMPONENTS AND ITEMS TO BE REMOVED OR RETAINED. THE PLUMBING CONTRACTORS SHALL VISIT THE SITE PRIOR TO SUBMISSION OF THEIR BIDS TO BECOME FAMILIAR WITH THE ACTUAL WORKING CONDITIONS AND THE EXTENT OF WORK. EQUIPMENT AND CONTROLS DESIGNATED TO BE REMOVED SHALL BE DISCONNECTED AND MADE SAFE. THE PLUMBING CONTRACTORS SHALL IMMEDIATELY NOTIFY THE GENERAL CONTRACTOR AND THE OWNERS REPRESENTATIVE OF ANY

UNANTICIAPTED OR HIDDEN CONDITIONS ENCOUNTERED DURING DEMOLITION.

14. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ALL SYSTEMS OR BUILDING COMPONENTS DAMGED BY HIM AS A RESULT OF CONSTRUCTION DURING THE EXECUTION OF THE WORK. DAMAGE SHALL INCLUDE, BUT NOT BE LIMITED TO, THE DESTRUCTION OR DISPOSAL OF ITEMS INTENDED TO REMAIN OR BE SALVAGED.

15. THE PLUMBING CONTRACTOR SHALL SYSTEM TRACE AND LABEL ALL EXISTING BRANCH SUSTEMS AND MAINS WITHIN OR ASSOCIATED WITH THE DEMOLITION SCOPE, PRIOR TO DEMOLITION AND DISCONNECTION. ALL SYSTEMS IDENTIFIED FOR REMOVAL SHALL BE TRACED AND FIELD LABELED TO ENSURE THAT NO AREA OUTSIDE THE DEMOLITION SCOPE LIMIT IS

AFFECTED.

16. IN ANY AREA REQUIRING THE PERFORMANCE OF ANY OTHER TRADE'S WORK, THE PLUMBING CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ANY OR ALL PLUMBING ITEMS IN PATH OF WORK, REINSTALLING AND RECONNECTING

SAME AS REQUIRED, IN

17. THE PLUMBING CONTRACTOR SHALL IDENTIFY ALL BRANCH SYSTEM COMPONENTS WHICH ARE TO REMAIN WITHIN THE AREA OF DEMOLITION SCOPE. THERE SHALL BE NO INTERRUPTION OF SERVICE TO ANY AREA OUTSIDE THE SCOPE LIMITS WITHOUT WRITTEN APPROVAL FROM THE OWNER'S REPRESENTATIVE. EXISTING EQUIPMENT TO REMAIN SHALL BE LEFT IN

A CODE COMPLIANT CONDITION.

18. THE PLUMBING CONTRACTOR SHALL TAKE INVENTORY OF PLUMBING ITEMS THAT ARE REMOVED AND PROVIDE A LIST TO THE OWNER'S REPRESENTATIVE FOR HIS SELECTION OF ITEMS TO BE RETAINED. ALL ITEMS REJECTED BY THE REPRESENTATIVE SHALL BECOME THE PROPERTY OF THE PLUMBING CONTRACTOR AND SHALL BE REMOVED FROM THE SITE AND

DISPOSED OF LEGALLY.

19. THE PLUMBING CONTRACTOR SHALL TEMPORARILY SUPPORT ALL ITEMS TO REMAIN THAT ARE AFFECTED BY THE DEMOLITION OF BUILDING STRUCTURAL COMPONENTS (WALLS, CEILINGS, PARTITIONS, ECT). CONTRACTOR SHALL TEMPORARILY SUPPORT ITEMS AND SHALL PROVIDE PERMANENT SUPPORTS WHEN FINALIZED STRUCTURES ARE IN PLACE.

20. ALL EXISTING PLUMBING EQUIPMENT THAT IS TO BE RELOCATED SHALL BE STORED IN A SAFE MANNER UNTIL SUCH TIME AS TO BE REINSTALLED. ANY DAMAGE INCURRED TO EQUIPMENT SHALL BE RECTIFIED BY THE PLUMBING CONTRACTOR.

21. ALL REMOVED ITEMS SHALL BE LEGALLY DISPOSED OF BY THE PLUMBING CONTRACTOR UNLESS IDENTIFIED FOR REUSE.

THE OWNER'S REPRESENTATIVE SHALL INSPECT ALL RETAINED ITEMS, PRIOR TO PLACEMENT IN THE IDENTIFIED STORAGE LOCATION

BY THE MECHANICAL CONTRACTOR.

22. PLUMBING CONTRACTOR WORK SCOPE SHALL INCLUDE AND NOT BE LIMITED TO THE FOLLOWING ADDITIONAL ITEMS AS PER ALL LANDLORD STANDARDS AND PROCEDURES AND WITH PRIOR APPROCAL FROM THE OWNER'S REPRESENTATIVE.

a. AFTER INSTALLATION OF NEW WORK, PROVIDE TESTING OF ALL SYSTEMS IN ACCORDANCE TO THE SPECIFICATIONS.

b. CUTTING, CAPPING, & REMOVAL OF EXISTING DUCTWORK AND INSULATION SYSTEMS.

c. PROTECT ALL EXISTING EQUIPMENT FROM DAMAGE IN AND AROUND EACH INDIVIDUAL WORK SITE.

23. THE GENERAL CONTRACTOR AND THE PLUMBING CONTRACTOR WILL PROVIDE ALL NECESSARY EQUIPMENT TO

PERFORM THE DEMOLITION AND NEW WORK SCOPE.

24. PROVIDE ALL THE NECESSARY EQUIPMENT, MANPOWER, TOOLS, MISELLANEOUS SUPPORTS, MISCELLANEOUS

EQUIPMENT AND SUPPLIES TO PROPERLY EXECUTE THE DEMOLITION AND NEW WORK.

25. PROVIDE ALL PERMITS AND COMPLY WITH ALL OASHA SAFETY REGULATIONS. TAKE DUE DILLIGENCE IN THE PROTECTION OF ALL WORK PERSONNEL AND THE GENERAL POPULATION IN AND AROUND THE WORK SITE. PROVIDE ISOLATION BARRIERS BETWEEN ACTIVE WORK AREAS AND DEMOLITION ZONES. KEEP THE WORK SITE CLEAN, SAFE, AND SECURE

THROUGHOUT ALL PHASES OF THE WORK ORDER.

26. NOTIFY “THE OWNER'S” PROJECT MANAGER THROUGH THE GENERAL CONTRACTOR ONE WEEK IN ADVANCE OF ANY INTENDED SHUTDOWNS OF EXISTING SYSTEMS OF ANY SORT. NOTIFY “THE OWNER'S” PROJECT MANAGER THROUGH THE GENERAL CONTRACTOR TWO WEEKS IN ADVANCE OF REQUIRED ACCESS TO ADJACENT SPACES WHERE WORK IS TO BE PERFORMED. “THE OWNER'S” PROJECT MANAGER WILL CONFIRM WITH THE “USERS GROUP” THE TIME AND DURATION OF THE REQUIRED SHUT DOWN AND ACCESS REQUIREMENTS AND INFORM THE CONTRACTOR IN WRITING OF THE

APPROVAL.

27. THE PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING, PRIOR TO FINAL BID, ALL EXISTING

CONDITIONS FOR

28. WHERE FLOOR DRAINS OCCUR WITHIN THE LIMITS OF CONSTRUCTION, PREVENT CONSTRUCTION DEBRIS FROM ENTERING

DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO START OF WORK.

30. ALL WORK IN PIPE CRAWL SPACE REQUIRES COORDINATION WITH ASBESTOS SOIL REPORTS, SAFETY CONFINED SPACE, AND VA IH. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE TEMPORARY LIGHTING, VENTILATION, EMERGENCY

EXTRACTION EQUIPMENT, ETC. FOR ALL WORK IN THE PIPE BASEMENT.

PLUMBING DEMOLITION NOTES

(R) REMOVE

1. ALL PLUMBING GENERAL NOTES, SYMBOLS, LISTS AND DETAILS ARE TO BE CONSIDERED AS APPLICABLE TO ALL PLUMBING

DRAWINGS FOR THIS PROJECT.

2. THE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND EXACT LOCATIONS AND ARRANGEMENTS OF EXIST!NEW EQUIPMENT, DUCTWORK, PIPING AND OTHER COMPONENTS SHALL BE DETERMINED IN THE FIELD WITH DUE CONSIDERATION OF STRUCTURAL, ELECTRICAL AND ARCHITECTURAL SYSTEM. EXISTING STRUCTURAL SYSTEMS SHALL NOT BE MODIFIED WITHOUT THE EXPRESS

PERMISSION OF THE ENGINEER.

3. IF REQUIRED THE PROJECT SHALL BE PHASED IN ACCORDANCE WITH THE APPROVED PHASING PLAN. THE CONTRACTOR SHALL OBTAIN APPROVAL FOR THE SEQUENCING AND TIMING OF OPERATIONS PRIOR TO COMMENCING WORK. SEE SPECIFICATIONS.

4. CONTRACTOR IS TO MAINTAIN SERVICE TO ROOMS OUTSIDE THE PROJECT SCOPE OF WORK AND PHASING SCHEDULE. IF INTERRUPTION OF SERVICE IS REQUIRED COORDINATE SHUTDOWN WITH PROJECT ENGINEER AND OWNER.

5. CARE SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT EXISTING SYSTEMS AND SURFACES TO REMAIN. RESTORE DAMAGED

AREAS THAT ARE BEYOND THE SCOPE OF THIS CONTRACT TO THEIR ORIGINAL CONDITION.

6. WHERE INDICATED ON THE DRAWINGS, REMOVE OR RELOCATE EXISTING COMPONENTS AS REQUIRED TO ACCOMMODATE THE

NEW WORK. REMOVALS SHALL INCLUDE ALL ASSOCIATED OFF-SITE DISPOSAL COSTS.

7. COORDINATE REMOVALS AND RELOCATION'S INCLUDING SELECTIVE CUTTING AND PENETRATIONS WITH ARCHITECTURAL, MECHANICAL STRUCTURAL AND ELECTRICAL CONTRACTORS.

8. MOST PARTITIONS ARE FULL HEIGHT AND REQUIRE UTILITIES PENETRATIONS TO BE SEALED, SEE ARCHITECTURAL DRAWINGS FOR PARTITION HEIGHTS. DUCTWORK SHOWN FOR CLARITY THAT MAY RUN PARALLEL TO WALL PARTITIONS WILL REQUIRE LOCATING IN

THE FIELD TO MINIMIZE CONFLICT WITH PARTITIONS.

9. FIELD VERIFY EXISTING EQUIPMENT AND PIPING PRIOR TO REMOVAL OR REUSE. CONFIRM WITH PROJECT ENGINEER THAT ALL EQUIPMENT AND PIPING DESIGNATED TO BE REMOVED IS NO LONGER IN SERVICE PRIOR TO ITS REMOVAL. PROJECT ENGINEER

SHALL HAVE FIRST RIGHT OF REFUSAL ON ALL DEMO'D EQUIPMENT.

10. EXISTING EQUIPMENT AND PIPING TO REMAIN IN SERVICE SHALL BE INSPECTED. REPORT INOPERABLE EQUIPMENT TO PROJECT

ENGINEER.

11. ALL UNUSED (ABANDONED), PIPING AND EQUIPMENT INDICATED TO BE REMOVED SHALL BE REMOVED AND CAPPED.

12. TIE-IN POINT LOCATIONS ARE APPROXIMATE. CONTRACTOR SHALL DETERMINE EXACT LOCATIONS IN THE FIELD BASED ON

EXISTING CONDITIONS.

13. COORDINATE THE LOCATIONS OF ALL WALL MOUNTED EQUIPMENT WITH FINAL EQUIPMENT/FURNITURE LAYOUT.

14. AT THE END OF EACH WORKING DAY, THE CONSTRUCTION SITE SHALL BE LEFT IN A CLEAN AND NEAT CONDITION.

15. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND GOOD PRACTICE NORMAL TO THE TRADE. INSTALLATION SHALL INCLUDE PROVISIONS FOR ACCESS TO NORMAL MAINTENANCE ITEMS. PROVIDE ADEQUATE STRUCTURAL SUPPORTS AND SECURE MOUNTING METHODS WITH PROVISIONS FOR VIBRATION ISOLATION AND EXPANSION

WHERE REQUIRED.

16. COORDINATE ALL PENETRATIONS WITH GENERAL CONTRACTOR. SEE ARCHITECTURAL DRAWINGS FOR PENETRATION DETAILS.

PLUMBING CONTRACTOR SHALL PROVIDE FLASHING AND COUNTER FLASHING FOR ROOF PENETRATIONS AS REQUIRED.

17. PROVIDE PIPE SUPPORTS, GUIDES AND OFFSETS AS NECESSARY TO PREVENT UNDUE STRAIN ON PIPING.

18. SEE DETAILS, PIPING DIAGRAMS AND MANUFACTURER'S RECOMMENDATIONS FOR ADDITIONAL VALVES & FITTINGS NECESSARY FOR

COMPLETE PIPING SYSTEM.

19. CONTRACTOR TO COORDINATE ALL WORK WITH OTHER BUILDING TRADES, RELOCATION OF EXISTING UTILITIES MAY BE

NECESSARY TO ACCOMMODATE INSTALLATION OF NEW EQUIPMENT OR DUCTWORK.

20. SEE SPECIFICATIONS FOR OTHER REQUIREMENTS.

21. CONTRACTOR SHALL FIELD VERIFY ALL CLEARANCES AND DIMENSIONS.

22. PROVIDE ACCESS PANELS FOR ALL CONCEALED SHUT-OFF VALVES EXCEPT THOSE ABOVE SUSPENDED CEILING.

23. INFILL ALL NEW OR EXISTING ABANDONED FLOOR SLAB PENETRATIONS WITH GROUT, FULL THICKNESS OF SLAB. MAINTAIN FIRE

RATING. ALL EXISTING CONCRETE FLOORS AND CHASES ARE 2-HR FIRE RATED.

24. ALL DOMESTIC WATER SUPPLY, VENT AND MEDICAL GAS PIPING SHALL BE RUN ABOVE CEILINGS OR WITHIN PARTITIONS UNLESS

OTHERWISE NOTED.

25. PLUMBING RISERS SHALL BE RUN CONCEALED WITHIN WALLS OR CHASES. COORDINATE WITH ARCHITECTURAL DRAWINGS.

26. COORDINATE FINAL LOCATIONS OF MEDICAL GAS OUTLETS. AND VALVE BOXES WITH ARCHITECT.

27. SANITARY LINES SHALL SLOPE 1/4" PER FOOT UNLESS NOTED OTHERWISE.

28. COORDINATE WITH BUILDING OWNER PRIOR TO CUTTING OR GRINDING FLOORS.

29. INSTALLATION SHALL PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT OF EQUIPMENT PROVIDED. PROVIDE ACCESS PANELS TO ALLOW ACCESS TO SYSTEMS COMPONENTS THAT REQUIRE INSPECTION AND MAINTENANCE ACCORDING TO

MANUFACTURER'S LITERATURE.

30. NEW PIPING LOCATIONS ON THE PLANS ARE DIAGRAMMATICAL. TO THE EXTENT POSSIBLE THE CONTRACTOR SHALL INSTALL

PIPING SYSTEMS TO MINIMIZE RUN LENGTHS TO FIXTURES.

PLUMBING GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\R G

U

IL

\D oc um en ts \1

_B ro ck to n_ B0

5_ M ec h_

R

_R G

U

IL

.rv t

5/

/2

:0 0:

A

M

P-001

PLUMBING LEGEND AND ABBREVIATIONS BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJCRevisions: Date:

UP

INCOMING 4" DOMESTIC

WATER SERVICE

EXISTING WATER METER

TO BE REMOVED

EXISTING BACKFLOW

PREVENTER TO BE REMOVED

E1 E2 E3

EJ

EI

EG.1

EG

EF

EE

ED

EC.9

E4 E5 E6 E7

E8

E8

EA

EB

EC

E5.5 E6.5 E7.5

E9 E10 E11 E12 E13 E15

E4.12 E4.13

E14 E16 E17 E18

EH

(R) 4"S(R) 4"S

(R) 4"SD

(R) 4

"SD

(R ) 3

"S

(R) 6"SD (R) 5"SD (R) 5"SD

(R ) 4

"S

(R ) 8

"S D

(R ) 4

"S D

(R ) 4

"S D

(R ) 8

"S D

(R ) 8

"S D

(R) 4"S (R) 4"S (R) 4"S

(R) 4"S

(R) 1/2" RHW

(R) 1 1/4" HW

(R) 2 1/2" CW

(R) 3/4" RHW

(R) 3" CW (R) 3" CW (R) 3" CW (R) 3" CW (R) 3" CW

(R) 1 1/2" HW

(R) 4"S

(R) 3/4" CW

(R) 3/4" RHW (R) 3/4" RHW (R) 3/4" RHW (R) 3/4" RHW

(R) 4" S

(R) 2" HW (R) 2" HW

(R) 3

"SD

(R) 3"SD

(R) 3" SD-UP(R) 3" SD-UP

(R) 3" SD-UP

(R) 3" SD-UP

(R) 3" SD-UP (R) 3" SD-UP

(R) 4" SD-UP

(R) 3" SD-UP

(R) 4" SD-UP

(E) 2" SD-UP

(R ) 4

"S (R

) 5 "S

(R ) 1

" C W

(R ) 1

" H W

(R ) 1

/2 "R

HW

(R) 1 1/2" CW-UP

(R) 2" CW-UP

(R) 3/4" CW-UP

(R) 3/4" CW-UP

(R ) 3

/4 " C

W

(R) 3" S-UP

(R) 4" S-UP

(R) 2" HW

(R) 3" CW

(R) 3/4" RHW

(R) 2" HW

(R) 1/2" V-UP

(R) 3" S-UP

(R) 3" S-UP

(R) 4" S-UP

(R) 3" S-UP

(R) 2" V-UP

(R) 3" S-UP

(R) 4" S-UP

(R) 2" S-UP

(R) 2" S-UP

(R) 2" S-UP

(R) 3" W&T-UP (R) 3" W&T-UP

(R) 3" S-UP

(R )3

/4 " C

W

(R) 4" S-UP

(R) 4" S-UP

(R) 3 "S

(R ) 1

/2 " R

HW (R

) 3

/4 " H

W (R

) 2 " C

W

(R) 5" SD-UP

(R) 4" SD-UP

(R ) 4

"S D

(R ) 4

" S D

(R) 5" SD

(E ) 8

"S D

W

IN

G B

W

IN

G A

W

IN

G B

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

W

IN

G A

(R) 3" S-UP

(R) 3" S-UP

(R) 2" S-UP

(R) 2" S-UP

(E ) 4

"S

(CAP) (CAP)

2 2

B A C

NOTES:

1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL

ESTABLISH THE INFRASTRUCTURE REQUIRED TO

EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK

SHALL BE COORDINATED WITH OTHER ASSOCIATED

TRADES.

DEMOLITION NOTES:

1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL

BE REMOVED

2. REMOVE ALL HOT WATER AND HOT WATER RECIRC

PIPING. REMOVE ALL VALVES, GAUGES ETC.

3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING

IN FIELD BEFORE COMMENCMENT OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\R G

U

IL

\D oc um en ts \1

_B ro ck to n_ B0

5_ M ec h_

R

_R G

U

IL

.rv t

5/

/2

:0 0:

A

M

PD100.1-1

PIPE BASEMENT - PLUMBING DEMOLITION

PLAN - WINGS A AND B

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC

1/8" = 1'-0"

AFL0 - PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WINGS A AND B F9 1/64" = 1'-0"

KEY PLAN - WINGS A AND B

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 (2)EXISTING STEAM WATER HEATER TO BE

REMOVED. CONTRACTOR SHALL REMOVE

ALL ASSOCIATED PIPING, VALVES, GAUGES

ETC.

EXISTING WATER HEATERS SHALL REMAIN

OPERATIONAL UNTIL DEMOLITION WORK HAS

BEEN COMPLETED AND NEW WATER

HEATERS HAVE BEEN INSTALLED.

2 REMOVE CW, HW AND RHW RISERS UP & DN

IN CHASE AND/OR WALL. REMOVE

ASSOCIATED BRANCH AND RUNOUT PIPING

COMPLETE TO FIXTURES. REMOVE ALL

ASSOCIATED HANGERS, SUPPORTS,VALVES,

ETC.

3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE

CW, HW, S & V SYSTEMS FOR CONNECTION

TO NEW FIXTURE.

Revisions: Date:

EJ

EI

EG.1

EG

EF

EE

ED

EC.9

EA

EB

EC

E17E18

E19 E20

E20.5

20.9

E21.5 E22.5 E23.5

21.6 22.4

EH

E26 E27

E.9

E25

E24E23E22E2120.4 21.3 21.9 22.9

C'

B'

A'

L*

K*

(R) 3" SD-UP

(R) 4" SD-UP

(R) 4" SD-UP

(R) 3" SD-UP

(R) 3" SD-UP(R) 3" SD-UP

(R) 2" CW-UP

(R) 2" CW-UP

(R) 2 1/2" CW

(R) 3/4" HW

(R) 1/2" RHW

(R) 2 1/2" CW

(R) 1 1/4" HW

(R) 3/4" RHW

(R ) 3

/4 " C

W (R

) 3 /4

" C W

(R) 3" CW(R) 3" CW

(R) 3/4" RHW(R) 3/4" RHW

(R) 1 1/4" HW(R) 1 1/2" HW

(R) 4" S

(R ) 5

" S (R

) 5 " S

(R ) 5

" S (R

) 5 " S

(R) 4" S-UP

(R) 3" S-UP

(R) 4" S-UP

(R) 1 1/2" V-UP

(R) 4" S(R) 4" S

(R) 4" S-UP

(R) 3" S-UP

(R) 3" S-UP

(E) 3" SD-UP

(E) 3" SD-UP

(R) 3 " S

D(R) 3" SD

(R ) 4

" S D

(R) 4" SD

(R ) 5

" S D

(R) 5" SD

(R ) 8

" S D

(R ) 8

" S D

(R ) 8

" S D

(R ) 4

" S D

(R) 4" SD

(R) 4" SD

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

(E ) 5

" S

(E ) 8

" S D

2 2

B A C

NOTES:

1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL

ESTABLISH THE INFRASTRUCTURE REQUIRED TO

EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK

SHALL BE COORDINATED WITH OTHER ASSOCIATED

TRADES.

DEMOLITION NOTES:

1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL

BE REMOVED

2. REMOVE ALL HOT WATER AND HOT WATER RECIRC

PIPING. REMOVE ALL VALVES, GAUGES ETC.

3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING

IN FIELD BEFORE COMMENCMENT OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\R G

U

IL

\D oc um en ts \1

_B ro ck to n_ B0

5_ M ec h_

R

_R G

U

IL

.rv t

5/

/2

:0 0:

A

M

PD100.1-2

PIPE BASEMENT - PLUMBING DEMOLITION

PLAN - WING C

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC

1/8" = 1'-0"

ALF0 - PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WING C 1 1/64" = 1'-0"

KEY PLAN - WING C

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 (2)EXISTING STEAM WATER HEATER TO BE

REMOVED. CONTRACTOR SHALL REMOVE

ALL ASSOCIATED PIPING, VALVES, GAUGES

ETC.

EXISTING WATER HEATERS SHALL REMAIN

OPERATIONAL UNTIL DEMOLITION WORK HAS

BEEN COMPLETED AND NEW WATER

HEATERS HAVE BEEN INSTALLED.

2 REMOVE CW, HW AND RHW RISERS UP & DN

IN CHASE AND/OR WALL. REMOVE

ASSOCIATED BRANCH AND RUNOUT PIPING

COMPLETE TO FIXTURES. REMOVE ALL

ASSOCIATED HANGERS, SUPPORTS,VALVES,

ETC.

3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE

CW, HW, S & V SYSTEMS FOR CONNECTION

DN

E1

1.1 1.3

E2

2.1

E3

3.2 3.9 4.1 4.3

LEJ

K

EI

G.9

EG.1

EG

G

EF

EE

ED

EC.9

E4 E5 E6 E7 7.1

E8

8.1

EAA.1

EBA.9

B.5

EC

E5.5 E6.5 E7.5

E9 E10E11 E12 E13 E15

E4.12 E4.13

E14 E16 E17E18

EH

(R) 3" SD-

UP & DN

(R) 3" SD-

UP & DN

(R) 3" SD-UP & DN

(R) 3" SD-

UP & DN

(R) 3" SD-UP

(R) 3" SD-UP & DN

(E) 4" SD-DN

(E) 3" SD-UP

(R) 4" SD-DN

(E) 2" SD-UP

(R) 1 1/2" CW-UP

(R) 3/4" CW-UP

(R) 3/4" CW-UP

(R) 3/4" CW-UP

(R) 1/2" HW-UP

(R) 3" S-UP

(R) 4" S-UP

(R) 1/2" V-UP

(R) 4" S-UP

(R) 3" S-UP

(R) 3" S-UP

(R) 4" S-UP

(R) 2" S-UP

(R) 2" S-UP

(R) 3" SD-UP

(R) 3" SD-UP

(R) 5" SD-DN

(R) 4" SD-DN

(R) 3" SD-UP (R) 3" SD-UP

(R) 4" SD

(R) 4" SD

(R) 3" SD-UP

(R) 3" SD

(R ) 4

" S D

(R) 4" SD-DN

(R ) 4

" S D

(R) 3" SD-UP

(R) 3" SD

W

IN

G B

W

IN

G A

W

IN

G B

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

W

IN

G A

(R) 2" V-UP

3(R)-LAV

3(R)-UR

3(R)-WC

3(R)-WC

3(R)-SHWR

B A C

NOTES:

1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL

ESTABLISH THE INFRASTRUCTURE REQUIRED TO

EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK

SHALL BE COORDINATED WITH OTHER ASSOCIATED

TRADES.

DEMOLITION NOTES:

1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL

BE REMOVED

2. REMOVE ALL HOT WATER AND HOT WATER RECIRC

PIPING. REMOVE ALL VALVES, GAUGES ETC.

3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING

IN FIELD BEFORE COMMENCMENT OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\R G

U

IL

\D oc um en ts \1

_B ro ck to n_ B0

5_ M ec h_

R

_R G

U

IL

.rv t

5/

/2

:0 0:

A

M

PD100.2-1

LEVEL 0 - PLUMBING DEMOLITION PLAN -

WINGS A AND B

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC

1/8" = 1'-0"

AFL00 - LEVEL 0 - PLUMBING DEMOLITION PLAN - WINGS A AND B 1 1/64" = 1'-0"

KEY PLAN - WINGS A AND B

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 (2)EXISTING STEAM WATER HEATER TO BE

REMOVED. CONTRACTOR SHALL REMOVE

ALL ASSOCIATED PIPING, VALVES, GAUGES

ETC.

EXISTING WATER HEATERS SHALL REMAIN

OPERATIONAL UNTIL DEMOLITION WORK HAS

BEEN COMPLETED AND NEW WATER

HEATERS HAVE BEEN INSTALLED.

2 REMOVE CW, HW AND RHW RISERS UP & DN

IN CHASE AND/OR WALL. REMOVE

ASSOCIATED BRANCH AND RUNOUT PIPING

COMPLETE TO FIXTURES. REMOVE ALL

ASSOCIATED HANGERS, SUPPORTS,VALVES,

ETC.

3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE

CW, HW, S & V SYSTEMS FOR CONNECTION

EG.1

EG

EF

EE

ED

EC.9

EA

EB

EC

E17E18

E19 E20

E20.5

20.9

E21.5 E22.5 E23.5

21.6 22.4

EH

E26 E27 C.7

D.8

E.9

E25

E24E23E22E2120.4 21.3 21.9 22.9

C'

B'

A'

L*

K*

7.1* 8.1*

(R ) 2

"C W

(R ) 1

"H W

(R ) 1

/2 "R

HW

(R ) 3

/4 "C

W (R

) 3 /4

"C W

(R ) 3

/4 "H

W (R

) 1 /2

" R

HW

(R) 2" CW-UP

(E) 3" SD-UP & DN

(E) 3" SD-UP & DN

(E) 3" SD-UP & DN(E) 3" SD-UP & DN

(R) 4" S-UP & DN

(R) 3" S-UP

(R) 4" S-UP

(E) 3" SD-UP & DN (E) 3" SD-UP & DN

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

(R) 3" S-UP

(R) 3" S-UP

(R) 3" S-UP

(R)-LAV

(R)-UR

(R)-WC

(R)-WC

(R)-LAV

(R)-SHWR

(R)-WC

(R)-WC

(R)-LAV

(R)-LAV

(R)-WC

(R) 3" SD-UP & DN (R) 3" SD-UP & DN

2 2

B A C

NOTES:

1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL

ESTABLISH THE INFRASTRUCTURE REQUIRED TO

EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK

SHALL BE COORDINATED WITH OTHER ASSOCIATED

TRADES.

DEMOLITION NOTES:

1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL

BE REMOVED

2. REMOVE ALL HOT WATER AND HOT WATER RECIRC

PIPING. REMOVE ALL VALVES, GAUGES ETC.

3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING

IN FIELD BEFORE COMMENCMENT OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\R G

U

IL

\D oc um en ts \1

_B ro ck to n_ B0

5_ M ec h_

R

_R G

U

IL

.rv t

5/

/2

:0 0:

A

M

PD100.2-2

LEVEL 0 - PLUMBING DEMOLITION PLAN -

WING C

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC

1/8" = 1'-0"

AFL00 - LEVEL 0 - PLUMBING DEMOLITION PLAN - WING C 1 1/64" = 1'-0"

KEY PLAN - WING C

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 (2)EXISTING STEAM WATER HEATER TO BE

REMOVED. CONTRACTOR SHALL REMOVE

ALL ASSOCIATED PIPING, VALVES, GAUGES

ETC.

EXISTING WATER HEATERS SHALL REMAIN

OPERATIONAL UNTIL DEMOLITION WORK HAS

BEEN COMPLETED AND NEW WATER

HEATERS HAVE BEEN INSTALLED.

2 REMOVE CW, HW AND RHW RISERS UP & DN

IN CHASE AND/OR WALL. REMOVE

ASSOCIATED BRANCH AND RUNOUT PIPING

COMPLETE TO FIXTURES. REMOVE ALL

ASSOCIATED HANGERS, SUPPORTS,VALVES,

ETC.

3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE

CW, HW, S & V SYSTEMS FOR CONNECTION

EXISTING SAN STACK

EXISTING STORM RISER

(3)EXISTING SAN STACK

REMOVE EXISTING LAV CUT AND

CAP SERVICES BACK 4" FROM

CLOSEST ACTIVE MAIN TYP. FOR 3

REMOVE EXISTING

SANITARY STACK

REMOVE EXISTING

SANITARY RISER

REMOVE EXISTING

SANITARY RISER (R) 3"SD-UP & DN

REMOVE EXISTING

SANITARY STACK

REMOVE EXISTING MOP SINK

CUT AND CAP SERVICES

BACK 4" FROM

CLOSEST ACTIVE MAIN

E1

1.1 1.3

E2

2.1

E3

3.2 3.9 4.1 4.3

LEJ

K

EI

G.9

EG.1

EG

G

EF

EE

ED

EC.9

E4 E5 E6 E7 7.1

E8

8.1

EAA.1

EBA.9

B.5

EC

E5.5 E6.5 E7.5

E9 E10 E11 E12 E13 E15

E4.12 E4.13

E14 E16 E17 E18

EH

(R) 1 1/4" CW-DN

(R) 1 1/4" HW-DN

(R) 1/2" RHW- DN

(R) 2" CW-DN

(R) 3/4" HW-DN

(R) 1/2" RHW-DN

(R) 1 1/4" CW-UP

(R) 1 1/4" HW-UP

(R) 1/2" RHW-UP

(R) 2" CW-UP

(R) 3/4" HW-UP

(R) 1/2" RHW-UP

(R) WC

(R) WC

(R) UR

(R) UR (R) LAV

(R) LAV

(R) LAV

(R) SK

(R) WC

(R) WC

(R) WC

(R) LAV

(R) LAV

(R) LAV

(R) DF

(R) MK

(R) WC

(R) LAV

(R) MK

2 (R) WC 2

1 1

1 1

(R) 3"SD-UP & DN

(R) 3"SD-UP & DN

(R) 3"SD-UP & DN

(R) 3"SD-

UP & DN

(R) 3"SD-

UP & DN

(R) 3"SD-UP & DN

(R) 3"SD-

UP & DN

(R) 3"SD-

UP & DN

(R) 3"SD-DN

(R) 3"SD-UP

(R) 3"SD-DN

(R) 3"SD-UP

W

IN

G B

W

IN

G A

W

IN

G B

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

W

IN

G A

(R)FC-4

(R)FC-4

(E)FC-2

(R)FC-2(R)FC-2

(R)FC-7

(R)FC-5

(R)FC-5

(R)FC-5

(R)FC-4(R)FC-4

(R)FC-4(R)FC-4

(E)FC-1

(E)FC-6

(E)FC-2 (R) FC(E)FC-6

(E)FC-2

(E)FC-2

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-3(E)FC-3

(E)FC-3

(E)FC-3 (E)FC-3

(E)FC-1 (E)FC-1

(E)FC-2

(E)FC-1 (E)FC-1(E)FC-1

(E)FC-1 (E)FC-1 (E)FC-1

(R)FC-1

(R) FC

(E ) C

D

(E ) C

D (E

) C D

(E ) C

D

(E ) C

D

(E) CD

(E) CD

(E) CD (E) CD

(E ) C

D (E

) C D

(E ) C

D

(E) CD

(E) CD(E) CD

(E) CD(E) CD

(E) CD

(E) CD

(E) CD

(E ) C

D

(E ) C

D

(E) CD

(E) CD (E) CD

(E) CD(E) CD

(E ) C

D (E

) C D

(E ) C

D

(E ) C

D

(CAP)

(CAP)

(CAP)

(CAP)

(E ) C

D

(E ) C

D

(E) CD

(R) CD (R) CD

(R ) C

D (R

) C D

(R ) C

D (R

) C D

(CAP)

(CAP)

(R) CD

OFFICE

B121

STAIR

ST5B101

CORRIDOR

B151

CLOSET

5-B151A

CLOSET

5-B151B

OFFICE

B150

OFFICE

B149

OFFICE

B148

STAIR

ST2B101

STORAGE

B145

STORAGE

B144

CORRIDOR

B152

OFFICE

B102

OFFICE

B103

OFFICE

B104

OFFICE

B101

STORAGE

B104A

STAFF BREAK

ROOM

B106

STAFF

RESTROOM

B141

JANITOR

CLOSET

B127

OFFICE

B139

OFFICE

B138

OFFICE

B137

OFFICE

B136

OFFICE

B135

CORRIDOR

B134

CLOSET

B134A

CLOSET

B134B

OFFICE

B133

OFFICE

B128

OFFICE

B129

OFFICE

B130

OFFICE

B131

OFFICE

B132

CORRIDOR

B124D

CORRIDOR

B124E

OFFICE

B115

OFFICE

B117

EMER.

ELECTRICAL

B119A

STAIR

ST6B101

OFFICE

B114

STORAGE

B113B

OFFICE

B112

OFFICE

B109

OFFICE

B108

OFFICE

B107

CLOSET

A108

STAIR

ST1A101

ELEVATOR

A112

TEL ROOM

A102

OFFICE

A117

OFFICE LEAD

CLERK

A120B

VESTIBULE

A101E

LOBBY

A101A

CORRIDOR

A122

OFFICE

C151

STAIR

ST4B101

OFFICE

B123

OFFICE

B122

CORRIDOR

B143

CORRIDOR

B140

LOBBY

A110A

OFFICE

C101

W

IN

G B

W

IN

G A

W

IN

G B

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

W

IN

G A

MEN

B105

GROUP

THERAPY

B147

WOMEN

A114

OFFICE

B119

OFFICE

B120

OFFICE

A106

OFFICE

A107

OFFICE

A105

OFFICE

A104

OFFICE

A103

EXAM/ TX

A115

OFFICE

A118

OFFICE

A119

OFFICE

A116

GROUP THERAPY

B116

GROUP THERAPY

B125

JAN.

A113

B A C

NOTES:

1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL

ESTABLISH THE INFRASTRUCTURE REQUIRED TO

EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK

SHALL BE COORDINATED WITH OTHER ASSOCIATED

TRADES.

DEMOLITION NOTES:

1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL

BE REMOVED

2. REMOVE ALL HOT WATER AND HOT WATER RECIRC

PIPING. REMOVE ALL VALVES, GAUGES ETC.

3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING

IN FIELD BEFORE COMMENCMENT OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\R G

U

IL

\D oc um en ts \1

_B ro ck to n_ B0

5_ M ec h_

R

_R G

U

IL

.rv t

5/

/2

:0 1:

A

M

PD101.1

LEVEL 1 - PLUMBING DEMOLITION PLAN -

WINGS A AND B

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC

1/8" = 1'-0"

AFL01 - LEVEL 1 - PLUMBING DEMOLITION PLAN - WINGS A AND B 1 1/64" = 1'-0"

KEY PLAN - WINGS A AND B

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 (2)EXISTING STEAM WATER HEATER TO BE

REMOVED. CONTRACTOR SHALL REMOVE

ALL ASSOCIATED PIPING, VALVES, GAUGES

ETC.

EXISTING WATER HEATERS SHALL REMAIN

OPERATIONAL UNTIL DEMOLITION WORK HAS

BEEN COMPLETED AND NEW WATER

HEATERS HAVE BEEN INSTALLED.

2 REMOVE CW, HW AND RHW RISERS UP & DN

IN CHASE AND/OR WALL. REMOVE

ASSOCIATED BRANCH AND RUNOUT PIPING

COMPLETE TO FIXTURES. REMOVE ALL

ASSOCIATED HANGERS, SUPPORTS,VALVES,

ETC.

3 REMOVE FIXTURE IN ITS ENTIRITY, PREPARE

CW, HW, S & V SYSTEMS FOR CONNECTION

(R) S-UP &DN

(E) 1 1/2" NG

(E) 1-1/2"NG UP

EJ

EI

EG.1

EG

EF

EE

ED

EC.9

EA

EB

EC

E17E18

E19 E20

E20.5 E21.5 E22.5 E23.5

EH

E26 E27 C.7

D.8

E.9

E25

E24E23E22E2120.4 21.3 21.9 22.9

C'

B'

A'

L*

K*

7.1* 8.1*

(R) LAV 1

(R) LAV 1

(R) LAV 1

(R) UR1

(R) UR1

(R) WC1

(R) WC1

(R) WC1

(R) WC1

(R) LAV1

(R) LAV1

(R) WC 1

(R) LAV 1

(R) SK1 (R) LAV1

(R) WC 1

(R) SH1

2 2

(R) SD-UP &DN

(R) S-UP &DN

(E ) 1

/2

" N G

(R) 3/4" CW-DN

(R) 3/4" HW-DN

(R) 1/2" RHW-DN

(R) 3/4" CW-DN

(R) 3/4" HW-DN

(R) 3" SD-

UP & DN

(R) 3" SD-

UP & DN

(R) 3" SD-

UP & DN

(R) 3" SD-UP & DN

(R) 4" S-

UP & DN

(R) 3" SD-

UP & DN

(R) 3" SD-

UP & DN

(R) 3" SD-

UP & DN

(R) 3" SD-

UP & DN

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

(R)FC-5

(E)FC-6

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-1 (E)FC-1

(E)FC-1(E)FC-1

(E)FC-2

(E)FC-2

(R)FC-2

(R)FC-2 (E)FC-1 (E)FC-1 (E)FC-1

(E)FC-1

(R)FC-1 (E)FC-1 (E)FC-1 (E)FC-1 (E)FC-2

(E)FC-2(E)FC-1

(E)FC-1

(E)FC-1

(E)FC-2(E)FC-2

(E)FC-3 (E)FC-3

(E)FC-3(E)FC-3

(E)FC-3 (E)FC-3

(E ) C

D (E

) C D

(CAP)

(E ) C

D (E

) C D

(E ) C

D

(E ) C

D

(E ) C

D

(E ) C

D (E

) C D

(E ) C

D

(E ) C

D (E

) C D

(E ) C

D

(E ) C

D (E

) C D

(E ) C

D

(E ) C

D

(E) CD

(E) CD (E) CD

(E) CD

(E) CD

(E) CD

(E) CD

(E) CD

(E) CD(E) CD

(E) CD(E) CD

(CAP)

(CAP)

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

TOILET

C147

OFFICE

C146

TOILET

C148

OFFICE

A116

OFFICE

C137

COPIER

C139

MEN'S

TOILET

C139OFFICE

A117

OFFICE

C151

H.A.C.

C143

SOCIAL

WORKER

C141

PSY. OFFICE

C140

OFFICE

C138

GROUP

THERAPY

C137A

OFFICE

C136

REC.

THERAPY

OFFICE

C135

PSY. OFFICE

C134

OFFICE

C133

STAFF

RESTROOM

C132

STAIR

ST3C101

OFFICE

C103

OFFICE

C104 OFFICE

C105

ELECTRICAL

C101A

STAFF BREAK

ROOM

C114

PUBLIC

RESTROOM -

F

C115A OFFICE

C116

OFFICE

C117

OFFICE

C118

OFFICE

C119

OFFICE

C121

OFFICE

C122

OFFICE

C123

OFFICE

C124OFFICE

C125

OFFICE

C126

TEL

C127

STORAGE

C128

CORRIDOR

C129A

CORRIDOR

C145

CORRIDOR

C154

OFFICE

C111

OFFICE

C112

OFFICE

C107

OFFICE

C108

CONFERENCE

C109

OFFICE

C110

STAIR

ST7C101

STAIR

ST9C101

CORRIDOR

C142

OFFICE

C106

CORRIDOR

C120

OFFICE

C101

OFFICE

C102

OFFICE

C150

B A C

NOTES:

1. SEE SHEET PL001 FOR LEGEND AND ABBREVIATIONS.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0 SHALL

ESTABLISH THE INFRASTRUCTURE REQUIRED TO

EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION WORK

SHALL BE COORDINATED WITH OTHER ASSOCIATED

TRADES.

DEMOLITION NOTES:

1. ALL VERTICAL CW, HW, RHW, S, SD, & V RISERS SHALL

BE REMOVED

2. REMOVE ALL HOT WATER AND HOT WATER RECIRC

PIPING. REMOVE ALL VALVES, GAUGES ETC.

3. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF PIPING

IN FIELD BEFORE COMMENCMENT OF WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\R G

U

IL

\D oc um en ts \1

_B ro ck to n_ B0

5_ M ec h_

R

_R G

U

IL

.rv t

5/

/2

:0 1:

A

M

PD101.2

LEVEL 1 - PLUMBING DEMOLITION PLAN -

WING C

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC

1/8" = 1'-0"

AFL01 - LEVEL 1 - PLUMBING DEMOLITION PLAN - WING C 1 1/64" = 1'-0"

KEY PLAN - WING C

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 REMOVE PLUMBING FIXTURE AND

ASSOCIATED SANITARY, VENT AND

DOMESTIC WATER PIPING COMPLETE BACK

TO MAINS. REMOVE ASSOCIATED HANGERS,

CARRIERS,…

This is the start of the file's text. The full file is on GovTribe.