36C24121R0163 0012.pdf
PDF 281 KB Posted
- Solicitation number
- 36C24121R0163
About this file
This document is an amendment to a solicitation for a Mental Health Outpatient Renovation project at the Brockton, Massachusetts Veterans Affairs Medical Center. The amendment provides responses to bidders' questions to clarify project details. Required renovations include removing and replacing fan coil units, convectors, and finned-tube radiation with new controls integrated into the existing building automation system. The solicitation requests bids be submitted by March 16, 2023 for award of a contract to renovate approximately 90,000 square feet of clinical space. Funding is available for this project and the intent is to award a contract to the best value bidder in accordance with FAR.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
523A5-19-305
Department of Veterans Affairs VAMC Bedford
200 Springs Road Bedford MA 01730
Department of Veterans Affairs VAMC Bedford
200 Springs Road Bedford MA 01730
To all Offerors/Bidders
36C24121R0163
06-15-2023
X
X X
See CONTINUATION Page
X 1
The purpose of this amendment (12) is to publish RFI questions and answers for questions 15, 16, and 17 All RFIs and proposals should be sent to the CS Scott Doucette; scott.doucette@va.gov
RFI Questions Submitted with Answers 36C24121R0163
Amendment 0010
523A5-19-305 BLDG 5 MH Outpatient Renovation Brockton, MA
VAMC
Question# 1 Is COVID Vaccination required to work on this project? What are the facility COVID requirements?
Answer:
1. COVID Vaccination is not required in order to work in the hospital spaces on this project.
2. Currently, any personnel who will be entering the active hospital spaces are required to perform a daily screening
3. Currently, any transit through areas where human interaction can take place requires masking. Masking is not required
4. Attached is the VHA Covid-19 Operational Plan (VHA COVID-19 Operational Plan 1-27-2023) as an additional resource
Question# 2 Who should we send the solicitation proposal attachments to and when are they due? When this project was amended the forms were never updated.
Answer:
1. All RFI’s should be sent to the Contract Specialist Scott Doucette scott.doucette@va.gov/ and the Contracting Officer Stephen Slaby Stephen.slaby@va.gov.
2. All proposals are due by March 16 2023 NLT 2:00 PM EST
3. Updated Submission Information and PPQ form is attached.
Question# 3 Can you provide the Site Visit Sign-in sheet from the site visit held on Thursday February 9, 2023?
Answer: Yes, The sign in sheet will be added as an attachment to amendment 0007 labeled “S04 - Site Visit Sign In Sheet”
Question# 4 Are we required to review, sign and submit the previous amendments?
Answer: Yes, they can be found on the contract opportunities solicitation web site posting.
Question# 5 Who currently provides maintenance/ inspections for the VAMC Brockton Campus?
Answer:
Currently the PACs System is maintained by Redhawk/ADT or Signet/Encore.
Question# 6 mailto:scott.doucette@va.gov/ mailto:Stephen.slaby@va.gov
What is the current PACS System in Brockton MA Campus?.
The system is Hirsch Velocity Identiv.
Question# 7 What is the series / model of the existing PACS Head End?
The model number is Hirsch Velocity Identiv 3.7 SP3.
Question# 8 Is there currently a Paging System? What is the Model number?
Yes, current paging system is TOA 900 Series II. It is an analog system with dual feeds, one all zones feed and one addressable feed through the telephone system (NEC SV8500), primary connection from the Operators Suite, Building 3 to main telephone room in Building 3 basement. Each building has an amplifier that is connected back to the main head end equipment in Building 3. This information does not remove the Contractor requirement to confirm any necessary information and submit for approval any equipment/materials for this project prior to ordering materials..
Question# 9 Drawing E-001 calls for Aiphone AX Series Intercom System, this series is reaching its EOL, is there an Alternative Series you prefer?
This system is an open spec; any equal alternate manufacturer/model is acceptable. This information does not remove the Contractor requirement to confirm any necessary information and submit for approval any equipment/materials for this project prior to ordering materials.
Question# 10 Will the VA OIT Team provide Network for all systems?
It is anticipated that VA OIT will provide necessary network for all systems with the exception of Fire Alarm (separate system), PACs, and BMS. For PACs OIT will provide network to the Hirsch panel but it is the responsibility of the Contractor to provide a connection to each individual device and interconnection to the fire alarm. For BMS the network is provided to the panel, but will not provide connection to each individual device that is the responsibility of the Contractor.
Question# 11 What are the requirements determined for existing Exacqvision NVR? Does the existing NVR require hard drives add cameras?
Network Video Recorders (NVRs) to be hybrids that incorporate both network (IP) and integrated existing (analog) cameras. They should be expandable NVRs each with 54+ TB of usable storage (expandable to 120TB). The system has advanced line Smart-UPS (Uninterruptable Power Supply) power protection.
Question# 12 What are the Model Numbers of existing NVR’s?
Tyco Z-Series 4U; exacq A-Series 2U (IPS-6000-R2). This information does not remove the Contractor requirement to confirm any necessary information and submit for approval any equipment/materials for this project prior to ordering materials.
Question# 13 What are the recording requirements for Retention , fps, how many days storage, Resolution?
Recordings shall be retained for 30 days; 30 ips for 720 x 240.
Question# 14
• Demo Work: (Drawings MD101.1, MD101.2, MD102.1, MD102.2, MD111.1, MD111.2, MD112.1, and MD112.2)
• Removing FCU and Convectors - No information on the existing controls serving this equipment.
• Are we removing/capping pneumatic controls or are we removing all DDC controls & associated wiring?
• Cost Impact for this work – field survey will be required.
• New Work: (Drawings MH100.2-1, MH100-2-2, MH101.1, MH101.2, MH102.1, MH102.2, , MP111.1, MP111.2, MP112.1, MP112.2)
• Existing FCU and Convectors – No information on the existing controls serving this equipment.
• Existing FCU’s - do the existing FCU’s have existing DDC controls? If not, we’ll need to include in our price.
• New Fin tube radiation – are we just replacing the control valves and connecting to the existing ddc controllers or do we need to provide all new controllers.
• Cost Impact for this work – field survey will be required.
This is a very old building with a mix match of controls. The controls for the existing FTR are self-contained control valves and electric actuated control valves.
Existing FCU are DDC control with electric actuation.
Demo Work: Field survey work is required per the contract documents to determine the extent of the work (including, but not limited to the existing controls serving fan coil unit and convectors). New Work: Provide new controllers. Provide a “B-ASC” for each existing fan coil unit as specified (23 09 23). There are approximately ninety (90) existing fan coil units in the building on Level 1 and Level 2 that require replacement controllers. The B-ASC shall control both existing cooling only 2-pipe fan coil units as well finned-tube radiation control valve within the same thermal zone. A single temperature sensor shall control both zone cooling and zone heating functions. All controls furnished must seamlessly integrate with the existing Siemens BAS. All programming and controls associated with both the new and existing control systems shall provide a fully integrated control system.
Question# 15 Question: Will there be a follow-up posting with any new RFP submission docs or bid requirements, etc. or are we redating our most recent prior submission ?
Answer: All RFP submission docs are posted to Contract Opportunities
Question#16 Question: I suspect I’ll be ordering a new bid bond and at the very least submitting an updated tech pack with a new schedule ?
Answer:
4. Answer: Bid bonds must be current and meet requirements at time of offer
Question# 17 Question: I have been asked to inquire as to whether this project is funded or if the government intends to award only after funding is available.
Answer: Funding is available for this project. The Government intends to award a contract to one offeror deemed responsible in accordance with Federal Acquisition Regulation (FAR) whose proposal conforms to the RFP's requirements and are judged to represent the Best Value to the Government.