S06 523A5-19-305-MD101-2.pdf

PDF 403 KB Posted

Attached to
Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305
Solicitation number
36C24121R0163
Issued by

About this file

This document includes a mechanical demolition plan and related federal contract opportunity for HVAC system renovations. The demolition plan outlines the planned removal and replacement of ductwork, fans, valves, and other HVAC components across multiple rooms in Building 5 of a Veterans Affairs outpatient mental health facility in Brockton, Massachusetts. Project 523A5-19-305 will support upgrading the facility's HVAC infrastructure to current standards in accordance with the phasing, sequencing, and coordination requirements specified. The related solicitation seeks bids for the mechanical demolition and installation work associated with the renovation of the mental health outpatient facility under opportunity number 36C24121R0163, issued by the Department of Veterans Affairs Veterans Health Administration VISN 1.

View the file

Other files

File Type Posted
36C24121R0163 0012.pdf PDF
36C24121R0163 0011.docx DOCX document
36C24121R0163 0010.docx DOCX document
36C24121R0163 0009.pdf PDF
36C24121R0163 0008.docx DOCX document
S04 - Site Visit Sign In Sheet 2-9-2023.pdf PDF
S06 General Decision Number MA20230012 1-27-2023.pdf PDF
36C24121R0163 0007.docx DOCX document
S06 Limitations on Subcontracting Certificate of Compliance 11-2022.pdf PDF
VHA COVID-19 Operational Plan 1-27-2023 (1).pdf PDF
36C24121R0163 0006.pdf PDF
S02 MA20230012.pdf PDF
36C24121R0163 0005.pdf PDF
36C24121R0163 0004.pdf PDF
S06 36C24121R0163 0003.docx DOCX document
S06 w7-r Sanitary - Profiles - Sewers.pdf PDF
S06 523A5-19-305-MD111-1.pdf PDF
S06 523A5-19-305-EP652.pdf PDF
S06 220927 19101 ADDENDUM 01_R5.docx DOCX document
S06 VA Brockton and Jamaica Plain Dust and Soil Rpt _FINAL 021716.pdf PDF
S06 Sommerville High School Drawings Renovation 1-23-18 - Room Number Marku....pdf PDF
S06 w4-r Sanitary - Location Plan - Sanitary-Sewer-Water.pdf PDF
36C24121R0163 0002.docx DOCX document
S02 General Decision Number MA20220012 09-02-2022.pdf PDF
S02 General Decision Number MA20220012 08122022.txt TXT text file
36C24121R0163 0001.docx DOCX document
S04 Sign In Sheet B5 MH Outpatient.pdf PDF
S02 36C24121R0163 Final.docx DOCX document
36C24121R0163.docx DOCX document
523A5-19-305 - B5 Outpatient MH Renovation 100 Percent Final Bid Documents - SPECS.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 1_STAMPED_210514_19101.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 2_STAMPED_210514_19101.pdf PDF
S02 SSJ - B5 MH Outpatient_R1SIGNED PA-DW.pdf PDF
EMR FORM.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B A C

(R)FC-2

(R)FC-2 (E)FC-1 (E)FC-1 (E)FC-1

(E)FC-2 (E)FC-2

(E)FC-1 (E)FC-1

(E)FC-1(E)FC-1

(E)FC-1 (E)FC-1

(E)FC-1(E)FC-1

(R)FC-5 (E)FC-6

(E)FC-1

(R)FC-1

(E)FC-3 (E)FC-3

(E)FC-3(E)FC-3

(E)FC-3 (E)FC-3

(E)FC-1 (E)FC-1 (E)FC-1 (E)FC-2

(E)FC-2(E)FC-1(E)FC-1(E)FC-1

(E)FC-2(E)FC-2

(E)10"x6" SA(E)14"x8" SA

(E )1

6" x8

SA

(E)14"x8" SA

(E)12"x6" SA

(E)28"x13" SA

(E)12"x10" EA

(E)12"x6" EA

EJ

EI

EG.1

EG

EF

EE

ED

EC.9

EA

EB

EC

E17 E18

E19 E20

E20.5 E21.5 E22.5 E23.5

EH

E26 E27

E.9

E25

E24E23E22E21

20.4 21.3 21.9 22.9

C'

B'

A'

L*

K*

(E) 14x14

EA UP.

(E)18"x10" EA

(E)8"x6" EA

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

STAIR

ST7C101

CONFERENCE

C109

OFFICE

C110

OFFICE

C111

OFFICE

C108

OFFICE

C107

OFFICE

C112

OFFICE

C101 OFFICE

C102

OFFICE

C103

OFFICE

C104

OFFICE

C105

OFFICE

C106

OFFICE

C151

OFFICE

C150

OFFICE

C148

CORRIDOR

C129A

STAIR

ST3C101

H.A.C.

C143

STAFF

RESTROOM

C132

SOCIAL

WORKER

C141

OFFICE

C133

PSY. OFFICE

C134

PSY. OFFICE

C140

OFFICE

C139

REC.

THERAPY

OFFICE

C135

OFFICE

C136

OFFICE

C138

OFFICE

C137B

OFFICE

C137C

GROUP

THERAPY

C137A

STAIR

ST9C101

OFFICE

C119

OFFICE

C118

OFFICE

C117

OFFICE

C116

OFFICE

C124

OFFICE

C123

OFFICE

C122

OFFICE

C121

CORRIDOR

C120

OFFICE

C126

OFFICE

C125

STAFF BREAK

ROOM

C114

PUBLIC

RESTROOM -

F C115A

OFFICE

C146

TOILET

C148

TOILET

C147

NOTES:

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0

SHALL ESTABLISH THE INFRASTRUCTURE REQUIRED

TO EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION

WORK SHALL BE COORDINATED WITH OTHER

ASSOCIATED TRADES.

3. COORDINATE ALL DEMOLITION WITH ASSOCIATED

PHASING PLAN. THE INTENT OF THIS PROJECT IS TO

MAINTAIN OPERATION IN ALL AREAS OUTSIDE OF THE

DESIGNATED PHASE DELINEATION, REFER TO GI003

FOR CONSTRUCTION SEQUENCE.

4. THE MECHANICAL CONTRACTOR SHALL CLEAN,

INSPECT AND REPAIR ALL RE-USED DUCTWORK,

DAMPERS, MECHANICAL COMPONENTS AND ANY

OTHER ITEM(S) NECESSARY FOR A COMPLETE AND

PROPER OPERATING SYSTEM.

5. REFER TO GENERAL NOTES 14, 42 & 43 FOR

FIRESTOPPING REQUIREMENTS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\k be rry \D oc um en ts

\1

_B ro ck to n_

B0 5_

M ec h_ R

_k be rry sm rti nc

.c om

.rv t

9/

/2

:3 8:

A

M

MD101.2

LEVEL 1 - HVAC DEMOLITION PLAN - WING C BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC BGG

1/64" = 1'-0"

KEY PLAN - WING C

1/8" = 1'-0"

AFL01 - LEVEL 1 - HVAC DUCTWORK DEMOLITION PLAN - WING C F8

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 REMOVE FAN COIL UNIT, DUCTWORK, VALVES, CONTROL WIRING,

COMPONENTS AND SUPPORTS IN ITS ENTIRETY.

Revisions: Date:

ADDENDUM 1 09-27-2022

5-14-21

File details come from the government source that posted it. Updated .