523A5-19-305-100 Percent FINAL BD DWGS VOL 1_STAMPED_210514_19101.pdf

PDF 41 MB Posted

Attached to
Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305
Solicitation number
36C24121R0163
Issued by

About this file

This document provides details for a federal contract solicitation. The solicitation number is 36C24121R0163 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for mental health outpatient renovation services at project number 52A5-19-305. The opportunity type is a solicitation for the Z1DA--Mental Health Outpatient Renovation B5 Project. The solicitation seeks construction services to renovate outpatient mental health facilities. The response due date and anticipated award date are not specified.

View the file

Other files

File Type Posted
36C24121R0163 0012.pdf PDF
36C24121R0163 0011.docx DOCX document
36C24121R0163 0010.docx DOCX document
36C24121R0163 0009.pdf PDF
36C24121R0163 0008.docx DOCX document
S04 - Site Visit Sign In Sheet 2-9-2023.pdf PDF
S06 General Decision Number MA20230012 1-27-2023.pdf PDF
36C24121R0163 0007.docx DOCX document
S06 Limitations on Subcontracting Certificate of Compliance 11-2022.pdf PDF
VHA COVID-19 Operational Plan 1-27-2023 (1).pdf PDF
36C24121R0163 0006.pdf PDF
S02 MA20230012.pdf PDF
36C24121R0163 0005.pdf PDF
36C24121R0163 0004.pdf PDF
S06 36C24121R0163 0003.docx DOCX document
S06 w7-r Sanitary - Profiles - Sewers.pdf PDF
S06 523A5-19-305-MD111-1.pdf PDF
S06 523A5-19-305-EP652.pdf PDF
S06 220927 19101 ADDENDUM 01_R5.docx DOCX document
S06 523A5-19-305-MD101-2.pdf PDF
S06 VA Brockton and Jamaica Plain Dust and Soil Rpt _FINAL 021716.pdf PDF
S06 Sommerville High School Drawings Renovation 1-23-18 - Room Number Marku....pdf PDF
S06 w4-r Sanitary - Location Plan - Sanitary-Sewer-Water.pdf PDF
36C24121R0163 0002.docx DOCX document
S02 General Decision Number MA20220012 09-02-2022.pdf PDF
S02 General Decision Number MA20220012 08122022.txt TXT text file
36C24121R0163 0001.docx DOCX document
S04 Sign In Sheet B5 MH Outpatient.pdf PDF
S02 36C24121R0163 Final.docx DOCX document
36C24121R0163.docx DOCX document
523A5-19-305 - B5 Outpatient MH Renovation 100 Percent Final Bid Documents - SPECS.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 2_STAMPED_210514_19101.pdf PDF
S02 SSJ - B5 MH Outpatient_R1SIGNED PA-DW.pdf PDF
EMR FORM.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS:

AB ANCHOR BOLT

A/C AIR CONDITIONING

ACCU AIR CONDITIONING CONDENSER UNIT

ACPLAS ACCOUSTICAL PLASTER

ACT ACOUSTIC CEILING TILE

AFF ABOVE FINISH FLOOR

AGG AGGREGATE

ALT ALTERNATE

AP ACCESS PANEL

APROX APPROXIMATE

ARCH ARCHITECTURAL

BCX BOTTOM CORD EXTENSION

BD BOARD

BIT BITUMINOUS

BLDG BUILDING

BLP BORROWED LIGHT PANEL

BO BOTTOM OF

BOF BOTTOM OF FOOTING

BOS BOTTOM OF STEEL

BOT BOTTOM

BRDG BRIDGING

BRG BEARING

BS BOTH SIDES

BSE BRICK SHELF ELEVATION

C CHANNEL

CB CATCH BASIN / CHALKBOARD

CEM BD CEMENTITIOUS BACKER BOARD

CFM CUBIC FEET PER MINUTE

CIP CAST IN PLACE

CJ CONTROL JOINT / CONSTRUCTION JOINT

CL CENTER LINE

CLL CONTRACT LIMIT LINE

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

CT CERAMIC TILE

CUH CABINET UNIT HEATER

D DIAMETER

DBL DOUBLE

DF DRINKING FOUNTAIN

DL DEAD LOAD

DR DISPLAY RAIL

DTL DETAIL

DW DISHWASHER

DWG DRAWING

DWV DRAIN/WASTE/VENT

EA EACH

EF EXHAUST FAN / EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

EOP EDGE OF PAVEMENT

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EQ EQUAL

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FB FLAT BAR

FBO FURNISHED BY OTHERS

FCO FLOOR CLEA-OUT

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR / FAR FACE

FFE FINISH FLOOR ELEVATION

FO FRAMED OPENING

FRP FIBER REINFORCED PLASTIC

FS FAR SIDE

FTG FOOTING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GDT GYPSUM DROP-IN TILE

GV GRAVITY VENT

GWB GYPSUM WALL BOARD

H HORIZONTAL

HC HANDICAPPED / HOLLOW CORE

HORIZ HORIZONTAL

HM HOLLOW METAL

HRU HEAT RECOVERY UNIT

H&V HEATING AND VENTILATING

HVAC HEATING, VENTILATING AND AIR CONDITIONING

I INCLUDED ANGLE

ID INSIDE DIAMETER

IF INSIDE FACE

IJ ISOLATION JOINT

IMP IMPACT RESISTANT

INS INSULATED

INV INVERT

JS JOINT SUBSTITUTE

K KIPS

L ANGLE / LENGTH

LF LEFT

LINO SHEET LINOLEUM

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LP LIGHTING PANEL / LIQUIFIED PROPANE

MAX MAXIMUM

MB MARKER BOARD

MDO MEDIUM DENSITY OVERLAY

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MR MOISTURE-RESISTANT

MUA MAKE-UP AIR

N NOSING

NCB NEW CATCH BASIN

NDMH NEW DRAIN MANHOLE

NFM NEW FORCE MAIN

NIC NOT IN CONTRACT

NS NEAR SIDE

NSD NEW STORM DRAIN LINE

NSS NEW SANITARY SEWER LINE

NTS NOT TO SCALE

NW NEW WATER LINE

OC ON CENTER

OF OUTSIDE FACE

OH OVERHEAD

PA PUBLIC ADDRESS

PAF POWER-ACTUATED FASTENER

PDU POOL DEHUMIDIFICATION UNIT

PL PLATE / PROPERTY LINE

PLAM PLASTIC LAMINATE

PLF POUNDS PER LINEAR FOOT

PP POWER PANEL

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE-TREATED

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

R RISER / RADIUS

RB RESILIENT BASE

RD ROOF DRAIN

REINF REINFORCED

REQ'D REQUIRED

RT RIGHT

RO ROUGH OPENING

ROW RIGHT OF WAY

RR RUB-RAIL

RTU ROOF TOP UNIT (HVAC)

SACT SUSPENDED ACOUSTIC TILE CEILING

SC SOLID CORE

SF SQUARE FOOT / SUPPLY FAN

SFRM SPRAYED FIRE-RESISTIVE MATERIAL

SHT SHEET

SIM SIMILAR

SK SHEAR KEY

SN SANITARY NAPKIN (DISPENSER)

SP SPECIAL

SS STAINLESS STEEL

STA STATION

STL STEEL

STRUC STRUCTURAL

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

TBM TEMPORARY BENCHMARK

TCE TOP CHORD EXTENSION

TJ TIE JOIST

TO TOP OF

TOC TOP OF CONCRETE

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PIER

TOS TOP OF STEEL

TOW TOP OF WALL

TP TOILET PAPER (DISPENSER) / TEST PIT

TS TUBE STEEL

TYP TYPICAL

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

V VENT PIPE / VERTICAL

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VP VISION PANEL

VTR VENT THROUGH THE ROOF

W/ WITH

WC WATER CLOSET

WD WOOD

WF WIDE FLANGE

WH WATER HEATER

W/O WITH OUT

WP WORKING POINT

WS WEB STIFFENER

WWF WELDED WIRE FABRIC

KEY NOTE

A

MAIN

LOBBY

A402

COLUMN BUBBLE AND

CENTER LINE

PARTITION TAG

DOOR TAG

ROOM TAG

EQUIPMENT/ACCESSORY TAG

A00

AE000

A00

AE000

A00

AE000

A00

AE000

INTERIOR ELEVATION

EXTERIOR ELEVATION

DATUM REFERENCE

BUILDING SECTION

WALL SECTION

DETAIL

A0

D0

C0

B0AE000

WINDOW TAG

SYMBOL LEGEND:

CUT DIRECTION

SECTION NUMBER

SHEET NUMBER

CUT DIRECTION

SECTION NUMBER

SHEET NUMBER

SECTION NUMBER

AREA OF DETAIL

SHEET NUMBER

ELEVATION DIRECTION

SECTION NUMBER

SHEET NUMBER

ELEVATION NUMBER/

DIRECTION

SHEET NUMBER

DOOR NUMBER

ROOM NAME

ROOM NUMBER

REVISION

REVISION NUMBER#

REVISION TAG

AREA OF REVISION

EXISTING COLUMN BUBBLE AND

CENTER LINEA

XXX SF ROOM AREA (WHEN APPLICABLE)

LOCATION MAP:

5 74

46 44

47 49

R A M P

E N C L O S E D W A L K

E N C L O S E D W A L K

E N C L O S

E D

W

A L K

VA

TENNINIS

COURT

CAMPUS MAP:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\J An de rs on \D oc um en ts

\1

_B ro ck to n_

B0 5_

Ar ch

_R

_J An de rs on .rv t 5/

/2

2:

:0

PM

GI001A

COVER SHEET VOLUME 1 BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 RJC LGC/EVR

BUILDING 5 OUTPATIENT MENTAL HEALTH RENOVATION

PROJECT LOCATIONDRAWING LIST

Sheet Number Sheet Name

15 - ELECTRICAL

E-001 LEGEND AND GENERAL NOTES

ED100.1 LEVEL 0 DEMOLITION PLAN - WINGS A AND B

ED100.2 LEVEL 0 DEMOLITION PLAN - WING C

ED101.1 LEVEL 1 DEMOLITION PLAN - WINGS A AND B

ED101.2 LEVEL 1 DEMOLITION PLAN - WING C

ED102.1 LEVEL 2 DEMOLITION PLAN - WINGS A AND B

ED102.2 LEVEL 2 DEMOLITION PLAN - WING C

ED103 ROOF AND PENTHOUSE DEMOLITION PLAN

EP100.1 LEVEL 0 POWER PLAN - WINGS A AND B

EP100.2 LEVEL 0 POWER PLAN - WING C

EP101.1 LEVEL 1 POWER PLAN - WINGS A AND B

EP101.2 LEVEL 1 POWER PLAN - WING C

EP102.1 LEVEL 2 POWER PLAN - WINGS A AND B

EP102.2 LEVEL 2 POWER PLAN - WING C

EP103 ROOF AND PENTHOUSE POWER PLAN

EP401 ENLARGED POWER PLANS

EP601 PANEL SCHEDULES

EP602 PANEL SCHEDULES

EP651 DEMOLITION ONE-LINE DIAGRAM

EP652 NEW WORK ONE LINE DIAGRAM

EL100.1 LEVEL 0 LIGHTING PLAN - WINGS A AND B

EL100.2 LEVEL 0 LIGHTING PLAN - WING C

EL101.1 LEVEL 1 LIGHTING PLAN - WINGS A AND B

EL101.2 LEVEL 1 LIGHTING PLAN - WING C

EL102.1 LEVEL 2 LIGHTING PLAN - WINGS A AND B

EL102.2 LEVEL 2 LIGHTING PLAN - WING C

EL601 LIGHT FIXTURE SCHEDULE AND DETAILS

EL602 LIGHTING CONTROL DETAILS

EL603 LIGHTING CONTROL DETAILS

EY100.1 LEVEL 0 SYSTEMS PLAN - WINGS A AND B

EY100.2 LEVEL 0 SYSTEMS PLAN - WING C

EY101.1 LEVEL 1 SYSTEMS PLAN - WINGS A AND B

EY101.2 LEVEL 1 SYSTEMS PLAN - WING C

EY102.1 LEVEL 2 SYSTEMS PLAN - WINGS A AND B

EY102.2 LEVEL 2 SYSTEMS PLAN - WING C

EY651 RISER DIAGRAMS

E-601 SCHEDULES

E-701 DETAILS

DRAWING LIST

Sheet Number Sheet Name

11 - GENERAL

GI001B COVER SHEET VOLUME 2

12 - PLUMBING

P-001 PLUMBING LEGEND AND ABBREVIATIONS

PD100.1-1 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WINGS

A AND B

PD100.1-2 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WING C

PD100.2-1 LEVEL 0 - PLUMBING DEMOLITION PLAN - WINGS A AND B

PD100.2-2 LEVEL 0 - PLUMBING DEMOLITION PLAN - WING C

PD101.1 LEVEL 1 - PLUMBING DEMOLITION PLAN - WINGS A AND B

PD101.2 LEVEL 1 - PLUMBING DEMOLITION PLAN - WING C

PD102.1 LEVEL 2 - PLUMBING DEMOLITION PLAN - WINGS A AND B

PD102.2 LEVEL 2 - PLUMBING DEMOLITION PLAN - WING C

PD103.1 PLUMBING ROOF AND PENTHOUSE DEMOLITION PLAN

PL100.1-1 PIPE BASEMENT - PLUMBING DWV PLAN - WINGS A AND B

PL100.1-2 PIPE BASEMENT - PLUMBING DWV PLAN - WING C

PL100.2-1 LEVEL 0 - PLUMBING DWV PLAN - WINGS A AND B

PL100.2-2 LEVEL 0 - PLUMBING DWV PLAN - WING C

PL101.1 LEVEL 1 - PLUMBING DWV PLAN - WINGS A AND B

PL101.2 LEVEL 1 - PLUMBING DWV PLAN - WING C

PL102.1 LEVEL 2 - PLUMBING DWV PLAN - WINGS A AND B

PL102.2 LEVEL 2 - PLUMBING DWV PLAN - WING C

PL103.1 PLUMBING ROOF AND PENTHOUSE PLAN

PP100.1-1 PIPE BASEMENT - PLUMBING SUPPLY PIPING PLAN -

WINGS A AND B

PP100.2-1 LEVEL 0 - PLUMBING SUPPLY PIPING PLAN - WINGS A

AND B

PP100.2-2 LEVEL 0 - PLUMBING SUPPLY PIPING - WING C

PP101.1 LEVEL 1 - PLUMBING SUPPLY PIPING - WINGS A AND B

PP101.2 LEVEL 1 - PLUMBING SUPPLY PIPING - WING C

PP102.1 LEVEL 2 - PLUMBING SUPPLY PIPING - WINGS A AND B

PP102.2 LEVEL 2 - PLUMBING SUPPLY PIPING - WING C

PP103.1 PLUMBING ROOF AND PENTHOUSE PLAN

PL401 PLUMBING PART PLANS

PP401 PLUMBING PART PLANS

P501 PLUMBING DETAILS

P502 PLUMBING DETAILS

P601 PLUMBING SCHEDULES

14 - MECHANICAL

M-001 MECHANICAL LEGEND AND ABBREVIATIONS

M-002 MECHANICAL GENERAL NOTES

MD100.1-1 PIPE BASEMENT - HVAC DEMOLITION PLAN - WINGS A

AND B

MD100.1-2 PIPE BASEMENT - HVAC DEMOLITION PLAN - WING C

MD100.2-1 LEVEL 0 - HVAC DEMOLITION PLAN - WINGS A AND B

MD100.2-2 LEVEL 0 - HVAC DEMOLITION PLAN - WING C

MD101.1 LEVEL 1 - HVAC DEMOLITION PLAN - WINGS A AND B

MD101.2 LEVEL 1 - HVAC DEMOLITION PLAN - WING C

MD102.1 LEVEL 2 - HVAC DEMOLITION PLAN - WINGS A AND B

MD102.2 LEVEL 2 - HVAC DEMOLITION PLAN - WING C

MD111.1 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WINGS A

AND B

MD111.2 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WING C

MD112.1 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WINGS A

AND B

MD112.2 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WING C

MH100.1-1 PIPE BASEMENT - HVAC PLAN - WINGS A AND B

MH100.1-2 PIPE BASEMENT - HVAC PLAN - WING C

MH100.2-1 LEVEL 0 - HVAC PLAN - WINGS A AND B

MH100.2-2 LEVEL 0 - HVAC PLAN - WING C

MH101.1 LEVEL 1 - HVAC PLAN - WINGS A AND B

MH101.2 LEVEL 1 - HVAC PLAN - WING C

MH102.1 LEVEL 2 - HVAC PLAN - WINGS A AND B

MH102.2 LEVEL 2 - HVAC PLAN - WING C

MH130 MECHANICAL ROOF AND PENTHOUSE PLAN

MP111.1 LEVEL 1 - HVAC PIPING PLAN - WINGS A AND B

MP111.2 LEVEL 1 - HVAC PIPING PLAN - WING C

MP112.1 LEVEL 2 - HVAC PIPING PLAN - WINGS A AND B

MP112.2 LEVEL 2 - HVAC PIPING PLAN - WING C

M-501 MECHANICAL DETAILS

M-502 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-504 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULES

M-602 MECHANICAL SCHEDULES

M-603 MECHANICAL SCHEDULES

M-604 MECHANICAL SCHEDULES

M-651 MECHANICAL SEQUENCE OF OPERATIONS

M-652 MECHANICAL SEQUENCE OF OPERATIONS

DRAWING LIST

Sheet Number Sheet Name

01 - GENERAL

GI001A COVER SHEET VOLUME 1

GI002 MOUNTING HEIGHTS, WALL AND ROOF TYPES, TOP OF

WALL DETAILS

GI003 LEVEL 0 - PHASE 0 FLOOR PLAN AND PHASING NOTES

GI004 LEVEL 0, 1, AND 2 - PHASE B-1 FLOOR PLANS

GI005 LEVEL 0, 1, AND 2 - PHASE B-2 FLOOR PLANS

GI006 LEVEL 0, 1, AND 2 - PHASE C-1 FLOOR PLANS

GI007 LEVEL 0, 1, AND 2 - PHASE C-2 FLOOR PLANS

GI008 LEVEL 0, 1, AND 2 - PHASE A-1 FLOOR PLANS

GI009 LEVEL 0, 1, AND 2 - PHASE A-2 FLOOR PLANS

GI010 TEMPORARY FACILITIES AND SITE PLAN

GI011 TEMPORARY SITE DETAILS

02 - HAZARDOUS MATERIALS

HA100-1 PIPE BASEMENT ABATEMENT PLAN

HA100-2 LEVEL 0 - ABATEMENT PLAN

HA101 LEVEL 1 - ABATEMENT PLAN

HA102 LEVEL 2 - ABATEMENT PLAN

HA130 ROOF - ABATEMENT PLAN

06 - ARCHITECTURAL

A000 CODE SUMMARY

A000-1 PIPE BASEMENT - CODE COMPLIANCE PLAN

A000-2 LEVEL 0 - CODE COMPLIANCE PLAN

A001 LEVEL 1 - CODE COMPLIANCE PLAN

A002 LEVEL 2 - CODE COMPLIANCE PLAN

A003 ROOF - CODE COMPLIANCE PLAN

AD100-1 PIPE BASEMENT DEMOLITION PLAN

AD100-2 LEVEL 0 - DEMOLITION PLAN

AD101 LEVEL 1 - DEMOLITION PLAN

AD102 LEVEL 2 - DEMOLITION PLAN

AD130 ROOF - DEMOLITION PLAN

A-100-1 PIPE BASEMENT - FACILITY PLAN

A-100-2 LEVEL 0 - FACILITY PLAN

A-101 LEVEL 1 - FACILITY PLAN

A-102 LEVEL 2 - FACILITY PLAN

AE100.1-1 PIPE BASEMENT FLOOR PLAN - WINGS A AND B

AE100.1-2 LEVEL 0 - FLOOR PLAN - WINGS A AND B

AE100.2-1 PIPE BASEMENT FLOOR PLAN - WING C

AE100.2-2 LEVEL 0 - FLOOR PLAN - WING C

AE101.1 LEVEL 1 - FLOOR PLAN - WINGS A AND B

AE101.2 LEVEL 1 - FLOOR PLAN WING C

AE102.1 LEVEL 2 - FLOOR PLAN - WINGS A AND B

AE102.2 LEVEL 2 - FLOOR PLAN - WING C

AE120.1 LEVEL 0 - REFLECTED CEILING PLAN - WINGS A AND B

AE120.2 LEVEL 0 - REFLECTED CEILING PLAN - WING C

AE121.1 LEVEL 1 - REFLECTED CEILING PLAN - WINGS A AND B

AE121.2 LEVEL 1 - REFLECTED CEILING PLAN - WING C

AE122.1 LEVEL 2 - REFLECTED CEILING PLAN - WINGS A AND B

AE122.2 LEVEL 2 - REFLECTED CEILING PLAN - WING C

AE130 ROOF AND PENTHOUSE PLAN

AE200 EXTERIOR ELEVATIONS

AE210 INTERIOR ELEVATIONS

AE211 INTERIOR ELEVATIONS

AE400 ENLARGED TOILET PLANS

AE401 ENLARGED PLANS

AE402 ENLARGED PLANS

AE500 DETAILS - BUILDING

AE501 DETAILS - ROOF

AE510 DETAILS - PLAN

AE520 DETAILS - CASEWORK

AE600 SCHEDULE - DOOR

AE601 DETAILS - DOOR

AE602 WINDOW TYPES AND DETAILS

07 - INTERIORS

ID100.1-2 LEVEL 0 - FINISH PLAN - WINGS A AND B

ID100.2-2 LEVEL 0 - FINISH PLAN - WING C

ID101.1 LEVEL 1 - FINISH PLAN - WINGS A AND B

ID101.2 LEVEL 1 - FINISH PLAN WING C

ID102.1 LEVEL 2 - FINISH PLAN - WINGS A AND B

ID102.2 LEVEL 2 - FINISH PLAN - WING C

ID600 PRODUCT INDEX SHEET

11 - FIRE PROTECTION

FP001 FIRE PROTECTION LEGEND AND ABBREVIATIONS

FP100.1 LEVEL 0 - FIRE PROTECTION PLAN - WINGS A AND B

FP100.2 LEVEL 0 - FIRE PROTECTION PLAN - WING C

FP101.1 LEVEL 1 - FIRE PROTECTION PLAN - WINGS A AND B

FP101.2 LEVEL 1 - FIRE PROTECTION PLAN - WING C

FP102.1 LEVEL 2 - FIRE PROTECTION PLAN - WINGS A AND B

FP102.2 LEVEL 2 - FIRE PROTECTION PLAN - WING C

FP501 FIRE PROTECTION DETAILS

VA BOSTON HEALTHCARE SYSTEM - BROCKTON CAMPUS

BROCKTON, MASSACHUSETTS

VOLUME 1

DRAWING LIST - VOLUME 1 DRAWING LIST - VOLUME 2 DRAWING LIST - VOLUME 2

Revisions: Date: 05-14-21

6" U

.N .O

U.

N.

O.

1'

- 6

" M

IN

U.

N.

O.

1'

- 0 " M

IN

TYPE STUD

SIZE

PART.

THICK. RATNG DESIGNSOUND ATTN

BLANKET

E3.1 3-5/8" 6-1/8" FULL

DEPTH

SEE SCHEDULE

BELOW FOR DIMENSION

FINISHED FLOOR

ACOUSTICAL SEALANT

(1) LAYER OF 5/8" GWB

SOUND ATTENUATION

BLANKET

(SEE SCHEDULE BELOW)

FINISHED CEILING (SEE RCP)

UNDERSIDE OF DECK

ABOVE

F1b

F3a

1-5/8"

3-5/8"

2-1/4"

4-7/8"

N/A

STC - X

LINE OF NEW OR

EXISTING PARTITION

OR SUBSTRATE

TYPE STUD

SIZE

PART.

THICK.

RATNG DESIGN

DEFLECTION TRACK

ACOUSTICAL SEALANT

SOUND ATTN

BLANKET

BRACE FRAMING TO

SUBSTRATE NOT TO

EXCEED 8'-0" O.C.

NONE

ROXUL

S3.1 3-5/8" 4-7/8"

S6.1

STUD

SIZE

PART.

THICK.

6" 7-1/4"

SOUND ATTN

BLANKET

FULL

DEPTH

FULL

DEPTH

SEE SCHEDULE

BELOW FOR DIMENSION

FINISHED FLOOR

ACOUSTICAL SEALANT

STEEL STUD FRAMING (SEE

SCHEDULE BELOW)

SOUND ATTENUATION

BLANKET

(SEE SCHEDULE BELOW)

FINISHED CEILING (SEE RCP)

DEFLECTION TRACK

UNDERSIDE OF DECK

ABOVE

(1) LAYER OF 5/8"

GWB AT EACH SIDE (IMPACT RESISTANT AT S3.2)

EXTEND 3" THICK SOUND

ATTENUATION BLANKETS 2'-0"

HORIZONTALLY EACH SIDE OF

PARTITIONS SCHEDULED TO

RECEIVE BLANKETS

E..

STUD - PARTITIONS

SCALE: 1 1/2" = 1'-0"

UL DESIGN U419

S..

STUD PARTITIONS

SCALE: 1 1/2" = 1'-0"

SEE PLAN FOR DIMENSION

F..

FURRED PARTITIONS

SCALE: 1 1/2" = 1'-0"

TYPE RATING

DESIGN

NOTESSTC

STC

STC

R1

ROOF TYPE

SCALE: 1 1/2" = 1'-0"

REINSTALLED

BALLAST

EPDM

MEMBRANE

R-33 ROOF DECK

INSULATION

EXISTING CONCRETE

DECKING AIR VAPOR

BARRIER

COVER BOARD

NOTE: INFILL OPENINGS IN EXISTING PARTITIONS WITH CONSTRUCTION TO MATCH

EXISTING CONSTRUCTION. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED

ACCESSORIES AND CASEWORK. CONFIRM THAT RATED WALLS EXTEND TO CEILING AND

THAT ALL PENETRATIONS ARE SEALED. INFILL IN RATED WALLS TO MATCH EXISTING

ADJACENT RATED CONSTRUCTION.

FINISHED FLOOR

ACOUSTICAL SEALANT

STEEL STUD FRAMING (SEE

SCHEDULE BELOW)

SOUND ATTENUATION

BLANKET

(SEE SCHEDULE BELOW)

FINISHED CEILING (SEE RCP)

DEFLECTION TRACK

(1) LAYER OF 5/8"

GWB AT EACH SIDE

EXTEND 3" THICK SOUND

ATTENUATION BLANKETS 2'-0"

HORIZONTALLY EACH SIDE OF

PARTITIONS SCHEDULED TO

RECEIVE BLANKETS

TO MATCH EXISTING

ADJACENT WALL

TYPE STUD

SIZE

PART.

THICK. RATNG DESIGNSOUND ATTN

BLANKET

E12 N/A 1'-1 5/8" FULL

DEPTH

E..

EXTERIOR

SCALE: 1 1/2" = 1'-0"

NOTE: INFILL OPENINGS IN EXISTING PARTITIONS WITH CONSTRUCTION TO MATCH

EXISTING CONSTRUCTION. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED

ACCESSORIES AND CASEWORK. CONFIRM THAT RATED WALLS EXTEND TO CEILING AND

THAT ALL PENETRATIONS ARE SEALED. INFILL IN RATED WALLS TO MATCH EXISTING

ADJACENT RATED CONSTRUCTION.

(1) LAYER OF 5/8"

GWB

TO MATCH EXISTING

ADJACENT WALL

MATCH EXISTING WALL CONSTRUCTION

CONCRETE

BRICK

INTERIOREXTERIOR

F1a 7/8" 1-1/2" N/ANONE

MATCH EXISTING WALL CONSTRUCTION

ACOUSTICAL SEALANT

UNDERSIDE OF DECK

ABOVE

ACOUSTICAL SEALANT

F3b 3-5/8" 4-7/8" N/ANONE

F0a N/A 5/8" N/ANONE

STUD

SIZE

PART.

THICK.

SOUND ATTN

BLANKET

FINISHED FLOOR

ACOUSTICAL SEALANT

STEEL STUD FRAMING (SEE

SCHEDULE BELOW)

SOUND ATTENUATION

BLANKET

(SEE SCHEDULE BELOW)

DEFLECTION TRACK

UNDERSIDE OF COUNTER

ABOVE

(1) LAYER OF 5/8" GWB

S..

STUD PARTITIONS

SCALE: 1 1/2" = 1'-0"

TYPE RATING

DESIGN

NOTESSTC

ACOUSTICAL SEALANT

S8.1 (2)3 5/8" 8-3/8" UL DESIGN U419 STCFULL

DEPTH

BELOW FOR DIMENSION

SEE SCHEDULE

(1) LAYER OF 1/2" PLYWOOD

S3.2 3-5/8" 4-7/8" FULL

DEPTH STC IMPACT RESISTANT GWB

B.

O

DI

SP

EN

SE

R

B.

O

DI

SP

EN

SE

R

B.

O

M

IR

RO

RM

AX

LIQUID SOAP

DISPENSER

(S. DISP.)

PAPER TOWEL DISP.

(PT. DISP. & PTD.)

MIRROR

3'

- 6

3'

- 6

3'

- 4

1' - 6"

2'

- 1

0"

1' - 0" 3' - 6"

3'

- 0

" M

AX

3' - 0" 6"

HC WATER

CLOSET

GRAB BARS AT

WATER CLOSET

GRAB BARS AT

WATER CLOSET

TOILET PAPER DISP. W/

SANITARY DISPOSAL. (FEMALE

TOILETS ONLY)

LAVATORY/MIRROR TYP. LAVATORY DISPENSERS/TYP.

TOILET RM. DEVICES

2'

- 0

MIN

1' - 3"

2'

- 1

0" M

AX

2'

- 5

" M

IN

3'

- 4

" M

AX

MIN

1' - 3"

CL

EA

R 2'

- 5

3'

- 6

4'

- 6

" 6'

- 8

B.

O

. R

EF

LE

CT

IN

G

SU

RF

AC

E

M

AX

T O

H

IG

HE

ST

O

PE

RA

TI

NG

P

AR

T

T.

O

. S

YR

IN

G

E

DR

OP

TY

P.

U

NO

TO

C

EN

TE

RL

IN

E O

F

CL

O

CK

U .N

.O

SHARPS/GLOVE DISP. CLOCK

READ

THIS

TOWEL BAR BABY CHANGING

STATION

STD. WALL

PHONE

STD. WALL PHONE

AT WORKSTATIONS

COAT HOOK/ROBE

HOOK

COAT RACK

SIGNAGE

3'

- 6

4'

- 6

4'

- 0

4'- 0"

R

O

BE

H O

OK

4'

- 6

5'

- 0

M

AX

R

IM

2'

- 1

0"

3'

- 4

M

IN

1'

- 6

3' - 4"

2' -9

" M

IN

3'

- 0

M

AX

1' - 6"

2'

- 1

0"FRONT SIDE

2' -9

" M

IN

3'

- 1

0"

9" M

IN

SHELVING

SECTION

3'

- 6

2'

- 6

2'

- 9

" M

IN

3'

- 0

" M

AX

3'

- 2

" M

IN

4'

- 0

" M

AX

2'

- 9

" M

IN

3'

- 0

" M

AX

1' - 6"

M

IN

SHOWER

CONTROL SIDE WALL

SHOWER

BACK WALL

1'

- 5

1'

- 7 " M

AX

RAMP AND STAIR

HANDRAILS

2'

- 1

0"

2'- 8"

BOTTOM OF FIRE

EXTINGUISHER

CABINET

CENTER OF

BRACKET

CONTINUOUS BLOCKING

IN WALLS AS REQUIRED

FIRE

EXTINGUISHER

CABINET

FIRE

EXTINGUISHER

3'- 0"

4'- 0"

CONTINUOUS BLOCKING IN

WALL AS REQUIRED

WHITE BOARD

EQ EQ

5'- 0"

CL

6"

CEILING

EXIT

4'- 0"

8'- 0"

6'- 0"

6"4'- 0"

CLOCK OR

INTERCOMTHERMOSTAT

INTERCOM

FIRE ANNUNCIATOR

PANEL

ROOM

SIGNAGE

NOTE: TYPICAL MOUNTING HEIGHTS U.N.O.

BATHROOM PARTITION

4" 5'

- 1 1"

CEILING

HEADRAIL

DOOR

SUPPORTING

PEDESTAL

PANEL UP

TO TOP BAR

2"

INFILL PANEL

NOTE: SEAL ALL OPENINGS, GAPS, PENETRATIONS, AND JOINTS IN

PARTITION TYPES AS FOLLOWS:

FIRE RATED PARTITIONS AND SMOKE BARRIERS: SEAL IN ACCORDANCE

WITH THE REQUIREMENTS SPECIFIED IN THE DIVISION 07 SPECIFICATION

SECTIONS FOR PENETRATION FIRESTOP SYSTEMS AND FIRE RESISTIVE

JOINT SYSTEMS. REFER TO CODE COMPLIANCE DRAWINGS FOR LOCATIONS

OF SMOKE BARRIERS.

PARTITIONS DESIGNED TO RESIST THE PASSAGE OF SMOKE: SEAL

COMPLETELY WITH ELASTOMERIC SEALANT. FOR THE LOCATION AND

EXTENT REFER TO CODE COMPLIANCE DRAWINGS.

OTHER LOCATIONS: SEAL AS INDICATED AND REQUIRED ELSEWHERE BY

THE CONTRACT DOCUMENTS.

FOR ALL NON-RATED PARTITIONS, CLOSE THE VOID BETWEEN PARTITION

AND UNDERSIDE OF FLOOR OR ROOF DECK WITH MINERAL WOOL (SAFING

INSULATION) AND PROVIDE 1/2" DEEP NON-SAG ACOUSTICAL SEALANT,

BEADED.

PARTITION SHEET GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\J An de rs on \D oc um en ts

\1

_B ro ck to n_

B0 5_

Ar ch

_R

_J An de rs on .rv t 5/

/2

2:

:2

PM

GI002

MOUNTING HEIGHTS, WALL AND ROOF

TYPES, TOP OF WALL DETAILS

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 RJC LGC/EVR

1/2" = 1'-0"

TYP. DOOR CLEARANCE F1

CONSTRUCTION SEQUENCE NOTES:

GENERAL:

1. THE OVERALL SCOPE OF WORK ASSOCIATED WITH THE RENOVATIONS TO BUILDING 5 IS

REQUIRED TO MAINTAIN ACCESS AND OPERATIONS THROUGHOUT THE DURATION OF

CONSTRUCTION. THIS SHALL BE ACHIEVED THROUGH A SEQUENCE OF PHASES THAT

SHIFTS PROGRAM AREAS AFFECTED DURING THE ASSOCIATED PHASE TO TEMPORARY

STRUCTURES LOCATED ADJACENT TO THE SITE- REFER TO SHEET GI010.

2. A DETAILED PHASING AND SEQUENCING PLAN SHALL BE PROVIDED AND DETAILED PRIOR

TO EACH PHASE WITH ACKNOWLEDGEMENT OF SYSTEMS AND OPERATIONS THAT WILL

BE AFFECTED. EACH PHASE SHALL REQUIRE THE DEVELOPMENT OF THIS PLAN AND

ACCEPTANCE BY THE VA.

3. ALL PHASES SHALL MEET THE APPROPRIATE INFECTION CONTROL RISK ASSESSMENT

(ICRA) STANDARDS BASED UPON THE OCCUPANCY AND USE TYPE. EACH PHASE SHALL

REQUIRE THE DEVELOPMENT OF THIS PLAN AND ACCEPTANCE BY THE VA.

4. ALL PHASES SHALL MEET THE APPROPRIATE INTERIM LIFE SAFETY (ILSM) STANDARDS

BASED UPON THE OCCUPANCY AND USE TYPE. EACH PHASE SHALL REQUIRE THE

DEVELOPMENT OF THIS PLAN AND ACCEPTANCE BY THE VA.

5. THE CONSTRUCTION SEQUENCING DRAWINGS PROVIDED REFLECT ONE FEASIBLE

OPTION BASED ON THE BEST AVAILABLE INFORMATION PROVIDED BY THE VAMC STAFF.

6. ALL SERVICE INTERRUPTIONS SHALL BE PLANNED IN ADVANCE AND WORK SHALL BE

COORDINATED WITH THE VAMC STAFF. AFFECTS OF SERVICE INTERRUPTION SHALL BE

IDENTIFIED AND SHALL BE PERFORMED OUTSIDE OF NORMAL OPERATING HOURS.

7. THE CONTRACTOR SHALL WORK WITH THE VAMC STAFF TO FACILITATE THE MOVE OF

AFFECTED STAFF, FURNITURE AND EQUIPMENT. THESE MOVES INCLUDE THOSE

ASSOCIATED WITH TEMPORARY CONDITIONS AS WELL AS RELOCATION PER THE VAMC

MOVE PLAN. THE CONTRACTOR IS RESPONSIBLE FOR ALL MOVES OF FURNITURE AND

EQUIPMENT IN PREPARATION FOR EACH PHASE. THE CONTRACTOR SHALL ACCOUNT

FOR FURNITURE MOVED OUT OF A CONSTRUCTION AREA AND SHALL PROVIDE FOR

TEMPORARY STORAGE. THE CONTRACTOR SHALL WORK WITH THE VAMC STAFF AND

RELOCATED FURNITURE AND EQUIPMENT BASED UPON THE ACTIVATION

REQUIREMENTS ESTABLISHED BY THE VA.

8. WHEN WORK NEEDS TO BE PERFORMED IN AREAS THAT MUST BE KEPT CLEAR FOR

DAILY OPERATIONS THIS WORK WILL BE PERFORMED OUTSIDE OF NORMAL DAILY

OPERATIONS. WHEN THIS WORK IS PERFORMED THE AREA AFFECTED SHALL BE

RETURNED TO NORMAL USE BY THE START OF THE NEXT BUSINESS DAY.

9. WHERE TEMPORARY SERVICE IS REQUIRED TO MAINTAIN DAILY OPERATIONS, A

COMPREHENSIVE PLAN SHALL BE DEVELOPED BY THE CONTRACTOR AND REVIEWED

WITH THE VAMC STAFF WITH AN UNDERSTANDING OF THE EFFECTS TO ASSOCIATED

SERVICES. A STARTING TIME AND AN ANTICIPATED DURATION SHALL BE CLEARLY

DEFINED.

10. DURING EACH PHASE APPROPRIATE SIGNAGE AND WAYFINDING SHALL BE MAINTAINED.

SEQUENCE DESCRIPTION:

1. AS NOTED IN THE PHASING PLANS THE GOAL IS TO MAINTAIN NORMAL VA OPERATIONS

DURING THE CONSTRUCTION DURATION. AS MUCH OF THE INFRASTRUCTURE WORK

WILL AFFECT AREAS ON BOTH THE FIRST AND SECOND FLOORS THE PHASING PLANS

ARE DIVIDED INTO PHASES AND SUB-PHASES BY WING, AFFECTING AREAS ON BOTH

LEVELS. DETAILED PHASING PLANS SHALL BE DEVELOPED BY THE CONTRACTOR TO

COORDINATE WORK ASSOCIATED WITH EACH PHASE. THESE DETAILED PHASING PLANS

SHALL BE COORDINATED WITH THE VAMC STAFF. IF THERE ARE CHANGES TO THESE

PHASING PLANS, NEW PLANS SHALL BE DEVELOPED THAT INDICATE CHANGES.

2. TO ENSURE SUCH EXECUTIONS, CONTRACTOR SHALL FURNISH THE COR WITH A

SCHEDULE OF APPROXIMATE PHASING DATES ON WHICH THE CONTRACTOR INTENDS

TO ACCOMPLISH WORK IN EACH SPECIFIC AREA OF SITE, BUILDING OR PORTION

THEREOF. IN ADDITION, CONTRACTOR SHALL NOTIFY THE COR 30 DAYS IN ADVANCE OF

THE PROPOSED DATE OF STARTING WORK IN EACH SPECIFIC AREA OF SITE, BUILDING

OR PORTION THEREOF.

3. THE WORK TO BE PHASED SHALL INCLUDE, BUT NOT BE LIMITED TO:

4. PHASE 0: INFRASTRUCTURE AND TEMPORARY FACILITIES. THIS PHASE INCLUDES ALL

INFRASTRUCTURE WORK IN BUILDING 5 TO BE COMPLETED PRIOR TO WORKING ON

SUBSEQUENT PHASES – REFER TO DRAWING GI003. SOME AREAS MAY NOT BE VACATED

ENTIRELY BY THE VA PRIOR TO CONSTRUCTION FIELD WORK COMMENCEMENT FOR

PHASE 0. CONTRACTOR SHALL ENSURE THE OPERATIONS OF THE STAFF ARE NOT

NEGATIVELY AFFECTED. PORTABLE DUST CONTAINMENT SYSTEMS WILL BE REQUIRED

TO PERFORM WORK IF STAFF ARE ON THIS WARD. THIS PHASE ALSO INCLUDES THE

INSTALLATION OF TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) WHICH WILL NEED

TO BE INSTALLED, COMMISSIONED AND OPERATIONAL PRIOR TO WORKING ON

SUBSEQUENT PHASES – REFER TO DRAWING GI010. SEE NOTE C.

5. PHASE B-1: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO

CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI004. STAFF WILL

BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE

AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE

RENOVATION WORK IS ONGOING IN PHASE B-1. SEE NOTE D.

6. PHASE B-2: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO

CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI005. STAFF WILL

BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE

AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE

RENOVATION WORK IS ONGOING IN PHASE B-2. SEE NOTE E.

7. PHASE C-1: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO

CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI006. STAFF WILL

BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE

AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE

RENOVATION WORK IS ONGOING IN PHASE C-1. SEE NOTE F.

8. PHASE C-2: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO

CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI007. STAFF WILL

BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE

AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE

RENOVATION WORK IS ONGOING IN PHASE C-2. SEE NOTE G.

9. PHASE A-1: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO

CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI008. STAFF WILL

BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE

AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE

RENOVATION WORK IS ONGOING IN PHASE A-1. SEE NOTE H.

10. PHASE A-2: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO

CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI009. STAFF WILL

BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE

AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE

RENOVATION WORK IS ONGOING IN PHASE A-2. SEE NOTE I.

11. NOTES:

A. THE ORDER OF PHASING MAY CHANGE AT THE DISCRETION OF THE VA

B. ONE PHASE SHALL BE COMPLETED BEFORE THE NEXT PHASE CAN COMMENCE.

C. 30 CALENDAR DAYS PRIOR TO START OF PHASE 0, THE CONTRACTOR SHALL

PROVIDE WRITTEN NOTIFICATION TO THE VA THE ACTUAL DATE CONSTRUCTION

FIELD WORK FOR PHASE 0 WILL COMMENCE (CONTRACTOR SHALL PROCEED WITH

CONSTRUCTION ONLY AFTER VETERANS AFFAIRS’ ACCEPTANCE OF ALL REQUIRED

SUBMITTALS AND COORDINATION DRAWINGS). VA WILL CONDUCT INTERNAL

COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE THE CONTRACTOR

CAN COMMENCE PHASE 0 WORK.

D. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE

ACTION FOR PUNCH LIST ITEMS AND BENEFICIAL OCCUPANCY DETERMINATION OF

THE TEMPORARY FACILITIES) OF PHASE 0, THE CONTRACTOR SHALL PROVIDE

WRITTEN NOTIFICATION TO THE VA THE DATE PHASE 0 WILL BE COMPLETE. VA HAS

14 CALENDAR DAYS FROM THE END OF PHASE 0 ACTUAL COMPLETION DATE TO

CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS ETC. BEFORE

THE CONTRACTOR CAN COMMENCE PHASE B-1 WORK.

E. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE

ACTION FOR PUNCH LIST ITEMS) OF PHASE B-1, THE CONTRACTOR SHALL PROVIDE

WRITTEN NOTIFICATION TO THE VA THE DATE PHASE B-1 WILL BE COMPLETE. VA HAS

14 CALENDAR DAYS FROM THE END OF PHASE B-1 ACTUAL COMPLETION DATE TO

CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE

THE CONTRACTOR CAN COMMENCE PHASE B-2 WORK.

F. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE

ACTION FOR PUNCH LIST ITEMS) OF PHASE B-2, THE CONTRACTOR SHALL PROVIDE

WRITTEN NOTIFICATION TO THE VA THE DATE PHASE B-2 WILL BE COMPLETE. VA HAS

14 CALENDAR DAYS FROM THE END OF PHASE B-2 ACTUAL COMPLETION DATE TO

CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE

THE CONTRACTOR CAN COMMENCE PHASE C-1 WORK.

G. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE

ACTION FOR PUNCH LIST ITEMS) OF PHASE C-1, THE CONTRACTOR SHALL PROVIDE

WRITTEN NOTIFICATION TO THE VA THE DATE PHASE C-1 WILL BE COMPLETE. VA

HAS 14 CALENDAR DAYS FROM THE END OF PHASE C-1 ACTUAL COMPLETION DATE

TO CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC.

BEFORE THE CONTRACTOR CAN COMMENCE PHASE C-2 WORK.

H. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE

ACTION FOR PUNCH LIST ITEMS) OF PHASE C-2, THE CONTRACTOR SHALL PROVIDE

WRITTEN NOTIFICATION TO THE VA THE DATE PHASE C-2 WILL BE COMPLETE. VA

HAS 14 CALENDAR DAYS FROM THE END OF PHASE C-2 ACTUAL COMPLETION DATE

TO CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC.

BEFORE THE CONTRACTOR CAN COMMENCE PHASE A-1 WORK.

I. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE

ACTION FOR PUNCH LIST ITEMS) OF PHASE A-1, THE CONTRACTOR SHALL PROVIDE

WRITTEN NOTIFICATION TO THE VA THE DATE PHASE A-1 WILL BE COMPLETE. VA HAS

14 CALENDAR DAYS FROM THE END OF PHASE A-1 ACTUAL COMPLETION DATE TO

CONDUCT INTERNAL COORDINATION/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE

THE CONTRACTOR CAN COMMENCE PHASE A-2 WORK.

12. THESE PHASES TAKE INTO CONSIDERATION THE TYPES OF ROOM AFFECTED AND

TEMPORARY FACILITIES SHALL ACCOMMODATE THE AFFECTED PROGRAM AREAS.

13. THE PHASES INDICATED ACCOUNT FOR ISLM AND ICRA REQUIREMENTS WHICH

MAINTAINS A SAFE AND HEALTHY WORKING ENVIRONMENT FOR THE VETERANS THE

VAMC STAFF AND THE ASSOCIATED CONTRACTORS.

14. THE INTENT OF THE TEMPORARY FACILITIES IS TO FLEX IN SIZE AND DURATION BASED

ON THE TYPE OF PROGRAM REQUIRED AND THE TIME FRAME ASSOCIATED WITH

RETURNING THE RENOVATED SPACE BACK TO OCCUPIABLE SPACE. HOWEVER THE

CONTRACTOR SHALL ESTABLISH TEMPORARY FACILITIES THAT ACCOMMODATE

SUFFICIENT SPACE FOR ALL THE PHASES (ESTIMATED AT 11,000 SF). THE CONTRACTOR

SHALL ACCOMMODATE TWO SPECIFIC PHASES B2 AND C2 WITH ADDITIONAL

TEMPORARY FACILITIES FOR LARGE CLASSROOM/MULTI-PURPOSE ROOM PROGRAM

AREAS. TEMPORARY FACILITIES FOR LARGE CLASSROOM/MULTI-PURPOSE SPACE SHALL

BE ADDED TO THE ESTABLISHED FACILITY AS APPROVED BY THE VA COR.

SEQUENCE DESCRIPTION (CONTINUED):

15. NOISE CONTROL- DUE TO THE NATURE OF THE VETERANS BEING TREATED AT THIS

FACILITY THERE WILL BE REQUIREMENTS TO MITIGATE NOISE GENERATED ON A

PERIODIC OR CONTINUOUS BASIS. A PLAN OF OPERATION SHALL BE DEVELOPED BY THE

CONTRACTOR THAT DEFINES THE DAILY WORK ACTIVITY AND WHAT MITIGATION PLANS

ARE IN PLACE TO MINIMIZE THE DISRUPTION OF DAILY ACTIVITIES. THIS DAILY PLAN

SHALL INDICATE WORK BEING PERFORMED THAT ACCOUNTS FOR SUDDEN NOISE OR

EXCESSIVE VIBRATION. IF THESE TASKS ARE TO BE PERFORMED, AN AGREED UPON

DURATION AND LOCATION SHALL BE ESTABLISHED.

16. THE CONTRACTOR SHALL ASSURE THAT THE SITE SUPERINTENDENT IS EASILY

ACCESSIBLE. IF THE SITE SUPERINTENDENT IS NOT ON SITE THEN AN INTERIM CONTACT

SHALL BE PROVIDED. THE CONTRACTOR SHALL PROVIDE THE VA WITH A LIST OF

CONTACTS IN DESCENDING ORDER OF RESPONSIBILITY STARTING WITH THE SITE

SUPERINTENDENT.

INFECTION CONTROL RISK ASSESSMENT (ICRA)

1. THE CONTRACTOR SHALL ESTABLISH A PROCESS FOR THE REVIEW OF PCRA

REQUIREMENTS FOR EACH PHASE OF THE PROJECT WITH THE STAFF OF THE VAMC.

THEY SHALL WORK WITH THE VAMC STAFF TO ESTABLISH AND APPROVE EACH PHASE.

THIS PROCESS AT A MINIMUM SHALL REQUIRE THE FOLLOWING:

A. SEPARATION OF THE AREAS OF HEAVY AND MODERATE CONSTRUCTION FROM THE

VETERANS AND STAFF. THIS WILL BE ACHIEVED THROUGH THE CONSTRUCTION OF

TEMPORARY WALLS AND ACCESS DOORS THAT COMPLY WITH THE REQUIREMENTS

OF EACH PHASE.

a. THIS SEPARATED AREA SHALL BE KEPT IN NEGATIVE PRESSURE USING A HEPA

FILTERED NEGATIVE AIR MACHINES EXHAUSTED TO THE EXTERIOR. SOME

EXCEPTIONS SHALL BE REVIEWED AND IF APPROPRIATE APPROVED. THIS AREA

SHALL BE MONITORED USING A MAGNEHELIC PRESSURE GAUGE.

B. WHEN WORK IS PERFORMED ADJACENT TO INTAKE AIR AT MECHANICAL UNITS THEN

MEASURES MUST BE IN PLACE TO FILTER THE AIR APPROPRIATELY TO MINIMIZE THE

AFFECTS ON INDOOR AIR QUALITY.

2. DURING EACH PHASE THE CONTRACTOR SHALL DEVELOP A SAFETY STANDARD

OPERATING PROCEDURE TO BE REVIEWED WITH THE SUB CONTRACTORS. THIS

PROCEDURE SHALL BE COORDINATED WITH THE VA STAFF TO ENSURE SAFETY DURING

THE OPERATION OF CERTAIN TASKS.

3. THE CONTRACTOR SHALL CONTROL THE MIGRATION OF DUST AND MAINTAIN A CLEAN

JOB SITE. ANY CLEANING PERFORMED IN OCCUPIED AREAS SHALL BE ACCOMPLISHED

USING A HEPA FILTERED VACUUM.

INTERIM LIFE SAFETY MEASURES (ILSM)

1. THE CONTRACTOR SHALL ESTABLISH A PROCESS FOR THE REVIEW OF ILSM

REQUIREMENTS FOR EACH PHASE OF THE PROJECT WITH THE STAFF OF THE VAMC.

THEY SHALL WORK WITH THE VAMC STAFF TO ESTABLISH AND APPROVE EACH PHASE.

THIS PROCESS AT A MINIMUM SHALL REQUIRE THE FOLLOWING:

A. ESTABLISHING CLEAR PATHS OF EGRESS FOR VETERANS, THE VA STAFF AND THOSE

CONTRACTORS WITHIN THE CONSTRUCTION AREA. THIS SHALL INCLUDE

APPROPRIATE SIGNAGE APPROVED BY THE VA.

B. ALL EGRESS ROUTES SHALL BE KEPT CLEAR OF CONSTRUCTION MATERIAL AND

DEBRIS.

C. IF THE PLAN CALLS FOR ANY MODIFICATION OR REDUCTION IN THE LIFE SAFETY

FEATURES WITHIN THE FACILITY A DETAILED PLAN SHALL BE SUBMITTED FOR EACH

EVENT AND APPROVED BY THE VAMC STAFF. THESE EVENTS SHALL HAVE A

DEFINITIVE START AND END TIME. IF ADDITIONAL TIME IS REQUIRED, THEN THE PLAN

WILL NEED TO BE AMENDED ACCORDINGLY AND APPROVED BY THE VAMC STAFF.

SECURE ENVIRONMENT

1. THE CONTRACTOR SHALL INSTITUTE A METHOD TO TRACK ALL SUB-CONTRACTORS ON

SITE. THE CONTRACTOR SHALL MANAGE THE CHECK IN PROCESS AND TRACKING OF

SUB-CONTRACTORS.

2. THE SITE SHALL REMAIN A SECURE SITE AND MANAGEMENT OF ACCESS TO THE ACTIVE

AREAS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

UTILITY PHASING:

1. EACH TRADE SHALL PREPARE A PHASING PLAN COMPLYING WITH THE FOLLOWING

REQUIREMENTS

A. THE CONSTRUCTION PHASING ANTICIPATES THAT THE NEW WORK ASSOCIATED

WITH THE MECHANICAL, ELECTRICAL AND PLUMBING INFRASTRUCTURE SHALL BE

CONSTRUCTED TOGETHER TO ALLOW FOR EACH PHASE TO BE BROUGHT ON LINE

WITHOUT DELAY.

B. MECHANICAL:

a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE

INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH

NOTED IN GI003- GI011.

b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL

SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL

BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH TO WORK WITH LEVEL

1 AND LEVEL 2 RENOVATIONS.

c. ANY VALVING THAT NEEDS TO BE PROVIDED TO ACCOMMODATE PHASING SHALL

BE THE RESPONSIBILITY OF THE CONTRACTOR.

d. ANY INTERMEDIATE BALANCING TO ACCOMMODATE THE PHASED APPROACH

SHALL BE PROVIDED.

e. HEATING DISTRIBUTION SHALL BE CONSTRUCTED AT LEVEL 0 AND PREPARED TO

RISE UP VERTICALLY IN COORDINATION WITH EACH PHASE. THIS WORK SHALL

BE CLEAN AND PROTECTED, ALL PIPING, DUCTWORK AND ASSOCIATED MATERIAL

SHALL BE CLEAN WITHOUT CONSTRUCTION DEBRIS. DUCTWORK ON SITE OR

INSTALLED SHALL HAVE OPEN ENDS COVERED UNTIL FINAL INSTALLATION.

C. PLUMBING:

a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE

INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH

NOTED IN GI003- GI011.

b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL

SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL

BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH ASSOCIATED WITH

LEVEL 1 AND LEVEL 2 RENOVATIONS.

c. ANY VALVING THAT NEEDS TO BE PROVIDED TO ACCOMMODATE PHASING SHALL

BE THE RESPONSIBILITY OF THE CONTRACTOR.

d. ANY INTERMEDIATE BALANCING TO ACCOMMODATE THE PHASED APPROACH

SHALL BE PROVIDED.

e. DOMESTIC WATER, WASTE AND VENTING SHALL BE CONSTRUCTED AT LEVEL 0

AND PREPARED TO RISE UP VERTICALLY IN COORDINATION WITH EACH PHASE.

THIS WORK SHALL BE CLEAN AND PROTECTED.

D. ELECTRICAL:

a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE

INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH

NOTED IN GI003- GI011.

b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL

SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL

BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH ASSOCIATED WITH

LEVEL 1 AND LEVEL 2 RENOVATIONS.

c. ANY CIRCUITING THAT CROSSES PHASES SHALL BE FED TEMPORARILY TO

MAINTAIN FULL OPERATIONS.

E. LOW VOLTAGE:

a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE

INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH

NOTED IN GI003- GI011.

b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL

SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL

BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH ASSOCIATED WITH

LEVEL 1 AND LEVEL 2 RENOVATIONS.

c. ANY SYSTEMS TAKEN OUT OF SERVICE DURING CONSTRUCTION MUST MEET THE

REQUIREMENTS OF THE ILSM DEVELOPED FOR EACH PHASE.

F. FIRE PROTECTION:

a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE

INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH

NOTED IN GI003- GI011.

b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL

SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL

BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH TO WORK ASSOCIATED

WITH LEVEL 1 AND LEVEL 2 RENOVATIONS.

c. ANY SYSTEMS TAKEN OUT OF SERVICE DURING CONSTRUCTION MUST MEET THE

REQUIREMENTS OF THE ILSM DEVELOPED FOR EACH PHASE.

G. TEMPORARY SIGNAGE

a. SHALL BE PROVIDED AT EACH PHASE OF WORK INDICATING, BUT NOT LIMITED TO

THE FOLLOWING:

• CONTRACTOR INFORMATION

1. SITE IDENTIFICATION

2. SITE ACCESS

3. EGRESS

4. TEMPORARY FACILITIES

5. SAFETY AREAS

6. ALL VAMC SIGNAGE REQUIREMENTS

• VAMC

1. ENTRY LOCATIONS

2. ACCESSIBILITY FEATURES

3. EGRESS

4. PROGRAM AREA IDENTIFICATION- INTERCHANGEABLE

5. DIRECTORIES- INTERCHANGEABLE

6. TEMPORARY PARKING

7. ALL VAMC SIGNAGE REQUIREMENTS

• ALL SIGNS SHALL BE PROVIDED BY THE CONTRACTOR WITH VAMC REVIEW

AND APPROVAL.

• ALL SIGNS TO MEET OR EXCEED ALL APPLICABLE CODES AND STANDARDS.

CARPENTRY

B004B

ALCOVE

B004

CARPENTRY

STORAGE

B004C

TOILET

B004A

STAIR

5-ST5B-001

STORAGE

B002E

PAINT SHOP

B002B

STAIR #4

5-ST4B-001

STORAGE

B002C

VACANT

B002D

LOUNGE

B003

STAIRS #2

ST2B101

ALCOVE

B002

STORAGE

B002A

STORAGE

B001

STORAGE

B005

OFFICE

B006

EQUIPMENT

STORAGE

B007

SERVICE

ROOM

B008

STORAGE

B005A

PUMP

MECHANICAL

ROOM

A003

STORAGE

B005D

STORAGE

B005C

CARPENTRY

STORAGE

B005B

STAIR

5-ST6B-001

SWITCH GEAR

A002

TELEPHONE

A001D

STORAGE

A001

STORAGE

A001B

PIPE SPACE

A001A

STORAGE

A001E

CORRIDOR

CR001

STORAGE

A004C

MECHANICAL

ROOM

A005

REPAIR SHOP

C001

STORAGE

C001A

OFFICE

C002

OFFICE

C003

STORAGE

A001C

STORAGE

C004

ELECTRIC

SHOP

C005

OFFICE

C005B

OFFICE

C005C

ELECTRIC

SHOP

C005A

STAIR #7

5-ST7C-001

STORAGE

C010

MENS TOILET

SHOWER &

SINK

C009A

TEL

C008 STORAGE

C009B

HVAC SHOP

C009C

STAIR #9

5-ST9C-001

PLUMBING

SHOP

C009D

CORRIDOR

C009

LOCK SHOP

C007

CONNECTING

CORRIDOR

C009F

STORAGE

C006

OFFICE

C005I

STORAGE

C005D

TOILET

C005E

TOILET

C005F

TOILET

C005G

STORAGE

C005H

STORAGE

C006A

CORRIDOR

CR002

CORRIDOR

CR003

PHASE 0

SCOPE OF WORK:

INFRASTRUCTURE PREPARATION FOR PHASED WORK TO BE COMPLETED ON LEVELS 1, 2 AND THE PENTHOUSE.

GENERAL NOTE:

ALL SYSTEMS SHALL REMAIN ACTIVE AND OPERATIONAL DURING NORMAL BUSINESS HOURS. ANY WORK COMPLETED IN OFF HOURS CONDITIONS THAT AFFECTS SYSTEMS OPERATION SHALL BE PLACED BACK INTO SERVICE AND TESTED PRIOR TO NEXT BUSINESS DAY OPERATIONS. ALL WORK TO BE COORDINATED WITH VAMC STAFF. ALL WORK ON LEVEL 0 AS PART OF THIS PHASE SHALL BE IN PREPARATION FOR PHASED WORK ASSOCIATED WITH B PHASE, C PHASE AND A PHASE WORK. EXISTING SYSTEMS TO REMAIN IN OPERATION UNTIL APPROPRIATE CUT OVER TO NEW SYSTEMS HAS BEEN REVIEWED AND APPROVED BY THE VA. EACH DISCIPLINE SHALL CREATE PHASED COORDINATION DRAWINGS AND SUBMIT TO THE VA AND THE DESIGN TEAM FOR REVIEW

AND APPROVAL.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\J An de rs on \D oc um en ts

\1

_B ro ck to n_

B0 5_

Ar ch

_R

_J An de rs on .rv t 5/

/2

2:

:4

PM

GI003

LEVEL 0 - PHASE 0 FLOOR PLAN AND

PHASING NOTES

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 RJC LGC/EVR

1" = 20'-0"

LEVEL 0 - 0 PHASING PLAN C10

OFFICE

B101

OFFICE

B102

OFFICE

B103

OFFICE

B104

CORRIDOR

B152

OFFICE

B148

OFFICE

B149

OFFICE

B150

CLOSET

5-B151A

CLOSET

5-B151B

STAIR #5

5-ST5B-101

OFFICE

B109

CONTROL ROOM

B110

OFFICE

B112

HALL

B113A

STORAGE

B113B

OFFICE

B108

CORRIDOR

B111

DIRECTOR OFFICE

C137B

OFFICE

C138

STAIR #9

5-ST9C-101

OFFICE

C139

STAIR #7

5-ST7C-101

CO

RR

ID

O

R C

CORRIDOR

C120

MENS TIOLET

B105

GROUP THERAPY

B147

STORAGE

B144

STORAGE

B145

STORAGE

B104A

OFFICE

B106

OFFICE

B107

OFFICE

B114

OFFICE

B115

GROUP THERAPY

B116

OFFICE

B117

EMER. ELECTRICAL

B118

OFFICE

B119

OFFICE

B120

STAIRS #2

ST2B101

LOBBY & WAITING

A101

OFFICE

A103

OFFICE

A106

OFFICE

A107

STORAGE

A108

STORAGE

A111

ELEVATOR

A112

H.A.C.

A113

WOMENS TOILET

A114

EXAM/TX

A115

COPY ROOM

A116

ELEC CLOSET

A121

CORRIDOR

A122

STAIRS #1

ST1A101

VESTIBULE

A101A

OFFICE

C101

OFFICE

C102

OFFICE

C103

OFFICE

C104

OFFICE

C105

FILE STORAGE

C106

OFFICE

C107

OFFICE

C114

MENS TOILET

C115

OFFICE

C116

TELE

C127

STORAGE

C128

CORRIDOR

C129

ALCOVE

C131

TOILET

C132

OFFICE

C133

PSY. OFFICE

C140

SOCIAL WORKER

C141

CO

RR

ID

O

R C

H.A.C.

C143

ELECTRICAL

CLOSET

C144

CO

RR

ID

O

R C

OFFICE

C146

TOILET

C147

MENS TOILET

C148

OFFICE

C149

OFFICE

C150

OFFICE

C151

EMER. ELEC

C101A

STAIRS #3

ST3C101

CORRIDOR

B146

STAIR #6

5-ST6B-101

OFFICE

C108

OFFICE

C109

OFFICE

C112

OFFICE

C111

OFFICE

C110

OFFICE

C117

OFFICE

C118

OFFICE

C119

OFFICE

C124

OFFICE

C123

OFFICE

C122

OFFICE

C121

OFFICE

C125

OFFICE

C126

PSY. OFFICE

C134

REC. THERAPY

OFFICE

C135

OFFICE

C136

CONFERENCE

C137A

OFFICE

A117

OFFICE

A118

OFFICE

A119OFFICE LEAD

CLERK

A120

OFFICE

A104

OFFICE

A105

OFFICE

B121

CARPENTRY

B004B

ALCOVE

B004

CARPENTRY

STORAGE

B004C

TOILET

B004A

STAIR

5-ST5B-001

LOUNGE

B003

STAIRS #2

ST2B101

STORAGE

B005

OFFICE

B006

EQUIPMENT

STORAGE

B007

SERVICE ROOM

B008

STORAGE

B005A

PUMP MECHANICAL

ROOM

A003

STORAGE

B005D

STORAGE

B005C

CARPENTRY

STORAGE

B005B

STAIR

5-ST6B-001

SWITCH GEAR

A002

TELEPHONE

A001D

STORAGE

A001

STORAGE

A001B

PIPE SPACE

A001A

STORAGE

A001E

STORAGE

A004C

MECHANICAL ROOM

A005

REPAIR SHOP

C001

STORAGE

C001A

OFFICE

C002

OFFICE

C003

STORAGE

A001C

STORAGE

C004

ELECTRIC SHOP

C005

OFFICE

C005B

OFFICE

C005C

ELECTRIC SHOP

C005A

STAIR #7

5-ST7C-001

STORAGE

C010

MENS TOILET

SHOWER & SINK

C009A

TEL

C008 STORAGE

C009B

HVAC SHOP

C009C

STAIR #9

5-ST9C-001

PLUMBING SHOP

C009D

CORRIDOR

C009

LOCK SHOP

C007

STORAGE

C006

OFFICE

C005I

STORAGE

C005D

TOILET

C005E

TOILET

C005F

TOILET

C005G

STORAGE

C005H

STORAGE

C006A

CORRIDOR

CR002 CORRIDOR

CR003

CLASSROOM

B218

PIPE SPACE

B219A

MEN'S TOILETS

B219

OFFICE

B217

STAIR #5

5-ST5B-201

CLASSROOM

B221

MULTI

C210

KITCHEN

C208

CONFERENCE

ROOM

C217A

OFFICE

C217

OFFICE

C215

OFFICE

C216

CO

RR

ID

O

R C

OFFICE

C226

OFFICE

C227

OFFICE

C228

OFFICE

C229

OFFICE

C230

OFFICE

C231

OFFICE

C232

COPY ROOM

C233

STAIR #9

5-ST9C-201

GROUP THERAPY

C234

OFFICE

C225

JAN. CLOSET

C236

STAFF TOILET

C223

ELECT.

C237

OFFICE

C238

STAIR 3

ST3C201

SOILED

C207

TOILET

C213A

MENS TOILET

C214FOOD STORAGE

C205

STORAGE

C204

OFFICE

C202

VOL. OFFICE

C203

VOL. OFFICE

C201

EMG. ELEC.

C201A

CLOSET

B220 OFFICE

B222

CLOSET

B216

STAIR #2

ST2B201

CLOSET

B223

TOILET

B222A

KITCHEN

B222B

OFFICE

B224

OFFICE

B225

OFFICE

A215A

OFFICE

A215

OFFICE

A214

OFFICE

A211

OFFICE

A210

OFFICE

A209A

GROUP OFFICE

A201

ELEVATOR

P-3

JANITOR CLOSET

A205

WOMENS TOILET

A206

OFFICE

A208

OFFICE

A207

OFFICE

A209

OFFICE

C239A

OFFICE

C239

OFFICE

C218

STORAGE

C213

COMM CLOSET

C220 STORAGE

C219

TOILET

B267

CORRIDOR

A217

OFFICE

B226

TOILET

B270

STORAGE

A202

CLOSET

C215A

STAIRS #1

ST1A201

CORRIDOR

A216

CORRIDOR

A218

STAIR #6

5-ST6B-201

STAIR #7

5-ST7C-201

WOMEN'S TOILET

B219A

STAFF RESTROOM

B214

OFFICE

B213

OFFICE

B212

OFFICE

B211H

OFFICE

B211G

OFFICE

B211F

CORRIDOR

B211E

CLOSET

5-B211J

CLOSET

5-B211K

STORAGE

B208

OFFICE

B209

OFFICE

B210

OFFICE

B211A

OFFICE

B211C

OFFICE

B211D

OFFICE

B211B

CLOSET

B215

ELEC.

B206

CONF.

B207

LACTATION

B206

STORAGE

B204

STORAGE

B204A COMPUTER LAB

B203

CO

RR

ID

O

R B2

STAIR

ST4B201

CONSTRUCTION ACCESS

TEMPORARY WALL

TEMPORARY DOOR

EX

IT

EXIT

TEL/DATA

A213

SECURE SHARED

OFFICE (HOTELING)

A211

STAFF RESTROOM

B141

JANITOR CLOSET

B127

ELEC CLOSET

B126B

CORRIDOR

B134

CLOSET

B134A

CLOSET

B134B

OFFICE

B128

STAIR

ST4B101

ELEC CLOSET

B126A OFFICE

B123

CO

RR

ID

O

R B1

CO

RR

ID

O R

B1

OFFICE

B125

SUPPORT

B125A

OFFICE

B129

OFFICE

B130

OFFICE

B131

OFFICE

B132

OFFICE

B133

OFFICE

B139

OFFICE

B138

OFFICE

B137

OFFICE

B136

OFFICE

B135

OFFICE

B122

TEL ROOM

A102

CONSTRUCTION ACCESS

TEMPORARY WALL

TEMPORARY DOOR

PHASE AREA OF WORK:

B-1

CONSTRUCTION ACCESS

EXIT

EX

IT

EXIT

EX

IT

STORAGE

B002E

PAINT SHOP

B002B

STAIR

ST4B001

STORAGE

B002C

VACANT

B002D

AL

C

O

VE

B0

ST

O

RA

G

E B0

A

STORAGE

B001

ELECTRICAL

B001A

CONSTRUCTION ACCESS

CORRIDOR

CR001

EX

IT

EX

IT

AREA COMPLETE

EGRESS DOOR

PHASING LEGEND:

EXIT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\J An de rs on \D oc um en ts

\1

_B ro ck to n_

B0 5_

Ar ch

_R

_J An de rs on .rv t 5/

/2

2:

:1

PM

GI004

LEVEL 0, 1, AND 2 - PHASE B-1 FLOOR PLANS BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 RJC LGC/EVR

1" = 20'-0"

LEVEL 1 - B-1 PHASING PLAN E6

1" = 20'-0"

LEVEL 0 - B-1 PHASING PLAN F10

1" = 20'-0"

LEVEL 2 - B-1 PHASING PLAN C10

B-1

B-2

C-1

C-2A-1 A-2

KEY PLAN - PHASES

1/64" = 1'-0"

SERVICE ROOM

B008

PUMP MECHANICAL

ROOM

A003

SWITCH GEAR

A002

TELEPHONE

A001D

STORAGE

A001

STORAGE

A001B

PIPE SPACE

A001A

STORAGE

A001E

STORAGE

A004C

MECHANICAL ROOM

A005

REPAIR SHOP

C001

STORAGE

C001A

OFFICE

C002

OFFICE

C003

STORAGE

A001C

STORAGE

C004

ELECTRIC SHOP

C005

OFFICE

C005B

OFFICE

C005C

ELECTRIC SHOP

C005A

STAIR #7

5-ST7C-001

STORAGE

C010

MENS TOILET

SHOWER & SINK

C009A

TEL

C008 STORAGE

C009B

HVAC SHOP

C009C

STAIR #9

5-ST9C-001

PLUMBING SHOP

C009D

CORRIDOR

C009

LOCK SHOP

C007

STORAGE

C006

OFFICE

C005I

STORAGE

C005D

TOILET

C005E

TOILET

C005F

TOILET

C005G

STORAGE

C005H

STORAGE

C006A

CORRIDOR

CR002 CORRIDOR

CR003

CARPENTRY

B004B

ALCOVE

B004

CARPENTRY

STORAGE

B004C

RESTROOM

B004A

STAIR

ST5B001

STORAGE

B002E

STAIR

ST4B001

STORAGE

B002C

VACANT

B002D

LOUNGE

B003

STAIR

ST2B001

AL

C

O

VE

B0

ST

O

RA

G

E B0

A

STORAGE

B001

STORAGE

B005

OFFICE

B006

EQUIPMENT

STORAGE

B007

STORAGE

B005A

STORAGE

B005D

STORAGE

B005C

CARPENTRY

STORAGE

B005B

STAIR

ST6B001

CORRIDOR

CR001

ELECTRICAL

B001A

CONSTRUCTION ACCESS

PAINT SHOP

B002B

EX

IT

EX

IT

DIRECTOR OFFICE

C137B

OFFICE

C138

STAIR #9

5-ST9C-101

OFFICE

C139

STAIR #7

5-ST7C-101

CORRIDOR

C120

OFFICE

B119

OFFICE

B120

OFFICE

A103

OFFICE

A106

OFFICE

A107

STORAGE

A108

STORAGE

A111

ELEVATOR

A112

H.A.C.

A113

WOMENS TOILET

A114

EXAM/TX

A115

COPY ROOM

A116

STAIRS #1

ST1A101

VESTIBULE

A101A

OFFICE

C101

OFFICE

C102

OFFICE

C103

OFFICE

C104

OFFICE

C105

FILE STORAGE

C106

OFFICE

C107

OFFICE

C114

MENS TOILET

C115

OFFICE

C116

TELE

C127

STORAGE

C128

ALCOVE

C131

TOILET

C132

OFFICE

C133

PSY. OFFICE

C140

SOCIAL WORKER

C141

CO

RR

ID

O

R C

H.A.C.

C143

ELECTRICAL

CLOSET

C144

OFFICE

C146

TOILET

C147

MENS TOILET

C148

OFFICE

C149

OFFICE

C150

OFFICE

C151

EMER. ELEC

C101A

STAIRS #3

ST3C101

OFFICE

C108

OFFICE

C109

OFFICE

C112

OFFICE

C111

OFFICE

C110

OFFICE

C117

OFFICE

C118

OFFICE

C119

OFFICE

C124

OFFICE

C123

OFFICE

C122

OFFICE

C121

OFFICE

C125

OFFICE

C126

PSY. OFFICE

C134

REC. THERAPY

OFFICE

C135

OFFICE

C136

CONFERENCE

C137A

OFFICE

A117

OFFICE

A118

OFFICE

A119OFFICE LEAD

CLERK

A120

OFFICE

A104

OFFICE

A105

OFFICE

B121

CO

RR

ID

O

R C

LOBBY & WAITING

A101

CORRIDOR

A122

CORRIDOR

C129

CO

RR

ID

O

R C

STAIR

ST5B101

CO

RR

ID

O

R B1

CLOSET

5-B151A

CLOSET

5-B151B

OFFICE

B150

OFFICE

B149

OFFICE

B148

OFFICE

B147A STAIR

ST2B101

STORAGE

B145

STORAGE

B144

CORRIDOR

B152

OFFICE

B102

OFFICE

B103

OFFICE

B104

OFFICE

B101

STORAGE

B104A

STAFF BREAK

ROOM

B106

STAFF RESTROOM

B141

JANITOR CLOSET

B127

ELEC CLOSET

B126B

CLOSET

B134A

CLOSET

B134B

OFFICE

B128

CORRIDOR

B124E

OFFICE

B115 OFFICE

B116A

STAIR

ST6B101

OFFICE

B114

STORAGE

B113B

STAIR

ST4B101

ELEC CLOSET

B126A OFFICE

B123

CO

RR

ID

O

R B1

CO

RR

ID

O R

B1

OFFICE

B147B

OFFICE

B125

SUPPORT

B125A

PUBLIC RESTROOM

- F

B105APUBLIC RESTROOM

- M

B105B

CORRIDOR

B113A

CORRIDOR

B124B

CORRIDOR

B124C

OFFICE

B129

OFFICE

B130

OFFICE

B131

OFFICE

B132

OFFICE

B133

OFFICE

B139

OFFICE

B138

OFFICE

B137

OFFICE

B136

OFFICE

B135

OFFICE

B107

OFFICE

B108

OFFICE

B109

OFFICE

B112

OFFICE

B116B

OFFICE

B117

OFFICE

B122

TEL ROOM

A102

CONSTRUCTION ACCESS

EMER. ELECTRICAL

B119A

TEMPORARY DOOR

TEMPORARY WALL

PHASE AREA OF WORK:

B-2

CONSTRUCTION ACCESS

EXIT

EX

IT

MULTI

C210

KITCHEN

C208

CONFERENCE

ROOM

C217A

OFFICE

C217

OFFICE

C215

OFFICE

C216

CO

RR

ID

O

R C

OFFICE

C226

OFFICE

C227

OFFICE

C228

OFFICE

C229

OFFICE

C230

OFFICE

C231

OFFICE

C232

COPY ROOM

C233

STAIR #9

5-ST9C-201

GROUP THERAPY

C234

OFFICE

C225

JAN. CLOSET

C236

STAFF TOILET

C223

ELECT.

C237

OFFICE

C238

STAIR 3

ST3C201

SOILED

C207

TOILET

C213A

MENS TOILET

C214FOOD STORAGE

C205

STORAGE

C204

OFFICE

C202

VOL. OFFICE

C203

VOL. OFFICE

C201

EMG. ELEC.

C201A

OFFICE

A215A

OFFICE

A215

OFFICE

A214

OFFICE

A213

OFFICE

A211

OFFICE

A210

OFFICE

A209A

GROUP OFFICE

A201

ELEVATOR

P-3

JANITOR CLOSET

A205

WOMENS TOILET

A206

OFFICE

A208

OFFICE

A207

OFFICE

A209

OFFICE

C239A

OFFICE

C239

OFFICE

C218

STORAGE

C213

COMM CLOSET

C220 STORAGE

C219

TOILET

B267

CORRIDOR

A217

STORAGE

A202

CLOSET

C215A

STAIRS #1

ST1A201

CORRIDOR

A217

CORRIDOR

A217

STAIR #7

5-ST7C-201

CLASSROOM

B218

OFFICE

B217

PUBLIC RESTROOM

- F

B219A PUBLIC RESTROOM

- M

B219B

CORRIDOR

A201C

CLOSET

B216

STAIR

ST2B201

STAFF RESTROOM

B214

OFFICE

B213

OFFICE

B212

OFFICE

B211H

OFFICE

B211G

OFFICE

B211F

CLOSET

5-B211J

CLOSET

5-B211K

STORAGE

B208

OFFICE

B209

OFFICE

B210

OFFICE

B211A

OFFICE

B211C

OFFICE

B211D

OFFICE

B211B

CLOSET

B215

ELEC.

B206

CONF.

B207

LACTATION

B206

STORAGE

B204

STORAGE

B204A COMPUTER LAB

B203

OFFICE

B226

OFFICE

B225

OFFICE

B224

CLOSET

B223

TOILET

B222A

KITCHEN

B222BOFFICE

B222

CLOSET

B220

CLASSROOM

B221

STAIR

ST6B201

STAIR

ST5B201

CO

RR

ID

O

R B2

STAIR

ST4B201

TOILET

B270

CO

RR

ID

O

R A2

E

CONSTRUCTION ACCESS

TEMPORARY DOOR

TEMPORARY WALL

EXIT

EX

IT

AREA COMPLETE

EGRESS DOOR

PHASING LEGEND:

EXIT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\J An de rs on \D oc um en ts

\1

_B ro ck to n_

B0 5_

Ar ch

_R

_J An de rs on .rv t 5/

/2

2:

:4

PM

GI005

LEVEL 0, 1, AND 2 - PHASE B-2 FLOOR PLANS BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 RJC LGC/EVR

1" = 20'-0"

LEVEL 0 - B-2 PHASING PLAN F10

1" = 20'-0"

LEVEL 1 - B-2 PHASING PLAN E6

1" = 20'-0"

LEVEL 2 - B-2 PHASING PLAN C10

B-1

B-2

C-1

C-2A-1 A-2

KEY PLAN - PHASES

PUMP MECHANICAL

ROOM

A003

SWITCH GEAR

A002

TELEPHONE

A001D

STORAGE

A001

STORAGE

A001B

PIPE SPACE

A001A

STORAGE

A001E

STORAGE

A004C

MECHANICAL ROOM

A005

REPAIR SHOP

C001

STORAGE

C001A

OFFICE

C002

OFFICE

C003

STORAGE

A001C

STORAGE

C004

ELECTRIC SHOP

C005

OFFICE

C005B

OFFICE

C005C

ELECTRIC SHOP

C005A

STAIR #7

5-ST7C-001

STORAGE

C010

MENS TOILET

SHOWER & SINK

C009A

TEL

C008 STORAGE

C009B

LOCK SHOP

C007

STORAGE

C006

OFFICE

C005I

STORAGE

C005D

TOILET

C005E

TOILET

C005F

TOILET

C005G

STORAGE

C005H

STORAGE

C006A

CORRIDOR

CR002 CORRIDOR

CR003

CORRIDOR

C009

STAIR #7

5-ST7C-101

EMER. ELECTRICAL

B118

OFFICE

B119

OFFICE

B120

OFFICE

A103

OFFICE

A106

OFFICE

A107

STORAGE

A108

STORAGE

A111

ELEVATOR

A112

H.A.C.

A113

WOMENS TOILET

A114

EXAM/TX

A115

COPY ROOM

A116

STAIRS #1

ST1A101

VESTIBULE

A101A

OFFICE

C101

OFFICE

C102

OFFICE

C103

OFFICE

C104

OFFICE

C105

FILE STORAGE

C106

OFFICE

C107

OFFICE

C114

MENS TOILET

C115

OFFICE

C116

TELE

C127

STORAGE

C128

MENS TOILET

C148

OFFICE

C149

OFFICE

C150

OFFICE

C151

EMER. ELEC

C101A

STAIRS #3

ST3C101

OFFICE

C108

OFFICE

C109

OFFICE

C112

OFFICE

C111

OFFICE

C110

OFFICE

C117

OFFICE

C118

OFFICE

C119

OFFICE

C124

OFFICE

C123

OFFICE

C122

OFFICE

C121

OFFICE

C125

OFFICE

C126

OFFICE

A117

OFFICE

A118

OFFICE

A119OFFICE LEAD

CLERK

A120

OFFICE

A104

OFFICE

A105

OFFICE

B121

CORRIDOR

C120

CO

RR

ID

O

R C

LOBBY & WAITING

A101

CORRIDOR

A122

CO

RR

ID

O

R C

MULTI

C210

KITCHEN

C208

CONFERENCE

ROOM

C217A

OFFICE

C217

OFFICE

C215

OFFICE

C216

OFFICE

C238

STAIR 3

ST3C201

SOILED

C207

TOILET

C213A

MENS TOILET

C214FOOD STORAGE

C205

STORAGE

C204

OFFICE

C202

VOL. OFFICE

C203

VOL. OFFICE

C201

EMG. ELEC.

C201A

OFFICE

A215A

OFFICE

A215

OFFICE

A214

OFFICE

A213

OFFICE

A211

OFFICE

A210

OFFICE

A209A

GROUP OFFICE

A201

ELEVATOR

P-3

JANITOR CLOSET

A205

WOMENS TOILET

A206

OFFICE

A208

OFFICE

A207

OFFICE

A209

OFFICE

C239A

OFFICE

C239

OFFICE

C218

STORAGE

C213

COMM CLOSET

C220 STORAGE

C219

CORRIDOR

A217

STORAGE

A202

CLOSET

C215A

STAIRS #1

ST1A201

CORRIDOR

A217

CORRIDOR

A217

STAIR #7

5-ST7C-201

CARPENTRY

B004B

ALCOVE

B004

CARPENTRY

STORAGE

B004C

RESTROOM

B004A

STAIR

ST5B001

STORAGE

B002E

STAIR

ST4B001

STORAGE

B002C

VACANT

B002D

LOUNGE

B003

STAIR

ST2B001

AL

C

O

VE

B0

ST

O

RA

G

E B0

A

STORAGE

B001

STORAGE

B005

OFFICE

B006

EQUIPMENT

STORAGE

B007

STORAGE

B005A

STORAGE

B005D

STORAGE

B00…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .