523A5-19-305-100 Percent FINAL BD DWGS VOL 1_STAMPED_210514_19101.pdf
PDF 41 MB Posted
- Solicitation number
- 36C24121R0163
About this file
This document provides details for a federal contract solicitation. The solicitation number is 36C24121R0163 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for mental health outpatient renovation services at project number 52A5-19-305. The opportunity type is a solicitation for the Z1DA--Mental Health Outpatient Renovation B5 Project. The solicitation seeks construction services to renovate outpatient mental health facilities. The response due date and anticipated award date are not specified.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS:
AB ANCHOR BOLT
A/C AIR CONDITIONING
ACCU AIR CONDITIONING CONDENSER UNIT
ACPLAS ACCOUSTICAL PLASTER
ACT ACOUSTIC CEILING TILE
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
AP ACCESS PANEL
APROX APPROXIMATE
ARCH ARCHITECTURAL
BCX BOTTOM CORD EXTENSION
BD BOARD
BIT BITUMINOUS
BLDG BUILDING
BLP BORROWED LIGHT PANEL
BO BOTTOM OF
BOF BOTTOM OF FOOTING
BOS BOTTOM OF STEEL
BOT BOTTOM
BRDG BRIDGING
BRG BEARING
BS BOTH SIDES
BSE BRICK SHELF ELEVATION
C CHANNEL
CB CATCH BASIN / CHALKBOARD
CEM BD CEMENTITIOUS BACKER BOARD
CFM CUBIC FEET PER MINUTE
CIP CAST IN PLACE
CJ CONTROL JOINT / CONSTRUCTION JOINT
CL CENTER LINE
CLL CONTRACT LIMIT LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CT CERAMIC TILE
CUH CABINET UNIT HEATER
D DIAMETER
DBL DOUBLE
DF DRINKING FOUNTAIN
DL DEAD LOAD
DR DISPLAY RAIL
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWV DRAIN/WASTE/VENT
EA EACH
EF EXHAUST FAN / EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FB FLAT BAR
FBO FURNISHED BY OTHERS
FCO FLOOR CLEA-OUT
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR / FAR FACE
FFE FINISH FLOOR ELEVATION
FO FRAMED OPENING
FRP FIBER REINFORCED PLASTIC
FS FAR SIDE
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GDT GYPSUM DROP-IN TILE
GV GRAVITY VENT
GWB GYPSUM WALL BOARD
H HORIZONTAL
HC HANDICAPPED / HOLLOW CORE
HORIZ HORIZONTAL
HM HOLLOW METAL
HRU HEAT RECOVERY UNIT
H&V HEATING AND VENTILATING
HVAC HEATING, VENTILATING AND AIR CONDITIONING
I INCLUDED ANGLE
ID INSIDE DIAMETER
IF INSIDE FACE
IJ ISOLATION JOINT
IMP IMPACT RESISTANT
INS INSULATED
INV INVERT
JS JOINT SUBSTITUTE
K KIPS
L ANGLE / LENGTH
LF LEFT
LINO SHEET LINOLEUM
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LP LIGHTING PANEL / LIQUIFIED PROPANE
MAX MAXIMUM
MB MARKER BOARD
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE-RESISTANT
MUA MAKE-UP AIR
N NOSING
NCB NEW CATCH BASIN
NDMH NEW DRAIN MANHOLE
NFM NEW FORCE MAIN
NIC NOT IN CONTRACT
NS NEAR SIDE
NSD NEW STORM DRAIN LINE
NSS NEW SANITARY SEWER LINE
NTS NOT TO SCALE
NW NEW WATER LINE
OC ON CENTER
OF OUTSIDE FACE
OH OVERHEAD
PA PUBLIC ADDRESS
PAF POWER-ACTUATED FASTENER
PDU POOL DEHUMIDIFICATION UNIT
PL PLATE / PROPERTY LINE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PP POWER PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE-TREATED
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
R RISER / RADIUS
RB RESILIENT BASE
RD ROOF DRAIN
REINF REINFORCED
REQ'D REQUIRED
RT RIGHT
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RUB-RAIL
RTU ROOF TOP UNIT (HVAC)
SACT SUSPENDED ACOUSTIC TILE CEILING
SC SOLID CORE
SF SQUARE FOOT / SUPPLY FAN
SFRM SPRAYED FIRE-RESISTIVE MATERIAL
SHT SHEET
SIM SIMILAR
SK SHEAR KEY
SN SANITARY NAPKIN (DISPENSER)
SP SPECIAL
SS STAINLESS STEEL
STA STATION
STL STEEL
STRUC STRUCTURAL
T TREAD
TB TACKBOARD
T&B TOP AND BOTTOM
TBM TEMPORARY BENCHMARK
TCE TOP CHORD EXTENSION
TJ TIE JOIST
TO TOP OF
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PIER
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOILET PAPER (DISPENSER) / TEST PIT
TS TUBE STEEL
TYP TYPICAL
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
V VENT PIPE / VERTICAL
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VP VISION PANEL
VTR VENT THROUGH THE ROOF
W/ WITH
WC WATER CLOSET
WD WOOD
WF WIDE FLANGE
WH WATER HEATER
W/O WITH OUT
WP WORKING POINT
WS WEB STIFFENER
WWF WELDED WIRE FABRIC
KEY NOTE
A
MAIN
LOBBY
A402
COLUMN BUBBLE AND
CENTER LINE
PARTITION TAG
DOOR TAG
ROOM TAG
EQUIPMENT/ACCESSORY TAG
A00
AE000
A00
AE000
A00
AE000
A00
AE000
INTERIOR ELEVATION
EXTERIOR ELEVATION
DATUM REFERENCE
BUILDING SECTION
WALL SECTION
DETAIL
A0
D0
C0
B0AE000
WINDOW TAG
SYMBOL LEGEND:
CUT DIRECTION
SECTION NUMBER
SHEET NUMBER
CUT DIRECTION
SECTION NUMBER
SHEET NUMBER
SECTION NUMBER
AREA OF DETAIL
SHEET NUMBER
ELEVATION DIRECTION
SECTION NUMBER
SHEET NUMBER
ELEVATION NUMBER/
DIRECTION
SHEET NUMBER
DOOR NUMBER
ROOM NAME
ROOM NUMBER
REVISION
REVISION NUMBER#
REVISION TAG
AREA OF REVISION
EXISTING COLUMN BUBBLE AND
CENTER LINEA
XXX SF ROOM AREA (WHEN APPLICABLE)
LOCATION MAP:
5 74
46 44
47 49
R A M P
E N C L O S E D W A L K
E N C L O S E D W A L K
E N C L O S
E D
W
A L K
VA
TENNINIS
COURT
CAMPUS MAP:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\J An de rs on \D oc um en ts
\1
_B ro ck to n_
B0 5_
Ar ch
_R
_J An de rs on .rv t 5/
/2
2:
:0
PM
GI001A
COVER SHEET VOLUME 1 BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 RJC LGC/EVR
BUILDING 5 OUTPATIENT MENTAL HEALTH RENOVATION
PROJECT LOCATIONDRAWING LIST
Sheet Number Sheet Name
15 - ELECTRICAL
E-001 LEGEND AND GENERAL NOTES
ED100.1 LEVEL 0 DEMOLITION PLAN - WINGS A AND B
ED100.2 LEVEL 0 DEMOLITION PLAN - WING C
ED101.1 LEVEL 1 DEMOLITION PLAN - WINGS A AND B
ED101.2 LEVEL 1 DEMOLITION PLAN - WING C
ED102.1 LEVEL 2 DEMOLITION PLAN - WINGS A AND B
ED102.2 LEVEL 2 DEMOLITION PLAN - WING C
ED103 ROOF AND PENTHOUSE DEMOLITION PLAN
EP100.1 LEVEL 0 POWER PLAN - WINGS A AND B
EP100.2 LEVEL 0 POWER PLAN - WING C
EP101.1 LEVEL 1 POWER PLAN - WINGS A AND B
EP101.2 LEVEL 1 POWER PLAN - WING C
EP102.1 LEVEL 2 POWER PLAN - WINGS A AND B
EP102.2 LEVEL 2 POWER PLAN - WING C
EP103 ROOF AND PENTHOUSE POWER PLAN
EP401 ENLARGED POWER PLANS
EP601 PANEL SCHEDULES
EP602 PANEL SCHEDULES
EP651 DEMOLITION ONE-LINE DIAGRAM
EP652 NEW WORK ONE LINE DIAGRAM
EL100.1 LEVEL 0 LIGHTING PLAN - WINGS A AND B
EL100.2 LEVEL 0 LIGHTING PLAN - WING C
EL101.1 LEVEL 1 LIGHTING PLAN - WINGS A AND B
EL101.2 LEVEL 1 LIGHTING PLAN - WING C
EL102.1 LEVEL 2 LIGHTING PLAN - WINGS A AND B
EL102.2 LEVEL 2 LIGHTING PLAN - WING C
EL601 LIGHT FIXTURE SCHEDULE AND DETAILS
EL602 LIGHTING CONTROL DETAILS
EL603 LIGHTING CONTROL DETAILS
EY100.1 LEVEL 0 SYSTEMS PLAN - WINGS A AND B
EY100.2 LEVEL 0 SYSTEMS PLAN - WING C
EY101.1 LEVEL 1 SYSTEMS PLAN - WINGS A AND B
EY101.2 LEVEL 1 SYSTEMS PLAN - WING C
EY102.1 LEVEL 2 SYSTEMS PLAN - WINGS A AND B
EY102.2 LEVEL 2 SYSTEMS PLAN - WING C
EY651 RISER DIAGRAMS
E-601 SCHEDULES
E-701 DETAILS
DRAWING LIST
Sheet Number Sheet Name
11 - GENERAL
GI001B COVER SHEET VOLUME 2
12 - PLUMBING
P-001 PLUMBING LEGEND AND ABBREVIATIONS
PD100.1-1 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WINGS
A AND B
PD100.1-2 PIPE BASEMENT - PLUMBING DEMOLITION PLAN - WING C
PD100.2-1 LEVEL 0 - PLUMBING DEMOLITION PLAN - WINGS A AND B
PD100.2-2 LEVEL 0 - PLUMBING DEMOLITION PLAN - WING C
PD101.1 LEVEL 1 - PLUMBING DEMOLITION PLAN - WINGS A AND B
PD101.2 LEVEL 1 - PLUMBING DEMOLITION PLAN - WING C
PD102.1 LEVEL 2 - PLUMBING DEMOLITION PLAN - WINGS A AND B
PD102.2 LEVEL 2 - PLUMBING DEMOLITION PLAN - WING C
PD103.1 PLUMBING ROOF AND PENTHOUSE DEMOLITION PLAN
PL100.1-1 PIPE BASEMENT - PLUMBING DWV PLAN - WINGS A AND B
PL100.1-2 PIPE BASEMENT - PLUMBING DWV PLAN - WING C
PL100.2-1 LEVEL 0 - PLUMBING DWV PLAN - WINGS A AND B
PL100.2-2 LEVEL 0 - PLUMBING DWV PLAN - WING C
PL101.1 LEVEL 1 - PLUMBING DWV PLAN - WINGS A AND B
PL101.2 LEVEL 1 - PLUMBING DWV PLAN - WING C
PL102.1 LEVEL 2 - PLUMBING DWV PLAN - WINGS A AND B
PL102.2 LEVEL 2 - PLUMBING DWV PLAN - WING C
PL103.1 PLUMBING ROOF AND PENTHOUSE PLAN
PP100.1-1 PIPE BASEMENT - PLUMBING SUPPLY PIPING PLAN -
WINGS A AND B
PP100.2-1 LEVEL 0 - PLUMBING SUPPLY PIPING PLAN - WINGS A
AND B
PP100.2-2 LEVEL 0 - PLUMBING SUPPLY PIPING - WING C
PP101.1 LEVEL 1 - PLUMBING SUPPLY PIPING - WINGS A AND B
PP101.2 LEVEL 1 - PLUMBING SUPPLY PIPING - WING C
PP102.1 LEVEL 2 - PLUMBING SUPPLY PIPING - WINGS A AND B
PP102.2 LEVEL 2 - PLUMBING SUPPLY PIPING - WING C
PP103.1 PLUMBING ROOF AND PENTHOUSE PLAN
PL401 PLUMBING PART PLANS
PP401 PLUMBING PART PLANS
P501 PLUMBING DETAILS
P502 PLUMBING DETAILS
P601 PLUMBING SCHEDULES
14 - MECHANICAL
M-001 MECHANICAL LEGEND AND ABBREVIATIONS
M-002 MECHANICAL GENERAL NOTES
MD100.1-1 PIPE BASEMENT - HVAC DEMOLITION PLAN - WINGS A
AND B
MD100.1-2 PIPE BASEMENT - HVAC DEMOLITION PLAN - WING C
MD100.2-1 LEVEL 0 - HVAC DEMOLITION PLAN - WINGS A AND B
MD100.2-2 LEVEL 0 - HVAC DEMOLITION PLAN - WING C
MD101.1 LEVEL 1 - HVAC DEMOLITION PLAN - WINGS A AND B
MD101.2 LEVEL 1 - HVAC DEMOLITION PLAN - WING C
MD102.1 LEVEL 2 - HVAC DEMOLITION PLAN - WINGS A AND B
MD102.2 LEVEL 2 - HVAC DEMOLITION PLAN - WING C
MD111.1 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WINGS A
AND B
MD111.2 LEVEL 1 - HVAC PIPING DEMOLITION PLAN - WING C
MD112.1 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WINGS A
AND B
MD112.2 LEVEL 2 - HVAC PIPING DEMOLITION PLAN - WING C
MH100.1-1 PIPE BASEMENT - HVAC PLAN - WINGS A AND B
MH100.1-2 PIPE BASEMENT - HVAC PLAN - WING C
MH100.2-1 LEVEL 0 - HVAC PLAN - WINGS A AND B
MH100.2-2 LEVEL 0 - HVAC PLAN - WING C
MH101.1 LEVEL 1 - HVAC PLAN - WINGS A AND B
MH101.2 LEVEL 1 - HVAC PLAN - WING C
MH102.1 LEVEL 2 - HVAC PLAN - WINGS A AND B
MH102.2 LEVEL 2 - HVAC PLAN - WING C
MH130 MECHANICAL ROOF AND PENTHOUSE PLAN
MP111.1 LEVEL 1 - HVAC PIPING PLAN - WINGS A AND B
MP111.2 LEVEL 1 - HVAC PIPING PLAN - WING C
MP112.1 LEVEL 2 - HVAC PIPING PLAN - WINGS A AND B
MP112.2 LEVEL 2 - HVAC PIPING PLAN - WING C
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-503 MECHANICAL DETAILS
M-504 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES
M-603 MECHANICAL SCHEDULES
M-604 MECHANICAL SCHEDULES
M-651 MECHANICAL SEQUENCE OF OPERATIONS
M-652 MECHANICAL SEQUENCE OF OPERATIONS
DRAWING LIST
Sheet Number Sheet Name
01 - GENERAL
GI001A COVER SHEET VOLUME 1
GI002 MOUNTING HEIGHTS, WALL AND ROOF TYPES, TOP OF
WALL DETAILS
GI003 LEVEL 0 - PHASE 0 FLOOR PLAN AND PHASING NOTES
GI004 LEVEL 0, 1, AND 2 - PHASE B-1 FLOOR PLANS
GI005 LEVEL 0, 1, AND 2 - PHASE B-2 FLOOR PLANS
GI006 LEVEL 0, 1, AND 2 - PHASE C-1 FLOOR PLANS
GI007 LEVEL 0, 1, AND 2 - PHASE C-2 FLOOR PLANS
GI008 LEVEL 0, 1, AND 2 - PHASE A-1 FLOOR PLANS
GI009 LEVEL 0, 1, AND 2 - PHASE A-2 FLOOR PLANS
GI010 TEMPORARY FACILITIES AND SITE PLAN
GI011 TEMPORARY SITE DETAILS
02 - HAZARDOUS MATERIALS
HA100-1 PIPE BASEMENT ABATEMENT PLAN
HA100-2 LEVEL 0 - ABATEMENT PLAN
HA101 LEVEL 1 - ABATEMENT PLAN
HA102 LEVEL 2 - ABATEMENT PLAN
HA130 ROOF - ABATEMENT PLAN
06 - ARCHITECTURAL
A000 CODE SUMMARY
A000-1 PIPE BASEMENT - CODE COMPLIANCE PLAN
A000-2 LEVEL 0 - CODE COMPLIANCE PLAN
A001 LEVEL 1 - CODE COMPLIANCE PLAN
A002 LEVEL 2 - CODE COMPLIANCE PLAN
A003 ROOF - CODE COMPLIANCE PLAN
AD100-1 PIPE BASEMENT DEMOLITION PLAN
AD100-2 LEVEL 0 - DEMOLITION PLAN
AD101 LEVEL 1 - DEMOLITION PLAN
AD102 LEVEL 2 - DEMOLITION PLAN
AD130 ROOF - DEMOLITION PLAN
A-100-1 PIPE BASEMENT - FACILITY PLAN
A-100-2 LEVEL 0 - FACILITY PLAN
A-101 LEVEL 1 - FACILITY PLAN
A-102 LEVEL 2 - FACILITY PLAN
AE100.1-1 PIPE BASEMENT FLOOR PLAN - WINGS A AND B
AE100.1-2 LEVEL 0 - FLOOR PLAN - WINGS A AND B
AE100.2-1 PIPE BASEMENT FLOOR PLAN - WING C
AE100.2-2 LEVEL 0 - FLOOR PLAN - WING C
AE101.1 LEVEL 1 - FLOOR PLAN - WINGS A AND B
AE101.2 LEVEL 1 - FLOOR PLAN WING C
AE102.1 LEVEL 2 - FLOOR PLAN - WINGS A AND B
AE102.2 LEVEL 2 - FLOOR PLAN - WING C
AE120.1 LEVEL 0 - REFLECTED CEILING PLAN - WINGS A AND B
AE120.2 LEVEL 0 - REFLECTED CEILING PLAN - WING C
AE121.1 LEVEL 1 - REFLECTED CEILING PLAN - WINGS A AND B
AE121.2 LEVEL 1 - REFLECTED CEILING PLAN - WING C
AE122.1 LEVEL 2 - REFLECTED CEILING PLAN - WINGS A AND B
AE122.2 LEVEL 2 - REFLECTED CEILING PLAN - WING C
AE130 ROOF AND PENTHOUSE PLAN
AE200 EXTERIOR ELEVATIONS
AE210 INTERIOR ELEVATIONS
AE211 INTERIOR ELEVATIONS
AE400 ENLARGED TOILET PLANS
AE401 ENLARGED PLANS
AE402 ENLARGED PLANS
AE500 DETAILS - BUILDING
AE501 DETAILS - ROOF
AE510 DETAILS - PLAN
AE520 DETAILS - CASEWORK
AE600 SCHEDULE - DOOR
AE601 DETAILS - DOOR
AE602 WINDOW TYPES AND DETAILS
07 - INTERIORS
ID100.1-2 LEVEL 0 - FINISH PLAN - WINGS A AND B
ID100.2-2 LEVEL 0 - FINISH PLAN - WING C
ID101.1 LEVEL 1 - FINISH PLAN - WINGS A AND B
ID101.2 LEVEL 1 - FINISH PLAN WING C
ID102.1 LEVEL 2 - FINISH PLAN - WINGS A AND B
ID102.2 LEVEL 2 - FINISH PLAN - WING C
ID600 PRODUCT INDEX SHEET
11 - FIRE PROTECTION
FP001 FIRE PROTECTION LEGEND AND ABBREVIATIONS
FP100.1 LEVEL 0 - FIRE PROTECTION PLAN - WINGS A AND B
FP100.2 LEVEL 0 - FIRE PROTECTION PLAN - WING C
FP101.1 LEVEL 1 - FIRE PROTECTION PLAN - WINGS A AND B
FP101.2 LEVEL 1 - FIRE PROTECTION PLAN - WING C
FP102.1 LEVEL 2 - FIRE PROTECTION PLAN - WINGS A AND B
FP102.2 LEVEL 2 - FIRE PROTECTION PLAN - WING C
FP501 FIRE PROTECTION DETAILS
VA BOSTON HEALTHCARE SYSTEM - BROCKTON CAMPUS
BROCKTON, MASSACHUSETTS
VOLUME 1
DRAWING LIST - VOLUME 1 DRAWING LIST - VOLUME 2 DRAWING LIST - VOLUME 2
Revisions: Date: 05-14-21
6" U
.N .O
U.
N.
O.
1'
- 6
" M
IN
U.
N.
O.
1'
- 0 " M
IN
TYPE STUD
SIZE
PART.
THICK. RATNG DESIGNSOUND ATTN
BLANKET
E3.1 3-5/8" 6-1/8" FULL
DEPTH
SEE SCHEDULE
BELOW FOR DIMENSION
FINISHED FLOOR
ACOUSTICAL SEALANT
(1) LAYER OF 5/8" GWB
SOUND ATTENUATION
BLANKET
(SEE SCHEDULE BELOW)
FINISHED CEILING (SEE RCP)
UNDERSIDE OF DECK
ABOVE
F1b
F3a
1-5/8"
3-5/8"
2-1/4"
4-7/8"
N/A
STC - X
LINE OF NEW OR
EXISTING PARTITION
OR SUBSTRATE
TYPE STUD
SIZE
PART.
THICK.
RATNG DESIGN
DEFLECTION TRACK
ACOUSTICAL SEALANT
SOUND ATTN
BLANKET
BRACE FRAMING TO
SUBSTRATE NOT TO
EXCEED 8'-0" O.C.
NONE
ROXUL
S3.1 3-5/8" 4-7/8"
S6.1
STUD
SIZE
PART.
THICK.
6" 7-1/4"
SOUND ATTN
BLANKET
FULL
DEPTH
FULL
DEPTH
SEE SCHEDULE
BELOW FOR DIMENSION
FINISHED FLOOR
ACOUSTICAL SEALANT
STEEL STUD FRAMING (SEE
SCHEDULE BELOW)
SOUND ATTENUATION
BLANKET
(SEE SCHEDULE BELOW)
FINISHED CEILING (SEE RCP)
DEFLECTION TRACK
UNDERSIDE OF DECK
ABOVE
(1) LAYER OF 5/8"
GWB AT EACH SIDE (IMPACT RESISTANT AT S3.2)
EXTEND 3" THICK SOUND
ATTENUATION BLANKETS 2'-0"
HORIZONTALLY EACH SIDE OF
PARTITIONS SCHEDULED TO
RECEIVE BLANKETS
E..
STUD - PARTITIONS
SCALE: 1 1/2" = 1'-0"
UL DESIGN U419
S..
STUD PARTITIONS
SCALE: 1 1/2" = 1'-0"
SEE PLAN FOR DIMENSION
F..
FURRED PARTITIONS
SCALE: 1 1/2" = 1'-0"
TYPE RATING
DESIGN
NOTESSTC
STC
STC
R1
ROOF TYPE
SCALE: 1 1/2" = 1'-0"
REINSTALLED
BALLAST
EPDM
MEMBRANE
R-33 ROOF DECK
INSULATION
EXISTING CONCRETE
DECKING AIR VAPOR
BARRIER
COVER BOARD
NOTE: INFILL OPENINGS IN EXISTING PARTITIONS WITH CONSTRUCTION TO MATCH
EXISTING CONSTRUCTION. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED
ACCESSORIES AND CASEWORK. CONFIRM THAT RATED WALLS EXTEND TO CEILING AND
THAT ALL PENETRATIONS ARE SEALED. INFILL IN RATED WALLS TO MATCH EXISTING
ADJACENT RATED CONSTRUCTION.
FINISHED FLOOR
ACOUSTICAL SEALANT
STEEL STUD FRAMING (SEE
SCHEDULE BELOW)
SOUND ATTENUATION
BLANKET
(SEE SCHEDULE BELOW)
FINISHED CEILING (SEE RCP)
DEFLECTION TRACK
(1) LAYER OF 5/8"
GWB AT EACH SIDE
EXTEND 3" THICK SOUND
ATTENUATION BLANKETS 2'-0"
HORIZONTALLY EACH SIDE OF
PARTITIONS SCHEDULED TO
RECEIVE BLANKETS
TO MATCH EXISTING
ADJACENT WALL
TYPE STUD
SIZE
PART.
THICK. RATNG DESIGNSOUND ATTN
BLANKET
E12 N/A 1'-1 5/8" FULL
DEPTH
E..
EXTERIOR
SCALE: 1 1/2" = 1'-0"
NOTE: INFILL OPENINGS IN EXISTING PARTITIONS WITH CONSTRUCTION TO MATCH
EXISTING CONSTRUCTION. PROVIDE BLOCKING AS REQUIRED FOR WALL-MOUNTED
ACCESSORIES AND CASEWORK. CONFIRM THAT RATED WALLS EXTEND TO CEILING AND
THAT ALL PENETRATIONS ARE SEALED. INFILL IN RATED WALLS TO MATCH EXISTING
ADJACENT RATED CONSTRUCTION.
(1) LAYER OF 5/8"
GWB
TO MATCH EXISTING
ADJACENT WALL
MATCH EXISTING WALL CONSTRUCTION
CONCRETE
BRICK
INTERIOREXTERIOR
F1a 7/8" 1-1/2" N/ANONE
MATCH EXISTING WALL CONSTRUCTION
ACOUSTICAL SEALANT
UNDERSIDE OF DECK
ABOVE
ACOUSTICAL SEALANT
F3b 3-5/8" 4-7/8" N/ANONE
F0a N/A 5/8" N/ANONE
STUD
SIZE
PART.
THICK.
SOUND ATTN
BLANKET
FINISHED FLOOR
ACOUSTICAL SEALANT
STEEL STUD FRAMING (SEE
SCHEDULE BELOW)
SOUND ATTENUATION
BLANKET
(SEE SCHEDULE BELOW)
DEFLECTION TRACK
UNDERSIDE OF COUNTER
ABOVE
(1) LAYER OF 5/8" GWB
S..
STUD PARTITIONS
SCALE: 1 1/2" = 1'-0"
TYPE RATING
DESIGN
NOTESSTC
ACOUSTICAL SEALANT
S8.1 (2)3 5/8" 8-3/8" UL DESIGN U419 STCFULL
DEPTH
BELOW FOR DIMENSION
SEE SCHEDULE
(1) LAYER OF 1/2" PLYWOOD
S3.2 3-5/8" 4-7/8" FULL
DEPTH STC IMPACT RESISTANT GWB
B.
O
DI
SP
EN
SE
R
B.
O
DI
SP
EN
SE
R
B.
O
M
IR
RO
RM
AX
LIQUID SOAP
DISPENSER
(S. DISP.)
PAPER TOWEL DISP.
(PT. DISP. & PTD.)
MIRROR
3'
- 6
3'
- 6
3'
- 4
1' - 6"
2'
- 1
0"
1' - 0" 3' - 6"
3'
- 0
" M
AX
3' - 0" 6"
HC WATER
CLOSET
GRAB BARS AT
WATER CLOSET
GRAB BARS AT
WATER CLOSET
TOILET PAPER DISP. W/
SANITARY DISPOSAL. (FEMALE
TOILETS ONLY)
LAVATORY/MIRROR TYP. LAVATORY DISPENSERS/TYP.
TOILET RM. DEVICES
2'
- 0
MIN
1' - 3"
2'
- 1
0" M
AX
2'
- 5
" M
IN
3'
- 4
" M
AX
MIN
1' - 3"
CL
EA
R 2'
- 5
3'
- 6
4'
- 6
" 6'
- 8
B.
O
. R
EF
LE
CT
IN
G
SU
RF
AC
E
M
AX
T O
H
IG
HE
ST
O
PE
RA
TI
NG
P
AR
T
T.
O
. S
YR
IN
G
E
DR
OP
TY
P.
U
NO
TO
C
EN
TE
RL
IN
E O
F
CL
O
CK
U .N
.O
SHARPS/GLOVE DISP. CLOCK
READ
THIS
TOWEL BAR BABY CHANGING
STATION
STD. WALL
PHONE
STD. WALL PHONE
AT WORKSTATIONS
COAT HOOK/ROBE
HOOK
COAT RACK
SIGNAGE
3'
- 6
4'
- 6
4'
- 0
4'- 0"
R
O
BE
H O
OK
4'
- 6
5'
- 0
M
AX
R
IM
2'
- 1
0"
3'
- 4
M
IN
1'
- 6
3' - 4"
2' -9
" M
IN
3'
- 0
M
AX
1' - 6"
2'
- 1
0"FRONT SIDE
2' -9
" M
IN
3'
- 1
0"
9" M
IN
SHELVING
SECTION
3'
- 6
2'
- 6
2'
- 9
" M
IN
3'
- 0
" M
AX
3'
- 2
" M
IN
4'
- 0
" M
AX
2'
- 9
" M
IN
3'
- 0
" M
AX
1' - 6"
M
IN
SHOWER
CONTROL SIDE WALL
SHOWER
BACK WALL
1'
- 5
1'
- 7 " M
AX
RAMP AND STAIR
HANDRAILS
2'
- 1
0"
2'- 8"
BOTTOM OF FIRE
EXTINGUISHER
CABINET
CENTER OF
BRACKET
CONTINUOUS BLOCKING
IN WALLS AS REQUIRED
FIRE
EXTINGUISHER
CABINET
FIRE
EXTINGUISHER
3'- 0"
4'- 0"
CONTINUOUS BLOCKING IN
WALL AS REQUIRED
WHITE BOARD
EQ EQ
5'- 0"
CL
6"
CEILING
EXIT
4'- 0"
8'- 0"
6'- 0"
6"4'- 0"
CLOCK OR
INTERCOMTHERMOSTAT
INTERCOM
FIRE ANNUNCIATOR
PANEL
ROOM
SIGNAGE
NOTE: TYPICAL MOUNTING HEIGHTS U.N.O.
BATHROOM PARTITION
4" 5'
- 1 1"
CEILING
HEADRAIL
DOOR
SUPPORTING
PEDESTAL
PANEL UP
TO TOP BAR
2"
INFILL PANEL
NOTE: SEAL ALL OPENINGS, GAPS, PENETRATIONS, AND JOINTS IN
PARTITION TYPES AS FOLLOWS:
FIRE RATED PARTITIONS AND SMOKE BARRIERS: SEAL IN ACCORDANCE
WITH THE REQUIREMENTS SPECIFIED IN THE DIVISION 07 SPECIFICATION
SECTIONS FOR PENETRATION FIRESTOP SYSTEMS AND FIRE RESISTIVE
JOINT SYSTEMS. REFER TO CODE COMPLIANCE DRAWINGS FOR LOCATIONS
OF SMOKE BARRIERS.
PARTITIONS DESIGNED TO RESIST THE PASSAGE OF SMOKE: SEAL
COMPLETELY WITH ELASTOMERIC SEALANT. FOR THE LOCATION AND
EXTENT REFER TO CODE COMPLIANCE DRAWINGS.
OTHER LOCATIONS: SEAL AS INDICATED AND REQUIRED ELSEWHERE BY
THE CONTRACT DOCUMENTS.
FOR ALL NON-RATED PARTITIONS, CLOSE THE VOID BETWEEN PARTITION
AND UNDERSIDE OF FLOOR OR ROOF DECK WITH MINERAL WOOL (SAFING
INSULATION) AND PROVIDE 1/2" DEEP NON-SAG ACOUSTICAL SEALANT,
BEADED.
PARTITION SHEET GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\J An de rs on \D oc um en ts
\1
_B ro ck to n_
B0 5_
Ar ch
_R
_J An de rs on .rv t 5/
/2
2:
:2
PM
GI002
MOUNTING HEIGHTS, WALL AND ROOF
TYPES, TOP OF WALL DETAILS
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 RJC LGC/EVR
1/2" = 1'-0"
TYP. DOOR CLEARANCE F1
CONSTRUCTION SEQUENCE NOTES:
GENERAL:
1. THE OVERALL SCOPE OF WORK ASSOCIATED WITH THE RENOVATIONS TO BUILDING 5 IS
REQUIRED TO MAINTAIN ACCESS AND OPERATIONS THROUGHOUT THE DURATION OF
CONSTRUCTION. THIS SHALL BE ACHIEVED THROUGH A SEQUENCE OF PHASES THAT
SHIFTS PROGRAM AREAS AFFECTED DURING THE ASSOCIATED PHASE TO TEMPORARY
STRUCTURES LOCATED ADJACENT TO THE SITE- REFER TO SHEET GI010.
2. A DETAILED PHASING AND SEQUENCING PLAN SHALL BE PROVIDED AND DETAILED PRIOR
TO EACH PHASE WITH ACKNOWLEDGEMENT OF SYSTEMS AND OPERATIONS THAT WILL
BE AFFECTED. EACH PHASE SHALL REQUIRE THE DEVELOPMENT OF THIS PLAN AND
ACCEPTANCE BY THE VA.
3. ALL PHASES SHALL MEET THE APPROPRIATE INFECTION CONTROL RISK ASSESSMENT
(ICRA) STANDARDS BASED UPON THE OCCUPANCY AND USE TYPE. EACH PHASE SHALL
REQUIRE THE DEVELOPMENT OF THIS PLAN AND ACCEPTANCE BY THE VA.
4. ALL PHASES SHALL MEET THE APPROPRIATE INTERIM LIFE SAFETY (ILSM) STANDARDS
BASED UPON THE OCCUPANCY AND USE TYPE. EACH PHASE SHALL REQUIRE THE
DEVELOPMENT OF THIS PLAN AND ACCEPTANCE BY THE VA.
5. THE CONSTRUCTION SEQUENCING DRAWINGS PROVIDED REFLECT ONE FEASIBLE
OPTION BASED ON THE BEST AVAILABLE INFORMATION PROVIDED BY THE VAMC STAFF.
6. ALL SERVICE INTERRUPTIONS SHALL BE PLANNED IN ADVANCE AND WORK SHALL BE
COORDINATED WITH THE VAMC STAFF. AFFECTS OF SERVICE INTERRUPTION SHALL BE
IDENTIFIED AND SHALL BE PERFORMED OUTSIDE OF NORMAL OPERATING HOURS.
7. THE CONTRACTOR SHALL WORK WITH THE VAMC STAFF TO FACILITATE THE MOVE OF
AFFECTED STAFF, FURNITURE AND EQUIPMENT. THESE MOVES INCLUDE THOSE
ASSOCIATED WITH TEMPORARY CONDITIONS AS WELL AS RELOCATION PER THE VAMC
MOVE PLAN. THE CONTRACTOR IS RESPONSIBLE FOR ALL MOVES OF FURNITURE AND
EQUIPMENT IN PREPARATION FOR EACH PHASE. THE CONTRACTOR SHALL ACCOUNT
FOR FURNITURE MOVED OUT OF A CONSTRUCTION AREA AND SHALL PROVIDE FOR
TEMPORARY STORAGE. THE CONTRACTOR SHALL WORK WITH THE VAMC STAFF AND
RELOCATED FURNITURE AND EQUIPMENT BASED UPON THE ACTIVATION
REQUIREMENTS ESTABLISHED BY THE VA.
8. WHEN WORK NEEDS TO BE PERFORMED IN AREAS THAT MUST BE KEPT CLEAR FOR
DAILY OPERATIONS THIS WORK WILL BE PERFORMED OUTSIDE OF NORMAL DAILY
OPERATIONS. WHEN THIS WORK IS PERFORMED THE AREA AFFECTED SHALL BE
RETURNED TO NORMAL USE BY THE START OF THE NEXT BUSINESS DAY.
9. WHERE TEMPORARY SERVICE IS REQUIRED TO MAINTAIN DAILY OPERATIONS, A
COMPREHENSIVE PLAN SHALL BE DEVELOPED BY THE CONTRACTOR AND REVIEWED
WITH THE VAMC STAFF WITH AN UNDERSTANDING OF THE EFFECTS TO ASSOCIATED
SERVICES. A STARTING TIME AND AN ANTICIPATED DURATION SHALL BE CLEARLY
DEFINED.
10. DURING EACH PHASE APPROPRIATE SIGNAGE AND WAYFINDING SHALL BE MAINTAINED.
SEQUENCE DESCRIPTION:
1. AS NOTED IN THE PHASING PLANS THE GOAL IS TO MAINTAIN NORMAL VA OPERATIONS
DURING THE CONSTRUCTION DURATION. AS MUCH OF THE INFRASTRUCTURE WORK
WILL AFFECT AREAS ON BOTH THE FIRST AND SECOND FLOORS THE PHASING PLANS
ARE DIVIDED INTO PHASES AND SUB-PHASES BY WING, AFFECTING AREAS ON BOTH
LEVELS. DETAILED PHASING PLANS SHALL BE DEVELOPED BY THE CONTRACTOR TO
COORDINATE WORK ASSOCIATED WITH EACH PHASE. THESE DETAILED PHASING PLANS
SHALL BE COORDINATED WITH THE VAMC STAFF. IF THERE ARE CHANGES TO THESE
PHASING PLANS, NEW PLANS SHALL BE DEVELOPED THAT INDICATE CHANGES.
2. TO ENSURE SUCH EXECUTIONS, CONTRACTOR SHALL FURNISH THE COR WITH A
SCHEDULE OF APPROXIMATE PHASING DATES ON WHICH THE CONTRACTOR INTENDS
TO ACCOMPLISH WORK IN EACH SPECIFIC AREA OF SITE, BUILDING OR PORTION
THEREOF. IN ADDITION, CONTRACTOR SHALL NOTIFY THE COR 30 DAYS IN ADVANCE OF
THE PROPOSED DATE OF STARTING WORK IN EACH SPECIFIC AREA OF SITE, BUILDING
OR PORTION THEREOF.
3. THE WORK TO BE PHASED SHALL INCLUDE, BUT NOT BE LIMITED TO:
4. PHASE 0: INFRASTRUCTURE AND TEMPORARY FACILITIES. THIS PHASE INCLUDES ALL
INFRASTRUCTURE WORK IN BUILDING 5 TO BE COMPLETED PRIOR TO WORKING ON
SUBSEQUENT PHASES – REFER TO DRAWING GI003. SOME AREAS MAY NOT BE VACATED
ENTIRELY BY THE VA PRIOR TO CONSTRUCTION FIELD WORK COMMENCEMENT FOR
PHASE 0. CONTRACTOR SHALL ENSURE THE OPERATIONS OF THE STAFF ARE NOT
NEGATIVELY AFFECTED. PORTABLE DUST CONTAINMENT SYSTEMS WILL BE REQUIRED
TO PERFORM WORK IF STAFF ARE ON THIS WARD. THIS PHASE ALSO INCLUDES THE
INSTALLATION OF TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) WHICH WILL NEED
TO BE INSTALLED, COMMISSIONED AND OPERATIONAL PRIOR TO WORKING ON
SUBSEQUENT PHASES – REFER TO DRAWING GI010. SEE NOTE C.
5. PHASE B-1: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO
CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI004. STAFF WILL
BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE
AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE
RENOVATION WORK IS ONGOING IN PHASE B-1. SEE NOTE D.
6. PHASE B-2: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO
CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI005. STAFF WILL
BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE
AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE
RENOVATION WORK IS ONGOING IN PHASE B-2. SEE NOTE E.
7. PHASE C-1: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO
CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI006. STAFF WILL
BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE
AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE
RENOVATION WORK IS ONGOING IN PHASE C-1. SEE NOTE F.
8. PHASE C-2: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO
CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI007. STAFF WILL
BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE
AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE
RENOVATION WORK IS ONGOING IN PHASE C-2. SEE NOTE G.
9. PHASE A-1: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO
CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI008. STAFF WILL
BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE
AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE
RENOVATION WORK IS ONGOING IN PHASE A-1. SEE NOTE H.
10. PHASE A-2: THIS AREA OF WORK WILL BE VACATED BY THE VA PRIOR TO
CONSTRUCTION FIELD WORK COMMENCEMENT – REFER TO DRAWING GI009. STAFF WILL
BE RELOCATED TO TEMPORARY FACILITIES (DEDUCT ALTERNATIVE #1) AND FURNITURE
AND EQUIPMENT WILL BE RELOCATED TO TEMPORARY STORAGE WHILE THE
RENOVATION WORK IS ONGOING IN PHASE A-2. SEE NOTE I.
11. NOTES:
A. THE ORDER OF PHASING MAY CHANGE AT THE DISCRETION OF THE VA
B. ONE PHASE SHALL BE COMPLETED BEFORE THE NEXT PHASE CAN COMMENCE.
C. 30 CALENDAR DAYS PRIOR TO START OF PHASE 0, THE CONTRACTOR SHALL
PROVIDE WRITTEN NOTIFICATION TO THE VA THE ACTUAL DATE CONSTRUCTION
FIELD WORK FOR PHASE 0 WILL COMMENCE (CONTRACTOR SHALL PROCEED WITH
CONSTRUCTION ONLY AFTER VETERANS AFFAIRS’ ACCEPTANCE OF ALL REQUIRED
SUBMITTALS AND COORDINATION DRAWINGS). VA WILL CONDUCT INTERNAL
COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE THE CONTRACTOR
CAN COMMENCE PHASE 0 WORK.
D. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE
ACTION FOR PUNCH LIST ITEMS AND BENEFICIAL OCCUPANCY DETERMINATION OF
THE TEMPORARY FACILITIES) OF PHASE 0, THE CONTRACTOR SHALL PROVIDE
WRITTEN NOTIFICATION TO THE VA THE DATE PHASE 0 WILL BE COMPLETE. VA HAS
14 CALENDAR DAYS FROM THE END OF PHASE 0 ACTUAL COMPLETION DATE TO
CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS ETC. BEFORE
THE CONTRACTOR CAN COMMENCE PHASE B-1 WORK.
E. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE
ACTION FOR PUNCH LIST ITEMS) OF PHASE B-1, THE CONTRACTOR SHALL PROVIDE
WRITTEN NOTIFICATION TO THE VA THE DATE PHASE B-1 WILL BE COMPLETE. VA HAS
14 CALENDAR DAYS FROM THE END OF PHASE B-1 ACTUAL COMPLETION DATE TO
CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE
THE CONTRACTOR CAN COMMENCE PHASE B-2 WORK.
F. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE
ACTION FOR PUNCH LIST ITEMS) OF PHASE B-2, THE CONTRACTOR SHALL PROVIDE
WRITTEN NOTIFICATION TO THE VA THE DATE PHASE B-2 WILL BE COMPLETE. VA HAS
14 CALENDAR DAYS FROM THE END OF PHASE B-2 ACTUAL COMPLETION DATE TO
CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE
THE CONTRACTOR CAN COMMENCE PHASE C-1 WORK.
G. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE
ACTION FOR PUNCH LIST ITEMS) OF PHASE C-1, THE CONTRACTOR SHALL PROVIDE
WRITTEN NOTIFICATION TO THE VA THE DATE PHASE C-1 WILL BE COMPLETE. VA
HAS 14 CALENDAR DAYS FROM THE END OF PHASE C-1 ACTUAL COMPLETION DATE
TO CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC.
BEFORE THE CONTRACTOR CAN COMMENCE PHASE C-2 WORK.
H. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE
ACTION FOR PUNCH LIST ITEMS) OF PHASE C-2, THE CONTRACTOR SHALL PROVIDE
WRITTEN NOTIFICATION TO THE VA THE DATE PHASE C-2 WILL BE COMPLETE. VA
HAS 14 CALENDAR DAYS FROM THE END OF PHASE C-2 ACTUAL COMPLETION DATE
TO CONDUCT INTERNAL COORDINATIONS/RELOCATIONS/NOTIFICATIONS/ETC.
BEFORE THE CONTRACTOR CAN COMMENCE PHASE A-1 WORK.
I. 30 CALENDAR DAYS PRIOR TO COMPLETION (WHICH INCLUDES ALL CORRECTIVE
ACTION FOR PUNCH LIST ITEMS) OF PHASE A-1, THE CONTRACTOR SHALL PROVIDE
WRITTEN NOTIFICATION TO THE VA THE DATE PHASE A-1 WILL BE COMPLETE. VA HAS
14 CALENDAR DAYS FROM THE END OF PHASE A-1 ACTUAL COMPLETION DATE TO
CONDUCT INTERNAL COORDINATION/RELOCATIONS/NOTIFICATIONS/ETC. BEFORE
THE CONTRACTOR CAN COMMENCE PHASE A-2 WORK.
12. THESE PHASES TAKE INTO CONSIDERATION THE TYPES OF ROOM AFFECTED AND
TEMPORARY FACILITIES SHALL ACCOMMODATE THE AFFECTED PROGRAM AREAS.
13. THE PHASES INDICATED ACCOUNT FOR ISLM AND ICRA REQUIREMENTS WHICH
MAINTAINS A SAFE AND HEALTHY WORKING ENVIRONMENT FOR THE VETERANS THE
VAMC STAFF AND THE ASSOCIATED CONTRACTORS.
14. THE INTENT OF THE TEMPORARY FACILITIES IS TO FLEX IN SIZE AND DURATION BASED
ON THE TYPE OF PROGRAM REQUIRED AND THE TIME FRAME ASSOCIATED WITH
RETURNING THE RENOVATED SPACE BACK TO OCCUPIABLE SPACE. HOWEVER THE
CONTRACTOR SHALL ESTABLISH TEMPORARY FACILITIES THAT ACCOMMODATE
SUFFICIENT SPACE FOR ALL THE PHASES (ESTIMATED AT 11,000 SF). THE CONTRACTOR
SHALL ACCOMMODATE TWO SPECIFIC PHASES B2 AND C2 WITH ADDITIONAL
TEMPORARY FACILITIES FOR LARGE CLASSROOM/MULTI-PURPOSE ROOM PROGRAM
AREAS. TEMPORARY FACILITIES FOR LARGE CLASSROOM/MULTI-PURPOSE SPACE SHALL
BE ADDED TO THE ESTABLISHED FACILITY AS APPROVED BY THE VA COR.
SEQUENCE DESCRIPTION (CONTINUED):
15. NOISE CONTROL- DUE TO THE NATURE OF THE VETERANS BEING TREATED AT THIS
FACILITY THERE WILL BE REQUIREMENTS TO MITIGATE NOISE GENERATED ON A
PERIODIC OR CONTINUOUS BASIS. A PLAN OF OPERATION SHALL BE DEVELOPED BY THE
CONTRACTOR THAT DEFINES THE DAILY WORK ACTIVITY AND WHAT MITIGATION PLANS
ARE IN PLACE TO MINIMIZE THE DISRUPTION OF DAILY ACTIVITIES. THIS DAILY PLAN
SHALL INDICATE WORK BEING PERFORMED THAT ACCOUNTS FOR SUDDEN NOISE OR
EXCESSIVE VIBRATION. IF THESE TASKS ARE TO BE PERFORMED, AN AGREED UPON
DURATION AND LOCATION SHALL BE ESTABLISHED.
16. THE CONTRACTOR SHALL ASSURE THAT THE SITE SUPERINTENDENT IS EASILY
ACCESSIBLE. IF THE SITE SUPERINTENDENT IS NOT ON SITE THEN AN INTERIM CONTACT
SHALL BE PROVIDED. THE CONTRACTOR SHALL PROVIDE THE VA WITH A LIST OF
CONTACTS IN DESCENDING ORDER OF RESPONSIBILITY STARTING WITH THE SITE
SUPERINTENDENT.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
1. THE CONTRACTOR SHALL ESTABLISH A PROCESS FOR THE REVIEW OF PCRA
REQUIREMENTS FOR EACH PHASE OF THE PROJECT WITH THE STAFF OF THE VAMC.
THEY SHALL WORK WITH THE VAMC STAFF TO ESTABLISH AND APPROVE EACH PHASE.
THIS PROCESS AT A MINIMUM SHALL REQUIRE THE FOLLOWING:
A. SEPARATION OF THE AREAS OF HEAVY AND MODERATE CONSTRUCTION FROM THE
VETERANS AND STAFF. THIS WILL BE ACHIEVED THROUGH THE CONSTRUCTION OF
TEMPORARY WALLS AND ACCESS DOORS THAT COMPLY WITH THE REQUIREMENTS
OF EACH PHASE.
a. THIS SEPARATED AREA SHALL BE KEPT IN NEGATIVE PRESSURE USING A HEPA
FILTERED NEGATIVE AIR MACHINES EXHAUSTED TO THE EXTERIOR. SOME
EXCEPTIONS SHALL BE REVIEWED AND IF APPROPRIATE APPROVED. THIS AREA
SHALL BE MONITORED USING A MAGNEHELIC PRESSURE GAUGE.
B. WHEN WORK IS PERFORMED ADJACENT TO INTAKE AIR AT MECHANICAL UNITS THEN
MEASURES MUST BE IN PLACE TO FILTER THE AIR APPROPRIATELY TO MINIMIZE THE
AFFECTS ON INDOOR AIR QUALITY.
2. DURING EACH PHASE THE CONTRACTOR SHALL DEVELOP A SAFETY STANDARD
OPERATING PROCEDURE TO BE REVIEWED WITH THE SUB CONTRACTORS. THIS
PROCEDURE SHALL BE COORDINATED WITH THE VA STAFF TO ENSURE SAFETY DURING
THE OPERATION OF CERTAIN TASKS.
3. THE CONTRACTOR SHALL CONTROL THE MIGRATION OF DUST AND MAINTAIN A CLEAN
JOB SITE. ANY CLEANING PERFORMED IN OCCUPIED AREAS SHALL BE ACCOMPLISHED
USING A HEPA FILTERED VACUUM.
INTERIM LIFE SAFETY MEASURES (ILSM)
1. THE CONTRACTOR SHALL ESTABLISH A PROCESS FOR THE REVIEW OF ILSM
REQUIREMENTS FOR EACH PHASE OF THE PROJECT WITH THE STAFF OF THE VAMC.
THEY SHALL WORK WITH THE VAMC STAFF TO ESTABLISH AND APPROVE EACH PHASE.
THIS PROCESS AT A MINIMUM SHALL REQUIRE THE FOLLOWING:
A. ESTABLISHING CLEAR PATHS OF EGRESS FOR VETERANS, THE VA STAFF AND THOSE
CONTRACTORS WITHIN THE CONSTRUCTION AREA. THIS SHALL INCLUDE
APPROPRIATE SIGNAGE APPROVED BY THE VA.
B. ALL EGRESS ROUTES SHALL BE KEPT CLEAR OF CONSTRUCTION MATERIAL AND
DEBRIS.
C. IF THE PLAN CALLS FOR ANY MODIFICATION OR REDUCTION IN THE LIFE SAFETY
FEATURES WITHIN THE FACILITY A DETAILED PLAN SHALL BE SUBMITTED FOR EACH
EVENT AND APPROVED BY THE VAMC STAFF. THESE EVENTS SHALL HAVE A
DEFINITIVE START AND END TIME. IF ADDITIONAL TIME IS REQUIRED, THEN THE PLAN
WILL NEED TO BE AMENDED ACCORDINGLY AND APPROVED BY THE VAMC STAFF.
SECURE ENVIRONMENT
1. THE CONTRACTOR SHALL INSTITUTE A METHOD TO TRACK ALL SUB-CONTRACTORS ON
SITE. THE CONTRACTOR SHALL MANAGE THE CHECK IN PROCESS AND TRACKING OF
SUB-CONTRACTORS.
2. THE SITE SHALL REMAIN A SECURE SITE AND MANAGEMENT OF ACCESS TO THE ACTIVE
AREAS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
UTILITY PHASING:
1. EACH TRADE SHALL PREPARE A PHASING PLAN COMPLYING WITH THE FOLLOWING
REQUIREMENTS
A. THE CONSTRUCTION PHASING ANTICIPATES THAT THE NEW WORK ASSOCIATED
WITH THE MECHANICAL, ELECTRICAL AND PLUMBING INFRASTRUCTURE SHALL BE
CONSTRUCTED TOGETHER TO ALLOW FOR EACH PHASE TO BE BROUGHT ON LINE
WITHOUT DELAY.
B. MECHANICAL:
a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE
INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH
NOTED IN GI003- GI011.
b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL
SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL
BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH TO WORK WITH LEVEL
1 AND LEVEL 2 RENOVATIONS.
c. ANY VALVING THAT NEEDS TO BE PROVIDED TO ACCOMMODATE PHASING SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR.
d. ANY INTERMEDIATE BALANCING TO ACCOMMODATE THE PHASED APPROACH
SHALL BE PROVIDED.
e. HEATING DISTRIBUTION SHALL BE CONSTRUCTED AT LEVEL 0 AND PREPARED TO
RISE UP VERTICALLY IN COORDINATION WITH EACH PHASE. THIS WORK SHALL
BE CLEAN AND PROTECTED, ALL PIPING, DUCTWORK AND ASSOCIATED MATERIAL
SHALL BE CLEAN WITHOUT CONSTRUCTION DEBRIS. DUCTWORK ON SITE OR
INSTALLED SHALL HAVE OPEN ENDS COVERED UNTIL FINAL INSTALLATION.
C. PLUMBING:
a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE
INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH
NOTED IN GI003- GI011.
b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL
SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL
BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH ASSOCIATED WITH
LEVEL 1 AND LEVEL 2 RENOVATIONS.
c. ANY VALVING THAT NEEDS TO BE PROVIDED TO ACCOMMODATE PHASING SHALL
BE THE RESPONSIBILITY OF THE CONTRACTOR.
d. ANY INTERMEDIATE BALANCING TO ACCOMMODATE THE PHASED APPROACH
SHALL BE PROVIDED.
e. DOMESTIC WATER, WASTE AND VENTING SHALL BE CONSTRUCTED AT LEVEL 0
AND PREPARED TO RISE UP VERTICALLY IN COORDINATION WITH EACH PHASE.
THIS WORK SHALL BE CLEAN AND PROTECTED.
D. ELECTRICAL:
a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE
INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH
NOTED IN GI003- GI011.
b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL
SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL
BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH ASSOCIATED WITH
LEVEL 1 AND LEVEL 2 RENOVATIONS.
c. ANY CIRCUITING THAT CROSSES PHASES SHALL BE FED TEMPORARILY TO
MAINTAIN FULL OPERATIONS.
E. LOW VOLTAGE:
a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE
INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH
NOTED IN GI003- GI011.
b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL
SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL
BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH ASSOCIATED WITH
LEVEL 1 AND LEVEL 2 RENOVATIONS.
c. ANY SYSTEMS TAKEN OUT OF SERVICE DURING CONSTRUCTION MUST MEET THE
REQUIREMENTS OF THE ILSM DEVELOPED FOR EACH PHASE.
F. FIRE PROTECTION:
a. THE PLAN SHALL INDICATE WORK TO BE COMPLETED AS PART OF THE BASE
INFRASTRUCTURE REQUIRED TO ACCOMMODATE THE PHASED APPROACH
NOTED IN GI003- GI011.
b. THE INFRASTRUCTURE REQUIRED ON LEVEL 0 AND THE PIPE BASEMENT LEVEL
SHALL REPRESENT THE INITIAL PHASE OF CONSTRUCTION AS THIS WORK SHALL
BE IN PLACE TO ACCOMMODATE THE PHASED APPROACH TO WORK ASSOCIATED
WITH LEVEL 1 AND LEVEL 2 RENOVATIONS.
c. ANY SYSTEMS TAKEN OUT OF SERVICE DURING CONSTRUCTION MUST MEET THE
REQUIREMENTS OF THE ILSM DEVELOPED FOR EACH PHASE.
G. TEMPORARY SIGNAGE
a. SHALL BE PROVIDED AT EACH PHASE OF WORK INDICATING, BUT NOT LIMITED TO
THE FOLLOWING:
• CONTRACTOR INFORMATION
1. SITE IDENTIFICATION
2. SITE ACCESS
3. EGRESS
4. TEMPORARY FACILITIES
5. SAFETY AREAS
6. ALL VAMC SIGNAGE REQUIREMENTS
• VAMC
1. ENTRY LOCATIONS
2. ACCESSIBILITY FEATURES
3. EGRESS
4. PROGRAM AREA IDENTIFICATION- INTERCHANGEABLE
5. DIRECTORIES- INTERCHANGEABLE
6. TEMPORARY PARKING
7. ALL VAMC SIGNAGE REQUIREMENTS
• ALL SIGNS SHALL BE PROVIDED BY THE CONTRACTOR WITH VAMC REVIEW
AND APPROVAL.
• ALL SIGNS TO MEET OR EXCEED ALL APPLICABLE CODES AND STANDARDS.
CARPENTRY
B004B
ALCOVE
B004
CARPENTRY
STORAGE
B004C
TOILET
B004A
STAIR
5-ST5B-001
STORAGE
B002E
PAINT SHOP
B002B
STAIR #4
5-ST4B-001
STORAGE
B002C
VACANT
B002D
LOUNGE
B003
STAIRS #2
ST2B101
ALCOVE
B002
STORAGE
B002A
STORAGE
B001
STORAGE
B005
OFFICE
B006
EQUIPMENT
STORAGE
B007
SERVICE
ROOM
B008
STORAGE
B005A
PUMP
MECHANICAL
ROOM
A003
STORAGE
B005D
STORAGE
B005C
CARPENTRY
STORAGE
B005B
STAIR
5-ST6B-001
SWITCH GEAR
A002
TELEPHONE
A001D
STORAGE
A001
STORAGE
A001B
PIPE SPACE
A001A
STORAGE
A001E
CORRIDOR
CR001
STORAGE
A004C
MECHANICAL
ROOM
A005
REPAIR SHOP
C001
STORAGE
C001A
OFFICE
C002
OFFICE
C003
STORAGE
A001C
STORAGE
C004
ELECTRIC
SHOP
C005
OFFICE
C005B
OFFICE
C005C
ELECTRIC
SHOP
C005A
STAIR #7
5-ST7C-001
STORAGE
C010
MENS TOILET
SHOWER &
SINK
C009A
TEL
C008 STORAGE
C009B
HVAC SHOP
C009C
STAIR #9
5-ST9C-001
PLUMBING
SHOP
C009D
CORRIDOR
C009
LOCK SHOP
C007
CONNECTING
CORRIDOR
C009F
STORAGE
C006
OFFICE
C005I
STORAGE
C005D
TOILET
C005E
TOILET
C005F
TOILET
C005G
STORAGE
C005H
STORAGE
C006A
CORRIDOR
CR002
CORRIDOR
CR003
PHASE 0
SCOPE OF WORK:
INFRASTRUCTURE PREPARATION FOR PHASED WORK TO BE COMPLETED ON LEVELS 1, 2 AND THE PENTHOUSE.
GENERAL NOTE:
ALL SYSTEMS SHALL REMAIN ACTIVE AND OPERATIONAL DURING NORMAL BUSINESS HOURS. ANY WORK COMPLETED IN OFF HOURS CONDITIONS THAT AFFECTS SYSTEMS OPERATION SHALL BE PLACED BACK INTO SERVICE AND TESTED PRIOR TO NEXT BUSINESS DAY OPERATIONS. ALL WORK TO BE COORDINATED WITH VAMC STAFF. ALL WORK ON LEVEL 0 AS PART OF THIS PHASE SHALL BE IN PREPARATION FOR PHASED WORK ASSOCIATED WITH B PHASE, C PHASE AND A PHASE WORK. EXISTING SYSTEMS TO REMAIN IN OPERATION UNTIL APPROPRIATE CUT OVER TO NEW SYSTEMS HAS BEEN REVIEWED AND APPROVED BY THE VA. EACH DISCIPLINE SHALL CREATE PHASED COORDINATION DRAWINGS AND SUBMIT TO THE VA AND THE DESIGN TEAM FOR REVIEW
AND APPROVAL.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\J An de rs on \D oc um en ts
\1
_B ro ck to n_
B0 5_
Ar ch
_R
_J An de rs on .rv t 5/
/2
2:
:4
PM
GI003
LEVEL 0 - PHASE 0 FLOOR PLAN AND
PHASING NOTES
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 RJC LGC/EVR
1" = 20'-0"
LEVEL 0 - 0 PHASING PLAN C10
OFFICE
B101
OFFICE
B102
OFFICE
B103
OFFICE
B104
CORRIDOR
B152
OFFICE
B148
OFFICE
B149
OFFICE
B150
CLOSET
5-B151A
CLOSET
5-B151B
STAIR #5
5-ST5B-101
OFFICE
B109
CONTROL ROOM
B110
OFFICE
B112
HALL
B113A
STORAGE
B113B
OFFICE
B108
CORRIDOR
B111
DIRECTOR OFFICE
C137B
OFFICE
C138
STAIR #9
5-ST9C-101
OFFICE
C139
STAIR #7
5-ST7C-101
CO
RR
ID
O
R C
CORRIDOR
C120
MENS TIOLET
B105
GROUP THERAPY
B147
STORAGE
B144
STORAGE
B145
STORAGE
B104A
OFFICE
B106
OFFICE
B107
OFFICE
B114
OFFICE
B115
GROUP THERAPY
B116
OFFICE
B117
EMER. ELECTRICAL
B118
OFFICE
B119
OFFICE
B120
STAIRS #2
ST2B101
LOBBY & WAITING
A101
OFFICE
A103
OFFICE
A106
OFFICE
A107
STORAGE
A108
STORAGE
A111
ELEVATOR
A112
H.A.C.
A113
WOMENS TOILET
A114
EXAM/TX
A115
COPY ROOM
A116
ELEC CLOSET
A121
CORRIDOR
A122
STAIRS #1
ST1A101
VESTIBULE
A101A
OFFICE
C101
OFFICE
C102
OFFICE
C103
OFFICE
C104
OFFICE
C105
FILE STORAGE
C106
OFFICE
C107
OFFICE
C114
MENS TOILET
C115
OFFICE
C116
TELE
C127
STORAGE
C128
CORRIDOR
C129
ALCOVE
C131
TOILET
C132
OFFICE
C133
PSY. OFFICE
C140
SOCIAL WORKER
C141
CO
RR
ID
O
R C
H.A.C.
C143
ELECTRICAL
CLOSET
C144
CO
RR
ID
O
R C
OFFICE
C146
TOILET
C147
MENS TOILET
C148
OFFICE
C149
OFFICE
C150
OFFICE
C151
EMER. ELEC
C101A
STAIRS #3
ST3C101
CORRIDOR
B146
STAIR #6
5-ST6B-101
OFFICE
C108
OFFICE
C109
OFFICE
C112
OFFICE
C111
OFFICE
C110
OFFICE
C117
OFFICE
C118
OFFICE
C119
OFFICE
C124
OFFICE
C123
OFFICE
C122
OFFICE
C121
OFFICE
C125
OFFICE
C126
PSY. OFFICE
C134
REC. THERAPY
OFFICE
C135
OFFICE
C136
CONFERENCE
C137A
OFFICE
A117
OFFICE
A118
OFFICE
A119OFFICE LEAD
CLERK
A120
OFFICE
A104
OFFICE
A105
OFFICE
B121
CARPENTRY
B004B
ALCOVE
B004
CARPENTRY
STORAGE
B004C
TOILET
B004A
STAIR
5-ST5B-001
LOUNGE
B003
STAIRS #2
ST2B101
STORAGE
B005
OFFICE
B006
EQUIPMENT
STORAGE
B007
SERVICE ROOM
B008
STORAGE
B005A
PUMP MECHANICAL
ROOM
A003
STORAGE
B005D
STORAGE
B005C
CARPENTRY
STORAGE
B005B
STAIR
5-ST6B-001
SWITCH GEAR
A002
TELEPHONE
A001D
STORAGE
A001
STORAGE
A001B
PIPE SPACE
A001A
STORAGE
A001E
STORAGE
A004C
MECHANICAL ROOM
A005
REPAIR SHOP
C001
STORAGE
C001A
OFFICE
C002
OFFICE
C003
STORAGE
A001C
STORAGE
C004
ELECTRIC SHOP
C005
OFFICE
C005B
OFFICE
C005C
ELECTRIC SHOP
C005A
STAIR #7
5-ST7C-001
STORAGE
C010
MENS TOILET
SHOWER & SINK
C009A
TEL
C008 STORAGE
C009B
HVAC SHOP
C009C
STAIR #9
5-ST9C-001
PLUMBING SHOP
C009D
CORRIDOR
C009
LOCK SHOP
C007
STORAGE
C006
OFFICE
C005I
STORAGE
C005D
TOILET
C005E
TOILET
C005F
TOILET
C005G
STORAGE
C005H
STORAGE
C006A
CORRIDOR
CR002 CORRIDOR
CR003
CLASSROOM
B218
PIPE SPACE
B219A
MEN'S TOILETS
B219
OFFICE
B217
STAIR #5
5-ST5B-201
CLASSROOM
B221
MULTI
C210
KITCHEN
C208
CONFERENCE
ROOM
C217A
OFFICE
C217
OFFICE
C215
OFFICE
C216
CO
RR
ID
O
R C
OFFICE
C226
OFFICE
C227
OFFICE
C228
OFFICE
C229
OFFICE
C230
OFFICE
C231
OFFICE
C232
COPY ROOM
C233
STAIR #9
5-ST9C-201
GROUP THERAPY
C234
OFFICE
C225
JAN. CLOSET
C236
STAFF TOILET
C223
ELECT.
C237
OFFICE
C238
STAIR 3
ST3C201
SOILED
C207
TOILET
C213A
MENS TOILET
C214FOOD STORAGE
C205
STORAGE
C204
OFFICE
C202
VOL. OFFICE
C203
VOL. OFFICE
C201
EMG. ELEC.
C201A
CLOSET
B220 OFFICE
B222
CLOSET
B216
STAIR #2
ST2B201
CLOSET
B223
TOILET
B222A
KITCHEN
B222B
OFFICE
B224
OFFICE
B225
OFFICE
A215A
OFFICE
A215
OFFICE
A214
OFFICE
A211
OFFICE
A210
OFFICE
A209A
GROUP OFFICE
A201
ELEVATOR
P-3
JANITOR CLOSET
A205
WOMENS TOILET
A206
OFFICE
A208
OFFICE
A207
OFFICE
A209
OFFICE
C239A
OFFICE
C239
OFFICE
C218
STORAGE
C213
COMM CLOSET
C220 STORAGE
C219
TOILET
B267
CORRIDOR
A217
OFFICE
B226
TOILET
B270
STORAGE
A202
CLOSET
C215A
STAIRS #1
ST1A201
CORRIDOR
A216
CORRIDOR
A218
STAIR #6
5-ST6B-201
STAIR #7
5-ST7C-201
WOMEN'S TOILET
B219A
STAFF RESTROOM
B214
OFFICE
B213
OFFICE
B212
OFFICE
B211H
OFFICE
B211G
OFFICE
B211F
CORRIDOR
B211E
CLOSET
5-B211J
CLOSET
5-B211K
STORAGE
B208
OFFICE
B209
OFFICE
B210
OFFICE
B211A
OFFICE
B211C
OFFICE
B211D
OFFICE
B211B
CLOSET
B215
ELEC.
B206
CONF.
B207
LACTATION
B206
STORAGE
B204
STORAGE
B204A COMPUTER LAB
B203
CO
RR
ID
O
R B2
STAIR
ST4B201
CONSTRUCTION ACCESS
TEMPORARY WALL
TEMPORARY DOOR
EX
IT
EXIT
TEL/DATA
A213
SECURE SHARED
OFFICE (HOTELING)
A211
STAFF RESTROOM
B141
JANITOR CLOSET
B127
ELEC CLOSET
B126B
CORRIDOR
B134
CLOSET
B134A
CLOSET
B134B
OFFICE
B128
STAIR
ST4B101
ELEC CLOSET
B126A OFFICE
B123
CO
RR
ID
O
R B1
CO
RR
ID
O R
B1
OFFICE
B125
SUPPORT
B125A
OFFICE
B129
OFFICE
B130
OFFICE
B131
OFFICE
B132
OFFICE
B133
OFFICE
B139
OFFICE
B138
OFFICE
B137
OFFICE
B136
OFFICE
B135
OFFICE
B122
TEL ROOM
A102
CONSTRUCTION ACCESS
TEMPORARY WALL
TEMPORARY DOOR
PHASE AREA OF WORK:
B-1
CONSTRUCTION ACCESS
EXIT
EX
IT
EXIT
EX
IT
STORAGE
B002E
PAINT SHOP
B002B
STAIR
ST4B001
STORAGE
B002C
VACANT
B002D
AL
C
O
VE
B0
ST
O
RA
G
E B0
A
STORAGE
B001
ELECTRICAL
B001A
CONSTRUCTION ACCESS
CORRIDOR
CR001
EX
IT
EX
IT
AREA COMPLETE
EGRESS DOOR
PHASING LEGEND:
EXIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\J An de rs on \D oc um en ts
\1
_B ro ck to n_
B0 5_
Ar ch
_R
_J An de rs on .rv t 5/
/2
2:
:1
PM
GI004
LEVEL 0, 1, AND 2 - PHASE B-1 FLOOR PLANS BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 RJC LGC/EVR
1" = 20'-0"
LEVEL 1 - B-1 PHASING PLAN E6
1" = 20'-0"
LEVEL 0 - B-1 PHASING PLAN F10
1" = 20'-0"
LEVEL 2 - B-1 PHASING PLAN C10
B-1
B-2
C-1
C-2A-1 A-2
KEY PLAN - PHASES
1/64" = 1'-0"
SERVICE ROOM
B008
PUMP MECHANICAL
ROOM
A003
SWITCH GEAR
A002
TELEPHONE
A001D
STORAGE
A001
STORAGE
A001B
PIPE SPACE
A001A
STORAGE
A001E
STORAGE
A004C
MECHANICAL ROOM
A005
REPAIR SHOP
C001
STORAGE
C001A
OFFICE
C002
OFFICE
C003
STORAGE
A001C
STORAGE
C004
ELECTRIC SHOP
C005
OFFICE
C005B
OFFICE
C005C
ELECTRIC SHOP
C005A
STAIR #7
5-ST7C-001
STORAGE
C010
MENS TOILET
SHOWER & SINK
C009A
TEL
C008 STORAGE
C009B
HVAC SHOP
C009C
STAIR #9
5-ST9C-001
PLUMBING SHOP
C009D
CORRIDOR
C009
LOCK SHOP
C007
STORAGE
C006
OFFICE
C005I
STORAGE
C005D
TOILET
C005E
TOILET
C005F
TOILET
C005G
STORAGE
C005H
STORAGE
C006A
CORRIDOR
CR002 CORRIDOR
CR003
CARPENTRY
B004B
ALCOVE
B004
CARPENTRY
STORAGE
B004C
RESTROOM
B004A
STAIR
ST5B001
STORAGE
B002E
STAIR
ST4B001
STORAGE
B002C
VACANT
B002D
LOUNGE
B003
STAIR
ST2B001
AL
C
O
VE
B0
ST
O
RA
G
E B0
A
STORAGE
B001
STORAGE
B005
OFFICE
B006
EQUIPMENT
STORAGE
B007
STORAGE
B005A
STORAGE
B005D
STORAGE
B005C
CARPENTRY
STORAGE
B005B
STAIR
ST6B001
CORRIDOR
CR001
ELECTRICAL
B001A
CONSTRUCTION ACCESS
PAINT SHOP
B002B
EX
IT
EX
IT
DIRECTOR OFFICE
C137B
OFFICE
C138
STAIR #9
5-ST9C-101
OFFICE
C139
STAIR #7
5-ST7C-101
CORRIDOR
C120
OFFICE
B119
OFFICE
B120
OFFICE
A103
OFFICE
A106
OFFICE
A107
STORAGE
A108
STORAGE
A111
ELEVATOR
A112
H.A.C.
A113
WOMENS TOILET
A114
EXAM/TX
A115
COPY ROOM
A116
STAIRS #1
ST1A101
VESTIBULE
A101A
OFFICE
C101
OFFICE
C102
OFFICE
C103
OFFICE
C104
OFFICE
C105
FILE STORAGE
C106
OFFICE
C107
OFFICE
C114
MENS TOILET
C115
OFFICE
C116
TELE
C127
STORAGE
C128
ALCOVE
C131
TOILET
C132
OFFICE
C133
PSY. OFFICE
C140
SOCIAL WORKER
C141
CO
RR
ID
O
R C
H.A.C.
C143
ELECTRICAL
CLOSET
C144
OFFICE
C146
TOILET
C147
MENS TOILET
C148
OFFICE
C149
OFFICE
C150
OFFICE
C151
EMER. ELEC
C101A
STAIRS #3
ST3C101
OFFICE
C108
OFFICE
C109
OFFICE
C112
OFFICE
C111
OFFICE
C110
OFFICE
C117
OFFICE
C118
OFFICE
C119
OFFICE
C124
OFFICE
C123
OFFICE
C122
OFFICE
C121
OFFICE
C125
OFFICE
C126
PSY. OFFICE
C134
REC. THERAPY
OFFICE
C135
OFFICE
C136
CONFERENCE
C137A
OFFICE
A117
OFFICE
A118
OFFICE
A119OFFICE LEAD
CLERK
A120
OFFICE
A104
OFFICE
A105
OFFICE
B121
CO
RR
ID
O
R C
LOBBY & WAITING
A101
CORRIDOR
A122
CORRIDOR
C129
CO
RR
ID
O
R C
STAIR
ST5B101
CO
RR
ID
O
R B1
CLOSET
5-B151A
CLOSET
5-B151B
OFFICE
B150
OFFICE
B149
OFFICE
B148
OFFICE
B147A STAIR
ST2B101
STORAGE
B145
STORAGE
B144
CORRIDOR
B152
OFFICE
B102
OFFICE
B103
OFFICE
B104
OFFICE
B101
STORAGE
B104A
STAFF BREAK
ROOM
B106
STAFF RESTROOM
B141
JANITOR CLOSET
B127
ELEC CLOSET
B126B
CLOSET
B134A
CLOSET
B134B
OFFICE
B128
CORRIDOR
B124E
OFFICE
B115 OFFICE
B116A
STAIR
ST6B101
OFFICE
B114
STORAGE
B113B
STAIR
ST4B101
ELEC CLOSET
B126A OFFICE
B123
CO
RR
ID
O
R B1
CO
RR
ID
O R
B1
OFFICE
B147B
OFFICE
B125
SUPPORT
B125A
PUBLIC RESTROOM
- F
B105APUBLIC RESTROOM
- M
B105B
CORRIDOR
B113A
CORRIDOR
B124B
CORRIDOR
B124C
OFFICE
B129
OFFICE
B130
OFFICE
B131
OFFICE
B132
OFFICE
B133
OFFICE
B139
OFFICE
B138
OFFICE
B137
OFFICE
B136
OFFICE
B135
OFFICE
B107
OFFICE
B108
OFFICE
B109
OFFICE
B112
OFFICE
B116B
OFFICE
B117
OFFICE
B122
TEL ROOM
A102
CONSTRUCTION ACCESS
EMER. ELECTRICAL
B119A
TEMPORARY DOOR
TEMPORARY WALL
PHASE AREA OF WORK:
B-2
CONSTRUCTION ACCESS
EXIT
EX
IT
MULTI
C210
KITCHEN
C208
CONFERENCE
ROOM
C217A
OFFICE
C217
OFFICE
C215
OFFICE
C216
CO
RR
ID
O
R C
OFFICE
C226
OFFICE
C227
OFFICE
C228
OFFICE
C229
OFFICE
C230
OFFICE
C231
OFFICE
C232
COPY ROOM
C233
STAIR #9
5-ST9C-201
GROUP THERAPY
C234
OFFICE
C225
JAN. CLOSET
C236
STAFF TOILET
C223
ELECT.
C237
OFFICE
C238
STAIR 3
ST3C201
SOILED
C207
TOILET
C213A
MENS TOILET
C214FOOD STORAGE
C205
STORAGE
C204
OFFICE
C202
VOL. OFFICE
C203
VOL. OFFICE
C201
EMG. ELEC.
C201A
OFFICE
A215A
OFFICE
A215
OFFICE
A214
OFFICE
A213
OFFICE
A211
OFFICE
A210
OFFICE
A209A
GROUP OFFICE
A201
ELEVATOR
P-3
JANITOR CLOSET
A205
WOMENS TOILET
A206
OFFICE
A208
OFFICE
A207
OFFICE
A209
OFFICE
C239A
OFFICE
C239
OFFICE
C218
STORAGE
C213
COMM CLOSET
C220 STORAGE
C219
TOILET
B267
CORRIDOR
A217
STORAGE
A202
CLOSET
C215A
STAIRS #1
ST1A201
CORRIDOR
A217
CORRIDOR
A217
STAIR #7
5-ST7C-201
CLASSROOM
B218
OFFICE
B217
PUBLIC RESTROOM
- F
B219A PUBLIC RESTROOM
- M
B219B
CORRIDOR
A201C
CLOSET
B216
STAIR
ST2B201
STAFF RESTROOM
B214
OFFICE
B213
OFFICE
B212
OFFICE
B211H
OFFICE
B211G
OFFICE
B211F
CLOSET
5-B211J
CLOSET
5-B211K
STORAGE
B208
OFFICE
B209
OFFICE
B210
OFFICE
B211A
OFFICE
B211C
OFFICE
B211D
OFFICE
B211B
CLOSET
B215
ELEC.
B206
CONF.
B207
LACTATION
B206
STORAGE
B204
STORAGE
B204A COMPUTER LAB
B203
OFFICE
B226
OFFICE
B225
OFFICE
B224
CLOSET
B223
TOILET
B222A
KITCHEN
B222BOFFICE
B222
CLOSET
B220
CLASSROOM
B221
STAIR
ST6B201
STAIR
ST5B201
CO
RR
ID
O
R B2
STAIR
ST4B201
TOILET
B270
CO
RR
ID
O
R A2
E
CONSTRUCTION ACCESS
TEMPORARY DOOR
TEMPORARY WALL
EXIT
EX
IT
AREA COMPLETE
EGRESS DOOR
PHASING LEGEND:
EXIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\J An de rs on \D oc um en ts
\1
_B ro ck to n_
B0 5_
Ar ch
_R
_J An de rs on .rv t 5/
/2
2:
:4
PM
GI005
LEVEL 0, 1, AND 2 - PHASE B-2 FLOOR PLANS BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 RJC LGC/EVR
1" = 20'-0"
LEVEL 0 - B-2 PHASING PLAN F10
1" = 20'-0"
LEVEL 1 - B-2 PHASING PLAN E6
1" = 20'-0"
LEVEL 2 - B-2 PHASING PLAN C10
B-1
B-2
C-1
C-2A-1 A-2
KEY PLAN - PHASES
PUMP MECHANICAL
ROOM
A003
SWITCH GEAR
A002
TELEPHONE
A001D
STORAGE
A001
STORAGE
A001B
PIPE SPACE
A001A
STORAGE
A001E
STORAGE
A004C
MECHANICAL ROOM
A005
REPAIR SHOP
C001
STORAGE
C001A
OFFICE
C002
OFFICE
C003
STORAGE
A001C
STORAGE
C004
ELECTRIC SHOP
C005
OFFICE
C005B
OFFICE
C005C
ELECTRIC SHOP
C005A
STAIR #7
5-ST7C-001
STORAGE
C010
MENS TOILET
SHOWER & SINK
C009A
TEL
C008 STORAGE
C009B
LOCK SHOP
C007
STORAGE
C006
OFFICE
C005I
STORAGE
C005D
TOILET
C005E
TOILET
C005F
TOILET
C005G
STORAGE
C005H
STORAGE
C006A
CORRIDOR
CR002 CORRIDOR
CR003
CORRIDOR
C009
STAIR #7
5-ST7C-101
EMER. ELECTRICAL
B118
OFFICE
B119
OFFICE
B120
OFFICE
A103
OFFICE
A106
OFFICE
A107
STORAGE
A108
STORAGE
A111
ELEVATOR
A112
H.A.C.
A113
WOMENS TOILET
A114
EXAM/TX
A115
COPY ROOM
A116
STAIRS #1
ST1A101
VESTIBULE
A101A
OFFICE
C101
OFFICE
C102
OFFICE
C103
OFFICE
C104
OFFICE
C105
FILE STORAGE
C106
OFFICE
C107
OFFICE
C114
MENS TOILET
C115
OFFICE
C116
TELE
C127
STORAGE
C128
MENS TOILET
C148
OFFICE
C149
OFFICE
C150
OFFICE
C151
EMER. ELEC
C101A
STAIRS #3
ST3C101
OFFICE
C108
OFFICE
C109
OFFICE
C112
OFFICE
C111
OFFICE
C110
OFFICE
C117
OFFICE
C118
OFFICE
C119
OFFICE
C124
OFFICE
C123
OFFICE
C122
OFFICE
C121
OFFICE
C125
OFFICE
C126
OFFICE
A117
OFFICE
A118
OFFICE
A119OFFICE LEAD
CLERK
A120
OFFICE
A104
OFFICE
A105
OFFICE
B121
CORRIDOR
C120
CO
RR
ID
O
R C
LOBBY & WAITING
A101
CORRIDOR
A122
CO
RR
ID
O
R C
MULTI
C210
KITCHEN
C208
CONFERENCE
ROOM
C217A
OFFICE
C217
OFFICE
C215
OFFICE
C216
OFFICE
C238
STAIR 3
ST3C201
SOILED
C207
TOILET
C213A
MENS TOILET
C214FOOD STORAGE
C205
STORAGE
C204
OFFICE
C202
VOL. OFFICE
C203
VOL. OFFICE
C201
EMG. ELEC.
C201A
OFFICE
A215A
OFFICE
A215
OFFICE
A214
OFFICE
A213
OFFICE
A211
OFFICE
A210
OFFICE
A209A
GROUP OFFICE
A201
ELEVATOR
P-3
JANITOR CLOSET
A205
WOMENS TOILET
A206
OFFICE
A208
OFFICE
A207
OFFICE
A209
OFFICE
C239A
OFFICE
C239
OFFICE
C218
STORAGE
C213
COMM CLOSET
C220 STORAGE
C219
CORRIDOR
A217
STORAGE
A202
CLOSET
C215A
STAIRS #1
ST1A201
CORRIDOR
A217
CORRIDOR
A217
STAIR #7
5-ST7C-201
CARPENTRY
B004B
ALCOVE
B004
CARPENTRY
STORAGE
B004C
RESTROOM
B004A
STAIR
ST5B001
STORAGE
B002E
STAIR
ST4B001
STORAGE
B002C
VACANT
B002D
LOUNGE
B003
STAIR
ST2B001
AL
C
O
VE
B0
ST
O
RA
G
E B0
A
STORAGE
B001
STORAGE
B005
OFFICE
B006
EQUIPMENT
STORAGE
B007
STORAGE
B005A
STORAGE
B005D
STORAGE
B00…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .