S06 523A5-19-305-MD111-1.pdf
PDF 601 KB Posted
- Solicitation number
- 36C24121R0163
About this file
This document package includes mechanical demolition plans and specifications for the renovation of a mental health outpatient facility, along with details of the corresponding federal contract solicitation.
The renovation work outlined in the mechanical demolition plans will remove existing steam piping, fan coil units, ductwork and other HVAC components from Wings A and B of Building 5 at the Brockton VA Medical Center campus. The project will maintain HVAC system operation in all unaffected areas during phased construction. Solicitation 36C24121R0163 was issued by the Department of Veterans Affairs for the Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305. The solicitation seeks bids for trade contractor services to complete the demolition and renovation work depicted in the mechanical plans in accordance with project specifications.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E1
1.1 1.3
E2
2.1
E3
3.2 3.9 4.1 4.3
L
EJ
K
EI
G.9
EG.1
EG
G
EF
EE
ED
EC.9
E4 E5 E6 E7 7.1
E8
8.1
EA A.1
EB A.9
B.5
EC
E5.5 E6.5 E7.5
E9 E10 E11 E12 E13 E15
E4.12 E4.13
E14 E16 E17E18
EH
(E)FC-2
(E)FC-1 (E)FC-1
(E)FC-1
(E)FC-1 (E)FC-1 (E)FC-1
(E)FC-1
(E)FC-3
(E)FC-1
(E)FC-3
(E)FC-3
(E)FC-3
(E)FC-3
(R)FC-1
(E)FC-6 (E)FC-1
(R)FC-4 (R)FC-4
(R)FC-4 (R)FC-4
(E)FC-6
(E)FC-2 (E)FC-2
(R) FC
(R)FC-5 (R)FC-5 (R)FC-5
(R)FC-7
(R)FC-2 (R)FC-2
(E)FC-2
(R)FC-4
(R)FC-4
(E)FC-1 (E)FC-1
(E)FC-1(E)FC-1
(E)FC-1 (E)FC-1
(E)FC-1(E)FC-1
(E)FC-1 (E)FC-1
(E)FC-2
REMOVE RECESSED
STEAM CONVECTOR
UNITS, PIPING,
CONTROL VALVES &
SUPPORTS IN ITS
ENTIRETY (TYP.)
REMOVE RECESSED
STEAM CONVECTOR
UNITS, PIPING,
CONTROL VALVES &
SUPPORTS IN ITS
ENTIRETY (TYP.)
REMOVE RECESSED
STEAM CONVECTOR
UNITS, PIPING,
CONTROL VALVES &
SUPPORTS IN ITS
ENTIRETY (TYP.)
REMOVE RECESSED
STEAM CONVECTOR
UNITS, PIPING,
CONTROL VALVES &
SUPPORTS IN ITS
ENTIRETY (TYP.)
REMOVE RECESSED STEAM
CONVECTOR UNITS, PIPING,
CONTROL VALVES & SUPPORTS
IN ITS ENTIRETY (TYP.).)
REMOVE RECESSED
STEAM CONVECTOR
UNITS, PIPING,
CONTROL VALVES &
SUPPORTS IN ITS
ENTIRETY (TYP.)
(E) CHWR
(E) CHWR
(E) CHWS
(E) CHWR
(E) CHWR
(E) CHWS
(E) CHWR
(E) CHWR
(E) CHWS
(E) 4"
CHWS/R - UP
& DN.
(E) LPS/R - UP & DN
W
IN
G B
W
IN
G A
W
IN
G B
W
IN
G A
W
IN
G C
W
IN
G A
W
IN
G C
W
IN
G A
MEN
B105
WOMEN
A114
OFFICE
B119
OFFICE
B120 OFFICE
A106
OFFICE
A107
OFFICE
A105
OFFICE
A104
JAN. CLOSET
A113
EXAM/ TX
A115
OFFICE
A118OFFICE
A119
OFFICE
A116
OFFICE
B121
OFFICE
B101
OFFICE
B102
OFFICE
B103
OFFICE
B104
CORRIDOR
B151
CORRIDOR
B152
OFFICE
B150
OFFICE
B149
OFFICE
B148
STAIR
ST5B101
STAIR
ST2B101
STAFF BREAK
ROOM
B106
CORRIDOR
B124E
CORRIDOR
B124B
OFFICE
B109
OFFICE
B112
OFFICE
B108 STORAGE
B113B
STAIR
ST6B101
OFFICE
B114
OFFICE
B107
OFFICE
B115
OFFICE
B116A
OFFICE
B116B
SUPPORT
B125A
OFFICE
B125
OFFICE
B123
OFFICE
B122
STAIR
ST4B101
CORRIDOR
B134
OFFICE
B133
OFFICE
B132
OFFICE
B135
OFFICE
B136
OFFICE
B131
OFFICE
B130
OFFICE
B137
OFFICE
B138
OFFICE
B129
OFFICE
B128
OFFICE
B139
STAFF
RESTROOM
B141
JANITOR
CLOSET
B127
ELEVATOR
A112STAIR
ST1A101
LOBBY
A101A
TEL ROOM
A102
OFFICE LEAD
CLERK
A120B
OFFICE
A117
(E) LPS & LPR UP TO (E)
CONVECTOR TO REMAIN.
(E) LPS & LPR DN.
(E) CONVECTOR
TO REMAIN.
(E) LPS &
LPR DN.
(E) LPS & LPR UP
TO (E) CONVECTOR
TO REMAIN.
(E) LPS &
LPR DN.
(E) CONVECTOR
TO REMAIN.
(E) LPS &
LPR DN.
(E) LPS & LPR UP
TO (E) CONVECTOR
TO REMAIN.
(E) LPS &
LPR DN.
(E) CONVECTOR
TO REMAIN.
(E) 4" LPS &
(E) 2" LPR -
UP & DN.
1 1
1 1
1 1
1 1 1 1 1 1 1 1
1 1
1 1 1 1 1 1
2 2
OFFICE
A103
(R) FC 2
(E ) C
HW
R
(E ) C
HW
S
(E ) C
HW
R
B A C
NOTES:
1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.
2. REFER TO PHASING AND SEQUENCING PLANS,
SPECIFICATIONS AND GENERAL REQUIREMENTS IN
REFERENCE TO COORDINATION OF ALL WORK TO BE
PERFORMED. WORK ASSOCIATED WITH PHASE 0
SHALL ESTABLISH THE INFRASTRUCTURE REQUIRED
TO EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN
SYSTEMS IN FULL OPERATION. ALL DEMOLITION
WORK SHALL BE COORDINATED WITH OTHER
ASSOCIATED TRADES.
3. COORDINATE ALL DEMOLITION WITH ASSOCIATED
PHASING PLAN. THE INTENT OF THIS PROJECT IS TO
MAINTAIN OPERATION IN ALL AREAS OUTSIDE OF THE
DESIGNATED PHASE DELINEATION, REFER TO GI003
FOR CONSTRUCTION SEQUENCE.
4. THE MECHANICAL CONTRACTOR SHALL CLEAN,
INSPECT AND REPAIR ALL RE-USED DUCTWORK,
DAMPERS, MECHANICAL COMPONENTS AND ANY
OTHER ITEM(S) NECESSARY FOR A COMPLETE AND
PROPER OPERATING SYSTEM.
5. REFER TO GENERAL NOTES 14, 42 & 43 FOR
FIRESTOPPING REQUIREMENTS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
100% [FINAL] BID
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
0" 1/4" 1/2" 1" 2" 3"
C :\U se rs
\k be rry \D oc um en ts
\1
_B ro ck to n_
B0 5_
M ec h_ R
_k be rry sm rti nc
.c om
.rv t
9/
/2
:3 8:
A
M
MD111.1
LEVEL 1 - HVAC PIPING DEMOLITION PLAN -
WINGS A AND B
BUILDING 5 OUTPATIENT MENTAL
HEALTH RENOVATION
BROCKTON, MA
523A5-19-305
5-14-21 MJC BGG
1/8" = 1'-0"
AFL01 - LEVEL 1 -HVAC PIPING DEMOLITION PLAN - WINGS A AND B F9 1/64" = 1'-0"
KEY PLAN - WINGS A AND B
KEYNOTES
KEYNOTE KEYNOTE DESCRIPTION
1 EXISTING LPS/R PIPING TO BE REMOVED BACK TO POINT INDICATED AND
CAPPED. ALL LPS/R PIPE RISERS ROUTED WITHIN UNRENOVATED
WALLS/ENCLOSURES SHALL BE ABANDONED IN PLACE. CONTRACTOR
SHALL PROVIDE CAPS AT BOTH ENDS. CONTRACTOR SHALL REMOVE ALL
HORIZONTAL LPS/R PIPING ROUTED TO SECOND FLOOR CONVECTORS (TO
BE REMOVED) LOCATED WITHIN FIRST FLOOR PLENEM.
2 REMOVE FAN COIL UNIT, DUCTWORK, VALVES, CONTROL WIRING,
COMPONENTS AND SUPPORTS IN ITS ENTIRETY.
Revisions: Date:
ADDENDUM 1 09-27-2022
5-14-21