This document package includes mechanical demolition plans and specifications for the renovation of a mental health outpatient facility, along with details of the corresponding federal contract solicitation.

The renovation work outlined in the mechanical demolition plans will remove existing steam piping, fan coil units, ductwork and other HVAC components from Wings A and B of Building 5 at the Brockton VA Medical Center campus. The project will maintain HVAC system operation in all unaffected areas during phased construction. Solicitation 36C24121R0163 was issued by the Department of Veterans Affairs for the Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305. The solicitation seeks bids for trade contractor services to complete the demolition and renovation work depicted in the mechanical plans in accordance with project specifications.

View the file

Other files

File Type Posted
36C24121R0163 0012.pdf PDF
36C24121R0163 0011.docx DOCX document
36C24121R0163 0010.docx DOCX document
36C24121R0163 0009.pdf PDF
36C24121R0163 0008.docx DOCX document
S04 - Site Visit Sign In Sheet 2-9-2023.pdf PDF
S06 General Decision Number MA20230012 1-27-2023.pdf PDF
36C24121R0163 0007.docx DOCX document
S06 Limitations on Subcontracting Certificate of Compliance 11-2022.pdf PDF
VHA COVID-19 Operational Plan 1-27-2023 (1).pdf PDF
36C24121R0163 0006.pdf PDF
S02 MA20230012.pdf PDF
36C24121R0163 0005.pdf PDF
36C24121R0163 0004.pdf PDF
S06 36C24121R0163 0003.docx DOCX document
S06 w7-r Sanitary - Profiles - Sewers.pdf PDF
S06 523A5-19-305-EP652.pdf PDF
S06 220927 19101 ADDENDUM 01_R5.docx DOCX document
S06 523A5-19-305-MD101-2.pdf PDF
S06 VA Brockton and Jamaica Plain Dust and Soil Rpt _FINAL 021716.pdf PDF
S06 Sommerville High School Drawings Renovation 1-23-18 - Room Number Marku....pdf PDF
S06 w4-r Sanitary - Location Plan - Sanitary-Sewer-Water.pdf PDF
36C24121R0163 0002.docx DOCX document
S02 General Decision Number MA20220012 09-02-2022.pdf PDF
S02 General Decision Number MA20220012 08122022.txt TXT text file
36C24121R0163 0001.docx DOCX document
S04 Sign In Sheet B5 MH Outpatient.pdf PDF
S02 36C24121R0163 Final.docx DOCX document
36C24121R0163.docx DOCX document
523A5-19-305 - B5 Outpatient MH Renovation 100 Percent Final Bid Documents - SPECS.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 1_STAMPED_210514_19101.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 2_STAMPED_210514_19101.pdf PDF
S02 SSJ - B5 MH Outpatient_R1SIGNED PA-DW.pdf PDF
EMR FORM.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E1

1.1 1.3

E2

2.1

E3

3.2 3.9 4.1 4.3

L

EJ

K

EI

G.9

EG.1

EG

G

EF

EE

ED

EC.9

E4 E5 E6 E7 7.1

E8

8.1

EA A.1

EB A.9

B.5

EC

E5.5 E6.5 E7.5

E9 E10 E11 E12 E13 E15

E4.12 E4.13

E14 E16 E17E18

EH

(E)FC-2

(E)FC-1 (E)FC-1

(E)FC-1

(E)FC-1 (E)FC-1 (E)FC-1

(E)FC-1

(E)FC-3

(E)FC-1

(E)FC-3

(E)FC-3

(E)FC-3

(E)FC-3

(R)FC-1

(E)FC-6 (E)FC-1

(R)FC-4 (R)FC-4

(R)FC-4 (R)FC-4

(E)FC-6

(E)FC-2 (E)FC-2

(R) FC

(R)FC-5 (R)FC-5 (R)FC-5

(R)FC-7

(R)FC-2 (R)FC-2

(E)FC-2

(R)FC-4

(R)FC-4

(E)FC-1 (E)FC-1

(E)FC-1(E)FC-1

(E)FC-1 (E)FC-1

(E)FC-1(E)FC-1

(E)FC-1 (E)FC-1

(E)FC-2

REMOVE RECESSED

STEAM CONVECTOR

UNITS, PIPING,

CONTROL VALVES &

SUPPORTS IN ITS

ENTIRETY (TYP.)

REMOVE RECESSED

STEAM CONVECTOR

UNITS, PIPING,

CONTROL VALVES &

SUPPORTS IN ITS

ENTIRETY (TYP.)

REMOVE RECESSED

STEAM CONVECTOR

UNITS, PIPING,

CONTROL VALVES &

SUPPORTS IN ITS

ENTIRETY (TYP.)

REMOVE RECESSED

STEAM CONVECTOR

UNITS, PIPING,

CONTROL VALVES &

SUPPORTS IN ITS

ENTIRETY (TYP.)

REMOVE RECESSED STEAM

CONVECTOR UNITS, PIPING,

CONTROL VALVES & SUPPORTS

IN ITS ENTIRETY (TYP.).)

REMOVE RECESSED

STEAM CONVECTOR

UNITS, PIPING,

CONTROL VALVES &

SUPPORTS IN ITS

ENTIRETY (TYP.)

(E) CHWR

(E) CHWR

(E) CHWS

(E) CHWR

(E) CHWR

(E) CHWS

(E) CHWR

(E) CHWR

(E) CHWS

(E) 4"

CHWS/R - UP

& DN.

(E) LPS/R - UP & DN

W

IN

G B

W

IN

G A

W

IN

G B

W

IN

G A

W

IN

G C

W

IN

G A

W

IN

G C

W

IN

G A

MEN

B105

WOMEN

A114

OFFICE

B119

OFFICE

B120 OFFICE

A106

OFFICE

A107

OFFICE

A105

OFFICE

A104

JAN. CLOSET

A113

EXAM/ TX

A115

OFFICE

A118OFFICE

A119

OFFICE

A116

OFFICE

B121

OFFICE

B101

OFFICE

B102

OFFICE

B103

OFFICE

B104

CORRIDOR

B151

CORRIDOR

B152

OFFICE

B150

OFFICE

B149

OFFICE

B148

STAIR

ST5B101

STAIR

ST2B101

STAFF BREAK

ROOM

B106

CORRIDOR

B124E

CORRIDOR

B124B

OFFICE

B109

OFFICE

B112

OFFICE

B108 STORAGE

B113B

STAIR

ST6B101

OFFICE

B114

OFFICE

B107

OFFICE

B115

OFFICE

B116A

OFFICE

B116B

SUPPORT

B125A

OFFICE

B125

OFFICE

B123

OFFICE

B122

STAIR

ST4B101

CORRIDOR

B134

OFFICE

B133

OFFICE

B132

OFFICE

B135

OFFICE

B136

OFFICE

B131

OFFICE

B130

OFFICE

B137

OFFICE

B138

OFFICE

B129

OFFICE

B128

OFFICE

B139

STAFF

RESTROOM

B141

JANITOR

CLOSET

B127

ELEVATOR

A112STAIR

ST1A101

LOBBY

A101A

TEL ROOM

A102

OFFICE LEAD

CLERK

A120B

OFFICE

A117

(E) LPS & LPR UP TO (E)

CONVECTOR TO REMAIN.

(E) LPS & LPR DN.

(E) CONVECTOR

TO REMAIN.

(E) LPS &

LPR DN.

(E) LPS & LPR UP

TO (E) CONVECTOR

TO REMAIN.

(E) LPS &

LPR DN.

(E) CONVECTOR

TO REMAIN.

(E) LPS &

LPR DN.

(E) LPS & LPR UP

TO (E) CONVECTOR

TO REMAIN.

(E) LPS &

LPR DN.

(E) CONVECTOR

TO REMAIN.

(E) 4" LPS &

(E) 2" LPR -

UP & DN.

1 1

1 1

1 1

1 1 1 1 1 1 1 1

1 1

1 1 1 1 1 1

2 2

OFFICE

A103

(R) FC 2

(E ) C

HW

R

(E ) C

HW

S

(E ) C

HW

R

B A C

NOTES:

1. SEE SHEET M-001 FOR LEGEND AND GENERAL NOTES.

2. REFER TO PHASING AND SEQUENCING PLANS,

SPECIFICATIONS AND GENERAL REQUIREMENTS IN

REFERENCE TO COORDINATION OF ALL WORK TO BE

PERFORMED. WORK ASSOCIATED WITH PHASE 0

SHALL ESTABLISH THE INFRASTRUCTURE REQUIRED

TO EXECUTE EACH INDIVIDUAL PHASE AND MAINTAIN

SYSTEMS IN FULL OPERATION. ALL DEMOLITION

WORK SHALL BE COORDINATED WITH OTHER

ASSOCIATED TRADES.

3. COORDINATE ALL DEMOLITION WITH ASSOCIATED

PHASING PLAN. THE INTENT OF THIS PROJECT IS TO

MAINTAIN OPERATION IN ALL AREAS OUTSIDE OF THE

DESIGNATED PHASE DELINEATION, REFER TO GI003

FOR CONSTRUCTION SEQUENCE.

4. THE MECHANICAL CONTRACTOR SHALL CLEAN,

INSPECT AND REPAIR ALL RE-USED DUCTWORK,

DAMPERS, MECHANICAL COMPONENTS AND ANY

OTHER ITEM(S) NECESSARY FOR A COMPLETE AND

PROPER OPERATING SYSTEM.

5. REFER TO GENERAL NOTES 14, 42 & 43 FOR

FIRESTOPPING REQUIREMENTS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% [FINAL] BID

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

0" 1/4" 1/2" 1" 2" 3"

C :\U se rs

\k be rry \D oc um en ts

\1

_B ro ck to n_

B0 5_

M ec h_ R

_k be rry sm rti nc

.c om

.rv t

9/

/2

:3 8:

A

M

MD111.1

LEVEL 1 - HVAC PIPING DEMOLITION PLAN -

WINGS A AND B

BUILDING 5 OUTPATIENT MENTAL

HEALTH RENOVATION

BROCKTON, MA

523A5-19-305

5-14-21 MJC BGG

1/8" = 1'-0"

AFL01 - LEVEL 1 -HVAC PIPING DEMOLITION PLAN - WINGS A AND B F9 1/64" = 1'-0"

KEY PLAN - WINGS A AND B

KEYNOTES

KEYNOTE KEYNOTE DESCRIPTION

1 EXISTING LPS/R PIPING TO BE REMOVED BACK TO POINT INDICATED AND

CAPPED. ALL LPS/R PIPE RISERS ROUTED WITHIN UNRENOVATED

WALLS/ENCLOSURES SHALL BE ABANDONED IN PLACE. CONTRACTOR

SHALL PROVIDE CAPS AT BOTH ENDS. CONTRACTOR SHALL REMOVE ALL

HORIZONTAL LPS/R PIPING ROUTED TO SECOND FLOOR CONVECTORS (TO

BE REMOVED) LOCATED WITHIN FIRST FLOOR PLENEM.

2 REMOVE FAN COIL UNIT, DUCTWORK, VALVES, CONTROL WIRING,

COMPONENTS AND SUPPORTS IN ITS ENTIRETY.