36C24121R0163 0011.docx

DOCX document 34 KB Posted

Attached to
Z1DA--Mental Health Outpatient Renovation B5 Project 52A5-19-305
Solicitation number
36C24121R0163
Issued by

About this file

This document contains an amendment to a federal solicitation for mental health outpatient renovation services. The amendment dissolves the previous SDVOSB set-aside and opens competition to all small businesses. It updates the wage determination, schedules an additional site visit, extends the request for information and proposal due dates to July 10th and 17th, 2023 respectively, and provides answers to submitted questions. Key details include the Department of Veterans Affairs as the contracting agency, a project location at the VA Medical Center in Brockton, Massachusetts, and requirements relating to COVID safety protocols, the existing PACS and paging systems, network infrastructure scope, and controls integration for the existing HVAC equipment.

View the file

Other files

File Type Posted
36C24121R0163 0012.pdf PDF
36C24121R0163 0010.docx DOCX document
36C24121R0163 0009.pdf PDF
36C24121R0163 0008.docx DOCX document
S04 - Site Visit Sign In Sheet 2-9-2023.pdf PDF
S06 General Decision Number MA20230012 1-27-2023.pdf PDF
36C24121R0163 0007.docx DOCX document
S06 Limitations on Subcontracting Certificate of Compliance 11-2022.pdf PDF
VHA COVID-19 Operational Plan 1-27-2023 (1).pdf PDF
36C24121R0163 0006.pdf PDF
S02 MA20230012.pdf PDF
36C24121R0163 0005.pdf PDF
36C24121R0163 0004.pdf PDF
S06 36C24121R0163 0003.docx DOCX document
S06 w7-r Sanitary - Profiles - Sewers.pdf PDF
S06 523A5-19-305-MD111-1.pdf PDF
S06 523A5-19-305-EP652.pdf PDF
S06 220927 19101 ADDENDUM 01_R5.docx DOCX document
S06 523A5-19-305-MD101-2.pdf PDF
S06 VA Brockton and Jamaica Plain Dust and Soil Rpt _FINAL 021716.pdf PDF
S06 Sommerville High School Drawings Renovation 1-23-18 - Room Number Marku....pdf PDF
S06 w4-r Sanitary - Location Plan - Sanitary-Sewer-Water.pdf PDF
36C24121R0163 0002.docx DOCX document
S02 General Decision Number MA20220012 09-02-2022.pdf PDF
S02 General Decision Number MA20220012 08122022.txt TXT text file
36C24121R0163 0001.docx DOCX document
S04 Sign In Sheet B5 MH Outpatient.pdf PDF
S02 36C24121R0163 Final.docx DOCX document
36C24121R0163.docx DOCX document
523A5-19-305 - B5 Outpatient MH Renovation 100 Percent Final Bid Documents - SPECS.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 1_STAMPED_210514_19101.pdf PDF
523A5-19-305-100 Percent FINAL BD DWGS VOL 2_STAMPED_210514_19101.pdf PDF
S02 SSJ - B5 MH Outpatient_R1SIGNED PA-DW.pdf PDF
EMR FORM.docx DOCX document
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 523A5-19-305 Department of Veterans Affairs VAMC Bedford 200 Springs Road Bedford MA 01730 Department of Veterans Affairs VAMC Bedford 200 Springs Road Bedford MA 01730 To all Offerors/Bidders

36C24121R0163 06-15-2023

X X X

14:00 EST 7-17-2023

See CONTINUATION Page X The purpose of this amendment is to dissolve the SDVOSB set-aside and open competition to all small business concerns.

Any prior references to SDVOSB set-aside are hereby removed, any SDVOSB clauses and requirements are hereby removed, VAAR 852.219-75 Requirements are hereby removed, and 52.219-6 Notice o f Total Small Business Set-Aside and FAR 52.219-14 Limitations on Subcontracting are hereby incorporated. Joint Venture and Mentor Proteges must meet 13 CFR 125.9.

The Wage Determination is hereby updated to WD MA20230004. See attached document.

A n additional site visit is scheduled for Thursday June 22 at 11:00 AM EST. Interested vendors will meet with VA at the VA Medical Center, Building 5 inside Lobby, 940 Belmont St. Brockton, MA 02301. See attached info.

The RFI due date is hereby exten ded to Monday July 10, by 2:00 PM EST.

proposal due date is hereby extended to Monday July 17, by 2:00 PM ET.

All RFIs and proposals should be sent to the CS Scott Doucette; scott.doucette@va.gov RFI Questions Submitted with Answers 36C24121R0163 Amendment 0010 523A5-19-305 BLDG 5 MH Outpatient Renovation Brockton, MA VAMC

Question# 1 Is COVID Vaccination required to work on this project? What are the facility COVID requirements?

Answer:

1. COVID Vaccination is not required in order to work in the hospital spaces on this project.

2. Currently, any personnel who will be entering the active hospital spaces are required to perform a daily screening

3. Currently, any transit through areas where human interaction can take place requires masking. Masking is not required

4. Attached is the VHA Covid-19 Operational Plan (VHA COVID-19 Operational Plan 1-27-2023) as an additional resource

Question# 2 Who should we send the solicitation proposal attachments to and when are they due? When this project was amended the forms were never updated.

Answer:

1. All RFI’s should be sent to the Contract Specialist Scott Doucette scott.doucette@va.gov/ and the Contracting Officer Stephen Slaby Stephen.slaby@va.gov.

2. All proposals are due by March 16 2023 NLT 2:00 PM EST

3. Updated Submission Information and PPQ form is attached.

Question# 3 Can you provide the Site Visit Sign-in sheet from the site visit held on Thursday February 9, 2023?

Answer: Yes, The sign in sheet will be added as an attachment to amendment 0007 labeled “S04 - Site Visit Sign In Sheet”

Question# 4 Are we required to review, sign and submit the previous amendments?

Answer: Yes, they can be found on the contract opportunities solicitation web site posting.

Question# 5 Who currently provides maintenance/ inspections for the VAMC Brockton Campus?

Answer:

Currently the PACs System is maintained by Redhawk/ADT or Signet/Encore.

Question# 6 What is the current PACS System in Brockton MA Campus?.

The system is Hirsch Velocity Identiv.

Question# 7 What is the series / model of the existing PACS Head End?

The model number is Hirsch Velocity Identiv 3.7 SP3.

Question# 8 Is there currently a Paging System? What is the Model number?

Yes, current paging system is TOA 900 Series II. It is an analog system with dual feeds, one all zones feed and one addressable feed through the telephone system (NEC SV8500), primary connection from the Operators Suite, Building 3 to main telephone room in Building 3 basement. Each building has an amplifier that is connected back to the main head end equipment in Building 3. This information does not remove the Contractor requirement to confirm any necessary information and submit for approval any equipment/materials for this project prior to ordering materials..

Question# 9 Drawing E-001 calls for Aiphone AX Series Intercom System, this series is reaching its EOL, is there an Alternative Series you prefer?

This system is an open spec; any equal alternate manufacturer/model is acceptable. This information does not remove the Contractor requirement to confirm any necessary information and submit for approval any equipment/materials for this project prior to ordering materials.

Question# 10 Will the VA OIT Team provide Network for all systems?

It is anticipated that VA OIT will provide necessary network for all systems with the exception of Fire Alarm (separate system), PACs, and BMS. For PACs OIT will provide network to the Hirsch panel but it is the responsibility of the Contractor to provide a connection to each individual device and interconnection to the fire alarm. For BMS the network is provided to the panel, but will not provide connection to each individual device that is the responsibility of the Contractor.

Question# 11 What are the requirements determined for existing Exacqvision NVR? Does the existing NVR require hard drives add cameras?

Network Video Recorders (NVRs) to be hybrids that incorporate both network (IP) and integrated existing (analog) cameras. They should be expandable NVRs each with 54+ TB of usable storage (expandable to 120TB). The system has advanced line Smart-UPS (Uninterruptable Power Supply) power protection.

Question# 12 What are the Model Numbers of existing NVR’s?

Tyco Z-Series 4U; exacq A-Series 2U (IPS-6000-R2). This information does not remove the Contractor requirement to confirm any necessary information and submit for approval any equipment/materials for this project prior to ordering materials.
Question# 13

What are the recording requirements for Retention , fps, how many days storage, Resolution?

Recordings shall be retained for 30 days; 30 ips for 720 x 240.

Question# 14
•Demo Work: (Drawings MD101.1, MD101.2, MD102.1, MD102.2, MD111.1, MD111.2, MD112.1, and MD112.2)
•Removing FCU and Convectors - No information on the existing controls serving this equipment.
•Are we removing/capping pneumatic controls or are we removing all DDC controls & associated wiring?
•Cost Impact for this work – field survey will be required.
•New Work: (Drawings MH100.2-1, MH100-2-2, MH101.1, MH101.2, MH102.1, MH102.2, , MP111.1, MP111.2, MP112.1, MP112.2)
•Existing FCU and Convectors – No information on the existing controls serving this equipment.
•Existing FCU’s - do the existing FCU’s have existing DDC controls? If not, we’ll need to include in our price.
•New Fin tube radiation – are we just replacing the control valves and connecting to the existing ddc controllers or do we need to provide all new controllers.
•Cost Impact for this work – field survey will be required.

This is a very old building with a mix match of controls. The controls for the existing FTR are self-contained control valves and electric actuated control valves. Existing FCU are DDC control with electric actuation.

Demo Work: Field survey work is required per the contract documents to determine the extent of the work (including, but not limited to the existing controls serving fan coil unit and convectors). New Work: Provide new controllers. Provide a “B-ASC” for each existing fan coil unit as specified (23 09 23). There are approximately ninety (90) existing fan coil units in the building on Level 1 and Level 2 that require replacement controllers. The B-ASC shall control both existing cooling only 2-pipe fan coil units as well finned-tube radiation control valve within the same thermal zone. A single temperature sensor shall control both zone cooling and zone heating functions. All controls furnished must seamlessly integrate with the existing Siemens BAS. All programming and controls associated with both the new and existing control systems shall provide a fully integrated control system.