This document is an addendum to a request for bids on a state and local contract opportunity for the renovation of the Alma Armory for the Michigan Department of Military and Veterans Affairs. The addendum provides details on the demolition work required, including the removal of existing luminaires, antennas, utility poles, junction boxes, electrical panels, and HVAC equipment. The contractor is responsible for disconnecting and removing these items as necessary to accommodate the renovation project. The bid attachments must be uploaded to the SIGMA VSS system, and questions should be emailed to the project manager. Individual attachments cannot exceed 6 MB, and the bid deadline is 2:00 PM on the specified date. The project is located in Gratiot County and Allendale CDP, Michigan.

The contract opportunity does not provide details on pricing terms, set-asides, incumbents, funding requirements, or other salient financial information. Interested bidders are expected to review the full bid package and addendum to understand the complete scope of work and requirements for this state and local renovation project.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

DN

FACP

42"

42"42"

42"

TV

84"

TV

84"

F

F

FF

F

F F

F

EWC

GFI

PB

OS

A

OS

A

OS2OS2

OS2 OS2

O S2

O S2

3 3

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

OS

A

J

GENERAL NOTES:

A. ANY EXISTING CONDITIONS INDICATED ARE BASED ON INFORMATION

PROVIDED BY OTHERS AND POSSIBLE LIMITED FIELD VERIFICATION.

THE CONTRACTOR SHALL ADJUST FOR THE ACTUAL FIELD

CONDITIONS AT NO EXPENSE TO THE OWNER.

B. THE CONTRACTOR SHALL VISIT THE PROJECT SITE, REVIEW EXISTING

CONDITIONS AGAINST THE PLANS, AND FAMILIARIZE THEMSELF WITH

THE WORK PRIOR TO BIDDING AND START OF THE WORK.

C. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING

EQUIPMENT, DEVICES, AND LUMINAIRES AS INDICATED AND/OR AS

REQUIRED TO ALLOW FOR INSTALLATION AND CONSTRUCTION OF

THE NEW WORK. REMOVE ALL EQUIPMENT, DEVICES, LUMINAIRES,

CONDUITS, SUPPORTS, HANGERS, ETC. THAT ARE NOT SHOWN AND

ARE REQUIRED TO BE REMOVED IN ORDER TO COMPLETE THE NEW

WORK.

D. CONTRACTOR SHALL DISCONNECT AND REMOVE ALL DEVICES IN

WALLS BEING REMOVED. REMOVE BOXES, CONDUITS, AND WIRE TO

SOURCE OR FIRST JUNCTION BOX TO MAINTAIN EXISTING DEVICES ON

SAME CIRUIT.

E. MAINTAIN CONTINUITY OF EXISTING CIRCUITS AS REQUIRED TO

PROVIDE POWER TO REMAINING EQUIPMENT, DEVICES, AND

LUMINAIRES THAT ARE NOT BEING REMOVED.

C

B

E

E

D1 D

EX. A

ST

AT

E O

F M

IC

HI

GA

N

D E P A R

TM

E N T

O F

TE

C H N O

LO

G Y M A N A G E M E N T

A N D

B U D G E T

FA

C

IL

IT

IE

S

A N D

B U S

IN

E S S

S E R V

IC

E S

A D M

IN

IS

TR

A

TI

O N

A D A M

LA

C H R A D

IR

E C

TO

R

DE

SI

G

N

AN

D

CO

NS

TR

UC

TI

O N

DI

VI

SI

O

N

AL

M A

AR

M

O R

Y R

EN

O

VA

TI

O N

DE

PA

RT

M

EN

T

O F

M

IL

IT

AR

Y

AN

D

VE

TE

RA

NS

AF

FA

IR

S

AL

M A, M

IC

HI

GA

N

D E S

IG

N E D

D R A W N

C H E C K E D

A P P R O V E D

D A

TE

IS

SU

ED

FO

R P R E

LI

M

IN

A R Y

C O N S

TR

U C

TI

O N

F

IN

A L R E C O R D

ID

EN

TI

FI

C

AT

IO

N

N O

P R O

JE

C T

1/

0.

RW

G

IN

D E X

C O D E

DT

M

B7

S H

EE

T

CN CN AR AG

1/

ED

1 DISCONNECT AND REMOVED LUMINAIRE, ANTENNA, WOOD POLE, CONDUIT AND WIRE BACK

TO SOURCE.

2 COORDINATE WITH UTILITY AND VERIFY WITH OWNER COMMUNICATIONS PEDESTAL AND ALL

ASSOCIATED WIRING SUCH THAT IT IS CLEAR OF THE RENOVATION ADDITION OF THE

BUILDING.

3 WALL MOUNTED LUMINAIRE SHALL BE REMOVED.

4 DISCONNECT AND REMOVE JUNCTION BOX AND CONDUIT ALONG WALL. REMOVE ALL

CONDUIT AND WIRE BACK TOWARD EXISTING LIGHT POLE SUCH THAT IT IS CLEAR OF THE

RENOVATION ADDITION OF THE BUILDING.

5 DISCONNECT AND REMOVE MAST OVERHEAD SERVICE DROP POLES AND WIRING. CAP AND

SEAL PULL BOX PROPERLY. COORDINATE WITH CONSUMERS ENERGY.

6 DISCONNECT AND REMOVE PANEL A COVER, CIRCUIT BREAKERS, BUSS AND GROUND BARS.

EXISTING WIRING TO REMAIN.

7 DISCONNECT AND REMOVE PANEL. EXISTING FEEDER AND BRANCH WIRING TO REMAIN.

COORDINATE PATCHING WALL.

8 ALL LIGHT FIXTURES AND DEVICES IN ROOM TO REMAIN, UNLESS OTHERWISE NOTED.

9 DISCONNECT AND REMOVE ROOF MOUNTED RECEPTACLE ON (RTU-5). CONDUIT AND WIRING

TO BE REUSED FOR NEW ROOF RECEPTACLE.

10 DISCONNECT AND REMOVE RTU-5. DISCONNECT AND REMOVE CONDUIT AND WIRING TO

SOURCE.

11 DISCONNECT BOILER RECIRC. PUMPS. DISCONNECT AND REMOVE CONDUIT AND WIRING TO

SOURCE.

KEYNOTES

SCALE : 1/8" = 1'-0"

1 FIRST FLOOR PLAN - DEMOLITION

SCALE : 1/8" = 1'-0"

2 BASEMENT FLOOR PLAN - DEMOLITION

8 8

8 8

File details come from the government source that posted it. Updated .