511-21325CAK_06 Plumb Addendum 1.pdf
PDF 1 MB Posted
- Attached to
- 511/21325. CAK; Alma Armory - Renovate Armor
- Solicitation number
- RFQ - 171 - 230000000729
- Issued by
- Gratiot County, Allendale CDP, Michigan
About this file
This document is an addendum to a state and local contract opportunity for the renovation of the Alma Armory in Alma, Michigan. The renovation project is being managed by the Michigan Department of Technology, Management and Budget's Facilities and Business Services Administration. The addendum provides general plumbing notes, symbols, and details for the project, including instructions for field verifying site conditions, pitch requirements for underfloor piping, and locations for cleanouts and connections to site utilities. The addendum also includes plumbing plans for the first floor and roof, as well as a plumbing demolition plan and equipment schedules.
The contract opportunity has a bid due date of August 21, 2023 and is for the renovation of the Alma Armory located in Alma, Michigan, which is within Gratiot County. The project is being funded by the Michigan Department of Military and Veterans Affairs. No other pricing or contract term details are provided in the addendum document.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W M
S
T/P
T/P
TP
EM
IR
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL PLUMBING SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
BUILDING CODE
BY EXECUTING THE CONSTRUCTION AGREEMENT, THE CONTRACTOR
REPRESENTS THAT HE BY EXECUTING THE CONSTRUCTION AGREEMENT, THE
CONTRACTOR REPRESENTS THAT HE HAS VISITED THE SITE, FAMILIARIZED
HIMSELF WITH THE LOCAL CONDITIONS UNDER WHICH THE WORK IS TO BE
PERFORMED, CORRELATED HIS OBSERVATIONS WITH ALL THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS, AND IS AWARE OF THE
OWNER'S INTENDED USE OF THE PROJECT AREA. ANY AREAS WHERE
ADDITIONAL INFORMATION IS REQUIRED ARE TO BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE OWNER, IN WRITING.
CONTRACTOR:
INSTALL WORK SUBSTANTIALLY AS INDICATED ON THE DRAWINGS. VERIFY
EXACT LOCATION AND ELEVATIONS AT THE SITE. DO NOT SCALE THE
DRAWINGS. MAKE NECESSARY CHANGES IN ELEVATION, FITTINGS OR
OFFSETS TO ACCOMMODATE OBSTACLES OR INTERFERENCES. ALL
DIMENSIONS ARE TO BE FIELD VERIFIED BEFORE START OF WORK.
THE CONTRACTOR IS TO PROTECT FURNISHINGS, EQUIPMENT, ETC., AND
PROPERLY STORE MATERIAL AS REQUIRED UNTIL COMPLETION OF THE
PROJECT.
CONTRACTOR TO VERIFY ALL MEASUREMENTS BEFORE ORDERING
MATERIALS OR DOING ANY WORK. NO EXTRA COMPENSATION OR CHANGE
ORDERS WILL BE ISSUED DUE TO DIFFERENCES BETWEEN THE ACTUAL
MEASUREMENT AND THE DIMENSIONS ON THE DRAWINGS. CONTRACTOR
SHALL LAY OUT ALL EQUIPMENT PRIOR TO FABRICATION OR INSTALLATION TO
ASSURE PROPER FIT AND AVOIDANCE OF OBSTRUCTIONS, AND SHALL
THOROUGHLY COORDINATE WORK WITH ALL TRADES AND DETERMINE EXACT
ROUTE AND LOCATION OF EACH ELEMENT AND PIECE OF EQUIPMENT BEFORE
FABRICATION AND INSTALLATION.
CONTRACTOR TO BE RESPONSIBLE FOR KEEPING THE GENERAL WORK AREA
CLEAN AND FREE FROM DIRT AND CONSTRUCTION MATERIALS, AND FOR
CLEANING THE AREA AT THE END OF EACH DAY. ANY AND ALL DAMAGE TO
THE EXISTING WALLS, CEILINGS, FLOOR, ETC., THAT OCCURS DURING THE
WORK, SHALL BE REPAIRED AND PATCHED. IF THE SPECIFIC METHOD OF
REPAIR IS IN QUESTION, THE CONTRACTOR IS TO CONFER WITH THE
OWNER'S REPRESENTATIVE BEFORE COMMENCING THE REPAIR.
THE CONTRACTOR SHALL MAINTAIN ON THE SITE FOR THE OWNER A
COMPLETE SET OF CONTRACT DOCUMENTS AND ALL COPIES OF APPROVED
SHOP DRAWINGS, ALL CHANGE ORDERS, FIELD ORDERS, AND BULLETINS,
PROGRESSIVELY FILED AND UPDATED TO REFLECT THE LATEST CHANGES.
THE CONTRACTOR IS TO PROVIDE AS-BUILT DRAWINGS AT THE COMPLETION
OF THE PROJECT.
CONTRACTOR ACKNOWLEDGES HE HAS VERIFIED WITH THE OWNER'S
REPRESENTATIVE ALL OF THE DETAILS OF THE WORK TO BE PERFORMED
INCLUDING THE ACCURACY OF ALL CONTRACT DRAWINGS AND
SPECIFICATIONS. ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND
SPECIFICATIONS, UNLESS NOTED OTHERWISE.
ALL DEFECTS IN EQUIPMENT OR MATERIALS, OR ERRORS IN THE DRAWINGS
DISCOVERED DURING THE PERFORMANCE OF THE WORK SHALL BE
REPORTED PROMPTLY TO THE OWNER'S REPRESENTATIVE. IN NO EVENT
SHALL THE WORK PROCEED UNTIL DEFECTS AND/OR ERRORS HAVE BEEN
RESOLVED.
THE PLANS ARE DIAGRAMMATIC AND INDICATE ONLY THE SIZE AND GENERAL
ARRANGEMENT OF PIPING AND EQUIPMENT. EXACT LOCATION OF ALL
ELEMENTS SHALL BE DETERMINED AS WORK PROGRESSES, IN COOPERATION
AND COORDINATION WITH THE WORK OF ALL OTHER TRADES. IT IS NOT
INTENDED TO SHOW EVERY ITEM OF WORK OR MINOR PIECE OF EQUIPMENT,
BUT THE CONTRACTOR SHALL FURNISH AND INSTALL WITHOUT ADDITIONAL
REMUNERATION ANY COMPONENT NECESSARY TO COMPLETE THE SYSTEM IN
ACCORDANCE WITH THE BEST PRACTICE OF THE TRADE.
PIPING PENETRATION FIRE WALLS AND FLOORS SHALL BE FIRESTOPPED.
REFER TO THE ARCHITECTURAL DRAWINGS FOR FIRE WALL AND FLOOR
LOCATION.
ALL PHYSICAL ATTRIBUTES OF EQUIPMENT AND DEVICES ARE BASED ON
THOSE MANUFACTURERS LISTED IN THE SPECIFICATIONS AND/ OR THE
EQUIPMENT SCHEDULES. THE RESPECTIVE CONTRACTORS ARE RESPONSIBLE
FOR ALL CHANGES BROUGHT ABOUT BY USE OF ITEMS BY OTHER
MANUFACTURERS. THE ARCHITECT/ ENGINEER HAS RESERVED THE RIGHT TO
REJECT ITEMS BY OTHER MANUFACTURERS IF THOSE ITEMS DO NOT MATCH
THE PHYSICAL ATTRIBUTES OF THE MANUFACTURERS LISTED.
CODES AND REGULATIONS:
THE CONTRACTOR SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS,
RULES, REGULATIONS AND ORDERS OF ANY PUBLIC AUTHORITY BEARING ON
THE PERFORMANCE OF THE WORK, BOTH ON AND OFF SITE. IF ANY OF THE
CONTRACT DOCUMENTS ARE AT VARIANCE THEREWITH IN ANY RESPECT,
CONTRACTOR SHALL PROMPTLY NOTIFY THE OWNER'S REPRESENTATIVE IN
WRITING.
CONTRACTOR REPRESENTS AND WARRANTS COMPLIANCE WITH ALL
FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES AND REGULATIONS
APPLICABLE TO THIS ORDER, INCLUDING THE BUILDING CODE, AND THE LOCAL
GOVERNING BODY.
FINAL COMPLETION:
PERFORM ALL OF THE WORK REQUIRED TO COMPLETE THE PROJECT,
INCLUDING THE SATISFACTORY OPERATION OF ALL EQUIPMENT, AND THE
CORRECTION OF ALL UNACCEPTABLE OR INCOMPLETE PORTIONS OF THE
PROJECT TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE, SETTLE
ALL CLAIMS AND SECURE THE RELEASE OF ALL MECHANICS LIEN OR LIENS OF
A LIKE NATURE, AND SECURE THE ISSUANCE BY AN APPROPRIATE
GOVERNMENT AUTHORITY OF A CERTIFICATE OF OCCUPANCY. REMOVE ALL
RUBBISH, SURPLUS MATERIALS, SCAFFOLDING, AND EQUIPMENT FROM THE
SITE WHETHER OR NOT LEFT BY OR BELONGING TO THE CONTRACTOR.
WRITING.
GENERAL NOTESABBREVIATIONS
POINT OF DISCONNECT FROM EXISTING
DEMOLITION KEYNOTE
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
4" RD-1
PLUG
DRAIN TAG
DRAIN SIZE
FLOOR DRAIN
DRAIN SIZE
ROOF DRAIN
TYPE (SEE SCHEDULE)
DRAIN TAG
PLUMBING FIXTURE TAG
PLUMBING FIXTURE
REDUCING 45 DEGREE TEE
45 DEGREE TEE
6" FD-2
TYPE (SEE SCHEDULE)
4" ORD-1
HYD-2
TYPE (SEE SCHEDULE)
CAP
PIPE RISE
PIPE DROP
PIPE TEE
PIPE TEE DN
PIPE TEE UP
UNION
PIPE REDUCER
DOMESTIC WATER METER
CIRCUT SETTER VALVE
BALL VALVE
CHECK VALVE
THREE WAY VALVE
GAS SHUTOFF COCK
MOTORIZED CONTROL VALVE
PRESSURE REDUCING VALVE
EMERGENCY GAS SHUTOFF
THERMOSTATIC MIXING VALVE
PLUG VALVE
BACKFLOW PREVENTER
Room
EXISTING PIPE TAG
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
COMPRESSED AIR
COMBINATION WASTE & VENT
DEIONIZED WATER
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL GAS VENT
DOMESTIC HOT WATER-CIRCULATING
DOMESTIC HOT WATER
ACID VENT
DOMESTIC COLD WATER
DOMESTIC HOT WATER 140°
INSTRUMENT AIR
INDIRECT DRAIN
NATURAL GAS
SANITARY DRAIN
STORM DRAINAGE
STORM DRAINAGE-OVERFLOW
TEMPERED WATER
VACUUM
VENT
AV
CW
CA
COMB
DI
FOR
FOS
FGV
RHW
HW
HW 140°
IA
IND
NG
SAN
ST
ST(S)
T
VAC
V
2"
(E)
ACID WASTEAW
PLUMBING AND PIPING SYMBOLS
FLEX PIPE
PIPE GUIDE
PIPE ANCHOR
A
G
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
1/4" / 12" SLOPE
INVERT: -1' - 0"
BACKWATER SWING
CHECK VALVE
BALANCING VALVE
RECIRC. VALVE
QUICK OPENING VALVE
GATE VALVE
STRAINER
TRAP PRIMER
EMERGENCY THERMOSTATIC
MIXING VALVE
IRRIGATION WATER METER
PRESSURE REGULATOR VALVE
S T
A T
E O
F M
IC
H
IG
A
N
D E P A R T M E N T
O F
T E C H N O
LO
G Y M A N A G E M E N T
A N D
B U D G E T
F A C
IL
IT
IE
S
A N D
B U S
IN
E S S
S E R V
IC
E S
A D M
IN
IS
T R A T
IO
N
A D A M
LA
C H R A D
IR
E C T O R
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
A L
M A
A R
M O
R Y
R E
N O
V A
T
IO
N D
E P
A R
T M
E N
T O
F M
IL
IT
A R
Y A
N D
V E
T E
R A
N S
A F
F A
IR
S
S
S
T A
T E
S T
A
L M
A
M
IC
H
IG
A N
D E S
IG
N E D
D R A W N
C H E C K E D
A P P R O V E D
D A T E
IS
S U E D
F O R
P R E L
IM
IN
A R Y
C O N S T R U C T
IO
N
F
IN
A L
R E C O R D
ID
E N T
IF
IC
A T
IO
N
N O
P R O J E C T
/2
.C
A K
IN
D E X
C O D E
S H E E T
P J
P J
A G
A G
1/
P
HB HOSE BIB
HC HANDICAPPED
HD HEAD
HOA HAND-OFF-AUTO
HORIZ HORIZONTAL
HP HORSE POWER
HTG HEATING
HTR HEATER
HVAC HEATING VENTILATION AND AIR
CONDITIONING
HW HOT WATER
HZ HERTZ
ID INSIDE DIAMETER
IN INCH/INCHES
IN W.G. INCHES OFWATER GAUGE
INL INLET
INSUL INSULATION
INT INTERIOR
INV INVERT
IPS IRON PIPE SIZE
JST JOIST
JT JOINT
KW KILOWATTS
KWH KILOWATTS PER HOUR
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB POUNDS
LF LINEAL FOOT
LOC LOCATION
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MR MOISTURE RESISTANT
MTD MOUNTED
MTG MOUNTING
MTL METAL
MTR MOTOR
N NECK
NA NOT APPLICABLE
NC NORMALLY CLOSED
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NON
COMB
NON COMBUSTIBLE
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER
PD PRESSURE DROP
PH PHASE
PI PRESSURE INDEPENDENT
PLBG PLUMBING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH
GAUGE
PVC POLYVINYL CHLORIDE
PW POTABLE WATER
PWR POWER
R RISER
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
RED REDUCER
REFR REFRIGERATION
REG REGISTER
REINF REINFORCED
REL RELOCATE
REM REMOVABLE
REQ REQUIRE/REQUIRED
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RO ROUGH OPENING
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
RTD RATED
RTG RATING
SA SUPPLY AIR
SCHED SCHEDULE
SD SMOKE DAMPER
SECT SECTION
SF SQUARE FEET/FOOT
SIM SIMILAR
SM SURFACE MOUNTED
SP STATIC PRESSURE
SPEC SPECIFIED OR SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT STRUCTURE OR STRUCTURAL
SYS SYSTEM
T THERMOSTAT
TCP TEMPERATURE CONTROL PANEL
TD TEMPERATURE DROP
TEMP TEMPERATURE
THRU THROUGH
TMPD TEMPERED
TO TRANSFER OPENING
TOB TOP OF BEAM
TP TOTAL PRESSURE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
UR URINAL
VERT VERTICAL
VIF VERIFY IN FIELD
W WITH
W/O WITHOUT
WC WATER CLOSET
WM WIRE MESH
WT WEIGHT
WWM WELDED WIRE MESH
& AND
@ AT
Ø ROUND
ABV ABOVE
ACOUS ACOUSTICAL
ACT ACOUSTIC CEILING TILE
AD ACCESS DOOR
ADD ADDENDUM
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFUE ANNUAL FUEL UTILIZATION
EFFICIENCY
AG ABOVE GROUND
AHJ AUTHORITY HAVING
JURISDICTION
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ATTN ATTENTION
AUTO AUTOMATIC
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BLKG BLOCKING
BLW BELOW
BM BEAM
BO BY OTHER
BOP BOTTOM OF PIPE
BOT BOTTOM
BSMT BASEMENT
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER
HOUR
BTWN BETWEEN
CAP CAPACITY
CAT CATEGORY
CB CATCH BASIN
CC CENTER TO CENTER
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CL CENTERLINE
CLG CEILING
CLG COOLING
CO CLEANOUT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CTR CENTER
CUFT CUBIC FEET
D DEEP, DEPTH
DB DRY BULB
DEG DEGREE
DEMO DEMOLISH OR DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIM DIMENSION/DIMENSIONS
DIV DIVISION
DN DOWN
DRN DRAIN
DTL DETAIL
DV DISPLACEMENT VENTILATION
DWG DRAWING
EA EACH
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
TEMPERTURE
EL ELBOW
ELEC ELECTRICAL
ELEV ELEVATION
EMER EMERGENCY
ENCL ENCLOSURE
ENG ENGINEER
EPDM ETHYLENE PROPYLENE DIENE
M-CLASS
EQ EQUAL
EQUIP EQUIPMENT
EWB ENTERING WET BULB
TEMPERTURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
EXH EXHAUST
EXH-1 EXHAUST AIR - TYPE 1
EXH-2 EXHAUST AIR - TYPE 2
EXP EXPANSION
EXPJT EXPANSION JOINT
EXT EXTERIOR
F DEGREES FAHRENHEIT
FC FAIL CLOSED
FD FLOOR DRAIN
FLEX FLEXIBLE
FLG FLANGE
FLR FLOOR
FND FOUNDATION
FO FAIL OPEN
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FPI FINS PER INCH
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOOR SINK
FT FEET/FOOT
FTG FOOTING
FUT FUTURE
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACT
GEN GENERATOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HIGH/HEIGHT
PLUMBING GENERAL NOTES
1 FIELD VERIFY ALL NEW WATER, WASTE, AND VENT PIPING
CONNECTIONS AND PROVIDE NEW CONNECTIONS AS REQUIRED FOR
PROPERLY OPERATING SYSTEMS.
2 PITCH UNDERFLOOR SANITARY WASTE AND STORM PIPING 3" AND
GREATER AT 1/8" PER FOOT, UNLESS NOTED OTHERWISE. PITCH ALL
OTHER WASTE PIPING AT 1/4" PER FOOT UNLESS OTHERWISE NOTED.
3 FIELD VERIFY LOCATION AND INVERTS OF SITE UTILITIES PRIOR TO
INSTALLATION.
4 ROUTE DOMESTIC WATER, FIRE PROTECTION, SANITARY SEWER, AND
STORM SEWER SERVICES TO SITE UTILITIES 5'-0" FROM BUILDING
UNLESS NOTED OTHERWISE. REFER TO CIVIL PLANS.
5 WASTE AND VENT PIPING BELOW FLOOR AND THROUGH FLOOR SHALL
BE 2" MINIMUM.
6 PROVIDE CLEANOUT IN ACCESSIBLE LOCATION AT THE BASE OF ALL
PLUMBING RISERS.
EQUIPMENT DESIGNATIONS
BT BATH TUB
BV BALANCING VALVE
BWV BACKWATER VALVE
CO CLEANOUT
CS CUP SINK
CV CONTROL VALVE
DC DUAL CHECK BACKFLOW PREVENTER
DCDA DOUBLE CHECK DETECTOR ASSEMBLY
BACKFLOW PREVENTER
DF DRINKING FOUNTAIN
DPCO DECK PLATE CLEANOUT
DSC DOWNSPOUT COVER
DWH DOMESTIC WATER HEATER
DWP DOMESTIC WATER BOOSTER PUMP
EJ EXPANSION JOINT
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWS EMERGENCY EYEWASH/SHOWER
FI FILTER
GCO GRADE CLEANOUT
HB HOSE BIBB
KS KITCHEN SINK
LAV LAVATORY
M METER
NF NON-FREEZE HOSE BIB
OB OUTLET BOXES
OS OIL SEPARATOR
P PUMP
RP DOMESTIC HOT WATER RECIRCULATION PUMP
RPDA REDUCED PRESSURE ZONE DETECTOR
ASSEMBLY BACKFLOW PREVENTER
RPZ REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
S SINK
SA SHOCK ABSORBER (WATER HAMMER
ARRESTOR)
SH SHOWER
SP SUMP PUMP
SRV SAFTY REFIEF VALVE
SS SERVICE SINK \ MOP SINK
SWP SEWAGE PUMP
TK WATER TANK
TMV THERMOSTATIC MIXING VALVE
UR URINAL
VB VACUUM BREAKER
WC WATER CLOSET
WCO WALL CLEANOUT
WF WASH FOUNTAIN
WS WATER SOFTENER
PLUMBING SHEET INDEX
P000 PLUMBING LEGEND SHEET
PD101 LEVEL 1 PLUMBING DEMOLITION PLAN
P101 LEVEL 1 PLUMBING PLAN
P110 ROOF PLUMBING PLAN
P600 PLUMBING SCHEDULES
DN
STORM FROM ROOF
ROUTE TO CIVIL STORM PIPING
NEW SANITARY DRAIN
FROM OIL
SEPARATOR. SAW CUT
FLOOR AS REQUIRED
1/2" RHW
1 1/2" HW
1 1/2" CW
1 1/4" HW
1 1/4" CW
3/4" HW
3/4" CW
1/2" RHW
1 1/2" HW
3" WCO
2" SWR. DRAIN FURNISHED
WITH SWR. ENCLOSURE.
TYP. OF 4
3" FD-1 WITH TS-1
MATCH EXISTING
3" FD-1 WITH TS-1
MATCH EXISTING
HYD-1 REUSE EXISTING IF POSSIBLE
OTHERWISE MATCH
1" CW
3/4" HW
3" WCO
3" SAN
1 1/2" V
6" SAN
3" SAN
4" SAN
4" SAN
3" V TR
EXISTING STORM
DRAIN CAPPED IN
PLACE
REMOVE EXSITING
OIL/WATER SEPERATOR
AND RELACE WITH J.R.
SMITH MODEL 8510
4" SAN
4" SAN
1/2" RHW
EXISTING NAT GAS LINE
3/4" RHW
2" HW
2" CW
3" NG 2" NG
DHW-1
2" HW
3/4" RHW
2" CW
RELOCATED
RECIRC PUMP
MATCH NEW SHOWER HEADS
WITH EXISTING
2GPM HEADS IN MENS SHOWER
ROOM
PROVIDE CIRCUIT
SETTER AND CHECK
VALVE IN EXISTING RHW
LINE SET @0.5GPM
PROVIDE CIRCUIT
SETTER AND CHECK
VALVE IN RHW LINE SET
@0.5GPM
1/2" RHW
GCO
GCO
LACATION
VESTIBULE
CORRIDOR
MEN'S
ROOM
WOMEN'S
ROOM
MEN'S
SHOWER
MEN'S
SHOWER
PHYSICAL
TRAINING
MECH
OFFICE
PLATOON
COUNCIL
BOILER
ROOM
CLASSROOM
MECHANICAL
STATE
MAINTENANCE
VEHICLE
STORAGE
3" ST
3" ST
S T
A T
E O
F M
IC
H
IG
A
N
D E P A R T M E N T
O F
T E C H N O
LO
G Y M A N A G E M E N T
A N D
B U D G E T
F A C
IL
IT
IE
S
A N D
B U S
IN
E S S
S E R V
IC
E S
A D M
IN
IS
T R A T
IO
N
A D A M
LA
C H R A D
IR
E C T O R
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
A L
M A
A R
M O
R Y
R E
N O
V A
T
IO
N D
E P
A R
T M
E N
T O
F M
IL
IT
A R
Y A
N D
V E
T E
R A
N S
A F
F A
IR
S
S
S
T A
T E
S T
A
L M
A
M
IC
H
IG
A N
D E S
IG
N E D
D R A W N
C H E C K E D
A P P R O V E D
D A T E
IS
S U E D
F O R
P R E L
IM
IN
A R Y
C O N S T R U C T
IO
N
F
IN
A L
R E C O R D
ID
E N T
IF
IC
A T
IO
N
N O
P R O J E C T
/2
.C
A K
IN
D E X
C O D E
S H E E T
T T
T T
R G
R G
1/
P
SCALE : 1/4" = 1’−0"
FIRST FLOOR DOMESTIC PLUMBING PLAN
A. 4 NEW SHOWERS. SEE ARCH FOR FIXTURES.
B. BRANCH HW/CW OFF EXISTING MAIN LINE.
C. ROUTE RETURN HW FOR NEW AREA BACK TO EXISTING HW MAIN.
D. ALL DROPS FOR SHOWERS TO HAVE ISOLATION VALVES.
E. HW/CW BRANCH FOR NEW WING TO HAVE ISOLATION VALVES.
GENERAL NOTES
4" STORM DROPPED IN WALL OF LACTATION ROOM
CONNECT TO CIVIL STORM DRAINAGE.
3" RD-1
3" RD-1
EMERGENCY OVERFLOW DRAIN
S T
A T
E O
F M
IC
H
IG
A
N
D E P A R T M E N T
O F
T E C H N O
LO
G Y M A N A G E M E N T
A N D
B U D G E T
F A C
IL
IT
IE
S
A N D
B U S
IN
E S S
S E R V
IC
E S
A D M
IN
IS
T R A T
IO
N
A D A M
LA
C H R A D
IR
E C T O R
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
A L
M A
A R
M O
R Y
R E
N O
V A
T
IO
N D
E P
A R
T M
E N
T O
F M
IL
IT
A R
Y A
N D
V E
T E
R A
N S
A F
F A
IR
S
S
S
T A
T E
S T
A
L M
A
M
IC
H
IG
A N
D E S
IG
N E D
D R A W N
C H E C K E D
A P P R O V E D
D A T E
IS
S U E D
F O R
P R E L
IM
IN
A R Y
C O N S T R U C T
IO
N
F
IN
A L
R E C O R D
ID
E N T
IF
IC
A T
IO
N
N O
P R O J E C T
/2
.C
A K
IN
D E X
C O D E
S H E E T
T T
T T
R G
R G
1/
P
SCALE : 3/16" = 1’−0"
ROOF PLUMBING PLAN
WRAP WITH FIBERGLASS
INSULATION BY
MECHANICAL CONTRACTOR
RAINWATER LEADER- SLOPE
1/4" PER FOOT BY
MECHANICAL CONTRACTOR
SEALANT ALL
AROUND
MACHINE SCREWS W/
EXPOSED ANCHORS BY
MECHANICAL CONTRACTOR
DOWNSPOUT NOZZLE OR
DOWNSPOUT WITH HINGED
COVER
SPLASH BLOCK (IF REQUIRED)
BY GENERAL CONTRACTOR
A F
G
FLASHING AND COUNTER-FLASHING
OF VENT THROUGH ROOF IS BY
ROOFING CONTRACTOR.
ROOF INSULATION
ROOF DECK
CORE DRILL ROOF OR PROVIDE
SLEEVE IF REQUIRED BY TYPE OF
ROOF DECK. PROVIDE FIRE STOP
SEAL BETWEEN PIPE AND SLEEVE
OR DECK
MINIMUM 18" ABOVE ROOF
NORMALLY. EXTEND TO HEIGHT OF
PARAPET WHEN WITHIN 10' OF
PARAPET. IF ROOF USED FOR
ASSEMBLY PROMENADE,
OBSERVATION DECK, SUNBATHING
DECK OR SIMILAR PURPOSES, OPEN
VENT PIPE SHALL TERMINATE NOT
LESS THAN 7 FEET ABOVE THE ROOF.
NOTE:
REFER TO PLANS FOR VENT THROUGH ROOF PIPE SIZES AND LOCATIONS. ANCHOR PIPE TO ROOF
DECK OR PURLIN WITH U-BOLT AROUND PIPE AND ANGLE IRON, WELDED OR SCREWED TO ROOF
DECK OR JOIST. LOCATE VENT THROUGH ROOF A MINIMUM THREE FEET FROM PROPERTY LINE, OR TEN FEET HORIZONTAL OR THREE FEET VERTICAL ABOVE ANY BUILDING OPENING OR FRESH AIR
INTAKE, OR ONE FOOT FROM ANY VERTICAL SURFACE . LOCATE VENT THROUGH ROOF MINIMUM
18" FROM PARAPET, EXPANSION JOINTS, EQUIPMENT CURB, ETC. OFFSET IN CEILING SPACE WHERE
REQUIRED TO MEET THESE CONDITIONS.
3" DIAMETER PIPE MINIMUM UP
THROUGH ROOF
1' -0
(M
IN
ET-1
EXPANSION TANK:
TACO MODEL PAX42
DHW-1
ISOLATION VALVE
CHECK VALVE
ISOLATION VALVE
2" CW
1/2" CW
6"Ø FLUE
3/4" RHW
2" HW
6"Ø C/A
2" NG
S T
A T
E O
F M
IC
H
IG
A
N
D E P A R T M E N T
O F
T E C H N O
LO
G Y M A N A G E M E N T
A N D
B U D G E T
F A C
IL
IT
IE
S
A N D
B U S
IN
E S S
S E R V
IC
E S
A D M
IN
IS
T R A T
IO
N
A D A M
LA
C H R A D
IR
E C T O R
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
A L
M A
A R
M O
R Y
R E
N O
V A
T
IO
N D
E P
A R
T M
E N
T O
F M
IL
IT
A R
Y A
N D
V E
T E
R A
N S
A F
F A
IR
S
S
S
T A
T E
S T
A
L M
A
M
IC
H
IG
A N
D E S
IG
N E D
D R A W N
C H E C K E D
A P P R O V E D
D A T E
IS
S U E D
F O R
P R E L
IM
IN
A R Y
C O N S T R U C T
IO
N
F
IN
A L
R E C O R D
ID
E N T
IF
IC
A T
IO
N
N O
P R O J E C T
/2
.C
A K
IN
D E X
C O D E
S H E E T
T T
T T
R G
R G
1/
P
SCALE : 1" = 1’−0"
SECONDARY ROOF DRAIN DOWNSPOUT NOZZLE
DETAIL
SCALE : N.T.S.
SANITARY VENT THRU ROOF
DHW-1 GAS FIRED AO SMITH BTHS-750A 120 120/1/60 DISCONNECT BY EC
TAG TYPE
BASIS OF DESIGN
MANUFACTURER
MODEL SIZE
POWER SUPPLY
(V/PH/HZ)
ACCESSORIES
HOT WATER HEATER
SCALE :
WATER HEATER PIPING ISOMETRIC
DISCONNECT HW PIPING AND
DEMO BACK TO BOILER ROOM
NEEDS TO BE UPSIZED FOR NEW
SHOWERS
DISCONNECT EXISTING
WALL HYDRANT AND CAP
BACK TO NEXT BRANCH.
REMOVE EXISTING HOT WATER
HEATER AND PIPING ASSOCIATED
BACK TO WHERE SHOWN,
PREPARE FOR NEW HW HEATER
1 1/2" HW
HYD-1
3/4"
2"
3/4"
2" C
W
1/
2" H
W
1/ 2"
R H
W
1/
2" H
W
2" C
W
1/2" RHW 3/4" HW
VESTIBULE
CORRIDOR
MEN'S
ROOM
WOMEN'S
ROOM
MEN'S
SHOWER
MEN'S
SHOWER
PHYSICAL
TRAINING
MECH
OFFICE
BOILER
ROOM
REMOVE EXISTING HOT WATER
TANK AND ASSOCIATED
SUPPORTS.
S T
A T
E O
F M
IC
H
IG
A
N
D E P A R T M E N T
O F
T E C H N O
LO
G Y M A N A G E M E N T
A N D
B U D G E T
F A C
IL
IT
IE
S
A N D
B U S
IN
E S S
S E R V
IC
E S
A D M
IN
IS
T R A T
IO
N
A D A M
LA
C H R A D
IR
E C T O R
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
A L
M A
A R
M O
R Y
R E
N O
V A
T
IO
N D
E P
A R
T M
E N
T O
F M
IL
IT
A R
Y A
N D
V E
T E
R A
N S
A F
F A
IR
S
S
S
T A
T E
S T
A
L M
A
M
IC
H
IG
A N
D E S
IG
N E D
D R A W N
C H E C K E D
A P P R O V E D
D A T E
IS
S U E D
F O R
P R E L
IM
IN
A R Y
C O N S T R U C T
IO
N
F
IN
A L
R E C O R D
ID
E N T
IF
IC
A T
IO
N
N O
P R O J E C T
/2
.C
A K
IN
D E X
C O D E
S H E E T
T T
T T
R G
R G
1/
P D
SCALE : 1/4" = 1’−0"
FIRST FLOOR DOMESTIC PLUMBING DEMO PLAN
| Sheets |
| P000 - PLUMBING LEGEND SHEET |
| P101 - LEVEL 1 PLUMBING PLAN |
| P110 - ROOF PLUMBING PLAN |
| P600 - PLUMBING SCHEDULES |
| PD101 - LEVEL 1 PLUMBING DEMOLITION PLAN |