511-21325CAK_E802_ADDENDUM2.pdf

PDF 37 KB Posted

Attached to
511/21325. CAK; Alma Armory - Renovate Armor
Solicitation number
RFQ - 171 - 230000000729
Issued by
Gratiot County, Allendale CDP, Michigan

About this file

This document is a panel board schedule for the Alma Armory Renovation project, conducted by the State of Michigan Department of Technology, Management and Budget Facilities and Business Services Administration Design and Construction Division for the Department of Military and Veterans Affairs in Alma, Michigan. The document provides a detailed electrical load summary and feeder calculation, including connected KVA loads for lighting, receptacles, motors, and other equipment, as well as the corresponding overcurrent protection requirements. Key details include the project identification number (171/19-470), the electrical demand factors, and the panel board specifications such as the main lug only (MLO), mounting type, amperage rating, and short-circuit current rating.

The related state and local contract opportunity involves bid attachments that must be uploaded to the SIGMA VSS system, with no hard copies accepted. Bidders are instructed to email any questions to the designated contact, Robert Gibb, rather than submitting them through the SIGMA VSS system. The bid opportunity covers the renovation of the Alma Armory, located in Gratiot County, Michigan. Bidders may be asked to email their proposals if they experience issues with the SIGMA VSS system, which will be handled on a case-by-case basis.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ST

AT

E O

F M

IC

HI

GA

N

D E P A R

TM

E N T

O F

TE

C H N O

LO

G Y M A N A G E M E N T

A N D

B U D G E T

FA

C

IL

IT

IE

S

A N D

B U S

IN

E S S

S E R V

IC

E S

A D M

IN

IS

TR

A

TI

O N

A D A M

LA

C H R A D

IR

E C

TO

R

DE

SI

G

N

AN

D

CO

NS

TR

UC

TI

O N

DI

VI

SI

O

N

AL

M A

AR

M

O R

Y R

EN

O

VA

TI

O N

DE

PA

RT

M

EN

T

O F

M

IL

IT

AR

Y

AN

D

VE

TE

RA

NS

AF

FA

IR

S

AL

M A, M

IC

HI

GA

N

D E S

IG

N E D

D R A W N

C H E C K E D

A P P R O V E D

D A

TE

IS

SU

ED

FO

R P R E

LI

M

IN

A R Y

C O N S

TR

U C

TI

O N

F

IN

A L R E C O R D

ID

EN

TI

FI

C

AT

IO

N

N O

P R O

JE

C T

1/

0.

RW

G

IN

D E X

C O D E

DT

M

B7

S H

EE

T

CN CN AR AG

1/

E8

#1: 100% FIRST 10 KVA + 50% REMAINING

RECEPTACLE DEMAND FACTOR: 46.9 MIN. OVERCURRENT DEVICE AMPS

1.25 1.0 1.0 1.0 1.0 1.0 CONTINUOUS/NONCONT FACTOR

25% OF LARGEST MOTOR 0.0 47.0 DEMAND AMPS

PHASE C CONNECTED KVA 0.0 0.2 3.8 0.0 0.0 4.0 0.0 0.2 13.3 0.0 0.0 13.5 3.4 16.9 DEMAND KVA

PHASE B CONNECTED KVA 0.0 0.0 4.2 0.0 0.0 4.2 1.25 #1 1.0 1.0 1.0 DEMAND FACTOR

PHASE A CONNECTED KVA 0.0 0.0 5.4 0.0 0.0 5.4 0.0 0.2 13.3 0.0 0.0 13.5 25% CONNECTED KVA

LTS REC MOTOR OTHER KIT TOTAL LTS REC MOTOR OTHER KIT SUBTOT SPARE TOTAL

SUBTOTAL CONNECTED KVA LOAD SUMMARY & FEEDER CALCULATION

41 SPARE 20 1 41 C 42 1 20 SPARE 42

39 SPARE 20 1 39 B 40 1 20 SPARE 40

37 SPARE 20 1 37 A 38 1 20 SPARE 38

35 SPARE 20 1 35 C 36 1 20 SPARE 36

33 SPARE 20 1 33 B 34 1 20 SPARE 34

31 SPARE 20 1 31 A 32 1 20 SPARE 32

29 SPARE 20 1 29 C 30 1 20 SPARE 30

27 SPARE 20 1 27 B 28 1 20 SPARE 28

25 SPARE 20 1 25 A 26 1 20 SPARE 26

23 SPARE 20 1 23 C 24 1 20 SPARE 24

21 SPARE 20 1 21 B 22 1 20 SPARE 22

19 SPARE 20 1 19 A 20 1 20 SPARE 20

17 2195 17 C 18 1 20 SPARE 18

15 2195 15 B 16 1 20 SPARE 16

ACCU-1

30 3

13 A 14 1 20 SPARE 14

11 444 11 C 12 1 20 200 DHW-1 12

9 444 9 B 10 1 20 396 ERV-1 10

FCU-1

20 3

7 A 8 1 20 1560 B-1 8

5 576 5 C 6 576 6

3 576 3 B 4 576 4

P-1

20 3

1 A 2 3 20

P-2

CKT DESCRIPTION LTS REC MOTOR OTHER KIT OCPD P CKT PH CKT P OCPD LTS REC MOTOR OTHER KIT DESCRIPTION CKT

LOAD LOAD... LOAD... LOAD

WIRE: 4 MLO: 225A MTG./NEMA #: 1 FEEDER: 3#4/0 + 1#4 GND, 2 1/2"C.

PHASE: 3 MCB: BRKR SPACE: 42 SOURCE: (E) MDPG

VOLTS: 208 MAINS RATING: A.I.C. RATING: 10,000 LOCATION: PLATOON 121

P A N E L B O A R D S C H E D U L E

#1: 100% FIRST 10 KVA + 50% REMAINING

RECEPTACLE DEMAND FACTOR: 45.4 MIN. OVERCURRENT DEVICE AMPS

1.25 1.0 1.0 1.0 1.0 1.0 CONTINUOUS/NONCONT FACTOR

45.4 DEMAND AMPS

25% OF LARGEST MOTOR 0.0 0.0 0.0 7.6 0.0 0.0 0.0 7.6 1.9 9.5 DEMAND KVA

PHASE B CONNECTED KVA 0.0 3.2 0.0 0.0 0.0 3.2 1.0 #1 1.0 1.0 1.0 DEMAND FACTOR

PHASE A CONNECTED KVA 0.0 4.3 0.0 0.0 0.0 4.3 0.0 7.6 0.0 0.0 0.0 7.6 25% CONNECTED KVA

LTS REC MOTOR OTHER KIT TOTAL LTS REC MOTOR OTHER KIT SUBTOT SPARE TOTAL

SUBTOTAL CONNECTED KVA LOAD SUMMARY & FEEDER CALCULATION

13 EX. LOAD 540 20 1 13 A 14 1 20 540 EX. LOAD 14

11 EX. LOAD 540 20 1 11 B 12 1 20 540 EX. LOAD 12

9 EX. LOAD 540 20 1 9 A 10 1 20 540 EX. LOAD 10

7 EX. LOAD 540 20 1 7 B 8 1 20 540 EX. LOAD 8

5 EX. LOAD 540 20 1 5 A 6 1 20 540 EX. LOAD 6

3 EX. LOAD 540 20 1 3 B 4 1 20 540 EX. LOAD 4

1 EX. LOAD 540 20 1 1 A 2 1 20 540 EX. LOAD 2

CKT DESCRIPTION LTS REC MOTOR OTHER KIT OCPD P CKT PH CKT P OCPD LTS REC MOTOR OTHER KIT DESCRIPTION CKT

LOAD LOAD... LOAD... LOAD

WIRE: 3 MLO: 150A MTG./NEMA #: 1 FEEDER: 2#6 + 1#10 GND, 3/4"C.

PHASE: 1 MCB: BRKR SPACE: 14 SOURCE: (E) MDP

H (PREVIOUSLY PANEL

E)

VOLTS: 208 MAINS RATING: A.I.C. RATING: 10,000 LOCATION: STATE MAINTENANCE 125

P A N E L B O A R D S C H E D U L E

File details come from the government source that posted it. Updated .