5-16. Attachment O - Sample Master Change Order Form.pdf

PDF 48 KB Posted

Attached to
Osage WTP Settling Basin Repairs Phase 02 - West Basin
Solicitation number
BVB 415-26 SEC
Issued by
Nueces County, Texas

About this file

This is a Sample Master Change Order Form attachment provided by the City of Amarillo for the Osage Water Treatment Plant (WTP) Settling Basin Repairs Phase 02 - West Basin project in Texas. The form serves as a template for documenting and processing change orders throughout the contract execution period, establishing a standardized procedure for contractors to request modifications to the original contract scope of work, schedule, or cost. The document outlines the administrative framework for tracking changes, including fields for change order identification, description of work modifications, and authorization signatures from both the contractor and city representatives, ensuring clear communication and documentation of any deviations from the bid specifications.

The Master Change Order Form establishes pricing protocols for requested changes, requiring detailed cost breakdowns that include labor, materials, equipment, and overhead allocations. The form includes provisions for schedule impact analysis, contract amount adjustments, and approval workflows that necessitate signatures from appropriate city officials before implementation. This standardized approach protects both the City of Amarillo and the contractor by creating a transparent mechanism for managing scope changes, preventing disputes over unapproved modifications, and maintaining clear records of all contract amendments throughout the project duration for the settling basin repair work at the West Basin facility.

View the file

Other files

File Type Posted
20-01. Notice to Bidders BVB 415-26 SEC.pdf PDF
4-10. Attachment I - Bond - Maintenance.pdf PDF
17-08. Attachment G - Bid Proposal - Osage WTP - Sed Basin Ph 2.pdf PDF
11-17. Attachment P - Prevailing Wage Rate 2021 for COA.pdf PDF
19-02. Attachment A -Scope of Work - Technical Specifications Osage WTP - Sed Basin Ph 2.pdf PDF
16-05. Attachment D - Special Provisions - Osage WTP - Sed Basin Ph 2.pdf PDF
10-11. Attachment J - Local Preference Consideration.pdf PDF
6-09. Attachment H - References Template.pdf PDF
3-18. Attachment Q - Tax Exemption Certificate.pdf PDF
15-03. Attachment B - AMA Osage WTP Phase 2 Plans - Sealed.pdf PDF
9-10. Attachment I - Bond - Performance.pdf PDF
7-13. Attachment L - Insurance Sample.pdf PDF
8-12. Attachment K - City of Amarillo Vendor Acknowledgement Form.pdf PDF
2-15. Attachment N - CEP List Revised 10-03-24.pdf PDF
14-04. Attachment C - Supplementary General Conditions - Osage WTP - Sed Basin Ph 2.pdf PDF
12-14. Attachment M - Sample Standard Form of Agreement.pdf PDF
13-07. Attachment F - Bid Criteria and Bidders Statement of Qualifications.pdf PDF
1-10. Attachment I - Bond - Payment.pdf PDF
18-06. Attachment E - Uniform General Conditions for City of Amarillo Civil Construction Contracts.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

CHANGE ORDER NO.

ORIGINAL REVISED NET NET

ITEM ESTIMATE ESTIMATE CHANGE UNIT UNIT CHANGE

NO. DESCRIPTION QUAN. QUAN. IN QUAN. MEASURE PRICE IN DOLLARS

NET THIS CHANGE ORDER $ 0.00

PREVIOUS CHANGE ORDERS $ 0

TOTAL OF CHANGE ORDERS $ 0.00

ORIGINAL CONTRACT TOTAL $

REVISED CONTRACT TOTAL $ 0.00

APPROVED: RECOMMENDED:

Contractor Engineer

By Director of

City Manager cc: Departmental Accounting Contractor Project Representative Public Works Project Coord.

REVISED CONTRACT TIME IN WORKING DAYS- 0

DESCRIPTION OF CHANGE

CHANGE ORDER

CITY OF AMARILLO

DEPARTMENT

CONTRACTOR:

JOB NO.

Sheet1