11-17. Attachment P - Prevailing Wage Rate 2021 for COA.pdf
PDF 314 KB Posted
- Solicitation number
- BVB 415-26 SEC
- Issued by
- Nueces County, Texas
About this file
This is a Prevailing Wage Rate document for 2021 prepared by the City of Amarillo, Texas, in compliance with prevailing wage requirements applicable to the Osage Water Treatment Plant Settling Basin Repairs Phase 02 project. The document establishes the minimum wage rates that must be paid to workers engaged in the repair and construction activities at the West Basin settling basins. These rates apply to all laborers, craftsmen, and other workers performing work on the project and serve as a mandatory compensation floor for all bidders and contractors involved in the work.
The prevailing wage rates specified in this attachment are binding requirements for all contractors bidding on and executing work related to the settling basin repairs project. These rates ensure compliance with applicable federal, state, and local prevailing wage laws and regulations. Contractors must incorporate these wage rates into their bid proposals and cost estimates, as failure to pay prevailing wages as specified constitutes a material breach of contract requirements. The specific wage classifications and hourly rates detailed in the document address the various skilled and unskilled trade positions required for the completion of the settling basin repair work.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .