15-03. Attachment B - AMA Osage WTP Phase 2 Plans - Sealed.pdf

PDF 8 MB Posted

Attached to
Osage WTP Settling Basin Repairs Phase 02 - West Basin
Solicitation number
BVB 415-26 SEC
Issued by
Nueces County, Texas

About this file

This document comprises sealed bid plans and specifications for the City of Amarillo's Osage Water Treatment Plant (WTP) Settling Basin Repairs Phase 2 - West Basin project located in Amarillo, Texas. The project involves comprehensive rehabilitation of the west sedimentation basin, including removal and replacement of existing grout under clarifier mechanisms (approximately 24,540 square feet), repair of expansion joints, installation of waterproofing coatings on interior walls and structures, removal and reinstallation of stainless steel track, replacement of scraper blades with new 3/8" HDPE blades, concrete crack repairs, and structural repairs to concrete surfaces. The contract specifies a start date between October 1 and October 15 with a completion timeline of 140 calendar days for final completion with no allowances for weather delays or holidays. A non-mandatory pre-bid meeting is scheduled at the Osage Water Treatment Plant Ozone Building Meeting Room. The project documents include general notes, site plans, basin section details, and photographic reference materials prepared by KSA engineering firm under TBPE registration number F-1356.

The project requires contractors to maintain water treatment plant operations throughout construction, coordinate all work with the engineer and plant manager, and provide temporary piping and electrical systems to sustain plant functionality. Contractors must obtain utility locating services through Texas One Call with a minimum 48-hour advance notice before excavation and are responsible for all costs related to disposal of excess materials at approved locations. Construction activities are limited to 7 a.m. to 7 p.m. Monday through Saturday, with Sunday work permitted only with prior approval from the plant manager. The contractor must submit an affidavit-of-bills-paid document before final payment is released and maintain strict dust control measures and site cleanliness throughout the project duration. Bid alternates are included for concrete walkway and handrail structural repairs, with specifications addressing surface preparation, waterproofing admixtures, epoxy bonding agents, and coating systems for all interior basin surfaces.

View the file

Other files

File Type Posted
9-10. Attachment I - Bond - Performance.pdf PDF
16-05. Attachment D - Special Provisions - Osage WTP - Sed Basin Ph 2.pdf PDF
10-11. Attachment J - Local Preference Consideration.pdf PDF
3-18. Attachment Q - Tax Exemption Certificate.pdf PDF
8-12. Attachment K - City of Amarillo Vendor Acknowledgement Form.pdf PDF
6-09. Attachment H - References Template.pdf PDF
4-10. Attachment I - Bond - Maintenance.pdf PDF
12-14. Attachment M - Sample Standard Form of Agreement.pdf PDF
2-15. Attachment N - CEP List Revised 10-03-24.pdf PDF
5-16. Attachment O - Sample Master Change Order Form.pdf PDF
1-10. Attachment I - Bond - Payment.pdf PDF
18-06. Attachment E - Uniform General Conditions for City of Amarillo Civil Construction Contracts.pdf PDF
17-08. Attachment G - Bid Proposal - Osage WTP - Sed Basin Ph 2.pdf PDF
20-01. Notice to Bidders BVB 415-26 SEC.pdf PDF
11-17. Attachment P - Prevailing Wage Rate 2021 for COA.pdf PDF
7-13. Attachment L - Insurance Sample.pdf PDF
13-07. Attachment F - Bid Criteria and Bidders Statement of Qualifications.pdf PDF
14-04. Attachment C - Supplementary General Conditions - Osage WTP - Sed Basin Ph 2.pdf PDF
19-02. Attachment A -Scope of Work - Technical Specifications Osage WTP - Sed Basin Ph 2.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 TomTom

PAMPA

BORGER

DUMAS

AMARILLO

HEREFORD

PLAINVIEW

CANYON

TULIA

CLARENDON

LOCATION MAP

CITY OF AMARILLO

OSAGE WTP

SETTLING BASIN REPAIRS

PHASE 2 - WEST BASIN

BID NO. BVB _______

\\ksa.net\gateway\Projects\102973\008 CAD\30 Sheets\02 Civil\PHASE 2\102973-C-COVER-0001.dwg : COVER

PROJECT

LOCATION

VICINITY MAP

PROJECT

LOCATION

RECOMMENDED BY:

KSA TBPE FIRM REGISTRATION No. F-1356

CLAYTON A. SCALES 6/19/2026

VICE PRESIDENT

600 S. Tyler St., Suite 1625 Amarillo, TX 79101 T. 806-335-1600 www.ksaeng.com a Pape-Dawson company

415-26 SEC

G

EN

ER

AL

N O

TE

S

G-001

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-G I-N

O

TE

S-

.D

W G

G

EN

ER

AL

N

O

TE

S | 6

/1 9/

:1

AM

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny

GENERAL NOTES

1. PRIOR TO SUBMISSION OF THE PROPOSAL, THE CONTRACTOR SHALL HAVE MADE A CAREFUL

EXAMINATION OF THE WORK SITE, THE CONTRACT DOCUMENTS, AND ALL MATTERS THAT MAY

AFFECT THE COST AND TIME FOR THE COMPLETION OF THE WORK INVOLVED.

2. THE INFORMATION SHOWN ON THIS DRAWING CONCERNING TYPE AND LOCATION OF

UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE

CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATIONS AS TO TYPE AND

LOCATION OF UNDERGROUND PIPELINES, CONDUITS AND STRUCTURES BY CONTACTING

OWNERS OF UNDERGROUND UTILITIES AND BY PROSPECTING IN ADVANCE OF EXCAVATION

OPERATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING TEXAS ONE CALL A

MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION.

3. CONTRACTOR IS RESPONSIBLE FOR ALL COST INVOLVED IN DISPOSING OF EXCESS

MATERIALS. THE LOCATION FOR THE DISPOSAL OF CONSTRUCTION MATERIAL SHALL BE

APPROVED BY THE OWNER PRIOR TO THE START OF CONSTRUCTION.

4. ALL PHASES OF CONSTRUCTION MUST BE COORDINATED WITH THE ENGINEER AND PLANT

MANAGER. FIELD ADJUSTMENTS MAY BE NECESSARY AND WILL BE CARRIED OUT AS DIRECTED

BY THE ENGINEER AT NO EXTRA PAY.

5. THE CONTRACTOR SHALL VERIFY, LOCATE AND PROTECT EXISTING WATER, SANITARY SEWER, FIBER, STORM SEWER, GAS, ELECTRIC AND TELEPHONE MAINS AND SERVICES AND RESTORE

SERVICE IN CASE OF ANY DAMAGE AT NO EXTRA PAY.

6. THE CONTRACTOR SHALL NOTIFY THE OWNER AT LEAST 24 HOURS PRIOR TO ANY REQUIRED

TESTING. THE CONTRACTOR SHALL COORDINATE ALL TESTING ACTIVITIES WITH THE CITY AND

THE TESTING FIRM.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE CAUSED BY THE

CONTRACTOR OUTSIDE OF THE DESIGNATED WORK AREA WITH EQUAL OR BETTER QUALITY

MATERIAL AT THE CONTRACTOR'S EXPENSE.

8. THE CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO CONTROL DUST.

CONTRACTOR SHALL CONTROL DUST BY SPRINKLING WATER OR AS APPROVED BY THE

OWNER AND ENGINEER.

9. THE CONTRACTOR SHALL VERIFY AND COORDINATE ALL DIMENSIONS SHOWN, INCLUDING THE

HORIZONTAL AND VERTICAL LOCATION OF ALL UTILITIES.

10. PRE-CONSTRUCTION MEETING: SUBSEQUENT TO THE COMPLETION OF THE CONTRACT

DOCUMENTS AND AWARD OF THE CONTRACT, A PRE-CONSTRUCTION MEETING SHALL BE HELD

AT A DATE AND TIME SET BY THE ENGINEER. THE CONTRACTOR SHALL HAVE THE PROJECT

SUPERINTENDENT AND ANYONE ELSE HE DEEMS NECESSARY TO BE IN ATTENDANCE AT THIS

MEETING. THE PURPOSE OF THE MEETING SHALL BE TO DISCUSS THE PROJECT AND RESOLVE

ANY INITIAL PROBLEMS. THE NOTICE TO PROCEED LETTER SHALL BE GIVEN AT THIS MEETING.

ACCESS AND TRAFFIC CONTROL WILL ALSO BE DISCUSSED.

11. PRE-BID MEETING: THERE SHALL BE A NON-MANDATORY PRE-BID MEETING HELD AT THE

OSAGE WATER TREATMENT PLANT OZONE BUILDING MEETING ROOM AT THE DATE AND TIME

STATED IN THE CONTRACT DOCUMENTS.

12. CONTRACTOR SHALL KEEP A SET OF PLANS ON THE SITE AT ALL TIMES. PARTIAL PLAN SETS ARE NOT TO BE KEPT ON THE JOB SITE. PLANS SHALL BE SEALED, SIGNED, AND DATED BY A

PROFESSIONAL ENGINEER.

13. IF ANY DISCREPANCIES EXIST BETWEEN THESE GENERAL NOTES AND THE CONTRACT

SPECIFICATIONS, CONTRACTOR SHALL NOTIFY THE ENGINEER FOR CLARIFICATION.

14. DATE OF COMPLETION: THE START DATE WILL BE BETWEEN OCTOBER 1 AND OCTOBER 15.

CONTRACT TIME WILL INCLUDE 140 CALENDAR DAYS FOR FINAL COMPLETION. THERE SHALL BE

NO SUBSTANTIAL COMPLETION, WEATHER, HOLIDAY, OR NON-WORKING DAYS CONSIDERED.

15. FINAL PAYMENT OF BILLS: PRIOR TO THE RELEASE OF THE FINAL PAYMENT ON THE PROJECT, THE CONTRACTOR SHALL BE REQUIRED TO SUBMIT AN AFFIDAVIT-OF-BILLS PAID FOR THE

PROJECT. FINAL PAYMENT SHALL NOT BE RELEASED UNTIL THIS INFORMATION IS SUBMITTED

TO AND REVIEWED BY THE PROJECT ENGINEER.

RELATIONSHIPS WITH EXISTING FACILITIES

16. UNLESS OTHERWISE INDICATED, THE WATER TREATMENT PLANT MUST REMAIN IN OPERATION

DURING CONSTRUCTION OF THIS PROJECT. EXISTING EQUIPMENT MUST BE AVAILABLE TO

PLANT PERSONNEL AT ALL TIMES. THE CONTRACTOR SHALL KEEP THE SITE FREE OF CLUTTER

AND DEBRIS. AT NO TIME SHALL THE CONTRACTOR'S PERSONNEL, EQUIPMENT, OR MATERIAL

PREVENT THE RAPID ACCESS BY PLANT STAFF TO ANY ITEM OF EQUIPMENT, PIPING, WIRING, OR CONTROLS. IF THE PLANT MANAGER OR PLANT PERSONNEL ASK THE CONTRACTOR TO

REMOVE THEIR EQUIPMENT, MATERIALS, OR ANY MATERIAL INCLUDED IN THE WORK, THEY

SHALL DO SO PROMPTLY AND PLACE SAID EQUIPMENT OR MATERIAL IN AN AREA WHICH DOES

NOT INTERFERE WITH THE PLANT FUNCTION. THE CONTRACTOR SHALL NOT ADJUST OR

OPERATE ANY SERVICEABLE OR FUNCTIONING EQUIPMENT OR SYSTEM WITHOUT THE

CONSENT OF THE PLANT MANAGER.

17. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND PLANT MANAGER ONE WEEK IN

ADVANCE OF THE TIME THAT IS NECESSARY TO TAKE OUT OF SERVICE ANY EXISTING

EQUIPMENT, PIPELINE, OR ELECTRICAL CIRCUIT, OR TO BYPASS ANY PORTION OF THE PLANT.

18. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY PIPING OR ELECTRICAL WIRING AS

NECESSARY TO MAINTAIN OPERATION OF THE PLANT AT ALL TIMES DURING CONSTRUCTION.

19. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORTS FOR EXISTING EQUIPMENT WHEN

NEEDED AND WILL TAKE PRECAUTIONS TO PROTECT ALL EQUIPMENT REMAINING IN SERVICE.

PROTECTION OF INSTALLATIONS

20. THE CONTRACTOR SHALL CORRECT OR REPLACE WITHOUT DELAY ANY AND ALL DAMAGE TO

EXISTING STRUCTURES, SURFACES, EQUIPMENT, CONTROLS OR SYSTEMS RESULTING FROM

HIS OPERATIONS AT THE CONTRACTOR'S SOLE EXPENSE.

21. THE CONTRACTOR'S ATTENTION IS PARTICULARLY DIRECTED TO THE DUST, ABRASIVE

PARTICLES, DEBRIS AND DIRT GENERATED BY THE PLACEMENT, CHIPPING, CUTTING,

FINISHING AND GRINDING OF NEW OR EXISTING CONCRETE AND METAL; AND THE FUMES,

PARTICULATE MATTER, AND SPLATTER FROM WELDING, BRAZING AND PAINTING OF NEW OR

EXISTING PIPING AND EQUIPMENT. THE CONTRACTOR SHALL AS A MINIMUM USE VACUUM

CLEANERS, BLOWERS WITH FILTERS, PROTECTIVE SHIELDING, AND OTHER DUST

SUPPRESSION METHODS AT ALL TIMES TO ADEQUATELY PROTECT MOTORS, PUMPS,

ELECTRICAL EQUIPMENT, AND TREATMENT PROCESSES.

PERMANENT UTILITIES

22. THE CONTRACTOR SHALL SCHEDULE ALL WORK TO MINIMIZE INTERRUPTION OF UTILITY

SERVICES TO THE PLANT. WHERE AN INTERRUPTION IS UNAVOIDABLE, THE CONTRACTOR

SHALL GIVE AT LEAST SEVEN DAYS NOTICE TO THE ENGINEER AND PLANT MANAGER AND

SHALL SUBMIT AN ACCEPTABLE PROGRAM OF WORK FOR REVIEW. THE PLANT MANAGER

SHALL APPROVE PRIOR TO WORK BEING PERFORMED.

DEACTIVATING EXISTING FACILITIES

23. THE WEST SEDIMENTATION BASIN AT THE WATER TREATMENT PLANT WILL BE TAKEN OUT OF

SERVICE DURING THE CONSTRUCTION OF THE PROJECT TO ALLOW REMOVAL OF EXISTING

GROUT FROM THE FLOOR OF THE NORTHWEST AND SOUTHWEST CLARIFIERS, GROUTING OF

THE FLOOR, COATING OF WALLS, AND INSTALLATION OF NEW SCRAPER BLADES.

24. WORK IN EAST BASIN MUST BE COMPLETE AND THE BASIN RETURNED TO SERVICE BEFORE

THE WEST BASIN CAN BE TAKEN OUT OF SERVICE AND MADE AVAILABLE FOR WORK THERE.

CONTRACTOR MUST CONSIDER THE TIME FOR THIS TRANSITION IN PLANNING TO COMPLETE

THE PROJECT WITHIN THE OVERALL PROJECT TIME.

25. PRIOR TO INITIATING CONSTRUCTION, THE CONTRACTOR SHALL FULLY INVESTIGATE THE

WORK SITE AND IDENTIFY ALL NECESSARY CONCRETE CRACK AND JOINT REPAIRS. A FULL

REPORT SHALL BE PROVIDED TO THE PLANT MANAGER AND ENGINEER FOR REVIEW AND

APPROVAL.

REHABILITATION OF EXISTING STRUCTURES

26. THE WEST SEDIMENTATION BASIN SHALL BE TAKEN OUT OF SERVICE AS A PART OF THIS

PROJECT TO ALLOW THE REMOVAL OF EXISTING GROUT LAYER ON THE FLOOR OF THE

CLARIFIER. THE CONTRACTOR SHALL REMOVE THE GROUT LAYER BY ANY REASONABLE

METHOD INCLUDING HYDRO-BLASTING, CHIPPING HAMMER OR OTHER LIGHT TOOL METHODS.

THE USE OF LARGE JACK HAMMERS WILL NOT BE ALLOWED DUE TO THE POSSIBILITY OF

DAMAGE TO THE CONCRETE FLOOR UNDER THE GROUT LAYER. ALL GROUT MATERIAL SHALL

BE REMOVED FROM THE CLARIFIER AND DISCARDED OFFSITE. WHEN REMOVING THE GROUT

LAYER FROM THE FLOOR OF THE CLARIFIER, THE CONTRACTOR SHALL TAKE GREAT CARE TO

NOT DAMAGE THE MECHANISM IN THE CLARIFIER.

27. THE CONTRACTOR SHALL REMOVE LOOSE AND DETERIORATED CONCRETE IN THE SLOPED

AREAS IN THE CORNERS OF THE CLARIFIER. HE SHALL THEN PLACE NEW CLASS A CONCRETE

(PER SECTION 03305) IN THESE AREAS TO REESTABLISH THE SLOPES TO ORIGINAL CONDITION.

28. PRIOR TO GROUTING OF THE FLOOR, CONTRACTOR SHALL MAKE ALL NECESSARY CONCRETE

CRACK AND JOINT REPAIRS AS IDENTIFIED IN THE CONTRACTOR'S REPORT AND APPROVED BY

THE ENGINEER AND PLANT MANAGER. CONTRACTOR SHALL FOLLOW THE REPAIR

PROCEDURES AS SPECIFIED AND NOTED IN THE CONTRACT DOCUMENTS IN ACCORDANCE

WITH THE MANUFACTURER'S INSTRUCTIONS.

29. PRIOR TO GROUTING THE FLOOR OF THE CLARIFIER, THE CONTRACTOR SHALL INSPECT THE

CLARIFIER MECHANISM TO ENSURE ALL BOLTS ARE SECURELY TIGHTENED AND IN GOOD

CONDITION. CONTRACTOR SHALL LEVEL THE EXISTING CLARIFIER MECHANISM PRIOR TO

INSTALLATION OF GROUT. THE CONTRACTOR SHALL THEN REMOVE THE SCRAPER BLADES

FROM THE RAKE. SCREED BOARDS SHALL THEN BE ATTACHED TO THE TWO RAKE ARMS IN A

MANNER RECOMMENDED BY OVIVO (EIMCO), THE MANUFACTURER OF THE CLARIFIER

MECHANISM. ON COMPLETION OF GROUTING, NEW SCRAPER BLADES SHALL BE INSTALLED.

CLEANING UP

30. THE CONTRACTOR SHALL NOT ALLOW THE SITE OF THE WORK TO BECOME LITTERED WITH

TRASH AND WASTE MATERIAL BUT SHALL MAINTAIN THE SITE OF THE WORK IN A NEAT AND

ORDERLY CONDITION THROUGHOUT THE CONSTRUCTION PERIOD. ON OR BEFORE THE

COMPLETION OF THE WORK, THE CONTRACTOR SHALL CAREFULLY CLEAN OUT ALL PITS,

DRAIN LINES AND DRAINS, CHAMBERS AND CONDUITS AND SHALL REMOVE ALL TEMPORARY

STRUCTURES AND RUBBISH OF ALL KINDS FROM ANY OF THE GROUNDS WHICH HE HAS

OCCUPIED AND LEAVE THEM IN FIRST CLASS CONDITION TO THE SATISFACTION OF THE

ENGINEER.

31. THE CONTRACTOR IS ADVISED THAT THE FINAL CLEANUP OF THE PROJECT SHALL BE DONE

WITH METICULOUS CARE AND THAT THE ENGINEER EXPECTS ALL BASINS, CHANNELS, PIPES,

AND CHAMBERS TO BE THOROUGHLY CLEANED AND DUST FREE PRIOR TO FINAL ACCEPTANCE

OF THE WORK.

USE OF OWNER'S FACILITIES

32. CONTRACTOR SHALL MAINTAIN FOR ALL EMPLOYEES AND SUBCONTRACTORS PARKING,

RESTROOMS, TELEPHONE SERVICE, SHOWERS AND WATER FOUNTAINS. PLANT FACILITIES

WILL NOT BE AVAILABLE FOR CONTRACTOR'S USE.

33. CONTRACTOR SHALL OPERATE THE EXISTING RAKE ONLY UNDER THE OWNER'S INSTRUCTION.

CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO THE CLARIFIER MECHANISM

THAT OCCURS DURING OPERATION.

34. THE CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN SUCH A WAY AS TO MINIMIZE

DISRUPTION OF THE SURROUNDING AREA AND TO LIMIT NUISANCE CONDITIONS AS FOLLOWS:

A. CONTRACTOR'S PERSONNEL SHALL ONLY PARK IN THE AREA DESIGNATED ON

THESE DRAWINGS. THE CONTRACTOR SHALL NOT BLOCK STREET OR DRIVEWAY

ACCESS OR VEHICULAR TRAFFIC BY HIS ACTIVITIES. PROPER TRAFFIC CONTROL

MEASURES SHALL BE USED WHERE REQUIRED.

B. THE CONTRACTOR SHALL LIMIT NOISE AT THE CONSTRUCTION SITE AS MUCH AS

POSSIBLE. ALL INTERNAL COMBUSTION ENGINES SHALL BE EQUIPPED WITH

PROPERLY OPERATING MUFFLERS.

C. THE CONTRACTOR'S WORK SHALL BE LIMITED TO BETWEEN THE HOURS OF 7 AM

AND 7 PM MONDAY THROUGH SATURDAY. SUNDAY WORK WILL ONLY BE

CONSIDERED UPON REQUEST GIVEN TO THE PROJECT ENGINEER OR RESIDENT

PROJECT REPRESENTATIVE PRIOR TO NOON ON FRIDAYS. A DECISION TO ALLOW

WORK ON SUNDAY WILL BE MADE BY THE PLANT MANAGER PRIOR TO 5 PM ON THE

FRIDAY IN QUESTION.

D. DUST SHALL BE STRICTLY CONTROLLED AT THE PLANT SITE DURING

CONSTRUCTION.

E. THE CONTRACTOR SHALL EXERCISE CAUTION IN TRAVELING OVER EXISTING

PAVING IN AND NEAR THE CITY OF AMARILLO. WHEEL LOADS FOR CONCRETE,

EQUIPMENT DELIVERY AND OTHER TRUCKS SHALL NOT EXCEED LEGAL LIMITS AND

LIMITS FOR STREETS SET BY THE CITY OF AMARILLO. ALL STREETS, ESPECIALLY IN

THE VICINITY OF THE PLANT SITE, SHALL BE KEPT CLEAN AND FREE FROM MUD

AND DEBRIS. ONLY RUBBER TIRED VEHICLES SHALL BE ALLOWED ON PAVEMENT.

THE CONTRACTOR SHALL NOT OPERATE TRACKED EQUIPMENT OR VEHICLES ON

PAVEMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL

DAMAGE TO PAVEMENT CAUSED BY THE CONTRACTOR'S NEGLIGENT USE OR

NONCOMPLIANCE WITH LAWS AND ORDINANCES.

F. CONTRACTOR SHALL NOT USE OFF SITE STORAGE WITHOUT OWNER'S WRITTEN

APPROVAL. IT SHALL NOT CAUSE A NUISANCE OR BE VISIBLE TO THE GENERAL

PUBLIC.

Sheet List Table

Sheet Number Sheet Title

-- COVER

G-001 GENERAL NOTES

C-101 SITE PLAN

C-102 EXISTING SETTLING BASIN PLAN

C-301 BASIN SECTION DETAILS

C-501 DETAILS

C-901 DETAIL PHOTOS

C-902 DETAIL PHOTOS 2

S1 BID ALTERNATE 2 STRUCTURAL

GENERAL NOTES AND SCHEDULES

S2 BID ALTERNATE 2 STRUCTURAL

WALKWAY AND HANDRAIL DETAILS

6/19/26

GRAPHIC SCALE IN FEET

150' 300'150'

WEST BASIN WORK AREA

SEE SHEET C-102

S.

O

SA

G

E

ST

PLANT ENTRANCE

SI

TE

P

LA

N

C-101

CONTRACTOR

STAGING AREA

SILT FENCE

ADMIN BUILDING

TEMPORARY

CONTRACTOR PARKING

SEDIMENTATION BASINS

FILTERS

CHEMICAL

BUILDING

FLOCCULATORS

SLUDGE PONDS

TEMPORARY SEDIMENT CONTROL FENCE

NTS

ATTACH THE W.W.M. AND FABRIC ON END POSTS

USING 4 T-CLIPS OR SEWN VERTICAL POCKETS.

2"

PLACE 6" OF FABRIC AGAINST

THE TRENCH SIDE AND APPROX. 2" ACROSS

TRENCH BOTTOM IN UPSTREAM DIRECTION.

MINIMUM TRENCH SIZE SHALL BE 6" SQUARE.

BACKFILL AND HAND TAMP.

90°

4' MIN. STEEL POSTS SPACED

AT 6' TO 8'.

GALV. W.W.M. (12.5 GA. MIN.)

MAX. OPENING SIZE

SHALL BE 2" X 4".

CONNECT THE ENDS OF SUCCESSIVE

REINFORCEMENT SHEETS OR ROLLS

A MIN. OF 6 TIMES WITH HOG RINGS.

FLOW

WOVEN FILTER FABRIC

FASTEN FABRIC TO TOP STRAND OF WELDED

WIRE MESH (W.W.M.) BY HOG RINGS OR CORD

AT A MAX. SPACING OF 15".

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-L O

-S

IT

E-

.D

W G

SI

TE

PL

AN

6/

/2

- 1

1:

A M

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny

MEETING ROOM

0 20' 40'20'

GRAPHIC SCALE IN FEET

C-102

EXISTING DRAIN/SLUDGE BOX

SEE NOTE 5 (TYP)

GROUT CORNERS

BY HAND (TYP)

CONTRACTOR TO REMOVE

CORNER RAKES BEFORE

BEGINNING GROUT REMOVAL

AND REPLACE UPON

COMPLETION OF REPAIR

WORK.

EXISTING LEAN CONCRETE FILL

TO BE DEMOLISHED AND

REPLACED. SEE SHEET C-301

BID ALTERNATE #1

SETTLING BASIN NO. 1

SETTLING BASIN NO. 2

LEGEND

REMOVE AND REPLACE GROUT

(SEE NOTE 1)

APPLY WATERPROOF COATING

(SEE NOTE 4)

REPAIR EXPANSION JOINT

(SEE NOTE 2)

REMOVE AND REINSTALL STAINLESS TRACK

(SEE NOTE 3)

REMOVE AND REPLACE LEAN CONCRETE FILL

REPAIR SPALLING AND INSTALL FIBERGLASS CAP

FL

O

C C

U

LA

TI

O

N B

AS

IN

N O

. 1

FL

O C

C U

LA

TI

O N

B

AS

IN

N

O . 2

EF

FL

U

EN

T W

EI

R

S

EF

FL

U

EN

T

W

EI

R S

EX

IS

TI

N

G S

ET

TL

IN

G

B

AS

IN

PL

AN

M

AR

K

R

EV

IS

IO

N D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-P R

O P-

LO

-0

1.

D W

G

PR

O

JE

C

T

LA

YO

U

T | 6

/1 9/

:1

AM

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny

3'

-0

30'-0"

112'-6"

1'-6"

112'-6"53'-0" 20'-0"

SEE NOTE 4

(TYP)

NOTES:

1. REMOVE AND DISPOSE OF EXISTING GROUT (THICKNESS VARIES) UNDER CLARIFIER MECHANISMS (APPROX. 24,540 SF). VERIFY SOUNDESS OF EXISTING SLAB USING

HAMMER TAPPING, CHAIN, ETC TO OWNER'S SATISFACTION. REMOVE AND REPLACE UNSOUND AREAS WITH CLASS A CONCRETE (REINFORCING TO MATCH EXISTING).

FURNISH AND INSTALL NEW GROUT WITH WATERPROOFING ADMIXTURE UNDER MECHANISM PER SPECIFICATIONS. GROUT TO BE SWEPT IN BY EXISTING CLARIFIER MECHANISM. REMOVE AND DISPOSE OF EXISTING SCRAPER BLADES. GROUT SHALL BE SWEPT IN WITH TEMPORARY SCREED BOARDS. PROVIDE AND INSTALL 3/8" HDPE SCRAPER BLADES UPON COMPLETION OF REPAIR WORK FOR PERMANENT USE. SEE DETAIL PHOTO 8 ON SHEET C-902.

2. ALL VERTICAL AND HORIZONTAL EXPANSION JOINTS WITHIN THE WEST BASIN AND EFFLUENT CHANNEL SHALL BE REPAIRED AND RESEALED ACCORDING TO THE DETAILS

ON SHEET C-501. SEE DETAIL PHOTO 4 ON SHEET C-901.

3. REMOVE AND SALVAGE EXISTING STAINLESS STEEL TRACK. CUT EXISTING ANCHOR BOLTS FLUSH. UPON COMPLETION OF REPAIR WORK, REINSTALL TRACK WITH NEW ANCHOR BOLTS (1/2" DIA SS ANCHOR WITH HILTI HIT-ICE ADHESIVE). REMOVE AND REATTACH BRACKETS TO TRACK AS NECESSARY. SEE DETAIL ON SHEET C-501.

4. UPON COMPLETION OF GROUTING WORK AND NECESSARY CONCRETE/CRACK REPAIRS, CONTRACTOR SHALL COAT THE ENTIRE WEST SEDIMENTATION BASIN (SETTLING BASIN NO. 2) INTERIOR WALLS, CONCRETE STRUCTURES, AND FLOOR UNDERNEATH EFFLUENT WEIRS WITH A WATERPROOFING COATING SYSTEM PER SPECIFICATIONS.

COATING IS NOT REQUIRED ON FLOOR AREA WHERE NEW GROUT WITH ADMIXTURE IS INSTALLED.

5. CONTRACTOR SHALL PROTECT EXISTING DRAIN AND SLUDGE BOXES DURING REPAIR WORK. SEE SHEET C-301 SECTION A-A FOR ADDITIONAL INFORMATION.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FLOCCULATOR PADDLES AND BAFFLES FROM ANY OVERSPRAY OF THE PROPOSED WATERPROOF COATING. ANY DAMAGE TO THE PADDLES OR BAFFLES RESULTING FROM THE PROPOSED WORK SHALL BE REPAIRED AT THE CONTRACTOR'S SOLE EXPENSE. SEE DETAIL PHOTO 10 ON

SHEET C-902.

REPAIR SLUDGE BOX RIM AND APPLY

WATERPROOF COATING. SEE DETAIL PHOTO

1 AND 2 ON SHEET C-901 (TYP OF 4)

RAPID MIX BASIN NO. 1

RAPID MIX BASIN NO. 2

EXISTING LEAN CONCRETE FILL

ON DIVIDING WALL TO REMAIN.

DO NOT DISTURB. (TYP)

EXISTING LEAN CONCRETE FILL TO

BE DEMOLISHED AND REPLACED.

SEE SHEET C-301.

BID ALTERNATE #1

LOCATION OF SURFACE

CONCRETE/CRACK REPAIR ON

EXTERIOR CHANNEL WALL

LOCATION OF CONCRETE

WALKWAY STRUCTURAL

REPAIR (FULL LENGTH OF

BASIN). SEE DETAIL PHOTO

4 AND 5 ON SHEET C-901

BID ALTERNATE #2

REMOVE EXISTING EXPANSION

JOINT SEALANT AND FILLER TO

9' BELOW EXISTING GRADE.

REPLACE FILLER AND INSTALL

NEW JOINT SEALANT

REPAIR SPALLING AND

INSTALL FIBERGLASS CAP

ALONG ENTIRE WEST WALL

CONTRACTOR TO VERIFY LOCATIONS OF ALL

EXISTING UNDERGROUND UTILITIES. PROTECT

AND BRACE ALL EXISTING UTILITIES TO ALLOW

FOR CONSTRUCTION IN THIS AREA. REPAIR ANY

DAMAGE. LOCATION, PROTECTION, AND REPAIR

OF DAMAGE TO EXISTING UTILITIES SHALL BE AT

NO COST TO THE OWNER.

REMOVE EXISTING

TEMPORARY CRACK REPAIR

PRIOR TO APPLYING

WATERPROOF COATING

113'-0" 12"12"

17'-0"

112'-6" 1'-6"1'-6"

17'-2"

4'-0"

SETTLING BASIN NO. 2

T/WALL ELEV. 3616.50

W.L. ELEV. 3615.00

3/4

3/4

SLUDGE POCKET

TRUSS TYPE BRIDGE

BA

SI

N S

EC

TI

O N

D

ET

AI

LS

C-301

SECTION A-A

SCALE 3/4"=1'-0"

NOTES:

1. CONTRACTOR SHALL PLACE A NEW SEWER PLUG IN THE EXISTING 12" PIPE EXITING THE SLUDGE POCKET. CONTRACTOR SHALL THEN PLACE 34" PLYWOOD OVER ENTIRE OPENING OF THE SLUDGE POCKET DURING ALL GROUTING OPERATIONS. PLYWOOD SHALL BE SUPPORTED AS NECESSARY AND SHALL LEAVE NO GAPS GREATER THAN 14". ALL GAPS BETWEEN THE PLYWOOD AND THE EXISTING CONCRETE SHALL BE SEALED WITH CAULK. THE SEWER PLUG SHALL NOT BE REMOVED UNTIL ALL WORK IN THE CLARIFIER IS COMPLETE. CONTRACTOR SHALL PUMP OUT ALL ACCUMULATED LIQUIDS RATHER THAN ALLOWING THEM TO ENTER DRAIN LINE. CONTRACTOR SHALL REMOVE ANY TRASH IN THE DRAIN LINE ONCE CONSTRUCTION IS COMPLETE.

THE PLUG SHALL BECOME THE PROPERTY OF CITY OF AMARILLO.

2. ALL GROUT SHALL INCLUDE WATERPROOF CRYSTALLINE ADMIXTURE (XYPEX C-1000, SIKA WATERTIGHT CONCRETE POWDER OR ENGINEER APPROVED EQUAL) AT MANUFACTURER'S

RECOMMENDED DOSAGE.

3. OWNER'S PROJECT REPRESENTATIVE ASSIGNED TO THIS PROJECT SHALL INSPECT TEMPORARY SCREED BOARDS BEFORE GROUTING AND PROVIDE WRITTEN APPROVAL.

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-D T-

.D W

G

BA

SI

N

SE

C

TI

O N

D

ET

AI

LS

6/

/2

- 1 1:

A

M

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny

REMOVE AND DISPOSE OF EXISTING GROUT UNDER

CLARIFIER MECHANISM. FURNISH AND INSTALL NEW

GROUT UNDER MECHANISM PER SPECIFICATIONS

(THICKNESS VARIES). USE EPOXY BONDING AGENT

BETWEEN NEW GROUT AND EXISTING CONCRETE

SLAB. GROUT SHALL BE SWEPT IN BY EXISTING

CLARIFIER MECHANISM.

CONTRACTOR SHALL REMOVE EXISTING RAKE ARM

SCRAPER BLADES TO ALLOW PLACING OF GROUT WITH

SCREED BOARDS. UPON COMPLETION OF GROUTING,

REPLACE SCREED BOARDS WITH NEW 38" HDPE SCRAPER

BLADES. BLADES SHALL BE MANUFACTURED WITH SLOTS

TO ALLOW FOR VERTICAL ADJUSTMENTS. PROVIDE 3/4"

GAP BETWEEN INSTALLED BLADES AND FINISHED FLOOR.

CONTRACTOR SHALL LEVEL CLARIFIER MECHANISM

BEFORE PLACING PROPOSED GROUT.

CONTRACTOR SHALL LEVEL RAKES BEFORE AND

AFTER INSTALLATION OF PROPOSED GROUT.

CONTRACTOR SHALL VERIFY THAT THE CLARIFIER

TOWER IS PLUMB BEFORE LEVELING RAKES.

APPLY WATERPROOF

COATING TO INTERIOR

WALLS

APPLY WATERPROOF

COATING TO INTERIOR

WALLS

ROUGHEN EXISTING

CONCRETE SURFACE

AND USE EPOXY

BONDING AGENT, TYP.

FILL WITH 4000 PSI

(GROUT) PER

SPECIFICATION 03305

SLOPE FROM TOP

OF WALL TO TOP

OF CURB

SLOPED CONCRETE AREA - SECTION (TYP)

AS PART OF BID ALTERNATE #1

SCALE 1" = 4'

EXISTING

CONCRETE WALL

EXISTING

CONCRETE CURB

8" 8"

8'-6"

MAX HEIGHT

OF SLOPE

1'-4"

D

ET

AI

LS

C-501

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-D T-

.D W

G

D

ET

AI

LS

6/

/2

- 1 1:

A

M

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny

CUT EXISTING ANCHOR BOLTS FLUSH.

INSTALL NEW S.S. ANCHOR BOLTS (1

2"Ø X 4 12"

EMBEDMENT ANCHOR WITH HILTI HIT-RE 500

ADHESIVE OR ENGINEER APPROVED

EQUAL). MATCH EXISTING SPACING.

EXPANSION JOINT DETAILS

N.T.S.

S.S. TRACK MOUNTING DETAIL

N.T.S.

EXPANSION JOINT DETAILS

N.T.S.

SURFACE CONCRETE AND CRACK

REPAIR DETAIL

N.T.S.

WATERPROOF COATING

AS SPECIFIED

CONCRETE SURFACE

REPAIR MORTAR AS

SPECIFIED

CHIP AND FILL WITH CRACK

REPAIR GROUT AS

SPECIFIED TO STOP WATER

FLOW

ACTIVELY LEAKING

CRACK

SLURRY COATING AS SPECIFIED

1.5"

1.5"

NOTES:

1. CONTRACTOR SHALL FOLLOW MANUFACTURERS' PUBLISHED

INSTRUCTIONS AND RECOMMENDATIONS IN THE PREPARATION,

APPLICATION, AND CURING OF REPAIR PRODUCTS.

2. SEE SPECIFICATION 03900.

STRUCTURAL CONCRETE

REPAIR MORTAR AS SPECIFIED

PRIMER COATING AS SPECIFIED

STRUCTURAL CONCRETE REPAIR

DETAIL

N.T.S.

WATERPROOF COATING

AS SPECIFIED

SECTION SECTION

NOTES:

1. CONTRACTOR SHALL USE STRUCTURAL REPAIR DETAIL FOR

ANY REPAIR THAT EXPOSES REINFORCEMENT.

2. UNDERCUT ALL EXPOSED REINFORCING STEEL BY REMOVING

CONCRETE FROM THE FULL CIRCUMFERENCE OF STEEL TO

PROVIDE A MINIMUM CLEARANCE OF 34".

3. CONTRACTOR SHALL FOLLOW MANUFACTURERS' PUBLISHED

INSTRUCTIONS AND RECOMMENDATIONS IN THE PREPARATION,

APPLICATION, AND CURING OF REPAIR PRODUCTS.

4. SEE SPECIFICATION 03900.

3/4"

MINIMUM

LARGER

THAN 6"

DEMOLITION

REMOVE EXISTING GROUT

(THICKNESS VARIES)

REMOVE EXISTING GROUT TO MATCH DEPTH OF

ADJACENT GROUT REMOVAL. CONTRACTOR SHALL

SOUND REMAINING MATERIAL. REMOVE ANY AREAS OF

DELAMINATION OR OTHER UNSOUNDNESS AND

REPLACE WITH CLASS A CONCRETE OR GROUT AS

DESCRIBED IN SECTION 03305 AND DIRECTED BY THE

ENGINEER.

JOINT SEALING

SIKA COMBIFLEX SG

(8 IN WIDTH)

1"MIN.

4" CHAMFER (TYP.)

SLOPE AS NEEDED TO AID IN

REMOVING TEMPORARY BLOCKING

1" ± WATERTIGHT JOINT SEALANT

(SUBMERSEAL BY EMSEAL

OR ENGINEER APPROVED EQUAL)

CONTRACTOR TO FIELD MEASURE

ALL EXPANSION JOINTS BEFORE

ORDERING MATERIAL.

2" (T

YP

REMOVE EXISTING JOINT SEALANT AND

FILLER MATERIAL TO EX WATER STOP. DO

NOT DAMAGE EXISTING WATER STOP.

EPOXY BONDING

AGENT (TYP.)

PROPOSED GROUT (7 SACK PEA GRAVEL

MIX WITH WATERPROOFING ADMIXTURE

AND PROPEX FIBERMESH 300 OR

ENGINEER APPROVED EQUAL)

EXISTING GROUT

EXISTING WATER STOP

10"

(TYP.)

10" (TYP.)

EXISTING REINFORCING

TO BE PROTECTED

NOTES:

1. REPAIR OF EXPANSION JOINTS ON WALL SHALL FOLLOW THE

SAME PROCESS AS FLOOR EXPANSION JOINTS MINUS THE

REMOVAL AND PLACEMENT OF GROUT.

D

ET

AI

L

PH

O

TO

S

C-901

DETAIL PHOTO 1 - CONCRETE REPAIR

SLUDGE BOX RIM

DETAIL PHOTO 4 -

TYPICAL EXPANSION JOINT

DETAIL PHOTO 2 - WATERPROOF COATING

SLUDGE BOX WALLS

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-D T-

.D W

G

D

ET

AI

L

PH

O

TO

S

| 6 /1

9/

:1

AM

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny

DETAIL PHOTO 5 - CONCRETE REPAIR

UNDERSIDE OF WALKWAY

BID ALTERNATE #2

DETAIL PHOTO 6 - CONCRETE REPAIR

UNDERSIDE OF WALKWAY

BID ALTERNATE #2

REFER TO DETAIL SURFACE

CONCRETE AND CRACK

REPAIR DETAIL ON SHEET

C-501 INSTALL WATERPROOF COATING

ON SLUDGE BOX WALLS

REMOVE AND REPLACE

EXISTING WALKWAY. SEE

STRUCTURAL SHEETS.

REINSTALL EXISTING

HANDRAILS, PIPING, CONDUIT,

WIRE, ETC. WITH NEW HANGERS

AND ANCHOR BOLTS.

REMOVE AND REPLACE

EXPANSION JOINT MATERIAL.

REFER TO JOINT SEALING

DETAIL ON SHEET C-501

DETAIL PHOTO 3 - REPAIR EXTERIOR

EXPANSION JOINT

REMOVE EXPANSION JOINT

FILLER AND SEALANT. REPLACE

WITH EMSEAL SEAL JOINT

EXISTING LEAN CONCRETE FILL TO

BE DEMOLISHED AND REPLACED.

D

ET

AI

L

PH

O

TO

S

C-902

DETAIL PHOTO 7 - NORTH

WEST BASIN

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-D T-

.D W

G

D

ET

AI

L

PH

O

TO

S

| 6

/1 9/

:1

AM

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny M

AR

K

R

EV

IS

IO

N D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

\\K

SA

.N

ET

\G

AT

EW

AY

\P R

O

JE

C

TS

\1

3\

C

AD

\3

SH

EE

TS

\0

C

IV

IL

\P H

AS

E

2\

3- C

-D T-

.D W

G

D

ET

AI

L

PH

O

TO

S

| 6

/1 9/

:1

AM

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

KE

T

N G

K

6/

/2

S.

T yl er S t., S ui te

Am ar illo

, T X

T.

-3

-1 w w w

.k sa en g.

co m a Pa pe -D aw so n co m pa ny

DETAIL PHOTO 8 - SOUTH

WEST BASIN

DETAIL PHOTO 9 - CLARIFIER

RAKE ARM

DETAIL PHOTO 10 - SLOPED CONCRETE

BID ALTERNATE #1

DETAIL PHOTO 11 - WEST

FLOCCULATION BASIN

CONCRETE REINFORCING LAP SPLICE TABLE

CONCRETE COVER REQUIREMENTS

CONCRETE MATERIAL SCHEDULE

BI

D

A

LT

ER

N

AT

E

#2

ST

R U

C

TU

R

AL

G

EN

ER

AL

N O

TE

S

AN

D

S C

H

ED

U

LE

S

S1

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

F:

\C

O

ST

EL

LO

\R D

R

IV

E\

PD

\4

\2 9\

0\

AM

A

O

SA

G E

W

TP

C

O N

C R

ET

E

W

AL

KW

AY

R

EP

LA

C

EM

EN

T\ D

W G

\ 4

-0

_A

M A

O

SA

G E

W

TP

C

O N

C R

ET

E

W

AL

KW

AY

R

EP

LA

C

EM

EN

T_ S1

_S

TR

U C

TU

R

AL

N

O

TE

S.

D

W G

ST

R U

C

TU

R

AL

N O

TE

S

| 1 1/

/2

- 1 :1

PM

S.

T yl er

S t.

Su it e

Am ar ill o, T ex as

T.

-3

-1

F

8-

4-w w w .k sa en g.

co m

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

FE

C

M

AW

FE

C

/1

7/

P R

O F

E S

SIONAL ENG

IN

E E

R

S

TA

TE

OF TEXA

S

128045

LICENSED

MARCOS A. WORTLEY

11/17/2025

SAW-CUT AND DEMO - SECTION

PROPOSED REPLACEMENT - SECTION

TYPICAL HANDRAIL DETAIL

HANDRAIL POST FASTENING TO CONCRETE

CONSTRUCTION JOINT KEY DETAILS

BI

D

A

LT

ER

N

AT

E

#2

ST

R U

C

TU

R

AL

W

AL

KW

AY

AN

D

H

AN

D R

AI

LS

D

ET

AI

LS

S2

M

AR

K R

EV

IS

IO

N

D

AT

E

KS

A

JO

B

N O

LA

TE

ST

R

EV

IS

IO

N

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

SH

EE

T N

AM

E:

PR

O

JE

C

T N

AM

E:

SEAL:

TBPE Firm Registration No. F-1356

SHEET NO.

D R

AW

IN

G P

AT

H

\N

AM

E | L

AY

O

U T

| P

LO

T D

AT

E

- T

IM

E

F:

\C

O

ST

EL

LO

\R D

R

IV

E\

PD

\4

\2 9\

0\

AM

A

O

SA

G E

W

TP

C

O N

C R

ET

E

W

AL

KW

AY

R

EP

LA

C

EM

EN

T\ D

W G

\ 4

-0

_A

M A

O

SA

G E

W

TP

C

O N

C R

ET

E

W

AL

KW

AY

R

EP

LA

C

EM

EN

T_ S3

_S

TR

U C

TU

R

AL

D

ET

AI

LS

.D

W G

ST

R U

C

TU

R

AL

D

ET

AI

LS

/1 7/

1:

P

M

S.

T yl er

S t.

Su it e

Am ar ill o, T ex as

T.

-3

-1

F

8-

4-w w w .k sa en g.

co m

C

IT

Y O

F

AM

AR

IL

LO

O

SA

G

E W

TP

SE

TT

LI

N G

B

AS

IN

R

EP

AI

R S

PH

AS

E

- W

ES

T

BA

SI

N

AM

AR

IL

LO

, T

EX

AS

FE

C

M

AW

FE

C

/1

7/

P R

O F

E S

SIONAL ENG

IN

E E

R

S

TA

TE

OF TEXA

S

128045

LICENSED

MARCOS A. WORTLEY

11/17/2025

File details come from the government source that posted it. Updated .