This is a bid criteria and bidder statement of qualifications document issued by the City of Amarillo for the Osage WTP Settling Basin Repairs Phase 02 - West Basin project. The City of Amarillo uses the Best Value Bid procurement method as authorized by Texas Local Government Code Title 8, Subtitle A, Section 252.043. Bidders must submit proposals on forms furnished by the City, with prices written in ink or typewritten and executed by an authorized representative. Proposals may not be modified after opening to correct price errors; any corrections must be made prior to submission. Individual bidders, partnerships, corporations, and joint ventures (limited to two firms) are eligible to submit proposals, with joint venture partners required to complete separate evaluations. Failure to submit required bidder evaluation information at the time of proposal submittal may result in the proposal being deemed non-responsive and rejected. The evaluation criteria are weighted as follows: Price (40 points), Reputation of the Bidder and Previous Work (25 points), Experience (25 points), Safety Record (5 points), and References (5 points), for a maximum total of 100 points.
Bidders must complete comprehensive qualifications documentation including general organization information, organizational history, construction experience, key personnel details, project experience within the past ten years, subcontractor and equipment information, and a safety record questionnaire. The safety record evaluation considers OSHA citations within three years, environmental protection agency citations within five years, criminal convictions resulting in bodily harm or death within ten years, and the company's Experience Modification Rate. Bidders must disclose any defaults, failures to complete awarded work, disqualifications, litigation, or refusals to perform contracted work. The City reserves the right to waive irregularities, require additional information, reject any or all proposals, and reject proposals containing material misstatements, with such misstatements potentially resulting in contract termination and liability for additional costs and damages. A proposed list of subcontractors must accompany the initial proposal, with a final list due not later than seven business days after the proposal close date.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR BID 1. PREPARATION FOR PROPOSAL
1.1 The proposal shall be correctly filled in, stating the price in numerals for which the Bidder intends to do the work contemplated or furnish the materials required. Such prices shall be written in ink, distinctly and legibly, or typewritten. In case of discrepancy between the unit price and the extended total for a proposal item, the unit price will be taken. A proposal that has been opened may not be changed for the purpose of correcting an error in the proposal price. The Bidder shall submit the proposal on forms furnished by the City, and any corrections to the proposal price must be made on the proposal submittal prior to proposal opening.
1.2 If the proposal is submitted by an individual, his name must be signed by him or his duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given and the proposal signed by a member of the firm, association or partnership, or person duly authorized. If the proposal is submitted by a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. Powers of attorney authorizing agents or others to sign proposals must be properly certified and must be in writing and submitted with the proposal. The proposal shall be executed in ink.
BEST VALUE BID CRITERIA
BASIS OF PROPOSALS AND SELECTION CRITERIA
The City of Amarillo uses the Best Value Bid procurement method as authorized by the Texas Legislature and further defined by Texas Local Government Code Title 8, Subtitle A, Section 252.043. Criteria used from Sec. 252.043(b) may include:
(a) the purchase price.
(b) the reputation of the bidder and of the bidder's goods or services.
(c) the quality of the bidder's goods or services.
(d) Extent to which services meet COA needs.
(e) the extent to which the goods or services meet the municipality's needs;
(f) the bidder's past relationship with the COA
(g) Long term cost to acquire bidders’ services.
(h) any relevant criteria specifically listed in the request for bids or proposals.
The Maximum Point value is equal to 100 points. The selection criteria used to evaluate each proposal includes the following:
A. Price (40 Possible Points):
B. Reputation Of The Bidder And Of The Bidder’s Previous Work (25 Possible
Points):
C. Experience (25 Possible Points):
D. Safety Record (5 Possible Points)
E. References (5 Possible Points)
Bidders Statement of Qualifications
Individual Bidders and joint ventures submitting a proposal must complete the following evaluation information for the Project. Joint ventures shall be composed of not more than two firms and each firm must complete separate evaluations. Evaluation information must be submitted at time of proposal submittal. Failure to submit the following Bidder Evaluation information may result in the OWNER considering the proposal non-responsive and result in rejection of the proposal by the OWNER. Bidders are to provide any additional information requested by the OWNER.
The OWNER reserves the right to waive irregularities in determining the firm's qualifications and reserves the right to require the submission of additional information at the discretion of the purchasing agent in writing.
The qualifications of a firm shall not deprive the OWNER of the right to accept a proposal, which in its judgement is the best value to the OWNER, to reject any and all proposals, to waive irregularities in the proposals, or to reject nonconforming, non- responsive, or conditional proposals. In addition, the OWNER reserves the right to reject any proposal where circumstances and developments have in the opinion of the OWNER changed the qualifications or responsibility of the firm.
Material misstatements on the qualification’s forms may be grounds for rejection of the firm's proposal on this project. Any such misstatement, if discovered after award of the contract to such firm, may be grounds for immediate termination of the contract. Additionally, the firm will be liable to the OWNER for any additional costs or damages to the OWNER resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages.
Complete the following information for your organization:
Bidder’s General Information
Organization Doing Business As
Business Address of Principle Office
Telephone Numbers Main Number Fax Number
Web Site Address Form of Business (Check One) A Corporation A Partnership An Individual If a Corporation Date of Incorporation State of Incorporation Chief Executive Officer’s Name President’s Name
Vice President’s Name(s)
Secretary’s Name Treasurer’s Name If a Partnership Date of Organization State whether partnership is general or limited
If an Individual Name
Business Address
Identify all individuals not previously named which exert a significant amount of business control over the organization
Indicators of Organization Size Average Number of Current Full Time Employees
Average Estimate of Revenue for the Current Year
Bidder’s Organizational Experience
Business Address of Regional Office
Name of Regional Office Manager Telephone Numbers
Main Number Fax Number
Web Site Address Organization History List of names that this organization currently, has or anticipates operating under over the history of the organization, including the names of related companies presently doing business:
Names of Organization From Date To Date
List of companies, firms or organizations that own any part of the organization.
Name of companies, firms or organization Percent Ownership
Construction Experience Years experience in projects similar to the proposed project:
As a General Bidder As a Joint Venture Partner Has this or a predecessor organization ever defaulted on a project or failed to complete any work awarded to it?
If yes provide full details in a separate attachment. See attachment No.
Has this or a predecessor organization been released from a proposal or proposal in the past ten years?
Has this or a predecessor organization ever been disqualification as a Bidder by any local, state, or federal agency within the last five years?
Is this organization or your proposed surety currently in any litigation or contemplating litigation?
Has this or a predecessor organization ever refused to construct or refused to provide materials defined in the contract documents?
Bidder’s Proposed Key Personnel
Proposed Project Organization Provide a brief description of the managerial structure of the organization and illustrate with an organizational chart.
Include the title and names of key personnel. Include this chart as an attachment to this description. See attachment No.
Provide a brief description of the managerial structure proposed for this project and illustrate with an organizational chart. Include the title and names of proposed key personnel and alternates. Include this chart as an attachment to this description. See attachment No.
Experience of Key Personnel Provide information on the key personnel proposed for this project that will provide the following key functions.
Provide information for candidates for each of these positions on the pages for each of these key personnel. Also provide biographical information for each primary and alternate candidate as an attachment. The biographical information must include the following as a minimum: technical experience, managerial experience, education and formal training, work history which describes project experience, including the roles and responsibilities for each assignment, and primary language. Additional information highlighting experience which makes them the best candidate for the assignment should also be included.
Role Primary Candidate Alternate Candidate Project Manager Project Superintendent Project Safety Officer Quality Control Manager
If key personnel are to fulfill more than one of the roles listed above, provide a written narrative describing how much time will be devoted to each function, their qualifications to fulfill each role and the percentage of their time that will be devoted to each role. If the individual is not to be devoted solely to this project, indicate how time it to be divided between this project and their other assignments.
Proposed Project Managers
Primary Candidate Name of Individual Years of Experience as Project Manager Years of Experience with this organization Number of similar projects as Project Manager Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Estimated Project Completion Date
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference) Name Name Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Candidate role on Project
Alternate Candidate Name of Individual Years of Experience as Project Manager Years of Experience with this organization Number of similar projects as Project Manager Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Candidate role on Project
Proposed Project Superintendent
Name of Individual Years of Experience as Project Superintendent Years of Experience with this organization Number of similar projects as Superintendent Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Candidate role on Project
Years of Experience as Project Superintendent Years of Experience with this organization Number of similar projects as Superintendent Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Proposed Project Safety Officer
Name of Individual Years of Experience as Project Safety Officer Years of Experience with this organization Number of similar projects as Safety Officer Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Years of Experience as Project Safety Officer Years of Experience with this organization Number of similar projects as Safety Officer Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Proposed Project Quality Control Manager
Name of Individual Years of Experience as Quality Control Manager Years of Experience with this organization Number of similar projects as Quality Manager Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Years of Experience as Quality Control Manager Years of Experience with this organization Number of similar projects as Quality Manager Number of similar projects in other positions Current Project Assignments
Name of Assignment Percent of Time Used for this Project
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Title/ Position Title/ Position Organization Organization Telephone Telephone E-mail E-mail Project Project Candidate role on Project
Bidder’s Project Experience and Resources
Projects Provide a list of major projects that are currently underway, or have been completed within the last ten years on Attachment A Provide a completed Project Information form (Attachment B) for projects that have been completed in the last five years which specifically illustrate the organizations capability to provide best value to the Owner for this project.
Include a completed Project Information form (Attachment B) for projects which illustrate the experience of the proposed key personnel.
Provide a description of your organizations approach to completing this project to provide best value for the Owner.
Including a description of your approach in the following areas:
1. Contract administration
2. Management of sub-contractor and suppliers
3. Time management
4. Cost control
5. Quality management
6. Project site safety
7. Managing changes to the project
8. Managing equipment
Equipment Provide a list of major equipment proposed for use on this project. Attach Additional Information if necessary
Equipment Item Primary Use on Project Own Will Buy Lease
Division of Work between Organization and Sub-Contractor What work will the organization complete using its own resources?
What work does the organization propose to subcontract on this project?
Bidder’s Sub-contractors and Vendors
Project Sub-contractors Provide a list of sub-contractors that will provide more than 10 percent of the work (based on contract amounts
Name Work to be Provided Est. Percent of Contract
Provide information on the proposed key personnel, project experience and a description of past relationship and work experience for each sub-contractor listed above using the Project Information Forms.
Equipment Vendors Provide a list of major equipment proposed for use on this project. Attach Additional Information if necessary
Vendor Name
Equipment / Material Provided Furnish
Only
Furnish and Install
Attachment A
Current Projects and Project Completed within the last 10 Years
Project Owner Project Name General Description of Project:
Project Cost Date Project Completed
Key Project Personnel Project Manager Project Superintendent Safety Officer Quality Control Manager
Name Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/ Position Organization Telephone E-mail Owner Designer Construction Manager
Project Owner Project Name General Description of Project:
Project Cost Date Project Completed
Key Project Personnel Project Manager Project Superintendent Safety Officer Quality Control Manager
Name Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/ Position Organization Telephone E-mail Owner Designer Construction Manager
Project Owner Project Name General Description of Project:
Project Cost Date Project Completed
Key Project Personnel Project Manager Project Superintendent Safety Officer Quality Control Manager
Name Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)
Name Title/ Position Organization Telephone E-mail Owner Designer Construction Manager
Project Information Attachment B Project Owner Project Name General Description of Project
Project Budget and Schedule Performance Budget History Schedule Performance
Amount % of Proposal
Date Days
Proposal Notice to Proceed Change Orders Contract Substantial Completion Date at Notice to Proceed
Owner Enhancements Contract Final Completion Date at Notice to Proceed Unforeseen Conditions Change Order Authorized Substantial Completion Date Design Issues Change Order Authorized Final Completion Date Total Actual / Estimated Substantial Completion Date
Final Cost Actual / Estimated Final Completion Date Key Project Personnel
Project Manager Project Sup Safety Officer Quality Control Manager
Name Percentage of Time Devoted to the Project Proposed for this Project Did Individual Start and Complete the Project?
If not, who started or completed the project in their place.
Reason for change.
Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference) Name Title/ Position Organization Telephone E-mail
Owner Designer Construction Manager Surety Issues / Disputes Resolved or Pending Resolution by Arbitration, Litigation or Dispute Review Boards Number of Issues Resolved
Total Amount involved in Resolved Issues
Number of Issues Pending
Total Amount involved in Resolved Issues
Safety Record Questionnaire
The City of Amarillo City Council desires to avail itself of the benefits of Section 252.0435 of the Local Government Code, and consider the safety records of potential Bidders prior to awarding proposals on City contracts. Pursuant to Section 252.0435 of the Local Government Code, City of Amarillo has adopted the following written definition and criteria for accurately determining the safety record of a Bidder prior to awarding proposals on City contracts.
The definition and criteria for determining the safety record of a Bidder for this consideration shall be:
The City of Amarillo shall consider the safety record of the Bidders in determining the responsibility thereof. The City may consider any incidence involving worker safety or safety of the citizens of the City of Amarillo, be it related or caused by environmental, mechanical, operational, supervision or any other cause or factor. Specifically, the City may consider, among other things:
a. Complaints to, or final orders entered by, the Occupational Safety and Health Review Commission
(OSHRC), against the Bidder for violations of OSHA regulations within the past three (3) years.
b. Citations (as defined below) from an Environmental Protection Agency (as defined below) for violations within the past five (5) years. Environmental Protection Agencies include, but are not necessarily limited to, the U.S. Army Corps of Engineers (USACOE), the U.S. Fish and Wildlife Service (USFWS), the Environmental Protection Agency (EPA), the Texas Commission on Environmental Quality (TCEQ), the Texas Natural Resource Conservation Commission (TNRCC) (predecessor to the TCEQ), the Texas Department of State Health Services (DSHS), the Texas Parks and Wildlife Department (TPWD), the Structural Pest Control Board (SPCB), agencies of local governments responsible for enforcing environmental protection or worker safety related laws or regulations, and similar regulatory agencies of other states of the United States. Citations include notices of violation, notices of enforcement, suspension/revocations of state or federal licenses or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments.
c. Convictions of a criminal offense within the past ten (10) years, which resulted in bodily harm or death.
d. Any other safety related matter deemed by the City Council to be material in determining the responsibility of the Bidder and his or her ability to perform the services or goods required by the proposal documents in a safe environment, both for the workers and other employees of Bidder and the citizens of the City of Amarillo.
In order to obtain proper information from Bidders so that City of Amarillo may consider the safety records of potential Bidders prior to awarding proposals on City contracts, City of Amarillo requires that Bidders answer the following three (3) questions and submit them with their proposals:
QUESTION ONE
Has the Bidder, or the firm, corporation, partnership, or institution represented by the Bidder, or anyone acting for such firm, corporation, partnership or institution, received citations for violations of OSHA within the past three (3) years?
YES NO
If the Bidder has indicated YES for question number one above, the Bidder must provide to City of Amarillo, with its proposal submission, the following information with respect to each such citation:
Date of offense, location of establishment inspected, category of offense, final disposition of offense, if any, and penalty assessed.
Bidder’s Initials
QUESTION TWO
Has the Bidder, or the firm, corporation, partnership, or institution represented by the Bidder, or anyone acting for such firm, corporation, partnership or institution, received citations for violations of environmental protection laws or regulations, of any kind or type, within the past five years? Citations include notice of violation, notice of enforcement, suspension/revocations of state or federal licenses, or registrations, fines assessed, pending criminal complaints, indictments, or convictions, administrative orders, draft orders, final orders, and judicial final judgments.
If the Bidder has indicated YES for question number two above, the Bidder must provide to City of Amarillo, with its proposal submission, the following information with respect to each such conviction:
Date of offense or occurrence, location where offense occurred, type of offense, final disposition of offense, if any, and penalty assessed.
QUESTION THREE
Has the Bidder, or the firm, corporation, partnership, or institution represented by Bidder, or anyone acting for such firm, corporation, partnership, or institution, ever been convicted, within the past ten (10) years, of a criminal offense which resulted in serious bodily injury or death?
If the Bidder has indicated YES for question number three above, the Bidder must provide to City of Amarillo, with its proposal submission, the following information with respect to each such conviction:
Date of offense, location where offense occurred, type of offense, final disposition of offense, in any, and penalty assessed.
QUESTION FOUR
Provide your company’s Experience Modification Rate and supporting information:
PROPOSED LIST OF SUB-CONTRACTORS
Company Name Location Services Provided
THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR PROPOSAL
IF NO SUB-CONTRACTORS WILL BE USED PLEASE INDICATE SO
SUBMITTED BY:
(PRINT NAME OF COMPANY)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
POST-CLOSING DOCUMENT REQUIREMENTS
The below-listed document must be received in the Purchasing Department Not Later Than when bonds and contracts are due to OWNER after the close date when proposals are due.
FINAL LIST OF SUB-CONTRACTORS
FINAL LIST OF SUB-CONTRACTORS
Company Name Location Services Provided
SUBMITTED BY:
(PRINT NAME OF COMPANY)
THIS FORM SHALL BE COMPLETED AND RETURNED NOT LATER THAN SEVEN BUSINESS
DAYS AFTER THE CLOSE DATE WHEN PROPOSALS ARE DUE
IF NO SUB-CONTRACTORS WILL BE USED PLEASE INDICATE SO
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
| Safety Record Questionnaire |
| THIS FORM SHALL BE COMPLETED AND RETURNED ALONG WITH YOUR PROPOSAL IF NO SUB-CONTRACTORS WILL BE USED PLEASE INDICATE SO |
| SUBMITTED BY: |