092300 - Gypsum Plastering_2023.01.18.pdf
PDF 69 KB Posted
- Attached to
- Lobby Security Upgrades Keating Federal Building Construction Project Federal contract opportunity
- Solicitation number
- 47PC0222R0025
About this file
This solicitation is for a construction project to renovate the lobby of the Kenneth B. Keating Federal Building in Rochester, NY. The project includes modifications to planters, security fences and gates, structural improvements to columns, provision of temporary and permanent entrances, installation of storefront systems, construction of an airlock vestibule and security station, modification of mechanical, electrical and plumbing systems, and installation of turnstiles and signage. Questions are due by May 18th, 2022 and bids are due June 1st, 2022. The General Services Administration Public Buildings Service Region 2 is the contracting agency. Interested parties must complete an SBU Clause and Disposal Form to receive specifications and drawings. An optional site visit will be held on May 11th, 2022.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lobby Security Upgrades For Construction – Addendum No. 2 Kenneth B. Keating Federal Bldg. 01/18/2023 Rochester, NY 14614
GYPSUM PLASTERING 092300 - 1
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
SECTION 092300 - GYPSUM PLASTERING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Gypsum plastering on expanded-metal lath.
2. Gypsum plastering on unit masonry.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Store materials inside under cover, and keep them dry and protected against damage from weather, moisture, direct sunlight, contamination, corrosion, construction traffic, and other causes.
1.5 FIELD CONDITIONS
A. Comply with ASTM C842 requirements or gypsum plaster manufacturer's written recommendations, whichever are more stringent.
B. Room Temperatures: Maintain temperatures at not less than 55 deg F (13 deg C) or greater than 80 deg F (27 deg C) for at least seven days before application of gypsum plaster, continuously during application, and for seven days after plaster has set or until plaster has dried.
C. Avoid conditions that result in gypsum plaster drying out too quickly.
1. Distribute heat evenly; prevent concentrated or uneven heat on plaster.
2. Maintain relative humidity levels for prevailing ambient temperature that produce normal drying conditions.
3. Ventilate building spaces in a manner that prevents drafts of air from contacting surfaces during plaster application and until plaster is dry.
Rochester, NY 14614
GYPSUM PLASTERING 092300 - 2
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Fire-Resistance Ratings: Where indicated, provide gypsum plaster assemblies identical to those of assemblies tested for fire resistance according to ASTM E119 by a qualified testing agency.
B. Sound-Transmission Characteristics: Where indicated, provide gypsum plaster assemblies identical to those of assemblies tested for STC ratings according to ASTM E90 and classified according to ASTM E413 by a qualified testing agency.
2.2 EXPANDED-METAL LATH
A. Expanded-Metal Lath: ASTM C847, cold-rolled carbon-steel sheet with ASTM A653/A653M, G60 (Z180), hot-dip galvanized-zinc coating.
1. Paper Backing: Kraft paper factory bonded to back of lath.
2. Diamond-Mesh Lath or Flat-Rib Lath to match the existing at location of patch.
2.3 MISCELLANEOUS MATERIALS
A. Water for Mixing and Finishing Plaster: Potable and free of substances capable of affecting plaster set or of damaging plaster, lath, or accessories.
B. Bonding Compound: ASTM C631.
C. Fasteners for Attaching Metal Lath to Substrates: ASTM C841.
D. Wire: ASTM A641/A641M, Class 1 zinc coating, soft temper, not less than 0.0475-inch diameter unless otherwise indicated.
E. Mix Additives: Use gypsum plaster accelerators and retarders from plaster manufacturer if required by Project conditions. Use only additives that manufacturer recommends in writing for use with plaster to which it is added.
2.4 BASE-COAT PLASTER MATERIALS
A. Lightweight-Gypsum Ready-Mixed Plaster: ASTM C28/C28M, with mill-mixed perlite aggregate.
B. Gypsum Neat Plaster: ASTM C28/C28M, for use with job-mixed aggregates.
C. Gypsum Wood-Fibered Plaster: ASTM C28/C28M, for use as is or with the addition of job-mixed sand in up to equal proportions by weight.
D. High-Strength Gypsum Neat Plaster: ASTM C28/C28M, with a minimum, average, dry compressive strength of 2800 psi (19 MPa) according to ASTM C472 for a mix of 100 lb (45 kg) of plaster and 2 cu. ft. (0.06 cu. m) of sand.
E. Aggregates for Base-Coat Plasters: ASTM C35, sand and perlite.
Rochester, NY 14614
GYPSUM PLASTERING 092300 - 3
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
2.5 FINISH-COAT PLASTER MATERIALS
A. Gypsum Gaging Plaster: ASTM C28/C28M.
B. Gypsum Ready-Mixed Finish Plaster: Manufacturer's standard, mill-mixed, gaged, interior finish.
C. High-Strength Gypsum Gaging Plaster: ASTM C28/C28M, with a minimum, average, dry compressive strength of 5000 psi (34 MPa) according to ASTM C472 for a neat mix.
D. Gypsum Keene's Cement: ASTM C61/C61M.
E. Lime: ASTM C206, Type S, special finishing hydrated lime.
F. Lime: ASTM C206, Type N, normal finishing hydrated lime.
G. Aggregates for Float Finishes: ASTM C35, sand and perlite; graded according to ASTM C842.
2.6 PLASTER MIXES
A. Mixing: Comply with ASTM C842 and manufacturer's written instructions for applications indicated.
B. Mix Additives: Use accelerators and retarders, if required by Project conditions, according to manufacturer's written instructions.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Protect adjacent work from soiling, spattering, moisture deterioration, and other harmful effects caused by plastering.
3.3 INSTALLATION, GENERAL
A. Fire-Resistance-Rated Assemblies: Install components according to requirements for design designations from listing organization and publication indicated on Drawings.
B. STC-Rated Assemblies: Install components according to requirements for design designations from listing organization and publication indicated on Drawings.
Rochester, NY 14614
GYPSUM PLASTERING 092300 - 4
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
C. Sound-Attenuation Blankets: Where required, install blankets before installing lath unless blankets are readily installed after lath has been installed on one side.
3.4 INSTALLING EXPANDED-METAL LATH
A. Expanded-Metal Lath: Install according to ASTM C841.
3.5 INSTALLING ACCESSORIES
A. General: Install according to ASTM C841.
3.6 PLASTER APPLICATION
A. General: Comply with ASTM C842.
1. Do not deviate more than plus or minus 1/8 inch in 10 feet (3 mm in 3 m) from a true plane in finished plaster surfaces when measured by a 10-foot (3-m) straightedge placed on surface.
2. Finish plaster flush with metal frames and other built-in metal items or accessories that act as a plaster ground unless otherwise indicated. Where casing bead does not terminate plaster at metal frame, cut base coat free from metal frame before plaster sets and groove finish coat at junctures with metal.
3. Provide plaster surfaces that are ready to receive field-applied finishes indicated.
B. Bonding Compound: Apply on unit masonry and concrete substrates for direct application of plaster.
C. Base-Coat Plaster:
1. Over Expanded-Metal Lath:
a. Scratch Coat: patch type to match existing plaster type.
b. Brown Coat: patch type to match existing plaster type.
2. Over Unit Masonry: patch type to match existing plaster type.
D. Finish Coats:
1. Smooth-Troweled Finishes:
a. Materials: patch type to match existing plaster type.
2. Float Finishes:
a. Materials: patch type to match existing plaster type.
Rochester, NY 14614
GYPSUM PLASTERING 092300 - 5
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
3.7 PLASTER REPAIRS
A. Repair or replace work to eliminate cracks, dents, blisters, buckles, crazing and check cracking, dry outs, efflorescence, sweat outs, and similar defects and where bond to substrate has failed.
3.8 CLEANING AND PROTECTION
A. Remove temporary protection and enclosure of other work after plastering is complete.
Promptly remove plaster from door frames, windows, and other surfaces not indicated to be plastered. Repair floors, walls, and other surfaces stained, marred, or otherwise damaged during plastering.
END OF SECTION 092300
Rochester, NY 14614
GYPSUM PLASTERING 092300 - 6
CONTROLLED UNCLASSIFIED INFORMATION (CUI)
PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY
Do not remove this notice properly destroy or return documents when no longer needed
THIS SHEET IS INTENTIONALLY LEFT BLANK
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section Includes: |
| 1.3 ACTION SUBMITTALS |
| A. Product Data: For each type of product. |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| A. Store materials inside under cover, and keep them dry and protected against damage from weather, moisture, direct sunlight, contamination, corrosion, construction traffic, and other causes. |
| 1.5 FIELD CONDITIONS |
| A. Comply with ASTM C842 requirements or gypsum plaster manufacturer's written recommendations, whichever are more stringent. |
| B. Room Temperatures: Maintain temperatures at not less than 55 deg F (13 deg C) or greater than 80 deg F (27 deg C) for at least seven days before application of gypsum plaster, continuously during application, and for seven days after plaster has set or until plaster has dried. |
| C. Avoid conditions that result in gypsum plaster drying out too quickly. |
| PART 2 - PRODUCTS |
| 2.1 PERFORMANCE REQUIREMENTS |
| A. Fire-Resistance Ratings: Where indicated, provide gypsum plaster assemblies identical to those of assemblies tested for fire resistance according to ASTM E119 by a qualified testing agency. |
| B. Sound-Transmission Characteristics: Where indicated, provide gypsum plaster assemblies identical to those of assemblies tested for STC ratings according to ASTM E90 and classified according to ASTM E413 by a qualified testing agency. |
| 2.2 EXPANDED-METAL LATH |
| A. Expanded-Metal Lath: ASTM C847, cold-rolled carbon-steel sheet with ASTM A653/A653M, G60 (Z180), hot-dip galvanized-zinc coating. |
| 2.3 MISCELLANEOUS MATERIALS |
| A. Water for Mixing and Finishing Plaster: Potable and free of substances capable of affecting plaster set or of damaging plaster, lath, or accessories. |
| B. Bonding Compound: ASTM C631. |
| C. Fasteners for Attaching Metal Lath to Substrates: ASTM C841. |
| D. Wire: ASTM A641/A641M, Class 1 zinc coating, soft temper, not less than 0.0475-inch diameter unless otherwise indicated. |
| E. Mix Additives: Use gypsum plaster accelerators and retarders from plaster manufacturer if required by Project conditions. Use only additives that manufacturer recommends in writing for use with plaster to which it is added. |
| 2.4 BASE-COAT PLASTER MATERIALS |
| A. Lightweight-Gypsum Ready-Mixed Plaster: ASTM C28/C28M, with mill-mixed perlite aggregate. |
| B. Gypsum Neat Plaster: ASTM C28/C28M, for use with job-mixed aggregates. |
| C. Gypsum Wood-Fibered Plaster: ASTM C28/C28M, for use as is or with the addition of job-mixed sand in up to equal proportions by weight. |
| D. High-Strength Gypsum Neat Plaster: ASTM C28/C28M, with a minimum, average, dry compressive strength of 2800 psi (19 MPa) according to ASTM C472 for a mix of 100 lb (45 kg) of plaster and 2 cu. ft. (0.06 cu. m) of sand. |
| E. Aggregates for Base-Coat Plasters: ASTM C35, sand and perlite. |
| 2.5 FINISH-COAT PLASTER MATERIALS |
| A. Gypsum Gaging Plaster: ASTM C28/C28M. |
| B. Gypsum Ready-Mixed Finish Plaster: Manufacturer's standard, mill-mixed, gaged, interior finish. |
| C. High-Strength Gypsum Gaging Plaster: ASTM C28/C28M, with a minimum, average, dry compressive strength of 5000 psi (34 MPa) according to ASTM C472 for a neat mix. |
| D. Gypsum Keene's Cement: ASTM C61/C61M. |
| E. Lime: ASTM C206, Type S, special finishing hydrated lime. |
| F. Lime: ASTM C206, Type N, normal finishing hydrated lime. |
| G. Aggregates for Float Finishes: ASTM C35, sand and perlite; graded according to ASTM C842. |
| 2.6 PLASTER MIXES |
| A. Mixing: Comply with ASTM C842 and manufacturer's written instructions for applications indicated. |
| B. Mix Additives: Use accelerators and retarders, if required by Project conditions, according to manufacturer's written instructions. |
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Examine substrates and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. |
| B. Proceed with installation only after unsatisfactory conditions have been corrected. |
| 3.2 PREPARATION |
| A. Protect adjacent work from soiling, spattering, moisture deterioration, and other harmful effects caused by plastering. |
| 3.3 INSTALLATION, GENERAL |
| A. Fire-Resistance-Rated Assemblies: Install components according to requirements for design designations from listing organization and publication indicated on Drawings. |
| B. STC-Rated Assemblies: Install components according to requirements for design designations from listing organization and publication indicated on Drawings. |
| C. Sound-Attenuation Blankets: Where required, install blankets before installing lath unless blankets are readily installed after lath has been installed on one side. |
| 3.4 INSTALLING EXPANDED-METAL LATH |
| A. Expanded-Metal Lath: Install according to ASTM C841. |
| 3.5 INSTALLING ACCESSORIES |
| A. General: Install according to ASTM C841. |
| 3.6 PLASTER APPLICATION |
| A. General: Comply with ASTM C842. |
| B. Bonding Compound: Apply on unit masonry and concrete substrates for direct application of plaster. |
| C. Base-Coat Plaster: |
| D. Finish Coats: |
| 3.7 PLASTER REPAIRS |
| A. Repair or replace work to eliminate cracks, dents, blisters, buckles, crazing and check cracking, dry outs, efflorescence, sweat outs, and similar defects and where bond to substrate has failed. |
| 3.8 CLEANING AND PROTECTION |
| A. Remove temporary protection and enclosure of other work after plastering is complete. Promptly remove plaster from door frames, windows, and other surfaces not indicated to be plastered. Repair floors, walls, and other surfaces stained, marred, or otherwise damaged during plastering. |