47PB0024Q0001 RFQ Amendment 03 RFQ Attach 07 PWS Exhibit 20 KPI Calculations Sample 2023 12 15.xlsx
XLSX spreadsheet 96 KB Posted
- Solicitation number
- 47PB0024Q0001
About this file
This document outlines key performance indicators (KPIs) and quality assurance surveillance plan (QASP) metrics for the operation and maintenance contract at the Murphy Federal Records Center in Waltham, MA. The contractor will be evaluated on cost control, quality, and schedule based on 11 KPIs measuring routine and emergency service requests, preventative maintenance completion, NCMMS data entry, morning and monthly reports, and building systems inventory updates. Specific performance standards and rating thresholds are provided for each KPI to determine quarterly ratings in these evaluation areas. Timeliness metrics for service requests, reports, and data entry will affect cost control and quality ratings, while preventative maintenance, data systems, and inventory management metrics impact schedule and quality ratings. Failure to meet standards in multiple KPIs may jeopardize contract award or renewal.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Murphy O&M |
| TBD |
| QASP KPIs |
| Summary Ratings |
| Metric | Metric | Metric | Metric | Metric | Base | Base | |||||||
| Key Performance Indicators | Task | Objective | Metric | Cost Control | Quality | Schedule | Max | Min | Max | Min | Max | Score | Rating |
| KPI #01: Routine Service Requests | The Contractor shall respond promptly to and complete routine work requests within 48 hours of notification (unless a written extension request is granted). | This KPI supports PBS’s efforts to remove barriers to its tenants' abilities to carry out the business of governance, by ensuring that corrective actions and / or repairs are quickly taken care of with minimal impact to facility operations. | o Green Rating: 90-100%. o Yellow Rating: 75-89%. o Red Rating: Less than 75%. | Cost Control | Quality | 100% | 90% | 89% | 75% | 74% | 81% | Yellow | |
| KPI #02: Scheduled Preventative Maintenance | The Contractor will complete all scheduled services such as PMs within the 1-month time frame and enter the data within 5 days after completion in the NCMMS. | This KPI supports PBS’s efforts to minimize unscheduled maintenance-related disruptions by ensuring that O&M contractors are conducting preventative maintenance actions in a timely, verifiable manner. | o Green Rating: Completes all scheduled PMs by the end of month (based on the average of all PMs) o Yellow Rating: Completes all scheduled PMs within 5 days of end of month (based on the average of all PMs) o Red Rating: Fails to meet Yellow Rating. | Cost Control | Schedule | 100% | 100% | Plus 5 Days | Yellow | ||||
| KPI #03: Corrective Maintenance and Repair | The Contractor will enter corrective maintenance and repair data correctly and timely in the NCMMS. | This KPI supports PBS’s efforts to implement the national NCMMS, to predict equipment failure, forecast operations/maintenance budgets, and base facilities management decisions on quantifiable data. | o Green Rating: 97 - 100% of all corrective maintenance and repair work orders list the asset for which the repair or corrective maintenance was completed. o Yellow Rating: 80 - 96% of all corrective maintenance and repair work orders list the asset for which the repair or corrective maintenance was completed. o Red Rating: Less than 80% | Quality | Schedule | 100% | 97% | 96% | 80% | 79% | 87% | Yellow | |
| KPI #04: Preventative Maintenance Schedule | The Contractor will ensure that the Preventive maintenance program data is complete and correct withing the NCMMS for all building systems equipment. All building systems equipment requiring regular recurring maintenance will have an approved Preventive Maintenance schedule set up in NCMMS. | This KPI supports PBS’s efforts to implement the national NCMMS, to predict equipment failure, forecast operations/maintenance budgets, and base facilities management decisions on quantifiable data. | o Green Rating: 97 - 100% of all assets in the NCMMS either have scheduled approved Preventive Maintenance plans in place, or are marked as run to fail. o Yellow Rating: 80 - 96% of all assets in the NCMMS either have scheduled approved Preventive Maintenance plans in place, or are marked as run to fail. o Red Rating: Less than 80% | Quality | Schedule | 100% | 97% | 96% | 90% | 89% | 83% | Red | |
| KPI #05: NCMMS Data Entry | The Contractor will enter data correctly and timely in NCMMS. | This KPI supports PBS’s efforts to implement the national NCMMS, to predict equipment failure, forecast operations/maintenance budgets, and base facilities management decisions on quantifiable data. | o Green Rating: 97 - 100% data entry based on average NCMMS data input monthly. o Yellow Rating: 80 - 96% data entry based on average NCMMS data input monthly. o Red Rating: Less than 80% | Quality | Schedule | 100% | 97% | 96% | 80% | 79% | 93% | Yellow | |
| KPI #06: Emergency Call-Backs | The Contractor will respond to Emergency Call Back requests immediately (within the shortest possible time consistent with the mechanic's location), remain on the job until the emergency situation has been secured and adequate temporary repairs have been made, and seek approval if the emergency call back is expected to take more than two hours to resolve. | This KPI supports PBS’s goal to ensure the federal workplace is ready for normal operations at required start up times by ensuring that emergency maintenance is taken care of prior to tenant’s arrival. | o Green Rating: 97 - 100% o Yellow Rating: 90 - 96% o Red Rating: Less than 90% | Cost Control | Quality | 100% | 97% | 96% | 90% | 89% | 91% | Yellow | |
| KPI #07: Urgent Services | The Contractor will respond to Urgent Work Orders within 60 minutes during normal working hours, and remain on the job until the urgent repairs have been made. | This KPI supports PBS’s efforts to remove barriers to its tenants' abilities to carry out the business of governance, by ensuring that urgent repairs are quickly resolved with minimal impact to the facilities operations. | o Green Rating: 95 - 100% o Yellow Rating: 85 - 94% o Red Rating: Less than 85% | Cost Control | Quality | 100% | 95% | 94% | 85% | 84% | 86% | Yellow | |
| KPI #08: Emergency Services | The Contractor will respond to an Emergency Work Order immediately during normal working hours and remain on the job until the emergency situation has been secured and adequate temporary repairs have been made. | This KPI supports PBS’s efforts to remove barriers to its tenants' abilities to carry out the business of governance, by ensuring that emergency repairs are quickly resolved with minimal impact to the facility’s normal operations. | o Green Rating: 97 - 100% o Yellow Rating: 90 - 96% o Red Rating: Less than 90 | Cost Control | Quality | 100% | 97% | 96% | 90% | 89% | 91% | Yellow | |
| KPI #09: Morning Reports | The Contractor will provide a detailed morning report in a timely manner to the Government Facility Manager. | This KPI supports PBS’s efforts to provide its facility managers with tools that will allow them to practice priority driven maintenance management decisions. | o Green Rating: The Contractor provides a detailed morning report within two hours of daily start up. This report will include status of the operational status of all chillers/boilers and any HVAC equipment not in operational status. o Yellow Rating: The Contractor provides the above information 95 - 99% of the time. o Red Rating: The Contractor fails to meet Green or Yellow rating. | Cost Control | Schedule | 2 hours | 99% | 95% | 94 | 7% | Red | ||
| KPI #10: Monthly Reports | The Contractor will provide the detailed monthly report in an approved format to the COR within 5 business days after the start of the subsequent month. | This KPI supports PBS’s efforts to provide its facility managers with tools that will allow them to practice priority-driven maintenance management decisions. | o Green Rating: The Contractor provides a detailed monthly report within 5 business days after the start of the subsequent month 100% of the time. o Yellow Rating: The Contractor provides the above information 95 - 99% of the time. o Red Rating: The Contractor fails to meet Green or Yellow rating. | Cost Control | Schedule | 100% | 100% | 99% | 95% | 94% | 0 | Red | |
| KPI #11: Building Inventory | The Contractor will continuously keep building systems equipment inventory up-to-date within the NCMMS. | This KPI is to ensure building equipment inventory is kept continuously up-to-date within the NCMMS. | o Green Rating: The equipment inventory and preventive maintenance schedule in the NCMMS is updated with any newly-added, replaced, or removed equipment within 15 days of installation by the Contractor. In the case of projects not completed by the Contractor, equipment inventory should be updated within 15 days of receipt of necessary information from the project team. o Yellow Rating: The equipment inventory and preventive maintenance schedule in the NCMMS is updated with any newly-added, replaced, or removed equipment within 45 days of installation by the Contractor. In the case of projects not completed by the Contractor, equipment inventory should be updated within 45 days of receipt of necessary information from the project team. o Red Rating: Equipment inventory and preventive maintenance schedule information is not updated in the NCMMS within the Yellow timeframe. | Quality | Schedule | 15 Days | 45 Days | 46 | Red |
| Base | Base | Base | Base | Base | |
| Green | Yellow | Red | Total | Rating | |
| Cost Control | 0 | 5 | 2 | 7 | Yellow |
| Quality | 0 | 6 | 2 | 8 | Red |
| Schedule | 0 | 3 | 4 | 7 | Red |
&F &A Page &P of
1. Routine
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #1: Routine Service Requests
Task: The Contractor shall respond promptly to and complete routine work requests within 48 hours of notification (unless a written extension request is granted).
Objective: This KPI supports PBS’s efforts to remove barriers to its tenants' abilities to carry out the business of governance, by ensuring that corrective actions and / or repairs are quickly taken care of with minimal impact to facility operations.
Rating: Green Rating: 90 - 100%. Yellow Rating: 75 - 89%. Red Rating: Less than 75%.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Cost Control & Quality.
| CPARS Rating Area | QASP KPI | Period | Month | Requests | Timely | Timely | Rating |
| Cost Control & Quality | Service Requests Timely Completion (Routine) | Base | August 2022 | 67 | 39 | 58.2% | Red |
| Cost Control & Quality | Service Requests Timely Completion (Routine) | Base | September 2022 | 58 | 52 | 89.7% | Yellow |
| Cost Control & Quality | Service Requests Timely Completion (Routine) | Base | October 2022 | 49 | 40 | 81.6% | Yellow |
| Cost Control & Quality | Service Requests Timely Completion (Routine) | Base | November 2022 | 59 | 44 | 74.6% | Red |
| Cost Control & Quality | Service Requests Timely Completion (Routine) | Base | December 2022 | 52 | 47 | 90.4% | Green |
| Cost Control & Quality | Service Requests Timely Completion (Routine) | Base | January 2023 | 43 | 43 | 100.0% | Green |
| Base | 328 | 265 | 80.8% | Yellow | |
| Comments |
&F &A Page &P of
2. Preventative
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #2: Scheduled Preventative Maintenance
Task: The Contractor will complete all scheduled services such as PMs within the 1-month time frame and enter the data within 5 days after completion in the NCMMS.
Objective: This KPI supports PBS’s efforts to minimize unscheduled maintenance-related disruptions by ensuring that O&M contractors are conducting preventative maintenance actions in a timely, verifiable manner.
Rating: Green Rating: Completes all scheduled PMs by the end of month (based on the average of all PMs). Yellow Rating: Completes all scheduled PMs within 5 days of end of month (based on the average of all PMs). Red Rating: Fails to meet Yellow Rating.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Cost Control & Schedule.
| CPARS Rating Area | QASP KPI | Period | Month | Created | Completed | Perf. | +5 Days | Rating |
| Cost Control & Schedule | Scheduled Preventative Maintenance | Base | August 2022 | 300 | 300 | 100.0% | Yes | Yellow |
| Cost Control & Schedule | Scheduled Preventative Maintenance | Base | September 2022 | 285 | 285 | 100.0% | Green | |
| Cost Control & Schedule | Scheduled Preventative Maintenance | Base | October 2022 | 296 | 296 | 100.0% | Green | |
| Cost Control & Schedule | Scheduled Preventative Maintenance | Base | November 2022 | 312 | 312 | 100.0% | Green | |
| Cost Control & Schedule | Scheduled Preventative Maintenance | Base | December 2022 | 328 | 328 | 100.0% | Green | |
| Cost Control & Schedule | Scheduled Preventative Maintenance | Base | January 2023 | 299 | 299 | 100.0% | Green |
| Base | 1,820 | 1,820 | 100.0% | Yes | Yellow | |
| Comments |
&F &A Page &P of
3. Corrective
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #3: Corrective Maintenance and Repair
Task: The Contractor will enter corrective maintenance and repair data correctly and timely in the NCMMS.
Objective: This KPI supports PBS’s efforts to implement the national NCMMS, to predict equipment failure, forecast operations/maintenance budgets, and base facilities management decisions on quantifiable data.
Rating: Green Rating: 97 - 100% of all corrective maintenance and repair work orders list the asset for which the repair or corrective maintenance was completed. Yellow Rating: 80 - 96% of all corrective maintenance and repair work orders list the asset for which the repair or corrective maintenance was completed. Red Rating: Less than 80%
CPARS: This metric support justification that the contractor is achieving or not achieving the CPARS evaluation factor on Schedule & Quality.
| CPARS Rating Area | QASP KPI | Period | Month | Correct | Incorrect | Pct | Rating |
| Schedule & Quality | Corrective Maintenance & Repair | Base | February 2021 | 20 | 20 | 100% | Green |
| Schedule & Quality | Corrective Maintenance & Repair | Base | March 2021 | 32 | 32 | 100% | Green |
| Schedule & Quality | Corrective Maintenance & Repair | Base | April 2021 | 21 | 21 | 100% | Green |
| Schedule & Quality | Corrective Maintenance & Repair | Base | May 2021 | 34 | 33 | 97% | Green |
| Schedule & Quality | Corrective Maintenance & Repair | Base | June 2021 | 30 | 26 | 87% | Yellow |
| Schedule & Quality | Corrective Maintenance & Repair | Base | July 2021 | 18 | 2 | 11% | Red |
| Schedule & Quality | Corrective Maintenance & Repair | Base | August 2021 | 8 | 8 | 100% | Green |
| Schedule & Quality | Corrective Maintenance & Repair | Base | September 2021 | 11 | 10 | 91% | Yellow |
| Base | 174 | 152 | 87% | Yellow | |
| Comments | |||||
| This is a measure of the percentage of CM Work Type work orders in the given period that have all required fields completed: Lead, Actual Labor, Asset, and Failure Reporting fields (Failure Code, Problem Code, Cause, and Remedy). |
&F &A Page &P of
4. Preventative Sched
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #4: Preventative Maintenance Schedule
Task: The Contractor will ensure that the Preventive maintenance program data is complete and correct withing the NCMMS for all building systems equipment. All building systems equipment requiring regular recurring maintenance will have an approved Preventive Maintenance schedule set up in NCMMS.
Objective: This KPI supports PBS’s efforts to implement the national NCMMS, to predict equipment failure, forecast operations/maintenance budgets, and base facilities management decisions on quantifiable data.
Rating: Green Rating: 97 - 100% of all assets in the NCMMS either have scheduled approved Preventive Maintenance plans in place, or are marked as run to fail. Yellow Rating: 90 - 96% of all assets in the NCMMS either have scheduled approved Preventive Maintenance plans in place, or are marked as run to fail. Red Rating: Less than 90%
CPARS: This metric support justification that the contractor is achieving or not achieving the CPARS evaluation factor on Schedule & Quality.
| CPARS Rating Area | QASP KPI | Period | Month | Pct | Rating |
| Schedule & Quality | Preventive Maintenance Schedule | Base | February 2021 | 76% | Red |
| Schedule & Quality | Preventive Maintenance Schedule | Base | March 2021 | Red | |
| Schedule & Quality | Preventive Maintenance Schedule | Base | April 2021 | 99% | Green |
| Schedule & Quality | Preventive Maintenance Schedule | Base | May 2021 | 71% | Red |
| Schedule & Quality | Preventive Maintenance Schedule | Base | June 2021 | 71% | Red |
| Schedule & Quality | Preventive Maintenance Schedule | Base | July 2021 | 71% | Red |
| Schedule & Quality | Preventive Maintenance Schedule | Base | August 2021 | 95% | Yellow |
| Schedule & Quality | Preventive Maintenance Schedule | Base | September 2021 | 95% | Yellow |
| Base | 83% | Red | |
| Comments |
&F &A Page &P of
5. NCMMS Data Entry
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #5 – NCMMS Data Entry
Task: The Contractor will enter data correctly and timely in NCMMS.
Objective: This KPI supports PBS’s efforts to implement the national NCMMS, to predict equipment failure, forecast operations/maintenance budgets, and base facilities management decisions on quantifiable data. This KPI supports PBS’s efforts to implement the national NCMMS, to predict equipment failure, forecast operations/maintenance budgets, and base facilities management decisions on quantifiable data.
Rating: Green Rating: 97 - 100% data entry based on average NCMMS data input monthly. Yellow Rating: 80 - 96% data entry based on average NCMMS data input monthly. Red Rating: Less than 80%
CPARS: This metric support justification that the contractor is achieving or not achieving the CPARS evaluation factor on Schedule & Quality.
| CPARS Rating Area | QASP KPI | Period | Month | Correct | Incorrect | Total | Pct | Rating |
| Schedule & Quality | NCMMS Data Entry | Base | August 2022 | 49 | 7 | 56 | 87.50% | Yellow |
| Schedule & Quality | NCMMS Data Entry | Base | September 2022 | 60 | 0 | 60 | 100.00% | Green |
| Schedule & Quality | NCMMS Data Entry | Base | October 2022 | 59 | 14 | 73 | 80.82% | Yellow |
| Schedule & Quality | NCMMS Data Entry | Base | November 2022 | 63 | 2 | 65 | 96.92% | Yellow |
| Schedule & Quality | NCMMS Data Entry | Base | December 2022 | 500 | 15 | 515 | 97.09% | Green |
| Schedule & Quality | NCMMS Data Entry | Base | January 2023 | 51 | 25 | 76 | 67.11% | Red |
| Base | 782 | 63 | 845 | 92.54% | Yellow | |
| Comments |
&F &A Page &P of
6. Emergency CB
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #6: Emergency Call Back Requests
Task: The Contractor will respond to Emergency Call Back requests immediately (within the shortest possible time consistent with the mechanic's location), remain on the job until the emergency situation has been secured and adequate temporary repairs have been made, and seek approval if the emergency call back is expected to take more than two hours to resolve. Final repairs shall be completed within 48 hours (continuous time, including after hours and weekends) from identification of the problem unless an extension is approved by the CO or designee.
Objective: This KPI supports PBS’s goal to ensure the federal workplace is ready for normal operations at required start up times by ensuring that emergency maintenance is taken care of prior to tenant’s arrival.
Rating: Green Rating: 97 - 100%. Yellow Rating: 90 - 96%. Red Rating: Less than 90%.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Cost Control & Quality.
| CPARS Rating Area | QASP KPI | Period | Day | Description | ECBR | Timely | Succ | T/S |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 10/5/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 10/15/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 11/7/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 11/19/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 12/1/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 12/9/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 12/11/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 12/13/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 12/14/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 12/20/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Response (Emergency) | Base | 12/24/22 | Gate Arm Spewing Oil | 1 | Yes | No |
| Base | 11 | 10 | ||
| 90.9% | ||||
| Rating | Yellow | |||
| Comments |
&F &A Page &P of
7. Urgent
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #7: Urgent Service Requests
Task: The Contractor will respond to Urgent Work Orders within 60 minutes during normal working hours, and remain on the job until the urgent repairs have been made.
Objective: This KPI supports PBS’s efforts to remove barriers to its tenants' abilities to carry out the business of governance, by ensuring that urgent repairs are quickly resolved with minimal impact to the facilities operations.
Rating: Green Rating: 95 - 100%. Yellow Rating: 85 - 94%. Red Rating: Less than 85%.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Cost Control & Quality.
| CPARS Rating Area | QASP KPI | Period | Month | USR | Timely | Perf. | Rating |
| Cost Control & Quality | Service Requests Timely Completion (Urgent) | Base | August 2022 | 20 | 19 | 95.00% | Green |
| Cost Control & Quality | Service Requests Timely Completion (Urgent) | Base | September 2022 | 8 | 8 | 100.00% | Green |
| Cost Control & Quality | Service Requests Timely Completion (Urgent) | Base | October 2022 | 47 | 43 | 91.49% | Yellow |
| Cost Control & Quality | Service Requests Timely Completion (Urgent) | Base | November 2022 | 100 | 85 | 85.00% | Yellow |
| Cost Control & Quality | Service Requests Timely Completion (Urgent) | Base | December 2022 | 200 | 169 | 84.50% | Red |
| Cost Control & Quality | Service Requests Timely Completion (Urgent) | Base | January 2023 | 2 | 1 | 50.00% | Red |
| Base | 377 | 325 | 86.21% | Yellow | |
| Comments |
&F &A Page &P of
8. Emergency
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #8: Emergency Service Requests
Task: The Contractor will respond to an Emergency Work Order immediately during normal working hours and remain on the job until the emergency situation has been secured and adequate temporary repairs have been made. Final repairs shall be completed within 48 hours (continuous time, including after hours and weekends) from identification of the problem unless an extension is approved by the CO or designee.
Objective: This KPI supports PBS’s efforts to remove barriers to its tenants' abilities to carry out the business of governance, by ensuring that emergency repairs are quickly resolved with minimal impact to the facility’s normal operations.
Rating: Green Rating: 97 - 100%. Yellow Rating: 90 - 96%. Red Rating: Less than 90%.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Cost Control & Quality.
| CPARS Rating Area | QASP KPI | Period | Day | Description | ESR | Timely | Succ | T/S |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 10/5/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 10/15/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 11/7/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 11/19/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 12/1/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 12/9/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 12/11/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 12/13/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 12/14/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 12/20/22 | Leaking Water Pump | 1 | Yes | Yes | 1 |
| Cost Control & Quality | Service Requests Timely Completion (Emergency) | Base | 12/24/22 | Gate Arm Spewing Oil | 1 | Yes | No |
| Base | 11 | 10 | ||
| 90.9% | ||||
| Rating | Yellow | |||
| Comments |
&F &A Page &P of
9. Morning Reports
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #9: Morning Reports
Task: The Contractor will provide a detailed morning report in a timely manner to the Government Facility Manager.
Objective: This KPI supports PBS’s efforts to provide its facility managers with tools that will allow them to practice priority driven maintenance management decisions.
Rating: Green Rating: The Contractor provides a detailed morning report within two hours of daily start up. This report will include status of the operational status of all chillers/boilers and any HVAC equipment not in operational status. Yellow Rating: The Contractor provides the above information 95 - 99% of the time. Red Rating: The Contractor fails to meet Green or Yellow rating.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Cost Control & Schedule.
| CPARS Rating Area | QASP KPI | Period | Week of | Req. | Sbmtd | Correct | Sub/Corr | Rating |
| Cost Control & Schedule | Morning Reports | Base | August 1, 2022 | 5 | 4 | 4 | 80% | Red |
| Cost Control & Schedule | Morning Reports | Base | August 8, 2022 | 5 | 5 | 5 | 100% | Green |
| Cost Control & Schedule | Morning Reports | Base | August 15, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | August 22, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | August 29, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | September 5, 2022 | 4 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | September 12, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | September 19, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | September 26, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | October 3, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | October 10, 2022 | 4 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | October 17, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | October 24, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | October 31, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | November 7, 2022 | 4 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | November 14, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | November 21, 2022 | 4 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | November 28, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | December 5, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | December 12, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | December 19, 2022 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | December 26, 2022 | 4 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | January 2, 2023 | 4 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | January 9, 2023 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | January 16, 2023 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | January 23, 2023 | 5 | 0 | 0 | 0% | Red |
| Cost Control & Schedule | Morning Reports | Base | January 30, 2023 | 5 | 0 | 0 | 0% | Red |
| Req. | Sbmtd | Correct | Sub/Corr | ||
| Base | 129 | 9 | 9 | 7% | Red |
Comments
&F &A Page &P of
10. Monthly Reports
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #10: Monthly Reports
Task: The Contractor will provide the detailed monthly report in an approved format to the COR within 5 business days after the start of the subsequent month.
Objective: This KPI supports PBS’s efforts to provide its facility managers with tools that will allow them to practice priority-driven maintenance management decisions.
Rating: Green Rating: The Contractor provides a detailed monthly report within 5 business days after the start of the subsequent month 100% of the time. Yellow Rating: The Contractor provides the above information 95 - 99% of the time. Red Rating: The Contractor fails to meet Green or Yellow rating.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Cost Control & Schedule.
| CPARS Rating Area | QASP KPI | Period | Month | Timely | Correct | Rating |
| Cost Control & Schedule | Monthly Reports | Base | February 2021 | Yes | No | Red |
| Cost Control & Schedule | Monthly Reports | Base | March 2021 | Yes | No | Red |
| Cost Control & Schedule | Monthly Reports | Base | April 2021 | Yes | No | Red |
| Cost Control & Schedule | Monthly Reports | Base | May 2021 | Yes | No | Red |
| Cost Control & Schedule | Monthly Reports | Base | June 2021 | Yes | No | Red |
| Cost Control & Schedule | Monthly Reports | Base | July 2021 | Yes | No | Red |
| Cost Control & Schedule | Monthly Reports | Base | August 2021 | Yes | No | Red |
| Cost Control & Schedule | Monthly Reports | Base | September 2021 | Yes | No | Red |
| Req. | T/C | T/C | |||
| Base | 8 | 0 | 0.0% | Red | |
| Comments |
&F &A Page &P of
11. Building Inventory
| Murphy O&M |
| TBD |
| QASP KPIs |
KPI #11: Building Inventory
Task: The Contractor will continuously keep building systems equipment inventory up-to-date within the NCMMS.
Objective: This KPI is to ensure building equipment inventory is kept continuously up-to-date within the NCMMS.
Rating: Green Rating: The equipment inventory and preventive maintenance schedule in the NCMMS is updated with any newly added, replaced, or removed equipment within 15 days of installation by the Contractor. In the case of projects not completed by the Contractor, equipment inventory should be updated within 15 days of receipt of necessary information from the project team. Yellow Rating: The equipment inventory and preventive maintenance schedule in the NCMMS is updated with any newly added, replaced, or removed equipment within 45 days of installation by the Contractor. In the case of projects not completed by the Contractor, equipment inventory should be updated within 45 days of receipt of necessary information from the project team. Red Rating: Equipment inventory and preventive maintenance schedule information is not updated in the NCMMS within the Yellow timeframe.
CPARS: This metric supports justification that the Contractor is achieving or not achieving the CPARS evaluation factor on Schedule & Quality.
| CPARS Rating Area | QASP KPI | Period | Asset Number | Equipment | Install Date | Updated | Days | Rating |
| Schedule & Quality | Building Inventory | Base | All Cafeteria Equipment | 2/1/21 | 2/15/21 | 14 | Green | |
| Schedule & Quality | Building Inventory | Base | All BAS Assets | 2/1/21 | 2/28/21 | 27 | Yellow | |
| Schedule & Quality | Building Inventory | Base | Garage Exhaust System | 2/1/21 | 4/2/21 | 60 | Red | |
| Schedule & Quality | Building Inventory | Base | Childcare Equipment Assets | 2/1/21 | Never | Never | Red | |
| Schedule & Quality | Building Inventory | Option 1 | All Cafeteria Equipment | 9/1/21 | Never | Never | Red | |
| Schedule & Quality | Building Inventory | Option 1 | All BAS Assets | 9/1/21 | Never | Never | Red | |
| Schedule & Quality | Building Inventory | Option 1 | Garage Exhaust System | 9/1/21 | Never | Never | Red | |
| Schedule & Quality | Building Inventory | Option 1 | Childcare Equipment Assets | 9/1/21 | Never | Never | Red |
| Yellow | Red | Rating | ||
| Base | 1 | 2 | Red | |
| Comments |